1 ENVIRONMENTAL IMPACT ASSESSMENT STUDY SUMMARY MORDOGAN WIND FARM, TURKEY 1. Introduction An EIA Not Necessary decision was granted for the Mordogan Wind Farm Project by the General Directorate of Environmental Impact Evaluation, Approval and Audit of Ministry of Environment and Urbanization. However, an EIA Report was prepared considering that it may be needed by potential creditor banks and other institutions; it may be useful in the carbon emission reduction project development process; and within the scope of corporate social responsibility; although the project is exempt from an EIA study according the current regulations and the decision referred above. The EIA Study was conducted and the corresponding EIA Report was prepared by an accredited company according to the regulations. The results were described in the Mordogan Wind Power Plant Environmental Impact Assessment Report. This EIA study gave results indicating that both the project have no significant impacts on the environment. The potential negative effects in environmental, social and economic aspects are minimal and within accepted range described by the relevant legislation. The EIA Report was prepared both in Turkish and English languages. The contents of these two versions are exactly the same. More detailed summary of the report for this EIA study was given below. 2. Mordogan Wind Power Plant Environmental Impact Assessment Report The EIA Study of the project was conducted and the resulting report was prepared by Topcuoglu Mining, Industry and Trade Co. Ltd, a private entity accredited by the General Directorate of Environmental Impact Evaluation, Approval and Audit of Ministry of Environment and Urbanization. The report was published in February The report was divided into ten sections, and an annexes part at the end. The summary was done according to this divisions. SECTION I: DESCRIPTION AND GOAL OF THE PROJECT In this section, the project activity is described. Lifetime of the project is specified and importance of the project for the region and the country in economic and social aspects are discussed. The importance of the project as a wind power plant using a renewable energy source producing no emissions is emphasized giving statistical figures from Turkey and the world. Global warming caused by the emission of greenhouse gases and damage caused by other harmful gases and pollutants are explained. The benefits of wind energy in terms of reduction of greenhouse gases, other harmful gases 1

2 and pollutants are emphasized, giving the fossil-fuel dependent status of Turkish Energy Sector as an example. In the last part of this section, some brief information is given regarding the wind power technology. SECTION II: LOCATION OF THE PLACE SELECTED FOR THE PROJECT In this section, the location of the project area is described. The project is located in Bitiktepe Degirmendagi Kemerdagi Duzlendagi Mordogan Location, near Mordogan Town, in Karaburun District of Izmir Province, in the Aegean Geographical Region of Turkey. The nearest settlement to Mordoğan Wind Farm is Mordogan Town, which is located at 600 meters south-east. There is a residence belonging to Mordogan town at approximately 350 meters away from the project area. The area where the wind farm shall be established is a forest land and it is not suitable for agriculture. There is no private property right established on the land and necessary permissions shall be obtained according to development process of the project. The installed capacity of the power plant is MW. There are 15 wind turbines each having an output power of 2.05 MW. The coordinates of the wind turbines are also given. SECTION III: ECONOMICAL AND SOCIAL ASPECTS OF THE PROJECT Here, a short financial analysis of the project is given. It is stated that 25 % of the project investment is provided by equity capital, and 75 % by debt. Investment cost is given by items. Annual operational costs are also given. Annual incomes are also described, including carbon credit sales revenues. The carbon credit income period is accepted as 21 years, and the price is assumed as 7 Euro/ton. SECTION IV: DETERMINATION OF THE AREA THAT WOULD BE AFFECTED BY THE WIND POWER PLANT AND DESCRIPTION OF ENVIRONMENTAL PROPERTIES IN THIS AREA In this section the area that would be affected the project activity is described. Physical and biological properties of the project area and the utilization of the natural resources are explained in detail. Geological features of the wind power plant location like tectonic movements, topographic properties, mineral resources, landslide, unique formations, avalanche, flood, rock fall, 1/25,000 geological map etc. are explained. Earthquake risks of the area is evaluated. Hydrological, present and planned utilization of surface water is described. Soil properties and usage characteristics of the area are also examined. Agricultural usage characteristics of the project area are described. It is stated that the project area does not lie or is not near to a natural reserve or any other specific area under protection. Flora and fauna of the area are also examined in detail. 2

3 Figure 1. Earthquake Map of Izmir Province 3

4 Figure 2. Phytogeographical Regions of Turkey (Map prepared by P.H. Davis) ( It is also stated that The Convention on the Conservation of European Wildlife and Natural Habitats (Bern Convention) will be obeyed regarding the related fauna species. Information about the climate of the region is given. Wind speed characteristics of the region is also explained in detail. Figure 3. Wind Rose of Izmir Province for Winter Months 4

5 Figure 4. Wind Rose of Izmir Province for Summer Months Social and Economical Characteristics of the region are also mentioned in this section including the status of education, health, culture, tourism, industry and trade. SECTION V: THE IMPACTS OF THE PROJECT ON THE REGION DEFINED IN SECTION IV AND THE PRECAUTIONS THAT WILL BE TAKEN In this section, the impacts of the project on the physical and biological environment are defined. Legal, administrative, and technical precautions that will be taken to mitigate and alleviate these impacts are explained for both the preparation, construction and installation phase and the operational phase separately and in detail. First, the activities during the land preparation, construction and instalment phase, the impacts on the physical and biological environment and the precautions that will be taken are explained. Information is given regarding where the excavations and how much excavation will be done within the scope of works to be done to prepare the land; and the usage, transport and storage of inflammable, explosive, dangerous and toxic materials to be used during excavation. It is calculated that the total amount of excavated material during the construction phase will be 11,817 m 3. This excavated material will not be transported somewhere else; but will be used in the environmental and landscape design, and in the correction of degraded lands in the region, depending on the inclination. The total dust emission is calculated as kg/hour. This is below the legal threshold of 1 kg/hour; and so an acceptable value. The solid domestic waste amount is calculated as 26.8 kg/day for the construction phase; and 6.7 kg/day for the operational phase. The total wastewater amount is calculated as 4 m 3 /day for the construction phase; and 1 m 3 /day for the operational phase. 5

6 The grounding works and lightning rod instalment are mentioned. The effect of noise for the land preparation, construction and instalment phase is evaluated using noise models. The nearest settlement to Mordoğan Wind Energy Plant is Mordoğan Town, which is located at 600 meters south-east. There is a residence belonging to Mordoğan town at approximately 350 meters away from the project area. According to the calculations, the noise level remains below the limit value set out in the Regulation on Assessment and Management of Environmental Noise as of 100 meters. Since duty machines shall not be operated simultaneously and since the noise sources are not fixed tools, the noise level shall remain below the calculated value. Therefore, the noise to come into existence during the activity shall have no adverse effect on the residential units. Other activities that will done during the land preparation, construction and instalment are also evaluated in terms of their effects on the physical and biological environment. No significant potential negative impacts could be found. All the potential impacts that could be specified are within the acceptable range defined by the legislation. The potential impacts of the project for the operational phase are also evaluated in the EIA Study and mentioned in the report. The maintenance affairs of the wind farm is discussed. The main issue regarding the maintenance of the wind turbines is the annual periodic change of the gearbox lubricant oil. The waste oil will not be stored and will be taken away according to the regulations. Waste oil treatment will be done strictly in line with the corresponding legislation. All the necessary precautions will be taken to prevent any potential oil leakage. Electromagnetic impacts of the wind turbines are also examined. Electric and magnetic fields that will be produced by the wind turbines are evaluated. With reference to the up-to-date and the most recent scientific research findings related to this field, it is concluded that the electromagnetic effects of the project can only be considered significant only for the locations very near to the turbines; and in general and for normal distances, the overall electromagnetic impacts are minimal and within acceptable range. Light reflection and shadow flicker effects are also discussed. To minimize light reflection, the turbines are dyed with light dull grey colour in line with the international standards. No shadow flicker effects could be found. The impacts on the bird life is examined in an ornithological study contained in the EIA and found to be minimal and acceptable. The effect of the project on the communicational facilities like telephone lines, radio and TV transmitters are also evaluated and found to be significant only for places very near to the turbines. No potential negative impacts of the project on the forest land could be found. The procedures related with the firefighting will be done according to the relevant legislation. The noise impact of the project activity during the operation is also evaluated by using models. The nearest settlement to Mordogan Wind Farm is Mordogan Town, which is located at 600 meters southeast. There is a residence belonging to Mordogan town at approximately 350 meters away from the project area. The noise level remains below the limit value set out in the Regulation on Assessment and Management of Environmental Noise as of 500 meters. Therefore, the noise to come into existence during operation shall have no adverse effect on the residential units. Provisions of the "Regulation on Assessment and Management of Environmental Noise" of No shall 6

7 be obeyed at the operation stage of the project. Therefore, the noise to come into existence during operation shall have no adverse effect on the residential units. Hence, the noise level is within the acceptable range. A short cost-benefit analysis is done for the wind turbines in general, and wind power plants are found to be favourable. SECTION VI: THE IMPACTS THAT MAY HAPPEN AFTER THE OPERATION HAS STOPPED AND THE CONTINUING IMPACTS, AND PRECAUTIONS THAT WILL BE TAKEN AGAINST THESE The lifetime of the project activity is specified as 25 years in the EIA Study. The equipment having completed their lives will be renewed and put into operation. When the project activity has been terminated, all the turbines and towers will be dismantled and area that has been covered by the turbine towers will be converted to its natural state. SECTION VII: PROJECT ALTERNATIVES In this section, the possible alternatives of the project are compared with reference to location selection, technology, and the precautions that will be taken. An order of preference is made for these alternatives. The dependence of Turkey on fossil fuels in electricity generation, and inadequacy of hydroelectric power to compensate this is emphasized. The pros and cons of the wind power technology are discussed and it is concluded that wind power is the best alternative among the electricity generation technologies available in the region. SECTION VIII: MONITORING (FOLLOW-UP) PROGRAMME In this section, the monitoring programmes proposed for the constructional, operational, and postoperational phases are introduced. The bylaws related with the electrical installations, noise, solid wastes, water pollution, air pollution, and occupational health and safety are mentioned. The precautions and measures stated in the previous chapters for environmental, economic and social aspects are summarized. Emergency Response Plans for Occupational Accident, Fire and Earthquake are shown in in detail in figures. In brief, it is stated in this chapter that all the necessary precautions and measures shall be taken to eliminate or minimize all the potential negative effects of the project within the scope of the relevant legislation. SECTION IX: PUBLIC PARTICIPATION In this section, it is stated that a public participation meeting has been held in order to inform the local people in the project area region and to receive feedbacks. It is mentioned that no negative feedback has been taken. 7

8 SECTION X: CONCLUSIONS In this section, all the explanations given are summarized. A general evaluation is made in which important environmental impacts of the project are listed and the extent to which the potential negative environmental impacts can be mitigated in case the project is realized is specified. The preferences among the alternatives within the scope of the project and the reasons of these preferences are explained. The legislation that will be obeyed during all the phases of project development is explained and listed. ANNEXES In this last part, there are critical documents about the project like reports and maps. These include generation licence, 1/25, 000 scale topographic and geological maps, Turkey Wind Atlas, photographs of the project area, Ornithology Report, etc. Some examples of these are presented below: 8

9 Figure 5. 1/25,000 Topographical Map of the Project Area with Wind Turbine Locations (Blue Circles) 9

10 Figure 6. Land Asset Map of the Project Area Showing Soil Types and Wind Turbine Locations (Blue Dots) 10

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Station #1 Interpreting Infographs

Station #1 Interpreting Infographs Energy Resources Stations Activity Page # 1 Station #1 Interpreting Infographs 1. Identify and explain each of the energy sources (5) illustrated in the infograph. 2. What do the white and black circles

More information

12 ENERGY. 12.1 Introduction

12 ENERGY. 12.1 Introduction 12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh

More information

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW) Zorlu Plaza, 34310 Avcılar ISTANBUL / TURKIYE Tel: + 90 (212) 456-2300 Fax: +90 (212) 422-0099 www.zorlu.com.tr NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM

More information

Grid-connected electricity generation from wind turbines in Turkey

Grid-connected electricity generation from wind turbines in Turkey Grid-connected electricity generation from wind turbines in Turkey Beyond Carbon, Turkey 2012 Project summary With the carbon offset programme Kores Kocadağ 17.5 MW Wind Power Project, myclimate and its

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site Amherst County Public Schools AP Environmental Science Curriculum Pacing Guide College Board AP Environmental Science Site REV: 8/12 1 st 9 weeks AP Objectives Energy Resources and Consumption A. Energy

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. 6 RENEWABLE ENERGY Image Source: (Word Clip Art Stock Photo, 2011) Date: May, 2015 BACKGROUND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT 789

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

12.5: Generating Current Electricity pg. 518

12.5: Generating Current Electricity pg. 518 12.5: Generating Current Electricity pg. 518 Key Concepts: 1. Electrical energy is produced by energy transformations. 2. Electrical energy is produced from renewable and non-renewable resources. 4. Electrical

More information

It s hard to avoid the word green these days.

It s hard to avoid the word green these days. Going green : Environmental jobs for scientists and engineers Alice Ramey Alice Ramey is an economist in the Office of Occupational Statistics and Employment Projections, BLS. She is available at (202)

More information

23.1 RENEWABLE ENERGY

23.1 RENEWABLE ENERGY Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.

More information

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros: P a g e 1 Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Generating Electrical Energy Using Moving Water: Hydro-Electric Generation

More information

ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X

ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X The Royal Society for Protection of Nature (RSPN) in collaboration with Department of Curriculum Research & Development (DCRD) of Ministry of Education

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE

ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE 1. Introduction This guideline follows the Implementation Rules for Company Environmental

More information

A Guide to Woodland Carbon for Business

A Guide to Woodland Carbon for Business A Guide to Woodland Carbon for Business Contents: 1. Investing in Woodland Carbon: an overview 2. Why Woodland Carbon? 3. How much does it cost? 4. Woodland Carbon Code 5. Woodland Carbon compliance 6.

More information

REPUBLIC OF TURKEY MINISTRY OF FORESTRY AND WATER AFFAIRS

REPUBLIC OF TURKEY MINISTRY OF FORESTRY AND WATER AFFAIRS REPUBLIC OF TURKEY MINISTRY OF FORESTRY AND WATER AFFAIRS Turkey s position in the World Prof. Dr. Veysel EROĞLU Minister of Forestry and Water Affairs The Ministry of Forestry and Water Affairs, formerly

More information

T E A C H E R S N O T E S

T E A C H E R S N O T E S T E A C H E R S N O T E S Focus: Students explore energy: its sources, forms, and transformations. Students also consider the benefits of energy-efficient technologies and energy conservation. Learning

More information

Do-Now. 1.) Get out notebook.

Do-Now. 1.) Get out notebook. Do-Now 1.) Get out notebook. 2.) Answer the following questions on the first clean sheet in your notebook. 1.) What are renewable resources? 2.) What are nonrenewable resources? Alternative Sources of

More information

A clean energy solution from cradle to grave

A clean energy solution from cradle to grave Environmental Product Declaration A clean energy solution from cradle to grave Offshore wind power plant employing SWT-6.0-154 siemens.com / wind 2 Assessing the performance of a wind power plant The environmental

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Climate Change and Sri Lanka Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Asia Total Area: 65610 Km Land Area : 62705 Km Inland water : 2905 Km 2 Coastal

More information

Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope.

Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope. Republic of Turkey Unofficial Translation 1 of the Turkish Law No. 5710 2 Concerning the Construction and Operation of Nuclear Power Plants and the Sale of Energy Generated from Those Plants Date of acceptance:

More information

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE ESCI 101 - INTRODUCTION TO ENVIRONMENTAL SCIENCE

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE ESCI 101 - INTRODUCTION TO ENVIRONMENTAL SCIENCE STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE ESCI 101 - INTRODUCTION TO ENVIRONMENTAL SCIENCE Prepared By: Rajiv Narula, Ph.D. SCHOOL OF SCIENCE, HEALTH, AND CRIMINAL

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

P. G. DIPLOMA IN DISASTER RELIEF & REHABILITATION

P. G. DIPLOMA IN DISASTER RELIEF & REHABILITATION P. G. DIPLOMA IN DISASTER RELIEF & REHABILITATION ORDINANCES TITLE: The title of the course shall be P. G. Diploma in Disaster Relief & Rehabilitation OBJECTIVE: The aim of this course is to impart knowledge

More information

Living & Working Managing Natural Resources and Waste

Living & Working Managing Natural Resources and Waste Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

REPUBLIC OF TURKEY INTENDED NATIONALLY DETERMINED CONTRIBUTION

REPUBLIC OF TURKEY INTENDED NATIONALLY DETERMINED CONTRIBUTION REPUBLIC OF TURKEY INTENDED NATIONALLY DETERMINED CONTRIBUTION In accordance with decisions 1/CP.19 and 1/CP.20, the Republic of Turkey hereby presents its Intended Nationally Determined Contribution (INDC)

More information

KAPIDAĞ WIND POWER PLANT ENVIRONMENTAL MANAGEMENT PLAN

KAPIDAĞ WIND POWER PLANT ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ KAPIDAĞ RÜZGAR ENERJİSİ SANTRALİ ÜRETİM A.Ş. Name of

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

RULES FOR INSTALLATION OF COMMUNICATION TOWERS.

RULES FOR INSTALLATION OF COMMUNICATION TOWERS. Annexure-A RULES FOR INSTALLATION OF COMMUNICATION TOWERS. 1 Definition Communication Tower-shall include antenna fixtures, fabricated antenna, tower to install the telephone lines and transmission towers.

More information

46575 STEG Tunisia power transmission project EBRD/EIB/STEG ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP)

46575 STEG Tunisia power transmission project EBRD/EIB/STEG ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP) 46575 STEG Tunisia power transmission project EBRD/EIB/STEG ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP) Main STEG departments involved in the ESAP: DEQ: Division for Equipment (responsible for implementing

More information

Developments in Turkey in the Context of Participatory Approach Based on River Basin Management. Nermin ÇİÇEK, Özge Hande SAHTİYANCI

Developments in Turkey in the Context of Participatory Approach Based on River Basin Management. Nermin ÇİÇEK, Özge Hande SAHTİYANCI Developments in Turkey in the Context of Participatory Approach Based on River Basin Management Nermin ÇİÇEK, Özge Hande SAHTİYANCI The Ministry of Forestry and Water Affairs, General Directorate of Water

More information

Intended Nationally Determined Contribution

Intended Nationally Determined Contribution Department of Environment Islamic Republic of Iran Intended Nationally Determined Contribution 19 November 2015 National Climate Change Committee: Iran INDC, page 1 1. Introduction The Islamic Republic

More information

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question 2 The Fremont School District uses oil to heat school buildings. Go Green! is a new project the district will implement. The superintendent has

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

ENVIRONMENTAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL IMPACT ASSESSMENT REPORT for Investment Proposal: BUILDING A NEW NUCLEAR UNIT OF THE LATEST CHAPTER 12: CONCLUSION OF THE TEAM AND TEAM LEADER PREPARING THE ASSESSMENT original copy PREPARED

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011 Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011 HEALTH Kindergarten: Grade 1: Grade 2: Know that litter can spoil the environment. Grade 3: Grade 4:

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

The Next Generation Science Standards (NGSS) Correlation to. EarthComm, Second Edition. Project-Based Space and Earth System Science

The Next Generation Science Standards (NGSS) Correlation to. EarthComm, Second Edition. Project-Based Space and Earth System Science The Next Generation Science Standards (NGSS) Achieve, Inc. on behalf of the twenty-six states and partners that collaborated on the NGSS Copyright 2013 Achieve, Inc. All rights reserved. Correlation to,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Module 7 Forms of energy generation

Module 7 Forms of energy generation INTRODUCTION In rich countries like Australia, our standard of living is dependent on easily available energy. Every time you catch a bus, turn on a light or watch television energy is being used up. Over

More information

. (1) the prospectivity of Victoria s geology for commercial sources of onshore unconventional gas;

. (1) the prospectivity of Victoria s geology for commercial sources of onshore unconventional gas; To the Government of the day. From Rob & Sharon Rentsch, We have been farming at the above address for nearly 35 years and very fortunate to have been able to farm at Byaduk for the last 10 years. We are

More information

CIRCULAR 2009. ircular PLANNING SERIES

CIRCULAR 2009. ircular PLANNING SERIES 5 HIERARCHY CIRCULAR 2009 OF DEVELOPMENTS ircular PLANNING SERIES Scottish Planning Series CIRCULAR 5 2009 Hierarchy of Developments July 2009 Crown copyright 2009 ISSN 0141-514X ISBN 978 0 7559 7572 3

More information

Renewable Choice Energy

Renewable Choice Energy Catawba College Table of Contents About Renewable Choice The Problem: Electricity Production Today The Solutions: Renewable Energy Sources Renewable Energy Credits (RECs) Who can participate in Renewable

More information

./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$7363 83%3te9. Sol9ara 1 Pro;ect. !"l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=?

./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$7363 83%3te9. Sol9ara 1 Pro;ect. !l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=? ./01&2/M./T34 1MP36T ST3T.M./T 1a$t3l$4 536e-al4 13$7363 83%3te9 Sol9ara 1 Pro;ect!"l$%e ( Mai$ &e(ort Te-t )e*te%,e- 2//0 :; =?@ ENVIRONMENTAL IMPACT STATEMENT VOLUME A: MAIN REPORT TEXT CR 7008_09_v4

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC).

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC). Who are we? We re one of the world s leading power and gas companies. Here in the UK, we supply energy to more than 5 million customers, generate enough electricity for around 8 million homes and employ

More information

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question1 Read the following article from the Fremont Gazette and answer the questions that follow. (a) Identify and describe TWO water-related environmental

More information

NAPCS Product List for NAICS 54162: Environmental Consulting Services

NAPCS Product List for NAICS 54162: Environmental Consulting Services NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,

More information

The Intended Nationally Determined Contribution of the Kingdom of Saudi Arabia under the UNFCCC

The Intended Nationally Determined Contribution of the Kingdom of Saudi Arabia under the UNFCCC The Intended Nationally Determined Contribution of the Kingdom of Saudi Arabia under the UNFCCC Riyadh, November 2015 The Kingdom of Saudi Arabia is pleased to submit its Intended Nationally Determined

More information

Planning and Environmental Policy Group

Planning and Environmental Policy Group Planning and Environmental Policy Group Planning Policy Statement 18 Renewable Energy August 2009 Planning Policy Statement 18: Renewable Energy Planning Policy Statements (PPSs) set out the policies

More information

The California Environmental Protection Agency works to restore, protect,

The California Environmental Protection Agency works to restore, protect, Environmental Protection The California Environmental Protection Agency works to restore, protect, and enhance environmental quality. The Agency coordinates the state s environmental regulatory programs

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

How to Prepare a Good Proposal?

How to Prepare a Good Proposal? How to Prepare a Good Proposal? Danmark, 11. juni 2015 Bent Jepsen, NEEMO-ELLE Facts of LIFE 1) There is significant competition for LIFE funds 2 Submission Trend 2007 2014 (Total) CLIMA proposals are

More information

Geography. Curriculum Glance Cards

Geography. Curriculum Glance Cards Geography Curriculum Glance Cards A fundamental principle of the curriculum is that children s current understanding and knowledge should form the basis for new learning. The curriculum is designed to

More information

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1 Cornwall Local Plan 2010-2030: Proposed Monitoring Framework Part 1: Strategic Policies Policy 1: Presumption in Favour of Sustainable Development Policy 2: Spatial Strategy Policy 2a Key Targets Job provision

More information

Environmental Impact Assessment of Forestry Projects

Environmental Impact Assessment of Forestry Projects Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer

More information

Sustainable Tourism Management - an overview -

Sustainable Tourism Management - an overview - of Sustainable Tourism Management - an overview - Dr. Head of Dept of Tourism Dublin Institute of Technology Who are we? Dublin Institute of of Technology 6 x Faculties Faculty of of Tourism and and Food

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS

Published in Official Gazette of the Republic of Macedonia No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Article 1 Subject of regulation (1) This Law shall regulate the measures for avoidance,

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

Overview on SEA output

Overview on SEA output 1 st SEA workshop of the revised PDP VII Overview on SEA output of Project N a t i o n a l P o w e r D e v e l o p m e n t P l a n p e r i o d 2 0 11-2 0 2 0, v i s i o n 2 0 3 0 ( P D P V I I ) P r e

More information

Archant London Environmental Awards

Archant London Environmental Awards Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has

More information

Alternative Energy. Terms and Concepts: Relative quantities of potential energy resources, Solar constant, Economies of scale

Alternative Energy. Terms and Concepts: Relative quantities of potential energy resources, Solar constant, Economies of scale Objectives Key Terms and Concepts Introduction Solar Wind Hydroelectric Power Geothermal Sources Biofuels Summary: Economies of Scale Questions for the video if time permits Alternative Energy Objectives:

More information

PROJECT DESIGN DOCUMENT (PDD)

PROJECT DESIGN DOCUMENT (PDD) CDM Executive Board Page 1 PROJECT DESIGN DOCUMENT FORM FOR CDM PROJECT ACTIVITIES (F-CDM-PDD) Version 04.1 PROJECT DESIGN DOCUMENT (PDD) Title of the project activity Aksu Wind Farm Project, Turkey Version

More information

Anchorage All-Hazard Mitigation Plan October 2004

Anchorage All-Hazard Mitigation Plan October 2004 EXECUTIVE SUMMARY The Municipality of Anchorage (MOA) is vulnerable to a wide range of natural, technological, and human/societal hazards including earthquakes, avalanches, and hazardous material accidents.

More information

NAPA COUNTY WATERSHED SYMPOSIUM

NAPA COUNTY WATERSHED SYMPOSIUM Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath

More information

April 2015 C 2015/31 E. Thirty-ninth Session. Rome, 6-13 June 2015. Global Soil Partnership - World Soil Charter

April 2015 C 2015/31 E. Thirty-ninth Session. Rome, 6-13 June 2015. Global Soil Partnership - World Soil Charter April 2015 C 2015/31 E CONFERENCE Thirty-ninth Session Rome, 6-13 June 2015 Global Soil Partnership - World Soil Charter Executive Summary The FAO Conference adopted the World Soil Charter (WSC) at its

More information

The External and Social Costs of Energy Technologies

The External and Social Costs of Energy Technologies SIXTH FRAMEWORK PROGRAMME [6.1] [ Sustainable Energy Systems] The External and Social Costs of Energy Technologies Rainer Friedrich Universitaet Stuttgart Brussels, February 16, 2009 Social Costs = total

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Wind Energy in Switzerland

Wind Energy in Switzerland Wind Energy in Switzerland Particular challenges with nature conservation - 12.11.2013 Peter Suter, Head of Renewables CKW CKW Group Service area: Central Switzerland page 2 Fully integrated utility page

More information

Conventional Energy Sources

Conventional Energy Sources 9.2 Conventional Energy Sources Key Question: What benefits and problems come with common sources of energy? Hints The word plant here is not the kind that grows out of the ground. In this section, plants

More information

Alternative Energy Resources

Alternative Energy Resources Alternative Energy Resources Energy Resource Advantages Disadvantages What are some renewable energy resources? A nonrenewable resource cannot be replaced in a reasonable amount of time. Fossil fuels such

More information

Broken Arrow Public Schools AP Environmental Science Objectives Revised 11-19-08

Broken Arrow Public Schools AP Environmental Science Objectives Revised 11-19-08 1 st six weeks 1 Identify questions and problems that can be answered through scientific investigation. 2 Design and conduct scientific investigations to answer questions about the world by creating hypotheses;

More information

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING Barclays has a strong and longstanding commitment to managing the environmental and social risks associated with commercial lending. We recognise that

More information

Environmental Liability Regulations. Kevin Motherway Environmental Liability Unit EPA Waste Workshop, Athlone 23 rd of October 2009

Environmental Liability Regulations. Kevin Motherway Environmental Liability Unit EPA Waste Workshop, Athlone 23 rd of October 2009 Environmental Liability Regulations Kevin Motherway Environmental Liability Unit EPA Waste Workshop, Athlone 23 rd of October 2009 The Environmental Liability Regulations (ELR)* S.I. No. 547 of 2008 in

More information

DEPARTMENT OF FORESTRY DRAFT REVISED NATIONAL FOREST POLICY OF MALAWI

DEPARTMENT OF FORESTRY DRAFT REVISED NATIONAL FOREST POLICY OF MALAWI DEPARTMENT OF FORESTRY DRAFT REVISED NATIONAL FOREST POLICY OF MALAWI July, 2013 1. Foreword 2. Preface 3. Introduction 4. Policy linkages 5. Broad Policy Direction 6. Policy Priority Areas Provides the

More information

Appendix J Online Questionnaire

Appendix J Online Questionnaire Appendix J Online Questionnaire In accordance with the Paperwork Reduction Act, this questionnaire was approved by the Office of Management and Budget (OMB). The OMB control number and expiration date

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

Identifying Environmental Aspects

Identifying Environmental Aspects Identifying Environmental Aspects How an organization interfaces with the environment Environmental Aspect: Element of an organization s activities, products, or services that can interact with the environment.

More information

Natural Resources. Air and Water Resources

Natural Resources. Air and Water Resources Natural Resources Key Concepts Why is it important to manage air and water resources wisely? How can individuals help manage air and water resources wisely? Air and Water Resources What do you think? Read

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

Aiding the Hydro-scheme development process. Web-links to useful information sources

Aiding the Hydro-scheme development process. Web-links to useful information sources Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation

More information

A Correlation of Environmental Science Your World, Your Turn 2011

A Correlation of Environmental Science Your World, Your Turn 2011 A Correlation of Your World, Your Turn 2011 To Ohio s New Learning Standards for Science, 2011, High School Science Inquiry and Application Course Content INTRODUCTION This document demonstrates how Pearson,

More information

ADVANTAGES AND DISADVANTAGES OF ENERGY SOURCES. Prepared by Sandra Vasa-Sideris, PhD, Southern Polytechnic State University, for use by students

ADVANTAGES AND DISADVANTAGES OF ENERGY SOURCES. Prepared by Sandra Vasa-Sideris, PhD, Southern Polytechnic State University, for use by students ADVANTAGES AND DISADVANTAGES OF ENERGY SOURCES Prepared by Sandra Vasa-Sideris, PhD, Southern Polytechnic State University, for use by students Questions to consider Where are the nonrenewable sources

More information

Global Environment Facility GEF OPERATIONAL PROGRAM #13 ON CONSERVATION AND SUSTAINABLE USE OF BIOLOGICAL DIVERSITY IMPORTANT TO AGRICULTURE

Global Environment Facility GEF OPERATIONAL PROGRAM #13 ON CONSERVATION AND SUSTAINABLE USE OF BIOLOGICAL DIVERSITY IMPORTANT TO AGRICULTURE Global Environment Facility GEF OPERATIONAL PROGRAM #13 ON CONSERVATION AND SUSTAINABLE USE OF BIOLOGICAL DIVERSITY IMPORTANT TO AGRICULTURE CONTENTS Introduction..1 Convention Guidance... 2 Agricultural

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Environment Situation in Timor-Leste

Environment Situation in Timor-Leste Environment Situation in Timor-Leste Historically; 1. East-Timor or Timor-Leste, the Portuguese name of the country. 2. It was colonialised by Portuguese 450 years and Occupied by Indonesian 24 years.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Creating Green Jobs within the Environment and Culture sector.

Creating Green Jobs within the Environment and Culture sector. Creating Green Jobs within the Environment and Culture sector. Matilda Skosana Environmental Programmes (ILO Definition): 1. DEFINITION OF GREEN JOB. Jobs are green when they help reduce negative environmental

More information

Transformation of the energy system in Germany challenges and opportunities for regional development

Transformation of the energy system in Germany challenges and opportunities for regional development Transformation of the energy system in Germany challenges and opportunities for regional development Spa-ce.net Conference 2012 Kecskemét (Hungary) 26 October 2012 Bernhard Müller Andreas Ortner C.Wachler

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information