1 Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to restore the land so that it is suitable for future uses in support of the development of the Harwell Campus. We are engaging with the local community and seeking feedback on our proposals, ahead of making a planning application to the Vale of White Horse District Council. What is the Aim of the Project? The aim of the project is to safely: Remove all of the facilities Remove all wastes Return the land to a clean condition Who is Involved in the Project? The work is being undertaken by Magnox acting as a contractor to the Nuclear Decommissioning Authority (NDA). The work is being undertaken on publically owned land that once cleaned will be returned for reuse as part of the Harwell Campus. The NDA have contracted Magnox ltd. to complete the decommissioning of the Harwell Nuclear Site. The Harwell Nuclear Site is only one part of the Harwell Campus. The Nuclear Decommissioning Authority (NDA) is a non-departmental public body created through the Energy Act The NDA is a strategic authority that owns the civil nuclear liabilities, previously under the control of the UK Atomic Energy Authority and British Nuclear Fuels Ltd (BNFL). The NDA is responsible for: Decommissioning and cleaning up nuclear liabilities Managing the wastes produced Magnox, owned by Cavendish Fluor Partnership, is the management and operations contractor responsible for twelve nuclear sites in the UK, working for the Nuclear Decommissioning Authority. 1

2 The Magnox Harwell nuclear site is the birthplace of the UK s nuclear industry. In 1946, Britain s Atomic Energy Research Establishment was established at Harwell, which until that time had been an RAF airfield. The main site reactors and research facilities were built and operated up to 1990 by UKAEA, since when the nuclear site was no longer required and decommissioning began. The nuclear site is part of the Harwell Campus. The Campus is an internationally important science centre which is undergoing expansion. Land released from decommissioning the nuclear site is made available for redevelopment of the Campus. Around 20% of the original nuclear site has been released. What is involved in the Clean-Up Work? The works involve five significant physical elements: Erection of temporary structures/cabins: construction of access route, additional fencing, topsoil storage, environmental protection measures etc. to enable the works. Temporary Diversion of a Public Right of Way: Remediation engineering works: involving use of demolition and excavation machines to remove all structures and pollutants. All wastes will be packaged and moved to new temporary buildings on the Sewage Farm for assay. All wastes will be shipped offsite. Restoration of the land: to a new site profile as a generally flat/gently sloping fielded area, planted with grass. Construction of a pond: to act as a passive protection feature for existing surface water drains that serve the Campus. What is the Condition of the Land before the Works? One parcel of land to be remediated and released is the ex-liquid Effluent Treatment Plant (LETP) and an associated ex-sewage Farm area to the North of the Campus. These areas are adjacent to each other, separated by a public right of way and are separate from the main Nuclear Site. Work is already underway to demolish the above ground structures on the LETP. The above ground structures on the Sewage Farm were removed previously. The LETP is included in the RSRL Harwell nuclear licence. However, it is located on a separate 4 hectare island about 500m from the Harwell Eastern Entrance. The site is surrounded by publicly accessible land. It is ~100m from a housing estate and a children s nursery, and the site boundary is within 10m of commercial offices and there are some other nearby business and retail shops. The LETP was constructed in the late 1940s and has been extensively modified and upgraded over the years. The LETP s primary role was the treatment of aqueous radioactive and chemically contaminated wastes from the Harwell site and the discharge of the treated effluent by permitted routes. At present, the LETP consists of the following areas: o The Sewage Farm area. This area contained the site sewage treatment plant that was removed several years ago. The Sewage Farm was used to treat foul aqueous 2

3 waste arisings. The only items of plant which remain in this part of the site are some subsurface structures, a penstock chamber for surface water diversion, and a surface water measuring flume. The offsite discharge pipeline (ODP) runs along one side of the Sewage Farm area and is the subject of a separate project. o The LETP area. This contains the main LETP and consists of seven main buildings and nine large above ground and underground tanks, associated plant, and embedded piping systems. The LETP was shut down in 2013 after the demand for liquid effluent processing had decreased significantly following the shutdown of Harwell s reactors and most of its processing facilities. The facility structures are to be decommissioned to floor-slab level in the period up to 2016, which is the Phase 1 project. The Phase 2 land remediation will then return the land to a condition suitable the next use in the period up to 2019, with delicensing and release in 2020/21. The LETP buildings, plant, and soil have been subject to a contaminative use involving low levels of radioactive and chemical materials from over 60 years of operations. It is expected that excavation and removal of underground structures, pipes and soils will be required to remove all contaminants to meet regulatory standards. Prior to the main works a programme of characterisation will be undertaken to supplement existing knowledge and to enable detailed planning of the clean-up. The levels of radioactivity are low and are of a type that has been handled safely on the LETP for many decades without impact to the public. What will the Area Look like During the Works? The works will have the appearance of civil earthworks and will involve controlled demolition of underground structures, removal of embedded piping and excavation of contaminated soils. Demolition will be using machines and there will be no use of explosives. In order to assay the wastes produced by the remediation, some new temporary warehouse-like facilities will be constructed on the Sewage Farm area. These will be removed upon completion of the project. There will be some heavy goods vehicles movements in the area for the duration of the works in order to export the waste materials to suitably permitted offsite locations (~20 movements per day). Radioactive wastes will be exported to offsite treatment and disposal facilities all of which are currently outside of Oxfordshire. The public right of way will be diverted during the works. The diversion will be around the LETP to the South on existing roads and tracks. The diversion will be clearly signposted and is subject to a Temporary Traffic Diversion Order issued by the local authority. Traffic will enter and leave the LETP through the existing entrance and will be routed offsite via the new link road to the Fermi Road campus entrance. There will be two temporary warehouse buildings erected on the Sewage Farm area. These will be used to handle wastes. There will also be porta-cabin buildings on the Sewage Farm area to accommodate the workers. What Measures are to be taken for Safety? Normal working practices, such as monitoring of the materials, careful handling, use of misting/dust control systems, use of local containments as required, use of packages to hold 3

4 and handle the wastes and the deployment of environmental monitoring systems will be sufficient to ensure public and worker safety. All operations are regulated under the existing Nuclear Licence and all discharges/wastes are regulated under existing environmental permits. The industrial safety of the works will be integrated under a Construction Phase Plan as part of the CDM regulations Details of the impacts and controls for the works will be contained in an Environmental Statement that will be support the planning What will the Area Look like After the Works? The land will have a flat or gently sloping field-like appearance. The area will be planted with grass. There will be a substantial pond on one area of the land. This is required to act as a collection point for some existing surface water drains that serve the main campus. It replaces a function previously provided by the LETP to provide environmental protection to the Lydebank Brook. The public right of way will be re-opened on the current route. This will have the appearance of a stone surfaced track. The existing fences will remain in place. The only remaining structures will be an existing electrical sub-station and an existing utility sewage access point, both along the public right of way. How is the work performed? Survey and characterisation: Measurements are undertaken to the condition of the area and whether there are any pollutants that require to be removed Establishment of infrastructure including temporary waste buildings Establishment of controls, including dust suppression and monitoring systems to ensure environmental protection. Demolition and excavation within zones. Waste placed into containers and moved to a waste assay building constructed on the Sewage Farm area Waste measured to determine disposal route Waste dispatched offsite within contained vehicles Exposed areas where works have been completed are sampled and surveyed to show clean-up is complete Land reinstatement to a safe land profile and construction of the pond Removal of regulatory controls through submission of evidence to regulators What is the Timeline for the project? A planning application will be submitted in late

5 2015/16 Design, planning, consultation 2016/17 - Characterisation, Establish Infrastructure 2017 mid 2019 Remediation and Reinstatement 2020/21 removal of licence and permits Early End What are the Temporary Warehouses on Sewage Farm for? It is likely that two warehouses will be constructed. These will use a proprietary design of building designed for temporary use. Containers of waste will be taken to one of the buildings after removal from the working area. Sealed containers will be used to handle all wastes on the site. In this first building the container will be measured using sensitive detection equipment that will enable the correct waste route for the material to be identified. The second building will be used to store the waste containers until they are approved for shipment to an offsite waste management route. How much Traffic will the project give rise to? We expect around a maximum of 20 heavy good vehicle movements per day due to the project. Other traffic flows will be similar to those that have arisen from the LETP over previous years. Is there a Potential for Hazardous Emissions? Very low levels of radioactivity are involved. A series of measures will be used to ensure that dusts do not present a risk of any significant harm to the public or workers. A monitoring system will be deployed at the site boundary to check for all dust emissions. Is there the potential for Noise? Noise monitoring will take place before and during the works to ensure there is no significant nuisance from the noise of demolition operations. Demolition is already taking place on the site. 5

6 Is there the potential to harm Ecology? Surveys will be completed before and during the works to ensure impacts to ecology are managed. How clean will the area be afterwards? The land will be returned to a condition suitable for any foreseeable future use, including use for example, as public areas, for housing or for agricultural. The actual next use of the land is not part of the scope of this project. The clean-up standards are specified by both the Environment Agency and the Office for Nuclear Regulation and they will not release the land from regulatory control unless they are independently satisfied that the clean-up targets have been achieved. 6

MBJ Environmental Programmes

MBJ Environmental Programmes MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,

More information

Guide to nuclear decommissioning

Guide to nuclear decommissioning Guide to nuclear decommissioning Contents: What is decommissioning? Stages of decommissioning Site restoration Waste management The UK decommissioning industry The international picture What is decommissioning?

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

2.0 Land Quality Programme

2.0 Land Quality Programme 2.0 Land Quality Programme The Sellafield site has a legacy of ground contamination from its historical use as a Royal Ordnance factory and its subsequent development as a nuclear facility. The ground

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

HOW TO... Be Aware of Your Environmental Legal Responsibilities

HOW TO... Be Aware of Your Environmental Legal Responsibilities HOW TO... Be Aware of Your Environmental Legal Responsibilities How to... Be Aware of Your Environmental Legal Responsibilities You have legal responsibilities for the impact your business has on the environment.

More information

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102 CHAPTER 9 PERMITTING 9.1 England and Wales 100 9.1.1 T24 exemption for on-farm AD 100 9.1.2 T25 exemption for off-farm AD 100 9.1.3 Standard rules environmental permits 100 9.1.4 Standard rules for on-farm

More information

SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies the control of environmental pollution and damage that the Contractor must consider for air,

More information

BP Texas City Refinery

BP Texas City Refinery BP Texas City Refinery ENVIRONMENTAL STATEMENT FOR YEAR 2010 (Review of Y2009 Performance) Introduction Recognizing the complex nature of petroleum refining operations and to ensure that we meet our stated

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,

More information

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident

More information

CONSTRUCTION SEQUENCE & PROGRAMME

CONSTRUCTION SEQUENCE & PROGRAMME CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone

More information

ANNEX 2 Emergency / Pollution Incident Response Plan

ANNEX 2 Emergency / Pollution Incident Response Plan ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...

More information

Foul Drainage, systems and responsibility. Environmental Protection

Foul Drainage, systems and responsibility. Environmental Protection Foul Drainage, systems and responsibility Environmental Protection The Building Act 1984 The Building Act 1984 can be used to deal with unsatisfactory provision for drainage and appliances which are harmful

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION 1000 FRENCH STREET SITE Wilmington, Delaware DE 1115 June 1999 Department of Natural Resources and Environmental Control Division of Air and Waste Management Site Investigation

More information

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

Proposed (Concrete Cutting And Drilling) Environmental Management Plan SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part

More information

Draft Business Plan. Financial year beginning April 2016 to fi nancial year ending March 2019

Draft Business Plan. Financial year beginning April 2016 to fi nancial year ending March 2019 Draft Business Plan Financial year beginning April 2016 to fi nancial year ending March 2019 January 2016 . Nuclear Decommissioning Authority Draft Business Plan Financial year beginning April 2016 to

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

NAPCS Product List for NAICS 54162: Environmental Consulting Services

NAPCS Product List for NAICS 54162: Environmental Consulting Services NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

Paragraph 9 Exemption The reclamation or improvement of land

Paragraph 9 Exemption The reclamation or improvement of land The reclamation or improvement of land 1 INTRODUCTION This document provides guidance, definitions, operational policy and strategy with regard registering a paragraph 9 exemption under Schedule 1 of the

More information

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 JBA Prepared by : John Barnett and Associates / SLR Consulting 7 Dundrum Business Park

More information

Standard terms and conditions

Standard terms and conditions Standard terms and conditions INTRODUCTION For the provision of a water service (Water Supply, Wastewater and Drainage) Under Section 73(2)(a) of the Water Services Act 2012, landowners may be entitled

More information

Slide 1. Enviros Consulting Ltd

Slide 1. Enviros Consulting Ltd Slide 1 Regulation of Waste Management Activities Past, Present and Future! Steve Bell Technical Manager Waste Management Thursday, 26 July 2007 Presentation Aims An insight of where we have come from

More information

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

Safely delivering excellence in decommissioning, waste management and reprocessing

Safely delivering excellence in decommissioning, waste management and reprocessing Sellafield site overview Safely delivering excellence in decommissioning, waste management and reprocessing www.nda.gov.uk www.sellafieldsites.com www.nuclearmanagementpartners.com People, partnerin Under

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

Construction Site Set Up Requirements

Construction Site Set Up Requirements Process Code Number Revision COP A 035 B Document Title Construction Site Set Up Requirements B 1/11/10 SRC SAT DH Final A 1/10/10 SRC MI Draft comment Rev. Date Prepared Reviewed Approved Detail/Comment

More information

ENVIRONMENTAL MANAGEMENT SYSTEMS QUOTE REQUEST FORM

ENVIRONMENTAL MANAGEMENT SYSTEMS QUOTE REQUEST FORM ENVIRONMENTAL MANAGEMENT SYSTEMS QUOTE REQUEST FORM Please provide the following information to enable us to confirm the costs of registration. To which standard are you requiring registration? (please

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email kaweraudc@kaweraudc.govt.nz

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide Renew provides multidisciplinary engineering services to maintain and develop UK infrastructure focused in

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

RWE npower Plc. The Economy Tuesday 19 th July 2011

RWE npower Plc. The Economy Tuesday 19 th July 2011 RWE npower Plc Statement on the soundness of the Economy Chapter of the South Oxfordshire Proposed Core Strategy and information on the availability of Didcot A Power Station for employment related development.

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS April 2013 i Introduction This guide focuses on repair methods for some of the types of land damage that occurred on flat residential land as a result

More information

SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC)

SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC) SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC) UNIVERSITY RISK MANAGEMENT Occupational and Health Programs 19 Hagood Avenue, Suite 908 Charleston SC 29425 843-792-3604 Revised: June 2015 Spill

More information

Draft ABCA : USEPA 2015 Brownfields Cleanup Grant Application for Former Hudepohl Brewery Site by Port of Greater Cincinnati Development Authority

Draft ABCA : USEPA 2015 Brownfields Cleanup Grant Application for Former Hudepohl Brewery Site by Port of Greater Cincinnati Development Authority Analysis of Brownfield Cleanup Alternatives (ABCA) for Hudepohl Brewery Site Introduction & History The Port of Greater Cincinnati Development Authority (Port Authority) has developed a draft proposal

More information

Development enquiry request

Development enquiry request Development enquiry request Water supply and/or drainage capacity assessment for a proposed development NOTE: Please ensure all relevant sections of the application are completed and refer to the attached

More information

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available

More information

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES Introduction 1. This statement of the UK Government and devolved administrations policy on the decommissioning of nuclear facilities updates

More information

Introduction to Waste Treatment Technologies. Contents. Household waste

Introduction to Waste Treatment Technologies. Contents. Household waste Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting

More information

Twenty-four contracting services environmental claim scenarios you may not have thought about.

Twenty-four contracting services environmental claim scenarios you may not have thought about. Environmental DIVISION Twenty-four contracting services environmental claim scenarios you may not have thought about. Contracting Services Environmental Liability Policy Great American Insurance Group

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB2 OFFICE OF THE PRESIDENT TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For the Meeting of May 15, 2013 ACTION ITEM APPROVAL OF THE BUDGET AND APPROVAL OF DESIGN FOLLOWING ACTION PURSUANT TO

More information

CHAPTER 62-740 PETROLEUM CONTACT WATER

CHAPTER 62-740 PETROLEUM CONTACT WATER CHAPTER 62-740 PETROLEUM CONTACT WATER 62-740.010 Declaration of Intent (Repealed) 62-740.020 Applicability 62-740.030 Definitions 62-740.040 General 62-740.100 Management Practices for Producers of PCW

More information

Number of incidents. Non-permitted activities

Number of incidents. Non-permitted activities Pollution incidents 214 evidence summary July 215 1. Introduction Following an increase in the number of serious pollution incidents in 213, the total number of serious pollution incidents decreased by

More information

INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8

INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8 1 INDEX Introduction 3 The Septic System 3 What Does The Septic Tank Do? 4 Where It All Goes 5 Problems 7 Some Dontʼs 8 Management of Your On-Site System 9 Tank Maintenance 9 Disposal Field Area 10 Appendix

More information

The Clean Up of Clandestine Drug Lab Sites in Minnesota

The Clean Up of Clandestine Drug Lab Sites in Minnesota CLEANUP OF CLANDESTINE DRUG LAB SITES ORDINANCE for Renville County ARTICLE I. GENERAL PROVISIONS SECTION 1.10 SECTION 1.20 SECTION 1.30 SECTION 1.40 SECTION 1.50 SECTION 1.60 SECTION 1.70 TITLE AND STATUTORY

More information

Guide Document for Development of WHS Management Plans

Guide Document for Development of WHS Management Plans DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS

More information

Construction Specification for Sewer Bypass Flow Pumping

Construction Specification for Sewer Bypass Flow Pumping Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 4.01 April 2013 Pumping Table of Contents TS 4.01.01 SCOPE... 2 TS 4.01.02 REFERENCES... 2 TS 4.01.03

More information

CERTIFYING DRAINLAYER

CERTIFYING DRAINLAYER No. 9198 REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING DRAINLAYER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2013. All rights reserved. No part of this publication may be reproduced

More information

MBA WINNER CIVIL ENVIRONMENTAL MANAGEMENT PROJECT - 2011 HMAS HARMAN REMEDIATION

MBA WINNER CIVIL ENVIRONMENTAL MANAGEMENT PROJECT - 2011 HMAS HARMAN REMEDIATION Submission for: MBA WINNER CIVIL ENVIRONMENTAL MANAGEMENT PROJECT - 2011 HMAS HARMAN REMEDIATION Completed site - November 2010 (sourced from Google Earth) Contact Details: Hewatt Earthworks Pty Ltd Geoff

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

OSU Extension FACT SHEET

OSU Extension FACT SHEET OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

Office of Environmental Quality Five Year Strategic Plan July, 2017 - June 2022

Office of Environmental Quality Five Year Strategic Plan July, 2017 - June 2022 Office of Environmental Quality Five Year Strategic Plan July, 2017 - June 2022 Agency Number: 13-856 Program: Office of Environmental Compliance Program Authorization: La. R.S. 30:2011(C)(1)c) Vision

More information

KANABEC COUNTY ORDINANCE NO. 30

KANABEC COUNTY ORDINANCE NO. 30 KANABEC COUNTY ORDINANCE NO. 30 CLEANUP OF CLANDESTINE DRUG LAB SITES ORDINANCE Kanabec County ARTICLE I. GENERAL PROVISIONS SECTION 1.10 SECTION 1.20 SECTION 1.30 SECTION 1.40 SECTION 1.50 SECTION 1.60

More information

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 RESPONSIBILITY

More information

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review Wellington Inner City Improvements National War Memorial Park (Pukeahu) Air Quality (Dust) Certification Review 22 November 2012 [CAQMP1 TR] Prepared in association with: Document produced by: Apecx PO

More information

Asbestos Storage Facility Plan Examples

Asbestos Storage Facility Plan Examples Asbestos Storage Facility Plan Examples The purpose of this document This document contains examples of what an operational plan, plans and specification, contingency plan and closure plan should look

More information

Environmental Site Inspection Checklist

Environmental Site Inspection Checklist Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information

ENVIRONMENTAL QUALITY

ENVIRONMENTAL QUALITY Background Briefing ENVIRONMENTAL QUALITY Viola Bay Wild, Senior Fiscal Analyst December 2012 The fiscal information in this background briefing is based on data through December 31, 2012. DEQ Program

More information

Getting Started - More Information:

Getting Started - More Information: Getting Started - More Information: In order to obtain Clean Ohio funding a project must meet the definition of a brownfield. The project also must have suspected or identified contamination above an applicable

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

Proposed Development Phase IV at CRC Oil Terminal, Tsing Yi - Refrigerated Storage Tanks for Liquefied Gas

Proposed Development Phase IV at CRC Oil Terminal, Tsing Yi - Refrigerated Storage Tanks for Liquefied Gas in association with China Resources Petrochems (Group) Co. Ltd Proposed Development Phase IV at CRC Oil Terminal, Tsing Yi - Refrigerated Storage Tanks for Liquefied Gas Project Profile July 2005 CONTENTS

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

Ingredion ANZ Pty Ltd

Ingredion ANZ Pty Ltd Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)

More information

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Urban Environmental Management in Singapore Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Introduction City state comprising a main island and some islets Land

More information

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION

More information

City of Charlottetown Wastewater Treatment Expansion & Upgrading

City of Charlottetown Wastewater Treatment Expansion & Upgrading City of Charlottetown Wastewater Treatment Expansion & Upgrading Background As Canada s smallest provincial capital, the City of the Charlottetown has a population of approximately 34,000 residents and

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

Guidance on applying for approval of installation of a commercial onsite wastewater system

Guidance on applying for approval of installation of a commercial onsite wastewater system Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the

More information

Chemical Decontamination and Fluid Handling Services

Chemical Decontamination and Fluid Handling Services Chemical Decontamination and Fluid Handling Services Westinghouse is a global industry expert in decontamination and fluid handling processes, with proven abilities in decontamination and remediation work.

More information

MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE

MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 6 CHEMICAL TOILETS, PORTABLE RESTROOM UNITS, PORTABLE WASTE HOLDING TANKS REGULATION 1. Definitions a. "Chemical toilet" means

More information

Environmental Role of Poplar and Willow Drusilla Riddell-Black Lupus Science United Kingdom

Environmental Role of Poplar and Willow Drusilla Riddell-Black Lupus Science United Kingdom Environmental Role of Poplar and Willow Drusilla Riddell-Black Lupus Science United Kingdom Environmental roles include Buffer zones Riparian zone protection Slope stabilisation Flooding reduction Carbon

More information

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks. Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some

More information

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public Appendix J3 - Outline Fuel Spill Contingency Response Plan Control room receives call on fuel spill from staff or public Initial Actions to be taken after Fuel Spill reported Identification of the source

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

HP SUPPLIER ENVIRONMENTAL PERFORMANCE REVIEW QUESTIONNAIRE

HP SUPPLIER ENVIRONMENTAL PERFORMANCE REVIEW QUESTIONNAIRE Document Number: HP 5951-1746-1 (CIQC STD 0014) Page 1 of 6 I. INTRODUCTION As supply chain management becomes more complex in today's procurement processes, supplier environmental management has become

More information

Case Study: City Of Stockton V. BNSF Railway

Case Study: City Of Stockton V. BNSF Railway Portfolio Media. Inc. 860 Broadway, 6th Floor New York, NY 10003 www.law360.com Phone: +1 646 783 7100 Fax: +1 646 783 7161 customerservice@law360.com Case Study: City Of Stockton V. BNSF Railway Law360,

More information

PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks)

PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks) PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks) LIABILITY OF THE COMPANY DOES NOT COMMENCE UNTIL THE PROPOSAL HAS BEEN ACCEPTED AND THE PREMIUM PAID THE TERRITORIAL

More information

Asbestos Disposal in the Northern Territory

Asbestos Disposal in the Northern Territory Information on the requirements for the disposal of Asbestos in the Northern Territory Scope These guidance notes have been developed to assist industry, local government, consultants and other relevant

More information

Environmental Construction Operations Plan (ECO Plan) Framework

Environmental Construction Operations Plan (ECO Plan) Framework ALBERTA INFRASTRUCTURE AND TRANSPORTATION Environmental Construction Operations Plan (ECO Plan) Framework COPYRIGHT, MAY 2005 THE CROWN IN RIGHT OF THE PROVINCE OF ALBERTA, AS REPRESENTED BY THE MINISTER

More information

COTA Bus, Vehicle Maintenance and Repair Facility

COTA Bus, Vehicle Maintenance and Repair Facility COTA Bus, Vehicle Maintenance and Repair Facility During the planning stage of COTA s new facilities, a Title VI equity analysis is required. The purpose of the study is to ensure that COTA selects a location

More information

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass

More information

The Proposed Plan and Proposed Plan Fact Sheet are available in the NCBC Gulfport ERP Administrative Record File.

The Proposed Plan and Proposed Plan Fact Sheet are available in the NCBC Gulfport ERP Administrative Record File. The World War II Landfill (Site 2) Proposed Plan Public Meeting was held from 2-4 pm on December 2, 2014 at the Gulfport Public Library. The Public Meeting marked the opening of a 30-day Public Comment

More information

KAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010)

KAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010) KAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010) Kawerau District Council General Bylaw Part 9: On-site Wastewater Disposal Systems (2010) Explanatory Statement

More information