2 WND Operating Study Using EQ WIN- FINAL.sav developed through the 890 process Got load updates from MDU, Central Power, UM G&T Made several topology updates to the case MDU Ray sub Dickinson-Green River Caps Swapped some NESET load over to Blaisdell Blaisdell is now serving Palermo, Stanley- MW7, Belden, Robinson lake, Finstad, East Newtwon, Parshall Adjusted some power factors based upon what was seen in the summer Set Kenaston, SWMINOT, HESS GASS, GARDENCREEK, Stateline to non-scaleable. These are large industrial loads and should be fairly constant. 2

3 Base Case The base case has a Williston Load Pocket Value of 583 MW The loads were distributed as follows WILLD=583.6 CCWAT=245.0 WATFORD_LOAD=90.5 KENMARE_LOAD=29.1 STANLEY_LOAD=18.7 WILLISTON_LOAD=78.7 WN_JUDSON_FLOW=112.6 TIOGA_LOAD=18.7 NESET_LOAD=65.7 KILLDEER_LOAD=45.2 CHARLIE_CRK_LOAD=16.6 DICKINSON_LOAD=84.6 MINOT_AREA=189.5 SWMINOT=8.4 BTHOLD=7.5 KENASTON=7.6 BLAISDELL= 71.4 MW 3

4 4

5 Williston Area Load Pocket Defined interface that we use to track load levels. Have been tracking for a little over a year now. Last Winter peaked at 400 MW s How high will it get this Winter? How high can it reliably get this Winter? WOLF POINT 115 TO POPLAR 115 RICHLAND 115 TO WILLISTON 115 CHARLIE CREEK 230 TO WATFORD CITY 230 LOGAN 230 TO BLAISDELL 230 LOGAN 115 TO KENMARE 115 BDV 230 TO TIOGA 230 CULBERTSON GEN 5

6 Williston Area Load Pocket Cont. 400 WTN.SCADA.WN (WN ALGI WILLISTON LOAD POCKET MW) /07/11 10/27/11 12/16/11 02/04/12 03/25/12 05/14/12 07/03/12 08/22/12 10/11/12 6

7 Western North Dakota System Oneline Williston 230 Tioga 230 Logan 230 Watford 230 Charlie Creek 345 7

8 B10T Reduced to 65 MW s (S N) and Culbertson Generation offline

9 B10T Reduced to 15 MW S N and Culbertson Generation offline

10 B10T Reduced to 15 MW S N and Culbertson Generation online at 95 MW s

11 System Intact Main Concerns System Intact Voltage at Kenmare/ Kenaston Kenaston Caps were delayed to Spring of 2013 Looking at boosting the tap ratio at Tioga/NESET to provide a slight boost. Studies show this can provide a 1-1.5% p.u. voltage boost at Kenmare. Loss of WN 230/115 Tx Moving the WC WN 115 to 230 kv the Transformer becomes critical. B10T has very little effect on this contingency. Solution set up UVLS at either Williston May need MW depending upon the load level and scenario Loss of WC CCR 230 Next most critical contingency Low voltages in the region 11

12 12

13 System Intact without Culbertson available Main Concerns Loss of WN 230/115 Tx Moving the WC WN 115 to 230 kv the Transformer becomes critical. B10T has very little effect on this contingency. UVLS at Williston will mitigate for this contingency Loss of WC CCR 230 Next most critical contingency Low voltages in the region At 475 MW s without Culbertson breaker the 230 kv ring will need to be opened to mitigate for this contingency. 13

14 14

15 Kenmare Voltage Had trouble in Winter 2011/2012 staying above 109 kv (.95 p.u.) during peaks 115/57 kv Tx has a 30 MVA capacity This winter modeling an additional 7.5 MW s at Kenaston which is adjacent to Kenmare. Kenaston Caps were delayed until March 2013 Models show re-tapping the Tioga and Neset 230/115 Tx may provide an additional 1 1.5% boost in Kenmare 115 kv voltage 15

16 Kenmare Voltage Cont 16

17 Worst System Outages Williston 230/115 Tx Projected 200 MW hanging from Williston 115 kv system can not support this load Charlie Creek Watford City 230 kv Eliminates key 230 path north of the lake Hangs additional load off of Williston Logan Blaisdell 230 kv Eliminates key 230 path north of the lake Hangs additional load off of Tioga Antelope Valley Charlie Creek 345 kv line Eliminates key transmission path to the Western North Dakota Area Next contingency (N-2) may overload underlying 115kV system 17

18 Williston 230/115 Tx Concern Williston Winter Peak 2011/ 2012 Configuration and Loads Williston Winter Peak 2012/ 2013 Configuration and Peak Load assumptions TGA TGA CQE Grenora 38MW WN /115 CQE Judson 112 MW WN /115 WC FVW 81 MW WN 115 WC TGJ FVW 80 MW WN 115 TGJ Winter 2011/2012 load served from Williston peaked at 120 MW Winter 2012/2013 load served from Williston is expected to peak at 192 MW That s a 60% increase from last winter. Removed WC 115 kv source and added WC 230 kv source Puts higher reliance on the 230/115 kv Transformer at Williston Transformer is highly reliable and another one is expected to be placed in service by end of year 2013 along with additional generation and synchronous condenser at Pioneer 18

19 Williston 230/115 Tx Concern cont As Planners we plan for the worst So how bad could it be? Case 1: Worst Case Williston load pocket scaled to 583 MW and 192 MW served out of Williston Without Culbertson providing support At peak load without Culbertson providing support 50 MW would need to be shed to maintain kv or.9 p.u. And an additional 20 MW would need to be shed to maintain kv or.95 p.u. With Culbertson providing support At peak load with Culbertson providing support 30 MW would need to be shed to maintain kv or.9 p.u. And an additional 20 MW would need to be shed to maintain kv or.95 p.u. Case 2: Williston load pocket scaled to 495 MW and 160 MW served out of Williston Without Culbertson providing support This load level without Culbertson providing support 5 MW would need to be shed to maintain kv or.9 p.u. And an additional 15 MW would need to be shed to maintain kv or.95 p.u. With Culbertson providing support At peak load with Culbertson providing support 0 MW would need to be shed to maintain kv or.9 p.u. And an additional 0 MW would need to be shed to maintain kv or.95 p.u. Low probability of this contingency Implement UVLS to prevent the need for pre-contingent load limitations for such a low probability event. 19

20 Williston UVLS Initial Proposal for UVLS on Williston 57 kv bus and/or somewhere on Williston-Judson-Stateline-Mont-Strandahl-Barr Butte-Grenora-Plentywood 115 kv line UVLS required when the combined load on the Williston 57 kv bus and on the Judson 115 kv line is greater than 160 MW Stage Breaker Description Delay Load 1 WN 3152 Stony Creek, MDU, LYC Trenton 57 kv 2 sec 28 MW 2 WN 3656 MWEC 12.47, WAPA Station Service* 2.5 sec 10 MW 3 WN 3552 MDU Williston 57 kv 3 sec 30 MW *WAPA would request MWEC switch load off this circuit after a UVLS operation so station service could be restored Automatic UVLS provides a controlled way to reduce loading and prevent a voltage collapse from occurring The system could be reconfigured after automatic UVLS operates to allow remaining industrial loads to perform an emergency shut down and restore service to residential and high priority loads 20

21 Williston UVLS The WND Operating Guide contains steps such as starting Culbertson Generation above certain load levels to minimize the chance of UVLS operating by keeping post-contingent voltages as high as possible Worst Case UVLS Operation for Various Single Contingencies Culbertson Unavailable, Williston + Judson Load = 182 MW, Williston Load Pocket = 575 MW Outage Stages of Load Drop MW of Load Drop Williston 230/115 Transformer 2 38 Watford City Charlie Creek 230* 3 68 Watford City Charlie Creek 230 Open Tioga Boundary Dam 230 (B10T) 0 0 Leland Olds Logan Logan Blaisdell Antelope Valley Charlie Creek *The WND Operating Guide contains steps to open the 230 kv ring at Watford City for high load levels with Culbertson unavailable, this would prevent the Williston UVLS from operating 21

22 LGN-BLS 230 Table Williston Load Pocket Limitation - Blaisdell - Logan 230 kv Prior outage** B10T* MCCS Williston / Tioga Load (S to N) Cul CT (E tow) Limiting Elements Limiting Contingency Load < Richland - FVW, Logan - Berthold WAT - CCR < Load < Richland - FVW, Logan - Berthold WAT - CCR < Load < Kenmare, Kenaston, Berthold,Voltage System Intact Load >= Kenmare, Kenaston, Berthold,Voltage System Intact Main Concerns Hanging additional load off of Tioga and cutting 230 path to Tioga 110 MW short of system Intact limits Loss of Watford City Charlie Creek 230 is the most critical next contingency Opens both ends of the 230 kv loop Richland Fairview 115 kv overload Kenmare Stanley 115 kv overload, Logan Berthold Kenmare overload Low voltages at Kenmare, Stanley, Berthold Implement load curtailments somehow Reducing load at Kenmare will help with System Intact voltage Opening Breaker 782 on the Watford City 230 kv ring bus pre-contingent. 22

23 23

24 LGN BLS 230 cont.. Table Williston Load Pocket Limitation - Blaisdell - Logan 230 kv Prior outage** Culbertson unavailable B10T* MCCS Williston / Tioga Load (S to N) Cul CT (E tow) Limiting Elements Limiting Contingency Load < Richland - FVW, Logan - Berthold WAT - CCR < Load < Richland - FVW, Logan - Berthold WAT - CCR 230 Load >= Kenmare, Kenaston, Berthold,Voltage System Intact Worst Case Culbertson unavailable how do limits look? Limit 450 MW s almost 150 MW s short of system Intact limit. Will likely see low voltages at Kenmare 24

25 LGN-BLS 230 Cont.. How does Opening Watford City Breaker 782 pre-contingent help? Allows us to overlook the worst contingency Done during Worst Case System Intact and Certain prior outages where it s advantageous Only done at certain load levels The next limiting contingency becomes Watford City Williston. Load reductions at Watford will not help this limit Watford City 230 kv Watford City 230 kv Williston Charlie Creek 230 Williston Charlie Creek Watford City 230/115 Tx Watford City 230/115 Tx Pre-contingent System Preposition Post-contingent fault operation 25

26 LGN BLS 230 cont

27 LGN BLS 230 and WC-CCR cont

28 Watford City CCR 230 kv Outage Virtually Identical to the Blaisdell Logan Prior Outage limits. Difference being the amount of load served at Blaisdell Main Concerns Cuts 230 kv path to Williston area. Hangs additional load off of Williston Almost 110 MW short of system intact limits and projected Winter Peak Loss of LGN BLS 230 is the most critical next contingency Opens both ends of the 230 kv loop Richland Fairview 115 kv overload Kenmare Stanley 115 kv overload, Logan Berthold Kenmare overload Low voltages at Kenmare, Stanley, Berthold Implement load curtailments somehow Reducing load at Kenmare will help with System Intact voltage Opening Breaker 1486 on the Blaisdell 230 kv ring Bus pre-contingent. 28

29 Watford City Watford City Winter Peak 2011/ 2012 Configuration and Peak Loads Watford City Winter Peak 2012/ 2013 Configuration and Peak Load assumptions 8.1 MVAR Williston 115 kv 68 MW WC 115 Charlie Creek MVAR 95 MW WC 115 WN /115 Charlie Creek 230 Williston 230 Winter 2011/2012 load served from Watford City peaked at 68 MW Concerns were system Intact voltage at Watford City Moved 8.1 MVAR mobile capacitor to Cherry Creek to help make it through Winter 2012/2013 Winter 2012/2013 load served from Watford City is expected to peak at 95 MW That s a 40% increase from last winter. 230 kv source is stronger and additional 30 MVARs at Watford City 115 kv bus eliminate System Intact voltage concerns. However in System Intact Conditions it is preferable to utilize the Killdeer delivery to it s full capability and offload the Watford City delivery to any extent possible. Offline studies estimate the Killdeer delivery can support up to 60 MW s Concern is post contingent CCR-Watford City operation. Offline studies show this configuration can only support 75 MW s at 109 kv or.95 p.u. post contingent Pre-contingent limits can be avoided by opening Breaker 782 in the ring bus to mitigate the effects of the Charlie Creek Watford City 230 kv fault. 29

30 AVS CCR 345 Table Williston Load Pocket Limitation - AVS - Charlie Creek 345 kv Prior outage Williston / Tioga B10T MCDC Limiting Limiting Elements Load (S to N) Cul CT (E to W) Contingency Note Load < 335 Haliday - Beulah Leland Olds - Logan 230 Dickinson - Mandan 1,2 335< Load 385 Haliday - Beulah online 20 Leland Olds - Logan 230 Dickinson - Mandan 3 385< Load Haliday - Beulah Dickinson - Mandan 4 Load => Haliday - Beulah Dickinson - Mandan 4, 5 Main Concerns Cuts major East-West path from the coal fields into the load pocket 160 MW short of system Intact limits Requires Miles City DC tie to stay at 20 MW East to West Loss of Dickinson - Mandan 230 is the most critical next contingency Leland Olds Logan 230 Overload Beulah Haliday Killdeer Charlie Creek 115 kv overload Low voltages at Haliday, Killdeer, Charlie Creek Possible solutions include Reverse Miles City DC Tie Run Miles City and/or Glendive CTs Shift load from Killdeer to Watford City (can t be done quickly) Implement load curtailments somehow 30

31 Load Limits how to implement? Worst Case with Culbertson unavailable may need up to 150 MW s Limits are set by operating guides for each prior outage if the load pocket is expected to exceed the limit then load reductions will be called for. Propose to break up into smaller area s and prioritize within each area Will be looking for larger industrial loads. Williston/ Judson-Stateline-Mont load Projected peak 60 MW s needed Tioga/Wheelock/Blaisdell load Projected peak 50 MW s needed Stanley/Kenmare/Kenaston/Berthold load 62.9 Projected peak 15 MW s needed Watford City load 90.5 Projected peak 25 MW s needed 31

32 Load Reductions Discussion Large loads would not necessarily need to be shut off. They could be reduced to a minimum output/ hibernation state. We would need to know what kind of a reduction this minimum state would provide Example load X is 15 MW s and their hibernation state is 3 MW s. Calling for load X to go into hibernation provides a 12 MW benefit and prevents their plant from sustaining irreparable damage. 32

33 Load Reductions discussion cont.. Williston/ Judson-Stateline-Mont load Reduction Stage Load Information Amount Estimated Entity Contact information 1 MDU Furnace 15 MW s MDU John Doe 2 Stateline 25 MW s MWE John Doe 3 xxxx 20 MW s xxx xxxxx Stage Tioga/Wheelock/Blaisdell load Reduction Load Information Amount Estimated Entity Contact information 1 xxxx 10 MW s xxxx John Doe 1 xxxx 10 MW s xxxx John Doe 2 xxxx 20 MW s xxxx John Doe 3 xxxx 10MW s xxx xxxxx 33

34 Conclusion System Intact limit for Winter 2012 /2013 is 600 MW s for the Williston Load Pocket Limitation is low system intact voltage at Kenmare/Kenaston WC-CCR 230 kv contingency Williston 230/115 kv Tx contingency will be mitigated with UVLS at Williston 115 kv substation Worst Case prior outages were studied and limits were derived Potentially 150 MW s could be called upon for pre-contingent reductions. These are Worst Case scenario s and the probability of them happening is quite low. However we need a plan of action in case they do. Otherwise we ll have to just start opening breakers or risk total system collapse. 34

NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario

NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents... 2 1. Executive Summary...

More information

16 West Coast Regional Plan

16 West Coast Regional Plan 16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast

More information

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives (Required per CPUC Decision No. C10-1328) Final Report (Submitted with Public Service s 2011 ERP) Executive Summary The objective

More information

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003 F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify

More information

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055 Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights

More information

Updated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA

Updated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA CROSS SOUND CABLE PROJECT 330MW HVdc INTERCONNECTION BETWEEN NEW HAVEN, CONNECTICUT AND SHOREHAM, NY Updated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA Subordinate Status Removal and Amendment of Approved

More information

Preliminary Feasibility Assessment For. The Rio Tinto Alcan to BCH Transfer Limit of 460 MW. With 50% Series Compensation on Both KMO KIT lines

Preliminary Feasibility Assessment For. The Rio Tinto Alcan to BCH Transfer Limit of 460 MW. With 50% Series Compensation on Both KMO KIT lines Preliminary Feasibility Assessment For The Rio Tinto Alcan to BCH Transfer Limit of 460 MW With 50% Series Compensation on Both KMO KIT lines Report : ASP2010-T001 July 2010 Asset Strategy & Planning,

More information

Northport - Norwalk Harbor Cable (NNC) Tie line

Northport - Norwalk Harbor Cable (NNC) Tie line September 9, 008 Northport - Norwalk Harbor Cable (NNC) Tie line Technical Assessment of Operating up to NNC Inter Tie STE Ratings Executive Summary Three (3) 38kV submarine cable circuits (Lines 60, 60,

More information

benefit all members Development to By Chris Gessele and Tammy Langerud Lonesome Creek Station

benefit all members Development to By Chris Gessele and Tammy Langerud Lonesome Creek Station Development to benefit all members By Chris Gessele and Tammy Langerud With all of the news headlines about rapid growth and increased activity coming out of the Williston Basin, it s natural to feel like

More information

Houston Region Import Capacity Project

Houston Region Import Capacity Project Houston Region Import Capacity Project July 25, 2013 Prepared by: CenterPoint Energy Transmission Planning Executive Summary 3 1. Introduction 5 2. Methodology and Study Assumptions 7 2.1 Case Description

More information

Treasure Valley Electrical Plan

Treasure Valley Electrical Plan Treasure Valley Electrical Plan Community Advisory Committee January 25, 2006 Agenda 10 a.m. Welcome 10:10 a.m. Follow up DSM discussion 10:30 a.m. TVEP CAC process update 10:40 a.m. Transmission Presentation

More information

IESO Supply Deliverability Guidelines

IESO Supply Deliverability Guidelines PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents

More information

4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

Item 8: Houston Import RPG Project

Item 8: Houston Import RPG Project : Houston Import RPG Project Jeff Billo Manager, Transmission Planning Board of Directors Meeting April 8, 2014 Study Overview ERCOT has determined that there will be a need for additional import capacity

More information

IBERDROLA USA ELECTRIC TRANSMISSION PLANNING MANUAL CRITERIA & PROCESSES

IBERDROLA USA ELECTRIC TRANSMISSION PLANNING MANUAL CRITERIA & PROCESSES IBERDROLA USA TECHNICAL MANUAL TM 1.10.00 Revision 01 Date : 11-2014 Technical Manual Iberdrola USA IBERDROLA USA ELECTRIC TRANSMISSION PLANNING MANUAL CRITERIA & PROCESSES New York State Electric & Gas

More information

Midwest Reliability Organization Procedure For NERC PRC-012

Midwest Reliability Organization Procedure For NERC PRC-012 Midwest Reliability Organization Procedure For NERC PRC-012 A. Introduction The following procedure developed by the MRO Protective Relay Subcommittee (PRS) and Transmission Assessment Subcommittee (TAS)

More information

Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System

Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System Prepared By: Transmission Planning Unit Baltimore Gas & Electric Company Table of Contents 1. INTRODUCTION

More information

Minimizing Impact of Electric Utility Outages with Backup Generation

Minimizing Impact of Electric Utility Outages with Backup Generation Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility

More information

Q140 Cluster Addendum

Q140 Cluster Addendum Cluster Addendum 1. INTRODUCTION This Interconnection Customer (IC), submitted a Small Generator Interconnection Request (IR) to Arizona Public Service Company (APS) for their proposed project, located

More information

Load Dispatcher (Class Code 5223) Task List

Load Dispatcher (Class Code 5223) Task List A. Load Dispatching, General Load Dispatcher (Class Code 5223) Task List 1. Prior to work shift speaks to Load Dispatcher(s), reviews hardcopy and computer logs, and looks at the dispatcher's diagram board

More information

Generator Interconnection and Deliverability Study Methodology Technical Paper

Generator Interconnection and Deliverability Study Methodology Technical Paper Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:

More information

Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents

Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents Federal Wage System Job Grading Standards for Electric Power Controlling, 5407 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 SPECIAL ADDITIONAL RESPONSIBILITIES...

More information

D.3 South Minneapolis Electric Distribution Delivery System Long-Term Study

D.3 South Minneapolis Electric Distribution Delivery System Long-Term Study D.3 South Minneapolis Electric Distribution Delivery System Long-Term Study Xcel Energy April 2009 Hiawatha Project SOUTH MINNEAPOLIS ELECTRIC DISTRIBUTION DELIVERY SYSTEM LONG-TERM STUDY Scott Zima Distribution

More information

ADMS(Advanced Distribution Management System ) in Smart Grid

ADMS(Advanced Distribution Management System ) in Smart Grid ADMS(Advanced Distribution Management System ) in Smart Grid 柯 佾 寬 博 士 Yi-Kuan Ke, Ph.D. 2014/03/28 Smart Grid Solution Smart Grid Solution Overview Smart Grid Solutions Smart Network Operation - Distribution

More information

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114. Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine

More information

Application of SVCs by CenterPoint Energy to Address Voltage Stability Issues: Planning and Design Considerations

Application of SVCs by CenterPoint Energy to Address Voltage Stability Issues: Planning and Design Considerations 1 Application of SVCs by CenterPoint Energy to Address Voltage Stability Issues: Planning and Design Considerations Wesley Woitt, Alberto Benitez, David Mercado; CenterPoint Energy Frank Schettler, Heinz

More information

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)

More information

Kent Active System Management (KASM) Oct 2015 / Matthieu Michel

Kent Active System Management (KASM) Oct 2015 / Matthieu Michel Kent Active System Management (KASM) Oct 2015 / Matthieu Michel Project Background (update): D Heat Map: SPN D Connection Offers Accepted (Cumulative) 1W D Heat map (June 2015) SPN D Connection Offers

More information

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering

More information

Robust Adaptive Topology Control

Robust Adaptive Topology Control Robust Adaptive Topology Control Mladen Kezunovic, PI Texas A&M University Kory W. Hedman, Co-PI Arizona State University January 14-15, 2015 System Integration Robust Adaptive Topology Control (RATC)

More information

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria A. Purpose: The FRCC Reliability Coordinator (RC) Contingency Analysis (CA) application is essential to maintaining the reliability of the FRCC Bulk Electric System. The application has the capability

More information

Conservation Voltage Reduction (CVR)

Conservation Voltage Reduction (CVR) Conservation Voltage Reduction (CVR) Nicholas Abi-Samra Senior Vice President October 15, 2013 DNV GL Energy Table of Contents What does CVR do? Why Does CVR Work? DNV GL s CVR Project Experience Needs

More information

Security Policy Review: Credible Event Management. Scope and Methodology Draft for Industry 2014

Security Policy Review: Credible Event Management. Scope and Methodology Draft for Industry 2014 Security Policy Review: Credible Event Management Scope and Methodology Draft for Industry 2014 Version Date Change 1 26/03/2014 Draft for industry Position Date Prepared By: Reviewed By: Ina Ilieva, Senior

More information

Rocky Mountain Power Transmission Five Year Study Findings Meeting

Rocky Mountain Power Transmission Five Year Study Findings Meeting Rocky Mountain Power Transmission Five Year Study Findings Meeting Study Areas for 2009 Goshen Idaho Study Area encompasses parts of Bingham, Bonneville, Butte, Clark, Fremont, Jefferson, Lemhi, Madison

More information

Bill is the author of 15 papers and lectures on transmission lines and other power system topics.

Bill is the author of 15 papers and lectures on transmission lines and other power system topics. Transmission Lines Electricity s Highway This talk starts with an explanation of Surge Impedance Loading and demonstrates how it is used for transmission line work. The St. Clair Curve widely used in transmission

More information

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION FEASIBILITY STUDY FOR PROPOSED XXXXXXXX GENERATION ON THE SIERRA BLANCA-FARMER 69 KV LINE

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION FEASIBILITY STUDY FOR PROPOSED XXXXXXXX GENERATION ON THE SIERRA BLANCA-FARMER 69 KV LINE EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION FEASIBILITY STUDY FOR PROPOSED XXXXXXXX GENERATION ON THE SIERRA BLANCA-FARMER 69 KV LINE El Paso Electric Company System Planning Department April

More information

Section 1: Executive Summary

Section 1: Executive Summary Section 1: Executive Summary SECTION 1: EXECUTIVE SUMMARY 1.1 SECTION PURPOSE This report has been prepared for the Nevada Energy Assistance Corporation (NEAC), a 501(c)(3) non-profit agency; in support

More information

Scope of Restoration Plan

Scope of Restoration Plan RWG Area Restoration Review Worksheet (10/28/09) EOP-006-02 Directory 8 EOP-005 NYSRG Rule G Text Restoration Plan Requirement R1.Each Reliability Coordinator shall have a Reliability Coordinator Area

More information

Dynamic Security Assessment in the Future Grid. Vijay Vittal Ira A. Fulton Chair Professor Arizona State University

Dynamic Security Assessment in the Future Grid. Vijay Vittal Ira A. Fulton Chair Professor Arizona State University 1 Dynamic Security Assessment in the Future Grid Vijay Vittal Ira A. Fulton Chair Professor Arizona State University 2 Key requirements for DSA Need to perform DSA as close to real time as possible Need

More information

Introduction to PowerWorld Simulator: Interface and Common Tools

Introduction to PowerWorld Simulator: Interface and Common Tools Introduction to PowerWorld Simulator: Interface and Common Tools 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com Fault Analysis Analysis

More information

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Centre for Sustainable Electricity and Distributed Generation Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac July 2008 FUNDED BY BERR URN 08/1144

More information

the amount of data will grow. It is projected by the industry that utilities will go from moving and managing 7 terabytes of data to 800 terabytes.

the amount of data will grow. It is projected by the industry that utilities will go from moving and managing 7 terabytes of data to 800 terabytes. Before the Department of Energy Washington, D.C. 20585 In the Matter of Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart

More information

Operation and Control Microgrid and Distributed Generation. Mohammad Shahidehpour Illinois Institute of Technology

Operation and Control Microgrid and Distributed Generation. Mohammad Shahidehpour Illinois Institute of Technology Operation and Control Microgrid and Distributed Generation Mohammad Shahidehpour Illinois Institute of Technology Outline Introduction - Microgrids High Reliability Distribution Systems Perfect Power System

More information

N-1-1 Contingency Analysis using PowerWorld Simulator

N-1-1 Contingency Analysis using PowerWorld Simulator N-1-1 Contingency nalysis using PowerWorld Simulator uthor: PowerWorld Corporation Scott R. Dahman, P.E. Date: March 24, 2010 October 25, 2012 (revised) Table of Contents Background and Objective... 2

More information

RELIABILITY PLANNING CRITERIA

RELIABILITY PLANNING CRITERIA RELIABILITY PLANNING CRITERIA Version 4.0 01/20/2016 Date Rev. No. Individual Making Edits REVISION HISTORY Reason / Comments 07/01/2013 1 J. Johnson Initial document 06/06/2014 2 R. Chapman Document review;

More information

Proceedings of the 38th Hawaii International Conference on System Sciences - 2005

Proceedings of the 38th Hawaii International Conference on System Sciences - 2005 The use of Multi-Attribute Trade-Off Analysis in Strategic Planning For an Electric Distribution utility: An Analysis of Abu Dhabi Distribution Company Richard D. Tabors, Ph.D. Rick Hornby Tabors Caramanis

More information

ELECTRICITY SUPPLY CORPORATION OF MALAWI (ESCOM)

ELECTRICITY SUPPLY CORPORATION OF MALAWI (ESCOM) ELECTRICITY SUPPLY CORPORATION OF MALAWI (ESCOM) PRESENTATION EXECUTIVE EXCHANGE ON DEVELOPING AN ANCILLARY SERVICE MARKET FOR SAPP BACKGROUND INFORMATION Malawi-119 thousand square kilometers Malawi population-15

More information

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI 1 Vision 2050 An Asset Management Strategy Jaclyn Cantler Manager, Transmission Planning, PHI 2 Agenda Case for Change About Vision 2050 Status Closing System Design Cybersecurity Interface with distributed/dispersed

More information

Pennsylvania Summer Reliability

Pennsylvania Summer Reliability A. Reliability Enhancement Programs In 2015, Pennsylvania Power Company s ( Penn Power or Company ) reliability plan incorporates projects and programs to enhance overall reliability. The plan is structured

More information

Emera Maine Proposed Potential Transmission Projects. Line Identification Line 75 - KR Sub. Estimated Cost $201,464 $0 $3,200,000

Emera Maine Proposed Potential Transmission Projects. Line Identification Line 75 - KR Sub. Estimated Cost $201,464 $0 $3,200,000 L75 & BW3 Rebuild ROW Phase I Keene Rd. Expansion for Oakfield Wind KR Transformer Addition Line Identification Line 75 - KR Sub Location Bangor Chester Chester Estimated Cost $201,464 $0 $3,200,000 Voltage

More information

Energy Management Systems (EMS)

Energy Management Systems (EMS) Energy Management Systems (EMS) Introduction Abstract This talk deals with the role of an Energy Management System (EMS) in the overall Smart Grid. Why an EMS is needed will be discussed and its importance

More information

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016 Achieving Operational Efficiencies through On-Line Substation Monitoring Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016 1 Agenda Maintenance Monitoring Equipment CMMS Data Historian

More information

March 14, 2014. Subject: Southern California Edison 2014 Annual Progress Report

March 14, 2014. Subject: Southern California Edison 2014 Annual Progress Report March 14, 2014 Mr. Tracy Rolstad, Chair WECC Technical Studies Subcommittee Avista Corp. 1411 East Mission Avenue Spokane, WA 99220-3727 Mr. Enoch Davies WECC Technical Staff 155 North 400 West, Suite

More information

This document should be reviewed at least every two years.

This document should be reviewed at least every two years. 1.0 Change Control Version Date Modification Author(s) Reviews and Approvals by Issue 1 06 August 2007 Initial Document Philip J. Tatro David Wright Issue 2 29 February Removed Confidential from Philip

More information

A Method for Assessing Relative Value of Central Generation and Distributed Energy Resources (DERs) in Distribution Feeders

A Method for Assessing Relative Value of Central Generation and Distributed Energy Resources (DERs) in Distribution Feeders A Method for Assessing Relative Value of Central Generation and Distributed Energy Resources (DERs) in Distribution Feeders Prof. Marija Ilić milic@ece.cmu.edu Staff Technical Conference on Increasing

More information

TRANSMISSION ALTERNATIVES CONSIDERED

TRANSMISSION ALTERNATIVES CONSIDERED EB-00-0 Tab Page of TRANSMISSION ALTERNATIVES CONSIDERED In determining the proposed facilities, Hydro One and the West GTA LDCs investigated six options to address the two needs identified in this Application

More information

N O W A V A I L A B L E

N O W A V A I L A B L E N O W A V A I L A B L E 5 0, 0 0 0 S F P O W E R E D S H E L L D A T A C E N T E R I I Data Center Park Catawba County, North Carolina Contact Doug Hollidge for more information Email: doug@five9sdigital.com

More information

Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION

Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION Outline What is Reactive Power and where does it come from? Why is it important?

More information

Typical Data Requirements Data Required for Power System Evaluation

Typical Data Requirements Data Required for Power System Evaluation Summary 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Harmonic Filter & Power Capacitor Bank Application Studies This document describes NEPSI

More information

Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3

Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System

More information

Transmissão em Corrente Contínua

Transmissão em Corrente Contínua Transmissão em Corrente Contínua Panorama Atual e Perspectivas Futuras no Brasil Multi-Terminal HVDC Classic Some Considerations Brazilian SC B4 Paulo Fischer de Toledo, ABB Basic considerations Traditional

More information

Advanced Protection of Distribution Networks with Distributed Generators

Advanced Protection of Distribution Networks with Distributed Generators Date:- 8 10 March 2011 Venue: University of Manchester EES-UETP Course title Advanced Protection of Distribution Networks with Distributed Generators Peter Crossley Director of the Joule Centre School

More information

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Summary Report November 2009 Technical Report on using EHV

More information

..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...

..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... ..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... TIME MARK CORPORATION 11440 EAST PINE STREET TULSA, OK 74116 USA tel 918 438-1220 fax 918 437-7584 www.time-mark.com

More information

September 13, 2010. Replace Tunis T1 Notification of Conditional Approval of Connection Proposal CAA ID Number: 2010-EX506

September 13, 2010. Replace Tunis T1 Notification of Conditional Approval of Connection Proposal CAA ID Number: 2010-EX506 September 13, 2010 Mr. Charles Wickham General Manager Eastern Operations Capital Power Corporation Suite 1301, 200 University Avenue Toronto, ON M5H 3C6 Dear Mr. Wickham: Replace Tunis T1 Notification

More information

SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan)

SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan) From the SelectedWorks of Radhey Shyam Meena Winter July 12, 2012 SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan) RADHEY SHYAM MEENA, Er. Available at: http://works.bepress.com/radhey_meena/5/

More information

Part 7.6: Glossary of Standard Operating Terms

Part 7.6: Glossary of Standard Operating Terms NPCCGLOSSARY PUBLIC IMP_GOT_0002 Market Manual 7: System Operations Part 7.6: Glossary of Standard Operating Terms Issue 9.0 This document provides a glossary of terms with definitions used in the System

More information

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Four Corners) Scheduling. Operating Procedure

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Four Corners) Scheduling. Operating Procedure Table of Contents Purpose... 1 1. Limits, Ratings, & Effectiveness Factors... 2 2. Contingency Operations... 2 2.1 Transmission Lines Outages... 2 2.2 APS Terminal Equipment Outages... 2 2.3 SCE Terminal

More information

Syed Ahmed Richard Krause Southern California Edison

Syed Ahmed Richard Krause Southern California Edison An Electric Utility s Power Transmission Modernization Needs Syed Ahmed Richard Krause Southern California Edison 2 Presentation Outline Existing System Electric System Components, Basic Power System,

More information

CLASS Voltage Regulation Scheme. 27 February 2014

CLASS Voltage Regulation Scheme. 27 February 2014 CLASS Voltage Regulation Scheme 27 February 2014 Functional Specifications and Voltage Regulation Scheme for the Autonomous Substation Controllers (ASCs) Date: 27 February 2014 Page 2 of 26 Table of Contents

More information

Topics. HVDC Fundamentals

Topics. HVDC Fundamentals Topics HVDC Fundamentals Conventional Converters Capacitor Commutated Converters Voltage Source Converters Reactive Power Requirements System Configurations Tapping Control basics High Power Transmission

More information

DISTRIBUTION RELIABILITY USING RECLOSERS AND SECTIONALISERS

DISTRIBUTION RELIABILITY USING RECLOSERS AND SECTIONALISERS ABB DISTIBUTION ELIABILITY USING ECLOSES AND SECTIONALISES obert E. Goodin Chief Engineer ABB Inc. Lake Mary, FL Timothy S. Fahey, PE Sr. Application Engineer ABB Inc. aleigh, NC Andrew Hanson, PE Executive

More information

Chapter 5. System security and ancillary services

Chapter 5. System security and ancillary services Chapter 5. System security and ancillary services 1 Introduction Markets for electrical energy can function only if they are supported by the infrastructure of a power system. System should continue to

More information

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 1 of 27 UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 2 of 27 Table of Contents 1. OBJECTIVE... 4 2. SCOPE... 4 3. COMMUNICATION... 4 4. LOSS OF NATURAL GAS SUPPLY... 5 5. LOSS OF

More information

6. The estimated costs here do not include any applicable ITCC tax

6. The estimated costs here do not include any applicable ITCC tax General Notes and Clarifications: 1. The following estimated costs are based on past experiences and are intended to provide an order of magnitude of the total project cost given the major system components.

More information

Full Network Model Scope for FNM DB2015Q4

Full Network Model Scope for FNM DB2015Q4 Transmission Projects PG&E SCE 1. Build Shepherd Substation (MWC 60) Install 115 kv ring bus and loop 115 kv line, phase # 4 2. CDCR Mule Creek Prison Load Interconnection, phase # 1 3. Chowchilla Solar

More information

The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development

The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development GE Digital Energy The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development IEEE Fellow IEEE PES President (2006-2007) IEEE Division VII

More information

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables

More information

Nuclear Power Plant Electrical Power Supply System Requirements

Nuclear Power Plant Electrical Power Supply System Requirements 1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, zeljko.jurkovic@nek.si Abstract Various regulations and standards require from electrical power system of the

More information

When this standard has received ballot approval, the text boxes will be moved to the Guidelines and Technical Basis section of the Standard.

When this standard has received ballot approval, the text boxes will be moved to the Guidelines and Technical Basis section of the Standard. CIP-002-5 Cyber Security BES Cyber System Categorization When this standard has received ballot approval, the text boxes will be moved to the Guidelines and Technical Basis section of the Standard. A.

More information

Extollo Communications. Home Electrical Wiring and Cross Phase Coupling Overview

Extollo Communications. Home Electrical Wiring and Cross Phase Coupling Overview Extollo Communications Home Electrical Wiring and Cross Phase Coupling Overview Table of Contents Introduction... 3 Electrical Wiring in the Typical North American Home... 3 Figure 1. Transformer for a

More information

Integrating Renewable Electricity on the Grid. A Report by the APS Panel on Public Affairs

Integrating Renewable Electricity on the Grid. A Report by the APS Panel on Public Affairs Integrating Renewable Electricity on the Grid A Report by the APS Panel on Public Affairs 2 Integrating Renewable Electricity on the Grid Executive Summary The United States has ample renewable energy

More information

Power Plant Electrical Distribution Systems

Power Plant Electrical Distribution Systems PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com

More information

EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID

EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID Tension (kv) Impedance (Ohms) EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID frequency (Hz) Simon DESCHANVRES Yannick VERNAY RTE, CNER, Substations Department t (ms) EMTP-RV Users Group

More information

LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University

LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University PURPOSE: The purpose of this lab is to introduce PSS/E. This lab will introduce the following aspects of PSS/E: Introduction to

More information

PA PUC AERS & Metropolitan Edison Company Site Visit

PA PUC AERS & Metropolitan Edison Company Site Visit PA PUC AERS & Metropolitan Edison Company Site Visit October 26, 2010 Scott Lowry Director-Operation Services, Met-Ed Andrew Zulkosky Manager-Engineering, Met-Ed Curt Christenson Manager-York Customer

More information

ICM Project Station Infrastructure and Equipment

ICM Project Station Infrastructure and Equipment EB 0 00 Schedule B. ( pages) ICM Project Station Infrastructure and Equipment (THESL) EB 0 00 Schedule B. I EXECUTIVE SUMMARY 0. Project Description Many Municipal Substations (MS) located outside of downtown

More information

FINAL. Alternative Evaluation. for the. Proposed Burlington-Wray 230-kilovolt Transmission Project

FINAL. Alternative Evaluation. for the. Proposed Burlington-Wray 230-kilovolt Transmission Project FINAL Alternative Evaluation for the Proposed Burlington-Wray 230-kilovolt Transmission Project Prepared by Tri-State Generation and Transmission Association, Inc. 1100 W. 116th Avenue Westminster, Colorado

More information

Asset Management Business Update

Asset Management Business Update Asset Management Business Update Improvements through Asset Management Mark Davis, Director, Asset Management & AW October 29, 2008 1 From Maintenance to Asset Management Maintain the System -Initial Focus

More information

Energy Management System (EMS) Model Updates and Quality Assurance (QA)

Energy Management System (EMS) Model Updates and Quality Assurance (QA) PJM Manual 3A: Energy Management System (EMS) Model Updates and Quality Assurance (QA) Revision: 10 Effective Date: June 25, 2015 Prepared by: Operation Support Division PJM 2015 PJM 2007 Revision 0, Effective

More information

Rail Loading Facilities Bakken Product Markets & Takeaway Capacity Denver, CO January 30, 2013 www.dakotaplains.com

Rail Loading Facilities Bakken Product Markets & Takeaway Capacity Denver, CO January 30, 2013 www.dakotaplains.com Rail Loading Facilities Bakken Product Markets & Takeaway Capacity Denver, CO January 30, 2013 www.dakotaplains.com Forward Looking Statements Statements made by representatives of Dakota Plains Holdings,

More information

Alberta Reliability Standard Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-AB-1

Alberta Reliability Standard Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-AB-1 A. Introduction 1. Title: 2. Number: 3. Purpose: To prevent and detect unauthorized changes to BES cyber systems by specifying configuration change management and vulnerability assessment requirements

More information

MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION

MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION REPORT ON NETWORK RELIABILITY ASPECTS OF THE CHOICE LINE VERSUS CABLE FOR

More information

INTRODUCTION TO SYSTEM PROTECTION. Hands-On Relay School 2012

INTRODUCTION TO SYSTEM PROTECTION. Hands-On Relay School 2012 INTRODUCTION TO SYSTEM PROTECTION Hands-On Relay School 2012 CONGRATULATIONS On choosing the field of system protection. It is an exciting, challenging profession. System protection has changed considerably

More information

ELECTRICITY SECURITY OF SUPPLY CHALLENGES IN THE ENERGY COMMUNITY

ELECTRICITY SECURITY OF SUPPLY CHALLENGES IN THE ENERGY COMMUNITY ELECTRICITY SECURITY OF SUPPLY CHALLENGES IN THE ENERGY COMMUNITY - topics for discussion - 17 th PHLG Meeting 30-31 May 2006 Zagreb, Croatia - Prepared by ECS - 1 CONTENTS CONTENTS PURPOSE LEGAL PROVISIONS

More information

A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software

A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software Abstract: The nature of explosive equipment failures, and the rate of serious burn injuries in the electrical industry

More information

Connections Customer Forum October 2015

Connections Customer Forum October 2015 Connections Customer Forum October 2015 Housekeeping Toilets Phones Fire exits Feedback Connections Customer Forum October 2015 2 Agenda 9am Welcome & introductions Nigel Hall 9:05am Opening remarks Mark

More information

Wolf Creek Hydropower Rehabilitation Analysis Report

Wolf Creek Hydropower Rehabilitation Analysis Report Wolf Creek Hydropower Rehabilitation Analysis Report David Bishop Kris Atanassov Team Cumberland, September 16, 2015 US Army Corps of Engineers Agenda Overview Water Availability Energy Modeling Preliminary

More information

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education

More information

2013 Ventyx, an ABB company

2013 Ventyx, an ABB company Co-optimization of Congestion Revenue Rights in ERCOT Day-Ahead Market Chien-Ning Yu, Vladimir Brandwajn, Show Chang ABB/Ventyx Sainath M. Moorty ERCOT FERC Conference on increasing real-time and day-ahead

More information