PJM Generator Interconnection Request Queue #B47 Red Lion 550MW Impact Study Report

Size: px
Start display at page:

Download "PJM Generator Interconnection Request Queue #B47 Red Lion 550MW Impact Study Report"

Transcription

1 PJM Generator Interconnection Request Queue #B47 550MW Impact Study Report April 2001 DMS#

2 General Project #B47 is a Conectiv Mid-Merit 550 MW (Summer) generation addition to be located adjacent to the existing Hay Road generation facility in New Castle county, Delaware. The generation addition will be arranged in a combined cycle configuration consisting of three gas turbines and one steam turbine. Three gas turbines are scheduled for commercial operation in May 2001 with connection to the Edgemoor 230kV substation on an interim basis (see #B47 Interim Impact Study report). The permanent connection to 500kV will be commercial in December A steam heat recovery unit will be added in May Direct Connection Requirements Project #B47 generating facilities will be located at Hay Road Generating Station but will be connected to the transmission network at the 500 kv Substation. This will require the addition of a new 23 mile circuit and a dedicated kv transformer as shown on the one line diagram below Keeney kv Hope Creek MVA Substation 7.28 mi. Utilize open position on dbl ckt tower occupied by existing line (Keeney - 230kV) approx. 23 miles 5.29 mi. Utilize open position on dbl ckt tower occupied by existing line (Keeney - Harmony 230kV) 0.84 mi. New R-O-W 3.46 mi. Utilize open position on dbl ckt tower occupied by existing line (Basin Rd. - Churchmans 138kV) 4.87 mi. rebuild existing 6805 line (Basin Rd. - Edgemoor 69kV) 1.7 mi. New R-O-W Project #B47 550MW CT1 CT2 CT3 ST 190MW Hay Road Generating Station 1

3 Conectiv Power Delivery will be responsible for construction of the facility upgrades necessary to connect the new generation. The estimated costs for the direct connection facilities are as follows: Radial 230kV line from #B47 to 500 kv substation $ 24,660, kv Substation work: 500 kv bus extension, install two circuit breakers (one 500 kv and one ), install 750 MVA 500- transformer, and provide line termination for the new 23 mile radial line from project #B47 $ 11,645,000 Total $ 36,305,000 The estimated time needed for construction of the above facilities is 8 months. All estimated direct connection costs include 37% Cost in Aid of Construction (CIAC). Network Impacts The system, as planned, was evaluated for compliance with reliability criteria. The B47 project was studied as 550MW capacity. The results are summarized below. Normal System Single Contingency (MAAC Criteria IIA) Second Contingency (MAAC Criteria IIB) Multiple Facility Contingency (MAAC Criteria IIC) Generator Deliverability The Graysferry-Parrish 230kV circuit was overloaded under normal system conditions. This overload was identified for a previous project and project B47 contributes 31 MW to the overload. Stability (MAAC Criteria IV) Stability analysis was performed at light load conditions and for maximum summer generator output. 2

4 See attachment #1 for the fault cases evaluated. The range of contingencies evaluated was limited to that necessary to demonstrate compliance with MAAC Reliability Criteria IV. Note: While the stability analysis has been performed at extreme system conditions, there is a potential that evaluation at higher levels of generator output over a range of load levels would disclose unforeseen stability problems. The MAAC yearly reliability analysis to be performed to test all system changes will include this evaluation. Any problems uncovered will need to be resolved. CETO/CETL (MAAC Criteria III / VIIB) Short Circuit Analysis System Reinforcements The Grays Ferry-Parrish circuit overload can be eliminated by reconductoring the circuit. The cost is estimated at $14,700,000 and is expected to take three years to complete. Cost Allocation The B47 project is 100% responsible for the direct connection costs of $36,305,000 for the project as described above. All network cost allocations only consider projects prior to and including B47 in the PJM generator interconnection queue. The B47 project contributes to the requirement for reconductor of the Grays Ferry Parrish 230kV circuit as described above. The B47 project cost allocation is 7.71% of $14,700,000 or $1,134,000. 3

5 ATTACHMENT #1 Breaker Clearing Times (cycles) Conectiv Mid-Merit ( Project B47) 2005 Light Load Stability Faults Station Primary Stuck Breaker Timer (total) All 500 kv All 5 16 ALL FAULTS ARE STABLE b47-1a 500 kv on Hope Creek kv on Keeney 5036 b47-1c 500 kv on 500/ AT kv on B47 b47-1e 500 kv on Hope Creek, bkr 503 stuck at (L/O AT50) b47-1f 500 kv on Hope Creek, bkr 501 stuck at (L/O B47) 500 kv on Keeney, bkr 502 stuck at (L/O AT50) 500 kv on Keeney, bkr 504 stuck at (L/O B47) b47-1i 500 kv on 500/ AT50, bkr 503 stuck at (L/O 5015) b47-1j 500 kv on 500/ AT50, bkr 502 stuck at (L/O 5036) 500 kv on B47 500/230, bkr 501 stuck at (L/O 5015) b47-1l 500 kv on B47 500/, bkr 504 stuck at (L/O 5036) b47-2a Hope Creek 500 kv on Hope Creek 5015 Hope Creek 500 kv on Hope Creek Salem 5037 b47-2c Hope Creek 500 kv on Hope Creek New Freedom 5023 Hope Creek 500 kv on Hope Creek Salem, bkr 3-4 stuck at Hope Creek (L/O 5015) b47-2e Hope Creek 500 kv on Hope Creek, bkr 3-4 stuck at Hope Creek (L/O 5037) b47-3a Salem 500 kv on Salem Hope Creek 5037 Salem 500 kv on Salem Deans 5021 b47-3c Salem 500 kv on Salem New Freedom 5024 Salem 500 kv on Salem Deans, bkr 2-8 stuck at Salem (L/O Salem north bus) b47-4a Keeney 500 kv on Keeney 5036 Keeney 500 kv on Keeney Peach Bottom/A b47-4c Keeney 500 kv on Keeney 500/ AT50 4

6 Keeney 500 kv on Keeney, bkr 504 stuck at Keeney (L/O AT50) b47-4e Keeney 500 kv on Keeney Peach Bottom/A29-30, bkr 505 stuck at Keeney (L/O AT50) b47-4f Keeney 500 kv on Keeney 500/ AT50, bkr 504 stuck at Keeney (L/O 5036) Keeney 500 kv on Keeney 500/ AT50, bkr 505 stuck at Keeney (L/O 5014) b47-5a B47 on B Keeney kv Hope Creek MVA Substation 7.28 mi. Utilize open position on dbl ckt tower occupied by existing line (Keeney - 230kV) approx. 23 miles 5.29 mi. Utilize open position on dbl ckt tower occupied by existing line (Keeney - Harmony 230kV) 0.84 mi. New R-O-W 3.46 mi. Utilize open position on dbl ckt tower occupied by existing line (Basin Rd. - Churchmans 138kV) 4.87 mi. rebuild existing 6805 line (Basin Rd. - Edgemoor 69kV) 1.7 mi. New R-O-W Project #B47 550MW CT1 CT2 CT3 ST 190MW Hay Road Generating Station 5

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055 Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights

More information

PJM Merchant Transmission Request. Queue #R75. Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study

PJM Merchant Transmission Request. Queue #R75. Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study PJM Merchant Transmission Request Queue #R75 Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study 413038v1a March 2007 PJM Interconnection 2007. All rights reserved. Preface The intent of the

More information

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114. Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine

More information

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)

More information

16 West Coast Regional Plan

16 West Coast Regional Plan 16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast

More information

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria A. Purpose: The FRCC Reliability Coordinator (RC) Contingency Analysis (CA) application is essential to maintaining the reliability of the FRCC Bulk Electric System. The application has the capability

More information

FINAL. Alternative Evaluation. for the. Proposed Burlington-Wray 230-kilovolt Transmission Project

FINAL. Alternative Evaluation. for the. Proposed Burlington-Wray 230-kilovolt Transmission Project FINAL Alternative Evaluation for the Proposed Burlington-Wray 230-kilovolt Transmission Project Prepared by Tri-State Generation and Transmission Association, Inc. 1100 W. 116th Avenue Westminster, Colorado

More information

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003 F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify

More information

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents:

More information

Generation and Transmission Interconnection Process

Generation and Transmission Interconnection Process PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents

More information

Emera Maine Proposed Potential Transmission Projects. Line Identification Line 75 - KR Sub. Estimated Cost $201,464 $0 $3,200,000

Emera Maine Proposed Potential Transmission Projects. Line Identification Line 75 - KR Sub. Estimated Cost $201,464 $0 $3,200,000 L75 & BW3 Rebuild ROW Phase I Keene Rd. Expansion for Oakfield Wind KR Transformer Addition Line Identification Line 75 - KR Sub Location Bangor Chester Chester Estimated Cost $201,464 $0 $3,200,000 Voltage

More information

Section 4: Integrating Public Policy Drivers

Section 4: Integrating Public Policy Drivers Public Policy Drivers Section : Integrating Public Policy Drivers PJM DE DC IL IN KY MD MI NJ NC OH PA TN VA WV Section.0: The Role of Public Policy in the RTEP Process Figure.1: Public Policy Drivers

More information

TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis

TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis R103-11 TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis Prepared for Transmission Developers, Inc. Submitted by: Larry Eng, Staff Consultant

More information

Houston Region Import Capacity Project

Houston Region Import Capacity Project Houston Region Import Capacity Project July 25, 2013 Prepared by: CenterPoint Energy Transmission Planning Executive Summary 3 1. Introduction 5 2. Methodology and Study Assumptions 7 2.1 Case Description

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator

More information

Updated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA

Updated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA CROSS SOUND CABLE PROJECT 330MW HVdc INTERCONNECTION BETWEEN NEW HAVEN, CONNECTICUT AND SHOREHAM, NY Updated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA Subordinate Status Removal and Amendment of Approved

More information

Chapter 7 - Appendix A

Chapter 7 - Appendix A Chapter 7 - Appendix A Transmission and Distribution Supplemental Information Table 7A.1 MTEP Transmission Projects in Missouri 1 Project Approved Project Title Project Description Category Estimated Cost

More information

NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario

NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents... 2 1. Executive Summary...

More information

Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System

Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System Prepared By: Transmission Planning Unit Baltimore Gas & Electric Company Table of Contents 1. INTRODUCTION

More information

Control Number : 14637. Item Number : 5. Addendum StartPage : 0

Control Number : 14637. Item Number : 5. Addendum StartPage : 0 Control Number : 14637 Item Number : 5 Addendum StartPage : 0 Pubtic Utility Commission of Tex s 7800 Shoal Creek Boulevard Austin, Texas 78757-1098 512/458-0100. (Fax) 458-8340 Pat Wood, III Chairman

More information

How To Operate The Williston Uvls

How To Operate The Williston Uvls WND Winter Operating Guide 2012/2013 1 WND Operating Study Using EQ-890-2012WIN- FINAL.sav developed through the 890 process Got load updates from MDU, Central Power, UM G&T Made several topology updates

More information

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives (Required per CPUC Decision No. C10-1328) Final Report (Submitted with Public Service s 2011 ERP) Executive Summary The objective

More information

Proceedings of the 38th Hawaii International Conference on System Sciences - 2005

Proceedings of the 38th Hawaii International Conference on System Sciences - 2005 The use of Multi-Attribute Trade-Off Analysis in Strategic Planning For an Electric Distribution utility: An Analysis of Abu Dhabi Distribution Company Richard D. Tabors, Ph.D. Rick Hornby Tabors Caramanis

More information

HTS Cables: Pitfalls and Potential LIPA Cable Project. J. Maguire American Superconductor. DOE Wire Workshop January, 2007 Panama City, FL

HTS Cables: Pitfalls and Potential LIPA Cable Project. J. Maguire American Superconductor. DOE Wire Workshop January, 2007 Panama City, FL HTS Cables: Pitfalls and Potential LIPA Cable Project J. Maguire American Superconductor DOE Wire Workshop January, 2007 Panama City, FL LIPA Project Overview Long Island Power Authority Holbrook Substation

More information

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering

More information

RELIABILITY PLANNING CRITERIA

RELIABILITY PLANNING CRITERIA RELIABILITY PLANNING CRITERIA Version 4.0 01/20/2016 Date Rev. No. Individual Making Edits REVISION HISTORY Reason / Comments 07/01/2013 1 J. Johnson Initial document 06/06/2014 2 R. Chapman Document review;

More information

Operating Security Standards

Operating Security Standards Version 1.1 Prishtina December 2009 TABLE OF CONTENTS 1 Introduction... 1 2 Definitions... 1 2.1 General...1 2.1.2 Kosovo Transmission System...1 2.1.3 Circuit...2 2.1.4 The N-1 Criterion...2 2.1.5 Normal

More information

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy

More information

BOUNDLESS ENERGY, LLC S RESPONSE TO THE REQUEST FOR INFORMATION BY THE NEW YORK ENERGY HIGHWAY

BOUNDLESS ENERGY, LLC S RESPONSE TO THE REQUEST FOR INFORMATION BY THE NEW YORK ENERGY HIGHWAY Background BOUNDLESS ENERGY, LLC S RESPONSE TO THE REQUEST FOR INFORMATION BY THE NEW YORK ENERGY HIGHWAY On April 11, 2012, the New York Energy Highway Task Force (Task Force) issued a request for information

More information

Q140 Cluster Addendum

Q140 Cluster Addendum Cluster Addendum 1. INTRODUCTION This Interconnection Customer (IC), submitted a Small Generator Interconnection Request (IR) to Arizona Public Service Company (APS) for their proposed project, located

More information

Generation Interconnection Facilities Study Report. For. PJM Generation Interconnection Request Queue Position R11. South River

Generation Interconnection Facilities Study Report. For. PJM Generation Interconnection Request Queue Position R11. South River Generation Interconnection Facilities Study Report For PJM Generation Interconnection Request Queue Position R11 South River May 2012 Transmission Owner Facilities Study Summary Description of Project

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

Current and voltage measuring relays

Current and voltage measuring relays Current and voltage measuring relays RXIK 1, RXEEB 1 and Page 1 Issued June 1999 Changed since July 1998 Data subject to change without notice RXIK 1 RXEEB 1 (SE980082) (SE980081) (SE970869) Features Application

More information

Transmission Related Station Power Use at Substations

Transmission Related Station Power Use at Substations Transmission Related Station Power Use at Substations BUSINESS PRACTICE This Business Practice identifies the cost responsibility for energy consumption at substations by American Transmission Company

More information

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 SHE Transmission 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 Summary This paper presents SHE Transmission s views and approach on the impact of transmission losses on the transmission

More information

Rocky Mountain Power Transmission Five Year Study Findings Meeting

Rocky Mountain Power Transmission Five Year Study Findings Meeting Rocky Mountain Power Transmission Five Year Study Findings Meeting Study Areas for 2009 Goshen Idaho Study Area encompasses parts of Bingham, Bonneville, Butte, Clark, Fremont, Jefferson, Lemhi, Madison

More information

AAPG 2011 Annual Convention & Exhibition April 10, 2011

AAPG 2011 Annual Convention & Exhibition April 10, 2011 Generator Transmission Grid Interconnection Guidelines AAPG 2011 Annual Convention & Exhibition April 10, 2011 Hala Ballouz, B.Sc., M.Sc. TAMU, P.E. President, Electric Power Engineers, Inc. Partner &

More information

Preliminary Feasibility Assessment For. The Rio Tinto Alcan to BCH Transfer Limit of 460 MW. With 50% Series Compensation on Both KMO KIT lines

Preliminary Feasibility Assessment For. The Rio Tinto Alcan to BCH Transfer Limit of 460 MW. With 50% Series Compensation on Both KMO KIT lines Preliminary Feasibility Assessment For The Rio Tinto Alcan to BCH Transfer Limit of 460 MW With 50% Series Compensation on Both KMO KIT lines Report : ASP2010-T001 July 2010 Asset Strategy & Planning,

More information

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.

More information

6. The estimated costs here do not include any applicable ITCC tax

6. The estimated costs here do not include any applicable ITCC tax General Notes and Clarifications: 1. The following estimated costs are based on past experiences and are intended to provide an order of magnitude of the total project cost given the major system components.

More information

Customer connection enquiry form (For the connection of loads and generators)

Customer connection enquiry form (For the connection of loads and generators) Customer connection enquiry form (For the connection of loads and generators) Please provide as much detail as possible to ensure TasNetworks can meet your requirements. When completed please attach and

More information

COMMONWEALTH OF VIRGINIA LRK,'S UNCE AT RICHMOND, SEPTEMBER 7,2012 TRUL CE.. P 112 : 51 APPLICATION OF FINAL ORDER

COMMONWEALTH OF VIRGINIA LRK,'S UNCE AT RICHMOND, SEPTEMBER 7,2012 TRUL CE.. P 112 : 51 APPLICATION OF FINAL ORDER COMMONWEALTH OF VIRGINIA STATE CORPORATION COMMISSION LRK,'S UNCE AT RICHMOND, SEPTEMBER 7,2012 TRUL CE.. P 112 : 51 APPLICATION OF VIRGINIA ELECTRIC AND POWER COMPANY For approval and certification of

More information

Office of Energy Projects Energy Infrastructure Update For August 2012

Office of Energy Projects Energy Infrastructure Update For August 2012 For August 212 Natural Gas Highlights SG Resources Mississippi placed into service Cavern 4 of its Southern Pines Energy Center Project which will add 1 Bcf of working gas capacity to its facilities located

More information

Typical Data Requirements Data Required for Power System Evaluation

Typical Data Requirements Data Required for Power System Evaluation Summary 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Harmonic Filter & Power Capacitor Bank Application Studies This document describes NEPSI

More information

Memorandum. This memorandum requires Board action. Executive Summary

Memorandum. This memorandum requires Board action. Executive Summary California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: July 8, 2014 Re: Decision on the Delaney-Colorado

More information

ASSET MANAGEMENT WHAT MAKES SENSE FOR HYDRO?

ASSET MANAGEMENT WHAT MAKES SENSE FOR HYDRO? Pat McCarty Generation Manager Tacoma Power ASSET MANAGEMENT WHAT MAKES SENSE FOR HYDRO? TACOMA POWER S ASSET MANAGEMENT INITIATIVE T&D group identified 13 asset classes i.e. Substation transformers, station

More information

Microgrid Building block for Smart Cities

Microgrid Building block for Smart Cities Microgrid Building block for Smart Cities Shay Bahramirad, Ph.D. Manager of Smart Grid & Technology December 2014 COMED OVERVIEW 1 The service territory covers 11,400 mi 2 in Northern Illinois Serving

More information

Financing New High Voltage Transmission Lines in Nepal Using HTLS Conductors Surendra Rajbhandari, Nepal Electricity Authority Zhang Lei, ADB South

Financing New High Voltage Transmission Lines in Nepal Using HTLS Conductors Surendra Rajbhandari, Nepal Electricity Authority Zhang Lei, ADB South Financing New High Voltage Transmission Lines in Nepal Using HTLS Conductors Surendra Rajbhandari, Nepal Electricity Authority Zhang Lei, ADB South Asia Energy Division Asia Clean Energy Forum June 2015

More information

Substations or Switching Stations

Substations or Switching Stations Transmission Facilities Transferred to MISO s Pursuant to Appendix (Transmission System Facilities) and Substations or Switching Stations Max kv Min kv Sub Transmission Facilities Transferred to MISO s

More information

NEW JERSEY CENTER OF EXCELLENCE

NEW JERSEY CENTER OF EXCELLENCE Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves

More information

PUBLIC UTILITIES COMMISSIO~t~ Docket No. DE 15-

PUBLIC UTILITIES COMMISSIO~t~ Docket No. DE 15- Th~NALZZ~ Exhibit STATE OF NEW HAMPSHIRE t~~eeee BEFORE THE FROM FILE PUBLIC UTILITIES COMMISSIO~t~ Liberty Utilities (Granite State Electric) Corp. dibla Liberty Utilities Calendar Year 2014 Reliability

More information

-1- PSEG-LI Update of LIPA SGIP Full Docw-NYISO reqmts above 10 MW 10-27-14

-1- PSEG-LI Update of LIPA SGIP Full Docw-NYISO reqmts above 10 MW 10-27-14 PSEG-Long Island Smart Grid Small Generator Interconnection Procedures for New Distributed Resources 20 MW or Less Connected in Parallel with LIPA s Radial Distribution Systems -1- PSEG-LI Update of LIPA

More information

Acceptance Page 2. Revision History 3. Introduction 14. Control Categories 15. Scope 15. General Requirements 15

Acceptance Page 2. Revision History 3. Introduction 14. Control Categories 15. Scope 15. General Requirements 15 Acceptance Page 2 Revision History 3 Introduction 14 Control Categories 15 Scope 15 General Requirements 15 Control Category: 0.0 Information Security Management Program 17 Objective Name: 0.01 Information

More information

Tehachapi Wind Energy Storage Project (TSP)

Tehachapi Wind Energy Storage Project (TSP) Tehachapi Wind Energy Storage Project (TSP) Peer Review Presented by Mr. Loïc Gaillac October 20, 2011 San Diego, CA 1 Outline Policy Challenges SCE s Position SCE Smart Grid Vision Project Description

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION'^^ j E DIRECT TESTIMONY RAJESH GUPTA PROJECT MANAGER, ENTERGY SERVICES, INC.

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION'^^ j E DIRECT TESTIMONY RAJESH GUPTA PROJECT MANAGER, ENTERGY SERVICES, INC. BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION'^^ j E s : D IN THE MATTER OF THE APPLICATION OF ENTERGY ARKANSAS, INC. FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED TO CONSTRUCT AND OPERATE

More information

IESO Supply Deliverability Guidelines

IESO Supply Deliverability Guidelines PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents

More information

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables

More information

Electric Power 2005 in Chicago. Dr. Aiham Alsammarae Minister Of Electricity Iraq

Electric Power 2005 in Chicago. Dr. Aiham Alsammarae Minister Of Electricity Iraq Electric Power 2005 in Chicago Dr. Aiham Alsammarae Minister Of Electricity Iraq IRAQ s ELECTRICAL SYSTEM (STATUS & FUTURE PLAN) April. 2005 IRAQ s ELECTRICAL SYSTEM A QUICK HISTORICAL REVIEW Electricity

More information

4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

Merchant Generation Site Selection On the AEP Transmission System

Merchant Generation Site Selection On the AEP Transmission System Merchant Generation Site Selection On the AEP Transmission System Pursuant to the Federal Energy Regulatory Commission's Order of November 20, 2001, in AEP Power Marketing, Inc., et al, 97 FERC 61,219,

More information

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3

More information

Network Interconnection of Offshore Wind

Network Interconnection of Offshore Wind Network Interconnection of Offshore Wind Prepared for REOLTEC Carlos Aguirre Madrid, December 3rd Experience you can trust. Introducing KEMA A trusted independent partner providing advise throughout the

More information

Robust Adaptive Topology Control

Robust Adaptive Topology Control Robust Adaptive Topology Control Mladen Kezunovic, PI Texas A&M University Kory W. Hedman, Co-PI Arizona State University January 14-15, 2015 System Integration Robust Adaptive Topology Control (RATC)

More information

TRANSMISSION AND SUBSTATION PROJECTS

TRANSMISSION AND SUBSTATION PROJECTS TRANSMISSION AND SUBSTATION PROJECTS OPERATING COMPANY: EMI CUSTOMER: WARREN POWER, LLC EJO # MS0010 SCOPE DOCUMENT FOR 340 MW, IPP PROJECT at VICKSBURG, MS WITH INTERCONNECTION AT BAXTER WILSON 500kV

More information

Midwest Reliability Organization Procedure For NERC PRC-012

Midwest Reliability Organization Procedure For NERC PRC-012 Midwest Reliability Organization Procedure For NERC PRC-012 A. Introduction The following procedure developed by the MRO Protective Relay Subcommittee (PRS) and Transmission Assessment Subcommittee (TAS)

More information

EVN SMART GRID PLAN. Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà Hanh@evn.com.vn

EVN SMART GRID PLAN. Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà Hanh@evn.com.vn EVN SMART GRID PLAN Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà Hanh@evn.com.vn Frankfurt, 14 th November 2013 1 Content 1. Introduction of Vietnam Electricity (EVN) 2. EVN Smart

More information

Rule 5.500 Fast Track Analysis for National Life Insurance Co.

Rule 5.500 Fast Track Analysis for National Life Insurance Co. Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION

More information

Item 8: Houston Import RPG Project

Item 8: Houston Import RPG Project : Houston Import RPG Project Jeff Billo Manager, Transmission Planning Board of Directors Meeting April 8, 2014 Study Overview ERCOT has determined that there will be a need for additional import capacity

More information

Project Screening Results

Project Screening Results Project Screening Results Updated Economic Issues List Issue Id Constraint Name Contingency M-1 Frederick Town AECI - Frederick Town AMMO 161 kv Line Lutesville - St Francois 345kV Line S-2 North East

More information

Kyrgyzstan: Power Generation & Transmission

Kyrgyzstan: Power Generation & Transmission Kyrgyzstan: Power Generation & Transmission October, 2010 Author: Artyom Zozulinsky, Business & Commercial Assistant, US Embassy Bishkek Contents SUMMARY... 2 POWER SECTOR OVERVIEW... 2 Infrastructure...

More information

University of Maryland College Park District Energy System. IDEA Campus Energy Conference February 9, 2012

University of Maryland College Park District Energy System. IDEA Campus Energy Conference February 9, 2012 University of Maryland College Park District Energy System IDEA Campus Energy Conference February 9, 2012 UMCP District Energy System The University of Maryland district energy system consists of a well

More information

From: Jean Hicks [ ] Sent: May 4, 2012 10:55 AM To: SiteC Review / Examen SiteC [CEAA] Subject: Public Submission

From: Jean Hicks [ ] Sent: May 4, 2012 10:55 AM To: SiteC Review / Examen SiteC [CEAA] Subject: Public Submission From: Jean Hicks [ ] Sent: May 4, 2012 10:55 AM To: SiteC Review / Examen SiteC [CEAA] Subject: Public Submission Canadian Environmental Assessment Agency: Please find comments as attached. The second

More information

GENERATOR DIFFERENTIAL PROTECTION RELAY STABILITY VIS-A -VIS SELECTION OF CTS MR. H. C. MEHTA & MR. JAY MEHTA Power Linker Group Co.

GENERATOR DIFFERENTIAL PROTECTION RELAY STABILITY VIS-A -VIS SELECTION OF CTS MR. H. C. MEHTA & MR. JAY MEHTA Power Linker Group Co. GENERATOR DIFFERENTIAL PROTECTION RELAY STABILITY VIS-A -VIS SELECTION OF CTS MR. H. C. MEHTA & MR. JAY MEHTA Power Linker Group Co., Mumbai ABSTRACT : For generator differential protection, one set of

More information

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION FEASIBILITY STUDY FOR PROPOSED XXXXXXXX GENERATION ON THE SIERRA BLANCA-FARMER 69 KV LINE

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION FEASIBILITY STUDY FOR PROPOSED XXXXXXXX GENERATION ON THE SIERRA BLANCA-FARMER 69 KV LINE EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION FEASIBILITY STUDY FOR PROPOSED XXXXXXXX GENERATION ON THE SIERRA BLANCA-FARMER 69 KV LINE El Paso Electric Company System Planning Department April

More information

SPP Notification to Construct

SPP Notification to Construct SPP-NTC-200365 SPP Notification to Construct January 12, 2016 Mr. John Fulton Southwestern Public Service Company P.O. Box 1261 Amarillo, TX 79105 RE: Notification to Construct for Transmission Service

More information

Northport - Norwalk Harbor Cable (NNC) Tie line

Northport - Norwalk Harbor Cable (NNC) Tie line September 9, 008 Northport - Norwalk Harbor Cable (NNC) Tie line Technical Assessment of Operating up to NNC Inter Tie STE Ratings Executive Summary Three (3) 38kV submarine cable circuits (Lines 60, 60,

More information

Minimizing Impact of Electric Utility Outages with Backup Generation

Minimizing Impact of Electric Utility Outages with Backup Generation Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility

More information

Load Dispatcher (Class Code 5223) Task List

Load Dispatcher (Class Code 5223) Task List A. Load Dispatching, General Load Dispatcher (Class Code 5223) Task List 1. Prior to work shift speaks to Load Dispatcher(s), reviews hardcopy and computer logs, and looks at the dispatcher's diagram board

More information

Advanced Protection of Distribution Networks with Distributed Generators

Advanced Protection of Distribution Networks with Distributed Generators Date:- 8 10 March 2011 Venue: University of Manchester EES-UETP Course title Advanced Protection of Distribution Networks with Distributed Generators Peter Crossley Director of the Joule Centre School

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP Grid Interconnection & Contract Development Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP Submittal Instructions Prior to submitting your application and

More information

Unit 1 Turbine Rotor 110 MW Replacement

Unit 1 Turbine Rotor 110 MW Replacement Proceedings World Geothermal Congress 2015 Melbourne, Australia, 19-25 April 2015 Unit 1 Turbine Rotor 110 MW Replacement Amri Zein 1, Wahyu Mulyana 2 and Heribertus Dwiyudha 3 Star Energy Geothermal (Wayang

More information

Morris S. Stover, P.E. Sponsor, Transmission Area

Morris S. Stover, P.E. Sponsor, Transmission Area Page 1 of 5 Job Function Morris has nearly 28 years in the power industry including design and construction of transmission line and substation facilities, He has extensive experience in contract development

More information

FIXED CHARGE: This is a cost that goes towards making the service available, including

FIXED CHARGE: This is a cost that goes towards making the service available, including ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer

More information

The Dayton Power and Light Company. Pre-Qualification Filing

The Dayton Power and Light Company. Pre-Qualification Filing The Dayton Power and Light Company Pre-Qualification Filing April 2013 (i) Name and address of the entity including a point of contact The Dayton Power and Light Company 1065 Woodman Drive Dayton, Ohio

More information

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013 PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity

More information

Oncor s Pioneering Transmission Dynamic Line Rating (DLR) Demonstration Lays Foundation for Follow-On Deployments

Oncor s Pioneering Transmission Dynamic Line Rating (DLR) Demonstration Lays Foundation for Follow-On Deployments Oncor s Pioneering Transmission Dynamic Line Rating (DLR) Demonstration Lays Foundation for Follow-On Deployments 1. Summary Oncor Electric Delivery Company (Oncor) successfully demonstrated a fully integrated

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING PETITION FOR DECLARATORY ORDER. (Issued March 15, 2007)

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING PETITION FOR DECLARATORY ORDER. (Issued March 15, 2007) UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff. Cottonwood Energy

More information

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach READ AND DELETE For best results with this template, use PowerPoint 2003 10 November 2015 Background and Importance of ICA Definition:

More information

Seattle City Light s Asset Management Program

Seattle City Light s Asset Management Program Seattle City Light s Asset Management Program September 25-26, 2012 Agenda Asset Management vs. WAMS Definitions and Distinctions AM Program Budget Status AM Program Major Accomplishments WAMS Budget Status

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff. Aero Energy, LLC

More information

Design of electrical power system for a 1000MW nuclear power generating station

Design of electrical power system for a 1000MW nuclear power generating station Design of electrical power system for a 1000MW nuclear power generating station K Raja, K Yesunadam Dept. of Electrical & Electronics Engineering, Lingaya s Institute of Management & Technology, Vijayawada,

More information

2012 San Francisco Colloquium

2012 San Francisco Colloquium 2012 San Francisco Colloquium http : //www.cigre.org Advances in voltage source converter (VSC) technologies B4-6 500 kv VSC Transmission System for lines and cables B. JACOBSON, B. WESTMAN, M. P. BAHRMAN*

More information

121 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

121 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 121 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff.

More information

Planning for Arizona s Energy Future

Planning for Arizona s Energy Future Planning for Arizona s Energy Future Brad Albert, General Manager of Renewable Resources Arizona Public Service Co. National Conference of State Legislators (NCSL), Energy Task Force December 8, 2010 Regulatory

More information

Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3

Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System

More information

Bill is the author of 15 papers and lectures on transmission lines and other power system topics.

Bill is the author of 15 papers and lectures on transmission lines and other power system topics. Transmission Lines Electricity s Highway This talk starts with an explanation of Surge Impedance Loading and demonstrates how it is used for transmission line work. The St. Clair Curve widely used in transmission

More information

DUKE ENERGY INDIANA. Preparation for Summer 2007. Presentation to Indiana Utility Regulatory Commission

DUKE ENERGY INDIANA. Preparation for Summer 2007. Presentation to Indiana Utility Regulatory Commission DUKE ENERGY INDIANA Preparation for Summer 2007 Presentation to Indiana Utility Regulatory Commission May 30, 2007 Overview of Presentation 2006 Duke Energy Indiana accomplishments/challenges Summer 2007

More information

SUBJECT: Marcy-South Series Compensation Project Capital Expenditure Authorization Request and Contract Award

SUBJECT: Marcy-South Series Compensation Project Capital Expenditure Authorization Request and Contract Award October 15, 2014 MEMORANDUM TO THE TRUSTEES FROM THE PRESIDENT and CHIEF EXECUTIVE OFFICER SUMMARY SUBJECT: Marcy-South Series Compensation Project Capital Expenditure Authorization Request and Contract

More information

IEEE Smart Grid Series of Standards IEEE 2030 TM (Interoperability) and IEEE 1547 TM (Interconnection) Status. #GridInterop

IEEE Smart Grid Series of Standards IEEE 2030 TM (Interoperability) and IEEE 1547 TM (Interconnection) Status. #GridInterop IEEE Smart Grid Series of Standards IEEE 2030 TM (Interoperability) and IEEE 1547 TM (Interconnection) Status #GridInterop Smart Grid (IEEE 2030): the integration of power, communications, and information

More information