MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: "Projects C F Bid Math Check" 1/8
|
|
- Amberly Wood
- 7 years ago
- Views:
Transcription
1 SPLOST Drainage Projects Package Project C: Hillcrest Avenue (Hillcrest Boulevard -to- Dillon Branch) Project D: Main Street Project E: Riverside Drive (at Railroad) Project F: Riverside Drive (at 7th Street) Created: 9/1/2015 Revised: 9/2/2015 PROJECTS C, D, E, & F Project C (Hillcrest Avenue) Project C (Hillcrest Avenue): Storm Drainage Items Erosion Control Items C-1 3 EA Construct and Remove Inlet Sediment Trap $ $1, $3, $11, $ $ $ $1, C SY Temporary Grass $2.00 $1, $4.05 $2, $1.00 $ $4.00 $2, C-3 2 EA Construct and Remove Construction Exits $1, $2, $ $1, $1, $2, $1, $2, C LF Temporary Silt Fence, Type C $3.50 $ $6.00 $ $3.00 $ $5.00 $ C SY Stone Dumped Rip-Rap, TP 3, 12 In. $45.00 $14, $58.00 $18, $70.00 $22, $70.00 $22, C AC Turf Establishment, TP C $1, $ $10, $1, $3, $ $5, $ C SY Permanent Soil Reinforcement Mat, as directed by Engineer $6.00 $ $14.00 $1, $5.00 $ $10.00 $1, C-9 50 CY Gravel for Trench Stabilization $50.00 $2, $47.50 $2, $40.00 $2, $40.00 $2, C-21 1 LS Restore stream to former alignment (to protect stream bank) $ Lump Sum $2, $ Lump Sum $8, $ Lump Sum $3, $ Lump Sum $10, Construction Items C LS Grading Complete $ Lump Sum $5, $ Lump Sum $8, $ Lump Sum $50, $ Lump Sum $25, C CY Class A Concrete, GA DOT Std Headwall (Inlet and Outlet headwalls, including concrete aprons) $1, $7, $1, $8, $1, $6, $3, $19, C LB Bar Reinforcing Steel, GA DOT Std Headwall (Inlet and Outlet headwalls, including concrete aprons) $3.00 $1, $5.25 $2, $6.00 $2, $4.00 $1, C LS Outlet Headwall, incl. concrete apron (STA. 0+26) $ Lump Sum $16, $ Lump Sum $26, $ Lump Sum $12, $ Lump Sum $35, C LF Ferrous Metal Handrail, Two Pipe $69.00 $3, $ $10, $ $5, $ $8, C LS Rehabilitate 72" CMP, as identified on plans $ Lump Sum $1, $ Lump Sum $81, $ Lump Sum $10, $ Lump Sum $1, C EA Grout 72" CMP Pipe Joints (full circumference) $ $9, $ $14, $ $11, $ $16, C LF Invert Paving for 72" CMP (new or existing pipe) $46.00 $8, $ $20, $ $45, $ $21, C LF Storm Drain Pipe, 30 In. RCP, H = 1-10 $75.00 $ $ $1, $ $1, $ $1, C LF Storm Drain Pipe, 54 In. RCP, H = 1-10 $ $1, $ $1, $ $2, $ $2, C LF Storm Drain Pipe, 72 In. RCP, H = 1-10 $ $87, $ $75, $ $90, $ $180, C LF Storm Drain Pipe, 72 In. Bituminous Coated CMP, H = 1-10 $ $5, $ $7, $ $5, $ $12, C EA Drop Inlet, GP 1 (for GaDOT Std. 1019A structures) $5, $15, $6, $19, $6, $18, $7, $22, C LF Drop Inlet, GP 1, Additional Depth (for GaDOT Std. 1019A structures) $ $2, $ $ $ $1, $ $1, C EA Storm Sewer Manhole, TP 2 (for GaDOT Std A structure) $8, $34, $4, $18, $12, $48, $15, $60, C LF Storm Sewer Manhole, TP 2, Additional Depth, Class 1 (for GaDOT Std A structure) $1, $6, $ $1, $1, $4, $ $3, Worksheet: "Projects C F " 1/8
2 C LS Connect to and Re-Build existing structure (STA. 6+92) $ Lump Sum $5, $ Lump Sum $3, $ Lump Sum $10, $ Lump Sum $10, Utility Relocation / Demolition / Restoration Items C LS Utility relocation coordination activities $ Lump Sum $1, $ Lump Sum $2, $ Lump Sum $20, $ Lump Sum $39, C LF 6" DIP Class 350 Water Main $60.00 $4, $97.00 $7, $ $8, $90.00 $7, C EA 6" Gate Valve $1, $2, $ $ $1, $3, $2, $4, C Lbs DI Fittings with concrete thrust blocks $3.50 $1, $8.00 $3, $5.00 $2, $5.00 $2, C EA Connection to 6" Water Main $1, $1, $1, $1, $2, $2, $3, $3, C EA Connection to 6" Water Service $1, $1, $ $ $1, $1, $3, $3, C LS Clearing and Grubbing $ Lump Sum $3, $ Lump Sum $3, $ Lump Sum $5, $ Lump Sum $10, C LS Project Demolition (for all construction activities) $ Lump Sum $7, $ Lump Sum $7, $ Lump Sum $10, $ Lump Sum $45, C CY Flowable Fill, Class "A" Concrete, as directed by Engineer $ $1, $ $2, $ $1, $ $2, C SY Concrete Slope Paving, 4 In. $65.00 $3, $ $11, $80.00 $4, $ $5, C SY Driveway Concrete, 8" Thick $50.00 $1, $72.00 $2, $80.00 $2, $90.00 $3, C LF Concrete Curb & Gutter (removal and replacement) $40.00 $3, $32.50 $2, $60.00 $4, $30.00 $2, C SY Class "A" Pavement (removal and replacement) $75.00 $7, $62.00 $6, $ $10, $70.00 $7, Miscellaneous Items C LS Traffic Control $ Lump Sum $5, $ Lump Sum $12, $ Lump Sum $5, $ Lump Sum $15, C LS General Overhead, including bonds, insurance, travel expenses, sanitary facilities, independent testing, record documentation, and other overhead costs $ Lump Sum $7, $ Lump Sum $16, $ Lump Sum $10, $ Lump Sum $70, Cash Allowance (Additional Work if ordered by the Engineer): C LS Soil and Concrete Testing $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, C LS Construction Surveying $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, C LS General Engineering Allowance $ Lump Sum $20, $ Lump Sum $20, $ Lump Sum $20, $ Lump Sum $20, Project C: Bid Total (Items 1-999) $314, $455, $469, $709, (c) (c) (c) (c) Worksheet: "Projects C F " 2/8
3 Project D (Main Street) Project D (Main Street): Storm Drainage Items Erosion Control Items D-1 2 EA Construct and Remove Inlet Sediment Trap $ $ $3, $7, $ $ $ $1, D SY Temporary Grass $2.00 $3, $4.05 $6, $1.00 $1, $4.00 $6, D-3 2 EA Construct and Remove Construction Exits $1, $2, $2, $5, $1, $2, $1, $2, D LF Temporary Silt Fence, Type C $3.50 $1, $6.00 $1, $3.00 $ $5.00 $1, D SY Stone Dumped Rip-Rap, TP 3, 12 In. $45.00 $4, $ $11, $70.00 $7, $70.00 $7, D AC Turf Establishment, TP C $1, $ $10, $3, $2, $ $5, $1, D SY Permanent Soil Reinforcement Mat, as directed by Engineer $6.00 $1, $14.00 $3, $4.00 $ $5.00 $1, D CY Gravel for Trench Stabilization $40.00 $6, $47.50 $7, $40.00 $6, $40.00 $6, D-10 1 EA Stone Check Dam $ $ $ $ $ $ $1, $1, Construction Items D LS Grading Complete $ Lump Sum $1, $ Lump Sum $9, $ Lump Sum $50, $ Lump Sum $25, D LF Ditch Grading $15.00 $4, $35.00 $10, $30.00 $9, $25.00 $7, D CY Class A Concrete, GA DOT Std Headwall (Inlet and Outlet headwalls, including concrete aprons) $1, $6, $1, $7, $1, $5, $2, $12, D LB Bar Reinforcing Steel, GA DOT Std Headwall (Inlet and Outlet headwalls, including concrete aprons) $3.00 $1, $5.25 $1, $6.00 $2, $4.00 $1, D LS Inlet Headwall, incl. concrete apron (STA. 3+93) $ Lump Sum $16, $ Lump Sum $16, $ Lump Sum $8, $ Lump Sum $12, D LS Outlet Headwall, incl. concrete apron (STA. 4+27) $ Lump Sum $20, $ Lump Sum $16, $ Lump Sum $12, $ Lump Sum $35, D LF Ferrous Metal Handrail, Two Pipe $69.00 $5, $ $13, $ $8, $ $9, D LF Storm Drain Pipe, 18 In. RCP, H = 1-10, as directed by Engineer $35.00 $ $ $1, $ $ $ $ D LF Storm Drain Pipe, 24 In. RCP, H = 1-10 $50.00 $1, $ $3, $ $3, $ $6, D LF Storm Drain Pipe, 30 In. RCP, H = 1-10 $60.00 $2, $ $4, $ $4, $ $12, D LF Storm Drain Pipe, 48 In. RCP, H = 1-10 $ $7, $ $11, $ $14, $ $28, D EA Drop Inlet, GP 1 (for GaDOT Std. 1019A structures) $5, $5, $6, $6, $6, $6, $10, $10, D LF Drop Inlet, GP 1, Additional Depth (for GaDOT Std. 1019A structures) $ $2, $ $1, $ $2, $ $2, D EA Storm Sewer Manhole, TP 1 (for GaDOT Std A structure) $5, $10, $4, $9, $6, $12, $10, $20, D LF Storm Sewer Manhole, TP 1, Additional Depth, Class 1 (for GaDOT Std A structure) $ $2, $ $2, $ $2, $ $2, D EA Storm Sewer Manhole, TP 2 (for GaDOT Std A structure) $5, $5, $4, $4, $12, $12, $10, $10, D LF Storm Sewer Manhole, TP 2, Additional Depth, Class 2 (for GaDOT Std A structure) $ $3, $ $3, $ $4, $ $3, D EA Clean out existing drop inlet $ $ $1, $1, $1, $1, $ $ Worksheet: "Projects C F " 3/8
4 Utility Relocation / Demolition / Restoration Items D LS Utility relocation coordination activities $ Lump Sum $1, $ Lump Sum $7, $ Lump Sum $8, $ Lump Sum $10, D LF 8" DIP Class 350 Water Main $70.00 $4, $ $7, $ $7, $ $10, D EA 8" Gate Valve $1, $2, $ $1, $1, $3, $6, $13, D Lbs DI Fittings with concrete thrust blocks $3.50 $1, $8.00 $4, $6.00 $3, $4.00 $2, D EA Connection to 8" Water Main $1, $3, $1, $3, $1, $2, $4, $9, D LS Clearing and Grubbing $ Lump Sum $5, $ Lump Sum $3, $ Lump Sum $10, $ Lump Sum $10, D LS Project Demolition (for all construction activities) $ Lump Sum $3, $ Lump Sum $8, $ Lump Sum $10, $ Lump Sum $38, D LF Sanitary Sewer Main, 8" PVC (SDR 26), all depths $ $9, $ $6, $ $5, $ $5, D VF 4' Diameter Manhole $ $2, $ $5, $ $4, $ $8, D LS Lining (AGRU and epoxy) $ Lump Sum $ $ Lump Sum $3, $ Lump Sum $10, $ Lump Sum $5, D EA Manhole Ring & Cover $ $1, $ $2, $ $1, $1, $3, D LS Connections and/or bypass pumping $ Lump Sum $1, $ Lump Sum $18, $ Lump Sum $5, $ Lump Sum $9, D SY Concrete Sidewalk, 4 Inch $32.00 $4, $38.00 $5, $70.00 $9, $70.00 $9, D LF Concrete Header Curb, 6 Inch, TP 2 (Ga DOT Std. 9032B) $35.00 $5, $32.50 $4, $70.00 $10, $30.00 $4, D SY Graded Aggregate Base Course, 8 Inch, incl. material $25.00 $6, $42.50 $11, $30.00 $8, $10.00 $2, D TN Recycled Asphalt Concrete, 12.5 mm Superpave, GP1 or 2, Incl. Bitum. Matl. $ $7, $ $12, $ $12, $ $21, Miscellaneous Items D LS Traffic Control $ Lump Sum $1, $ Lump Sum $3, $ Lump Sum $15, $ Lump Sum $20, D LS General Overhead, including bonds, insurance, travel expenses, sanitary facilities, independent testing, record documentation, and other overhead costs $ Lump Sum $5, $ Lump Sum $12, $ Lump Sum $10, $ Lump Sum $35, Cash Allowance (Additional Work if ordered by the Engineer): D LS Soil and Concrete Testing $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, D LS Construction Surveying $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, D LS General Engineering Allowance $ Lump Sum $10, $ Lump Sum $10, $ Lump Sum $10, $ Lump Sum $10, Project D: Bid Total (Items 1-999) $200, $308, $327, $460, (d) (d) (d) (d) Worksheet: "Projects C F " 4/8
5 Project E (Riverside Drive at Railroad) Project E (Riverside Drive at Railroad): Common Storm Drainage Items Erosion Control Items E SY Temporary Grass $2.00 $ $4.05 $ $1.00 $ $6.00 $ E LF Temporary Silt Fence, Type C $3.50 $ $6.00 $ $3.00 $ $5.00 $ E AC Turf Establishment, TP C $4, $ $10, $ $5, $ $5, $ E-9 50 CY Gravel for Trench Stabilization $50.00 $2, $47.50 $2, $50.00 $2, $40.00 $2, Common Construction Items (SDMH "E-AA1" to "E-BB1", inclusive) E LS Grading Complete $ Lump Sum $2, $ Lump Sum $8, $ Lump Sum $50, $ Lump Sum $5, E LF Storm Drain Pipe, 36 In. RCP, H = 1-10 $90.00 $13, $ $23, $ $21, $ $43, E LF Storm Drain Pipe, 36 In. RCP, H = $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A E LF Storm Drain Pipe, 36 In. RCP, H = $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A E LF Storm Drain Pipe, 36 In. RCP, H = $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A E EA Storm Sewer Manhole, TP 1 (for GaDOT Std A structure) $3, $10, $1, $4, $10, $30, $6, $18, E LF Storm Sewer Manhole, TP 1, Additional Depth, Class 1 (for GaDOT Std A structure) $ $4, $ $4, $ $4, $ $4, E LF Storm Sewer Manhole, TP 1, Additional Depth, Class 2 (for GaDOT Std A structure) $ $3, $ $4, $ $5, $ $3, Utility Relocation / Demolition / Restoration Items E LS Utility relocation coordination activities $ Lump Sum $1, $ Lump Sum $7, $ Lump Sum $10, $ Lump Sum $2, E LS Clearing and Grubbing $ Lump Sum $2, $ Lump Sum $4, $ Lump Sum $10, $ Lump Sum $2, E LS Project Demolition (for all construction activities) $ Lump Sum $2, $ Lump Sum $8, $ Lump Sum $10, $ Lump Sum $7, E CY Flowable Fill, Class "A" Concrete $ $21, $ $28, $ $20, $ $23, E SY Class "A" Pavement (removal and replacement) $65.00 $20, $62.00 $19, $ $32, $70.00 $22, Miscellaneous Items E LS Traffic Control $ Lump Sum $ $ Lump Sum $15, $ Lump Sum $5, $ Lump Sum $1, E LS General Overhead, including bonds, insurance (including railroad permit insurance requirements), travel expenses, sanitary facilities, independent testing, record documentation, and other overhead costs $ Lump Sum $7, $ Lump Sum $33, $ Lump Sum $30, $ Lump Sum $25, Cash Allowance (Additional Work if ordered by the Engineer): E LS Soil and Concrete Testing $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, E LS Construction Surveying $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, E LS General Engineering Allowance $ Lump Sum $5, $ Lump Sum $5, $ Lump Sum $5, $ Lump Sum $5, Bid Subtotal for Common Items (Items 1-999) $99, $174, $240, $170, (e common items ) (e common items ) (e common items ) (e common items ) Worksheet: "Projects C F " 5/8
6 ALTERNATE BID NO. 3: Construction & Restoration Items (Downstream of SDMH "E-BB1") E LS Grading Complete, including railroad embankment protective measures, soldier piles and/or other trench protective measures, demolition, excavation, backfilling, compaction, and miscellaneous items $ Lump Sum $7, $ Lump Sum $24, $ Lump Sum $100, $ Lump Sum $10, E LF Storm Drain Pipe, 36 In. RCP, H = 1-10 $ $4, $ $2, $ $2, $ $4, E LF Storm Drain Pipe, 36 In. RCP, H = $ $14, $ $9, $ $11, $ $16, E LF Storm Drain Pipe, 36 In. RCP, H = $ $3, $ $2, $ $8, $ $4, E LF Storm Drain Pipe, 36 In. RCP, H = $ $1, $ $1, $1, $4, $1, $4, E EA Storm Sewer Manhole, TP 1 (for GaDOT Std A structure) $6, $6, $4, $4, $12, $12, $6, $6, E LF Storm Sewer Manhole, TP 1, Additional Depth, Class 1 (for GaDOT Std A structure) $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A E LF Storm Sewer Manhole, TP 1, Additional Depth, Class 2 (for GaDOT Std A structure) $ $8, $ $3, $ $8, $ $6, E LF Storm Sewer Manhole, TP 1, Additional Depth, Class 3 (for existing structure) $ $3, $ $1, $1, $6, $ $3, E EA Manhole Ring & Cover (for existing structure) $ $ $ $ $ $ $1, $1, E SY Concrete Sidewalk, 6 Inch $ $12, $67.00 $3, $70.00 $3, $70.00 $3, Subtotal of ALTERNATE BID NO. 3 Items (Downstream of SDMH "E-BB1") $60, $53, $156, $58, (e alt. 3 items ) (e alt. 3 items ) (e alt. 3 items ) (e alt. 3 items ) Project E: Bid Total (Common Bid Items + Alt. Bid Items) $160, $227, $396, $228, (e) (e) (e) (e) Worksheet: "Projects C F " 6/8
7 Project F (Riverside Drive at 7th Street) Project F (Riverside Drive at 7th Street): Storm Drainage Items Erosion Control Items F SY Temporary Grass $2.00 $ $4.05 $ $1.00 $ $5.00 $1, F LF Temporary Silt Fence, Type C $3.50 $ $6.00 $ $3.00 $ $5.00 $ F AC Turf Establishment, TP C $1, $ $10, $ $3, $ $5, $ F CY Gravel for Trench Stabilization $50.00 $1, $47.50 $ $50.00 $1, $40.00 $ Construction Items F LS Grading Complete $ Lump Sum $10, $ Lump Sum $6, $ Lump Sum $40, $ Lump Sum $3, Pipeline Items (MH "F-B" to MH "F-C") F LF Storm Drain Pipe, 15 In. RCP, H = 1-10 $45.00 $3, $ $11, $ $8, $ $13, F LF Storm Drain Pipe, 15 In. RCP, H = $55.00 $5, $ $19, $ $13, $ $15, F LF Storm Drain Pipe, 15 In. RCP, H = $85.00 $ $ $1, $ $1, $ $1, F EA F LF F LF Storm Sewer Manhole, TP 1 (for GaDOT Std A structure) $4, $13, $6, $19, $6, $18, $5, $15, Storm Sewer Manhole, TP 1, Additional Depth, Class 1 (for GaDOT Std A structure) $ $1, $ $ $ $1, $ $1, Storm Sewer Manhole, TP 1, Additional Depth, Class 2 (for GaDOT Std A structure) $ $5, $ $5, $ $6, $ $5, Utility Relocation / Demolition / Restoration Items F SY Driveway Concrete, 6" thick $80.00 $ $52.00 $ $ $1, $70.00 $ F SY Concrete Sidewalk, 4" thick $50.00 $ $52.00 $ $ $1, $70.00 $ F LF Concrete Curb & Gutter (removal and replacement) $80.00 $ $32.50 $ $ $1, $30.00 $ F SY Class "A" Pavement (removal and replacement) $90.00 $ $62.00 $ $ $2, $70.00 $ Miscellaneous Items F LS Traffic Control $ Lump Sum $1, $ Lump Sum $2, $ Lump Sum $1, $ Lump Sum $1, F LS General Overhead, including bonds, insurance, travel expenses, sanitary facilities, independent testing, record documentation, and other overhead costs $ Lump Sum $5, $ Lump Sum $18, $ Lump Sum $5, $ Lump Sum $6, Cash Allowance (Additional Work if ordered by the Engineer): F LS Soil and Concrete Testing $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, F LS Construction Surveying $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, F LS General Engineering Allowance $ Lump Sum $5, $ Lump Sum $5, $ Lump Sum $5, $ Lump Sum $5, Project F: Bid Subtotal (Items 1-999) $59, $98, $109, $74, (f1) (f1) (f1) (f1) Worksheet: "Projects C F " 7/8
8 Allowable Construction Techniques (Pipeline between MH "F-A" and MH "F-B") Allowable Construction Technique No. 1: Cured-in-Place Pipe Rehabilitation - Or - Allowable Construction Technique No. 2: Cut-and-Cover Pipe Installation Bid Form F2(a) Items: Cured-in-Place Pipe Rehabilitation F2(a) LF Clean existing storm drain pipe, 15" $0.00 $ $11, $0.00 $0.00 F2(a) EA Storm drain pipe point repair, 15" $0.00 $3, $10, $0.00 $0.00 F2(a) LF Additional footage, storm drain pipe point repair, 15" $0.00 $ $3, $0.00 $0.00 F2(a) LF Cured-in-place pipe, 15" $0.00 $ $16, $0.00 $0.00 F2(a) LF Post-Construction CCTV Video Inspection $0.00 $30.00 $2, $0.00 $0.00 F2(a) LS Utility relocation coordination activities $ Lump Sum $ Lump Sum $7, $ Lump Sum $ Lump Sum F2(a) LS Clearing and Grubbing $ Lump Sum $ Lump Sum $4, $ Lump Sum $ Lump Sum F2(a) LS Project Demolition (for all construction activities) $ Lump Sum $ Lump Sum $8, $ Lump Sum $ Lump Sum F2(a) SY Gravel driveway $0.00 $12.00 $3, $0.00 $0.00 Subtotal of Cured-in-Place Pipe Rehabilitation Technique -- Bid Form F2(a) Items --- $68, f2(a) f2(a) f2(a) f2(a) -- Or -- Bid Form F2(b) Items: Cut-and-Cover Pipe Installation F2(b) LF Storm Drain Pipe, 15 In. RCP, H = 1-10 $45.00 $4, $ $12, $ $14, $ $9, F2(b) LS Utility relocation coordination activities $ Lump Sum $1, $ Lump Sum $7, $ Lump Sum $5, $ Lump Sum $ F2(b) LS Clearing and Grubbing $ Lump Sum $1, $ Lump Sum $4, $ Lump Sum $2, $ Lump Sum $ F2(b) LS Project Demolition (for all construction activities) $ Lump Sum $1, $ Lump Sum $28, $ Lump Sum $5, $ Lump Sum $ F2(b) SY Gravel driveway $35.00 $14, $12.00 $4, $10.00 $4, $10.00 $4, Subtotal of Cut-and-Cover Pipe Installation Technique -- Bid Form F2(b) Items $23, $58, $30, $14, f2(b) f2(b) f2(b) f2(b) Project F: Bid Total (Sum of f1 + f2) $82, $156, $139, $88, (f) (f) (f) (f) Total "Base Bid" (Projects C, D, E, & F) Pyles Plumbing & Utility Contractors, Inc. Bid $757, Complete Sitework Services, LLC Bid $1,147, Site Engineering, Inc. Bid $1,333, Kemi Construction Co., Inc. Bid $1,487, (c) + (d) + (e) +(f) (c) + (d) + (e) +(f) (c) + (d) + (e) +(f) (c) + (d) + (e) +(f) Bid Bond 10% Bid Bond 10% Bid Bond 10% Bid Bond 10% Addendum No. 1 Acknowledged Addendum No. 1 Acknowledged Addendum No. 1 Acknowledged Addendum No. 1 Acknowledged Site Visit Acknowledged Site Visit Acknowledged Site Visit Acknowledged Site Visit Acknowledged UC # UC UC # UC UC # UC UC # UC Worksheet: "Projects C F " 8/8
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationFY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationA. Structures Quantity Item Price Cost @ $3,500 EA
PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,
More informationStorm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
More informationFigure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
More informationTABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
More informationSpecial Specification 7021 Water Main and Sewer Line Replacements
Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,
More informationItem No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount
Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationRiverside County Transportation Department Summary of Bids
Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,
More informationLos Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationSTORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
More informationSUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 102.5 Bid Deposits The City of Madison bid deposit form is required for all bids unless a Biennial Bid Bond is on file or check deposit is used.
More informationFDOT Specifications List
FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...
More informationSECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
More informationDemo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts
SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required
More informationWILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
More informationSANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -
More informationStormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationStorm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More informationMONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA
MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Phone: (540) 665-5651 Fax: (540) 665-6395
More informationBMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION Section Number Title 401 GENERAL 402 AMENDMENTS TO WSWS PART I - GENERAL CONDITIONS
More informationCHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationCHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
More informationLS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
More informationOutlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
More informationFDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
More informationADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH
Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct
More informationTabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14
Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationSEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationConstruction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
More informationLocal Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
More informationADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT
ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering
More informationDIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
More informationCITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationHelen Mercury Mine EE/CA OPINION OF PROBABLE COST
G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationCity of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions
More informationPreventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
More informationOPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
More informationThe Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationNOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
More informationCITY OF COOS BAY CITY COUNCIL Agenda Staff Report
CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE August 4, 2015 AGENDA ITEM NUMBER TO: Mayor Shoji and City Councilors FROM: Aaron Real, Engineering Technician THROUGH: Jim Hossley, Public
More informationBidding and Contract Requirements:
CITY OF LAREDO, TEXAS WATER UTILITIES DEPARTMENT 24-INCH TRANSMISSION MAIN ADDENDUM 7 June 10, 2016 To Bidder of Record: The following changes, additions, and/or deletions are hereby made a part of the
More informationDESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationNew Road 11.0m Asphalt 23m ROW
New Road 11.0m Asphalt 23m ROW Granular A - 150 mm sq. m. $5.35 $69.53 Granular B - 300 mm sq. m. $7.35 $95.54 Concrete Curb and Gutter m. $44.67 $89.34 HL3 Asphalt - 40 mm sq. m. $7.66 $84.23 HL 4 or
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationAnalyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction
Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting Matt Werth General Manager PM Construction Pipebursting is the answer to many very difficult rehabilitation needs where there are almost
More informationSUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
More informationGOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline
GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos
More informationSection 600 Incidental Construction
Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...
More informationHow To Build A Road In A Townhouse
FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and
More informationSECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More informationHow to Do a Water & Sewer System Inventory - Capital Improvements Plan
Table of Contents Background, Objective and Method... 2 Capital Outlay - Water System... 3 Capital Outlay - Sewer System... 4 Summary... 4 Water Exhibit... 5 Sewer Exhibit....6 w w w. c a v a n a u g h
More informationVDOT 2001 Road and Bridge Standards Section 100 - Drainage Items
VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts
More informationVIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS
VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post
More informationINVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA
INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA Sealed Bids will be received in the office of the Orlando-Orange County Expressway Authority, 4974 ORL Tower
More informationSECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
More informationCD i -STREETS- Detail #
-STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationChapter 5: Drainage, Ditches, and Culverts
Chapter 5: Drainage, Ditches, and Culverts chapter contents Characteristics of Good Drainage 82 Elements of Good Surface Drainage 82 Crown 82 Shoulders 82 Slope 82 Ditches 83 Culverts 83 Inlets 83 Optimal
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More information550 PIPE CULVERTS, SEWERS AND DRAINS
551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid
More informationA. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
More informationSECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
More informationSECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
More informationSPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
More informationFLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
More informationSTANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA
STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA MARCH 2014 ENGINEERING DIVISION 3400 PLYMOUTH BLVD. PLYMOUTH, MN USA 55447-1482 TELEPHONE (763) 509-5500 Doran M. Cote,
More informationARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of
More informationSECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
More information1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
More informationMemorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis
Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,
More informationSTANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design
SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect
More informationCW 2130 - GRAVITY SEWERS TABLE OF CONTENTS
August 2010 CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard Details...
More informationPUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
More informationSECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride
More information3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.
To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing
More informationPreliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006
Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)
More informationSANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
More information