1 ASSET MANAGEMENT (A.M.) COUNTY COUNCIL PRESENTATION SEPTEMBER 2015 How A.M. impacts the County of Dufferin
2 Slide taken from AMO Aug Conference presentation by Bill Hughes, Region of York Tuesday Aug. 18 Block B Concurrent Sessions
3 Slide taken from AMO Aug Conference presentation by Bill Hughes, Region of York Tuesday Aug. 18 Block B Concurrent Sessions
4 KEY ASSET ANALYSIS: WHAT COUNTY OWNS 322 km of paved roads (no unpaved roads), historical cost $75 million 85 Structures= 37 bridges and 48 culverts, historical cost $20 million 30 buildings (Housing 13 + Courthouse 5 + Oaks 3 + all others 9) Vehicle fleet of 44 (Paramedics 11, Plow trucks 11, all others 22) Technology Equipment valued at $1.4 million Other Equipment: includes traffic signals, parking lots, guiderails, Oaks beds, appliances, furniture, forest gates, lawn tractors, etc. etc. The REPLACEMENT VALUE of all these combined is about $350 Million. Land is excluded. Replacement needs of $130 Million (Gross) have been identified for next 10-year period.
5 WHAT THE COUNTY IS DOING NOW building some modest AM funds through its annual capital budget, which is taking care of areas like fleet, technology, housing repairs, facility repairs, paramedic equipment needs, Oaks beds AM emphasis has been on the Maintenance of County assets, in many cases assets remain in-service beyond their ordinary lifespan performing asset condition reviews, using external consultants, for independent opinions on the condition of County assets Roads Needs Structures: bridges + culverts (done every 2 years) Housing buildings BCA BUT Even well-maintained assets eventually wear out, and must be replaced. Replacement is never avoidable, so it should be planned for.
6 WHAT THE COUNTY IS NOT DOING (YET) Working on the Strategic Plan Objectives related to assets 4.1 Close the Infrastructure Gap (four parts to this one objective) Long-term financial plan, which considers infrastructure as a key element KEY AM is a key component within the strategic concept of SUSTAINABILITY.
7 THE INFRASTRUCTURE GAP WHAT? WHY? what s getting done each year < what should be getting done affordability RESULTS slowly deteriorating infrastructure, can be measured by asset condition increased exposure to the risk of failure (Example: a bridge closure) greater risk of reduced level of service (during time that an asset is out of service ) KEY Whenever a project gets deferred, its (future) cost goes up (because of price increases and/or job size change) Currently the single largest contributor to the Gap for Dufferin is Road Surfaces.
8 ROAD SURFACES Avg. life 15 yrs./ 322 km = 21.5 km./ year Approx. cost = $300,000 per km. estimate Gas Tax now at $1.75 million per year when a road project involves widening as part of the job, the cost will be higher than $300,000/km. good example, the Road 11 multi-stage project What about other assets besides roads? 2015 Ideally # km paved Estim. Cost $5,258,500 $6,450,000 Funded from 1. Gas Tax 2,460,000 1,750, DC 405, , Taxation 2,392,700 4,100,000 Gas Tax in 2015 included some unspent amounts received in Gas Tax may be used for other things besides roads, but this assumes it s used only for roads. These are targeted annual figures, to strive to achieve
9 ASSETS OTHER THAN ROADS 1. Structures were funded at $1.1 million in 2015, but need is closer to $1.5 million annually 2. Oaks needs moderate increase to fund future building repairs (nearing 15 years old) 3. DCMA s needs are similar to the Oaks (facility is now over 20 years old) 4. Social Housing needs increased tax support: capital grants are being reduced as of 2016 Paramedic equipment, Facilities, Technology, and vehicle fleets of all departments are currently being funded close to an adequate level of funding KEY All the above items refer to replacement of existing assets. There is no consideration being given to adding anything new, such as a new Social Housing building, or a new road.
10 A.M. STRATEGY OVER NEXT 3 YEARS Step 1 Begin to walk the path of long-term A.M. with 2016 budget Step 2 Keep on the A.M. strategy path through 2017 & 2018 Step 3 Reach financial sustainability
11 Taken from AMO Conference 2015 presentation by Bill Hughes, Region of York.
12 DUFFERIN COUNTY STRATEGIC PLAN has references to FINANCIAL SUSTAINABILITY The Strategic Plan Objectives related to capital assets are PRIORITY of SERVICE EXCELLENCE 4.1 Close the Infrastructure Gap (four pieces to this objective) see 4.1.1, 4.1.2, 4.1.3, PRIORITY of GOOD GOVERNANCE Long-term financial plan, which must include infrastructure as a key element
13
RESOLUTION R2004-48. PASSED AT SYCAMORE, ILLINOIS, THIS 16th DAY OF JUNE 2004, A.D. Chairman, DeKalb County Board ATTEST: County Clerk
RESOLUTION R2004-48 WHEREAS, the Governmental Accounting Standards Board issued Pronouncement #34 which requires governmental entities to capitalize and report Fixed Assets on the annual audited financial
Two Acres with House
9211 South Presa Street, San Antonio, Texas 78223 LOCATION Located in southeast San Antonio, north of Loop 410 and west of IH-37; MAPSCO 683F3 LAND SIZE AND FRONTAGE 2.0 AC; 87,120 SF 166 feet of frontage
The Corporation of the Municipality of Callander. Asset Management Plan
The Corporation of the Municipality of Callander Asset Management Plan April 2014 1 Index A) Executive Summary P. 3 B) Introduction P. 4 C) State of Local Infrastructure P. 7 D) Expected Levels of Service
Town of Huntsville Municipal Asset Management Plan
Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P age Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...
Assets Supporting Vehicle & Equipment Services
STRATEGY OUTLOOK The community has recently added additional revenues which has slowed the County road system s deterioration; however resources are insufficient to meet needs. Tillamook County manages
TOWN OF NEW HAVEN ROAD PLAN
1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served
County of Dufferin Budget 2013
County of Dufferin Budget 2013 DRAFT COUNTY of DUFFERIN 2013 DRAFT BUDGET INITIAL POSITION subject to debate and revisions INTRODUCTORY REMARKS The 2013 County of Dufferin draft budget has been prepared
2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation
2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation Version 1 Table of Contents Executive Summary... 5 1.1 Background... 5 1.2 State of Local Infrastructure... 5 1.3 Desired Levels
Safety Evidence for Bicycling
Photo: Boegh (Flickr) Cycling in Cities Research Program School of Population & Public Health The University of British Columbia Faculty of Health Sciences Simon Fraser University Driving near bicyclists
Brookdale Site. CB6 Update April 1, 2015
Brookdale Site CB6 Update April 1, 2015 Summary Timeline / Process How does DSNY operate now? Garage project and frequently asked questions Project facts Impact to emergency vehicle access Traffic congestion
Ingersoll Long Range Financial Plan (LRFP) Facilitated Session. Purpose of Session. Introduction to Long Range Financial Plan
Ingersoll Long Range Financial Plan (LRFP) Facilitated Session Purpose of Session Introduction to Long Range Financial Plan Review and Discuss Financial Condition Assessment and Draft Policies Review and
CAPITALIZATION AND DEPRECIATION OF INFRASTRUCTURE. OFFICE OF THE STATE AUDITOR Division of Technical Assistance. Presentation to:
CAPITALIZATION AND DEPRECIATION OF INFRASTRUCTURE OFFICE OF THE STATE AUDITOR Division of Technical Assistance Presentation to: Mississippi Association of Governmental Purchasing and Property Agents October
Highway Asset Management Strategy
w Highway Asset Management Strategy May 2014 - Version 2 Page 5 Surrey County Council Asset Management Strategy 1 Priorities, Vision and Objectives 1.1 Surrey County Council (SCC) recognises the importance
A SEISMIC OIL AND GAS PRIMER by Kevin B. Hill
A SEISMIC OIL AND GAS PRIMER by Kevin B. Hill Hill Geophysical Consulting 415 Texas Street, Suite 200 Shreveport, LA 71101 318.221 3329 [email protected] 1) What is seismic data? Outline 2) How is seismic
Louw Kannemeyer. Asset Management
Louw Kannemeyer Asset Management South African Road Network Authority Paved Gravel Total SANRAL 18,247 0 18,247 Provinces - 9 46,099 136,640 182,739 Metros - 8 51,682 14,461 66,143 Municipalities 37,691
PAVEMENT MANAGEMENT ANALYSIS USING RONET: CASE OF THE FREE STATE PROVINCE. SARF/IRF 2014 2-4 September, South Africa
PAVEMENT MANAGEMENT ANALYSIS USING RONET: CASE OF THE FREE STATE PROVINCE DR. M MOSTAFA HASSAN MR. TJ MOSIANEDI SARF/IRF 2014 2-4 September, South Africa PRESENTATION LAYOUT Current condition of Free State
How To Manage Transportation Asset Management
1 TRANSPORTATION ASSET MANAGEMENT THE NEW BUSINESS MODEL FOR TRANSPORTATION AGENCIES Presented at the AASHTO Subcommittee on Transportation Finance Policy Business Meeting Irvine, California June 26, 2012
Town of Mattawa Asset Management Plan. December 2013
Town of Mattawa Asset Management Plan December 2013 2 P a g e Town of Mattawa Asset Management Plan Executive Summary This Asset Management Plan is intended to describe the infrastructure owned, operated,
The Roads to Recovery. Facts About Transportation Funding and Spending
The Roads to Recovery Facts About Transportation Funding and Spending How Pima County spends transportation money (F.Y. 2014-15 Transportation Budget) 1 Debt Service (1997 bonds): $19.1 million In 1997,
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
FACT SHEET: HAZARDOUS MATERIALS ACCIDENTS
FACT SHEET: HAZARDOUS MATERIALS ACCIDENTS A hazardous materials accident can occur anywhere. Communities located near chemical manufacturing plants are particularly at risk. However, hazardous materials
How To Manage The County Of Simcoe'S Infrastructure
Asset Management Plan Asset Management Plan Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 4 3.0 State of County of Simcoe s Infrastructure... 7 4.0 Levels of Service... 14 5.0 Asset
Mobile Equipment Safety
Mobile Equipment Safety PLANNING THE JOB Hazard Assessment DO YOU HAVE THE RIGHT EQUIPMENT? ARE THERE HAZARDS TO BE AVOIDED? IS THE GROUND AREA STRONG ENOUGH TO SUPPORT THE EQUIPMENT? ARE THERE ANY UNUSUAL
Activity Management Plan Overview
Trevor Kerr Timaru District Council Activity Management Plan Overview 2012 2022 Transport Table of Contents 1. What we do now?... 5 1.1. Transport Assets... 5 1.2. Transport Activities... 5 2. Key Network
The Future of Transportation. PTV Group Shaping Transportation May 27, 2014
The Future of Transportation PTV Group Shaping Transportation May 27, 2014 Who Is ITS America ITS America is the nation s largest nonprofit association dedicated to the research, development and deployment
Status of Asset Management in the Roads Sector. L Kannemeyer
Status of Asset Management in the Roads Sector L Kannemeyer Why Asset Management? Road Condition 100 80 60 40 20 Good Fair Poor B A Very Poor (Typically Designed for Traffic Expected over 20-30 Years)
DRIVER LICENCE ENDORSEMENTS Demonstrate knowledge and skills for driving a forklift on a road for endorsement F (forklifts)
1 of 6 level: 3 credit: 2 planned review date: July 2006 sub-field: Driving replacement information: This unit standard replaced the components relating to endorsement F requirements of unit standard 16670
Bicycle Safety Webinar December 1 st 2010
Bicycle Safety Webinar December 1 st 2010 Kay Teschke Kay Teschke is Professor in the Schools of Population and Public Health and of Environmental Health at the University of British Columbia. She is principal
Advancements in GPR for a Sustainable Tomorrow
Advancements in GPR for a Sustainable Tomorrow Shawn Lapain, BSc. E., EIT Pavement Specialist Applied Research Associates Inc. 5401 Eglinton Avenue West, Suite 105, Toronto, ON, Canada, M9C 5K6 Tel: 416-621-9555,
BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
County of Oxford Asset Management Plan 2014. 1.0 Executive Summary... 2. 2.0 Introduction... 7. 3.0 Purpose and Methodology... 10
Asset Management Plan AUGUST 2014 County of Oxford Asset Management Plan 2014 Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 7 3.0 Purpose and Methodology... 10 4.0 State of Infrastructure...
AMP Agriplan. All about protecting your livelihood
AMP Agriplan All about protecting your livelihood 2 This brochure summarises some of the cover provided by AMP s Agriplan policy. It is important to note that terms, conditions and exclusions apply to
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
The City of Owen Sound Asset Management Plan
The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
MUNICIPAL ASSET MANAGEMENT & FINANCIAL PLANNING A CASE STUDY: THE TOWNSHIP OF SCUGOG
MUNICIPAL ASSET MANAGEMENT & FINANCIAL PLANNING IN SMALLER MUNICIPALITIES A CASE STUDY: THE TOWNSHIP OF SCUGOG JULY 2012 By: David A. Stewart THE PAPER VS. THE PRESENTATION The Paper Includes A literature
WHITE PAPER. Vehicle branding: Is there hidden value in your fleet?
WHITE PAPER Vehicle branding: Is there hidden value in your fleet? WHITE PAPER Executive summary In today s challenging business landscape, companies often find themselves striving to shrink expenses as
ASSET MANAGEMENT PLAN
ASSET MANAGEMENT PLAN DECEMBER 2013 (Released in August 2014) Asset management planning is the process of making the best possible decisions regarding the building, operating, maintaining, renewing, replacing
Court Costs and Fees (A Guide to Fee Waivers)
Court Costs and Fees (A Guide to Fee Waivers) Learn what to do if you cannot afford to pay court costs and fees for Family, civil, housing, and small claims cases. If you don't have the money to pay court
how much would you spend?
name: date: how much would you spend? scenario 1 Manuel wants to buy a car. But before he goes shopping, he wants to know exactly how much he can afford to spend each month on owning, operating, and maintaining
Electrical Safety Plugs What are the different types of plugs? Extension Cords What are some potential hazards involving extension cords?
Electrical Safety Electricity can be a friend, but it can also hurt if you do not treat it with respect. Everyday someone loses his or her home or business due to an electrical fire. These tragedies are
TAX NEWSLETTER. February 2012
TAX NEWSLETTER February 2012 RECORDING YOUR BUSINESS AUTOMOBILE EXPENSES PRESCRIBED AUTOMOBILE AMOUNTS FOR 2012 EMPLOYEE LOANS CRA SIMPLIFIED RATES FOR MOVING EXPENSES INCURRED IN 2011 CRA PUTS END TO
Item No. 4 Halifax Regional Council February 16, 2010
PO Box 1749 Halifax, Nova Scotia B3J 3A5, Canada Item No. 4 Halifax Regional Council February 16, 2010 TO: Mayor Kelly and Members of Halifax Regional Council SUBMITTED BY: Phillip Townsend, Director,
Thoughts on Warm Mix Asphalt production (..among other things!)
Thoughts on Warm Mix Asphalt production (..among other things!) Even K. Sund Senior Principal Engineer Roads and Traffic Department, Road Directorate Contents of presentation Brief status for road maintenance
Assisted Living & Memory Care
SACRAMENTO ASSISTED LIVING & MEMORY CARE 8685 GREENBACK LANE SACRAMENTO CALIFORNIA APN 261-0210-005 DESIGN REVIEW NARRATIVE PROPOSAL Rood Investments proposes to develop a 92,816 square foot Assisted Living
Good EMC Design Principles: cable routing
Good EMC Design Principles: cable routing Keith Armstrong describes three important techniques for cable routing in metal cabinets, whether the cables are bundles of individual wires, or individual or
Other factors affecting the cost of Income Protection Insurance include:
If you were sick or injured and unable to earn money from the business how would you service your mortgage, vehicle repayments and fund school fees and living costs? Income Protection insurance is a vital
SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN
SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN Introduction This Asset Management Plan (AMP) for Land Transport Network 2012 describes in detail how the District s land transport network will be managed
EMPLOYEE FALL PROTECTION
EMPLOYEE FALL PROTECTION You can fall from any height and be seriously injured or killed. In the construction industry, as well as any other industry, when falls from heights happen, they are usually very
Four Pillars of Urban Sustainability Submission
Four Pillars of Urban Sustainability Submission Introduction The sustainability of a city can, in part, be measured by the quality of its infrastructure. Physical assets such as roads, sewer lines, transit,
A Guide to Vehicle Aerodynamics
A Guide to Vehicle Aerodynamics A streamlined vehicle shape is vital in reducing fuel usage by up to 7%. Anything which changes the vehicle outline can add to fuel usage. This guide gives checklists and
ASSET MANAGEMENT STRATEGY
ASSET MANAGEMENT STRATEGY Transport and Highways June 2013 Asset Management Strategy (June 2013) Page 1 of 10 CONTENTS INTRODUCTION 3 SECTION 1: WHY ASSET MANAGEMENT 4 1.1 Background 4 1.2 Strategic Framework
Asset Management Plan
Asset Management Plan Final Report May 2014 EXECUTIVE SUMMARY Adequate municipal infrastructure such as roads, bridges, and underground water and sewage pipes are essential to economic development, citizen
EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME
EAST AYRSHIRE COUNCIL CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME Report by the Depute Chief Executive/Executive Director of Neighbourhood Services PURPOSE OF REPORT 1 The
Contents. Why budget? Do I need to budget? Why budget? 3. Do I need a budget? 3. Some budgeting ideas 4. Talking with a budgeting advisor 5
Managing your money Contents Why budget? Why budget? 3 Do I need a budget? 3 Some budgeting ideas 4 Talking with a budgeting advisor 5 Extra help with costs 6 Budget worksheet to help you get started 7
City of Auburn Summary of Capital Outlay by Fund and Department
General Fund ~ MidBiennium Budget Review ~ FY 04 City Council (none) $ Office of the City Manager $ 25,000 Judicial (none) Information Technology Information Technology Division Upgrade for intrusion detection
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
Equipment and Fleet Maintenance Review
Internal Audit Issue Date: July 2014 Report Number: FY2014-04 Executive Summary AUDIT OF: Equipment and Fleet Maintenance Review DATE: Fieldwork performed May 2014 June 2014 AUDIT RATING: Acceptable [
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located
Stonegate Apartments. 4301 Stone Gate Boulevard Elkton, Maryland 260-Unit Value-Add Apartment Community
Stonegate Apartments 4301 Stone Gate Boulevard Elkton, Maryland 260-Unit Value-Add Apartment Community The Opportunity Jones Lang LaSalle s Mid-Atlantic Multifamily Group, as exclusive agent, is pleased
Preparing for A Flood
Preparing for A Flood 1. Know if you are in a flood prone area. 2. Each year, update flood procedures to be followed by your company, employees and tenants: Including Emergency Contacts Evacuation Plans
Operations Committee. District Engineer and Utilities Manager. Appendix A: Significance Assessment
Report To: From: Operations Committee District Engineer and Utilities Manager Date: Thursday, 3 July 2014 File reference: Document: 1227007 Appendix A: Significance Assessment Decision-making: Subject:
chapter 3 basic driving skills
chapter 3 basic driving skills When curving to the left, keep the front wheels close to the right edge of the lane to keep your driver s side rear wheels out of the next lane of traffic. Curve ahead slow
Garfield County FLEET MANAGEMENT PLAN
Garfield County FLEET MANAGEMENT PLAN 1 Table of Contents Topic Page I. Executive Summary 3 II. Definitions 4 III. Fleet Management Policies 5 a) Fleet Management Responsibility b) General Use of County
Yuba County Administrative Policy & Procedures Manual
Yuba County Administrative Policy & Procedures Manual Subject: Policy Number: Page Number: D-3 Page 1 of 5 AUTOMOTIVE TRANSPORTATION Date Approved: Revised Date: 02/19/08 12/16/14 POLICY: It is County
Journey/Travel Management Training Program
Journey/Travel Management Training Program Introduction All-Can Engineering & Surveys (1976) Ltd. is involved in operations that span the entire province of Alberta. Transportation is an integral part
IN-KIND CONTRIBUTION PROCESS
IN-KIND CONTRIBUTION PROCESS Contents: 1) General Rules Applying to In-Kind Contributions. 2) Step-by-Step Instructions for Completion of In-Kind Contribution. 3) In-Kind Contribution Form: Descriptions
Sustainable transport in Stockholm. Gustaf Landahl City of Stockholm
Sustainable transport in Stockholm Gustaf Landahl City of Stockholm The Capital of Scandinavia Outline Is Stockholms transport sustainable? Stockholm grows fast Carrots and sticks Conclusions Urban Mobility
SOME COMMON QUESTIONS ABOUT FLOODPROOFING
SOME COMMON QUESTIONS ABOUT FLOODPROOFING WHEN DOES FLOODING OCCUR? Although flooding can occur at any time of the year, the risks of high floods are greatest in the spring and summer. Spring floods are