PhD project description The use of TBM in future Norwegian infrastructure projects
|
|
|
- Todd Todd
- 10 years ago
- Views:
Transcription
1 NTNU - The Norwegian University of Science and Technology PhD project description The use of TBM in future Norwegian infrastructure projects PhD candidate: Øyvind Dammyr Main supervisor: Professor Bjørn Nilsen (NTNU) Co- supervisor: Professor Kurosch Thuro (TUM) Photos from the Hallandsås TBM tunnel project in southwestern Sweden Signature PhD candidate Signature main supervisor Contents of this document: 1 Background Objectives Scope Research Method Expected results Work plan References... 9
2 1 Background Tunnel Boring Machines (TBMs) were extensively used in Norway from the 1970s to the 1990s. The technique was mostly utilized on hydropower projects for the excavation of long transfer and pressure tunnels. At the time of introduction few tunnels through hard rocks, which are predominant in Norway, had been excavated with TBMs. During the 20 years of tunnel boring, manufacturers, clients, contractors, consultants and research institutions took part in the development of TBMs for boring through harder and tougher rocks. At the start of the 1990s Norway was considered to be in the forefront regarding this type of TBM technology. NFF (1998) reports on the Norwegian TBM history. Especially for long tunnels with few access points the TBM technique often proved to be both faster and more cost effective than the traditional D&B (drill and blast) excavation method. For hydropower tunnels the smooth circular contour also contributed to a lower head loss in the waterway and the tunnel diameter could be reduced compared to a traditional D&B tunnel. Other TBM projects included sewer tunnels, tunnels for the transport of drinking water and three road tunnels. The three road tunnel projects were not optimal for the TBM technique due to their relatively short lengths. However, a great deal of experience was gained from boring of larger cross sections. Many of the positive benefits of these TBM drives where unfortunately overlooked due to not optimal planning and due to the less suitable circular profile compared to the traditional horseshoe shaped road tunnel. After the large hydropower development in Norway came to an end at the beginning of the 1990s so did the use of Tunnel Boring Machines. Today, twenty years later, few persons in the Norwegian tunneling industry have experience with TBM technology, and whilst most of the world s countries are using both techniques (TBM and D&B), with increasing use of TBMs (Lemmerer 2011), Norway is often uncritically (authors opinion) only considering the D&B technique. It is no doubt that the Norwegian D&B method is highly efficient and that it has evolved largely the last twenty years. The use of this flexible technique also results in tunnels of very good quality. However, the absence of TBM knowledge in many cases leads to the fact that TBM is not even considered or not properly examined as a possible excavation option. Especially today, where evaluations of high- speed railways are being undertaken (JBV 2012a) and where long rail (JBV 2012b) and road (SVV 2012a) tunnels are being planned in several parts of Norway, evaluations for possible TBM drives and their benefits are highly relevant. In recent years, especially after the rock collapse in the Hanekleiv road tunnel in 2006 (Nilsen et al. 2007), a debate to whether high traffic tunnels in Norway should be constructed differently has picked up. One important question is whether Norwegian high traffic tunnels should be built equal to what is regarded as standard in many European countries, with a full concrete lining as the final water and rock support (e.g. ÖVBB 2006 and ÖVBB 2011). In Europe a final lining with rock contact (no gap between lining and rock) is generally regarded as necessary to ensure the long- term stability, low maintenance costs, long service life, and required fire protection of tunnels. In Norway the standard, as 2
3 described in for example Handbook 021 (SVV 2010) by the Norwegian Public Roads Administration (NPRA), is to implement the final rock support and the water/frost support as separate layers, where the water support generally consists of a vault made of light weight concrete or relatively thin free standing constructions of polyethylene plates covered with shotcrete as fire protection (fig. 1). These systems have their weaknesses in that they are not as durable as a concrete lining and that there exist a gap between the rock and water support, which has to be inspected regularly. Ultimately, a decision to go for a standard waterproof final lining would lead to a higher construction cost for Norwegian high traffic tunnels, but it is also likely to give the public a more reliable service due to reduced maintenance needs, and to lower the total project lifetime costs. Both the Norwegian National Railway Administration (NNRA) and the NPRA have shown increased interest in these aspects the recent years, and the NPRA has started its own research program into the matter (SVV 2012b). Each method of tunneling, conventional and mechanical (boring) has its particular advantages and also disadvantages. The task of the designer and the tunnel engineer is to evaluate and compare these and then select and implement one method (Lemmerer 2011). Better knowledge about the advantages and limitations for both the D&B and especially the TBM method is in the eyes of the author in this respect necessary. Fig. 1: Illustration of the Norwegian rock and water support philosophy (by Arild W Solerød, NPRA). The primary scientific objectives of this PhD project will be on three research topics, which are listed below. These topics are believed to be of crucial importance for the successful implementation of the TBM technique in future 3
4 Norwegian infrastructure projects. The overall aim of the PhD project is to highlight possible future challenges and benefits of tunnel boring with focus on identifying good technical solutions and by addressing possible challenges with tunnel boring under typical Norwegian engineering geological conditions. 1: TBM stability and water support solutions for optimal project lifetime cost and service life. 2: Tunnel boring through weakness zones and required rock support measures. 3: Tunnel boring in high in situ rock stress environments with the occurrence of brittle failure. The importance of research point 1 has somewhat been covered in the above text, and the main focus will be on typical solutions for TBM excavations. The state of the art and most common in infrastructure TBM tunnels is to line as the TBM advances with a segmental lining, a concrete ring made out of segments that fits together and form a complete ring just behind the TBM (see e.g. Maidl et al. 2008). However, at projects with special engineering geological conditions there might be necessary to install the lining at a later stage, and hence the lining is normally constructed as a cast concrete lining behind the TBM. In this PhD project it will be important to analyze the durability of different kinds of stability and water support solutions, and to see how the traditional Norwegian solutions compare to the European standards. New tunnels shall be compared to older ones with the same or similar type of construction to identify problems. If a tunnel, which is constructed for 100 years of service life, should start to leak after a short operating time this may have huge effects for the users and the maintenance costs. New innovations are also welcomed, such as the construction of segments reinforced with steel or plastic fibers alone or in combination with the traditional rebar reinforcement (see Hansel & Guirguis 2011 and Fuente et al. 2012). This can have several advantages such as reduction in costs compared to traditional reinforcement and to better disperse forces acting in the segments, preventing/reducing concrete cracking and spalling typical resulting from the installation of the segments or from the TBM thrusting of the segments. Research point 2 involves analysis into the use of TBMs in geology of changing quality. The TBM technique is less flexible than a D&B excavation and after construction has begun it is harder to react and adapt to changing and unforeseen ground conditions. Major weakness zones or faults containing heavily crushed and altered rock mixed with gouge material represent the most difficult conditions in Norwegian hard rock tunnels (Mao et al. 2011). It is of paramount importance for future TBM tunnels that analysis into the crossing of these zones is undertaken. There are many recent experiences from tunneling through changing ground conditions in Europe (e.g. Sturk et al. 2011, Ehrbar 2008) and it will be important to look into how these relate to Norwegian geological conditions and to learn from them. It will also be important to analyze field data from ongoing projects in geology relevant to future Norwegian projects. Observations on how TBMs and the rock support perform under these conditions will be in focus. 4
5 ting equipment on each side of the main body. The first 1,700 m was bored virtually without stability problems. After the break-in period the net penetra- PhD project description Øyvind Dammyr tion was approx. 1.3 m/h and the weekly progress m. The rock material had good boreability (DRI at Research point 3 involves analysis of brittle failure theory and practice. Brittle failure is a phenomenon, which can occur where the rock mass compressive strength 65-75), is overcome but the by rock the in mass situ stress had around little underground jointing. excavations As boring (fig. 2). All the aspects of the phenomenon is not fully understood and attempts to model with brittle high failure cutterloads with traditional in the rock massive strength criterions rock such resulted as the Mohr in Coulomb heavy or vibrations the empirical of generalized the relatively Hoek- Brown light criterion body has not of succeeded. this Several researchers have looked into the phenomenon of brittle failure the recent TBM, years the (e.g. rock Martin bolting et al. 1997, equipment Ortlepp 2001, required Diederichs et extensive al. 2004, Noferesti & Rao 2010). Some have suggested a methodology for the estimation of maintenance and was eventually removed. the probability for spalling and the depth of spalling (Martin & Christiansson 2009) After and a similar about approach 1,700 has m been of advance, tested in a larger increasingly infrastructure intense project (Rojat et al. 2009). Others have tried to modify current rock strength criterions to spalling give more occurred. accurate numerical Some modelling spalling results had under been such high anticipated, rock stress conditions but the (Hajiabdolmajid intensity was et al. unexpected. 2002) and some have On used some an approach sections with uncertainty analysis to estimate spalling potential (Harrison & Hudson 2010). From the rock many experiences at the contour in Norway was we know more that or spalling less and crushed, rock bursts and resulting from brittle failure is a common occurrence in Norwegian underground excavations. the progress For future of tunnelling TBM drives further was analysis slowed into this down phenomena, due to: in the light of the newest available research, is necessary. It will be an advantage to see the installation of rock support how the theory relates to Norwegian geological conditions. As in point 2 it is important gripping to observe problems how TBMs due and rock to overbreak support perform in under the walls these conditions. Gathering of field data and observations will here be undertaken and correlated hand clearing of debris and rock fragments to the newest research in the field. 2: Overbreak due to crushing and spalling (from NFF 1998). Fig. 2 Overbreak due to crushing and spalling During the first critical phase, rock bolting was performed by jack-leg drilling. 5 Later, working platforms were added making it possible to install rock bolts du- Fig. 3 Ro diameter The sp fragment pened wh bolting a had time front-end TBM bo material into the t The norm with two needed t Furthe creased, thus cou ses. Still develop above th rock sup hind the tions bec
6 2 Objectives The overall aim of the PhD project is to highlight possible future challenges and benefits of tunnel boring at future Norwegian infrastructure projects with focus on identifying good technical solutions and by addressing possible challenges with tunnel boring under typical Norwegian engineering geological conditions. Analysis into how relevant theory and state of the art experiences applies to Norwegian conditions is here important. See also chapter 1 for a more detailed explanation of points 1 through 3. Scientific objectives: 1: TBM stability and water support solutions for optimal project lifetime cost and service life. Find the optimal stability and water support solutions. 2: Tunnel boring through weakness zones and required rock support measures. Identify challenges and propose solutions. Define the necessary rock support measures. 3: Tunnel boring in high in situ rock stress environments with the occurrence of brittle failure. Identify challenges and propose solutions. Define the necessary rock support measures. 3 Scope The focus will generally be on geological conditions typical for Norway (hard rock) and engineering geological challenges that can be expected in Norway. Soil tunnels will not be included in the work. Soft/weak rock conditions will only be evaluated in relation to weakness zones. Detailed TBM tool wear and advance rate estimations are not in the scope of this PhD project. A lot of work has already been done on the topic and several research groups are currently working on new methods and optimization of existing methods. 4 Research Method Generally: Analysis will be undertaken based on extensive literature studies of theory and practice, experiences from earlier Norwegian projects, recent European projects, and collected field data and observations from site visits. The aim is to correlate practical experiences, numerical modelling and analytical calculations, with new published research in the fields, and to relate the results to typical Norwegian engineering geological situations. The points below describe the research method in more detail. Extensive literature studies of relevant theory. It is important to review the state of the art in all the research fields stated in the scientific objectives 1 through 3 in chapter 2. Analysis of earlier experiences from TBM projects in Norway. Knowledge transfer from Norwegian TBM experts and literature studies (e.g. NFF 6
7 1998). It is important to identify typical challenges and benefits made at earlier Norwegian TBM projects. Analysis of newer experiences from TBM infrastructure projects in similar geology internationally. Knowledge transfer and literature studies. Recent European experiences in similar geology/conditions and hence challenges that are expected in future Norwegian projects are crucial. The PhD project is undertaken in a close cooperation with the Technische Universität München (TUM), Germany. This cooperation enables extensive knowledge transfer and access to relevant European TBM projects. This involves both finished projects and projects under construction. This point and the point above are relevant for all the scientific objectives listed in chapter 2. Observations and gathering of field data from possible future Norwegian and built/current international TBM projects relevant for Norwegian conditions. For research point 1 it is relevant to gather data about the type of tunnel lining and type/nature of leakage problems through the tunnel lining in the operating phase. Here also data from Norwegian tunnels with the traditional Norwegian water proofing systems will be included. The data will be evaluated with respect to the type of lining used, the geological conditions and occurrence of water during construction. Data from new tunnels will be correlated to data from older tunnels to evaluate the quality and durability of the construction and what sort of problems that are commonly seen. For research points 2 and 3 deformation data and observations of brittle failure (possible measurement of the depth of failure) are to be collected systematically from a tunnel(s) under construction. Where possible should also classification of the rock mass (with the use of more than one classification system for correlation) be performed, and in situ rock samples for lab testing be taken (e.g. for testing of the UCS (Uniaxial Compressive Strength)). The collected data will be correlated to the observed challenges with the TBM drives and compared with the published literature. It will also be used in numerical modelling and analytical calculations (see below points). It will be important to relate the data to engineering geological conditions typical for Norway when interpreting the results. The data will also be compared to earlier experiences from Norwegian projects. Laboratory experiments. For numerical modelling and analytical calculations different kinds of laboratory tests might have to be undertaken (UCS with more) unless this has already been done and provided by others. Numerical modelling of deformations, stability and rock support. 2D and possibly 3D modelling will be undertaken and correlated with in situ observations. Analytical calculations of deformations and stability will be done and correlated with in situ observations. Correlations between numerical modelling and analytical results. This point is important to assure that both numerical and analytical results can be regarded as reasonable and to identify differences between numerical and analytical approaches. 7
8 5 Expected results Generally: A better understanding of how state of the art practice and theory relates to Norwegian engineering geological conditions will help to improve the decision basis for tunnel boring in Norway in the future. Below are some expected results listed together with how the outcome of the research can be applied in an industrial context or be useful to public administration. Highlight the possibilities and challenges (limitations) and hence better the decision basis for the choice of TBM in future Norwegian infrastructure projects. This is very relevant for contractors, consultants and project owners (e.g. the NPRA and the NNRA) and will benefit the society as a whole as typical projects will be both road and railway tunnels. Detailed analysis into three specific research topics will contribute to concrete recommendations on how to approach these different problems. The choice of the right support solutions to enable a longer project life and to reduce maintenance costs are very important for new projects and the direction the Norwegian tunnel philosophy will take in the future. Detailed knowledge about crossing of weakness zones and operation under high in situ stress concentrations are important to ensure the choice of the right technical solutions and to ensure the successful completion of future projects. Correlations of field data and in situ observations with numerical modelling, analytical calculations and published research may contribute to confirm or/and to optimize existing theory and practice. Hence, this will contribute to the research in the respective fields. 6 Work plan Shown below is a plan for the scheduled work. Planned papers are listed with numbers 1-5. Paper one is already sent in and accepted. It will be published at the EUROCK 2012 rock mechanics conference in Stockholm, Sweden at the end of May Paper 2 is in the works and the plan is that it will be published within the end of PhDAtimeplan Courses GB8310 GB8306 IFEL8000 GB8406 IndividualAreadingAcourse WorkAatANTNU TeachingArelatedA(25%) Research LitteratureAstudies FieldAworkA(andAlab.) Analysis PublicationAwork PaperA1 PaperA2 PaperA3 PaperA4 PaperA5A(maybe) CompletionAofAPhDAthesis PhDAdefence Spring Autumn Spring Autumn Spring Autumn Spring Autumn Spring 8
9 7 References Diederichs, M., Kaiser, P., & Eberhardt, E Damage initiation and propagation in hard rock during tunnelling and the influence of near- face stress rotation. International Journal of Rock Mechanics & Mining Sciences, 41, Ehrbar, H Gotthard base tunnel, Switzerland. Experiences with different tunneling methods. In: Proceedings of the 2nd Congresso Brasileiro de Túneis e Estruturas Subterrâneas. Seminário Internacional South American Tunnelling, São Paulo, Brazil, Fuente A., Pujadas, P., Blanco, A. & Aguado, A Experiences in Barcelona with the use of fibres in segmental linings. Tunnelling and Underground Space Technology 27 (2012) Hajiabdolmajid, V., Kaiser, P., & Martin, C Modelling brittle failure of r ock. International Journal of Rock Mechanics & Mining Sciences, 39, Hansel, D. & Guirguis, P Steel- fibre- reinforced segmental linings: State- of- the- art and completed projects. Tunnel 1/2011. Harrison, J. P. & Hudson, J. A Incorporating Parameter Variability in Rock Mechanics Analyses: Fuzzy Mathematics Applied to Underground Rock Spalling. Rock Mechanics and Rock Engineering, 43, JBV, 2012a. The Norwegian National Rail Administration (JBV) high- speed rail feasibility study. Online presentations of the evaluation. URL: n/ Accessed: JBV, 2012b. The Follobanen project. Online information. URL: S- - - Ski/Dette- er- Oslo- Ski/ Accessed: Lemmerer, J Selection of tunneling method (Editorial). Geomechanics and Tunneling 4 (4): 278. Maidl, B., Schmid, L., Ritz, W. & Herrenknecht, M Hardrock Tunnel Boring Machines. Berlin: Ernst & Sohn. Mao, D., Nilsen, B. & Lu, M Analysis of loading effects on reinforced shotcrete ribs caused by weakness zone containing swelling clay. Tunnelling and Underground Space Technology 26 (2011) Martin, C., & Christiansson, R Estimating the potential for spalling around a deep nuclear waste repository in crystalline rock. International Journal of Rock Mechanics & Mining Sciences, 46, Martin, C., Read, R., & Martino, J Observations of Brittle Failure Around a Circular Test Tunnel. International Journal of Rock Mechanics and Mining Sciences, 34 (7), NFF, Publication No. 11: Norwegian TBM tunneling. Oslo: Norwegian Tunneling Society, NFF. Available online, URL: Nilsen, B., Bollingmo, P. & Nordgulen, Ø Raset i Hanekleivtunnelen 25. desember Rapport fra undersøkelsesgruppen. URL: Accessed: Noferesti, H., & Rao, K. S New Observations on the Brittle Failure Process of Simulated Crystalline Rocks. Rock Mechanics and Rock Engineering, 43,
10 Ortlepp, W The behaviour of tunnels at great depth under large static and dynamic pressures. Tunnelling and Underground Space Technology, 16, Rojat, F., Labiouse, V., Kaiser, P., & Descoeudres, F Brittle Rock Failure in the Steg Lateral Adit of the Lötschberg Base Tunnel. Rock Mechanics and Rock Engineering, 42, Sturk, R., Dudouit, F., Aurell, 0. & Eriksson, S Summary of the first TBM drive at the Hallandsas project. Rapid Excavation and Tunneling Conference (RETC) proceedings. Society for Mining, Metallurgy, and Exploration, Inc. SVV, 2012a. The Norwegian Public Roads Administration (SVV). E39 Rogfast sub- sea road- tunnel. Available online, URL: Accessed: SVV, 2012b. Modern road tunnels research and development program. Online information. URL: Moderne+vegtunneler Accessed: SVV, Håndbok 021 Vegtunneler. Available online, URL: ÖVBB, Österreichische Vereinigung für Beton und Bautechnik Guideline "Concrete Segmental Lining Systems" ÖVBB, Österreichische Vereinigung für Beton und Bautechnik Guideline "Inner Shell Concrete" 10
State Route 640 Itinerary Agrigento-Caltanissetta-A19. Description of work
Description of work Sicily Tunnel Caltanissetta Year: 2013 In progress Client: Anas s.p.a. Contractor: Empedocle 2 s.c.p.a. Total length: 28 km Works amount: 175.000.000,00 Activities: Construction design
TUNNEL boring was originally attempted over 150 years
The advantages of tunnel boring : a qualitative/quantitative comparison of D&B and TBM excavation by Peter J Tarkoy, PhD, Geotechnical and Tunnel Construction Consultant and James E Byram, PhD, Senior
Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction
Current opportunities of sprayed waterproofing membrane Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction 1 What would we like to achieve? 2 What is desired? 3 and
Nuevas tendencias de la Minería Subterránea profunda Planeación, operación y estabilización del macizo rocoso
Nuevas tendencias de la Minería Subterránea profunda Planeación, operación y estabilización del macizo rocoso By Ernesto Villaescusa, PhD Chair in Rock Mechanics WA School of Mines, CRC Mining & Curtin
TBMs for Norwegian Hydropower projects. Sindre Log The Robbins Company
TBMs for Norwegian Hydropower projects Sindre Log The Robbins Company Who am I? Sindre Log M.Sc. Civil engineering, NTNU Specializations in tunneling, geology and Project management Working out of Oslo,
Membrane for tunnels and underground construction
System Platon Membrane for tunnels and underground construction Drainage Protection Waterproofing Dry and healthy buildings The Isola history quality through innovation CONTENT The Isola History Air Gap
Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2
Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 W.F. Bawden, Chair Lassonde Mineral Engineering Program, U. of Toronto, Canada J.D. Tod, Senior Engineer, Mine Design
The role of Experts in Tunnelling projects
The role of Experts in Tunnelling projects Evert Hoek This paper was prepared as a keynote address for a workshop entitled The Tunnels of Egnatia Odos which was held in Ioannina, Greece on 7 December 2001.
Numerical analysis of boundary conditions to tunnels
Global journal of multidisciplinary and applied sciences Available online at www.gjmas.com 2015 GJMAS Journal-2015-3-2/37-41 ISSN 2313-6685 2015 GJMAS Numerical analysis of boundary conditions to tunnels
ASG TUNNEL SEGMENT GASKETS. www.arsankaucuk.com.tr
ASG TUNNEL SEGMENT GASKETS ASG TUNNEL SEGMENT GASKETS www.arsankaucuk.com.tr ARSAN KAUCUK has started manufacturing rubber technical products for various industries in Istanbul in1957. ARSAN KAUCUK, started
1 Introduction. 1.1 General. 1.2 Historical development
1 Introduction 1.1 General Tunnelling is one of the most interesting, but also the most difficult engineering disciplines. It unites theory and practice into its own construction art. For the weighting
Numerical Analysis of Independent Wire Strand Core (IWSC) Wire Rope
Numerical Analysis of Independent Wire Strand Core (IWSC) Wire Rope Rakesh Sidharthan 1 Gnanavel B K 2 Assistant professor Mechanical, Department Professor, Mechanical Department, Gojan engineering college,
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle EPB-TBM Face Support Control in the Metro do Porto Project, Portugal S. Babendererde, Babendererde Engineers LLC, Kent, WA; E. Hoek, Vancouver,
Tunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
Gotthard Base Tunnel Risk Management for the World's Longest Railway Tunnel: Lessons Learnt
Gotthard Base Tunnel Risk Management for the World's Longest Railway Tunnel: Lessons Learnt Dr. sc. techn. Rupert H. Lieb Head of Construction Management AlpTransit Gotthard Ltd, Switzerland [email protected]
Member Nation Report 2010 from Denmark.
Member Nation Report 2010 from Denmark. The has during the year 2010 arranged 6 member meetings including two technical site visits. The first technical site visit covered the 5.3 km long Leipzig City
DIMENSIONING TUNNEL SUPPORT BY DESIGN METHODOLOGY
DIMENSIONING TUNNEL SUPPORT BY DESIGN METHODOLOGY "INTERACTIVE STRUCTURAL DESIGN" Diseno Estructural Activo, DEA) Benjamín Celada Tamames, Director General, Geocontrol, Madrid Translated from: Taller sobre
The Follo Line Project
The Follo Line Project Longest. UrbAN. Complex. Faster. 2015/1 Norwegian National Rail Administration the follo line project 1 2 the follo line project The project The Follo Line Project is currently the
(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016. Nina Tveiten Norwegian National Rail Administration
(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016 Nina Tveiten Norwegian National Rail Administration The study has been conducted on behalf of: The Ministry of Transport and Communications The Municipality
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF
Solutions for tunneling and mining. Waterproofing. Expanding Horizons Underground. Expanding horizons underground
Solutions for tunneling and mining Waterproofing Expanding Horizons Underground Expanding horizons underground The Bonded Waterproofing Concept An innovative approach, the MASTERSEAL 345 waterproofing
Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.
Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Civil Engineer Public Power Corporation, Greece Public Power Corporation
MINIMIZING DEFECTS OCCURRENCES ON SFRC TUNNEL SEGMENT OF KLANG VALLEY MRT PROJECT
Journal of Engineering Science and Technology Special Issue on 4th International Technical Conference 2014, June (2015) 13-23 School of Engineering, Taylor s University MINIMIZING DEFECTS OCCURRENCES ON
A Conceptual Methodology and Practical Guidelines for Managing Data and Documents on Hydroelectric Projects
A Conceptual Methodology and Practical Guidelines for Managing Data and Documents on Hydroelectric Projects Alan Hodgkinson SoftXS GmbH Alpensrasse 14 CH-6300 Zug Switzerland Joseph J Kaelin Pöyry Infra
SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS
Fracture Mechanics of Concrete Structures Proceedings FRAMCOS-3 AEDIFICA TIO Publishers, D-79104 Freiburg, Germany SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS H.
Risk oriented design and construction of tunnels
Risk oriented design and construction of tunnels Wulf Schubert Graz University of Technology 3G-Gruppe Geotechnik Graz ZT GmbH INTRODUCTION Risk in engineering commonly is understood as the product of
Rock Support and Reinforcement Practice in Mining
PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON GROUND SUPPORT KALGOORLIE/WESTERN AUSTRALIA/15-17 MARCH 1999 Rock Support and Reinforcement Practice in Mining Edited by Ernesto Villaescusa Western Australian
SYDNEY SANDSTONE AND SHALE PARAMETERS FOR TUNNEL DESIGN
Robert Bertuzzi Pells Sullivan Meynink, Unit G3 56 Delhi Road, North Ryde NSW 2113, Australia 1 BACKGROUND Inherent in any set of rock mass parameters are various assumptions regarding, amongst other things
Sany Tunnel Boring Machines
Sany Tunnel Boring Machines 3 CORPORATE CULTRUE Mission Build a top Company, Foster top employees, Make top contributions Spirit Progress constantly, Develop national industry Core Value Morality first,
Structural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
Forensic engineering of a bored pile wall
NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Forensic engineering of a bored pile wall Willem Robert de Bruin Geovita AS, Norway,
World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety - India
World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety - India Rehabilitation of concrete lined tunnels using a composite sprayed liner with sprayed concrete and sprayable
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
Module 3: Sewer Material Lecture 3: Sewer Material
Module 3: Sewer Material Lecture 3: Sewer Material [NPTEL, IIT Kharagpur, Prof. M.M.Ghangrekar, Department of Civil Engineering Page 1 3.0 SEWER MATERIAL 3.1 Important Factors Considered for Selecting
FAN group includes NAMVARAN UPSTREAM,
INTRODUCTION Reservoir Simulation FAN group includes NAMVARAN UPSTREAM, FOLOWRD Industrial Projects and Azmouneh Foulad Co. Which of these companies has their own responsibilities. NAMVARAN is active in
GOWANUS EXPRESSWAY TUNNEL PRIMER
GOWANUS EXPRESSWAY TUNNEL PRIMER T he New York State Department of Transportation is currently studying the replacement of the Gowanus Expressway with a tunnel. This investigation involves looking at a
Critical Assessment of RMR based Tunnel Design Practices: a Practical Engineer s Approach
RAPID EXCAVATION & TUNNELING CONFERENCE, June 2013 Washington, DC Session: Design and Planning Critical Assessment of RMR based Tunnel Design Practices: a Practical Engineer s Approach Lowson, A.R. PE,
SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 1 ROCK MECHANICS THEORY
SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 1 ROCK MECHANICS THEORY SYLLABUS Copyright 2006 SANIRE CONTENTS PREAMBLE... 3 TOPICS
Module 3 : Sewer Material. Lecture 3 : Sewer Material
1 P age Module 3 : Sewer Material Lecture 3 : Sewer Material 2 P age 3.1 Important Factors Considered for Selecting Material for Sewer Following factors should be considered before selecting material for
A study on the causes of troubles in shield tunneling site with numerical analysis
A study on the causes of troubles in shield tunneling site with numerical analysis 1 B.K. Rho, 2 S.Y. Choo, 2 M.K. Song Korea Rail Network Authority, Daejeon, Korea 1 ; Danwoo E&C Co., Ltd., Sungnam, Korea
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 4
SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 4 ROCK MECHANICS PRACTICAL (SURFACE AND UNDERGROUND) SYLLABUS PREAMBLE... 5 TOPIC
Monitoring of cutting tools in TBM S
Monitoring of cutting tools in TBM S Thomas Edelmann Herrenknecht AG Tunnelbauforschung in Leoben, Schwanau und Bochum Workshop am, Ruhr Universität Bochum) CONTENT A. Introduction B. Cutting tools C.
Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units
Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Thomas Kline Director- Concrete Repair Solutions STRUCTURAL TECHNOLOGIES, LLC Houston, Texas USA November
LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION
4th DAAAM International Conference on Advanced Technologies for Developing Countries September 21-24, 2005 Slavonski Brod, Croatia LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION
The Real Service Life and Repair Costs for Bridge Edge Beams
The Real Service Life and Repair Costs for Bridge Edge Beams Hans-Åke MATTSSON*, Håkan SUNDQUIST ** *) MSc, PhD Student, Department of Civil and Architectural Engineering, Division of Structural Design
Integrated Tunnelling Data Management, Analysis and Visualization New IT Tools for Better Projects
Integrated Tunnelling Data Management, Analysis and Visualization New IT Tools for Better Projects K. Chmelina 1, G. Krusche 1, G. Hesina 2 1 Geodata Ziviltechnikergesellschaft mbh, Leoben, Austria; 2
Structural Audit of Buildings
International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 4 (2014), pp. 411-416 Research India Publications http://www.ripublication.com/ijcer.htm Structural Audit of Buildings
Oil and Gas Pipeline Design, Maintenance and Repair
Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University [email protected]
Technical Data. 7. Bearing Fits. 7.1 Interference. 7.2 Calculation of interference F B LLLLLLLLL( A-54
Technical Data 7. Bearing Fits 7.1 Interference For rolling s the rings are fixed on the or in the housing so that slip or movement does not occur between the mated surface during operation or under. This
Structural Design Criteria & Design Loads on Delhi Metro Rail and Checking of Safety of Radial Joints in Tunnel Lining Segments
International Journal of Scientific and Research Publications, Volume 5, Issue 7, July 2015 1 Structural Design Criteria & Design Loads on Delhi Metro Rail and Checking of Safety of Radial Joints in Tunnel
ITA Working Group Conventional Tunnelling
General report on Conventional Tunnelling Method ITA Working Group Conventional Tunnelling N ISBN : 978-2-9700624-1-7 ITA REPORT n 002 / APRIL 2009 ITA Report n 002 - General Report on Conventional Tunnelling
UNITED WATER LEAK DETECTION SERVICE
UNITED WATER LEAK DETECTION SERVICE M. O'BRIEN Field Supervisor, United Water International ABSTRACT This paper details information on United Water's recently developed leak detection service, the aim
Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels
Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE
SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes
Numerical modelling of shear connection between concrete slab and sheeting deck
7th fib International PhD Symposium in Civil Engineering 2008 September 10-13, Universität Stuttgart, Germany Numerical modelling of shear connection between concrete slab and sheeting deck Noémi Seres
AFTES POST-GRADUATE SPECIALISED MASTER S DEGREE TUNNELS AND UNDERGROUND STRUCTURES. from design to operation. www.aftes.asso.fr
AFTES www.aftes.asso.fr POST-GRADUATE SPECIALISED MASTER S DEGREE TUNNELS AND UNDERGROUND STRUCTURES from design to operation http://mstunnels.insa-lyon.fr Post-graduate specialised Master degree TUNNELS
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
Gas Explosion at a Subway Construction Site
Gas Explosion at a Subway Construction Site Apr. 8th, 1970, Osaka city KOBAYASHI, Hideo (Tokyo Institute of Technology) (Summary) On April 8th, 1970, a huge gas explosion occurred at the site of construction
Modelling the Discharge Rate and the Ground Settlement produced by the Tunnel Boring
Modelling the Discharge Rate and the Ground Settlement produced by the Tunnel Boring Giona Preisig*, Antonio Dematteis, Riccardo Torri, Nathalie Monin, Ellen Milnes, Pierre Perrochet *Center for Hydrogeology
Söderströmtunnel: immersion in downtown Stockholm, Sweden
Söderströmtunnel: immersion in downtown Stockholm, Sweden J. Glückert Dipl.-Ing, Züblin Ground Engineering, Stuttgart, Germany N.H.J. Vink MSe, M. Reijm BSc, P.T. van Westendorp BSc Strukton Immersion
Pipeline Replacement using Relining
Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to
Designed and Engineered to Perform
History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the
Development of Tunnel Electrical Resistivity Prospecting System and its Applicaton
Development of Tunnel Electrical Resistivity Prospecting System and its Applicaton HEE-HWAN RYU 1, GYE-CHUN CHO 2, SUNG-DON YANG 3 and HYUN-KANG SHIN 4 1 Professor, Korea Advanced Institute of Science
The Performance Prediction of A TBM in Difficult Ground Condition
The Performance Prediction of A TBM in Difficult Ground Condition Nuh BİLGİN, Cemal BALCI, Hakan TUNÇDEMİR, Şinasi ESKİKAYA Department of Mining Engineering, Technical University of İstanbul, Turkey. Mustafa
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
CIVL451. Soil Exploration and Characterization
CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
STRUCTURAL HEALTH MONITORING AT ROME UNDERGROUND, ROMA, ITALY
Ref: WhP_Rome_vA STRUCTURAL HEALTH MONITORING AT ROME UNDERGROUND, ROMA, ITALY WHITE PAPER Summary: This white paper shows how Structural Health Monitoring (SHM), helps to improve the quality in the construction
EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS
in the Euro-Mediterranean Area EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS By Prof. Amr Ezzat Salama Chairman of Housing, Building National Center Cairo, Egypt Former Minister of High Education
Specification for tunnelling third edition. The British Tunnelling Society and The Institution of Civil Engineers
Specification for tunnelling third edition The British Tunnelling Society and The Institution of Civil Engineers Published by Thomas Telford Limited, 40 Marsh Wall, London E14 9TP, UK. www.thomastelford.com
The advantages and disadvantages of dynamic load testing and statnamic load testing
The advantages and disadvantages of dynamic load testing and statnamic load testing P.Middendorp & G.J.J. van Ginneken TNO Profound R.J. van Foeken TNO Building and Construction Research ABSTRACT: Pile
Baton Rouge Foundation Repair
Baton Rouge Foundation Repair 13822 Florida Blvd Bldg 3 Baton Rouge, LA 70819 Baton Rouge Foundation Repair offers services to correct the settlement of both Slab foundations and Pier & Beam foundations
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
TOTAL HIP REPLACEMENT FOR A LIFETIME: THE CEMENTLESS METAL ON METAL RECONSTRUCTION
Richard A. Sweet, M.D. Louisville Orthopaedic Clinic Louisville, KY TOTAL HIP REPLACEMENT FOR A LIFETIME: THE CEMENTLESS METAL ON METAL RECONSTRUCTION INTRODUCTION Total hip replacement surgery (THR) has
Estimation Of Residual Service Life For Existing Sewerage Systems
Estimation Of Residual Service Life For Existing Sewerage Systems HW Kaempfer M Berndt G Voigtlaender Institute of Material Research and Testing at the Bauhaus University Weimar Germany Summary: The cost
Guaranteed Solutions for Solving Sewer Backups 1-800-977-4737
Guaranteed Solutions for Solving Sewer Backups The typical network of pipes in your home. What causes sewer pipe backup? Foreign objects Waste water flow What causes sewer pipe backup? Tree Roots Removed
Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.
TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may
SIGRAFLEX EMAIL. Properties. Applications
Multilayer sealing sheet, adhesive-free made from flexible graphite foil reinforced with stainless steel foils especially for use in PTFE envelope gaskets SIGRAFLEX EMAIL has been developed specially for
Rehabilitation of an Aging Concrete Reservoir Adit Tower
Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco
Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902
External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water
TBM CROSSING OF STATIONS
TBM CROSSING OF STATIONS Eng. Marco Barbanti Astaldi S.p.A. Eng. Tommaso Grosso Astaldi S.p.A. 18-11-2011 In the presence of groundwater the permeability of the ground is of great interest. It is important
Why measure in-situ stress?
C. Derek Martin University of Alberta, Edmonton, Canada Why measure in-situ stress? Engineering analyses require boundary conditions One of the most important boundary conditions for the analysis of underground
HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps
Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning May 7th 2013: Dominique Deschamps Scope of the paper Presentation of the project Cause of cracks
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
IS THAT LINER THICK ENOUGH?
IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter
Two Alternative Contract Strategies Contract issues discussion Strength - Weakness
Contract Issues 1 Two Alternative Contract Strategies Contract issues discussion Strength - Weakness 2 If you like challenges, try an interface 3 Why EPC contract Single point responsibility for safety,
Virtual Reality Scientific Visualisation - A Solution for Big Data Analysis of the Block Cave Mining System
Virtual Reality Scientific Visualisation - A Solution for Big Data Analysis of the Block Cave Mining System James Tibbett, Fidelis Suorineni, Bruce Hebblewhite and Alex Colebourn What is Block Caving?
Water Loss and Leak Detection. Gary Armentrout, Project Associate Environmental Finance Center Wichita State University
Water Loss and Leak Detection Gary Armentrout, Project Associate Environmental Finance Center Wichita State University Water Meters The Atlanta Journal-Constitution: Thousands of city of Atlanta water
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
Installation of Large Diameter Buried Pipes
Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES
ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects
