Helport Argentina. It has completed an impressive number of works namely:
|
|
- Bonnie Patrick
- 8 years ago
- Views:
Transcription
1
2 Helport Helport S.A. is a company specialized in design, construction, development and administration of big infrastructure developments in South America, mainly in, Uruguay, Peru, Ecuador Brazil, and In western Europe,. Also some minor developments in Latin America such as Panama and Colombia. Starting operations in 1962, the company has a vast experience in design, engineering and construction of civil constructions and roads, including Toll road concessions. Helport has a solid expertise in building design and maintenance projects up to the highest quality and time standards within strong operational restrictions (e.g. airports on going). It also manage road concessions, and in recent years it has created design team for hydraulic projects, wind farm mills, photovoltaic panels and energy conservations resources. It has completed an impressive number of works namely: Road Works: Helport S.A. d design and built over 800 km. of routes throughout and repaved over 900 km. It has received countless distinctions and awards for many of them works. Back in 2011, the Asociación de Carreteras (Argentine Association for Road Construction) honored Helport with the Road Work of the Year award for the construction of Ruta Nacional No. 40, section Río Agua Clara - Río Las Cuevas, in the province of Catamarca. Airport Works: It. carried out design, construction and maintenance works in the 33 Argentine airports that comprise the National Airport System (SNA) as well as in a number of airports in other countries. These works require vast experience and highly specialized staff to solve the major operational, quality and time management challenges that the commercial flight industry entails. Its modern equipment and human resources can adapt to the intensive and precise execution of complex works, allowing Helport to overcome the problems posed by the execution of works in restricted hours and with minimum operational closings. Hydraulic Works: Helport is conducting the dredging operations of the Salado River in the province of Buenos Aires, for the recovering of lands for production while preventing the constant overflow of the river banks. With this purpose, over 37 linear km. of the Salado River were dredged and more than 16 million cubic meters of land were dug to fill 1100 hectares. Likewise, the company has done hydraulic works in the province of Chaco and industrial works in the province of Santa Fe, both in. Civil Works: In the field of sanitary architecture, Helport carried out the works of Hospital Interzonal de Ezeiza in the province of Buenos Aires. The project comprised over 15,000 square meters. Due to its magnitude, it has turned into
3 one of the most important hospital constructions in the country. The company is currently building the Scientific-Technological Park of Palermo, Buenos Aires,. The 25,000 square meter building will comprise offices, a TV station and a 350-seat auditorium. design, Civil architectural and engineering scope of works: Architecture: With our architectural team, from conceptual design to construction documents including space planning, master planning code evaluations, renderings and LEED certified Facilities. Civil engineering: Concrete Design, structural calculations, metallic and / or wood structure, compliance with building codes, existing building structural analysis, and special inspections surveys. Civil Sanitary, Hydraulic and fire protection installation designs: Full Plumbing and sewage design, fire protection and security designs complete engineering services from the initial conceptual lay outs up to the as-built documents. Mechanical and thermomecanical: Mechanical, thermomecanical engineering services for power plants, Baggage systems transportation, air field installations, aeronautical fuel plants. Solutions such as energy management and modeling methods. Electrical engineer. electrical engineering services. Environmental: engineering services from the initial site investigation and assessment through remedial action and site closure, including for example wetland evaluations, biological monitoring, water quality evaluations, contamination assessments, indoor air quality and sustainable/leed solutions. Construction Management and construction Phase services: Analysis of the critical phases of the project development, maintaining and documenting communication, managing schedules, ensuring the quality of materials and quality during all the construction phase of projects, including administration of the procurement process and construction administration Italy Specifically, in the case of road works, we generally develop: STUDY BACKGROUND: Analysis of all documentation, value engineering, design phase assistance and program management. FIELD WORK: Preliminary constructability review surveys, comprehensive visual survey, field inspections, topographic surveys, construction layout verification On site facilities development. We cover all aspects of land surveys services, such as geodetic control, horizontal and vertical project control, mobile scanning, route/transportation surveys. ENVIRONMENTAL IMPACT STUDY: For the preparation of the Environmental Impact study preparing all the onsite tasks and surveys. Panama Colombia Ecuador Peru Brazil Chile Uruguay
4 DETAIL RELEVANT DESIGN AND TECHNICAL DOCUMENTATION AIRPORTS RELATED Design: Concept Stage Budgeting Financial assessment Design: Tender Stage Design: Executive Stage Design: As Build Stage Construction Management On site Management 2005 Mendoza International Airport, Terminal refurbishment and expansion Guayaquil International Airport, Ecuador Passenger Terminal Office Building Aircraft apron and taxiways Air Traffic Control Tower 2007 Rio Grande International Airport, Terminal refurbishment and expansion Bahía Blanca International Airport, Terminal refurbishment and expansion Erevan International Airport, Passenger Terminal Public Hall Parking lot Fire Brigade Station 2008 San Luis Airport, Terminal refurbishment 2009 Resistencia International Airport, Terminal refurbishment and expansion 2008/2013 Ezeiza International Airport, New Terminal C Toll Access Gate Road distributor Security Check Point Fire Brigade Building Apron expansion, terminal C with fueling pipe line Airport Fueling Farm Taxi way expansion Air traffic control tower ACC Buildiing Parking Lot Terminal C Parking Lot Employees 2010 Aeroparque International Airport, Terminal Expansion Office Building Apron expansion Air traffic control tower Galápagos International Airport, Ecuador Passenger Terminal Air traffic control tower Apron expansion Runway refurbish Leed Gold Certification Process 2011 Iguazú International Airport, Terminal refurbishment and expansion Air traffic control tower San Juan Airport, Terminal refurbishment and expansion Santiago del Estero Airport, Córdoba International Airport, Terminal refurbishment and expansion Air Traffic Control Tower Natal International Airport, Brazil Airport Masterplan (brand new airport) Passenger Terminal Toll Access Gate Security Check Point Fire Brigade Building Air traffic control tower Parking lot Power Station Brasilia International Airport, Brazil Airport Master plan Terminal refurbishment and expansion Apron refurbishment and expansion Arequipa International Airport, Perú Passenger Terminal parking lot Apron Taxiways 2013/2015 Chinchero Cusco International Airport, Perú Master plan (brand new airport) Passenger Terminal Air Traffic Control Tower ACC building Aircraft hangar Cargo Terminal Power Station Fuel Farm Security check point Parking lot Road layout Aprons Taxiways Runway Ezeiza International Airport, New Public Hall, Terminal B 2014/2015 Comodoro Rivadavia, New Passenger Terminal Rio Gallegos, Passenger Terminal Expansion Firenze International Airport, Italy Master Plan Runway Taxi ways Aprons Passenger Terminal expansion New Passenger Terminal Parking Lot Access Toll gate Pisa International Airport, Italy Passenger Terminal refurbishment and expansion
5 CONTENTS Airport Works Road Works Hydraulic Works Civil Works
6 AIRPORT ROAD works 1971 Reopening of Juliet Taxiway and Apron Connections - Aeropuerto Internacional de Ezeiza. Buenos Aires. [ARGENTINA] Reopening of Runway Aeropuerto de Río Cuarto - Córdoba. [ARGENTINA] 1975 Reopening of Runway Aeropuerto de Río Cuarto - Córdoba. [ARGENTINA] Reopening of Runway Aeropuerto de la Escuela Militar de Aviación - Córdoba. [ARGENTINA] 1979 Reopening of Runway VIII Brigada Aérea de José C. Paz. - Buenos Aires.1979 Construction of Pavement in Airport Service Roads of the Officers Housing Area. Base Aérea Militar Reconquista - Santa Fe. [ARGENTINA] Construction of Reinforced Concrete Apron for Large Aircraft Parking, Opposite Hangars 3 and 4, Aeropuerto Internacional de Ezeiza - Buenos Aires. [ARGENTINA] Taxiway Paving at Aeródromo Militar de Campo de Mayo - Buenos Aires. Vehicle Parking at the 1st Infantry Regiment Patricios. Paving of Service Roads at Batallón 601 en Campo de Mayo. [ARGENTINA] 1982 Repaving of Runway V Brigada Aérea Villa Reynolds - San Luis. [ARGENTINA] Taxiway at Aeródromo de San Fernando - Buenos Aires. [ARGENTINA] Repaving and Extension of Runway V Brigada Aérea Villa Reynolds - San Luis. [ARGENTINA] 1983 Construction of Vehicle Access and Vehicle Parking at Aeropuerto de San Carlos de Bariloche - Río Negro. [ARGENTINA] 1983 Taxiway at Aeródromo de San Fernando - Buenos Aires. [ARGENTINA]
7 Aeropuerto Internacional de Ezeiza
8 Aeroparque Jorge Newbery Construction of Runway Aeropuerto Internacional de Córdoba. [ARGENTINA] Reopening and Widening of Runway Aeropuerto de Santiago del Estero. [ARGENTINA] Construction of Touch Down Zone 25 at Base Aérea Militar de Río Gallegos, Santa Cruz. [ARGENTINA] 1986 Reopening of Runway, Access and Apron of Aeródromo de San Rafael, Mendoza. [ARGENTINA] 1988 Repaving of Runway Aeropuerto de Santa Rosa, La Pampa y Aeropuerto de Paraná, Entre Ríos. [ARGENTINA] 1999 Project and Construction of Perimeter of Service Roads and Channel - Aeropuerto de San Fernando, Buenos Aires. [ARGENTINA] 1999 Project and Construction of Vehicle Parking at Puesto Alfa - Aeroparque Jorge Newbery, Buenos Aires. [ARGENTINA] 2001 Expansion of Commercial Aircraft Apron and Reopening of Concrete Pavement - First stage - Aeropuerto Internacional Salta. [ARGENTINA] 2001 Concrete Slab Repairing in the Apron of Aeropuerto Gral. Mosconi, Comodoro Rivadavia, Chubut. [ARGENTINA] 2001 Reopening of Runway and Extension of Touch Down Zone 35 - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2001 Reconstruction and Reopening of Pavement in the Commercial Aircraft Apron, Taxiways and Runways of Aeropuerto de Formosa. [ARGENTINA] 2003 Reopening of Runway and Related Taxiways - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] Reopening Operations in Runway del Aeropuerto de Río Grande, Tierra del Fuego. [ARGENTINA] 2004 Reopening of Runway Aeropuerto Internacional de Salta. [ARGENTINA] 2004 Reopening of Runway 13-31, Taxiways and Apron - Aeropuerto Internacional de Mar del Plata. [ARGENTINA] Repairing of Taxiways: Main, Juliet, Delta; Cargo Apron and Aircraft Standing Positions - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] Construction of New Aircraft Standing Positions - Aeropuerto de San Carlos de Bariloche, Río Negro. [ARGENTINA]
9 Aeropuerto Internacional de Ezeiza Intensive Patching Operations in Runways, Taxiways and Apron - Aeroparque Jorge Newbery, Buenos Aires. [ARGENTINA] 2005 Reopening of Runway and Taxiways - Aeropuerto de La Rioja. [ARGENTINA] Pavement Repairing in Runway Aeropuerto Internacional de Córdoba. [ARGENTINA] Reopening of Runway and Taxiways - Aeropuerto de Catamarca. [ARGENTINA] Expansion of South Touch Down Zone Runway Aeroparque Jorge Newbery, Buenos Aires. [ARGENTINA] 2007 Repaving of Runway and Taxiways - Aeropuerto de San Luis. [ARGENTINA] 2008 Repaving of Runway Aeropuerto Internacional de Resistencia, Chaco. [ARGENTINA] 2008 Repaving of Runway - Aeropuerto de Jujuy. [ARGENTINA] 2009 Reopening of Pavement in Runway - Aeropuerto Internacional de Mar del Plata, Buenos Aires. [ARGENTINA] 2009 Repaving of Runway - Aeropuerto de Río Grande, Tierra del Fuego. [ARGENTINA] 2009 Draining of Cargo Apron and Green Areas - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2009 Expansion of Delta and Main Taxiways - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2009 Reopening of Pavement in Runway - Aeropuerto de Mar Del Plata, Buenos Aires. [ARGEN- TINA] 2009 Reopening of Pavement in Civil Apron, Runway and taxiway - Aeropuerto Internacional de Río Grande, Tierra del Fuego. [ARGENTINA] 2009 Construction of Taxiway Shoulders in Juliet Taxiway - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2009 Paving of Cargo Apron and Green Areas - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2010 Temporary Toll Expansion - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2010 Temporary Road to the Fire Extinction Service Unit - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2010 New Road Demolition Zone Access - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2010 Patching - Aeropuerto de San Fernando, Buenos Aires. [ARGENTINA] 2010 Reopening of Pavement, Widening of Runway Aeroparque Jorge Newbery, Buenos Aires. [ARGENTINA]
10 AIRPORT CIVIL works 1999 Supply and Construction, including the existing Terminal Expansion Project, at Aeropuerto de San Fernando, Buenos Aires. [ARGENTINA] 2005 Expansion of Air Station and Installation of New Passenger Boarding Bridges at Aeropuerto Internacional de Mendoza. [ARGENTINA] Expansion of Air Station and Jetways for Plane Access Air Bridges at Aeropuerto de Río Grande - Tierra del Fuego. Etapas 0, 1, 2, 3, 4, 5, 6, 7 y 8. [ARGENTINA] 2005 Migrations Works 1-5 and 6-10 at Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] Software Factory Building Construction at Aeropuerto Gral. Pico, La Pampa. [ARGENTINA]2007 Remodeling of Terminals A and B at Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2007 New Shopping Area at Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2008 Terminal Remodeling at Aeropuerto Internacional de Resistencia, Chaco. [ARGENTINA] 2009 Remodeling of Aeropuerto Internacional de Carrasco - República Oriental del Uruguay. [ARGENTINA] Construction of the Weather Station and Balloon Inflation Building at Aeropuerto Internacional de Córdoba. [ARGENTINA] 2009 TCA Cargo Terminal Warehouse at Aeropuerto Internacional de Ezeiza, Buenos Aires Relocation and Widening of West Road - Solution of Interferences - Aeroparque Jorge Newbery, Buenos Aires. [ARGENTINA] 2010 Square - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2010 New Commercial Aircraft Apron - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2010 New Passenger Terminal - Adequate Temporary Apron - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2010 Interchanger - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA]
11 Aeropuerto Internacional de Carrasco, Uruguay
12 Aeropuerto Internacional de Ezeiza 2010 Remodeling of Shop Gallery Stores and Stores 9 and 14 of Duty Free - Aeroparque Jorge Newbery, Buenos Aires. [ARGENTINA] 2010 New Migrations Sector - Aeroparque Jorge Newbery, Buenos Aires. [ARGENTINA] 2010 Aeropuerto de San Luis - Terminal Remodeling [ARGENTINA] 2010 Security Post 1 at Aeropuerto Internacional Ezeiza, Buenos Aires. [ARGENTINA] 2010 Public Vehicle Parking - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2010 Staff Vehicle Parking - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2010 North Vehicle Parking Upgrading - Aeroparque Jorge Newbery, Buenos Aires. [ARGENTINA] 2011 Commercial Aircraft Apron Stage 1A - Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2011 Fire Extinction Service Apron at Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] 2011 New Passenger Terminal C of Aeropuerto Internacional Ezeiza, Buenos Aires. [ARGENTINA] 2011 Preliminary tasks, demolition and perimeter works for the new terminal at Aeropuerto Internacional de Ezeiza - Buenos Aires. [ARGENTINA] 2011 New Maintenance Modules Construction, Aeropuerto Internacional de Ezeiza, Buenos Aires. [ARGENTINA] Aeropuerto de Santiago del Estero. Demolition of a 1,000 m 2 building and construction of a new 1,000 m 2 building with the airport in operation. Procedures in the platform and vehicle parking areas. Santiago del Estero. [ARGENTINA] Terminal B of Aeropuerto de Ezeiza, inaugurated on 15/12/. [ARGENTINA] Expansion of Aeroparque Metropolitano Ciudadde Buenos Aires (35,000 m 2 ). [ARGENTINA] Aeropuerto de Córdoba, completion of domestic arrivals areas and domestic flights bridges, reinforced concrete structure and main sector roof. [ARGENTINA] Press Conference Room at Aeropuerto de Ezeiza, completed in July. [ARGENTINA] Buildings III and IV Aeroparque, reinforced concrete structure completion. [ARGENTINA] Aeroparque International Area, inauguration of first stage on 15/12/. Total works completion in August [ARGENTINA] 2013 FBO terminal Ezeiza. [ARGENTINA] 2013 Aerolíneas s offices at Building IV of Aeroparque Metropolitano - Ciudad de Buenos Aires. [ARGENTINA] 2013 Building II - New Vehicle Parking Area on flat rooftop - Aeroparque Metropolitano - Ciudad de Buenos Aires. [ARGENTINA] 2013 Building III and IV - Construction of 4 cores, air bridges and new domestic flights pre-boarding sector - Aeroparque Metropolitano - Ciudad de Buenos Aires. [ARGENTINA] 2013 New American Airlines - Iberia VIP Lounge at Aeropuerto Internacional Ezeiza - Buenos Aires. [ARGENTINA] 2013 New Aeropuertos 2000 VIP Lounge - Aeropuerto Internacional Ezeiza - Buenos Aires. [ARGENTINA] 2013 New Customs yard at Terminal A - Aeropuerto Internacional Ezeiza - Buenos Aires. [ARGENTINA] 2013 Expansion of Migrations yard at Terminal A - Aeropuerto Internacional Ezeiza - Buenos Aires. [ARGENTINA] 2013 New Aerolíneas s offices at Aeropuerto Internacional Ezeiza - Buenos Aires. [ARGENTINA] 2013 New Control Tower - Aeropuerto Internacional Córdoba - Córdoba.
13 Aeropuerto Internacional de Guayaquil
14 Aeroporto de Brasília Zvartnots International Airport
15 Aeroporto de Natal
16 AIRPORT WORKS ENGINEERING SCOPE OF SERVICES COUNTRY LOCATION DESCRIPTION CLIENT YEAR ENGINEERING SCOPE OF SERVICES Peru Ayacucho New perimeter fence Aeropuertos Andinos del Perú S.A Peru Ayacucho New building construction for divestiture of supplies Aeropuertos Andinos del Perú S.A engineering services, Construction Management, Value Peru Juliaca New parking lot - Aeropuerto de Juliaca Aeropuertos Andinos del Perú S.A civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Peru Juliaca New building construction for solid waste disposal Aeropuertos Andinos del Perú S.A engineering services, Construction Management, Value COUNTRY LOCATION DESCRIPTION CLIENT YEAR ENGINEERING SCOPE OF SERVICES Juliaca New perimeter fence Aeropuertos Andinos del Perú S.A engineering services, Construction Management, Value engineering Ciudad Autónoma de Buenos Aires Ciudad Autónoma de Buenos Aires - Buildings III y IV - Civil and sanitary works Aeroparque Jorge Newbery Aeropuertos 2000 S.A engineering services, Construction Management, Value Peru Puerto Maldonado Works for the installation of electrical system Aeropuertos Andinos del Perú S.A engineering services, Construction Management, Value Peru Ayacucho efurbish and rehab runway Aeropuertos Andinos del Perú S.A civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Tacna Construction of perimeter path Aeropuertos Andinos del Perú S.A engineering services, Construction Management, Value engineering Brazil Natal New Natal International Airport at Sao Goncalo do Inframerica 2014 engineering services, Construction Management, Value Amarante - RN Ciudad Autónoma de Buenos Aires AEP Building IV - New concrete structure - Phase 1 & 2 - Aeroparque Jorge Newbery Aeropuertos 2000 S.A. engineering services, Construction Management, Value Brazil Brasilia New construction and general refurbish Brasilia International Consorcio Inframerica 2014 Airport engineering services, Construction Management, Value Ezeiza (Buenos Aires) New passenger Terminal - New commercial apron - Phase 1B - Aeropuerto Internacional de Ezeiza Aeropuertos Andinos del Perú S.A. civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Ecuador Ciudad Autónoma de Buenos Aires Islas Galápagos AEP New international terminal area - Aeroparque Jorge Newbery Zvartnots International Airport Public Area Construction Works Security Storage and Meeting Room Galapagos Ecological Airport Aeropuerto Seymour. New Terminal Construction Works. Covered area: m2. Aeropuertos 2000 S.A. International Airports Aeropuerto Ecológico de Galápagos Ecogal S.A engineering services, Construction Management, Value engineering, LEED certified process from starting conceptual design up to obtain LEED Gold Certification. Peru Arequipa Refurbish and increase terminal area Arequipa Airport Aeropuertos Andinos del Perú S.A engineering services, Construction Management, Value engineerin Peru Arequipa Construction of the Boarding bridges System Aeropuertos Andinos del Perú S.A Peru Ayacucho New parking lot - Aeropuerto de Ayacucho Aeropuertos Andinos del Perú S.A Ezeiza (Buenos Aires) Ezeiza (Buenos Aires) Bariloche (Río Negro) San Fernando (Buenos Aires) Ezeiza (Buenos Aires) Ezeiza (Buenos Aires) Ezeiza (Buenos Aires) New passenger terminal - Phase 1B - New concrete structure - Aeropuerto Internacional de Ezeiza New passenger terminal - Phase 1B - New metallic facade and structure - Aeropuerto Internacional Miling and refurbish of runway - Aeropuerto San Carlos de Bariloche. Refurbish of runway - Aeropuerto de San Fernando New commercial apron - Phase 1B - Bahía Arsa - Aeropuerto Internacional de Ezeiza New passenger terminal - Phase 1B - New metallic facade and structure - Aeropuerto Internacional New commercial apron - Phase 1B - Bahía Arsa - Aeropuerto Internacional de Ezeiza Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. engineering services, Construction Management, Value engineering services, Construction Management, Value engineering services, Construction Management, Value Architecture: civil from design, conceptual field inspections, design to topographic construction surveys, documents, construction engineering layout verification, services, On Construction site facilities Management, develop, project Value horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Architecture: civil from design, conceptual field inspections, design to topographic construction surveys, documents, construction engineering layout verification, services, On Construction site facilities Management, develop, project Value horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks.
17 COUNTRY LOCATION DESCRIPTION CLIENT YEAR ENGINEERING SCOPE OF SERVICES COUNTRY LOCATION DESCRIPTION CLIENT YEAR ENGINEERING SCOPE OF SERVICES Zvartnots International Airport Public Area Construction Works Presidential Road Project International Airports Zvartnots International Airport Public Area Construction Works Parking Construction International Airports 2011 Zvartnots International Airport Public Area Construction Works Artificial Grass International Airports Zvartnots International Airport Construction Works Cargo Cooling Room International Airports 2011 Ground Handling Boxes Reconstruction International Airports Ezeiza (Buenos Aires) New Terminal C - Phase 1A - Aeropuerto Intenacional de Ezeiza Aeropuertos 2000 S.A Ground Handling Boiler Construction International Airports Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Ezeiza (Pcia. Bs. As.) Ampliación Rodaje Delta del aeropuerto Internacional de Ezeiza Aeropuertos 2000 S.A Architecture: civil from design, conceptual field design inspections, to construction topographic documents, surveys, engineering construction services, layout Construction verification, Management, On site facilities Value develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Peru Peru Arequipa Arequipa Main entrance portico and toll station New parking lot - Aeropuerto de Arequipa Aeropuertos Andinos del Perú S.A. Aeropuertos Andinos del Perú S.A. Architecture: civil from design, conceptual field inspections, design to topographic construction surveys, documents, construction engineering layout verification, services, On Construction site facilities Management, develop, project Value horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Ciudad Autónoma de Buenos Aires Refurbish and and enlarge runway to accomadate into annez 14 - Aeroparque Jorge Newbery Zvartnots International Airport Public Area Construction Works Viaduct Construction Aeropuertos 2000 S.A. International Airports Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Peru Peru Ayacucho Puerto Maldonado Main entrance portico and toll station Main entrance portico and toll station Aeropuertos Andinos del Perú S.A. Aeropuertos Andinos del Perú S.A. Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Zvartnots International Airport Public Area Construction Works Basement Flooring Works Zvartnots International Airport Public Area Construction Works Water Tanks Construction International Airports International Airports Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Peru Peru Tacna Tacna New parking lot - Aeropuerto de Tacna Main entrance portico Aeropuertos Andinos del Perú S.A. Aeropuertos Andinos del Perú S.A. Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Zvartnots International Airport Public Area Construction Works Level Zvartnots International Airport Public Area Construction Works 3rd Phase International Airports International Airports Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Ezeiza (Buenos Aires) Bariloche (Río Negro) Ezeiza (Buenos Aires) Ezeiza (Buenos Aires) Sunchales (Santa Fe) New passenger terminal - New commercial apron - Phase 1B - Aeropuerto Internacional de Ezeiza Preliminary support works and demolition to build new Ezeiza Terminal New Terminal C - Phase 1A - Aeropuerto Intenacional de Ezeiza New passenger terminal de Pasajeros - New commercial apron- Phase 1A - Aeropuerto Internacional de Ezeiza Enlarge runway - Increase terminal area and refurbish - Aeródromo de Sunchales Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Sancor Coop. De Seguros S.A Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Architecture: civil from design, conceptual field inspections, design to topographic construction surveys, documents, construction engineering layout verification, services, On Construction site facilities Management, develop, project Value horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Ecuador Guayaquil Ezeiza (Buenos Aires) Rio Grande (Tierra del Fuego) Ecuador Cargo Terminal (TCE). New Building and Warehouse Construction Works. Covered area: m2. (ECUADOR) Refurbish of apron and rehab runway strip - Aeropuerto de Ezeiza Refurbish of runway - Aeropuerto de Río Grande Bravo II Construction Works - Phases III, IV & V Terminal de Cargas Ecuador S.A. Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. International Airports Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value engineerin
18 COUNTRY LOCATION DESCRIPTION CLIENT YEAR ENGINEERING SCOPE OF SERVICES COUNTRY LOCATION DESCRIPTION CLIENT YEAR ENGINEERING SCOPE OF SERVICES Ecuador Uruguay Uruguay Uruguay Tena Montevideo Montevideo Montevideo Tena Airport Aeropuerto Jumandy. New Terminal Construction Works. Covered area: m2 Runway lenghth: m Apron: m2. New commercial apron and taxiways - Aeropuerto Internacional de Carrasco New parking area for the new passenger terminal - Aeropuerto Internacional de Carrasco Water tieback dam for rainingwater - Aeropuerto Internacional de Carrasco Ministerio de Transportes y Obras Públicas - Ecuador Uruguay Punta del Este Refurbish and rehab runway Consorcio de Aeropuertos Internacionales 2009 S.A. Uruguay Uruguay Uruguay Montevideo Montevideo Montevideo Construction and program management new cargo terminal of Uruguay Major earthwork embankment main entrance roads for the new passenger terminal - Aeropuerto Internacional de Carrasco General onsite civil works - Aeropuerto Internacional de Carrasco Puerta del Sur S.A. Puerta del Sur S.A. Puerta del Sur S.A. Puerta del Sur S.A. Puerta del Sur S.A. Puerta del Sur S.A civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Uruguay Uruguay Montevideo Mendoza Zvartnots International Airport New Terminal Construction Works Apron, Fueling Pipeline, New Terminal Pavement, Trenches and Electric Piping Construction Works New construction site entrance road and site construction offices - Aeropuerto Internacional de Carrasco Terminal refurbish and enlarge - Aeropuerto de Mendoza International Airports Puerta del Sur S.A. Aeropuertos 2000 S.A civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Montevideo Increase commercial apron - Aeropuerto Internacional Puerta del Sur S.A civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project de Carrasco horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. San Luis Refurbish of runway - Aeropuerto de San Luis Aeropuertos 2000 S.A civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. La Rioja Catamarca Zvartnots International Airport Building Demolition Works Refurbish of runway and taxiways -Aeropuerto de La Rioja Refurbish of runway and taxiways -Aeropuerto de Catamarca International Airports Aeropuertos 2000 S.A. Aeropuertos 2000 S.A Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Architecture: civil from design, conceptual field design inspections, to construction topographic documents, surveys, engineering construction services, layout Construction verification, Management, On site facilities Value develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Architecture: civil from design, conceptual field design inspections, to construction topographic documents, surveys, engineering construction services, layout Construction verification, Management, On site facilities Value develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Resistencia (Chaco) Río Grande (Tierra del Fuego) Jujuy Gyumri Refurbish and rehab of runway, taxiways and apron - Aeropuerto de Resistencia Refurbish of runway and taxiways -Aeropuerto de Río Grande Refurbish of runway, taxiways and apron -Aeropuerto de Jujuy Zvartnots International Airport Public Area Construction Works Demolition and Excavation Gyumri Shirak Airport Runway and Lighting System Reconstruction Works Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. International Airports International Airports civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Architecture: civil from design, conceptual field design inspections, to construction topographic documents, surveys, engineering construction services, layout Construction verification, Management, On site facilities Value develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Zvartnots International Airport New Terminal Tunnel Construction Works Zvartnots International Airport New Terminal Construction Works Sanitary Installation Works Zvartnots International Airport Construction Works Runway and Lighting System Reconstruction Works Zvartnots International Airport New Terminal Construction Works Vertical Connection Units Construction Works Zvartnots International Airport New Terminal Construction Works Steel Deck, Stall, Tunnel Construction Works International Airports International Airports International Airports International Airports International Airports Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value civil and electrical design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value
19 COUNTRY LOCATION DESCRIPTION CLIENT YEAR ENGINEERING SCOPE OF SERVICES COUNTRY LOCATION DESCRIPTION CLIENT YEAR ENGINEERING SCOPE OF SERVICES Ecuador Guayaquil Zvartnots International Airport Runway ( segment) and Lighting System Reconstruction Works Guayaquil Airport Aeropuerto Internacional José Joaquín de Olmedo. New Terminal Construction Works. 1st Phase m2. International Airports Terminal Aeroportuaria de Guayaquil S.A. TAGSA civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Uruguay Zvartnots International Airport New Terminal Construction Works Apron, Fueling Pipeline, New Terminal Pavement, Trenches and Electric Piping Construction Works International Airports 2008 civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Montevideo Increase commercial apron - Aeropuerto Internacional Puerta del Sur S.A civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project de Carrasco horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Uruguay Montevideo Remodeling of Aeropuerto Internacional de Carrasco - República Oriental del Uruguay. Puerta del Sur S.A. San Luis Refurbish of runway - Aeropuerto de San Luis Aeropuertos 2000 S.A civil design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Bariloche (Río Negro) Río Grande (Tierra del Fuego) Ezeiza (Buenos Aires) New commercial apron Aeropuerto de San Carlos de Bariloche Terminal expansion. Phases 0,1,2 y 3 - Aeropuerto de Río Grande New migration area 1/5 y 6/10 - Aeropuerto Internacional de Ezeiza Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Aeropuertos 2000 S.A Architecture: civil from design, conceptual field design inspections, to construction topographic documents, surveys, engineering construction services, layout Construction verification, Management, On site facilities Value develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Uruguay Montevideo La Rioja Zvartnots International Airport Building Demolition Works New construction site entrance road and site construction offices - Aeropuerto Internacional de Carrasco Refurbish of runway and taxiways -Aeropuerto de La Rioja International Airports Puerta del Sur S.A. Aeropuertos 2000 S.A Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Architecture: civil from design, conceptual field design inspections, to construction topographic documents, surveys, engineering construction services, layout Construction verification, Management, On site facilities Value develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Zvartnots International Airport New Terminal Construction Works Excavation and Concrete Structure Zvartnots International Airport Terminal 1 Reconstruction Works International Airports International Airports Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Mendoza Catamarca Terminal refurbish and enlarge - Aeropuerto de Mendoza Refurbish of runway and taxiways -Aeropuerto de Catamarca Aeropuertos 2000 S.A. Aeropuertos 2000 S.A. Architecture: civil from design, conceptual field design inspections, to construction topographic documents, surveys, engineering construction services, layout Construction verification, Management, On site facilities Value develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Zvartnots International Airport Ground Handling, Fence, Pipeline Reconstruction Works International Airports 2003 Zvartnots International Airport New Terminal Tunnel Construction Works International Airports Zvartnots International Airport Data and Energy Main Pipeline Construction Works International Airports 2003 Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Zvartnots International Airport New Terminal Construction Works Sanitary Installation Works International Airports Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Zvartnots International Airport Ground Handling Pavement Reconstruction Works International Airports 2003 Zvartnots International Airport Construction Works Runway and Lighting System Reconstruction Works International Airports civil and electrical design, field inspections, topographic surveys, construction layout verification, On site facilities develop, project horizontal and vertical control, route/transportation surveys, construction Management, construction and administrative tasks. Zvartnots International Airport Runway ( segment) and Lighting System Reconstruction Works International Airports 2003 Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Zvartnots International Airport New Terminal Construction Works Vertical Connection Units Construction Works International Airports Architecture: from from conceptual design design to construction to construction documents, documents, engineering engineering services, Construction services, Management, Construction Value Management, Value Zvartnots International Airport Runway (09-27 segment) and Lighting System Reconstruction Works International Airports 2002 Zvartnots International Airport New Terminal Construction Works Steel Deck, Stall, Tunnel Construction Works International Airports
20 AIRPORT ROAD & CIVIL WORKS MOST REPRESENTATIVE WORKS LAST TEN YEARS COUNTRY LOCATION DESCRIPTION CLIENT AMMOUNT Peru Juliaca New parking lot - Aeropuerto de Juliaca Aeropuertos Andinos del Perú S.A. $ , Peru Juliaca New building construction for solid waste disposal Aeropuertos Andinos del Perú S.A. $ , YEAR Peru Juliaca New perimeter fence Aeropuertos Andinos del Perú S.A. $ , Peru Puerto Maldonado Works for the installation of electrical system Aeropuertos Andinos del Perú S.A. $ , Peru Tacna Construction of perimeter path Aeropuertos Andinos del Perú S.A. $ , COUNTRY Brazil Ecuador LOCATION DESCRIPTION CLIENT AMMOUNT Ciudad Autónoma de Buenos Aires Buildings III y IV - Civil and sanitary works - Aeroparque Aeropuertos 2000 S.A. $ , Jorge Newbery. Peru Ayacucho efurbish and rehab runway Aeropuertos Andinos del Perú S.A. $ , Brazil Natal New Natal International Airport at Sao Goncalo do Inframerica $ , Amarante - RN Brasilia New construction and general refurbish Brasilia Consorcio Inframerica $ , International Airport Ciudad Autónoma de Buenos Aires AEP New international terminal area - Aeroparque Aeropuertos 2000 S.A. $ , Jorge Newbery Islas Galápagos Zvartnots International Airport Public Area Construction Works Security Storage and Meeting Room Galapagos Ecological Airport Aeropuerto Seymour. New Terminal Construction Works. Covered area: m2. International Airports Aeropuerto Ecológico de Galápagos Ecogal S.A. $ ,27 $ ,00 Peru Arequipa Construction of the Boarding bridges System Aeropuertos Andinos del Perú S.A. $ , Peru Arequipa Refurbish and increase terminal area Arequipa Airport Aeropuertos Andinos del Perú S.A. $ , YEAR Ciudad Autónoma de Buenos Aires AEP Building IV - New concrete structure - Phase 1 Aeropuertos 2000 S.A. $ ,82 & 2 - Aeroparque Jorge Newbery Ezeiza (Buenos Aires) New passenger Terminal - New commercial apron - Aeropuertos 2000 S.A. $ ,57 Phase 1B - Aeropuerto Internacional de Ezeiza San Fernando (Buenos Aires) Refurbish of runway - Aeropuerto de San Fernando Aeropuertos 2000 S.A. $ ,62 Ezeiza (Buenos Aires) New passenger terminal - Phase 1B - New concrete structure Aeropuertos 2000 S.A. $ ,43 - Aeropuerto Internacional de Ezeiza Ezeiza (Buenos Aires) New passenger terminal - Phase 1B - New metallic facade and structure - Aeropuerto Internacional Zvartnots International Airport Public Area Construction Works Presidential Road Project Terminal Aeroportuaria de Aeropuertos 2000 S.A. International Airports $ ,00 Bariloche (Río Negro) Miling and refurbish of runway - Aeropuerto San Carlos Aeropuertos 2000 S.A. $ ,10 de Bariloche. Ezeiza (Buenos Aires) New commercial apron - Phase 1B - Bahía Arsa - Aeropuertos 2000 S.A. $ ,01 Aeropuerto Internacional de Ezeiza Zvartnots International Airport Public Area Construction Works Artificial Grass International Airports $ ,56 $ ,24 Peru Ayacucho New parking lot - Aeropuerto de Ayacucho Aeropuertos Andinos del Perú S.A. $ , Peru Ayacucho New perimeter fence Aeropuertos Andinos del Perú S.A. $ , Peru Ayacucho Refurbish of runway and taxiways -Aeropuerto de La Rioja Aeropuertos Andinos del Perú S.A. $ , Ground Handling Boxes Reconstruction International Airports $ ,84 Ground Handling Boiler Construction International Airports $ ,32
Domestic Policy Frameworks on Adaptation to Climate Change in Water Resources Argentina Country Case Study
ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT Annex I Expert Group Seminar Working Together to Respond to Climate Change Domestic Policy Frameworks on Adaptation to Climate Change in Water Resources
More informationRoutes Development in Lima
Routes Development in Lima November, 2008 Contents Ideal location First Steps Initial Conclusions Strategy Marketing activities Results Challenges 1 PERU, A SHORT OVERVIEW Peru is ideally situated PERU
More informationGeneral Information. Name Adress Phone Web site Aerolineas
An Observatory for Climate and Environment 4th Aquarius/SAC-D Science Workshop in honor of Dr. F. Raul Colomb 03-05 December 2008 Puerto Madryn, Chubut, Argentina General Information IMPORTANT: In order
More information3Aena Aeropuertos. Aena Internacional. 2011 Annual report. Aena Internacional
Since beginning operations in 1998, has been managing airport infrastructures abroad. Today we are present in eight countries in Europe, America and Africa, strengthening Aena Aeropuertos position as the
More informationESER was established in 1968 under the name of Tekser Technical Services Inc. Following a change in its name in 1985, it has served its customers under the name of ESER Consulting Engineering Inc. ESER
More informationINFORMATION ABOUT IT PRODUCT S FEATURES DISTRIBUTION ABOUT OUR READERS READER PROFILE MARKETPLACE
MEDIA KIT 2013 INFORMATION ABOUT IT PRODUCT S FEATURES Information Technology is the leading magazine of Technology and Business in Argentina. On 2012 it is marking its first 15 years of uninterrupted
More informationTHE COMPANY Safety, swiftness, efficiency constantly evolving. SERVICES Innovative and secure. Fixed Base Operator
THE COMPANY Safety, swiftness, efficiency constantly evolving SERVICES Innovative and secure 01. Cargo Services Reliable logistical processes, innovative and secure 02. Ground Handling Services A comprehensive
More informationSOWITEC GROUP THE LARGEST WIND DEVELOPER IN LATIN AMERICA -RIDERS OF THESTORM- Erfurt 19.6.2012
SOWITEC GROUP THE LARGEST WIND DEVELOPER IN LATIN AMERICA -RIDERS OF THESTORM- Erfurt 19.6.2012 CONTENT 1. About SoWiTec group / SoWiTec Argentina 2. Energy market Argentina 3. Why invest into Argentina
More informationNATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It
More informationVision Precision Value
Vision Precision Value Vision Energy and natural resources: new scenarios, new challenges The increasingly complex scenarios of the energy arena, natural resources, and environmental protection require
More informationHartsfield-Jackson Atlanta International Airport s
Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,
More informationPROJECT PROPOSAL FOR THE SUPPLY AND OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND
PROJECT PROPOSAL FOR THE SUPPLY AND INSTALLATION OF A RADAR SYSTEM, CONSTRUCTION OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND PRESIDENTIAL LOUNGE AT BANJUL INTERNATIONAL
More informationMary Murphy Slide Collection
Mary Murphy Collection Argentina, Buenos Aires: Chacabuco Tour SA-1998 Approaching Chacabuco. Feb. 3, 1998 SA-207 Argentina, Buenos Aires: Chacabuco Tour SA-1998 Approaching Chacabuco. Feb. 3, 1998 SA-208
More informationOPTIMIST WORLD SAILING CHAMPIONSHIP 2014
APPLICATION TO HOST THE OPTIMIST WORLD SAILING CHAMPIONSHIP 2014 The Asociación Optimist Argentina is bidding as candidate to host the Optimist World Championship in 2014. The venue and major organisers
More informationSixteenth Meeting of the Cross Polar Trans East Air Traffic Management Providers Work Group (CPWG/16) (Ottawa, Canada 3-6 December 2013)
CPWG/16 IP/19 03/12/13 Sixteenth Meeting of the Cross Polar Trans East Air Traffic Management Providers Work Group (CPWG/16) Agenda Item 5: Status on CPWG/15 Actions (Ottawa, Canada 3-6 December 2013)
More informationGAP DAY 2007. March 8-9 Puerto Vallarta, Jalisco
GAP DAY 2007 March 8-9 Puerto Vallarta, Jalisco CURRENT FULL-SCALE WORKS AT: CURRENT FULL-SCALE WORKS GUADALAJARA INTERNATIONAL AIRPORT CURRENT FULL-SCALE WORKS 1. REGIONAL AVIATION TERMINAL BUILDING UPGRADING
More informationMCAS Miramar Construction. Christopher Manis Deputy S-4, MCAS Miramar
MCAS Miramar Construction Christopher Manis Deputy S-4, MCAS Miramar PV streetlights ongoing, and they save ~750 KW-hr per year each 342,000 KW-hrs per year from this carport enough to power a 35Ksf bldg
More informationExisting Facilities. Current and Forecast Demand
Existing Facilities JIA is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual Service Volume (ASV) of the runway
More informationPRODUCT CHARACTERISTICS
PRODUCT CHARACTERISTICS INFORMATION ABOUT APERTURA PRINT RUN 29.000 READERSHIP 6.5 NET PAID SALES: 13.000 (*) SUBSCRIPTION AND MAILING: 17.500 (*)SOURCE MC READER PROFILE MALE 64% FEMALE 36% 20 TO 29 YEARS
More informationPeisa Climatación - A Successful Business Model
H E A T I N G + H O T W A T E R I n s t i t u t i o n a l b r o c h u r e 2 0 1 3 Our COMPANY Over 30 years of History and Growth has been over 30 years in the constant search for heating solutions, always
More informationCENTRAL OHIO NORTHEAST OHIO
CENTRAL OHIO Military Defense Supply Center Columbus Warehouse upgrades Columbus 1,000,000 Military Defense Supply Center Columbus Fire protection Columbus 500,000 Military Defense Supply Center Columbus
More informationExamples of Eligible Projects. Project Category Description Examples
Examples of Eligible Projects Public Transit Local Roads, Bridges, and Active Transportation Regional and Local Airports which supports a shared passenger transport system which is available for public
More informationA Report on Post-Earthquake Rapid Visual Damage Assessment of Buildings Of Tribhuvan International Airport
A Report on Post-Earthquake Rapid Visual Damage Assessment of Buildings Of Tribhuvan International Airport Prepared By: Civil Engineering Division Tribhuvan International Airport Civil Aviation Office
More informationDIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016
I. Purpose DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016 To provide a standard for a reasonable A/E fee structure on State of Utah Projects
More informationOCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES
OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES Revised June, 2012 1 OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES TABLE OF CONTENTS
More informationLiquid Effluent Treatment Plant (LETP) Land Clean-Up
Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to
More informationFleet in operation as of April 2015 Avianca. Avianca Cargo. Avianca in numbers
Fact Sheet 2015 Fleet in operation as of April 2015 Avianca 04 Boeing 787 Dreamliner 10 Airbus A330-200 57 Airbus A320-200 09 Airbus A321 32 Airbus A319-100 10 Airbus A318-100 12 Aviones jet Embraer E190
More informationExhibit C: Scope of Work and Schedule of Deliverables
Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza
More informationTHE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
More informationDisaster relief emergency fund (DREF) Argentina: Floods
Disaster relief emergency fund (DREF) Argentina: Floods DREF operation n MDRAR007 GLIDE n ST-2013-000035-ARG 12 April 2013 The International Federation of Red Cross and Red Crescent (IFRC) Disaster Relief
More informationARGENTINA MISSIONLINE LOGISTICS SA EXCLUSIVE MEMBER. Name: SALTA 3503 LA LUCILA B1637BXG BUENOS AIRES - ARGENTINA. Phone: +54-11-4711-6586
ARGENTINA Address: MISSIONLINE LOGISTICS SA SALTA 3503 LA LUCILA B1637BXG BUES AIRES - ARGENTINA Phone : +54-11-4711-6586 Fax : +54-11-4711-6586 C.E.O. or General Manager: RICHARD KRAAYENBRINK Phone: +54-11-4711-6586
More informationCHAPTER 8 - FINANCIAL PLAN
8.01 General CHAPTER 8 - FINANCIAL PLAN This chapter presents a financial plan to support capital improvement decisions and to serve as a guide for orderly development of Erie International Airport. It
More informationAerodrome Advisory Circular
Aerodrome Advisory Circular AC(AD) NO-13 Integration of International Aviation Security (AVSEC) Measures into Designs and Constructions of New Facilities and alterations to Existing Facilities. CIVIL AVIATION
More informationSurviving Sherman Repotenciado Last update : 14 July 2015
Surviving Sherman Repotenciado Last update : 14 July 2015 Listed here are the Argentine Sherman Repotenciado tanks created from deep modification of Sherman tanks, that still exist today. Jim Goetz, November
More informationThe total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.
Public Notice of Application for Authority to Impose and Use Passenger Facility Charges (PFCs) at EWR, LGA, JFK and SWF and Amendment to Approved PFC Applications at EWR, LGA, and JFK The Port Authority
More information> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29
Bankstown Airport Master Plan 2004/05 Bankstown Airport / Master Plan > 29 8.1 Bankstown Airport s Role in the Sydney Basin Bankstown Airport is the premier GA airport in NSW. In addition to servicing
More informationDeutsche Bank. Andean Region Conference. London, May, 2016
Deutsche Bank Andean Region Conference London, May, 2016 This presentation may include forward-looking comments regarding the Company s business outlook and anticipated financial and operating results.
More informationDIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: July 13, 2015
I. Purpose DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT To provide a standard for a reasonable A/E fee structure on State of Utah Projects II. Background The State Procurement Code requires that
More informationWind Potential in Argentina, situation and prospects. Author: MSc. Carlos V. M. Labriola
Wind Potential in Argentina, situation and prospects Author: MSc. Carlos V. M. Labriola Energy and Sustainability Group Electrotecnia Department Faculty of Engineering National University of Comahue Buenos
More informationCOMPANY PROFILE. History, Aims and Proyections INDUMIX S.A. EQUIPOS PARA EL INDUMIX S.A. EQUIPOS PARA EL HORMIGÓN. Concrete Equipment
COMPANY PROFILE History, Aims and Proyections INDUMIX S.A. EQUIPOS PARA EL INDUMIX S.A. EQUIPOS PARA EL HORMIGÓN HORMIGÓN ABOUT US Our company was born in 1993, as a regularization of a previous society
More informationFind job and training opportunities at SteadyGrowth.ca
3 4 Find job and training opportunities at SteadyGrowth.ca 5 6 7 8 9 10 11 12 13 14 Manitoba Trades What you do Program Entry Requirements Years to Complete Program Where the Jobs are Minimum Wages Apprentice
More informationEscuela de Lingüística Computacional ELiC 2010
Escuela de Lingüística Computacional ELiC 2010 July 26-30, 2010 - Departamento de Computación Facultad de Ciencias Exactas y Naturales - Universidad de Buenos Aires - Argentina Introduction ELiC 2010 was
More informationFACT SHEET. 2016 Page 1(3)
Punta del Este (Maldonado) ITF Seniors Circuit TOURNAMENT NAME AND DATES FACT SHEET Title SUDAMERICANO SENIORS 2016 Tournament Dates ORGANISER DETAILS TOURNAMENT TYPE Singles Entry Deadline Organiser 2016
More informationExceptional... Everytime!
Oil & Gas Exceptional... Everytime! Oil & Gas Industry With each Team Leader possessing 10 20 Years experience, BAR Engineering not only contributes high level engineering expertise, but also the practical
More informationLAN AIRLINES Presidente Riesco 5711, piso 3, Santiago, Chile (56 2) 565 3726 www.lan.com
LAN AIRLINES Presidente Riesco 5711, piso 3, Santiago, Chile (56 2) 565 3726 www.lan.com An overview of LAN Airlines Note: The following document contains general information about the company and its
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationSociedad de Calderería COALCA, S.A.
Sociedad de Calderería COALCA, S.A. 30 years mol!ng y"r projects Coalca was born in 1982 in order to offer effective solutions in the industrial and civil engineering scopes. It designs and manufactures
More information5th Brazil Infrastructure Investments Forum Cesar Cunha Campos
5th Brazil Infrastructure Investments Forum Cesar Cunha Campos Director, FGV Projetos diretoria.fgvprojetos@fgv.br New York, November 2014 Ports - Railways - Airports - Public-Private Partnerships (PPP/P3):
More informationC. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.
SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers
More informationAS ELIGIBLE FOR THE APP
INITIATIVE FOR THE INTEGRATION OF REGIONAL INFRASTRUCTURE IN SOUTH AMERICA IIRSA PROJECTS IDENTIFIED AT THE NATIONALLEVEL LEVEL AS ELIGIBLE FOR THE APP Presentation of and debate about the results of the
More informationAena Internacional is a shareholder in Grupo Aeroportuario del Pacífico (GAP), which operates 12 airports in Mexico.
Aena Internacional is a shareholder in Grupo Aeroportuario del Pacífico (GAP), which operates 12 airports in Mexico. General Information International Development 72 Annual Report 2006 Aena Internacional
More informationDEBRECEN INTERNATIONAL AIRPORT. Prepared by Tamás Sápi Technical Director
DEBRECEN INTERNATIONAL AIRPORT Prepared by Tamás Sápi Technical Director Location of the Debrecen Airport Debrecen International Airport Abandoned Russian military airport The Municipality took over the
More informationERASMUS MUNDUS PUEDES
ERASMUS MUNDUS PUEDES SECOND CALL RESULTS LIST OF SCHOLARSHIPS AND WAITING LIST All scholarship holders must be in possesion of all the required documents before starting the mobility period and meet all
More informationInternational Development
AENA INTERNACIONAL DESARROLLO S,A Aena Internacional conducts its activity as a leading Spanish company in the management of aeronautical facilities for a total of 28 airports, located throughout Latin
More informationOperations at Coulter Airfield
Operations at Coulter Airfield Outline Background Assets Budget Options Questions/Direction Vision (January 2010) 1. Maximize Economic Viability of Coulter Field as an Asset to the City Strategic Issue
More informationTownship of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
More informationWhen is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
More informationINTER-AMERICAN DEVELOPMENT BANK (IDB) Emerging and Sustainable Cities Initiative (ESCI)
INTER-AMERICAN DEVELOPMENT BANK (IDB) Emerging and Sustainable Cities Initiative (ESCI) TERMS OF REFERENCES URBAN DESIGN LAB CONSULTANCIES FOR CHILE Y ARGENTINA Master students in the fields of Architecture,
More informationAIRPORT PLANNING & DEVELOPMENT CONSULTING. Aviation and Airport Consultants With Global Reach & Perspective
AIRPORT PLANNING & DEVELOPMENT CONSULTING Aviation and Airport Consultants With Global Reach & Perspective Aviotec International is a professional consulting services firm offering aviation and airport
More informationHow To Manage A Building
Protecting your property s safety and performance with comprehensive, strategic solutions. Program Management Raba Kistner Facilities, Inc. provides a specialized offering of services that ultimately creates
More informationALTO PALERMO. Address: Arenales 3360 Year of acquisition: 1997. Nº of Stores: 145 Ownership: 100% Book Value: USD 14.8MM
PHOTO BOOK SHOPPING CENTERS ALTO PALERMO Address: Arenales 3360 Year of acquisition: 1997 GLA: 19,354 sqm Nº of Stores: 145 Ownership: 100% Book Value: USD 14.8MM Occupancy: 98.9% Anual retail sales for
More informationConstruction Management Association of America San Diego Chapter
Construction Management Association of America San Diego Chapter An Overview of 2015-2019 Capital Improvement Program Presented by: Iraj Ghaemi, P.E., Director Facilities Development November 13, 2014
More informationExecutive Flight Office & Hangar
ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 Exceptional value for world class 64,305 sq. ft. hangar facility in Eastern Washington ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 THE
More informationFLOOD DAMAGE PREVENTION ORDINANCE
FLOOD DAMAGE PREVENTION ORDINANCE SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS FO FACT, PURPOSE, AND OBJECTIVES 1.1 STATUTORY AUTHORIZATION The Legislature of the State of Washington has in RCW delegated
More informationAssociation of Panamerican Veterinary Medical Colleges
Association of Panamerican Veterinary Medical Colleges Animal Welfare and ONE HEALTH concept Dr. Juan de Jesus Taylor Preciado jjtaylorp2003@yahoo.com.mx PANVET Panamerican Veterinary Sciences Association
More informationWATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION
WATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION 1. PURPOSE. This Advisory Circular (AC) provides guidance for the selection of a water source and standards for the design
More informationBuilding Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County
Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means
More informationBuenos Aires, Argentina March 23-27, 2009 NEWSLETTER
ORGANIZATION OF AMERICAN STATES (OAS) INTER-AMERICAN COMMITTEE ON PORTS (CIP) TENTH EXECUTIVE BOARD MEETING (CECIP) Buenos Aires, Argentina March 23-27, 2009 NEWSLETTER 1. The Inter-American Commission
More informationMTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
More informationLayout Planning of Waste-to-Energy Plants
Layout Planning of Waste-to-Energy Plants Layout Planning of Waste-to-Energy Plants Falko Weber The layout planning of waste incineration and solid recovered fuel power plants is subject to certain local
More informationCITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
More informationBUENOS AIRES & MONTEVIDEO TOUR Classic Argentina & Uruguay ITINERARY
BUENOS AIRES & MONTEVIDEO TOUR Classic Argentina & Uruguay 8 DAYS / 7 NIGHTS This 8 day Argentina and Uruguay tour includes an in-depth tour of Buenos Aires in Argentina, and Colonia and Montevideo in
More informationCuyahoga County Airport - A Guide to Funding Capital Improvements
7.01 General CHAPTER 7 - FINANCIAL PLAN This chapter presents a financial plan to assist with future capital improvements and provide a guide for implementing the development of Cuyahoga County Airport.
More informationNOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions.
ATTACHMENT AA DETAILED SCOPE OF WORK Demolition & Removal Services for SR-7/US-441 from North of Fillmore Street to South of Stirling Road Hollywood, Broward County, Florida 1.0 Structures Structures are
More informationDescription of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationBiomass and Biogas Energy Potential in Argentina
Biomass and Biogas Energy Potential in Argentina Federico Moyano, FAO consultant at Probiomasa 1st June 2015 General topics The bioenergy within the energy context in Argentina Biomass and Biogas Potential
More informationFive Year Capital Plan
Five Year Capital Plan Fiscal Year 2010/11 Fiscal Year 2014/15 Business and Finance Division Five-Year Capital Plan Fiscal Year 2010-11 Fiscal Year 2014-15 3 Table of Contents 1. Executive Summary...1
More informationDesign and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities
At Macau International Airport (RFQ-198) Section 6 Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA
More informationACCIONA INNOVATION AND SUSTAINABLE DEVELOPMENT
ACCIONA INNOVATION AND SUSTAINABLE DEVELOPMENT ACCIONA Innovation and Sustainable Development +32,000 EMPLOYEES Energy Water in +30 countries, 5 continents. Sustainability Economic growth Environmental
More informationC-2 Construction, Inc. - NAICS Codes
C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining
More informationUnder Section: II Required Services: Under Section: III Leased Premises:
May 14, 2012 The following are submitted in response to questions and for clarification. Under Section: II Required Services: 4. Maintenance, repair, and servicing of aircraft: Please clarify that the
More informationPLUMBING ROUGH IN INSPECTION
This Program is made Possible through the Code Officials Education & Training Fund. Revenue for the Fund comes from Assessments on Building Permits. Please turn down cell phones and put pagers on vibrate.
More informationTypes of Engineering Jobs
What Do Engineers Do? Engineers apply the theories and principles of science and mathematics to the economical solution of practical technical problems. I.e. To solve problems Often their work is the link
More informationLAN and TAM Airlines invest more than US$100 million in technology to improve passenger experience
LAN and TAM Airlines invest more than US$100 million in technology to improve passenger experience The airlines introduced eight technology products and solutions to optimize service quality, improve passenger
More informationCOLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
More informationGAS TAX FUND CATEGORIES WITH EXAMPLES
GAS TAX FUND CATEGORIES WITH EXAMPLES PROJECT CATEGORY DESCRIPTION OUTCOME EXAMPLES Local Roads, Bridges Roads, bridges and New roads and rehabilitation of existing roads and Active active transportation
More informationPort of the Americas Rafael Cordero Santiago
THE PROJECT OVERVIEW Port the Americas Rafael Cordero Santiago February, 2007 Mr. Ramón Torres Morales, MSE, MBA, DBA Sc. Executive Director the Port the Americas Authority Box 34125, Ponce, PR, 00734-4125,
More informationPART 4: SITE INFORMATION
TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY
More informationSurviving Sherman Repotenciado Last update: August 9, 2014
Surviving Sherman Repotenciado Last update: August 9, 2014 Listed here are the Argentine Sherman Repotenciado tanks created from deep modification of Sherman tanks, that still exist today. Hélio Higuchi,
More informationJohn Wayne Airport Architect-Engineer (A-E) Services for On-call Engineering Services. Architect-Engineer Slate
John Wayne Airport Architect-Engineer (A-E) Services for On-call Engineering Services Architect-Engineer Slate Qualifications Review Committees (the Committees) comprised of three (3) John Wayne Airport
More information2012 Environmental Report
The Airport is committed to integrate economic, social, and environmental aspects into new projects, existing operations and management strategies while providing a quality service to the greater St. Louis
More informationDescription Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
More informationCOMMERCIAL AND GENERAL AVIATION
Existing Facilities Melbourne International Airport is served by three runways and a number of airside and landside facilities. The runways include Runway 05/23 (3,001 feet long by 75 feet wide), Runway
More informationMASTER PLAN PREPARATION
Located in the East Valley of the Phoenix Metropolitan Area, Phoenix-Mesa Gateway Airport is a former military airfield that has successfully made the transition to a full service commercial passenger
More informationRISK MANAGEMENT PLAN E6-608 SUNSHINE COAST AIRPORT EXPANSION PROJECT TABLES CONTENTS. 6.1 Introduction...609 6.1.1 Hazard and risk...
E6 Summary & Management Framework RISK MANAGEMENT PLAN CONTENTS TABLES 6.1 Introduction...609 6.1.1 Hazard and risk...609 6.2 assessment...609 6.2.1 Approach...609 6.2.2 register...609 6.2.3 Change in
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
3.0 INTRODUCTION CHAPTER 3 ALTERNATIVES CONSIDERED The existing Afton Airport parallel taxiway, with its approximate 4,360 foot length, only accommodates one half of the runway s length, and is too short
More informationAPPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY
ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer
More informationDEMOCRATIC REPUBLIC OF EAST TIMOR GOVERNMENT. Decree Law 6/2006 REGIMEN FOR ACCESS TO RESTRICT AND RESERVED AREAS AT AIRPORTS
DEMOCRATIC REPUBLIC OF EAST TIMOR GOVERNMENT Decree Law 6/2006 REGIMEN FOR ACCESS TO RESTRICT AND RESERVED AREAS AT AIRPORTS The need to protect air transportation and aviation in general makes it indispensable
More informationSEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.
SEPTIC SYSTEMS Who Has A Septic System? Approximately 30 percent of Connecticut s population is served by on-site subsurface sewage disposal systems (a.k.a. septic systems). This means a large percentage
More information