MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: "Projects C F Bid Math Check" 1/8

Size: px
Start display at page:

Download "MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: "Projects C F Bid Math Check" 1/8"

Transcription

1 SPLOST Drainage Projects Package Project C: Hillcrest Avenue (Hillcrest Boulevard -to- Dillon Branch) Project D: Main Street Project E: Riverside Drive (at Railroad) Project F: Riverside Drive (at 7th Street) Created: 9/1/2015 Revised: 9/2/2015 PROJECTS C, D, E, & F Project C (Hillcrest Avenue) Project C (Hillcrest Avenue): Storm Drainage Items Erosion Control Items C-1 3 EA Construct and Remove Inlet Sediment Trap $ $1, $3, $11, $ $ $ $1, C SY Temporary Grass $2.00 $1, $4.05 $2, $1.00 $ $4.00 $2, C-3 2 EA Construct and Remove Construction Exits $1, $2, $ $1, $1, $2, $1, $2, C LF Temporary Silt Fence, Type C $3.50 $ $6.00 $ $3.00 $ $5.00 $ C SY Stone Dumped Rip-Rap, TP 3, 12 In. $45.00 $14, $58.00 $18, $70.00 $22, $70.00 $22, C AC Turf Establishment, TP C $1, $ $10, $1, $3, $ $5, $ C SY Permanent Soil Reinforcement Mat, as directed by Engineer $6.00 $ $14.00 $1, $5.00 $ $10.00 $1, C-9 50 CY Gravel for Trench Stabilization $50.00 $2, $47.50 $2, $40.00 $2, $40.00 $2, C-21 1 LS Restore stream to former alignment (to protect stream bank) $ Lump Sum $2, $ Lump Sum $8, $ Lump Sum $3, $ Lump Sum $10, Construction Items C LS Grading Complete $ Lump Sum $5, $ Lump Sum $8, $ Lump Sum $50, $ Lump Sum $25, C CY Class A Concrete, GA DOT Std Headwall (Inlet and Outlet headwalls, including concrete aprons) $1, $7, $1, $8, $1, $6, $3, $19, C LB Bar Reinforcing Steel, GA DOT Std Headwall (Inlet and Outlet headwalls, including concrete aprons) $3.00 $1, $5.25 $2, $6.00 $2, $4.00 $1, C LS Outlet Headwall, incl. concrete apron (STA. 0+26) $ Lump Sum $16, $ Lump Sum $26, $ Lump Sum $12, $ Lump Sum $35, C LF Ferrous Metal Handrail, Two Pipe $69.00 $3, $ $10, $ $5, $ $8, C LS Rehabilitate 72" CMP, as identified on plans $ Lump Sum $1, $ Lump Sum $81, $ Lump Sum $10, $ Lump Sum $1, C EA Grout 72" CMP Pipe Joints (full circumference) $ $9, $ $14, $ $11, $ $16, C LF Invert Paving for 72" CMP (new or existing pipe) $46.00 $8, $ $20, $ $45, $ $21, C LF Storm Drain Pipe, 30 In. RCP, H = 1-10 $75.00 $ $ $1, $ $1, $ $1, C LF Storm Drain Pipe, 54 In. RCP, H = 1-10 $ $1, $ $1, $ $2, $ $2, C LF Storm Drain Pipe, 72 In. RCP, H = 1-10 $ $87, $ $75, $ $90, $ $180, C LF Storm Drain Pipe, 72 In. Bituminous Coated CMP, H = 1-10 $ $5, $ $7, $ $5, $ $12, C EA Drop Inlet, GP 1 (for GaDOT Std. 1019A structures) $5, $15, $6, $19, $6, $18, $7, $22, C LF Drop Inlet, GP 1, Additional Depth (for GaDOT Std. 1019A structures) $ $2, $ $ $ $1, $ $1, C EA Storm Sewer Manhole, TP 2 (for GaDOT Std A structure) $8, $34, $4, $18, $12, $48, $15, $60, C LF Storm Sewer Manhole, TP 2, Additional Depth, Class 1 (for GaDOT Std A structure) $1, $6, $ $1, $1, $4, $ $3, Worksheet: "Projects C F " 1/8

2 C LS Connect to and Re-Build existing structure (STA. 6+92) $ Lump Sum $5, $ Lump Sum $3, $ Lump Sum $10, $ Lump Sum $10, Utility Relocation / Demolition / Restoration Items C LS Utility relocation coordination activities $ Lump Sum $1, $ Lump Sum $2, $ Lump Sum $20, $ Lump Sum $39, C LF 6" DIP Class 350 Water Main $60.00 $4, $97.00 $7, $ $8, $90.00 $7, C EA 6" Gate Valve $1, $2, $ $ $1, $3, $2, $4, C Lbs DI Fittings with concrete thrust blocks $3.50 $1, $8.00 $3, $5.00 $2, $5.00 $2, C EA Connection to 6" Water Main $1, $1, $1, $1, $2, $2, $3, $3, C EA Connection to 6" Water Service $1, $1, $ $ $1, $1, $3, $3, C LS Clearing and Grubbing $ Lump Sum $3, $ Lump Sum $3, $ Lump Sum $5, $ Lump Sum $10, C LS Project Demolition (for all construction activities) $ Lump Sum $7, $ Lump Sum $7, $ Lump Sum $10, $ Lump Sum $45, C CY Flowable Fill, Class "A" Concrete, as directed by Engineer $ $1, $ $2, $ $1, $ $2, C SY Concrete Slope Paving, 4 In. $65.00 $3, $ $11, $80.00 $4, $ $5, C SY Driveway Concrete, 8" Thick $50.00 $1, $72.00 $2, $80.00 $2, $90.00 $3, C LF Concrete Curb & Gutter (removal and replacement) $40.00 $3, $32.50 $2, $60.00 $4, $30.00 $2, C SY Class "A" Pavement (removal and replacement) $75.00 $7, $62.00 $6, $ $10, $70.00 $7, Miscellaneous Items C LS Traffic Control $ Lump Sum $5, $ Lump Sum $12, $ Lump Sum $5, $ Lump Sum $15, C LS General Overhead, including bonds, insurance, travel expenses, sanitary facilities, independent testing, record documentation, and other overhead costs $ Lump Sum $7, $ Lump Sum $16, $ Lump Sum $10, $ Lump Sum $70, Cash Allowance (Additional Work if ordered by the Engineer): C LS Soil and Concrete Testing $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, C LS Construction Surveying $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, C LS General Engineering Allowance $ Lump Sum $20, $ Lump Sum $20, $ Lump Sum $20, $ Lump Sum $20, Project C: Bid Total (Items 1-999) $314, $455, $469, $709, (c) (c) (c) (c) Worksheet: "Projects C F " 2/8

3 Project D (Main Street) Project D (Main Street): Storm Drainage Items Erosion Control Items D-1 2 EA Construct and Remove Inlet Sediment Trap $ $ $3, $7, $ $ $ $1, D SY Temporary Grass $2.00 $3, $4.05 $6, $1.00 $1, $4.00 $6, D-3 2 EA Construct and Remove Construction Exits $1, $2, $2, $5, $1, $2, $1, $2, D LF Temporary Silt Fence, Type C $3.50 $1, $6.00 $1, $3.00 $ $5.00 $1, D SY Stone Dumped Rip-Rap, TP 3, 12 In. $45.00 $4, $ $11, $70.00 $7, $70.00 $7, D AC Turf Establishment, TP C $1, $ $10, $3, $2, $ $5, $1, D SY Permanent Soil Reinforcement Mat, as directed by Engineer $6.00 $1, $14.00 $3, $4.00 $ $5.00 $1, D CY Gravel for Trench Stabilization $40.00 $6, $47.50 $7, $40.00 $6, $40.00 $6, D-10 1 EA Stone Check Dam $ $ $ $ $ $ $1, $1, Construction Items D LS Grading Complete $ Lump Sum $1, $ Lump Sum $9, $ Lump Sum $50, $ Lump Sum $25, D LF Ditch Grading $15.00 $4, $35.00 $10, $30.00 $9, $25.00 $7, D CY Class A Concrete, GA DOT Std Headwall (Inlet and Outlet headwalls, including concrete aprons) $1, $6, $1, $7, $1, $5, $2, $12, D LB Bar Reinforcing Steel, GA DOT Std Headwall (Inlet and Outlet headwalls, including concrete aprons) $3.00 $1, $5.25 $1, $6.00 $2, $4.00 $1, D LS Inlet Headwall, incl. concrete apron (STA. 3+93) $ Lump Sum $16, $ Lump Sum $16, $ Lump Sum $8, $ Lump Sum $12, D LS Outlet Headwall, incl. concrete apron (STA. 4+27) $ Lump Sum $20, $ Lump Sum $16, $ Lump Sum $12, $ Lump Sum $35, D LF Ferrous Metal Handrail, Two Pipe $69.00 $5, $ $13, $ $8, $ $9, D LF Storm Drain Pipe, 18 In. RCP, H = 1-10, as directed by Engineer $35.00 $ $ $1, $ $ $ $ D LF Storm Drain Pipe, 24 In. RCP, H = 1-10 $50.00 $1, $ $3, $ $3, $ $6, D LF Storm Drain Pipe, 30 In. RCP, H = 1-10 $60.00 $2, $ $4, $ $4, $ $12, D LF Storm Drain Pipe, 48 In. RCP, H = 1-10 $ $7, $ $11, $ $14, $ $28, D EA Drop Inlet, GP 1 (for GaDOT Std. 1019A structures) $5, $5, $6, $6, $6, $6, $10, $10, D LF Drop Inlet, GP 1, Additional Depth (for GaDOT Std. 1019A structures) $ $2, $ $1, $ $2, $ $2, D EA Storm Sewer Manhole, TP 1 (for GaDOT Std A structure) $5, $10, $4, $9, $6, $12, $10, $20, D LF Storm Sewer Manhole, TP 1, Additional Depth, Class 1 (for GaDOT Std A structure) $ $2, $ $2, $ $2, $ $2, D EA Storm Sewer Manhole, TP 2 (for GaDOT Std A structure) $5, $5, $4, $4, $12, $12, $10, $10, D LF Storm Sewer Manhole, TP 2, Additional Depth, Class 2 (for GaDOT Std A structure) $ $3, $ $3, $ $4, $ $3, D EA Clean out existing drop inlet $ $ $1, $1, $1, $1, $ $ Worksheet: "Projects C F " 3/8

4 Utility Relocation / Demolition / Restoration Items D LS Utility relocation coordination activities $ Lump Sum $1, $ Lump Sum $7, $ Lump Sum $8, $ Lump Sum $10, D LF 8" DIP Class 350 Water Main $70.00 $4, $ $7, $ $7, $ $10, D EA 8" Gate Valve $1, $2, $ $1, $1, $3, $6, $13, D Lbs DI Fittings with concrete thrust blocks $3.50 $1, $8.00 $4, $6.00 $3, $4.00 $2, D EA Connection to 8" Water Main $1, $3, $1, $3, $1, $2, $4, $9, D LS Clearing and Grubbing $ Lump Sum $5, $ Lump Sum $3, $ Lump Sum $10, $ Lump Sum $10, D LS Project Demolition (for all construction activities) $ Lump Sum $3, $ Lump Sum $8, $ Lump Sum $10, $ Lump Sum $38, D LF Sanitary Sewer Main, 8" PVC (SDR 26), all depths $ $9, $ $6, $ $5, $ $5, D VF 4' Diameter Manhole $ $2, $ $5, $ $4, $ $8, D LS Lining (AGRU and epoxy) $ Lump Sum $ $ Lump Sum $3, $ Lump Sum $10, $ Lump Sum $5, D EA Manhole Ring & Cover $ $1, $ $2, $ $1, $1, $3, D LS Connections and/or bypass pumping $ Lump Sum $1, $ Lump Sum $18, $ Lump Sum $5, $ Lump Sum $9, D SY Concrete Sidewalk, 4 Inch $32.00 $4, $38.00 $5, $70.00 $9, $70.00 $9, D LF Concrete Header Curb, 6 Inch, TP 2 (Ga DOT Std. 9032B) $35.00 $5, $32.50 $4, $70.00 $10, $30.00 $4, D SY Graded Aggregate Base Course, 8 Inch, incl. material $25.00 $6, $42.50 $11, $30.00 $8, $10.00 $2, D TN Recycled Asphalt Concrete, 12.5 mm Superpave, GP1 or 2, Incl. Bitum. Matl. $ $7, $ $12, $ $12, $ $21, Miscellaneous Items D LS Traffic Control $ Lump Sum $1, $ Lump Sum $3, $ Lump Sum $15, $ Lump Sum $20, D LS General Overhead, including bonds, insurance, travel expenses, sanitary facilities, independent testing, record documentation, and other overhead costs $ Lump Sum $5, $ Lump Sum $12, $ Lump Sum $10, $ Lump Sum $35, Cash Allowance (Additional Work if ordered by the Engineer): D LS Soil and Concrete Testing $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, D LS Construction Surveying $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, $ Lump Sum $2, D LS General Engineering Allowance $ Lump Sum $10, $ Lump Sum $10, $ Lump Sum $10, $ Lump Sum $10, Project D: Bid Total (Items 1-999) $200, $308, $327, $460, (d) (d) (d) (d) Worksheet: "Projects C F " 4/8

5 Project E (Riverside Drive at Railroad) Project E (Riverside Drive at Railroad): Common Storm Drainage Items Erosion Control Items E SY Temporary Grass $2.00 $ $4.05 $ $1.00 $ $6.00 $ E LF Temporary Silt Fence, Type C $3.50 $ $6.00 $ $3.00 $ $5.00 $ E AC Turf Establishment, TP C $4, $ $10, $ $5, $ $5, $ E-9 50 CY Gravel for Trench Stabilization $50.00 $2, $47.50 $2, $50.00 $2, $40.00 $2, Common Construction Items (SDMH "E-AA1" to "E-BB1", inclusive) E LS Grading Complete $ Lump Sum $2, $ Lump Sum $8, $ Lump Sum $50, $ Lump Sum $5, E LF Storm Drain Pipe, 36 In. RCP, H = 1-10 $90.00 $13, $ $23, $ $21, $ $43, E LF Storm Drain Pipe, 36 In. RCP, H = $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A E LF Storm Drain Pipe, 36 In. RCP, H = $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A E LF Storm Drain Pipe, 36 In. RCP, H = $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A E EA Storm Sewer Manhole, TP 1 (for GaDOT Std A structure) $3, $10, $1, $4, $10, $30, $6, $18, E LF Storm Sewer Manhole, TP 1, Additional Depth, Class 1 (for GaDOT Std A structure) $ $4, $ $4, $ $4, $ $4, E LF Storm Sewer Manhole, TP 1, Additional Depth, Class 2 (for GaDOT Std A structure) $ $3, $ $4, $ $5, $ $3, Utility Relocation / Demolition / Restoration Items E LS Utility relocation coordination activities $ Lump Sum $1, $ Lump Sum $7, $ Lump Sum $10, $ Lump Sum $2, E LS Clearing and Grubbing $ Lump Sum $2, $ Lump Sum $4, $ Lump Sum $10, $ Lump Sum $2, E LS Project Demolition (for all construction activities) $ Lump Sum $2, $ Lump Sum $8, $ Lump Sum $10, $ Lump Sum $7, E CY Flowable Fill, Class "A" Concrete $ $21, $ $28, $ $20, $ $23, E SY Class "A" Pavement (removal and replacement) $65.00 $20, $62.00 $19, $ $32, $70.00 $22, Miscellaneous Items E LS Traffic Control $ Lump Sum $ $ Lump Sum $15, $ Lump Sum $5, $ Lump Sum $1, E LS General Overhead, including bonds, insurance (including railroad permit insurance requirements), travel expenses, sanitary facilities, independent testing, record documentation, and other overhead costs $ Lump Sum $7, $ Lump Sum $33, $ Lump Sum $30, $ Lump Sum $25, Cash Allowance (Additional Work if ordered by the Engineer): E LS Soil and Concrete Testing $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, E LS Construction Surveying $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, E LS General Engineering Allowance $ Lump Sum $5, $ Lump Sum $5, $ Lump Sum $5, $ Lump Sum $5, Bid Subtotal for Common Items (Items 1-999) $99, $174, $240, $170, (e common items ) (e common items ) (e common items ) (e common items ) Worksheet: "Projects C F " 5/8

6 ALTERNATE BID NO. 3: Construction & Restoration Items (Downstream of SDMH "E-BB1") E LS Grading Complete, including railroad embankment protective measures, soldier piles and/or other trench protective measures, demolition, excavation, backfilling, compaction, and miscellaneous items $ Lump Sum $7, $ Lump Sum $24, $ Lump Sum $100, $ Lump Sum $10, E LF Storm Drain Pipe, 36 In. RCP, H = 1-10 $ $4, $ $2, $ $2, $ $4, E LF Storm Drain Pipe, 36 In. RCP, H = $ $14, $ $9, $ $11, $ $16, E LF Storm Drain Pipe, 36 In. RCP, H = $ $3, $ $2, $ $8, $ $4, E LF Storm Drain Pipe, 36 In. RCP, H = $ $1, $ $1, $1, $4, $1, $4, E EA Storm Sewer Manhole, TP 1 (for GaDOT Std A structure) $6, $6, $4, $4, $12, $12, $6, $6, E LF Storm Sewer Manhole, TP 1, Additional Depth, Class 1 (for GaDOT Std A structure) $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A $ N/A E LF Storm Sewer Manhole, TP 1, Additional Depth, Class 2 (for GaDOT Std A structure) $ $8, $ $3, $ $8, $ $6, E LF Storm Sewer Manhole, TP 1, Additional Depth, Class 3 (for existing structure) $ $3, $ $1, $1, $6, $ $3, E EA Manhole Ring & Cover (for existing structure) $ $ $ $ $ $ $1, $1, E SY Concrete Sidewalk, 6 Inch $ $12, $67.00 $3, $70.00 $3, $70.00 $3, Subtotal of ALTERNATE BID NO. 3 Items (Downstream of SDMH "E-BB1") $60, $53, $156, $58, (e alt. 3 items ) (e alt. 3 items ) (e alt. 3 items ) (e alt. 3 items ) Project E: Bid Total (Common Bid Items + Alt. Bid Items) $160, $227, $396, $228, (e) (e) (e) (e) Worksheet: "Projects C F " 6/8

7 Project F (Riverside Drive at 7th Street) Project F (Riverside Drive at 7th Street): Storm Drainage Items Erosion Control Items F SY Temporary Grass $2.00 $ $4.05 $ $1.00 $ $5.00 $1, F LF Temporary Silt Fence, Type C $3.50 $ $6.00 $ $3.00 $ $5.00 $ F AC Turf Establishment, TP C $1, $ $10, $ $3, $ $5, $ F CY Gravel for Trench Stabilization $50.00 $1, $47.50 $ $50.00 $1, $40.00 $ Construction Items F LS Grading Complete $ Lump Sum $10, $ Lump Sum $6, $ Lump Sum $40, $ Lump Sum $3, Pipeline Items (MH "F-B" to MH "F-C") F LF Storm Drain Pipe, 15 In. RCP, H = 1-10 $45.00 $3, $ $11, $ $8, $ $13, F LF Storm Drain Pipe, 15 In. RCP, H = $55.00 $5, $ $19, $ $13, $ $15, F LF Storm Drain Pipe, 15 In. RCP, H = $85.00 $ $ $1, $ $1, $ $1, F EA F LF F LF Storm Sewer Manhole, TP 1 (for GaDOT Std A structure) $4, $13, $6, $19, $6, $18, $5, $15, Storm Sewer Manhole, TP 1, Additional Depth, Class 1 (for GaDOT Std A structure) $ $1, $ $ $ $1, $ $1, Storm Sewer Manhole, TP 1, Additional Depth, Class 2 (for GaDOT Std A structure) $ $5, $ $5, $ $6, $ $5, Utility Relocation / Demolition / Restoration Items F SY Driveway Concrete, 6" thick $80.00 $ $52.00 $ $ $1, $70.00 $ F SY Concrete Sidewalk, 4" thick $50.00 $ $52.00 $ $ $1, $70.00 $ F LF Concrete Curb & Gutter (removal and replacement) $80.00 $ $32.50 $ $ $1, $30.00 $ F SY Class "A" Pavement (removal and replacement) $90.00 $ $62.00 $ $ $2, $70.00 $ Miscellaneous Items F LS Traffic Control $ Lump Sum $1, $ Lump Sum $2, $ Lump Sum $1, $ Lump Sum $1, F LS General Overhead, including bonds, insurance, travel expenses, sanitary facilities, independent testing, record documentation, and other overhead costs $ Lump Sum $5, $ Lump Sum $18, $ Lump Sum $5, $ Lump Sum $6, Cash Allowance (Additional Work if ordered by the Engineer): F LS Soil and Concrete Testing $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, F LS Construction Surveying $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, $ Lump Sum $1, F LS General Engineering Allowance $ Lump Sum $5, $ Lump Sum $5, $ Lump Sum $5, $ Lump Sum $5, Project F: Bid Subtotal (Items 1-999) $59, $98, $109, $74, (f1) (f1) (f1) (f1) Worksheet: "Projects C F " 7/8

8 Allowable Construction Techniques (Pipeline between MH "F-A" and MH "F-B") Allowable Construction Technique No. 1: Cured-in-Place Pipe Rehabilitation - Or - Allowable Construction Technique No. 2: Cut-and-Cover Pipe Installation Bid Form F2(a) Items: Cured-in-Place Pipe Rehabilitation F2(a) LF Clean existing storm drain pipe, 15" $0.00 $ $11, $0.00 $0.00 F2(a) EA Storm drain pipe point repair, 15" $0.00 $3, $10, $0.00 $0.00 F2(a) LF Additional footage, storm drain pipe point repair, 15" $0.00 $ $3, $0.00 $0.00 F2(a) LF Cured-in-place pipe, 15" $0.00 $ $16, $0.00 $0.00 F2(a) LF Post-Construction CCTV Video Inspection $0.00 $30.00 $2, $0.00 $0.00 F2(a) LS Utility relocation coordination activities $ Lump Sum $ Lump Sum $7, $ Lump Sum $ Lump Sum F2(a) LS Clearing and Grubbing $ Lump Sum $ Lump Sum $4, $ Lump Sum $ Lump Sum F2(a) LS Project Demolition (for all construction activities) $ Lump Sum $ Lump Sum $8, $ Lump Sum $ Lump Sum F2(a) SY Gravel driveway $0.00 $12.00 $3, $0.00 $0.00 Subtotal of Cured-in-Place Pipe Rehabilitation Technique -- Bid Form F2(a) Items --- $68, f2(a) f2(a) f2(a) f2(a) -- Or -- Bid Form F2(b) Items: Cut-and-Cover Pipe Installation F2(b) LF Storm Drain Pipe, 15 In. RCP, H = 1-10 $45.00 $4, $ $12, $ $14, $ $9, F2(b) LS Utility relocation coordination activities $ Lump Sum $1, $ Lump Sum $7, $ Lump Sum $5, $ Lump Sum $ F2(b) LS Clearing and Grubbing $ Lump Sum $1, $ Lump Sum $4, $ Lump Sum $2, $ Lump Sum $ F2(b) LS Project Demolition (for all construction activities) $ Lump Sum $1, $ Lump Sum $28, $ Lump Sum $5, $ Lump Sum $ F2(b) SY Gravel driveway $35.00 $14, $12.00 $4, $10.00 $4, $10.00 $4, Subtotal of Cut-and-Cover Pipe Installation Technique -- Bid Form F2(b) Items $23, $58, $30, $14, f2(b) f2(b) f2(b) f2(b) Project F: Bid Total (Sum of f1 + f2) $82, $156, $139, $88, (f) (f) (f) (f) Total "Base Bid" (Projects C, D, E, & F) Pyles Plumbing & Utility Contractors, Inc. Bid $757, Complete Sitework Services, LLC Bid $1,147, Site Engineering, Inc. Bid $1,333, Kemi Construction Co., Inc. Bid $1,487, (c) + (d) + (e) +(f) (c) + (d) + (e) +(f) (c) + (d) + (e) +(f) (c) + (d) + (e) +(f) Bid Bond 10% Bid Bond 10% Bid Bond 10% Bid Bond 10% Addendum No. 1 Acknowledged Addendum No. 1 Acknowledged Addendum No. 1 Acknowledged Addendum No. 1 Acknowledged Site Visit Acknowledged Site Visit Acknowledged Site Visit Acknowledged Site Visit Acknowledged UC # UC UC # UC UC # UC UC # UC Worksheet: "Projects C F " 8/8

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

A. Structures Quantity Item Price Cost @ $3,500 EA

A. Structures Quantity Item Price Cost @ $3,500 EA PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

Figure 3 Pipe Cracking

Figure 3 Pipe Cracking The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 102.5 Bid Deposits The City of Madison bid deposit form is required for all bids unless a Biennial Bid Bond is on file or check deposit is used.

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Phone: (540) 665-5651 Fax: (540) 665-6395

More information

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION Section Number Title 401 GENERAL 402 AMENDMENTS TO WSWS PART I - GENERAL CONDITIONS

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

CHAPTER 5. Storm Sewer

CHAPTER 5. Storm Sewer CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

Local Road Assessment and Improvement Drainage Manual

Local Road Assessment and Improvement Drainage Manual Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University

More information

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

Preventing Storm Water Pollution: What We Can Do

Preventing Storm Water Pollution: What We Can Do Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE August 4, 2015 AGENDA ITEM NUMBER TO: Mayor Shoji and City Councilors FROM: Aaron Real, Engineering Technician THROUGH: Jim Hossley, Public

More information

Bidding and Contract Requirements:

Bidding and Contract Requirements: CITY OF LAREDO, TEXAS WATER UTILITIES DEPARTMENT 24-INCH TRANSMISSION MAIN ADDENDUM 7 June 10, 2016 To Bidder of Record: The following changes, additions, and/or deletions are hereby made a part of the

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

New Road 11.0m Asphalt 23m ROW

New Road 11.0m Asphalt 23m ROW New Road 11.0m Asphalt 23m ROW Granular A - 150 mm sq. m. $5.35 $69.53 Granular B - 300 mm sq. m. $7.35 $95.54 Concrete Curb and Gutter m. $44.67 $89.34 HL3 Asphalt - 40 mm sq. m. $7.66 $84.23 HL 4 or

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting Matt Werth General Manager PM Construction Pipebursting is the answer to many very difficult rehabilitation needs where there are almost

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos

More information

Section 600 Incidental Construction

Section 600 Incidental Construction Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...

More information

How To Build A Road In A Townhouse

How To Build A Road In A Townhouse FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

How to Do a Water & Sewer System Inventory - Capital Improvements Plan

How to Do a Water & Sewer System Inventory - Capital Improvements Plan Table of Contents Background, Objective and Method... 2 Capital Outlay - Water System... 3 Capital Outlay - Sewer System... 4 Summary... 4 Water Exhibit... 5 Sewer Exhibit....6 w w w. c a v a n a u g h

More information

VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items

VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts

More information

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post

More information

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA Sealed Bids will be received in the office of the Orlando-Orange County Expressway Authority, 4974 ORL Tower

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

CD i -STREETS- Detail #

CD i -STREETS- Detail # -STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Chapter 5: Drainage, Ditches, and Culverts

Chapter 5: Drainage, Ditches, and Culverts Chapter 5: Drainage, Ditches, and Culverts chapter contents Characteristics of Good Drainage 82 Elements of Good Surface Drainage 82 Crown 82 Shoulders 82 Slope 82 Ditches 83 Culverts 83 Inlets 83 Optimal

More information

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection for Construction Sites (1060) Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain

More information

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

550 PIPE CULVERTS, SEWERS AND DRAINS

550 PIPE CULVERTS, SEWERS AND DRAINS 551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA

STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA MARCH 2014 ENGINEERING DIVISION 3400 PLYMOUTH BLVD. PLYMOUTH, MN USA 55447-1482 TELEPHONE (763) 509-5500 Doran M. Cote,

More information

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of

More information

SECTION 7- STORM SEWER

SECTION 7- STORM SEWER SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...

More information

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP 5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'

More information

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,

More information

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect

More information

CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS

CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS August 2010 CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard Details...

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information