1 PJM Merchant Transmission Request Queue #R75 Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study v1a March 2007 PJM Interconnection All rights reserved.
2 Preface The intent of the feasibility study is to determine a plan, with ballpark cost and construction time estimates, to connect the subject merchant transmission upgrade to the PJM network at a location specified by the Interconnection Customer. As a requirement for interconnection, the Interconnection Customer may be responsible for the cost of constructing: Network Upgrades, which are facility additions, or upgrades to existing facilities, that are needed to maintain the reliability of the PJM system. All facilities required for interconnection of a merchant transmission upgrade must be designed to meet the technical specifications (on PJM web site) for the appropriate transmission owner. In some instances an interconnection customer may not be responsible for 100% of the identified network upgrade cost because other transmission network uses, e.g. another generation interconnection or merchant transmission upgrade, may also contribute to the need for the same network reinforcement. The possibility of sharing the reinforcement costs with other projects may be identified in the feasibility study, but the actual allocation will be deferred until the impact study is performed. The Feasibility Study estimates do not include the feasibility, cost, or time required to obtain property rights and permits for construction of the required facilities. The project developer is responsible for the right of way, real estate, and construction permit issues. For properties currently owned by Transmission Owners, the costs may be included in the study. PJM Interconnection All rights reserved.
3 General Reliant Energy Electric Solutions, LLC has proposed a project to upgrade the Mitchell Shepler Hill 138 kv circuit. The circuit is to be reconductored with miles of 954 ACSR. The proposed in-service date for this merchant transmission project is January 1, This Merchant Transmission Feasibility Study assesses the practicality and cost of incorporating the transmission facility into the PJM system. This study was limited to short-circuit analyses as well as load flow analyses of probable contingencies. PJM has provided preliminary estimates of the type, scope, cost, and lead time for construction of facilities. If the interconnection customer elects to pursue the System Impact Study, a more comprehensive analysis will be performed. Attachment Facilities The proposed reconductored 138 kv transmission line will terminate at existing facilities. The total project cost is estimated to be $ 3,000,000 in 2007 dollars. This estimate does not include tax gross up. This project will require 26 months to complete from the date of receipt of a signed Construction Service Agreement (CSA). Delays could be based on weather, equipment lead-time, and availability of outages to perform the work. NETWORK UPGRADES The study indicates no network upgrades are needed for the project. PJM Interconnection All rights reserved. 3
4 Network Impacts Project #R75 was evaluated for compliance with reliability criteria for summer peak conditions in Potential network impacts were as follows: Generator Deliverability No problems were identified Multiple Facility Contingency No problems were identified Contribution to Previously Identified Overloads No significant contributions to previously overloaded facilities were identified New System Reinforcements None identified. Contribution to Previously Identified System Reinforcements None identified. Short Circuit No overdutied breakers were found. IDRs at Elrama 138 kv 0 MW The incremental MW-injection is limited by the Mitchell-Uninon J. 138 kv line for the tower outage of 138 kv lines Mitchell-Charleroi and Mitchell-Dry Run. PJM Interconnection All rights reserved. 4
5 Elrama (DL) * Approximately 4 miles ACSR ACSR * AP Mitchell Union Jct PJM Queue P56 Dry Run AP Reconductor Mitchell Shepler Hill Jct. 138 kv circuit. Smithton Shepler Hill Jct 138 kv Belmont Charleroi AP SOURCE CAD FILE REVIEWED APPROVED DATE Allegheny Power P L A N MITCHELL SHEPLER HILL JCT. RECONDUCTOR 138 kv LINE FOR RELIANT ENERGY ELECTRIC SOLUTIONS MERCHANT TRANSMISSION CHARLEROI SERVICE CENTER DRAWN CHKD SCALE AUTHORIZATION NS REV Figure 1 PJM Interconnection All rights reserved. 5
Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055
Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights
More informationGeneration Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.
Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine
More informationGenerator Interconnection and Deliverability Study Methodology Technical Paper
Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:
More informationGeneration and Transmission Interconnection Process
PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents
More informationQ140 Cluster Addendum
Cluster Addendum 1. INTRODUCTION This Interconnection Customer (IC), submitted a Small Generator Interconnection Request (IR) to Arizona Public Service Company (APS) for their proposed project, located
More informationSOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)
More informationEmera Maine Proposed Potential Transmission Projects. Line Identification Line 75 - KR Sub. Estimated Cost $201,464 $0 $3,200,000
L75 & BW3 Rebuild ROW Phase I Keene Rd. Expansion for Oakfield Wind KR Transformer Addition Line Identification Line 75 - KR Sub Location Bangor Chester Chester Estimated Cost $201,464 $0 $3,200,000 Voltage
More informationControl Number : 37897. Item Number : 9. Addendum StartPage: 0
Control Number : 37897 Item Number : 9 Addendum StartPage: 0 PROJECT NO. 37897 PUC PROCEEDING RELATING TO PUBLIC UTILITy/^OI^IMISSIO^ RESOURCE AND RESERVE ^CL_^ ADEQUACY AND SHORTAGE OF TEXAS PRICING COMMENTS
More informationSection 4: Integrating Public Policy Drivers
Public Policy Drivers Section : Integrating Public Policy Drivers PJM DE DC IL IN KY MD MI NJ NC OH PA TN VA WV Section.0: The Role of Public Policy in the RTEP Process Figure.1: Public Policy Drivers
More informationFRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003
F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify
More informationUpdated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA
CROSS SOUND CABLE PROJECT 330MW HVdc INTERCONNECTION BETWEEN NEW HAVEN, CONNECTICUT AND SHOREHAM, NY Updated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA Subordinate Status Removal and Amendment of Approved
More informationTitle 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering
Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.
More informationCOMMONWEALTH OF VIRGINIA LRK,'S UNCE AT RICHMOND, SEPTEMBER 7,2012 TRUL CE.. P 112 : 51 APPLICATION OF FINAL ORDER
COMMONWEALTH OF VIRGINIA STATE CORPORATION COMMISSION LRK,'S UNCE AT RICHMOND, SEPTEMBER 7,2012 TRUL CE.. P 112 : 51 APPLICATION OF VIRGINIA ELECTRIC AND POWER COMPANY For approval and certification of
More informationTRANSMISSION ALTERNATIVES CONSIDERED
EB-00-0 Tab Page of TRANSMISSION ALTERNATIVES CONSIDERED In determining the proposed facilities, Hydro One and the West GTA LDCs investigated six options to address the two needs identified in this Application
More information16 West Coast Regional Plan
16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast
More informationBPA Network Open Season 2013 Cluster Study
BPA Network Open Season 2013 Cluster Study Customer Meeting January 15, 2014 Topics for Discussion Cluster Study TSR Overview Cluster Study Areas Incremental TTC Needed Cluster Study Areas Preliminary
More informationHouston Region Import Capacity Project
Houston Region Import Capacity Project July 25, 2013 Prepared by: CenterPoint Energy Transmission Planning Executive Summary 3 1. Introduction 5 2. Methodology and Study Assumptions 7 2.1 Case Description
More informationJoint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment
Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents:
More informationFINAL. Alternative Evaluation. for the. Proposed Burlington-Wray 230-kilovolt Transmission Project
FINAL Alternative Evaluation for the Proposed Burlington-Wray 230-kilovolt Transmission Project Prepared by Tri-State Generation and Transmission Association, Inc. 1100 W. 116th Avenue Westminster, Colorado
More informationTDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis
R103-11 TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis Prepared for Transmission Developers, Inc. Submitted by: Larry Eng, Staff Consultant
More informationSHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015
SHE Transmission 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 Summary This paper presents SHE Transmission s views and approach on the impact of transmission losses on the transmission
More informationDeliverability Testing
Deliverability Testing Henry Chao Vice President System & Resource Planning New York Independent System Operator New York State Reliability Council Executive Committee Meeting September 12, 2008 Definition
More informationFRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria
A. Purpose: The FRCC Reliability Coordinator (RC) Contingency Analysis (CA) application is essential to maintaining the reliability of the FRCC Bulk Electric System. The application has the capability
More informationSection 4: Scheduling Philosophy & Tools
Welcome to the Scheduling Philosophy & Tools section of the PJM Manual for Scheduling Operations. In this section you will find the following information: A description of the PJM OI s scheduling philosophy
More informationTransmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report
Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives (Required per CPUC Decision No. C10-1328) Final Report (Submitted with Public Service s 2011 ERP) Executive Summary The objective
More informationMillennium Pipeline Company, LLC Response to New York State Energy Highway RFI
Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI www.millenniumpipeline.com One Blue Hill Plaza, 7th Floor Post Office Box 1565 Pearl River, N Y 10965 845.620.1300 Voice 845.620.1320
More informationRocky Mountain Power Transmission Five Year Study Findings Meeting
Rocky Mountain Power Transmission Five Year Study Findings Meeting Study Areas for 2009 Goshen Idaho Study Area encompasses parts of Bingham, Bonneville, Butte, Clark, Fremont, Jefferson, Lemhi, Madison
More informationMemorandum. This memorandum requires Board action. Executive Summary
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: July 8, 2014 Re: Decision on the Delaney-Colorado
More informationPotomac Electric Power Company 1900 Pennsylvania Ave., N.W. Washington, D.C. 20068
Section 11 PEPCO'S EARLY PLANNING FOR A PHASED COAL GASIFICATION COMBINED-CYCLE PLANT Steven Scherer, P.E. Potomac Electric Power Company 1900 Pennsylvania Ave., N.W. Washington, D.C. 20068 PEPCO'S EARLY
More informationAGREEMENT FOR PRELIMINARY ENGINEERING DESIGN MISO PROJECT J233
SA 2507 INTERSTATE POWER AND LIGHT COMPANY E&P AGREEMENT VERSION 1.0.0 EFFECTIVE 3/1/2013 AGREEMENT FOR PRELIMINARY ENGINEERING DESIGN MISO PROJECT J233 Agreement for Preliminary Engineering Design - MISO
More informationPJM Interconnection LLC Regional Transmission Organization (RTO)
PJM Interconnection LLC Regional Transmission Organization (RTO) ComEd Generator Interconnection Meeting October 2015 William Patzin PJM Infrastructure Coordination October 2015 PJM 2013 Nine Major North
More informationSOUTH CAROLINA. Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)
SOUTH CAROLINA Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard) 1. Overview: This Standard contains the requirements, in addition
More informationCross-Tie Transmission Line. Ravikanth Varanasi Principal Transmission Planner
Cross-Tie Transmission Line Ravikanth Varanasi Principal Transmission Planner Overview ~213 mile 500-kV transmission line between PacifiCorp s proposed Clover 500 kv substation with NV Energy s Robinson
More informationAAPG 2011 Annual Convention & Exhibition April 10, 2011
Generator Transmission Grid Interconnection Guidelines AAPG 2011 Annual Convention & Exhibition April 10, 2011 Hala Ballouz, B.Sc., M.Sc. TAMU, P.E. President, Electric Power Engineers, Inc. Partner &
More informationIESO Supply Deliverability Guidelines
PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents
More informationThe Economic Impact of Dominion Capital Expenditure Projects
The Economic Impact of Dominion Capital Expenditure Projects Prepared for Dominion Virginia Power October 22, 2015 1309 E Cary Street, Richmond, VA 23219 1025 Huron Road East, Cleveland, OH 44115 chmuraecon.com
More informationIntegration Capacity Analysis Workshop 11/10/15 California IOU s Approach
Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach READ AND DELETE For best results with this template, use PowerPoint 2003 10 November 2015 Background and Importance of ICA Definition:
More informationEL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION FEASIBILITY STUDY FOR PROPOSED XXXXXXXX GENERATION ON THE SIERRA BLANCA-FARMER 69 KV LINE
EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION FEASIBILITY STUDY FOR PROPOSED XXXXXXXX GENERATION ON THE SIERRA BLANCA-FARMER 69 KV LINE El Paso Electric Company System Planning Department April
More informationPennsylvania Summer Reliability
A. Reliability Enhancement Programs In 2015, Pennsylvania Power Company s ( Penn Power or Company ) reliability plan incorporates projects and programs to enhance overall reliability. The plan is structured
More informationSUMMARY OF CAPITAL EXPENDITURES
Filed: May, EB--00 Page of SUMMARY OF CAPITAL EXPENDITURES.0 SUMMARY OF CAPITAL BUDGET The proposed capital expenditures result from a rigorous business planning and work prioritization process that reflects
More informationLoad Dispatcher (Class Code 5223) Task List
A. Load Dispatching, General Load Dispatcher (Class Code 5223) Task List 1. Prior to work shift speaks to Load Dispatcher(s), reviews hardcopy and computer logs, and looks at the dispatcher's diagram board
More informationPUBLIC SERVICE COMMISSION OF MARYLAND TEN-YEAR PLAN (2012 2021) OF ELECTRIC COMPANIES IN MARYLAND
PUBLIC SERVICE COMMISSION OF MARYLAND TEN-YEAR PLAN (2012 2021) OF ELECTRIC COMPANIES IN MARYLAND Prepared for the Maryland Department of Natural Resources In compliance with Section 7-201 of the Maryland
More informationTehachapi Renewable Transmission Project (TRTP)
SM Tehachapi Renewable Transmission Project (TRTP) February 2009 Why We Are Here Today Provide background on SCE s commitment to renewable energy Discuss the operational and economic importance of the
More informationHYDRO ONE LIMITED REPORTS FOURTH QUARTER 2015 RESULTS
HYDRO ONE LIMITED REPORTS FOURTH QUARTER 2015 RESULTS Quarterly results reflect a number of timing, unusual and unseasonal weather related items while core operations remain strong; Board declares first
More informationMicrogrid Building block for Smart Cities
Microgrid Building block for Smart Cities Shay Bahramirad, Ph.D. Manager of Smart Grid & Technology December 2014 COMED OVERVIEW 1 The service territory covers 11,400 mi 2 in Northern Illinois Serving
More informationItem 8: Houston Import RPG Project
: Houston Import RPG Project Jeff Billo Manager, Transmission Planning Board of Directors Meeting April 8, 2014 Study Overview ERCOT has determined that there will be a need for additional import capacity
More informationBOUNDLESS ENERGY, LLC S RESPONSE TO THE REQUEST FOR INFORMATION BY THE NEW YORK ENERGY HIGHWAY
Background BOUNDLESS ENERGY, LLC S RESPONSE TO THE REQUEST FOR INFORMATION BY THE NEW YORK ENERGY HIGHWAY On April 11, 2012, the New York Energy Highway Task Force (Task Force) issued a request for information
More informationTransmission Related Station Power Use at Substations
Transmission Related Station Power Use at Substations BUSINESS PRACTICE This Business Practice identifies the cost responsibility for energy consumption at substations by American Transmission Company
More informationDUKE ENERGY INDIANA. Preparation for Summer 2007. Presentation to Indiana Utility Regulatory Commission
DUKE ENERGY INDIANA Preparation for Summer 2007 Presentation to Indiana Utility Regulatory Commission May 30, 2007 Overview of Presentation 2006 Duke Energy Indiana accomplishments/challenges Summer 2007
More informationNTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario
NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents... 2 1. Executive Summary...
More informationAPPENDIX 7 TO LGIP INTERIM INTERCONNECTION SYSTEM IMPACT STUDY AGREEMENT
APPENDIX 7 TO LGIP INTERIM INTERCONNECTION SYSTEM IMPACT STUDY AGREEMENT THIS AGREEMENT is made and entered into this day of, 20 by and between, a organized and existing under the laws of the State of,
More informationPJM LMP Market Overview
PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people
More informationEconomic Impact Analysis of PSE&G s Capital Expenditure Program
Economic Impact Analysis of PSE&G s Capital Expenditure Program Submitted to: PSE&G June 2014 Joseph J. Seneca, Michael L. Lahr, Will Irving Contents Introduction... 1 Project Expenditure Data... 2 Methodology...
More information2015 Highlights. Operating Committee January 21, 2016
2015 Highlights Operating Committee January 21, 2016 Health & Safety Overview Alignment with improvements to incident reporting process and software (e.g. Catsweb) Improvement of safety culture and accountability
More informationElectric Power 2005 in Chicago. Dr. Aiham Alsammarae Minister Of Electricity Iraq
Electric Power 2005 in Chicago Dr. Aiham Alsammarae Minister Of Electricity Iraq IRAQ s ELECTRICAL SYSTEM (STATUS & FUTURE PLAN) April. 2005 IRAQ s ELECTRICAL SYSTEM A QUICK HISTORICAL REVIEW Electricity
More informationFORM EIA-411 INSTRUCTIONS COORDINATED BULK POWER SUPPLY AND DEMAND PROGRAM REPORT
PURPOSE REQUIRED RESPONDENTS RESPONSE DUE DATE METHODS OF FILING RESPONSE Form EIA-411 collects information about regional electricity supply and demand projections for a ten-year advance period and information
More information131 FERC 61,157 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING WAIVER. (Issued May 25, 2010)
131 FERC 61,157 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, and John R. Norris. Hudson Transmission Partners,
More informationTransmission Planning Standards for the Baltimore Gas & Electric Company Transmission System
Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System Prepared By: Transmission Planning Unit Baltimore Gas & Electric Company Table of Contents 1. INTRODUCTION
More informationGeneration Interconnection Facilities Study Report. For. PJM Generation Interconnection Request Queue Position R11. South River
Generation Interconnection Facilities Study Report For PJM Generation Interconnection Request Queue Position R11 South River May 2012 Transmission Owner Facilities Study Summary Description of Project
More information345 kv Brazos Valley Connection Project FAQs
345 kv Brazos Valley Connection Project FAQs Overview 1. Who is CenterPoint Energy Houston Electric, LLC? CenterPoint Energy Houston Electric, LLC (CenterPoint Energy) is an electric utility that maintains
More informationKyrgyzstan: Power Generation & Transmission
Kyrgyzstan: Power Generation & Transmission October, 2010 Author: Artyom Zozulinsky, Business & Commercial Assistant, US Embassy Bishkek Contents SUMMARY... 2 POWER SECTOR OVERVIEW... 2 Infrastructure...
More informationASSET MANAGEMENT STRATEGY Approved
Approved Document TP.TG 01.01 30/10/2014 Approved Transpower New Zealand Limited 2014. All rights reserved. Page 1 of 25 C O P Y R I G H T 2014 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A
More informationBEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION'^^ j E DIRECT TESTIMONY RAJESH GUPTA PROJECT MANAGER, ENTERGY SERVICES, INC.
BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION'^^ j E s : D IN THE MATTER OF THE APPLICATION OF ENTERGY ARKANSAS, INC. FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED TO CONSTRUCT AND OPERATE
More informationCOMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
More informationCyber Infrastructure for the Smart Grid
Cyber Infrastructure for the Smart Grid Dr. Anurag K. Srivastava, Dr. Carl Hauser, and Dr. Dave Bakken Smart Grid Use Cases: Part 2 SGIC Xcel Energy SG Xcel Energy A public Service company of Colorado
More informationPreliminary Feasibility Assessment For. The Rio Tinto Alcan to BCH Transfer Limit of 460 MW. With 50% Series Compensation on Both KMO KIT lines
Preliminary Feasibility Assessment For The Rio Tinto Alcan to BCH Transfer Limit of 460 MW With 50% Series Compensation on Both KMO KIT lines Report : ASP2010-T001 July 2010 Asset Strategy & Planning,
More informationComments of Louisiana Energy Users Group and Texas Industrial Energy Consumers. MISO South Market Congestion Planning Study. September 18, 2015
Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers On MISO South Market Congestion Planning Study September 18, 2015 In response to the MISO Staff s September 11, 2015 request
More informationSudbury to Hudson Transmission Reliability Project
Hudson Light & Power Sudbury to Hudson Transmission Reliability Project Sudbury, Massachusetts Board of Selectmen Presentation February 2, 2016 Revised on Page 12 to show Project Open House dates in Sudbury
More informationITP Evaluation Process Plan Cross-Tie Transmission Line
ITP Evaluation Process Plan Cross-Tie Transmission Line The goal of the coordinated Interregional Transmission Project (ITP) evaluation process is to achieve consistent planning assumptions and technical
More informationNETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2 2.0
More informationFinancing New High Voltage Transmission Lines in Nepal Using HTLS Conductors Surendra Rajbhandari, Nepal Electricity Authority Zhang Lei, ADB South
Financing New High Voltage Transmission Lines in Nepal Using HTLS Conductors Surendra Rajbhandari, Nepal Electricity Authority Zhang Lei, ADB South Asia Energy Division Asia Clean Energy Forum June 2015
More informationElectrical System Studies
Electrical System Studies INTRODUCTION s experienced professionals provide electrical systems planning and design services to improve the safety and the reliability of electric power systems. The planning,
More informationChapter 7 - Appendix A
Chapter 7 - Appendix A Transmission and Distribution Supplemental Information Table 7A.1 MTEP Transmission Projects in Missouri 1 Project Approved Project Title Project Description Category Estimated Cost
More informationSPP Notification to Construct
SPP-NTC-200365 SPP Notification to Construct January 12, 2016 Mr. John Fulton Southwestern Public Service Company P.O. Box 1261 Amarillo, TX 79105 RE: Notification to Construct for Transmission Service
More informationE N G I N E E R I N G
Purpose If the customer s proposed project proceeds to Gate 1 of the Integrated Customer Solutions (ICS) process (see the ICS Process and Proposal Submission Guide), the customer must prepare a Load Displacement
More information2014 Solicitation DGS Request for Proposals & ADGS Request for Information Conference. July 1, 2014
2014 Solicitation DGS Request for Proposals & ADGS Request for Information Conference July 1, 2014 Overview of the Conference Introduction Conference Agenda DGS and ADGS Overview RFP/RFI Schedule The DGS
More informationTexas Demand Response Programs Cirro Energy Services an NRG Energy Company
Texas Demand Response Programs Cirro Energy Services an NRG Energy Company April 04, 2014 Fazil Shaikh, Sales Manager Melissa Karner, Energy Consultant Outline Introduction ERCOT Resource Adequacy and
More informationIntegrating Renewable Electricity on the Grid. A Report by the APS Panel on Public Affairs
Integrating Renewable Electricity on the Grid A Report by the APS Panel on Public Affairs 2 Integrating Renewable Electricity on the Grid Executive Summary The United States has ample renewable energy
More informationPJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013
PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity
More informationEnergy Storage Market Overview MADRI 3/3/2015 John Fernandes Policy & Market Development Manager
Energy Storage Market Overview MADRI 3/3/2015 John Fernandes Policy & Market Development Manager Storage Technologies 2 Over 100 Energy Storage Technologies Background to the Market Flywheels Thermal ES
More informationUpdated: November 30, 2007 Date: 30-Nov-07 SUMMARY OF DISCOUNTED CASH FLOW CALCULATIONS EB-2007-0050 Project # Exhibit B Tab 4 Schedule 4 page 1 of 5
Date: 30-Nov-07 SUMMARY OF DISCOUNTED CASH FLOW CALCULATIONS Project # page 1 of 5 Facility Name: Bruce to Milton Reinforcement Project Scope: 500kV Line and related station modifications In-Service Date
More informationTreasure Valley Electric Plan - Community Advisory Committee
Treasure Valley Electric Plan - Community Advisory Committee What is a transmission line and why are they necessary? A transmission line is used to conduct electricity between two points. Without high
More informationCalculating the Business Case for Demand Response
Calculating the Business Case for Demand Response Whether for regional transmission systems, integrated utilities, or load serving retailers, there are many direct and indirect benefits financial, regulatory,
More informationTRANSMISSION BUSINESS PERFORMANCE
Filed: 0-0- Tx 0-0 Rates Tab Schedule Page of TRANSMISSION BUSINESS PERFORMANCE.0 INTRODUCTION 0 Hydro One is focused on the strategic goals and performance targets in the area of safety, customer satisfaction,
More informationFixed Income Investor Meeting
Fixed Income Investor Meeting James F. Pearson Senior Vice President and Chief Financial Officer NYSE, New York, NY May 20, 2015 Forward-Looking Statement Forward-Looking Statements: This Presentation
More informationCITY AND COUNTY OF SAN FRANCISCO
CITY AND COUNTY OF SAN FRANCISCO Mayor Gavin Newsom City Attorney Dennis Herrera Supervisor Michela Alioto-Pier Supervisor David Chiu Supervisor Sophenia Maxwell General Manager Edward Harrington May 8,
More informationConvergence of Wholesale And Retail Markets: The Texas Experience
Convergence of Wholesale And Retail Markets: The Texas Experience 1 COMMISSIONER KENNETH W. ANDERSON, JR. PUBLIC UTILITY COMMISSION OF TEXAS PRESENTATION FOR HARVARD ELECTRICITY POLICY GROUP JUNE 12, 2014
More informationEnabling End Users to see Real Time Price Signals and Manage their Own Electricity Costs via the PJM Demand Side Response Program Delaware DNREC
Enabling End Users to see Real Time Price Signals and Manage their Own Electricity Costs via the PJM Demand Side Response Program Delaware DNREC Joe Polidoro, Sr. Engineer PJM Interconnection, LLC 610-666-4693
More informationOperating Security Standards
Version 1.1 Prishtina December 2009 TABLE OF CONTENTS 1 Introduction... 1 2 Definitions... 1 2.1 General...1 2.1.2 Kosovo Transmission System...1 2.1.3 Circuit...2 2.1.4 The N-1 Criterion...2 2.1.5 Normal
More informationSchedule 19 POWER PURCHASES FROM COGENERATION AND SMALL POWER PRODUCTION QUALIFYING FACILITIES
I. APPLICABILITY & AVAILABILITY This Schedule is applicable to any Cogenerator or Small Power Producer (Qualifying Facility), as defined in the Public Utility Regulatory Policies Act of 1978 (PURPA), which
More informationHow To Operate The Williston Uvls
WND Winter Operating Guide 2012/2013 1 WND Operating Study Using EQ-890-2012WIN- FINAL.sav developed through the 890 process Got load updates from MDU, Central Power, UM G&T Made several topology updates
More informationPJM Renewable Integration Study
GE Energy Consulting PJM Renewable Integration Study Executive Summary Report Revision 03 Prepared for: PJM Interconnection, LLC. Prepared by: General Electric International, Inc. February 28, 2014 Legal
More informationTERMS AND CONDITIONS
Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator
More informationApplicability and Eligibility
Application for Resource Adequacy Deliverability Status for a Distributed Generation Resource Interconnected or Seeking Interconnection to the Distribution Facilities of an Investor-Owned Utility Participating
More informationNew York Independent System Operator (NYISO)
New York Independent System Operator (NYISO) 2010 ISO/RTO Metrics Report 196 Section 5 NYISO Performance Metrics and Other Information The New York Independent System Operator ( NYISO ) is a not-for-profit
More informationPJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations
PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region
More informationD.3 South Minneapolis Electric Distribution Delivery System Long-Term Study
D.3 South Minneapolis Electric Distribution Delivery System Long-Term Study Xcel Energy April 2009 Hiawatha Project SOUTH MINNEAPOLIS ELECTRIC DISTRIBUTION DELIVERY SYSTEM LONG-TERM STUDY Scott Zima Distribution
More informationNational Regulatory Conference May 20, 2015. The Role of Natural Gas in Electric Generation
National Regulatory Conference May 20, 2015 The Role of Natural Gas in Electric Generation Chairman Edward S. Finley, Jr. North Carolina Utilities Commission www.ncuc.net North Carolina fully regulates
More informationJason B. Keyes Keyes & Fox, LLP Kansas Solar Round Table Topeka, Kansas March 3, 2009
Net Metering and Interconnection of Solar Energy Facilities Jason B. Keyes Keyes & Fox, LLP Kansas Solar Round Table Topeka, Kansas March 3, 2009 What IREC Does Participate in state utility commission
More informationSuperconducting and Solid-State Electronic Fault Current Limiter Technologies The shift from demonstration projects to Business-as-Usual solutions
Superconducting and Solid-State Electronic Fault Current Limiter Technologies The shift from demonstration projects to Business-as-Usual solutions Dr. Detlev Kirsten & Herbert Piereder Solid State SSFCL
More information