Database Development for Earthquake Risk Assessment. Muhammad Murad Billah Senior GIS Coordinator
|
|
- Jewel Casey
- 8 years ago
- Views:
Transcription
1 Database Development for Earthquake Risk Assessment Muhammad Murad Billah Senior GIS Coordinator
2 CONTENTS Base Map Development Hazard Mapping - Active Fault Study - Engineering Geological Mapping - Seismic Hazard Mapping Vulnerability Mapping - Building - Lifeline (transportation & utility system) - Essential Facilities
3 GIS DATABASE DEVELOPMENT What is GIS? A geographic information system (GIS) integrates hardware, software, and data for capturing, managing, analyzing, and displaying all forms of geographically referenced information. Database View Model View Map View
4 BASE MAP Geological Map Source: GSB Grid Microzonation
5 BASE MAP Quickbird Images Resolution: 62cm Acquisition date: Georeferencing: RTK GPS & DGPS
6 Base Map Development Collection of Quick Bird Image Selection of TIC/GCP on the Image and Establishment of Bench Mark Development of GIS database as a base map by incorporating attribute data & field information Geo-referencing the Quickbird Image by RTK GPS with the surveyed GCPs Field verification and Attribute information collection Base line survey with total station On Screen Digitization (building, road, water body, open space, hill)
7 BASE MAP Topographic Maps Source: SoB (Dhaka & Sylhet), BIWTA&CDA (Chittagong) Scan & georeference Spot-height digitization Digital Elevation Model (DEM) generation
8 BASE MAP Ward Maps Source: DCC, CDA, SCC Scan, georeference, digitize Field verification & revision Validate to City Corporation Cluster generation
9 BASE MAP Physical Feature Components: building, road, waterbody, open space, hill Source: RAJUK, CDA, ADPC Base Map Digitize, field survey Field verification & revision
10 HAZARD MAPPING Active Fault Study Engineering Geological Mapping Seismic Hazard Mapping
11 ACTIVE FAULT STUDY Active Fault Location Madhupur Fault Dauki Fault Plate Boundary Fault - 1 Plate Boundary Fault - 2 Plate Boundary Fault - 3
12 ACTIVE FAULT STUDY Observation, Investigation, and Trenching Site Corona Image Study, Historical Earthquake Field Survey: Moynamoti, Dauki, Hobigonj, Tangail, Shitakunda, Madhabkunda, Teknaf &Haluaghat Trenching: Gabrakhari, Haluaghat; and Dharmapur, Feni
13 ACTIVE FAULT STUDY Trenching activities Gabrakhari, Haluaghat
14 ACTIVE FAULT STUDY Trenching activities Dharmapur, Feni
15 ENGINEERING GEOLOGY Field activities & database development Boring Borehole database
16 ENGINEERING GEOLOGY Field activities & database development PS Logging D7 - Mehernagar, Dhobadia (Kaskura), Dhaka
17 ENGINEERING GEOLOGY Field activities & database development Array Microtremor Shallow seismic wave measurement
18 item Usable data (quantities) Dhaka Chittagong Sylhet Area (sqkm) sqkm 420 Grids (250m) 5,150 3,750 2,600 11,500 grids 6720 Geology map by GSB generated Geomorphic Map by GSB generated Boring holes 80 by ADPC(DU)/GSB 1,166 1,145 1,066 3,376 m 4400 less than 30m depth max 100m SPT ,238 depths 2000 by ADPC(DU)/GSB 1.5m pitch 2m pitch PS logging holes 16 by ADPC(AIT) m 640m less than 30m depth max 50m Shallow Seismic Survey pts 2 Array Microtremor pts 2 Single H/V microtremor city Total reference of Gandhidham pts 50
19 Usable data (boring location)
20 Usable data (soil tests) General features of existing soil, such as density but not non-linear characteristics
21 Usable data (shallow seismic survey)
22 Usable data (array microtremor) depth Dhaka Chittagong Sylhet Vs>300m/s 15-46m 9-38m < 35m Vs>500m/s m m m
23 Usable data (single H/V microtremor)
24 AVS30 for each grid
25 SEISMIC HAZARD MAP Soil Classification Liquefaction Susceptibility Slope Hazard Susceptibility
26 Soil Classification
27 Liquefaction susceptibility
28 Slope hazard potential
29 VULNERABILITY MAPPING Building - General Building Stock Lifeline - Transportation System - Utility System Essential Facilities
30 VULNERABILITY MAPPING Building General Building Stock
31 VULNERABILITY MAPPING Building Vulnerability Assessment in Dhaka, Chittagong and Sylhet Under CDMP Project following number of buildings have been surveyed In Dhaka about 8500 buildings In Chittagong 6000 buildings and In Sylhet 4500 buildings
32 Visual and Measurement
33 Instruments Used for Building Vulnerability Assessment Micro Tremor
34 Vibration Shaker (Specially developed for this project)
35 Schmidt Hammer
36 Ferro-Scan
37 Ferro-Scan Test
38 Schmidt Hammer Test
39 Micro Tremor Test
40 Vibration Shaker Test
41 Technology Transfer Depart of Civil Engineering of Shajalal University of Science and Technology (SUST) and Chittagong University of Engineering and Technology (CUET) has acquired the capacity to do similar assessment. 35 Engineers was trained under this project to use different instruments for building vulnerability assessment. 110 Engineering students got on the job training (in surveying building type, occupancy and other aspects).
42 LIFELINE Highway Transportation System Components: Road, Bridge Assessment: accessibility, structural characteristics
43 LIFELINE Railway Transportation System Components: Track, Urban Station, Dispatch Facility, Fuel Facility, Maintenance Facility Assessment: accessibility, building structure, service performance
44 LIFELINE Bus Transportation System Components: Urban Station, Dispatch Facility, Fuel Facility, Maintenance Facility Assessment: building structure, service performance
45 LIFELINE Inland Water Transportation System Components: Passenger Terminal, Dispatch Facility, Fuel Facility, Maintenance Facility Assessment: building structure, service performance
46 LIFELINE Potable Water System Components: Pipeline, production & distribution facility Assessment: pipe ductility, facility service performance
47 LIFELINE Waste Water System Components: Pipeline, collection & distribution facility Assessment: pipe ductility, facility service performance
48 LIFELINE Natural Gas System Components: Pipeline, distribution facility Assessment: pipe ductility, facility service performance
49 LIFELINE Electric Power System Components: Distribution facility Assessment: seismic design, facility service performance
50 LIFELINE Communication System Components: Distribution & transmission station Assessment: structural characteristics, facility service performance
51 ESSENTIAL FACILITY Components: - Hospital & Clinic - Police & Fire Station - Emergency Operation Center - School & University Assessment: building structure, service performance
52 Thank You for Your Patience! For further information write to:
Utilizing satellite-based information for disaster risk assessment- why and how?
Utilizing satellite-based information for disaster risk assessment- why and how? Peeranan Towashiraporn ADPC Session 1, UN International Conference on Space-based Technologies for Disaster Management September
More informationChittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme
Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Main Report Deliverable 02 Sub-Surface Properties of Soil Development in Rangamati, Bandarban and Khagrachari Municipality
More informationDisaster Risk Assessment:
Disaster Risk Assessment: Disaster Risk Mapping Dr. Jianping Yan Disaster Risk Assessment Specialist Session Outline Essentials on Risk Mapping Map scale, grid size, aggregation unit Requirements for Risk
More informationTechnical #2 Discussion
Technical #2 Breakdown of teams? Need a scenario to do lifeline work Lifelines and Transportation: ASCE took a lead role in Seattle working with public works and municipalities and DOT. Political topic
More informationGeological 3D-model of the Basel region - a tool to explore geopotentials. Dr. Horst Dresmann. Prof. Peter Huggenberger. Dr.
Geological 3D-model of the Basel region - a tool to explore geopotentials Dr. Horst Dresmann Prof. Peter Huggenberger Dr. Janis Epting GeORG technical workshop 18.11.2010, Freiburg 1/24 Where are useable
More informationSEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES
SEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES Ryoji ISOYAMA 1, Eisuke ISHIDA 2, Kiyoji YUNE 3 And Toru SHIROZU 4 SUMMARY This paper presents a practical procedure for estimating damage
More informationPredicting Seismic Vulnerable Zones using GIS. Outline of the presentation. Objectives. Risk Mapping Overview Factor Maps. Three levels of Zonation
Predicting Seismic Vulnerable Zones using GIS by K.S.A. Dinesh Kumar Research Scholar, Anna University & Lecturer in Civil Engineering Dept. National Institute of Technical Teachers Training & Research
More informationhs2 Ground A non-technical guide
hs2 Ground Investigations A non-technical guide Contents HS2 ground investigations 1 Essential Q&A 2 2 In-ground investigation techniques 9 2.1 Cable percussion borehole 10 2.2 Rotary core borehole 12
More informationsonobot autonomous hydrographic survey vehicle product information guide
sonobot autonomous hydrographic survey vehicle product information guide EvoLogics Sonobot an autonomous unmanned surface vehicle for hydrographic surveys High Precision Differential GPS for high-accuracy
More informationUtah State General Records Retention Schedule SCHEDULE 1 GEOSPATIAL DATA SETS
Utah State General Records Retention Schedule SCHEDULE 1 BIOTA RECORDS (Item 1-26) These are geospatial records that depict wildlife use areas in the state of Utah as determined by wildlife biologists
More information13º Encontro Sociedade Brasileira de Geofísica 2013 Rio de Janeiro, 26-29 29 August Earthquake Mitigation in the Lisbon and Lower Tagus Valley area, Portugal 1 J. Carvalho, R. Dias, C. Pinto, T. Cunha,
More informationItaly - Porto Tolle: storage in offshore saline aquifer
Italy - Porto Tolle: storage in offshore saline aquifer Monia Politi Enel - Engineering & Innovation Division - Research CO2GeoNet Open Forum 9-11 May 2011, San Servolo Island, Venice High level overview
More informationChincha and Cañete, Peru, Based
Reconstruction of Ica, Pisco, Chincha and Cañete, Peru, Based on Updated Hazard Maps Julio Kuroiwa Professor emeritus National University of Engineering and UNDP Reconstruction Program/Sustainable Cities.
More informationPOST-EVENT DATA COLLECTION USING MOBILE GIS/GPS AND DEVELOPMENT OF SEISMIC EVALUATION TECHNIQUE FOR DAMAGE
POST-EVENT DATA COLLECTION USING MOBILE GIS/GPS AND DEVELOPMENT OF SEISMIC EVALUATION TECHNIQUE FOR DAMAGE Satoshi IWAI 1 And Hiroyuki KAMEDA 2 SUMMARY This paper presents mobile system for post-event
More informationStudent Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015
Student Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015 Database Management System for coastal cities Rozita Singh, Research Associate, Sustainable
More information(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.
Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing
More informationTraining Program on Urban Climate Change Resilience 20-22 April, 2015 Database Management System for coastal cities
Training Program on Urban Climate Change Resilience 20-22 April, 2015 Database Management System for coastal cities Rozita Singh, Research Associate, Sustainable Habitat Division, TERI Why Data? Infrastructure
More informationCornell University LADWP SHORT COURSE & WORKSHOP
CASE STUDY: LIFELINE RESILIENCE- LOS ANGELES DEPARTMENT OF WATER & POWER Tom O Rourke Cornell University 1200 km2 Los Angeles N 200 km 40 km Los Angeles Department of Water and Power (LADWP) Serves 4.0
More informationEarthquake Disaster Recovery Plan in TMG
Earthquake Disaster Recovery Plan in TMG Pre-disaster Management Measures by District and Recovery from Expected Earthquake Directly Underneath Tokyo Planning Section Urban Development Projects Division
More informationThe Use of Geographic Information Systems in Risk Assessment
The Use of Geographic Information Systems in Risk Assessment With Specific Focus on the RiVAMP Methodology Presented by Nadine Brown August 27, 2012 Climate Studies Group Mona Climate Change Workshop Presentation
More informationD 8.2 DELIVERABLE PROJECT INFORMATION
D 8.2 DELIVERABLE PROJECT INFORMATION Project Title: Acronym: Systemic Seismic Vulnerability and Risk Analysis for Buildings, Lifeline Networks and Infrastructures Safety Gain SYNER-G Project N : 244061
More informationOcean Engineering, Surveying and Mapping Services
Ocean Engineering, Surveying and Mapping Services FUGRO PELAGOS, INC. Fugro collects and interprets data related to the earth s surface and the soils and rocks beneath. It provides advice based on the
More informationII. Earth Science (Geology) Section (9/18/2013)
EAPS 100 Planet Earth Lecture Topics Brief Outlines II. Earth Science (Geology) Section (9/18/2013) 1. Interior of the Earth Learning objectives: Understand the structure of the Earth s interior crust,
More informationHow can we defend ourselves from the hazard of Nature in the modern society?
How can we defend ourselves from the hazard of Nature in the modern society?, University of Bologna President of the EGU Division of Natural Hazards Email: stefano.tinti@unibo.it nh@egu.eu GIFT 2013 Natural
More informationEGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS
in the Euro-Mediterranean Area EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS By Prof. Amr Ezzat Salama Chairman of Housing, Building National Center Cairo, Egypt Former Minister of High Education
More informationTunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
More informationGeotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns
1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.
More informationBuilding a Spatial Database for Earthquake Risk Assessment and Management in the Caribbean
Building a Spatial Database for Earthquake Risk Assessment and Management in the Caribbean Jacob Opadeyi and Rehanna Jadoo Department of Geomatics Engineering and Land Management, The University of the
More informationAppendix J Online Questionnaire
Appendix J Online Questionnaire In accordance with the Paperwork Reduction Act, this questionnaire was approved by the Office of Management and Budget (OMB). The OMB control number and expiration date
More informationRecent Earthquakes: Implications for U.S. Water Utilities [Project #4408]
Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408] ORDER NUMBER: 4408 DATE AVAILABLE: July 2012 PRINCIPAL INVESTIGATORS: John Eidinger and Craig A. Davis PROJECT PURPOSE: The purpose
More informationPPRD SOUTH ASSESSMENT TOOLS REGIONAL RISK ATLAS. Aim of the Atlas is to build a common risk assessment and
PPRD SOUTH ASSESSMENT TOOLS REGIONAL RISK ATLAS Aim of the Atlas is to build a common risk assessment and mapping methodology among the Partner Countries in view to stimulate discussion on shared approaches
More informationApplying GIS in seismic hazard assessment and data integration for disaster management
Applying GIS in seismic hazard assessment and data integration for disaster management Rumiana Vatseva, Dimcho Solakov, Emilia Tcherkezova, Stela Simeonova, Petya Trifonova National Institute of Geophysics,
More informationEurocode 7 - Geotechnical design - Part 2 Ground investigation and testing
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering
More informationThe Caribbean Disaster Mitigation Project: Supporting Sustainable Responses to Natural Hazards
The Caribbean Disaster Mitigation Project: Supporting Sustainable Responses to Natural Hazards Steven Stichter Caribbean Disaster Mitigation Project (CDMP) Unit of Sustainable Development and Environment
More informationTABLE OF CONTENTS PREFACE INTRODUCTION
TABLE OF CONTENTS PREFACE The Seismic Method, 2 The Near-Surface, 4 The Scope of Engineering Seismology, 12 The Outline of This Book, 22 INTRODUCTION Chapter 1 SEISMIC WAVES 1.0 Introduction, 27 1.1 Body
More informationEarthquake Resistant Design and Risk Reduction. 2nd Edition
Brochure More information from http://www.researchandmarkets.com/reports/2171210/ Earthquake Resistant Design and Risk Reduction. 2nd Edition Description: Earthquake Resistant Design and Risk Reduction,
More informationEXHIBIT LRP: 2007-0003:A ORDINANCE NO.
EXHIBIT LRP: 2007-0003:A ORDINANCE NO. AN ORDINANCE AMENDING TITLE 19 OF THE SAN LUIS OBISPO COUNTY CODE, THE BUILDING AND CONSTRUCTION ORDINANCE, BY AMENDING SECTION 19.07.042 RELATING TO WATER CONSERVATION
More informationSatish Pullammanappallil and Bill Honjas. Optim LLC, Reno, Nevada, USA. John N. Louie. J. Andrew Siemens. Siemens & Associates, Bend, Oregon, USA
Comparative Study of the Refraction Microtremor (ReMi) Method: Using Seismic noise and standard P-wave refraction equipment for deriving 1-D S-wave profiles Satish Pullammanappallil and Bill Honjas Optim
More informationIntroduction to GIS (Basics, Data, Analysis) & Case Studies. 13 th May 2004. Content. What is GIS?
Introduction to GIS (Basics, Data, Analysis) & Case Studies 13 th May 2004 Content Introduction to GIS Data concepts Data input Analysis Applications selected examples What is GIS? Geographic Information
More informationSONOBOT AUTONOMOUS HYDROGRAPHIC SURVEY VEHICLE PRODUCT INFORMATION GUIDE
SONOBOT AUTONOMOUS HYDROGRAPHIC SURVEY VEHICLE PRODUCT INFORMATION GUIDE EvoLogics SONOBOT: Autonomous Surface Vehicle for Hydrographic Surveys High Precision Differential GPS for high-accuracy cartography
More information1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum
Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation
More informationDESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
More informationANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY
ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS
More informationRegulation of Natural Gas Pipelines. June 23, 2008
Regulation of Natural Gas Pipelines June 23, 2008 Federal and State Regulations Federal: 49 United States Code 60101. et. seq. Title 49 Code of Federal Regulations The Office of Pipeline Safety (OPS),
More information( 1 ) Overview of Safety Measures ( 2 ) Overview of Measures for Attaining Greater Safety and Reliability
Contents 1 Effort for New Regulatory Requirements ( 1 ) Overview of a Gist of New Regulatory Requirements in Nuclear Regulation Authority ( 2 ) Major Requirements of a Gist of New Regulatory Requirements
More informationUniversity of Nairobi. Department Of Geospatial & Space Technology
University of Nairobi Department Of Geospatial & Space Technology Web-based spatial management information system for institutions of justice in Nairobi City County. A research project for the degree of
More informationWP 7: Build prototype software
Systemic Seismic Vulnerability and Risk Analysis for Buildings, Lifeline Networks and Infrastructures Safety Gain WP 7: Build prototype software D. Schäfer, VCE A. Bosi, VCE T. Gruber, VCE H. Wenzel, VCE
More informationAmerican Society of Civil Engineers
American Society of Civil Engineers Technical Council on Lifeline Earthquake Engineering Earthquake Investigation Committee Lifelines Water and Wastewater Electric Power and Communication Gas and Liquid
More informationGEOGRAPHIC INFORMATION SYSTEMS
GEOGRAPHIC INFORMATION SYSTEMS WHAT IS A GEOGRAPHIC INFORMATION SYSTEM? A geographic information system (GIS) is a computer-based tool for mapping and analyzing spatial data. GIS technology integrates
More informationMultisensor Data Integration in O&G Business Lutz Petrat Hélène Lemonnier Michael Hall
Multisensor Data in O&G Business Lutz Petrat Hélène Lemonnier Michael Hall ESA Oil and Gas Workshop 15/09/2010, Frascati, Italy Satellite Products and Services during a typical O&G project Project Life
More informationTHE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
More informationNATURAL HAZARD AND VULNERABILITY ASSESSMENT FOR PORTMORE, ST. CATHERINE. Presenters: Norman Harris & Rupert Green Mines and Geology Division
NATURAL HAZARD AND VULNERABILITY ASSESSMENT FOR PORTMORE, ST. CATHERINE Presenters: Norman Harris & Rupert Green Mines and Geology Division BACKGROUND UNDP Funded Project Project began in July 2006; 14
More informationOpportunities for the generation of high resolution digital elevation models based on small format aerial photography
Opportunities for the generation of high resolution digital elevation models based on small format aerial photography Boudewijn van Leeuwen 1, József Szatmári 1, Zalán Tobak 1, Csaba Németh 1, Gábor Hauberger
More informationEARTHQUAKE DISASTER GIS AND SPATIAL-TEMPORAL PATTERN OF EARTHQUAKE DISASTERS IN CHINA1
EARTHQUAKE DISASTER GIS AND SPATIAL-TEMPORAL PATTERN OF EARTHQUAKE DISASTERS IN CHINA1 Mao Feng 1 and Ma Jin feng 2 and Zhou Wen sheng 3 1 Professor,School of Architecture,Tsinghua University, BeiJing.
More informationDISASTER DISASTER MANAGEMENT CRISIS INFORMATICS GIS IN DIFFEERENT STAGES OF DISASTER MANAGEMENT
APPLICATION OF GIS AND REMOTE SENSING IN DISASTER PRONE AREAS: A CASE STUDY IN COASTAL KERALA DISASTER Disaster is an unpleasant event than occurs with little or no warning which results in economic disruption,
More information3D Model of the City Using LiDAR and Visualization of Flood in Three-Dimension
3D Model of the City Using LiDAR and Visualization of Flood in Three-Dimension R.Queen Suraajini, Department of Civil Engineering, College of Engineering Guindy, Anna University, India, suraa12@gmail.com
More informationWork Type Definition and Submittal Requirements
Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials
More informationRespecting the environment
MAIN FEATURE CHAPTER I RESEARCH WITH AN EYE ON THE FUTURE Respecting the environment Low power losses and a lesser visual impact on the landscape make Gas-Insulated Lines (GIL) a very environmentally friendly
More informationURBAN ROAD ACCIDENTS IN DHAKA, BANGLADESH
URBAN ROAD ACCIDENTS IN DHAKA, BANGLADESH Dr. Ishtiaque Ahmed Associate Professor, Faculty of Civil Engineering University Technology Malaysia (UTM), Johor Bahru 81310, Malaysia E-mail: ishtiaque@utm.my
More informationNetwork of European Research Infrastructures for Earthquake Risk Assessment and Mitigation. Report. Long-term sustainability plan for the
Network of European Research Infrastructures for Earthquake Risk Assessment and Mitigation Report D7.6 Long-term sustainability plan for the building inventory database Activity: Activity number: Classification
More informationA quick overview of geographic information systems (GIS) Uwe Deichmann, DECRG <udeichmann@worldbank.org>
A quick overview of geographic information systems (GIS) Uwe Deichmann, DECRG Why is GIS important? A very large share of all types of information has a spatial component ( 80
More informationTechnical Council on Lifeline Earthquake Engineering (TCLEE) Anshel J. Schiff
Technical Council on Lifeline Earthquake Engineering (TCLEE) by Anshel J. Schiff for GEER Joint Advisory Panel and Working Group Meeting October 7 & 8, 2004 Goals of TCLEE Elevate the state-of-the-art
More informationLegislative Council Panel on Information Technology and Broadcasting. Information Note on the Development of Global Positioning System in Hong Kong
CB(1)1709/03-04(01) Legislative Council Panel on Information Technology and Broadcasting Information Note on the Development of Global Positioning System in Hong Kong PURPOSE At the meeting of the Panel
More informationContents. 1. PROFILE p2. 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8
OCTOBER 2013 22 Contents 1. PROFILE p2 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8 2.2 Hydrographic & Geophysical services p 10 Bathymetric surveys p 12 High resolution
More informationA disaster occurs at the point of contact between social activities and a natural phenomenon of unusual scale.
Hazard Mapping and Vulnerability Assessment Mr. Toshiaki Udono Senior Project Manager, Kansai Division, PASCO Corporation, Japan Mr. Awadh Kishor Sah Project Manager, Project Implementation Department,
More informationHow To Prepare For A Natural Disaster
Earthquake Preparedness Strategy Update Overview Background Current Response Capability Assessing the Risk Reducing the Risk & Preparing to Respond Council Motions (2011) Assess risks and redundancy in
More informationTHE STUDY ON A DISASTER PREVENTION/MITIGATION BASIC PLAN IN ISTANBUL PART 2 - EVALUATION OF URBAN VULNERABILITY -
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 1361 THE STUDY ON A DISASTER PREVENTION/MITIGATION BASIC PLAN IN ISTANBUL PART 2 - EVALUATION OF URBAN
More informationSITE INVESTIGATION FACILITIES
SITE INVESTIGATION FACILITIES Drilling Hydraulic rotary & calax drilling rigs100/150mm Diameter boreholes having drilling capacity up to 200m depth. Auger drilling 100/150mm diameter boreholes up to maximum
More informationCreation of Soil Liquefaction Susceptibility Maps for San Luis Obispo & Marin Counties using Geographic Information Systems.
Creation of Soil Liquefaction Susceptibility Maps for San Luis Obispo & Marin Counties using Geographic Information Systems. Amelia M. Lowman December 2009 Dr. Lynn E. Moody Adviser Earth and Soil Sciences
More informationA GIS helps you answer questions and solve problems by looking at your data in a way that is quickly understood and easily shared.
A Geographic Information System (GIS) integrates hardware, software, and data for capturing, managing, analyzing, and displaying all forms of geographically referenced information. GIS allows us to view,
More informationStructures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.
More informationPacific Catastrophe Risk Assessment and Financing Initiative. Better Information for Smarter Investments
Pacific Catastrophe Risk Assessment and Financing Initiative Better Information for Smarter Investments Main Outputs Pacific disaster risk assessment Probabilistic assessment of major perils Pacific Risk
More informationGeographic Information Systems
Jan Coyne, William C. Bell, Mary Maureen Brown, Chad Rupert, and James Nolan Geographic Information Systems A geographic information system (GIS) combines database management and analysis functions with
More informationLIQUEFACTION POTENTIAL OF SELECTED RECLAIMED AREAS OF DHAKA CITY BASED ON CONE PENETRATION TEST
LIQUEFACTION POTENTIAL OF SELECTED RECLAIMED AREAS OF DHAKA CITY BASED ON CONE PENETRATION TEST BY RIPON HORE DEPARTMENT OF CIVIL ENGINEERING BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY, DHAKA
More informationUnderstanding the Seismic Vulnerability of Water Systems
Understanding the Seismic Vulnerability of Water Systems Lessons Learned and What You Can Do Donald Ballantyne October 2, 2013 Regional Water Providers Consortium Board Overview Oregon Resilience Plan
More informationLandslide Briefing to City Council April 28, 2014
Landslide Briefing to City Council April 28, 2014 OEM: Barb Graff DPD: Susan Chang, P.E. SPU: Nancy Ahern SDOT: Lawrence Eichhorn SFD: Chief A. D. Vickery Landslide Planning and Response History of landslides
More informationSECTION 8 Industrial Facilities Field Investigation
SECTION 8 Industrial Facilities Field Investigation Types of Data to Be Collected and Recorded Warehouses, manufacturing facilities, energy-producing facilities, and factories should be inspected for performance
More informationSite C Clean Energy Project Topic Specific Sessions: Presentation by Natural Resources Canada
Site C Clean Energy Project Topic Specific Sessions: Presentation by Natural Resources Canada Fort St. John, British Columbia January 13, 2014 Outline 1. Context for NRCan s Participation in the Joint
More informationTechnicalNotes. Terramodel Software for Construction
TechnicalNotes Terramodel Software for Construction INTEGRATED SOFTWARE FOR IMPROVED CONSTRUCTION PROCESSES Today s construction industry demands high accuracy and maximum efficiency throughout the construction
More informationREPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale
REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale Report
More informationHigh-speed rail alignment generation and optimization using GIS
High-speed rail alignment generation and optimization using GIS Abstract: GIS-based analysis is used to generate, evaluate and optimize alignment alternatives for high-speed rail projects across the world.
More informationA PROCEDURE FOR RISK MITIGATION OF WATER SUPPLY SYSTEM IN LARGE AND POPULATED CITIES
A PROCEDURE FOR RISK MITIGATION OF WATER SUPPLY SYSTEM IN LARGE AND POPULATED CITIES Mahmood Hosseini 1 and Hazhir Moshirvaziri 2 1 Associate Professor, Structural Engineering Research Center, International
More informationNatural Hazard Risk Assessment in the Australasian Region: Informing Disaster Risk Reduction and Building Community Resilience.
Natural Hazard Risk Assessment in the Australasian Region: Informing Disaster Risk Reduction and Building Community Resilience Jane Sexton Australia and Disaster Risk Reduction Australian Context Understanding
More informationCivil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationPREPARATION OF BASE MAPS FOR MASTER PLANS
Bangalore Metropolitan Region Developm ent Authority PREPARATION OF BASE MAPS FOR MASTER PLANS A case study of Bangalore Metropolitan Region Shantappa B. Honnur Additional Director of Town and Country
More informationNumerical Modeling Earthquake Effects On Sea Outfall Systems : Kadýköy Sea Outfall Case
2 ND INTERNATIONAL CONFERENCE ON MARINE WASTE WATER DISCHARGES MWWD 2002 - I STANBUL SEPT. 16 20 Numerical Modeling Earthquake Effects On Sea Outfall Systems : Kadýköy Sea Outfall Case Prof.Dr. Sedat Kabdaþlý
More information4.11 Geologic and Soil Resources
4.11 Geologic and Soil Resources Geology and soils are evaluated as part of an environmental document because conditions in the project area can influence the type and size of a project s structure, the
More informationREPORT OF WORK GUIDELINES
REPORT OF WORK GUIDELINES The following guidelines apply to a report of work submitted under section 56(1) of the Mining Act (http://laws.gnb.ca/en/showdoc/cs/m-14.1). 1 (1) A report of work shall be submitted
More informationPUBLIC SAFETY. Industry Solutions Harness the Power of GIS for Public Safety
PUBLIC SAFETY Industry Solutions Harness the Power of GIS for Public Safety Esri has thousands of customers worldwide who are using the transforming power of GIS technology to respond to disasters and
More informationPAPAMOA EAST URBAN DEVELOPMENT PART 1 AREA LIQUEFACTION HAZARD REVIEW Technical Report
PAPAMOA EAST URBAN DEVELOPMENT PART 1 AREA LIQUEFACTION HAZARD REVIEW Technical Report Tauranga District Council Papamoa East Urban Development Strategy Part 1 Area Liquefaction Hazard Review Technical
More informationGram Panchayat & Ward Boundary Delineation and Assets mapping
Gram Panchayat & Ward Boundary Delineation and Assets mapping For Rural Development Department & State Election Commission, Govt. of Maharashtra MAHARASHTRA REMOTE SENSING APPLICATIONS CENTRE Autonomous
More informationUnit 4 Lesson 6 Measuring Earthquake Waves. Copyright Houghton Mifflin Harcourt Publishing Company
Shake, Rattle, and Roll What happens during an earthquake? As plates of the lithosphere move, the stress on rocks at or near the edges of the plates increases. This stress causes faults to form. A fault
More informationOil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1
Department of Environmental Protection Sec. 22a-472 page 1 (4-97) TABLE OF CONTENTS Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental
More informationEarthquakes. Earthquakes: Big Ideas. Earthquakes
Earthquakes Earthquakes: Big Ideas Humans cannot eliminate natural hazards but can engage in activities that reduce their impacts by identifying high-risk locations, improving construction methods, and
More informationOverview of Capabilities and Current Limitations
Overview of Capabilities and Current Limitations Background & Purpose 1. Origin: Test the feasibility of identifying areas of relatively high flood risk using data on flood risk determinants derived from
More informationJACIE Science Applications of High Resolution Imagery at the USGS EROS Data Center
JACIE Science Applications of High Resolution Imagery at the USGS EROS Data Center November 8-10, 2004 U.S. Department of the Interior U.S. Geological Survey Michael Coan, SAIC USGS EROS Data Center coan@usgs.gov
More informationKentucky Lake Bridge Pile Load Testing Overview Ohio Transportation Engineering Conference Columbus, Ohio 10/28/2015
Kentucky Lake Bridge Pile Load Testing Overview Ohio Transportation Engineering Conference Columbus, Ohio 10/28/2015 Presented by: Jeff Dunlap, P.E. Terracon Consultants 1 Project Site Kentucky Official
More informationUsing AGS digital data transfer format D C Entwisle and S Self
Using AGS digital data transfer format D C Entwisle and S Self Synopsis UK Business model What is the AGS? What is AGS digital data transfer format? Using AGS data UK business model Client Consultant Main
More information2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
More informationHAZARD VULNERABILITY & RISK ASSESSMENT
Hazard Vulnerability Analysis Purpose and Scope A Hazard Vulnerability Analysis (HVA) evaluates risk associated with a specific hazard. During this analysis, the hazard is evaluated for its probability
More information