Property Adjuster and Claims Examiner Training Programs
|
|
|
- Julia Lawson
- 10 years ago
- Views:
Transcription
1 Property Adjuster and Claims Examiner Training Programs HALLIWELL ENGINEERING ASSOCIATES, INC. Chicago Cleveland Dallas Los Angeles Miami New York Orlando Philadelphia Providence San Francisco Tampa Page 1
2 Table of Contents Page Utilizing GIS Technology to Solve some of Property Claims Toughest Challenges... 3 Enhanced Procedures for Wind vs. Water Damage Investigations... 6 Commercial Roofing Damage, Investigations and Adjusting Considerations Curtain Wall Damage Investigations and Adjusting Considerations EIFS and Stucco Claims Sinkhole Investigations for Property Claims.. 23 Structural Damage to Buildings Resulting from Sinkholes The Basics of Moisture-Related Damage to Buildings Page 2
3 Utilizing GIS Technology to Solve some of Property Claims Toughest Challenges Statement of Knowledge Statement of knowledge, skills, and abilities the attendee is expected to obtain through this course: Our claims investigation experience over the past 25 years shows that 70 to 80 percent of all property claims are the direct result of weatherrelated perils. Analysis of weather related claims typically requires cause and origin engineering investigations that attempt to calibrate the observed damage to the weather event. Sometimes this involves separating damage caused by different perils (wind vs water). However, most engineering investigations are performed without the benefit of an integrated meteorological analysis of the different forces Page 3
4 applied to the property during the storm, or of a geographic mapping analysis of key weather data available from FEMA, USGS and NOAA. This presentation will identify how Geographic Information Systems, Global Mapping Software, and Big Data can be leveraged to not only expedite the claims investigation process, but to yield much more accurate analyses, with greater detail and visual proof of the conclusions. Learning Objectives The four learning objectives of this course are as follows: 1) The Increasing Need for both Speed and Certainty in Property Claim Investigations 2) What GIS and GMS are, and how they are currently being used in CAT Claim Investigations 3) What Big Data Information Can be accessed via GIS 4) How GIS/GMS/Big Data are being used to investigate: Wind vs. Water Claims FEMA Flood Mapping Storm Surge Inundation Power Outage Claims Pre and Post Event Conditions Tornado and Severe Storm Claims Earthquake Damage Claims Page 4
5 Course Outline I) Introduction 5 Minutes The increasing need for speed and certainty in CAT Claim Investigations, and the role of GIS/GMS. II) The application of Geographic Information Systems Technology in Property Claims 10 Minutes a) What Is GIS? b) How is it used in CAT Claim Investigations? c) Getting Started d) Main GIS Database Sources III) Utilizing GIS / GMS to Investigate an entire Portfolio of Insured Properties: Address Geo-Coding 5 Minutes IV) Utilizing GIS / GMS to Investigate Individual Property Claims: Address-Level Analysis 60 minutes a) Wind vs. Water Claims b) FEMA Flood Zone Determinations c) Storm Surge Inundation & Sewer Back-up Claims d) Power Outage Claims e) Pre and Post Event Conditions Analysis f) Tornado and Severe Storm Analysis V) Summary & Conclusions: 5 Minutes How to Apply GIS/GMS Technology to CAT Claim Investigations for: a) Faster and Greater Access to weather, earthquake, and infrastructure data b) Better Analysis of the data through high resolution viewing platforms c) Better Reporting through more comprehensive data and visual proof of analysis and conclusions. This course is Approved for 1 CEU Credit Page 5
6 Wind vs. Water Damage Investigations Statement of Knowledge Statement of knowledge, skills, and abilities the attendee is expected to obtain through this course: This course, New Procedures for Wind vs. Water CAT Claim Investigations, is intended for an audience of Property Insurance Carriers, their Managers, Examiners, and Adjusters, as well as outside, Independent Adjusters. The course is developed at an intermediate level of complexity and difficulty for experienced Examiners and Adjusters. Page 6
7 Learning Objectives The four learning objectives of this course are as follows: 1) Understand the way that Wind vs. Water Property Claims are investigated, analyzed, and adjusted, particularly following Hurricane Katrina and Ike. 2) Understand recent Legal Rulings on anti-concurrent causation language. 3) Discuss the in-depth engineering and meteorology required to provide appropriate determinations of how much wind and water forces each contributed to the property damage. 4) Understand other recent Legal Rulings, their implications regarding mass tort litigation, and the recommended procedures for managing multi-peril claims in this changing legal environment. Course Outline I) Introduction, Purpose and Objectives of this Presentation: New Strategies for Managing CAT Claims with Multiple Causes of Loss (10 Minutes) a) Multiple Peril CAT Claims b) Anti-Concurrent Causation Clauses c) Mass Tort Litigation d) The Corban Court Decision e) Concurrent Causation Analysis Page 7
8 II) Start-Up and Triage Phase Immediately Following the Storm: Engineering and Storm Data Development for Adjusting Large Scale Wind and Water Losses (50 Minutes) a) Baseline Survey of Wind and Water Damage Damage Documentation Storm Damage Profiles Triage Damage Areas Baseline Damage Characteristics b) Topographical Surveys of Damaged Areas Elevation Surveys Elevation Comparisons (Structures and Storm Surge) Elevation Certificates Elevation Overlays onto Pictometry The Need for Precise Elevation Data c) Meteorological Analysis of Wind and Water Forces: What is Needed and Why d) Hurricane Windfield Analysis Gradient Wind Speeds Wind Directions Wind Speed Timing e) Storm Surge Analysis Storm Surge & Flooding Heights Wave Heights Storm Surge Timing III) Adjusting Phase: 1 to 12 Months Following the Storm (40 Minutes) a) Wind Damage Analysis Where Wind Damage Occurs Identifying Pushing vs. Pulling Forces Typical Wind Force Profiles Wind Force Damage Patterns Page 8
9 b) Water Damage Analysis Where Water Damage Occurs Hydrostatic Pressures Hydrodynamic Forces Breaking Wave Forces c) Wind vs. Water Damage Comparisons IV) Litigation Phase: Typical Challenges to Wind vs. Water Causation Analyses (2 to 4 Years Following the Storm) (10 Minutes) a) Wind vs. Water Timing b) All Damage Due to Wind c) Storm Surge Height d) Enhanced Fujita Scale Application e) Tornado V) Understanding Tornados in Hurricanes (10 Minutes) a) How and Where Tornados Form b) Tornado Damage Signatures c) Tornado Wind Damage Patterns d) Level 2 and 3 Doppler Radar Analysis VI) Summary: Strategy to Minimize Litigation Exposure (5 Minutes) VII) Follow-up / Questions and Answers (5 Minutes) This course is Approved for 2 CEU Credits Page 9
10 Commercial Roofing Damage: Investigations, and Adjusting Considerations Statement of Knowledge Statement of knowledge, skills, and abilities the attendee is expected to obtain through this course: This course, Commercial Roofing Damage, Investigations and Adjusting Considerations, is intended for an audience of Commercial Property Insurance Carriers, their Managers, Examiners, and Adjusters. The course is developed at an intermediate to high level of subject matter complexity for experienced Examiners and Adjusters (5 years minimum). It is designed to provide the attendees with an in-depth knowledge of commercial roofing design, construction, real-world service life(s), and damage analysis, as well as repair/replacement design considerations. Page 10
11 Learning Objectives The five learning objectives of this course are as follows: 1) Understand the different types of commercial roofing, their components and their functional value in the service life of the roof. 2) Learn how and why roof damage occurs, and how to distinguish between normal degradation, premature deterioration, and storm damage. 3) Identify the mechanics of how and why wind forces can damage a commercial roof structure. 4) Know the key elements of Repair vs. Replacement decision making. 5) Recognize the necessary components for an investigative report to support a fair and rational claim resolution. Course Outline I) The Design Perspective: How Commercial Roofs Go Together (45 minutes) a) Roof Slopes b) Structural Decks c) Vapor Barriers d) Insulation e) Membranes (Roofing Systems) f) Surfacing Materials g) Drainage h) Flashing i) Roofing Design Guidelines, Standards and Codes Page 11
12 II) The Investigation Perspective: How and Why Roofs Come Apart (45 minutes) a) Natural Degradation 1. Alligatoring 2. Service Life Expectations vs. Experience 3. The Impacts of Climate 4. Steep vs. Low Sloped Roofs b) Premature Deterioration of Commercial Roofing Systems: 4 Root Causes 1. Improper Drainage 2. Improper Flashing 3. Improper Attachments 4. Inadequate Surface Coating c) Wind Damage Characteristics 1. Understanding wind speed and forces 2. Wind Velocity Pressure 3. ASCE 7 4. Push and Pull forces 5. Visualizing wind force profiles on different roof shapes 6. Wind Borne Debris 7. Wind Driven Rain d) The Building Structure 1. Components and Cladding 2. Connections 3. MWFRS: Maximum Wind Force Resisting System 4. Wind Damage Patterns: Expected Areas of Maximum Damage III) The Restoration Perspective: Repair or Replace? a) Expected and Types of Wind Storm Damage 1. Low Sloped Roofs 2. Steep Sloped Roofs (45 Minutes) Page 12
13 b) Repair or Replacement: Based on Damage and Condition 1. Scope of the Damage 2. Condition of the Membrane, Insulation, and Structural Deck 3. The Extent of Moisture Intrusion 4. The Loss of Uplift Resistance 5. Dead load Capacity of the Structural Deck 6. Ballasted Single Ply Membrane Roofs 7. Steep Sloped Roofs 8. Roofing Tests: Their value and applicability to damage assessments c) Repair or Replacement: Based on Building Code Requirements 1. Legacy Building Codes International Building Code Requirements 3. IBC Section 1510: Reroofing (Recovering vs. Replacement; Reinstallation of Materials) 4. Florida Building Code Requirements are Unique d) Repair or Replace: Based on Engineering Value Judgments IV) The Engineer s Damage and Restoration Report: What s Important for Claims Resolution? (15 Minutes) a) Different Report Format Options b) On-Site Observations and Investigations c) Engineering Analysis of the Meteorological Data, Observed Damage, Roofing System Conditions, Restoration Requirements and Building Code Impacts d) Conclusions and Recommended Scope of Repair or Replacement e) Estimated Cost of Restoration (Optional) This course is Approved for 2 CEU Credits Page 13
14 Curtain Wall Damage: Investigations and Adjusting Considerations Statement of Knowledge Statement of knowledge, skills and abilities the attendee is expected to obtain through this course: This course, Curtain Wall Damage, Investigations and Adjusting Considerations, is intended for an audience of Property Insurance Carriers, their Managers, Examiners, Adjusters as well as outside Independent Adjusters. The course is developed at an intermediate level of complexity and difficulty for experienced Examiners and Adjusters. It is designed to provide the attendees with a requisite understanding of Curtain Wall Designs and Construction, building envelope damage investigations, Page 14
15 along with damage analysis, and repair / replacement decision considerations. Learning Objectives The four learning objectives of this course are as follows: 1) Understand the basic types of glass curtain wall designs and constructions. 2) Recognize the distinction between curtain wall deterioration and damage. 3) Identify the key steps to properly investigate curtain wall damage. 4) Understand the primary issues included in curtain wall repair vs. replacement analysis. Course Outline I) The Damaged Curtain Wall Challenge: Repair or Replacement? (15 minutes) Three Primary Options for Restoration of Major Curtain Wall Damage: a) Repair of damaged areas with Like Kind and Quality Materials 1. Code Considerations 2. Matching Issues 3. Insured s Challenges b) Repair of damaged areas with New (Current) Code Compliant Design and Materials 1. Matching Issues 2. Technical Challenges 3. Code Considerations Page 15
16 4. Expanding Scope c) Replacement of Entire Curtain Wall with a New, Code-Compliant System 1. Significant Cost Issues 2. Scope Issues and System Upgrades 3. Business Interruption Consequences II) Curtain Walls Defined and Explained (15 minutes) a) Curtain Walls Defined by their Structure/Assembly b) Types 1. Glazed 2. Masonry / Stone Metal c) Classifications 1. By Assembly 2. By Function 3. By Materials 4. By Configuration d) Benefits: Why glass curtain walls are so popular III) How Curtain Walls Work (15 minutes) a) Evolution of Construction b) Load Support c) Accommodating Building Movement d) Challenges and Problems 1. Movement 2. Loading Analysis 3. Design Scope 4. Façade Design Principles Page 16
17 IV) Investigating Damages/Determining Causation (30 Minutes) a) Degradation of Materials 1. Disparate Lifespan of Materials 2. Service Life Expectations 3. Factors Accelerating Degradation b) Improper Maintenance 1. Lack of Knowledge, Training 2. Cost & Technique c) Design Errors and Omissions 1. Selection of Materials 2. Improper Detailing/Connections 3. Proper Drainage 4. Not accommodating movement 5. Over-reliance on Sealants d) Faulty Fabrication 1. In the Shop 2. In the Field e) Construction Defects 1. Detailed Design left to Contractor 2. Project Defining Methods 3. Field Erection Quality f) Extreme Weather Events 1. Wind Storms 2. Wind-Borne Debris 3. ASCE 7 Design Loads 4. IBC: Design Wind Speeds Have Increased g) Damage patterns and Wind Load Analysis 1. Plot Wind Speeds, Direction, Hour by Hour 2. Damage Patterns vs. Wind Speed/Direction Page 17
18 3. Urban Turbulence 4. ASCE Wind Pressure Load Analysis 5. Breeched Envelopes, Pressure Effects h) Understanding the new (IBC) Code for Damaged Curtain Walls 1. Repairs Defined 2. Alterations Defined 3. Dangerous/Hazardous Conditions 4. Applications to Damaged Glass Curtain Walls 5. Like Kind/Quality or Compliance with Current Code? 6. Recent Rulings V) Adjusting the Curtain Wall Loss (25 Minutes) Three Options for Restoration 1. Repair Damaged Areas with Like Kind, Quality 2. Repair Damaged Areas with (Current) Code-Complaint Materials 3. Replace Entire Curtain Wall System a) Code Considerations 1. Local Jurisdictions/IBC Modifications 2. IBC: Repair Alterations Dangerous/Hazardous Conditions 3. Code Compliance Requirements may differ for Mullions, Attachments, and Glazing 4. Other non-event related defects revealed? b) Technical Challenges 1. How Loads are Transferred from Curtain Wall to Main Structural Frame 2. Older Systems out of Manufacture 3. Splicing New into Existing System 4. Matching issues: Glazing and Mullions Page 18
19 c) Owner/Consultant Challenges 1. Early meetings with Code Officials 2. Responsible for Submission of Design, Permits 3. Architect refuses to Design for Repair 4. Effort to invoke Dangerous/Hazardous Conditions Interpenetrations 5. Not matching d) Recommended Adjusting Team Strategy 1. Thoroughly Investigate Damage, Existing Conditions and other Existing Defects 2. Analysis of Dangerous/Hazardous Conditions 3. Meet with Code Officials early on for Acceptability of Like Repair Option 4. Investigate other local Curtain Wall Damage, Repair Applications 5. Develop Design/Building Scope of Work Far Enough to produce Not-To-Exceed Cost Estimate 6. Include Collateral Damage Repairs; Dangerous Conditions, Re-Seal all glazing; interior damage repairs 7. Include all special conditions costs, overhead and profit 8. Submit as a Guaranteed Maximum Price VI) Summary: Affirmative Investigation: Adjustment (10 Minutes) a) Compliance Investigations b) Surrounding Facility Comparisons c) Prove: Technically Feasible d) Prove: Code Acceptable e) Prove: GMP This course is Approved for 2 CEU Credits Page 19
20 EIFS and Stucco Claims Statement of Knowledge Statement of knowledge, skills and abilities the attendee is expected to obtain through this course: This course, EIFS and Stucco Claims, is intended for an audience of Property Insurance Carriers, their Managers, Examiners, and Adjusters, as well as outside Independent Adjusters. The course is developed at an intermediate level of complexity and difficulty for experienced Examiners and Adjusters. It is designed to provide attendees with the requisite understanding of EIFS and Stucco Systems, to understand the underlying problems that exist, and the investigative processes required to determine repair or replacement decisions and considerations. Page 20
21 Learning Objectives The four learning objectives of this course are as follows: 1) Understand the different types of EIFS Systems and how you can tell them apart. 2) Recognize what constitutes a good investigative procedure. 3) Identify the key factors to determine the correct restoration scope. 4) Learns the primary issues associated with EIFS Systems repair vs. replacement Course Outline I) EIFS Introduction and Overview of the Issues (20 minutes) a) EIFS Defined (What is EIFS) b) EIFS Construction (How is EIFS Constructed) c) EIFS Benefits d) EIFS Problems II) EIFS A Brief History (15 minutes) a) Product Development b) Problems Arise III) EIFS Problems Explained (20 minutes) a) Legacy Barrier Walls Systems b) Drainage Wall Systems c) Why so Many Problems IV) Stucco Claims (20 minutes) a) Stucco Exterior Wall Finishes Page 21
22 b) Synthetic Stucco c) EIFS d) DAFS (Direct Applied Finish Systems) e) EIFS or Stucco V) EIFS Property Damage Claims (10 minutes) a) Scope of Damage b) Causation c) Scope of Repair VI) EIFS Repair vs. Replacement (20 minutes) a) Scope of Damage b) Causation c) Overall Condition d) Code Consideration e) Differing Opinions & Areas of Controversy VII) EIFS 3 Case Studies (20 minutes) a) Significant EIFS damage with no apparent pre-existing water damage b) Significant EIFS damage with underlying water intrusion c) Significant EIFS damage with underlying water damage VIII) EIFS Preventing Problems (10 minutes) a) Design b) Construction c) Maintenance d) EIFS Manufactures e) Consultant Contact Information This course is Approved for 2 CEU Credits Page 22
23 Sinkhole Investigations for Property Claims Statement of Knowledge Statement of knowledge, skills, and abilities that the attendee is expected to obtain through this course: This course, Sinkhole Investigations for Property Claims, was developed for an audience of property insurance Carriers, Examiners, and Adjusters. The course was developed at an intermediate level of complexity and difficulty for experienced Examiners and Adjusters. It is designed to provide the attendees with a requisite understanding of the underlying geotechnical nature and cause of sinkholes, the difference between Page 23
24 sinkholes and other forms of subsidence, the engineering methods used to investigate sinkholes, the methods used to remediate sinkholes, and the issues involved in successfully adjusting sinkhole property claims. Learning Objectives The Five Learning Objectives of this Course are as follows: 1) Understanding what Sinkholes are and how they occur; 2) Learning How to Investigate Sinkhole Property Claims 3) Becoming Familiar with Sinkhole Remediation Methods 4) Knowing the Correct Initial Response to a Sinkhole Claim 5) Understanding the Specific Issues involved in Adjusting a Sinkhole Claim Course Outline I) What are Sinkholes.and How Do They Occur? (40 Min) a) Initial Definition of a Sinkhole b) Loss of Surface Support c) Cause of Loss of Underlying Support d) Carbonate Bedrock e) Effects of Acids and Bases f) Beds, Bedding, and Fractures g) Dissolution h) Groundwater Effects i) Pipes and Drains j) The Bathtub Model of Subsidence k) 3 Types of Sinkholes Page 24
25 l) Sinkhole Shapes m) Karst Topography n) Final Definition of a Sinkhole o) Effects of Urbanization p) When it is NOT A Sinkhole II) Sinkhole Investigations (20 Min) a) Sinkhole Time Frames b) Sinkhole Symptoms & Clues c) Relative Floor Surface Elevation Study d) Subsurface Camera Survey e) Test Pits f) Dynamic Cone Penetrometer Soundings g) Shallow Test Borings h) Standard Penetration Test Borings i) Ground Penetrating Radar j) Investigation Plans III) Sinkhole Remediation Methods (10 Min) a) Remediation Strategies b) Remediation Methods: Shallow Underpinning c) Remediation Methods: Deep Underpinning d) Remediation Methods: Injection Grouting e) Remediation Methods: Chemical Grouting IV) Sinkhole Damage & Response (10 Min) a) Categories of Sinkhole Damage b) Initial Response Methods c) Repairs, Guarantees & Limitation V) Adjusting Sinkhole Claims (10 Min) a) Florida Sinkhole Legislation b) Other State Mandates for Sinkhole Claims c) Other Adjusting Issues Page 25
26 VI) Sinkhole Case Studies (20 Min) a) Lafayette County, FL b) Clearwater, FL c) Sumteville, FL d) Gainsville, FL e) Allentown, PA VII) Summary / Sinkhole Investigations (10 Min) This course is Approved for 2 CEU Credits Page 26
27 Structural Damage to Buildings Resulting from Sinkholes Statement of Knowledge Statement of knowledge, skills, and abilities that the attendee is expected to obtain through this course: This course, Structural Damage to Buildings Related to Sinkhole Activity, is intended for an audience of property insurance Carriers, Managers, Examiners, and Adjusters, as well as outside Independent Adjusters. The course is developed at an intermediate-to-advanced level of complexity/difficulty. Page 27
28 Learning Objectives The six learning objectives of the course are as follows: 1) Understanding what is and what is not structural damage 2) Understanding the different definitions of structural damage, including those specific to sinkhole investigations 3) Learning the specifics of the definitions; comparing/contrasting 4) Examining building code requirements intended address/mitigate structural damage 5) Learning about structural damage-resistant alternatives to conventional building materials 6) Understanding how to best get questions answered regarding claims related to structural damage Course Outline I) Why discuss structural damage to buildings? (5 minutes) II) What is damage? (10-15 minutes) a) Definition of damage b) Some general principles relating to damage c) Examples representing damage d) Examples not representing damage e) Types of issues Page 28
29 III) Specific examples of structural damage definitions (15-20 minutes) a) All too common b) Dictionary c) Existing building code d) Florida statutes e) Tennessee statutes IV) Parsing the definitions (60-70 minutes) a) Florida statutes b) Tennessee statutes V) Building code examples intended to limit structural damage to buildings (5 minutes) a) Design- related b) Construction-related c) Occupancy/maintenance-related d) Suggested code changes VI) Structural damage-resistant alternatives to conventional building materials (5 minutes) VII) Helping HEA to help you (5-10 minutes) a) Ask good questions b) Provide everything you can c)_ Get us up to speed; assist where possible d) Recognize limitations VIII) Questions (5-10 minutes) This course is Approved for 2 CEU Credits Page 29
30 The Basics of Moisture-Related Damage to Buildings Statement of Knowledge Statement of knowledge, skills, and abilities that the attendee is expected to obtain through this course: This course, Basics of Moisture-Related Damage to Buildings, is intended for an audience of property insurance Carriers, Managers, Examiners, and Adjusters as well as outside, Independent Adjusters. The course is developed at a basic-to-intermediate level of complexity/difficulty. Page 30
31 Learning Objectives The six learning objectives of the course are as follows: 1) Understanding what is/is not moisture-related damage 2) Learning about the different sources of moisture-related damage 3) Identifying what characteristics are associated with shorter-term versus longer-term durations of exposure 4) Examining Building Code requirements intended address/mitigate moisture-related damage 5) Learning about moisture-resistant alternatives to conventional building materials 6) Understanding how to best get questions answered regarding claims with moisture-related damage Course Outline I) Why discuss moisture-related damage? (5 minutes) II) What is damage? (10 minutes) a) Definition of damage b) Examples representing moisture-related damage c) Examples not representing moisture-related damage d) Types of issues e) Categories of moisture-related damage f) Examples of responses to moisture-related damage III) Categories of sources (35 minutes) a) Rainwater 1. Identification Page 31
32 2. Related causes 3. Discussion b) Stormwater/groundwater 1. Identification 2. Related causes 3. Discussion c) Plumbing leaks 1. Identification 2. Related causes 3. Discussion d) Humidity/condensation 1. Identification 2. Related causes 3. Discussion e) Animal-related 1. Identification 2. Related causes 3. Discussion f) Fraud-related 1. Identification 2. Related causes 3. Discussion IV) Duration discussion (15 minutes) a) Factors (potentially) affecting duration b) Shorter term 1. Identification 2. Discussion Page 32
33 c) Longer term 1. Identification 2. Discussion d) Very long term 1. Identification 2. Discussion V) Building Code examples that address/mitigate moisture-related problems (15 minutes) a) Design-related b) Construction-related c) Occupancy/maintenance-related d) Suggested code changes VI) Moisture-resistant alternatives to conventional building materials (10 minutes) VII) Helping HEA to help you (10 minutes) a) Ask good questions b) Provide everything you can c) Get us up to speed; assist where possible d) Recognize limitations VIII. Questions (5-10 minutes) This course is Approved for 2 CEU Credits Page 33
FIELD TESTING SERVICES
FIELD TESTING SERVICES Chris Leach Director of Testing Baton Rouge, Louisiana Destin, Florida Scott Leach David Nichols Field Testing Representative Field Testing Representative 17485 Opportunity Avenue
Claim No.: DOCUMENT TYPE: INVEST ENGINEERING REPORT Date of Loss: October 29, 2012. 384 Ocean Avenue Long Branch, NJ
January 9, 2013 Mr. Richard Swink National General Adjuster York SLA 5501 LBJ Freeway, Suite 375 Dallas, Texas 75240 Email: [email protected] Tel: 214/673-4148 (M) RE: Claim No.: TBD DOCUMENT TYPE:
The Florida Building Code
The Florida Building Code Florida s Response to Hurricane Risk Rick Dixon Florida Building Commission Florida Building Commission Architect Structural Engineer Mechanical Engineer Fire Protection Engineer
Commercial Residential Model Reviews
Commercial Residential Model Reviews Prepared by the Professional Team for The Florida Commission on Hurricane Loss Projection Methodology May 2002 I. Background and Items for Consideration In May, 2000,
SECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
Water Damage & Repair
Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below
Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages)
INNOVATIVE BUILDING AND ARCHITECTURE CONSULTANTS Mr. Bud Hall Senior Vice President of construction Turnberry Associates 19501 Biscayne Boulevard, Suite 400 Aventura, FL 33180 Subject: The Nashville Hilton
The Florida Building Code
Setting New Standards for Safety The Florida Building Code Florida Building Commission Florida Department of Community Affairs The Florida Building Code System The Florida Building Commission Florida Building
School Construction Authority Architecture & Engineering
SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following
Assessing Curtain Walls
Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC [email protected] What is a Curtain Wall System? A curtain wall system is an outer covering of a building
Roof Inspection. Summary Report
www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,
WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS:
WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS: BY WILLIAM D. SMITH Figure 1 Four Corporate Center, Franklin, TN. Architect: Little & Associates,Charlotte, NC. Gen. Contractor: Ray Bell Const. Co., Nashville,
How To Replace A Roofing System In Florida
Florida Consumer Considerations in Replacing their Roofing System The Florida Roofing, Sheet Metal and Air Conditioning Contractors Association provides the following general information to help Florida
RESIDENTIAL ROOF PERMITTING - 101. A REFRESHER WORKSHOP September 11, 2014
RESIDENTIAL ROOF PERMITTING - 101 A REFRESHER WORKSHOP September 11, 2014 Agenda Basics of Permit Application Use of Charlotte County GIS system Florida Product Approvals Top Application Mistakes Standard
Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria
Appendix B 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria 423.25 Public shelter design criteria. 423.25.1 New facilities. New educational facilities for school boards
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
Water Damage During Construction
Allianz Global Corporate & Specialty Americas Water Damage During Construction May 2012 A Contractor s Loss Prevention Guide Water damage losses are a major cause of loss during construction and represent
10DBMC International Conference On Durability of Building Materials and Components LYON [France] 17 20 April 2005
10DBMC International Conference On Durability of Building Materials and Components Wall Cladding System Durability Lessons Learned from the Premature Deterioration of Wood-Framed Construction Clad with
Exterior Elevated Elements Inspection Guidelines
Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code
Property Policyholder Risk Improvement Report and Hurricane Survey
Risk Engineering Property Policyholder Risk Improvement Report and Hurricane Survey Zurich Services Corporation Risk Engineering 1400 American Lane Schaumburg, IL 60196-1056 847.605.6000 Fax: 847.605.7854
Status of Building Codes in New Jersey and New York: The Future of Resilience in a Post-Sandy Environment
Status of Building Codes in New Jersey and New York: The Future of Resilience in a Post-Sandy Environment Sandy devastated properties in several states, but primarily in New York and New Jersey. Now, as
Wind vs. Water and Unique Monroe County Mitigating Factors for Wind Damage
Wind vs. Water and Unique Monroe County Mitigating Factors for Wind Damage A Presentation to the Florida Commission on Hurricane Loss Projection Methodologies Prepared by the Grassroots Organization FIRM
SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION
SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION As of October 1, 2007, this mitigation form must be submitted as part of the roofing permit application package. Secondary water barrier (if applicable)
RDH Building Sciences Inc.
MAK LTR 2007 03 26 Proposal for Building Enclosure Consulting Services RDH Building Sciences Inc. 509 FAIRVIEW AVENUE N SEATTLE WA 98109-5507 TEL 206 324 2272 FAX 206 324 6339 [email protected] WWW.RDHBE.COM
The Building Group First Tuesdays First Saint Paul s Lutheran Church 1301 North LaSalle Street, Chicago, Illinois
Wiss, Janney, Elstner Associates, Inc. 10 South LaSalle Street, Suite 2600 Chicago, Illinois 60603 312.372.0555 tel 312.372.0873 fax www.wje.com The Building Group First Tuesdays October 2, 2012 Jason
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
JOSEPH P. SOLINSKI. Membership affiliations and committee board standings are maintained with the following industry organizations:
JOSEPH P. SOLINSKI Page 1 of 5 SUMMARY Diversified experience within the Curtain Wall Industry has provided a complete spectrum of background and training. Mr. Solinski s more than 29 years of experience
RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012
RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 Commercial rooftops represent the most available, sustainable and secure real estate for new
APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET
Environmental Protection and Growth Management Department PERMITTING, LICENSING AND CONSUMER PROTECTION DIVISION 1 N. University Drive, Box #302 Plantation, Florida 33324 954-765-4400 www.broward.org/permittingandlicensing
metal Duil~ing manufacturers Association
metal Duil~ing manufacturers Association ApplicatiDns metal Building Systems Conventional Buildings Retrofit Roofing Projects l~e Perfect Cover.One of the most important technological advances in building
RESIDENTS DAMAGE ASSESSMENT FORM
Instructions for RESIDENTS DAMAGE ASSESSMENT FORM 4 Form 4 should be handed out to the residents to complete to the best of their ability and returned to the local community. Who in turn will forward to
INVESTIGATING AND REMEDIATING LEAKS IN BELOW GRADE STRUCTURES AND UNDER PLAZAS
INVESTIGATING AND REMEDIATING LEAKS IN BELOW GRADE STRUCTURES AND UNDER PLAZAS JUSTIN HENSHELL, FAIA, FASTM HENSHELL & BUCCELLATO, RED BANK, NJ B U I L D I N G E N V E L O P E T E C H N O L O G Y S Y M
Building Owners Guide to a Duro-Last System!
Building Owners Guide to a Duro-Last System Table of Contents Section 1: Introduction to Duro-Last Roofing Systems Section 2: Benefits of a Duro-Last Roofing System Section 3: Comparing a Duro-Last Roof
Roof Condition Analysis
Roof Condition Analysis Prepared for: J.W. Nelson John Evans Middle School - Gym Dome 2900 15th Avenue Greeley, Colorado Prepared by: Gregory Ham Coastal Specified Products 5252 Sherman Street Denver,
COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R
Legislation passed by the 82 nd legislature has modified the Texas Engineering Practice Act and the Texas Architect Practice Act. In order to give the public a clearer understanding of these changes, the
Bituminous Sheet Flat Roofs: Their repair and maintenance
Bituminous Sheet Flat Roofs: Their repair and maintenance Flat roof covered in sheets of bituminous felt Introduction Whilst flat roofs are often regarded as inferior to their pitched counterparts and
The Prefab Package. Modular EIFS construction offers benefits to today s busy jobsites. Building Envelope. Roland Serino, P.E., of Dryvit Systems Inc.
26 D+D MARCH 2015 Building Envelope Roland Serino, P.E., Dryvit Systems Inc. here has always been a need for a more efficient way to build in large cities like Chicago, New York, Los Angeles or other central
ELIGIBLE REPAIR PROJECT PARAMETERS
THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building
Investigation Of Water Damage Claims For Subrogation Potential
Investigation Of Water Damage Claims For Subrogation Potential by Chris Shiver, PE and Phil Chapski, PE, Cerny and Ivey Engineers, Inc., Norcross, Georgia Water entry into homes and businesses is the cause
bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls
A bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls CE 28 h Exterior finish materials are expected to protect the house from the elements while providing an attractive appearance.
Low-slope reroofing guidelines
Low-slope reroofing guidelines by Thomas Bollnow and Joan P. Crowe, AIA The NRCA Roofing and Waterproofing Manual, Fifth Edition, contains reroofing guidelines for steep- and low-slope roofing. The August
CZAR Engineering, L.L.C.
CZAR Engineering, L.L.C. Lamont H. Czar, P.E. Phone: (609) 653-9445 5014 Fernwood Avenue Fax:(609)653-2015 Egg Harbor Township, New Jersey 08234 www.czarengineering.com May 3, 2013 Craig Dothe, Architect
Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005
Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives
Tiled Shower Pan Leaks - Investigation And Repair FAQ
Tiled Shower Pan Leaks - Investigation And Repair FAQ 2010 by Paragon Property Services Inc, Chicago http://www.paragoninspects.com Prepared By Michael Thomas, Moisture Intrusion Specialist. mdt@paragoninspects,com,
How To Control Water Penetration In A Window
WATER PENETRATION CONTROL FOR WINDOWS A SERVICE LIFE APPROACH David R. Ricketts, P.Eng. 1 and Silvio Plescia, P.Eng. 2 INTRODUCTION Building envelope performance problems and their close link to poor window
Sun Vinyl New Construction Windows Homeowner's Warranty
Sun Windows Sun Vinyl New Construction Windows Homeowner's Warranty Vinyl Sun Windows, Inc. warrants for a period of 2 years that the quality of workmanship and materials of vinyl items shall be free from
SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE
A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION
Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems
Method of Test Committee Approval Product Group Approval Approved via 5/21/15 MOT CC Out for Ballot (#805-15) PUBLICATION NO. AAMA 501.2-XX DRAFT #2 DATED 5/21/15 Quality Assurance and Diagnostic Water
COMMERCIAL BUILDING APPLICATIONS
EXPANDED POLYSTYRENE FOR COMMERCIAL BUILDING APPLICATIONS www.falconfoam.com Commercial Building Ap Expanded Polystyrene Insulation Falcon Foam leads the commercial building industry with products that
Structural Damage Due to Floods
Structural Damage Due to Floods By Craig D. Rogers, P.E. The Federal Emergency Management Agency (FEMA) reports that each year approximately 90 percent of all disaster-related property damage results from
Nondestructive Evaluation of. Outback Steakhouse/Bertucci s Building at. 2207 Forest Drive, Annapolis, MD. Provided by: HurleyIR
Nondestructive Evaluation of Outback Steakhouse/Bertucci s Building at 2207 Forest Drive, Annapolis, MD Provided by: HurleyIR On Monday, June 2, 2014, HurleyIR provided a nondestructive evaluation for
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
Continuous Insulation Using Polyiso Wall Sheathing
PIMA Technical Bulletin #403 Continuous Insulation Using Polyiso Wall Sheathing What it is, what it does, and why you need it About Polyiso Insulation Polyiso is a rigid foam insulation used in over 70%
Self-Home Inspection Checklist
To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional
Standard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
Georgia State University. Urban Life Building Roof Replacement
ENGINEERING AND ENVIRONMENTAL 140 DECATUR STREET SE, ATLANTA, GA 30303 GEORGIA STATE UNIVERSITY - FACILITIES DESIGN & CONSTRUCTION 34 BROAD STREET, SUITE 100 ATLANTA, GA 30303 DRAWING INDEX A-0 PROJECT
The continued evolution of construction defect
LETTER FROM RICK KEEGAN > CONSTRUCTION DEFECT: A MOVING TARGET > NEW TECHNOLOGIES, NEW ISSUES > SOME THINGS NEVER CHANGE > A GROWING PROBLEM > MANAGING CONSTRUCTION DEFECT RISKS > The continued evolution
The Harold J. Becker Company, Inc.
The Harold J. Becker Company, Inc. It is the mission of The Harold J. Becker Company, Inc. to deliver the absolute best possible quality product at the most efficient cost to our clients, while providing
Moisture Control. System Solutions to Prevent Mold
System Solutions to Prevent Mold How a systems approach to managing moisture is the most effective strategy for minimizing the growth of mold. Moisture Control Architects, designers, contractors and maintenance
Structural Assessment Report
Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive
TARRANT COUNTY DETAIL STANDARDS
TARRANT COUNTY DETAIL STANDARDS 1. Standard Coping 2. Coping at End Wall 3. Standard Sheet Metal Engagement Details 4. Gravel Guard 5. Gravel Guard Wall Termination 6. Gravel Guard, Gutter, and Downspout
Exhibit C: Scope of Work and Schedule of Deliverables
Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza
Property Damage Wind, Water, Flood, Defect & Resulting Mold
Property Damage Wind, Water, Flood, Defect & Resulting Mold Prevention, Restoration & Remediation Techniques John G. Minor President CGC, CFM Complete, Inc. [email protected] N.C. Unlimited
Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2
Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 PROTECTING YOUR DURO-LAST ROOFING 3 Safety Measures 3 Inspection 3 Maintenance Program 4 Sealants 4 Drainage 4 Parapets Walls 4 Building
UPDATE October 8, 2012 Chicago Roofing Contractors Association CHICAGOLAND S ROOFING, INSULATION, AIR-BARRIER REQUIREMENTS
UPDATE October 8, 2012 Chicago Roofing Contractors Association CHICAGOLAND S ROOFING, INSULATION, AIR-BARRIER REQUIREMENTS Executive Summary: There is a proposal at the Joint Committee on Administrative
September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901
September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections
Flood Protection Tips
Flood Protection Tips Information About Floodplains and Flood Prevention What is a floodplain? Floodplains serve many useful purposes, and those that are preserved in their natural or nearly natural state
How To Improve Roof Drainage
The Roof Drainage Epidemic Stewart M. Verhulst, M.S., P.E., M.ASCE 1 Marco A. Deleon, M.E., P.E., M.ASCE 2 Bradley L. East, M.S., M.ASCE 3 1 Nelson Architectural Engineers, Inc., 9701 Brodie Lane, Suite
Risk Bulletin. Mold Prevention and Control for Mechanical and HVAC Contractors. XL Group Insurance
XL Group Insurance Risk Bulletin Mold Prevention and Control for Mechanical and HVAC Contractors Mechanical contractors have an inherent risk of mold claims arising out of the heating, ventilation, and
Exterior Repair Project. By: Kami Farahmandpour, PE, RRC, RWC, CCS, CCCA Alex Szatanek. Building Technology Consultants, PC BTC
Exterior Repair Project Glen Ellyn Public Library By: Kami Farahmandpour, PE, RRC, RWC, CCS, CCCA Alex Szatanek Outline 2010 and 2011 Roof Replacement and Facade Repair Project Review Primary Reasons for
7. Do you perform any out of state work?... If yes, in what states and provide details of work performed
Applicant s Name* (*If more than one entity, attach separate sheet with description of each entity s operations, relationship to each other and ownership.) Contractors Application Agent Applicant Mailing
Roof Inspection. Summary Report
Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:
How To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
PIMA Technical Bulletin #115. The High R Roof: Guidelines for Energy-Efficient Roofing and Re-Roofing. What is a High R Roof?
PIMA Technical Bulletin #115 The High R Roof: Guidelines for Energy-Efficient Roofing and Re-Roofing About Polysio Insulation Polyiso is a rigid foam insulation used in over 70% of commercial roof construction,
The mission of RCI, Inc. is to advance the profession of
The mission of RCI, Inc. is to advance the profession of building envelope (roofing, waterproofing and exterior wall) consultants. Educational Offerings 2016 www.rci-online.org EDUCATION EDUCATION RCI
BTC. Building Technology Consultants, PC 1845 E. Rand Road, Suite L-100 Arlington Heights, Illinois 60004 Main: (847) 454-8800, Fax: (847) 454-8801
BTC Structural Engineer [email protected] Patrick E. Reicher is a Structural Engineer at Building Technology Consultants, PC. 6BREGISTRATIONS Licensed Structural Engineer (SE), Illinois Certified Construction
Cuyahoga County Urban Mold & Moisture Project
Cuyahoga County Urban Mold & Moisture Project Housing Remediation Environmental Health Watch and HouseMender, Inc. 1 What I will cover: Mold & moisture problems in Cleveland housing Remediation strategy
Winterizing Your Building
Winterizing Your Building DEC Author: Steven J. Susca This article was originally published in the Hoffmann Architects Journal in Issue 3, 2009. As spring thaws uncover the ravages winter weather has wreaked
Control filling, grading, dredging, and other development which may increase erosion or flood damage; and
ARTICLE 16. FLOOD DAMAGE PREVENTION Section 16-1: Findings of Fact The flood hazard areas of the Town of Lillington are subject to periodic inundation which results in loss of life and property, health
Roof Maintenance Scope of Work
Roof Maintenance Scope of Work Reviewed By: Approved By: Version 3.0 Date 08-09-07 Author K. Vandenbussche 1 BACKGROUND The Integrated Service Provider s program will provide superior on-site equipment,
Roof Condition Report. Academy International School 8550 Charity Drive. Colorado Springs, Colorado
Roof Condition Report Academy International School 8550 Charity Drive Colorado Springs, Colorado FOR Mr. Robert Thompson Academy School District 20 10221 Lexington Drive Colorado Springs, Colorado July
SECTION 7 UNDERDRAIN SERVICE
SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations
Rooftop Matters. 2 0 1 2 Benchmark Report. Executive Summary
The 2012 Benchmark Report is our initial survey covering results from roof inspections and service calls over a six-month period. Our intention is to update these results annually in order to provide meaningful
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam
Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
Vision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3
TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete
Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide.
INTRODUCTION TO STORM SURGE Introduction to Storm Surge BOLIVAR PENINSULA IN TEXAS AFTER HURRICANE IKE (2008) What is Storm Surge? Inland Extent Storm surge can penetrate well inland from the coastline.
Figure 1 The GENERAL CONTRACTOR blames the applicator (if available) for improper installation and
BACKGROUND History The Exterior Insulation and Finish System (EIFS) was originally developed in West Germany in the 1960s. The original market for EIFS was providing an insulation layer to existing masonry
Analysis II Façade Redesign: Architectural Precast Panels
Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Overview: This analysis covers the comparison of the current EIFS façade and my proposed
What I will cover: Cuyahoga County Urban Mold & Moisture Project. Mold & moisture problems. Mold and moisture problems. Mold & moisture problems
Cuyahoga County Urban Mold & Moisture Project What I will cover: Housing Remediation Jim LaRue Environmental Health Watch www.ehw.org 1 Mold & moisture problems in Cleveland housing Remediation strategy
Commercial Roof Management
Disclaimer: This material is designed and intended for general informational purposes only, and is not intended, nor shall it be construed or relied upon, as specific legal advice. Roof damage is a leading
EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES
Building and Construction Industry A joint industry initiative produced by BSA Supershow logo.indd 1 30/01/2008 9:43:29 AM EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES FAILING WATERPROOFING