1 TOWNSHIP OF KING, ONTARIO ASSET MANAGEMENT PLAN September 2013 Drafted by: Subject matter leads: StraNexus Inc. Director of Finance & Treasurer Tel: Director of Engineering, Public Works & Building Manager Engineering

2 Version control Version number 1.0 Major changes Submitted by Reviewed by Approved by 1 st release of the Asset Management Plan completed for roads and bridges Director of Finance & Treasurer Director of Engineering, Public Works & Building Chief Administrative Officer Date of release (dd-mmm-yy) -Dec-2014 Township of King Asset Management Plan 1 P age

3 Table of contents 1. EXECUTIVE SUMMARY INTRODUCTION STATE OF LOCAL INFRASTRUCTURE Transportation Infrastructure Roads inventory Roads condition Roads deficit Bridges and Culverts inventory Bridges and Culvert condition Bridges and Culvert deficit SERVICE LEVELS Transportation Infrastructure ASSET MANAGEMENT STRATEGY Strategic framework Project-based activities Business-as-usual activities year roadmap FINANCIAL STRATEGY Township of King Asset Management Plan 2 P age

4 1. EXECUTIVE SUMMARY As infrastructure ages, while the Township of King continues to experience growth, it becomes essential to understand all our assets and plan on a long term basis the strategic direction, and corresponding funding models to be able to manage our assets and sure the desired service levels are being met. Assets generally fall under 5 asset classes 1 Facilities and buildings, 2 Fleet or mobile equipment, 3 Infrastructure, 4 Equipment, and 5 IT. The Township s major assets includes: roads and bridges, water distribution and wastewater collection, waste management (collection), disposal and recycling, recreation facilities, parks, and emergency services (fire). It also includes a collection of administration facilities for fire, operations, and other service departments. In addition, it includes a collection of fleet for our parks, operations and fire & emergency services. This plan incorporates the infrastructure asset class and more specifically roads, bridges and culverts. As studies for other assets are conducted, they can be added to this plan, until all 5 asset classes as stated above have been captured and can be managed on a long-term progressive manner. This plan is guided by the Township s Integrated Community Sustainability Plan a document for all decision making, including references to sustainable asset management in all four pillars of Environmental; Economic; Socio-Cultural; and Financial. The average Structural Adequacy rating for the current King Township road system was identified as 13.9 out of a maximum value of 20 as per the 2011 Roads Needs Report. A Structural Adequacy of 15.0 is reflective of a road network at approximately 69% of its as new condition which is considered acceptable. The condition of the existing road network is distributed as follows: 9.7 % with Major Rehabilitation Needs 23.7 % with Resurfacing Needs 66.6 % of roads are currently considered Adequate Township of King Asset Management Plan 3 P age

5 As per the 2011 Roads Needs Report, Bridge and Culverts structures are generally in good condition with moderate deterioration. Approximately 60% of Bridge and Culvert structures need some form of improvement of which 45-50% has a more immediate need. The difference between capital and operational cost, with similar historic funding sources led to an approximate short fall projection of $3.7M in 2014, emphasis will have to be place on financing strategies to bridge the gap. Key strategies could include but are not limited to, applying a portion of annual assessment growth to the financing of roads and bridges; extending the useful life of the assets where applicable; deferring of projects; increasing taxes; debenture financing; partnering with the region of York to perform rehabilitation work concurrently and uploading roads to the region where possible This Plan was developed with lead resources from Finance, Engineering and Public Works, and input from Information Technology, Parks, Recreation and Culture, Fire and Emergency Services, Planning, CAO, and research from other similar municipalities. Budgets were built based on current and future needs with little influence from past expenditures and with the assumptions that there were no financial constraints. Considerations were given to non-infrastructure solutions; maintenance activities; renewal/rehabilitation activities; replacement activities; disposal activities; expansion activities; procurement methods and desired service levels. Township of King Asset Management Plan 4 P age

6 2. INTRODUCTION King Township is one of the nine municipalities that make up the Regional Municipality of York. It encompasses the villages and hamlets of: Ansnorveldt, Kettleby, King City, Laskay, Lloydtown, Nobleton, Pottageville, Schomberg and Snowball. The Township is easily accessible by Highways 400, 407, 27 and 9, and is 30 minutes from Toronto s Pearson International Airport. The Township has a population that surpasses 20,000 people and is projected to grow to 35,000 people by An important asset of King Township is its strong rural economy and agricultural sector, which depends upon the Holland Marsh's deep fertile soils and rich growing season. About 60% of the Holland Marsh, also known as 'Ontario's Vegetable Basket' is found in King. The Province of Ontario requires Asset Management Plans to be completed for the priority infrastructure assets of Roads, Bridges, and Water and Wastewater Systems. The Township of King s Asset Management Plan and activities have been driven in the past by regulatory compliance, establishment of a 10-year Capital Works Program, Local Improvement Projects and the annual budget approval process. In the past these exercises have been conducted within the various asset classes and prioritization of capital works and rehabilitation programs have been conducted according to available funding from taxation, rates (water and sewer), and local improvement charges. This Plan will deliver on the Province of Ontario requirements for roads and bridges, and more importantly will be used as a reference document to support funding requests to council and provide direction to municipal staff on how best to maintain assets such that they provide the desired levels of service in a sustainable manner while managing risk at the lowest lifecycle cost. Key considerations were given to customer satisfaction, employee satisfaction, operational excellence, risk management and financial stewardship. The Plan is built over a ten year period, and it is recommended that it be updated at every Council term commencement (every four years). Township of King Asset Management Plan 5 P age

7 3. STATE OF LOCAL INFRASTRUCTURE This section discusses the current inventory and condition of assets owned by the Township of King. The inventory data was extracted from the 2012 PSAB registry and 2012 Reserve Strategy Analysis documents. The condition assessment data was obtained from the 2011 Road Needs Report, which covers roads, bridges and culverts. Asset inventory data is presented in tabular format with the headings explained below: Classification: each asset type is classified based on material or other criteria specific to the asset. Asset component: some assets are made up of different components for example Roads surface and Roads Base. Surface type: examples include gravel, surface treatment, and pavement. Length: measured in kilometers for linear assets. Quantity: number of items. Financial value: represents the depreciated value of each asset, considering its age, calculated based on the net book closing value. Replacement cost: estimate of the costs to replace the asset today, including material, labour, and all other costs necessary for the full replacement of that asset. As more information is made available about the circumstances for each asset, the replacement cost can be adjusted to reflect the cost impact. Age distribution: breakdown of the asset s age into different age ranges. The asset age was determined by subtracting the year of construction/purchase from 2012 Useful life: estimate value primarily used for accounting purposes, since the actual life of the assets could be lower or higher. It represents the full average expected lifespan from the date of installation of an asset as per PSAB, under typical in-service conditions, before it needs to be replaced. It Township of King Asset Management Plan 6 Page

8 is of importance that the useful life should not be considered in isolation of the asset condition, as an asset may have gone beyond its useful life but continues to remain structurally adequate. As more information becomes available about the condition of the asset, the useful life value can be adjusted accordingly. In this document, the useful life for each asset type was divided into appropriate ranges in order to provide a better understanding of the asset age distributions Transportation Infrastructure The Township of King s transportation infrastructure consists of linear roads, associated linear assets such as curbs and sidewalks, non-linear assets such as street lights, and transportation structures such as bridges and culverts. The component breakdown of these assets aligns with the financial reporting requirements under PSAB Roads inventory Table 1. Asset Component Roads Base (PSAB) Classification Rural Semi-urban Financial Replacement Age distribution (km) Surface Length value cost type (km*) (2012) (2012) yrs. yrs. yrs. yrs. yrs. Gravel N/A $62,597, Surface treatment $1,366,086 $27,011, Pavement $7,966,776 $50,207, Gravel 1.54 N/A $972, Surface treatment 0.13 N/A $82, Pavement $2,231,353 $25,369, Urban Pavement $6,155,198 $34,749, Total $17,719,413 $200,990, *Centerline-kilometer Useful life (yrs.) 45 Township of King Asset Management Plan 7 P age

9 Table 2. Asset Component Roads Roads Surface (PSAB) Classification Financial Replacement Age distribution (km) Surface Length value cost type (km*) (2012) (2012) yrs. yrs. yrs. yrs. Rural Gravel N/A $368, Rural Surface treatment N/A $3,291, Rural Pavement $945,616 $21,373, Semi-urban Gravel 1.54 N/A $4, Semi-urban Surface treatment 0.13 N/A $36, Semi-urban Pavement $371,049 $11,310, Urban Pavement $1,876,340 $15,465, Total $2,247,389 $51,849, *Centerline-kilometer Useful life (Yrs.) Roads condition The average Structural Adequacy rating for the current Township of King road system was identified as 13.9 out of a maximum value of 20 as per the 2011 Roads Needs Report. A Structural Adequacy of 15.0 is reflective of a road network at approximately 69% of its as new condition which is considered acceptable. The condition of the existing road network is distributed as follows: 9.7 % with Major Rehabilitation Needs 23.7 % with Resurfacing Needs 66.6 % of roads are currently considered Adequate This means that 1/3 of the roads within in the Township are currently in need of some level of rehabilitation or resurfacing or will have a need in the very near future. Township of King Asset Management Plan 8 P age

10 Construction per km benchmark costs were developed for typical reconstruction and resurfacing improvements based on current unit prices approved by the Township. The condition of the existing road network is shown in Tables 3 and 4. Table 3. Road network condition - Major Rehabilitation Needs (2011 Roads Needs Report) Classification Surface type length (km) Cost ($) Rural Gravel 0.8 $113,200 Rural Surface treatment 7.16 $5,116,000 Rural Pavement 8.86 $4,277,000 Semi-urban Surface treatment 0.13 $82,400 Semi-urban Pavement 9.58 $7,334,900 Urban Pavement 2.56 $3,216,100 Total $20,026,200 Table 4. Road network condition - Resurfacing Needs (2011 Roads Needs Report) Classification Surface type length (km) Cost ($) Rural Gravel 6.5 $36,050 Rural Surface treatment $1,203,550 Rural Pavement 24 $2,614,200 Semi-urban Surface treatment 1.29 $175,800 Semi-urban Pavement $1,380,300 Urban Pavement $5,361,500 Total $10,771,400 Township of King Asset Management Plan 9 P age

11 Tables 5-7 below show the costs required to bring all roads back up to as-new condition as of Although it is not financially feasible for the municipality to eliminate all its road needs, the cost value of the needs provides a basis for assessing future requirements for maintaining the road network. Table 5. Summary of roads needs Now (2011 Roads Needs Report) Classification Surface type length (km) Cost ($) Rural Gravel 7.3 $149,250 Rural Surface treatment 7.91 $5,122,250 Rural Pavement $4,520,000 Semi-urban Surface treatment 0.13 $82,400 Semi-urban Pavement 12.7 $7,535,700 Urban Pavement 2.77 $3,221,900 Total $20,631,500 Table 7. Summary of roads needs years (2011 Roads Needs Report) Classification Surface type length (km) Cost ($) Rural Surface treatment 4.43 $406,300 Rural Pavement 4.63 $507,500 Semi-urban Surface treatment 1.29 $175,800 Semi-urban Pavement 4.17 $583,000 Urban Pavement $3,899,300 Total $5,571,900 Table 6. Summary of roads needs years (2011 Roads Needs Report) Classification Surface type length (km) Cost ($) Rural Surface treatment 8.53 $791,000 Rural Pavement $1,863,700 Semi-urban Pavement 4.38 $596,500 Urban Pavement 3.77 $1,456,400 Total $4,707,600 Table 8. Summary of roads needs cost (2011 Roads Needs Report) Time Cost ($) Now $20,631, yrs. $4,707, yrs. $5,571,900 Total $30, 911,00 Township of King Asset Management Plan 10 P age

12 Roads deficit Since the 2011 Roads Needs Report, there has been activity to rehabilitate, resurface and replace the Townships roads network. Table 9 provides a breakdown of the dollars spent in 2011, 2012 and budgeted for in Table 9. Summary of expenditures Paved roads Activity Year (budgeted) Renewal/rehabilitation activities significant repairs designed to extend the life of the asset. $566,474 $84,261 $215,000 Replacement activities activities that are expected to occur once an asset has reached the end of its useful life and renewal/ rehabilitation is $944,168 $2,022,103 $4,689,179 no longer an option. Total $1,510,642 $2,106,364 $4,904,179 Total actual expenditures for 2011, 2012 and budgeted 2013 amount to $8.5 Mil. Based on the 2011 Roads Needs Report, $30, 9 Mil was recommended to bring 1/3 of the roads network back to as new condition. As mentioned above, it is not financially feasible for the municipality to eliminate all roads, however there is an approximate $22.4 Million that should be planned for over the next 10 years to ensure optimal lifecycle management of the roads network. Township of King Asset Management Plan 11 P age

13 Bridges and Culverts inventory Table 10. Bridge inventory (PSAB) Asset component Length (m) Financial value (2012) Replacement cost (2012) Age distribution (m) yrs. yrs. yrs. yrs. yrs. Deck $1,573,360 $7,605, Structure N/A $7,000,115 $19,911,693 N/A N/A N/A N/A N/A 75 Useful life (yrs.) Table 11. Culverts inventory (PSAB) Financial Replacement Age distribution (m) Useful Length Classification value cost life (m) (2012) (2012) (yrs.) yrs. yrs. yrs. yrs. yrs. yrs. Steel 144 $2,263,680 $14,269, Concrete $1,351,759 $3,543, $3,615,439 $17,813, Bridges and Culvert condition As per the 2011 Roads Needs Report, Bridge and Culverts structures are generally in good condition with moderate deterioration. Approximately 60% of Bridges and Culvert structures need some form of improvement, out of which 45-50% have a more immediate need. Tables 12 and 13 below show improvements required as of Township of King Asset Management Plan 12 P age

14 Table 12. Summary of Bridge needs 2011 Roads Needs Report Time of need for Type of Improvement Improvement (codes defined in table 14 below) Length (m) Cost Now IAG, SPI, REB and RSL $405, Years WSR, RSP, OTH, REB, and RSL $2,542, Year CDS, IAG, SPI, PWP, CSS, RIR and REB $873,700 Total $ 3,821,725 Table 13. Summary of Culvert needs 2011 Roads Needs Report Time of Need for Type of Improvement Length Improvement (codes defined in table 14 below) (m) Cost Now SPI, IAG, RSL and REC $1,415, Years IAG, RSP, SPI, REC and RSL $2,061, Year REC, RSL, ERI and SPI $1,056,454 Total 99.3 $4,532,649 Table 14. Type of bridge/culvert improvement descriptions 2011 Roads Needs Report Type of Improvement IAG SPI REB RSL WSR RSP OTH CDS PWP CSS RIR Description INSTALL APPROACH GUIDERAILS SCOUR PROTECTION IMPROVEMENT REMOVE EXISTING BRIDGE REPLACE BRIDGE - SAME LOCATION WEARING SURFACE REHABILITATION REHABILITATE SUPERSTRUCTURE OTHER CONCRETE DECK SOFFIT REPAIRS PATCH, WATERPROOF & PAVE COAT STRUCTURAL STEEL RAILING IMPROVEMENT / REPLACEMENT Township of King Asset Management Plan 13 P age

15 Bridges and Culvert deficit Since the 2011 Roads Needs Report, there has been activity to repair and replace the Townships Bridges and culverts. Table 15 provides a breakdown of the dollars spent in 2011, 2012 and budgeted for in Table 15. Summary of expenditures Bridges and Culverts Year (budgeted) $973,389 $449,501 $800,000 Total improvement expenditures for 2011/2012 (actual) and 2013 (budgeted) amount to $2.2 Mil. Based on the 2011 Roads Needs Report, $8.4 Mil was recommended for Bridge and Culvert improvements hence approximately $6.2Mil should be planned for over the next 10 years to ensure optimal lifecycle management of the Townships Bridges and Culverts. Township of King Asset Management Plan 14 P age

16 4. SERVICE LEVELS Service levels are commitments to carry out certain asset-related actions within a specified time frame. Similar to the previous section, data is presented in a tabular format. Each table is composed of the following general headings: Performance criteria: classification of service levels into different themes, such as condition, responsiveness, cost (affordability), capacity and legislative requirements. Current service level: describes the existing level of service for that specific activity. Objective reference: links the service to a particular objective in the strategy matrix to ensure alignment with the asset management strategy. Desired service levels: describes the service level that can be realistically achieved. It is broken down into minimum, maximum, realistic and stretch goal target levels. The minimum and maximum determine the parameters of the target service levels. The realistic and stretch goal describe what the Township of King will likely achieve and what the future state longer term stretch goals are that will achieve service level excellence and provide inspirational directional focus for the service providers (internal or external). Timeframe to achieve desired levels: time it would take to reach the desired realistic level of service if not currently there. External factors: discusses external trends or issues that may affect expected levels of service and the municipality s ability to meet them. Township of King Asset Management Plan 15 P age

17 4.1. Transportation Infrastructure The following table provides a summary of the road network service levels agreed upon by the senior management team. Table 166 Transportation infrastructure services levels Transportation infrastructure service levels Objective Desired service level Performance Current service level reference Min Max Realistic Stretch criteria goal Timeframe to achieve desired realistic levels External issues that affect service levels Responsiveness Customer (citizens) concerns are acknowledged within the next business day Operational response times follow the Minimum Maintenance Standards (MMS) Traffic calming resolved within 2 years 20-30% of the time, customers (citizens) are notified once their concerns have been addressed 1 - B Customer (citizens) concerns are acknowledged within the next business day 3 - B Operational response times follow the Minimum Maintenance Standards (MMS) 3 - B Traffic calming resolved within 2 years 1 - B 100% of the time, customers (citizens) are notified once their concerns have been Township of King Asset Management Plan 16 P age

18 Transportation infrastructure service levels Objective Desired service level Performance Current service level reference Min Max Realistic Stretch criteria goal addressed Timeframe to achieve desired realistic levels External issues that affect service levels Cost/Affordability The total cost of maintenance activities is within the budget The budget covers less than 100% of the assets lifecycle costs 5 - A The total cost of maintenance activities is within the budget 5 - A The budget covers 100% of the assets lifecycle costs Condition A complete Road/Structure Needs study every 2 years 3 - B A complete Road/Structure Needs study every 2 years Currently not in place 3 - B Annual Pavement Condition Index survey On-going road repair (Pot holes, asphalt patching) based on the minimum maintenance 3 - B On-going road repair (Pot holes, asphalt patching) based on the Township of King Asset Management Plan 17 P age

19 Transportation infrastructure service levels Objective Desired service level Performance Current service level reference Min Max Realistic Stretch criteria goal legislative standards minimum maintenance legislative standards Informal inspection 3 - B Annual sidewalk inspection Annual ditch maintenance 3 - B Annual ditch maintenance Annual line painting 3 - B Annual line painting Annual guide rails informal assessment 3 - B Annual guide rails formal Annual sign reflectivity informal inspection Biannual control of vegetation growth As per patrol schedule requirements (based on the minimum maintenance legislative standards) Annual tree maintenance assessment 3 - B Annual sign reflectivity formal inspection 3 - B Biannual control of vegetation growth 3 - B Annual shoulder maintenance 3 - B Annual tree maintenance Timeframe to achieve desired realistic levels External issues that affect service levels Staff/resource levels Township of King Asset Management Plan 18 P age

20 Transportation infrastructure service levels Objective Desired service level Performance Current service level reference Min Max Realistic Stretch criteria goal Condition driven based on road patrols, informal inspection and customer calls Bi-annual gravel application to gravel roads 3 - B Gravel roads grading (once a month on average) 3 - B Bi-annual gravel application to gravel roads Timeframe to achieve desired realistic levels External issues that affect service levels Annual ditch maintenance Annual dust suppressant Annual street lighting condition inspection Street lighting bulb replacement within 72 hours of being reported Condition driven based on road patrols and informal inspection 3 - B Annual ditch maintenance 3 - B Annual dust suppressant 3 - B Annual street lighting condition inspection 3 - B Street lighting bulb replacement within 72 hours of being reported 3 - B Schedule surface treatment based on age, condition and formal inspection Contractor delays Contractor delays Township of King Asset Management Plan 19 P age

21 Transportation infrastructure service levels Objective Desired service level Performance Current service level reference Min Max Realistic Stretch criteria goal Condition driven based on road patrols and informal inspection Winter maintenance (sand, salt and plowing) based on road patrol and maintenance standards 3 - B Scheduled crack sealing based on age, condition and formal inspection 3 - B Winter maintenance (sand, salt and plowing) based on road patrol and maintenance standards Issue-driven 3 - B Curbs condition inspection every 2 years Timeframe to achieve desired realistic levels External issues that affect service levels Staff/resource levels Capacity Road uploaded (to the region) as needed 5 - B Road class matches the road volume (based on Road Needs study) Compliance to the Region's criteria for road uploading and political constraints (council unwilling to relinquish authority) Township of King Asset Management Plan 20 P age

22 Transportation infrastructure service levels Objective Desired service level Performance Current service level reference Min Max Realistic Stretch criteria goal In progress 4 - C Transportation Master Plan development every 5 years Timeframe to achieve desired realistic levels External issues that affect service levels Consultant delays Legislative compliance 100% compliant 4 - C 100% compliant Timing of the legislation, financial constraints Township of King Asset Management Plan 21 P age

23 5. ASSET MANAGEMENT STRATEGY 5.1. Strategic framework The following tables are the Asset Management Strategic framework by organizational drivers. Note: to get a complete picture of the framework and its status, refer to the working copy excel document Township of King Asset Management Strategic Framework. Driver (1): Customer Satisfaction Quote from Community Sustainability Plan Goal (1): To take a proactive approach in meeting or exceeding public needs and level of service. Table 177 Strategic framework for Driver 1Customer Satisfaction and respective Goal 1 Objectives Performance measures Baseline value Targets Y1 Y2 Y3 Action items (1-A) To keep assets in such condition that creates a sense of pride in community % response to customer surveys % of community attendance at community events 40% 50% 70% 90% To determine the baseline measures Satisfaction rating derived from Develop satisfaction ratings community surveys and user groups Capacity utilization 95% Annual average number of online transactions per members Annual Number of complaints on asset condition by asset class Number of online members Develop survey questions focused on pride Log complaints by asset type and location in CRM (1-B) To deal Average initial response time to business Township of King Asset Management Plan 22 P age

24 Objectives with public inquiries and concerns by providing relevant and accurate information in a timely and professional manner (1-C) To maximize the utility obtained from assets while providing best value for tax dollar Performance measures public inquiries Average time to resolve public inquiries by asset type Average time to deliver final response Customer satisfaction rating as it relates to accuracy, timeliness and relevance % of available time the asset was in use $ value (replacement value) of assets that exceeded the planned life cycle % of assets that exceeded the planned life cycle and continues to perform satisfactorily Baseline value business day 1 business day of completi on Targets Y1 Y2 Y3 busine ss day 1 busine ss day of compl etion business day 1 business day of completi on day 1 business day of completion 3 5 Action items 100% Develop Council approved policies and service levels that provide value for money 10% Township of King Asset Management Plan 23 P age

25 Driver (2): Employee Satisfaction Goal (2): To create a workplace where empowered employees thrive on purposeful work accompanied by well-defined roles and responsibilities, while receiving guidance to ensure progress towards the intended objectives. Table 188 Strategic framework for Driver 2Employee Satisfaction and respective Goal 2 Objectives Performance measures Baselin e value Targets Y1 Y2 Y3 Action items (2-A) To ensure staff have the right parts, tools, and contextual information to do purposeful work Number of trips away from the worksite to obtain parts and tools In stock % of high demand parts and materials # of hours waiting for locate information # of hours, equip or tools that are out of service for unplanned maintenance GPS logs on all vehicles Develop an inventory management system for parts, tools and materials Integrate GIS information when creating work orders (2-B) To ensure staff have clarity of roles and responsibilities, and are empowered to manage assets in a manner that each employee feels pride of ownership % response to employee surveys (targeted in relation to Asset Mgmt.) % of employees that are satisfied with their work environment re. (tools, parts, materials, contextual info etc.) # of call backs for the same problem % of employee initiated job description reviews % of work orders with more than 1 call back for the same problem Implement a work order management system detailing out of service hours, repairs, required tools and parts Targeted employee survey re. current job descriptions, SOPs, training Provide a framework for allowing employees to give feedback on how to make things better Focused employee satisfaction survey re. Asset Management Township of King Asset Management Plan 24 P age

26 Objectives Performance measures Baselin e value Targets Y1 Y2 Y3 Action items (2-C) To foster a learning environment to support staff in their work and in dealing with the public # of opportunities for professional development Implement a performance management program Need action items around "Purposeful", i.e., making sure we always ask why -- 2 parts are training on the big picture (e.g., why are they putting in the work order data such as problem / cause / action codes), and using systems that help analyze the why/start/stop. Allocate an annual budget for Asset Mgmt. training and development Township of King Asset Management Plan 25 P age

27 Driver (3): Operational Excellence Goal (3): To better manage assets throughout their lifecycle in such a manner that optimizes capacity, Table 199 Strategic framework for Driver 3Operational Excellence and respective Goal 3 Objectives Performance measures Baseline value Targets Y1 Y2 Y3 Action items (3-A) To optimize utilization of capacity, asset versatility, and service levels through excellence in design, planning, procurement and implementation #/%/$ value of projects that are undertaken through partnerships with 3rd parties ( e.g. Sport assoc. community assoc. municipalities, private sector) Implement one CMMS for all asset classes Develop a work program including maintenance policies for each asset/component (i.e., fail-based vs. condition-based vs. use-based maintenance), job plans (incl frequency, trigger, procedures, performance and quality standards, safety procedures, standard parts, tools), starting with critical assets Have a design charter...such that needs of the frontline staff are documented and met and are incorporated in the ultimate design and that the designer has clearly articulated what has been planned and designed (3-B) To Schedule compliance - % of Tracking device to manage and Township of King Asset Management Plan 26 P age

28 Objectives optimize asset lifecycle through the implementation of best management practices for operation, maintenance, rehabilitation and disposal (3-C) To optimally manage the complete supply chain for parts and material (3-D) To be a leader in asset sustainability, while balancing environmental and fiscal responsibilities Performance measures time maintenance and inspections are completed as scheduled % of assets that fail prior to planned life cycle % inspections in compliance to regulatory standards Actual $ spent on asset maintenance per yr. by asset type compared to planned Frequency of unscheduled maintenance vs. planned In stock % of high demand parts and materials % of time 3rd party vendors are able to respond in a timely manner (e.g. 24hrs can vary by vendor)... Downtime due to out of stocks (parts and material) $ value or % of acquisitions that incorporate environmental/green technologies Savings from sustainability projects/year Baseline value Targets Y1 Y2 Y3 Action items measure work order performance Preferred vendors for maintenance and parts Wrench time measurement Develop policies to balance environmental benefits with fiscal responsibility Have a financial strategy in place to ensure assets can be maintained and replace as required Township of King Asset Management Plan 27 P age

29 Driver (4): Risk Management Goal (4): To proactively establish risk management plans that protects public health and safety and meets or exceeds regulatory requirements Table 20 Strategic framework for Driver 4 Risk Management and respective Goal 4 Objectives Performance measures Baseline value Targets Y1 Y2 Y3 Action items (4-A) To identify and prioritize risks associated with asset performance on an ongoing basis # of failures per year per asset type % of unplanned expenditures vs. planned Implement a risk management program $s spent on insurance claims per year per asset type (4-B) To create an environment where risk management is a priority, with staff having the proper tools and techniques to manage effectively # of claims per year per asset type % of employees trained on risk management and safety protocols % of employee accidents per yr. per asset type Establish a risk management and safety policy Township of King Asset Management Plan 28 P age

30 Objectives (4-C) To ensure awareness of current regulatory requirements and plan for anticipated changes and embed them into asset management practices Performance measures % adherence to regulatory requirement. Baseline value Targets Y1 Y2 Y3 Action items Township of King Asset Management Plan 29 P age

31 Driver (5): Financial Stewardship Goal (5): To sustain a fiscally responsible and financially optimized asset management program Table 21 Strategic framework for Driver 5 Financial Stewardship and respective Goal 5 Objectives Performance measures Baseline value Targets Y1 Y2 Y3 Action items (5-A) To align financial requirements with scheduled asset management activities % of annual approved budget vs. annual required budget Four year updates of the AMP including financial components to make adjustments for upcoming expansion, maintenance, renewal, replacement and disposal of all asset classes (5-B) To ensure strategic infrastructure investments are aligned with the community sustainability plan, subject to an innovative and effective financing strategy % of non-tax funding $s vs. tax capital funding $s To review development agreements to ensure there is clarity around what assets and when they become the Townships responsibility Timely and accurate databases of all asset classes Township of King Asset Management Plan 30 P age

32 Key next steps: # Activity Owner 1 Finalize performance measures with the senior management Director of Finance & Treasurer 2 Determine baseline measures and targets Director of Finance & Treasurer 3 Develop action items to determine project based activities Director of Finance & Treasurer Township of King Asset Management Plan 31 P age

33 5.2. Project-based activities Project based activities were derived from the strategic framework, Action Items based on the drivers, goals and objectives. These activities are focused on long achieving long term goals and are typically new processes or require some major change and are governed by performance measures and targets. Table 22 Project-based activities Strategic framework key projects Baseline measures Surveys and satisfaction ratings Customer complaints Policies and service levels that provide customer value for money An integrated inventory management system GPS Logs on vehicles Asset management system Description Determine baseline measures for performance targets where applicable Develop asset management surveys to solicit customer and employee feedback along with satisfaction ratings to measure results Use the CRM system to log and report on customer queries and complaints by asset type Develop policies and service levels with council s approval to maximize the utility obtained from assets while providing best value for tax dollar Implement an inventory management system to manage parts, tools and materials Track vehicle location and routes to improve productivity and performance Implement an asset management system to effectively support asset lifecycle optimization. Would include work order management to detail out service hours, repairs, required tools and parts. System should be integrated with GIS information and provide timely and accurate databases of all asset classes Performance management Optimized procurement Work Measurement Environmental benefits vs. fiscal responsibility Financial strategy Risk management AMP updates at council term Asset acquisition Implement performance management program to create / maintain a high performing workforce Preferred vendors for maintenance and parts Measure wrench time and identify opportunities to improve productivity Develop policies to balance environmental benefits with fiscal responsibility Implement a financial strategy to ensure assets can be maintained and replace as required Implement a risk management, should include a risk management and safety policy Update the AMP including financial components to make adjustments for upcoming expansion, maintenance, renewal, replacement and disposal of all asset classes Review development agreements to ensure there is clarity around what assets and when they become the Townships responsibility Township of King Asset Management Plan 32 P age

34 5.3. Business-as-usual activities Business as-activities are focused on efficiency and effectiveness of known processes where minor change or tweaking is required. They are governed by service level agreements and/or KPI s. The service level table in section 4.1 should be used to manage these activities. Table 20. Business as-usual activities Key activities On-going road repair (Pot holes, asphalt patching) Sidewalk inspections Ditch maintenance Guide rails formal assessment Sign reflectivity inspection Control of vegetation growth Shoulder maintenance Gravel roads grading Gravel application to gravel roads Ditch maintenance Dust suppressant Small/driveway culverts inspection Street lighting condition inspection Street lighting bulb replacement Road surface treatment Road crack sealing Curbs condition inspection Township of King Asset Management Plan 33 P age

35 year roadmap Note: This section needs to be populated as per the transition plan below. Transition Plan Section owner Director of Finance & Treasurer # Key activities Support Owner 1 Prioritize strategic projects (Short, Medium and Long) SMT Director of Engineering, Public Works & Building 2 Determine roll-out plan (who, what, when, how) SMT Director of Engineering, Public Works & Building 3 Obtain buy-in for roll-out plan from council SMT Chief Administrative Officer 4 Deploy plan SMT Director of Engineering, Public Works & Building 5 Measure progress SMT Director of Engineering, Public Works & Building Township of King Asset Management Plan 34 P age

36 6. FINANCIAL STRATEGY The capital and operational expenditures took into account non-infrastructure solutions; maintenance activities; renewal/rehabilitation activities; replacement and disposal activities; expansion activities and salaries. Note this section and the numbers will need revision based on the 10 year plan above. Township of King Asset Management Plan 35 P age

37 Table 21. Capital/Operational expense and funding Infrastructure (Operational Costs) 2014 Forecast Asphalt Maintenance & Patching $ 1,162,588 Grading, Ditching & Gravel Maintenance $ 1,166,003 Bridges and Culverts $ 123,491 Total $ 2,452,082 Infrastructure (Capital Costs) 2014 Forecast Asphalt Maintenance & Patching $ 2,283,761 Grading, Ditching & Gravel Maintenance $ Bridges and Culverts $ 6,254,114 Total $ 8,537,875 Operational Funding 2013 Actual Asphalt Maintenance & Patching $ 455,413 Grading, Ditching & Gravel Maintenance $ 1,088,287 Bridges and Culverts $ 108,219 Total $ 1,651,919 Capital Funding 2013 Actual Roads & Bridges Reserve $ - Build Canada Grant $ - Development Charges $ 1,768,200 Taxation $ 24,000 Developer Contribution $ - Gas Tax $ 709,106 Debentures $ 2,337,873 Total $ 4,839,179 Funding Sources Bridges 2013 Actual MIII Reserve Funds (Provincial Grant) $ 154,069 Holland Marsh Reserve $ - Taxation $ 48,931 Gas Tax $ 597,000 Total $ 800,000 Combined Capital and Operational Costs $ 10,989,957 Combined Capital and Operational Funding $ 7,291,098 Assuming same funding in 2014 (Shortfall) $ 3,698,859 Key assumptions: Inflation rate 2% per yr. An anticipated growth rate of 44% increase in roads over the next 30yrs 2014 funding same as 2013 Non-infrastructure solutions actions or policies that can lower costs or extend asset life (e.g., better integrated infrastructure planning and land use planning, demand management, insurance, process optimization, managed failures, etc.). Maintenance activities including regularly scheduled inspection and maintenance, or more significant repair and activities associated with unexpected events. Renewal/rehabilitation activities significant repairs designed to extend the life of the asset. Replacement activities activities that are expected to occur once an asset has reached the end of its useful life and renewal/rehabilitation is no longer an option Disposal activities the activities associated with disposing of an asset once it has reached the end of its useful life, or is otherwise no longer needed by the municipality. Expansion activities planned activities required to extend services to previously unserviced areas - or expand services to meet growth demands. Township of King Asset Management Plan 36 P age

38 In order to accommodate for the $3.7M shortfall in 2014, potential financing strategies will have to be employed, these could include but are not limited to: Applying a portion of annual assessment growth to the financing of roads and bridges Extending the useful life of the assets where applicable Deferring of projects Increase taxes Debenture finance Partner with the region of York to perform rehabilitation work concurrently Uploaded roads to the region where possible Transition Plan # Key activities Owner(s) 1 Plan for strategic projects as per the 10 year road map Director of Engineering, Public Works & Building Director of Finance & Treasurer 2 Determine overall cost for capital, operational and strategic projects Director of Finance & Treasurer 3 Explore financing strategies Director of Finance & Treasurer 4 Update the AMP accordingly Director of Finance & Treasurer Township of King Asset Management Plan 37 P age

Township of Amaranth. Asset Management Plan Report

Township of Amaranth. Asset Management Plan Report Township of Amaranth Prepared By: R.J. Burnside & Associates Limited 15 Townline Orangeville ON L9W 3R4 Prepared for: Township of Amaranth File No: 300033404 The material in this report reflects best judgement

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Asset Management Plan Final Report

Asset Management Plan Final Report AssetManagementPlan FinalReport DillonConsultingLimited 10FifthStreetSouth Chatham,ONN7M4V4 T:519-352-7802 F:519-354-2050 May,2014 www.dillon.ca EXECUTIVE SUMMARY Public infrastructure is central to our

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Town of Mattawa Asset Management Plan. December 2013

Town of Mattawa Asset Management Plan. December 2013 Town of Mattawa Asset Management Plan December 2013 2 P a g e Town of Mattawa Asset Management Plan Executive Summary This Asset Management Plan is intended to describe the infrastructure owned, operated,

More information

The Corporation of the Municipality of Callander. Asset Management Plan

The Corporation of the Municipality of Callander. Asset Management Plan The Corporation of the Municipality of Callander Asset Management Plan April 2014 1 Index A) Executive Summary P. 3 B) Introduction P. 4 C) State of Local Infrastructure P. 7 D) Expected Levels of Service

More information

Town of Huntsville Municipal Asset Management Plan

Town of Huntsville Municipal Asset Management Plan Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P age Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...

More information

Asset Management Plan 2015 Facilities and Transit

Asset Management Plan 2015 Facilities and Transit Asset Management Plan 2015 Facilities and Transit Prepared for Submitted by October 2015 Asset Management Plan Contents Section 1 Executive Summary Table of Content Section 2 Introduction Section 3 State

More information

County of Oxford Asset Management Plan 2014. 1.0 Executive Summary... 2. 2.0 Introduction... 7. 3.0 Purpose and Methodology... 10

County of Oxford Asset Management Plan 2014. 1.0 Executive Summary... 2. 2.0 Introduction... 7. 3.0 Purpose and Methodology... 10 Asset Management Plan AUGUST 2014 County of Oxford Asset Management Plan 2014 Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 7 3.0 Purpose and Methodology... 10 4.0 State of Infrastructure...

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

How To Manage The County Of Simcoe'S Infrastructure

How To Manage The County Of Simcoe'S Infrastructure Asset Management Plan Asset Management Plan Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 4 3.0 State of County of Simcoe s Infrastructure... 7 4.0 Levels of Service... 14 5.0 Asset

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Final Report May 2014 EXECUTIVE SUMMARY Adequate municipal infrastructure such as roads, bridges, and underground water and sewage pipes are essential to economic development, citizen

More information

LONDON CORPORATE ASSET MANAGEMENT PLAN 2014

LONDON CORPORATE ASSET MANAGEMENT PLAN 2014 LONDON CORPORATE ASSET MANAGEMENT PLAN 2014 ACKNOWLEDGEMENT Acknowledgement The Corporate Asset Management office would like to acknowledge the efforts of the staff of the individual City of London Service

More information

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation 2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation Version 1 Table of Contents Executive Summary... 5 1.1 Background... 5 1.2 State of Local Infrastructure... 5 1.3 Desired Levels

More information

ASSET MANAGEMENT PLAN

ASSET MANAGEMENT PLAN Tof Proud Heritage, Exciting Future ASSET MANAGEMENT PLAN 1 TABLE OF CONTENTS PAGE 3 OVERVIEW 8 FACILITIES 12 FLEET 16 PLAYGROUND EQUIPMENT 19 ROADWAYS 23 BRIDGES 26 WATER RELATED ASSETS 2 One of the goals

More information

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward.

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward. HALDIMAND COUNTY Report PW-GM-01-2014 of the General Manager of Public Works For Consideration by RE: 2014 Asset Management Plan OBJECTIVE: To present Council with an Asset Management Plan and recommended

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Table of Contents Executive Summary... 5 Asset Management Plan... 6 Introduction... 6 Financial Overview... 10 Conclusion... 10 Attached Appendices... 10 Asset Management Strategy...

More information

CITY OF GREATER SUDBURY. Municipal Roads, Structures and Related Infrastructure. Final Report. July 10, 2012

CITY OF GREATER SUDBURY. Municipal Roads, Structures and Related Infrastructure. Final Report. July 10, 2012 CITY OF GREATER SUDBURY Financial Planning for Municipal Roads, Structures and Related Infrastructure Final Report July 10, 2012 Financial Planning for Roads Table of Contents I. Financial Planning for

More information

ASSET MANAGEMENT PLAN

ASSET MANAGEMENT PLAN ASSET MANAGEMENT PLAN REPORT Prepared for: Township of South Frontenac December 2013 RVA 132914 This report is protected by copyright and was prepared by R.V. Anderson Associates Limited for the account

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies: ASSET MANAGEMENT STRATEGY BRIDGES AND LARGE CULVERTS (>3m Span) Inventory Anticipated Asset Life Cycle Fifteen (15) bridges and eleven (11) large culverts with a span greater than 3m (refer to PSAB 3150

More information

THE ASSET MANAGEMENT PLAN FOR THE TOWNSHIP OF ASHFIELD-COLBORNE-WAWANOSH

THE ASSET MANAGEMENT PLAN FOR THE TOWNSHIP OF ASHFIELD-COLBORNE-WAWANOSH THE ASSET MANAGEMENT PLAN FOR THE TOWNSHIP OF ASHFIELD-COLBORNE-WAWANOSH 2013 SUBMITTED DECEMBER 2013 BY PUBLIC SECTOR DIGEST 148 FULLARTON STREET, SUITE 1410 LONDON, ONTARIO, N6A 5P3 State of the Infrastructure

More information

Transportation and Public Works. Business Plan 2002-2003

Transportation and Public Works. Business Plan 2002-2003 Business Plan 2002-2003 March 27, 2002 Mission Transportation and Public Works Construct, maintain and manage provincial highways, buildings and related infrastructure, and provide accommodation, property

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Contents Executive Summary... 4 Asset Management Plan... 6 Introduction... 6 Financial Overview... 11 Conclusion... 11 Attached Appendices... 11 Asset Management Strategy... 13 Introduction...

More information

Asset Management Plan 2013-2022

Asset Management Plan 2013-2022 Asset Management Plan 2013-2022 Limitations and Disclosure This document has been prepared by Infrastructure Solutions Inc. ( ISI ) for the exclusive use of the Town of Blind River (the Client ). The information,

More information

cugog TOWNSHIP OF Ian

cugog TOWNSHIP OF Ian TOWNSHIP OF cugog EDUCATION AND TRAINING SESSION AGENDA MONDAY, OCTOBER 28, 2013 AT 9:00 A.M. IN COUNCIL CHAMBERS Road and Bridge Asset Management Plan The What and the How 9:00 a.m. The What Ian Roger

More information

The Corporation of the County of Prince Edward

The Corporation of the County of Prince Edward Prepared for: Prepared by: The Corporation of the County of Prince Edward KPMG LLP Shire Hall, 332 Main Street 863 Princess Street, Suite 400 Picton, ON K0K 2T0 Kingston, ON K7L 5C8 Tel: 613.476.2148 Tel:

More information

County of Peterborough Capital Asset Management Plan - Review

County of Peterborough Capital Asset Management Plan - Review 2013 County of Peterborough Capital Asset Management Plan December 18, 2013 Capital Asset Management Plan Preface The County of Peterborough owns, operates, and maintains a wide ranging inventory of tangible

More information

2015-18 Department Business Plan. Fleet Services

2015-18 Department Business Plan. Fleet Services 2015-18 Department Business Plan Fleet Services My objective as Director of Fleet Services is to provide a comprehensive fleet management program that supports our internal partners and the citizens of

More information

Road Asset Management vs Pavement Management A new Paradigm. Arthur Taute Stewart Russell

Road Asset Management vs Pavement Management A new Paradigm. Arthur Taute Stewart Russell Road Asset Management vs Pavement Management A new Paradigm Arthur Taute Stewart Russell Contents Background Definitions Improvements over PMS TMH22 elements Conclusions BACKGROUND Municipal AMS GRAP17

More information

Our Challenging Future

Our Challenging Future Protecting Our Future by Making Advanced Asset Management Decisions < All stories in this section Gregory M. Baird Dec 23, 2011 America s economic dominance as a world power over the past several decades

More information

ASSET MANAGEMENT PLAN

ASSET MANAGEMENT PLAN ASSET MANAGEMENT PLAN DECEMBER 2013 (Released in August 2014) Asset management planning is the process of making the best possible decisions regarding the building, operating, maintaining, renewing, replacing

More information

MUNICIPAL ASSET MANAGEMENT & FINANCIAL PLANNING A CASE STUDY: THE TOWNSHIP OF SCUGOG

MUNICIPAL ASSET MANAGEMENT & FINANCIAL PLANNING A CASE STUDY: THE TOWNSHIP OF SCUGOG MUNICIPAL ASSET MANAGEMENT & FINANCIAL PLANNING IN SMALLER MUNICIPALITIES A CASE STUDY: THE TOWNSHIP OF SCUGOG JULY 2012 By: David A. Stewart THE PAPER VS. THE PRESENTATION The Paper Includes A literature

More information

Asset Management B.C.

Asset Management B.C. Asset Management BC Roadmap Project Guide for using the Asset Management BC Roadmap Asset Management B.C. ROADMAP MAY 2011 Asset Management BC ROADMAP PROJECT Guide for using the Asset Management BC Roadmap

More information

4 TRANSPORTATION AND COMMUNITY PLANNING 2013 STATE OF INFRASTRUCTURE REPORT

4 TRANSPORTATION AND COMMUNITY PLANNING 2013 STATE OF INFRASTRUCTURE REPORT Clause No. 4 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 4 TRANSPORTATION AND COMMUNITY

More information

Infrastructure Asset Management Strategy

Infrastructure Asset Management Strategy Infrastructure Asset Management Strategy Strategy Owner Manager Parks and Assets Engineering and Infrastructure Creation Date 27 March 2006 Revision Date 4 March 2015 Please check Council s Intranet to

More information

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD Contents 4 Glossary 6 Background 9 Purpose of Communiqué 9 Australian and State Government Drivers

More information

COMPREHENSIVE ASSET MANAGEMENT STRATEGY

COMPREHENSIVE ASSET MANAGEMENT STRATEGY COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY

More information

Township of Terrace Bay Drinking Water System Financial Plan

Township of Terrace Bay Drinking Water System Financial Plan Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance

More information

Minto Asset Management Plan

Minto Asset Management Plan Minto Asset Management Plan 1. EXECUTIVE SUMMARY 1.1 What the Municipality Provides The Town of Minto has a significant portfolio of community assets under its care and control. These assets form an integral

More information

REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014

REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014 REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014 City of Waterloo Asset Management Plan EXECUTIVE SUMMARY The City of Waterloo has prepared this asset management plan in accordance with the Ministry

More information

DRAFT 2016 Budget and 2017-18 Financial Plan

DRAFT 2016 Budget and 2017-18 Financial Plan DRAFT 2016 Budget and 2017-18 Financial Plan Presentation to Special Council Council Chamber 1 Strategy Map Outlines Vaughan s vision, mission, values Brings focus and alignment to position City for success

More information

Business Unit Asset Management Plan Framework & Guidelines

Business Unit Asset Management Plan Framework & Guidelines Draft Report Business Unit Asset Management Plan Framework & Guidelines Prepared for March 2014 Contents Section Page Contents... i Background... 1 Asset Management Plans... 1 The AMP Framework... 1 About

More information

CGAM022.1/12/10. Asset Management Improvement Strategy 2010

CGAM022.1/12/10. Asset Management Improvement Strategy 2010 Asset Management Improvement Strategy 2010 Version Control Version No. Date Details Author/s 1.0 July 2009 Adopted Strategy 2.0 October 2010 Update TABLE OF CONTENTS OF CONTENTS 4 OF THE ASSET MANAGEMENT

More information

2015-18 Department Business Plan. Utilities

2015-18 Department Business Plan. Utilities 2015-18 Department Business Plan Utilities I am pleased to introduce Utilities 2015-18 Department Business Plan. The goals capture four main areas where Utilities will contribute to making Strathcona County

More information

This plan forms one part of a suite of Asset Management Plans that have been developed:

This plan forms one part of a suite of Asset Management Plans that have been developed: E: D1: Levee Footpath Bank Asset Management Plan March July 2014 2015 This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpaths

More information

ASSET MANAGEMENT PLAN Town of Newmarket

ASSET MANAGEMENT PLAN Town of Newmarket Town of Newmarket December 23, 2014 1 Acknowledgements The development of the Town of Newmarket s first Asset Management Plan was based on the contributions of many Town staff. This acknowledgement is

More information

Glossary. means the asset valuation module of Municipal DataWorks. means Geographic Information System

Glossary. means the asset valuation module of Municipal DataWorks. means Geographic Information System Getting Started The Prerequisites for Asset Management July 2009 Glossary Asset... means public infrastructure or a component thereof that has a tangible value, enables services to be provided and has

More information

Fleet Services CORPORATE SERVICES. Branch Manager: Steve Rapanos 57 FLEET SERVICES 2016 2018 BUSINESS PLAN

Fleet Services CORPORATE SERVICES. Branch Manager: Steve Rapanos 57 FLEET SERVICES 2016 2018 BUSINESS PLAN Fleet Services CORPORATE SERVICES Branch Manager: Steve Rapanos 57 FLEET SERVICES 2016 2018 BUSINESS PLAN Table of Contents INTRODUCTION Our Branch 60 CONTRIBUTION TO THE CITY S VISION The Way Ahead 62

More information

Village of Newbury Asset Management Plan

Village of Newbury Asset Management Plan Village of Newbury Asset Management Plan 7 Candle Crescent, Kitchener Ontario, N2P 2K7 www.4roads.ca 7 Candle Crescent, Kitchener Ontario, N2P 2K7 May 14, 2014 Village of Newbury 22910 Hagerty Road, PO

More information

City of Cambridge and IBM Build a Smarter City

City of Cambridge and IBM Build a Smarter City City of Cambridge and IBM Build a Smarter City September 8, 2010 Presented by Mike Hausser, P.Eng Director of Asset Management and Support Services City of Cambridge Infrastructure Asset Life Cycle Install

More information

ASSET MANAGEMENT (A.M.) COUNTY COUNCIL PRESENTATION

ASSET MANAGEMENT (A.M.) COUNTY COUNCIL PRESENTATION ASSET MANAGEMENT (A.M.) COUNTY COUNCIL PRESENTATION SEPTEMBER 2015 How A.M. impacts the County of Dufferin Slide taken from AMO Aug. 2015 Conference presentation by Bill Hughes, Region of York Tuesday

More information

Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL

Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL -- South Africa COTO Committee of Transport Officials Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL M a r c h 2013 C ommittee of Transport Officials Contents Background Process Contents of Manual Quo Vadis

More information

Glenorchy City Council Asset Management Strategy for Infrastructure Assets

Glenorchy City Council Asset Management Strategy for Infrastructure Assets Glenorchy City Council Asset Strategy for Infrastructure Assets 2014/15 to 2017/18 Version 1.3 June 2014 Glenorchy City Council Asset Strategy for Infrastructure Assets Document Control Document Control

More information

Strategic Plan 2012-2022 Where our past guides the future

Strategic Plan 2012-2022 Where our past guides the future Township of Wellesley Township of Wellesley Strategic Plan 2012-2022 Where our past guides the future Progress Report Summer 2012 STRATEGIC PLAN TABLE OF CONTENTS Township of Wellesley Mission & Vision

More information

Transportation Asset Management Best Practices for Canada

Transportation Asset Management Best Practices for Canada Primer Transportation Asset Management Best Practices for Canada Introduction Canada ranks seventh in the world in terms of road network size, with a two-lane equivalent length of 1.04 million kilometres,

More information

Appendix D: 2015 Program & Service Budget

Appendix D: 2015 Program & Service Budget Appendix D: 2015 Program & Service Budget Program & Service Budget by Program.. 1 Program & Service Budget by Sub-Program....... 2 Program & Service Budget by Service.... 3 Program & Service Budget by

More information

The Corporation of the Town of Amherstburg, Ontario ASSET MANAGEMENT PLAN

The Corporation of the Town of Amherstburg, Ontario ASSET MANAGEMENT PLAN The Corporation of the Town of Amherstburg, Ontario ASSET MANAGEMENT PLAN December 2013 Asset Management Plan Preface An Asset Management Plan is a strategy that identifies how municipal assets will be

More information

PUBLIC WORKS DEPARTMENT STRATEGIC PLAN 2015 2020

PUBLIC WORKS DEPARTMENT STRATEGIC PLAN 2015 2020 PUBLIC WORKS DEPARTMENT STRATEGIC PLAN 2015 2020 1 Purpose of Strategic Plan This document serves as the road map for the Public Works Department. It identifies where we are going and how we are going

More information

Township of Uxbridge Asset Management Plan Roads and Structures

Township of Uxbridge Asset Management Plan Roads and Structures Township of Uxbridge Asset Management Plan Roads and Structures 7 Candle Crescent, Kitchener Ontario, N2P 2K7 www.4roads.ca 7 Candle Crescent, Kitchener Ontario, N2P 2K7 Township of Uxbridge Attention:

More information

INNOVATIVE USE OF A CORPORATE SURVEY TOOL FOR PUBLIC CONSULTATION FOR THE SUSTAINABLE RURAL ROADS MASTER PLAN FOR STRATHCONA COUNTY, ALBERTA

INNOVATIVE USE OF A CORPORATE SURVEY TOOL FOR PUBLIC CONSULTATION FOR THE SUSTAINABLE RURAL ROADS MASTER PLAN FOR STRATHCONA COUNTY, ALBERTA INNOVATIVE USE OF A CORPORATE SURVEY TOOL FOR PUBLIC CONSULTATION FOR THE SUSTAINABLE RURAL ROADS MASTER PLAN FOR STRATHCONA COUNTY, ALBERTA Masood Hassan, EBA A Tetra Tech Company Richard Dekker, Strathcona

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 19, 2013

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 19, 2013 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 19, 2013 Item 9, Report No. 9, of the Committee of the Whole, which was adopted, as amended, by the Council of the City of Vaughan on March

More information

Asset Management Plan Public Works and Social Housing Infrastructure City of Brantford, Ontario

Asset Management Plan Public Works and Social Housing Infrastructure City of Brantford, Ontario 2013 Asset Management Plan Asset Management Plan City of Brantford, Ontario November 29, 2013 Prepared by: Capital Planning Facilities and Asset Management, Public Works Corporation of the City of Brantford

More information

2015-18 Department Business Plan. Fleet Services

2015-18 Department Business Plan. Fleet Services 2015-18 Department Business Plan Fleet Services Updated June 2016 My objective as Director of Fleet Services is to provide a comprehensive fleet program that supports our internal partners and the citizens

More information

Corporation of the County of Renfrew

Corporation of the County of Renfrew Corporation of the County of Renfrew Asset Management Plan November 26, 2014 TABLE OF CONTENTS 1.0 Executive Summary Page 3 2.0 Introduction Page 5 3.0 State of Infrastructure Page 15 Buildings Page 20

More information

BUILDING TOGETHER. Guide for Municipal Asset Management Plans. Ministry of Infrastructure

BUILDING TOGETHER. Guide for Municipal Asset Management Plans. Ministry of Infrastructure BUILDING TOGETHER Guide for Municipal Asset Management Plans Ministry of Infrastructure Letter from the Minister of Infrastructure and Minister of Transportation Infrastructure investments are vital to

More information

Capital Project Development - definitions, Values and Funding

Capital Project Development - definitions, Values and Funding Definitions and Descriptions Capital Expenditure - A capital expenditure is any significant expenditure incurred to acquire or improve land, buildings, engineering structures, machinery and equipment.

More information

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located

More information

Asset Management. Framework and Guidelines. Part 2 - Asset Management Guidelines for Western Australian Local Governments p1.

Asset Management. Framework and Guidelines. Part 2 - Asset Management Guidelines for Western Australian Local Governments p1. Asset Management Framework and Guidelines Part 2 - Asset Management Guidelines for Western Australian Local Governments p1. Contents Foreword 4 Part 1 Asset Management Framework 5 1. Introduction 7 2.

More information

The Town of Fort Frances

The Town of Fort Frances The Town of Fort Frances Long-Term Capital Financial Plan POLICY Resolution Number: 391 (Consent) 12/09 SECTION ADMINISTRATION AND FINANCE NEW: December 2009 REVISED: Supercedes Resolution No. Policy Number:

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY SHIRE OF BODDINGTON ASSET MANAGEMENT STRATEGY Version 1 January 2014 Asset Management Strategy Document Control Rev No Date Revision Details Author Reviewer Approver 1 January 2014 Draft Strategy T McCarthy

More information

How To Improve Road Quality

How To Improve Road Quality A Customer Service Level Approach for Maine DOT s Asset Management System Jeffrey L. Zavitski, B.A. Senior Implementation Specialist Deighton Associates Limited Chip Getchell, P.E. Director, Work Plan

More information

Roads and Footpaths Infrastructure Asset Management Plan

Roads and Footpaths Infrastructure Asset Management Plan Roads and Footpaths Infrastructure Asset Management Plan Version 2a November 2012 This page is left blank intentionally Prepared By: Rob Damhuis Senior Transport Asset Management Consultant Opus International

More information

Infrastructure assets are distinguished from other capital assets because they normally:

Infrastructure assets are distinguished from other capital assets because they normally: 4. REPORTING 4.2 Government-Wide Financial Statements 4.2.6 Infrastructure Reporting 4.2.6.10 Governments are required to report all of their capital assets in the statement of net position. Infrastructure

More information

Asset Management and Industry Solutions - A Municipal Perspective

Asset Management and Industry Solutions - A Municipal Perspective Asset Management and Industry Solutions - A Municipal Perspective Saidur Rahman, Ph.D., P. Eng. Senior Infrastructure Project Manager Town of Oakville Highlights Municipal Infrastructure in Canada Scope

More information

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

2012-2016 Business Plan Summary

2012-2016 Business Plan Summary Owner: 2012-2016 Business Plan Summary Program Corporate, Operational & Council Services Service grouping Corporate Services Service Type Internal Service Tom Johnson, Managing Director - Corporate Assets,

More information

How To Plan For A County Budget

How To Plan For A County Budget CHAPTER 10 CAPITAL IMPROVEMENTS ELEMENT The 1978 and 1985 Levy County Comprehensive Plans contained a statement of economic feasibility as a part of the Future Land Use Plan. This chapter updates that

More information

Business Plan: Fleet Services

Business Plan: Fleet Services Business Plan: Fleet Services How does this service contribute to the results identified in the City of London Strategic Plan? A Strong Economy A Green and Growing City Fleet Services owns and manages

More information

Financial Services FINANCIAL SERVICES UTILITIES 57 FINANCIAL SERVICES AND UTILITIES 2016-2018 BUSINESS PLAN. CR_2215 Attachment 1

Financial Services FINANCIAL SERVICES UTILITIES 57 FINANCIAL SERVICES AND UTILITIES 2016-2018 BUSINESS PLAN. CR_2215 Attachment 1 CR_2215 Attachment 1 Financial Services FINANCIAL SERVICES & UTILITIES 57 FINANCIAL SERVICES AND UTILITIES 2016-2018 BUSINESS PLAN Acting Branch Manager: Stacey Padbury Table of Contents INTRODUCTION Our

More information

4 Adoption of Asset Management Policy and Strategy

4 Adoption of Asset Management Policy and Strategy 4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are

More information

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN Introduction This Asset Management Plan (AMP) for Land Transport Network 2012 describes in detail how the District s land transport network will be managed

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

Asset Management Plan

Asset Management Plan Wandering Shire Council Roads Asset Management Plan TABLE OF CONTENTS 1 Executive Summary... 2 Context... 2 Questions you may have... 4 2. INTRODUCTION... 5 2.1 Background... 5 2.2 Goals and objectives

More information

The Roads to Recovery. Facts About Transportation Funding and Spending

The Roads to Recovery. Facts About Transportation Funding and Spending The Roads to Recovery Facts About Transportation Funding and Spending How Pima County spends transportation money (F.Y. 2014-15 Transportation Budget) 1 Debt Service (1997 bonds): $19.1 million In 1997,

More information

Asset Management Planning Tools and Resources. AMCTO 2015 Conference. Chris Terech Ministry of Municipal Affairs and Housing

Asset Management Planning Tools and Resources. AMCTO 2015 Conference. Chris Terech Ministry of Municipal Affairs and Housing Asset Management Planning Tools and Resources AMCTO 2015 Conference Chris Terech Ministry of Municipal Affairs and Housing Contents Tips for moving along the AMP continuum Tools and Resources Assessing

More information

ASSET MANAGEMENT FOR LOCAL GOVERNMENTS

ASSET MANAGEMENT FOR LOCAL GOVERNMENTS AGLG Perspectives Series Accessible Tools Audit Topic 3 - Tool 2 (July, 2015) ASSET MANAGEMENT FOR LOCAL GOVERNMENTS Key Considerations for Local Government Council, Board Members and Staff to Help You

More information

Water Utility Strategic Planning From Concept to Implementation

Water Utility Strategic Planning From Concept to Implementation Water Utility Strategic Planning From Concept to Implementation May 7, 2009 HDR Engineering, Inc. Presentation Overview Why Bother? Topics Administration, Customer Service, and Intradepartmental Master

More information

Reality MYTH: PROPERTY TAXES ARE GOOD ENOUGH. Is the Property Tax Adequate?

Reality MYTH: PROPERTY TAXES ARE GOOD ENOUGH. Is the Property Tax Adequate? MYTH: PROPERTY TAXES ARE GOOD ENOUGH About AUMA AUMA represents 272 urban municipalities including cities, towns, villages, and summer villages. We work on a broad range of issues that impact our members

More information

Business Plan: Roadway Planning & Design

Business Plan: Roadway Planning & Design Business Plan: Roadway Planning & Design How does this service contribute to the results identified in the City of London Strategic Plan? A Strong Economy A Sustainable Infrastructure London s transportation

More information

The Governance Brief

The Governance Brief ISSUE 21 2015 Infrastructure Asset Management: Can the Canadian Municipal Experience Help Inform Better Practices in Southeast Asia? By Murray Jamer The Infrastructure Deficit: A Municipal Perspective

More information

TABLE OF CONTENTS. Background Performance Review Guidelines 2. Fleet and Facility Performance Review Guidelines 2 Fleet 3 Facility 4 Guidelines 4

TABLE OF CONTENTS. Background Performance Review Guidelines 2. Fleet and Facility Performance Review Guidelines 2 Fleet 3 Facility 4 Guidelines 4 TABLE OF CONTENTS Background Performance Review Guidelines 2 Fleet and Facility Performance Review Guidelines 2 Fleet 3 Facility 4 Guidelines 4 Performance Review - Fleet and Facility Chart 6 Section A

More information

CITY OF TORONTO Fleet Services 2011 Recommended Operating Budget & 2011 2020 Capital Plan. January 13, 2011

CITY OF TORONTO Fleet Services 2011 Recommended Operating Budget & 2011 2020 Capital Plan. January 13, 2011 CITY OF TORONTO Fleet Services 2011 Recommended Operating Budget & 2011 2020 Capital Plan January 13, 2011 Agenda 1. Program Overview 2. 2010 Service Performance 3. 2011 Recommended Operating Budget 4.

More information

H: Road Asset Management Plan February 2015

H: Road Asset Management Plan February 2015 H: Road Asset Management Plan February 2015 Document Format This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpath E. Levee

More information

ROADING ASSET MANAGEMENT PLAN

ROADING ASSET MANAGEMENT PLAN ROADING ASSET MANAGEMENT PLAN 1 EXECUTIVE SUMMARY 1.1 Overview This Roading Asset Management Plan (RAMP) follows the format recommended by the National Asset Management Steering Group (NAMS) and is largely

More information

Ingersoll Long Range Financial Plan (LRFP) Facilitated Session. Purpose of Session. Introduction to Long Range Financial Plan

Ingersoll Long Range Financial Plan (LRFP) Facilitated Session. Purpose of Session. Introduction to Long Range Financial Plan Ingersoll Long Range Financial Plan (LRFP) Facilitated Session Purpose of Session Introduction to Long Range Financial Plan Review and Discuss Financial Condition Assessment and Draft Policies Review and

More information

Maintenance Management and Asset Management

Maintenance Management and Asset Management Defining and Understanding the Difference Between Maintenance Management and Asset Management Dr. Simon Lewis AgileAssets, Inc. 12th AASHTO-TRB Maintenance Management Conference Annapolis Maryland, July

More information

Asset Management Plan

Asset Management Plan Asset Management Plan (DRAFT) 2014 The Town of Aurora Asset Management Plan T own of Aurora Asset Management Plan (DRAFT) 2014 TABLE OF CONTENTS Executive Summary... 1 Introduction... 2 Town of Aurora

More information

Capital Improvement Program: Public Input and the Need for a Multi-year Plan

Capital Improvement Program: Public Input and the Need for a Multi-year Plan Attachment 1 OFFICE OF THE INDEPENDENT BUDGET ANALYST REPORT Date Issued: September 21, 2012 IBA Report Number: 12-39 Budget and Finance Committee Docket Date: September 26, 2012 Item Number: 8 OVERVIEW

More information

A Legislative Briefing prepared by Volume 7, Number 1 February 2001

A Legislative Briefing prepared by Volume 7, Number 1 February 2001 fiscal forum A Legislative Briefing prepared by Volume 7, Number 1 February 2001 Mitchell E. Bean, Director P. O. Box 30014, Lansing, MI 48909-7514 517-373-8080! FAX 517-373-5874! www.house.state.mi.us/hfa

More information