1 Appendix 14 Traffic Management Plan
2 Toms Gully Underground Project
3 Table of Contents 1 Purpose Location & Production Overview Operations History Current Traffic Management & Traffic Flow Future Traffic Management & Traffic Flow Existing Site Entrance and Approach Traffic Management Risk Controls Management Plan Review... 7 Appendix A Photographs... 8 Page 2
4 1 Purpose Primary Gold Limited (Primary Gold) is proposing to develop a new underground mining phase at Toms Gully (Toms Gully Underground (TGU Project)). This document describes the key aspects of traffic management and controls associated with safe operation. As it is a gold operation, there will be minimal impact on regional traffic as ore will be processed on site and other traffic changes will be minor as demonstrated within this Traffic Management Plan (TMP). 2 Location & Production Overview Toms Gully is an existing, non operating mine, located within the Old Mount Bundey Station, approximately 90 km south east of Darwin. The mine was operational for periods from 1988 and has most recently been in care and maintenance since February Existing mine infrastructure comprises of an open pit and underground mine, access roads, 22 kv power reticulation, processing facility, two waste rock dumps (WRDs), two tails storage facilities (TSFs), two evaporation dams, drains and sumps, maintenance shed and lay down yard, stores shed and yards and administration offices. The proposed TGU Project comprises of the following works: Mining underground to the south of the existing underground workings; Extraction of up to 350,000 tonnes per annum (tpa) of ore over three to four years; Removal of approximately 720,000 tpa of waste rock, replaced underground or in the base of the existing pit (no external storage of waste rock); Conventional Carbon in Leach gold processing plant and ancillaries renovated and reused; Storage of approximately 830,000 t of tailings in a raised TSF; New 2.1 GL freshwater dam; Treatment of pit water, then storage in new dam to facilitate mine dewatering; and Clearing of approximately 84 ha of native vegetation (46 ha being for freshwater dam). 3 Operations History The Toms Gully gold deposit was originally discovered in 1986 by Carpentaria Exploration Company, a subsidiary of Mount Isa Mines. Toms Gully was developed by Carpentaria in 1988 as an open cut mine, with an associated ore treatment plant, and later extended to an underground operation by Renison Consolidated Mines. In addition to Carpentaria, Toms Gully has had several owners and operators including Kakadu Resources, Sirocco Resources who changed their company name to Renison Consolidated Mines, GBS Gold Australia, and Crocodile Gold Australia Operations, who then sold to Primary Gold in Currently the site is in care and maintenance. Page 3
5 4 Current Traffic Management & Traffic Flow With the site currently being in care and maintenance, the site entrance is occasionally being used by the pastoralist and for site visits by various technical consultants engaged by Primary Gold. Annual traffic data for Counter RDVDP007 published by the Department of Transport in conjunction with Territory Asset Management Services (TAMS) Pty Ltd is provided in Table 1 below to provide an indication of the level of traffic flow on Arnhem Highway in the vicinity of the TGU Project. Counter RDVDP007 is located on Arnhem Highway, 35 km northwest of the TGU Project site entrance. Table 1: Counter RDVDP007 Traffic Data Year Inbound Vehicles Outbound Vehicles Both Vehicles Future Traffic Management & Traffic Flow A workforce of approximately 100 people will be required for the TGU Project and will be sourced predominantly from the nearby towns. The town of Humpty Doo is approximately 60km from the TGU Project, Palmerston approximately 80km and the centre of Darwin approximately 100km. Primary Gold will offer a bus service to transport employees to and from work, thereby considerably reducing TGU Project traffic on the road. The proposed underground mining method will see mined ore trucked directly to the existing Toms Gully processing facility which is on site. The proposed processing capacity of 350,000 tpa is expected to produce 65,000 oz per annum (pa). This level of production is relatively small for mining operations and as such deliveries of consumables and reagents will be low. TGU Project traffic flow on and off site is estimated at an average of five delivery trucks per week, up to six bus trips daily and ten light vehicles daily. Three quarries located East of the TGU Project site (Boral Concrete, Ostojic Group and Halkitis Bros) have, up to mid 2015, been supplying rock to the Inpex project at a production rate exceeding 1.5 Mtpa. The completion of the Inpex project will see a reduction in excess of 80 road trains per day travelling past the TGU Project site entrance. Due to the limited numbers of TGU Project traffic expected and the removal of approximately 80 road trains from current traffic volumes, the TGU Project is not expected to adversely impact on current traffic flow in the TGU Project vicinity. Page 4
6 6 Existing Site Entrance and Approach A layout of the existing site entrance is illustrated in Figure 1. Past operations have used this entrance without incident and therefore no modifications are proposed to the entrance as part of the TGU Project. 8 M Toms Gully 38 M Arnhem Highway 23 M Figure 1: Project Site Entrance Layout Page 5
7 Figure 2 illustrates the North and South direct line of sights along Arnhem Highway from the TGU Project site entrance. Arnhem Hwy 800M Toms Gully Intersection Visibility 400M Visibility Toms Gully Intersection Arnhem Hwy Figure 2: Direct Line of Sight on Arnhem Highway The section of Arnhem Highway adjacent to the site entrance consists of a two lane road with an approximate paved width of 8 m. This section of road is subject to a speed limit of 110 km/hr. As illustrated above, there is a direct line of sight from the entrance to the North of 800m and to the South of 400m. Sight distance requirements are given in Austroads Guide to Road Design Part 4A: Unsignalised and Signalised Intersections. The required distances assuming a reaction time of 2.5 seconds and a travelling speed of 110 km/hr are: Safe Intersection Sight Distance (SISD) (value for trucks at night has been used) 385m; Approach Sight Distance (value for trucks has been used) 293m; and Minimum Gap Sight Distance (MGSD) 305m for a right turn (this is the maximum distance given in Austroads). The available distances are all greater than the direct line of site distances and are therefore acceptable. Photographs of the approach roads and TGU Project site entrance are provided in Appendix A. Page 6
8 7 Traffic Management Risk Controls To mitigate the risks associated with TGU Project traffic, Table 2 identifies the management measures proposed to be implemented to minimise any adverse impacts: Table 2: Traffic Management Measures Action Timing Responsibility All drivers shall have the appropriate driving licences in place Life of TGU Project EH&S Manager All drivers on site shall have their competency confirmed through Life of TGU Project EH&S Manager competency based training or verification of competence All drivers on site shall undertake the TGU Project site induction Life of TGU Project EH&S Manager which shall contain a section on driving requirements A bus shall be made available to transport employees to and from Life of TGU Project EH&S Manager the TGU Project site Road signage shall be installed on the Northern and Southern approaches of Arnhem Highway warning of the mine entrance and the potential for entering and exiting vehicles. This signage shall be in accordance with Austroad requirements and to the satisfaction of the Northern Territory Department of Transport Prior to commencement of TGU Project EH&S Manager Signage shall be installed along the site entrance road warning of the upcoming intersection with the Arnhem Highway. A stop sign shall also be installed on the entrance road at the intersection point The site access road shall be regularly maintained and sprayed with water to minimise dust generation. Vehicle speed limits shall be set and signposted within the TGU Project site On site demarcation of heavy equipment, light vehicles and pedestrians shall be implemented where appropriate and practicable Prior to commencement of TGU Project Life of TGU Project Life of TGU Project Life of TGU Project EH&S Manager EH&S Manager EH&S Manager EH&S Manager All vehicles shall be regularly serviced and maintained Life of TGU Project EH&S Manager All loads shall be safely secured prior to departure and regularly Life of TGU Project EH&S Manager checked Transport, storage, handling, and use of hazardous materials shall Life of TGU Project EH&S Manager be in accordance with relevant Northern Territory legislation Traffic incidents for TGU Project related traffic shall be managed in accordance with the Project Incident Reporting and Management System Life of TGU Project EH&S Manager 8 Management Plan Review This TMP shall be reviewed if a number of traffic near misses and/or incidents are recorded. Upon review, the document shall be revised where appropriate and consultation undertaken with the Northern Territory Department of Transport where required. Page 7
9 Appendix A Photographs Figure 3: Site entrance West side of Arnhem Highway looking South Figure 4: Site entrance West side of Arnhem Highway looking North Page 8
10 Figure 5: East side of Arnhem Highway looking West along site access road Figure 6: Site entrance East side of Arnhem Highway looking South Page 9
11 Figure 7: Site entrance East side of Arnhem Highway looking North Figure 8: Arnhem Highway North of entrance looking South Page 10
12 Figure 9: Arnhem Highway South of entrance looking North Page 11
Traffic Management Issue 1.0 Revision: v2 October 2014
Disclaimer IMPORTANT: The information in this guide is of a general nature, and should not be relied upon as individual professional advice. If necessary, legal advice should be obtained from a legal practitioner
Environmental Management Plan TRAFFIC
Traffic Management Plan Environmental Department Environmental Management Plan TRAFFIC Document Control Edition Revision Author Comment Date Authorised by 1 Rev 0 S. Haures Initial document 2 Rev 1 R W
LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014
LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington
TRAFFIC MANAGEMENT PLAN
TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South
Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
Construction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction
Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited
Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status
Construction Phase Traffic Management Plan
Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land
Construction Traffic Management Sub-Plan
B Appendix B Construction Traffic Management Sub-Plan 13 January 2012 CiviLake Construction Traffic Management Plan Prepared for CiviLake Prepared by AECOM Australia Pty Ltd Level 21, 420 George Street,
ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT
I. GENERAL ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT ANNEX III B i. The setting up and implementing of appropriate management procedures is an essential tool for improving the
Traffic Management Plan
Traffic Management Plan Contract: [insert the contract title, section, chainage, length, contract ID No] Contractor: [Full name of the contractor, Address, City, Country] Supervision Consultant: [Full
Health & Safety Management System Manual
Health & Safety Management System Manual Document Information Document Number Description HSMSM This manual describes the Health & Safety Management System elements of the Integrated Management System
BROKEN HILL OPERATIONS Rasp Mine Project Traffic Management Plan
BROKEN HILL OPERATIONS Document History and Status Revision Date issued Reviewed by Approved by Date approved Revision type A 31-Mar-11 SKK TC 31-Mar-11 Issued for information B 18-July-11 SW GT 18-July-11
TRAFFIC MANAGEMENT PLAN AND TRUCK DRIVER CODE OF PRACTICE
TRAFFIC MANAGEMENT PLAN AND TRUCK DRIVER CODE OF PRACTICE Gunnedah Quarry Products Pty Ltd Gunnedah, NSW AUGUST 2014 QUALITY ASSURANCE This document has been prepared, checked and released in accordance
Construction Management Plan Template
Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name
Temporary Traffic Management
Temporary Traffic Management Tom Kiddle 4 th July 2012 Temporary Traffic Management Auckland Transport TTM Operation Requirements AT TTM Audits Qualified Persons on site Pedestrian Management 1 AT Temporary
Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure
Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state
Traffic Management Plan - Depot Procedure
Traffic Management Plan - Depot Procedure Date: 1/8/13 Version: TMPDPGWT001 Status: Approved 1. Purpose This procedure outlines the traffic management plan which must be followed for the Depots. 2. Scope
SIGNING SEQUENCE IN ADVANCE OF VEHICLE INSPECTION. STATIONS (VIS & MIS) Page 1of 3
Issued: JUL 2007 STATIONS (VIS & MIS) Page 1of 3 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS TYPICAL SIGNING PLANS General The safety of motorists using Alberta highways, and the maintenance
Traffic Management Plan. for the. Dargues Gold Mine
Traffic Management Plan for the This page has intentionally been left blank Traffic Management Plan for the Unity Mining Limited ABN: 61 005 674 073 Level 10, 350 Collins Street MELBOURNE VIC 3000 Telephone:
FOCUS MINERALS LIMITED
FOCUS MINERALS LIMITED Aggressively Expanding into a Rising Gold Price Campbell Baird, Chief Executive Officer ASX: FML www.focusminerals.com.au 2 Disclaimer and Competent Person s Statement This presentation
For personal use only
Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio
23 February 2015. Enfield Intermodal Logistics Centre
Enfield Intermodal Logistics Centre Overarching Operational Traffic Management Plan February 2015 Table of Contents 1. Introduction... 2 2. Purpose of the Plan... 2 3. Objective of the Plan... 3 4. Road
GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT
1 This General Guide provides information on how to manage traffic risks at a workplace. It is supported by specific guidance material on traffic management for shopping centres, construction workplaces,
Update on Heap Leach potential of the Murchison gold project
3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and
Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction
Devonport EfW CHP Facility CEMP Proposal for Non Destructive Testing Activities. 1. Introduction This application is issued in compliance with the principles of the approved Construction Environmental
Framework Traffic Management for Shared Zones in Large Private Estates AITPM 2014 National Conference
Framework Traffic Management for Shared Zones in Large Private Estates AITPM 2014 National Conference Presented by : Wayne Johnson Senior Project Manager GTA Consultants [email protected] Outline
GUIDE TO THE PREPARATION OF TRAFFIC MANAGEMENT PLANS
Issue Date: 27 June 2014 GUIDE TO THE PREPARATION OF TRAFFIC MANAGEMENT PLANS This document is owned and authorised by the Executive Director Road Network Services. Please submit all comments and requests
Guide to the Preparation of a Traffic Management Plan
Guide to the Preparation of a Traffic Management 1. INTRODUCTION... 4 2. PREPARATION OF TRAFFIC MANAGEMENT PLANS... 5 2.1. LEASEHOLDER SITE... 5 2.1.1. Site Operations... 6 2.1.2. Statutory Requirements...
Lynwood Quarry Community Investment Fund Plan 2015 to 2019
Strength. Performance. Passion. Community Investment Fund Plan 2015 to 2019 Holcim (Australia) Pty Ltd PO Box 76 Marulan 2579, NSW Australia ABN 87 099 732 297 Phone 1300 657 051 www.holcim.com.au Community
Basements and Deep Building Construction Policy 2014
Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets
Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk
December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort
GRWF BOP TRAFFIC MANAGEMENT PROTOCOL
GRWF BOP TRAFFIC MANAGEMENT PROTOCOL References: GRWF Traffic Management Plan GR-PM-PLN-0005 GRWF BOP Traffic Management Plan Rev:0 Rev Date: 4/4/13 Authorised by: C Fazekas Page 1 of 28 1.0 Overview Traffic
For personal use only
ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for
The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit
Safe roads, reliable journeys, informed travellers The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit Version I - July 2012 An executive agency for the
The Use and Application of the Benchmarking Assessment Tool for the Recovery and Recycling of Used Lead Acid Batteries in India
The Use and Application of the Benchmarking Assessment Tool for the Recovery and Recycling of Used Lead Acid Batteries in India Brian Wilson International Lead Management Center (ILMC) In conjunction with:
Northern Territory ROAD TRANSPORT FATIGUE MANAGEMENT
Northern Territory Code of Practice Northern Territory Northern Territory Code of Practice Contents 1 Background 4 2 Operator Duty of Care Responsibilities 5 3 Codes of Practice 6 4 Who should use the
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI CoP 44.0 Traffic Management and Logistics Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude
APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS.
Document No: 16-02-12A Issue Date: 09 December 2014 APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS (An approved Traffic Management
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues
CR Tabs_Main:Layout 1 14/5/09 3:15 PM Page 13 Transport 13
Transport 13 13 Transport 13.1 Introduction The Caval Ridge Mine Project has been divided into two distinctive phases for the purposes of this traffic assessment to account for the different traffic demand
Workplace Transport Safety Reversing Vehicles Information Sheet What are the dangers associated with reversing vehicles? Why is reversing a problem?
Workplace Transport Safety Reversing Vehicles Information Sheet This information sheet aims to raise awareness of the dangers caused by reversing vehicles in the workplace. It provides basic information,
Release: 1. RIIOHS302A Implement traffic management plan
Release: 1 RIIOHS302A Implement traffic management plan RIIOHS302A Implement traffic management plan Modification History Not applicable. Unit Descriptor This unit covers the competency required to implement
Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment
Transport Construction Authority Report for Auburn Stabling Project November 2010 Contents 1. Introduction 1 2. Existing Conditions 2 2.1 Site Description 2 2.2 Existing Operations 4 2.3 Existing Road
Work time and logbooks. A basic guide to work time and rest time requirements and logbook standards for transport operators and drivers.
Work time and logbooks A basic guide to work time and rest time requirements and logbook standards for transport operators and drivers. 2 NZ Transport Agency Work time and logbooks February 2015 For additional
Traffic Management During Construction
Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to
DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners
Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: [email protected] www.redwoodpartnership.co.uk REDWOOD
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
Managing Public Use of Freeway Emergency Access Gates and Median Crossovers
Managing Public Use of Freeway Emergency Access Gates and Median Crossovers Operational Instruction Transport Services Division TRAFFIC MANAGEMENT Operational Instructions Managing Public Use of Freeway
Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back
Southern Cross Goldfields Ltd ASX Announcement 5 September 2014 Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Wonawinta Silver Project (60 M oz) to be acquired
UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA
UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA AUGUST 2015 AngloGold Ashanti acknowledges that there are some legacy environmental
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing
TRAFFIC MANAGEMENT IN WORKPLACES
TRAFFIC MANAGEMENT IN WORKPLACES Code of Practice TABLE OF CONTENTS FOREWORD... 3 SCOPE AND APPLICATION... 3 1. INTRODUCTION... 4 1.1 The meaning of key terms... 4 1.2 Who has health and safety duties
FATIGUE MANAGEMENT MODULE STANDARDS
FATIGUE MANAGEMENT MODULE STANDARDS January 2010 Main Roads Western Australia makes this material available on the understanding that users exercise their own skill and care with respect to its use. Before
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK
ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK Siegfried GROSSKOPF, Tawab KAZEMI*, John HUGHES* & Sami ALMUSAWI Bani Hashim # Parsons International Limited,
Exploration and Development Activity
For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara
Pollution Incident Response Plan
Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution
Traffic Management Guidelines
Ministry of Transportation Traffic Management Guidelines For Work On Roadways September 2001 TABLE OF CONTENTS COVER PAGE 1 TABLE OF CONTENTS 2 LIST OF FIGURES AND TABLES 5 PREFACE 6 PART 1 - INTRODUCTION
Management Plan. Contractor Management
Management Plan Contractor Management Doc ID No. Version No. Owner Next Review Date Management Plan Contractor Management Risk Statement: High This document will be reviewed on a one yearly basis, unless
TABLE OF CONTENTS TABLES FIGURES
TABLE OF CONTENTS Introduction...1 1. On-Site Stacking...2 2. Number of School Driveways...2 3. School Driveway Standards...3 3A. Driveway Spacing...3 3B. Driveway Location...4 3C. Driveway Lane Widths
For personal use only
ASX Release 28 January 2016 QUARTERLY ACTIVITIES REPORT For the quarter ended 31 December 2015 Level 1, 672 Murray Street West Perth WA 6005 Locked Bag 8 West Perth WA 6872 t. +61 8 9322 1182 f. +61 8
MOKOLO AND CROCODILE RIVER (WEST) WATER AUGMENTATION PROJECT TRAFFIC MANAGEMENT
MOKOLO AND CROCODILE RIVER (WEST) WATER AUGMENTATION PROJECT TRAFFIC MANAGEMENT PLAN TABLE OF CONTENTS 1. INTRODUCTION 1 1.1 1.2 1.3 Background Study Area Objectives 1 2 3 2. 2.1 2.2 GUIDELINES FOR TMP
Construction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax
Site Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
ALCYONE REPORTS JORC SILVER RESOURCES
ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR
Blast management plan template
Guidance note Blast management plan template Information for shotfirers on what a blast management plan may look like. April 2012 Background A blast management plan (BMP) is a risk control plan used in
Traffic Management Plan
Boral Cement Limited Boral Cement Berrima Traffic Management Plan Document Filename: Document Owner: Approved By: CMT-ENV-008 Berrima Traffic Management Plan HSE Advisor, Berrima Works Operations Manager,
CIVIL AND MINING CONTRACTORS
ALLIANCE CONTRACTING COMPANY PROFILE CIVIL AND MINING CONTRACTORS our people are our advantage 2 Introduction Alliance Contracting is a civil and mining contracting company operating throughout Western
Principles of Traffic Management on sites / road network
IOSH Ireland, Construction Specialist Section Springfield Hotel, Leixlip, County Kildare. 25 March 2015 Principles of Traffic Management on sites / road network Padraig Watters, Chartered Engineer This
Guide Document for Development of WHS Management Plans
DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS
Tomingley Gold Project. Traffic Management Plan
Tomingley Gold Project Traffic Management Plan Traffic Management Plan TABLE OF REVISIONS Revision Number Revision Date Prepared By Approved by omments Revision 1 August 2012 Geolyse olleen Measday Submitted
Fleet Management & Vehicle Maintenance Team Plan 2015/16
Fleet Management & Vehicle Maintenance Team Plan 2015/16 Team Manager: Service Plan: Visible Services Date signed off: 31/07/2015 Signed off by: Miles Punter 1 Contents Team Overview... 3 Our Contribution
SUBMISSION Performance Benchmarking of Australian Business Regulation: Planning, Zoning and Development Assessments
SUBMISSION Performance Benchmarking of Australian Business Regulation: Planning, Zoning and Development Assessments INTRODUCTION Cement Concrete and Aggregates Australia made a preliminary submission to
1 / 6. Appendix-K. Traffic Management Plan. ESIA Report for Etlik IHCP Appendix-K Traffic Management Plan Project No.: 12/019.
1 / 6 Appendix-K Traffic Management Plan 2 / 6 3 / 6 TRAFFIC MANAGEMENT PLAN 1 Objectives and Scope Traffic Management Plan is aiming to establish the responsibilities and requirements for regular traffic
Seagull Intersection Layout. Island Point Road - A Case Study. Authors: John Harper, Wal Smart, Michael de Roos
Seagull Intersection Layout. Island Point Road - A Case Study Authors: John Harper, Wal Smart, Michael de Roos Presented by Mr John Harper, Road Safety and Traffic Services Manager Phone: 4221 2456 Mobile:
PLANNING POLICY 3.3.5
PLANNING POLICY 3.3.5 CHILD CARE PREMISES 1. Introduction A Child Care Premises is used to provide a child care service within the meaning of the Child Care Services Act 2007, but does not include a Family
TEMPORARY TRAFFIC MANAGEMENT Operate as a Traffic Controller (TC) for low volume and Level 1 roads
1 of 8 level: 3 credit: 4 planned review date: October 2008 sub-field: purpose: Highway Construction and Maintenance This unit standard is for people who may be appointed, subject to guidance and monitoring
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN
FUCHS LUBRICANTS (AUSTRALASIA) PTY LTD 2 HOLLAND STREET WICKHAM NSW POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN ENVIRONMENTAL PROTECTION LICENCE No.10181 Pubic Version DOC REF:ENV228 ISSUE:1 DATE:21.11.13
Construction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd
SIBANYE GOLD MINERAL RESOURCES and MINERAL RESERVES UPDATE: FURTHER INCREASE IN GOLD AND URANIUM MINERAL RESERVES
Sibanye Gold Limited Incorporated in the Republic of South Africa Registration number 2002/031431/06 Share code: SGL ISIN - ZAE000173951 Issuer code: SGL ("Sibanye Gold" or "the Company") SIBANYE GOLD
Traffic Management Scheme
Traffic Management Scheme Plan Number: #0296 Date Produced: 10/12/2013 Date Delivered: 08/01/2014 Works Description: Building deliveries & concrete pours to 540 Burke Rd, Camberwell Submitted To: Company
Fast Tracking to Production
Fast Tracking to Production THE ABU DABBAB TANTALUM-TIN-FELDSPAR PROJECT, EGYPT THE 400K DEVELOPMENT. Gippsland Ltd (February 2015)) 1 Important Notices Competent Persons Compliance Statement The information
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)