1 ISSUE DATE: October 16, 2015 REQUEST FOR EXPRESSIONS OF INTEREST (RFEI) TO DESIGN AND BUILD A SOUNDER COMMUTER RAIL MAINTENANCE BASE, AND MAINTAIN SOUNDER COMMUTER RAIL ROLLING STOCK 1. Introduction, Intent and Purpose of the RFEI Sound Transit is requesting Expressions of Interest (EOI) from designers, construction contractors and rolling stock maintenance service providers to gauge interest in proposing on the design and construction of a new Sounder Commuter Rail Maintenance Base, and Maintenance Services for Commuter Rail Rolling Stock. Sound Transit is currently evaluating three project delivery methods: Design-Bid-Build (DBB), Design-Build (DB), and Design-Build-Operate-Maintain (DBOM). Sound Transit may meet with or schedule calls with one or more of the respondents to clarify responses or receive feedback on delivery strategies. This is not a solicitation. Responses to this RFEI are not offers and will not form a binding contract between Sound Transit and the Respondent. 1.1 Background Sounder Commuter Rail has been in operation since September 2000, operating diesel-powered locomotives and bi-level push-pull passenger rail cars. Sounder primarily serves business commuters traveling from as far as Lakewood on the south end and Everett on the north end of the Central Puget Sound service area to and from Seattle (Monday through Friday). In addition, Sounder provides weekend service to special events. BNSF Railway, owner of the railway between Everett and Tacoma, provides crews for the service and dispatching of trains for the entire Sounder operation. Sound Transit owns the railway from Tacoma, through Lakewood, to Nisqually. Sounder s fleet consists of 14 locomotives, 40 coaches, and 18 cab cars with 9 more cab cars on order, scheduled to arrive in late All vehicles are currently maintained by Amtrak at their Holgate Yard in Seattle during the day with overnight storage for the four North-line trains in Everett and the six Southline trains in Lakewood. A seventh south-line train will be added in South-line commuter service operates six 7-car trains and offers ten daily round trips between Seattle and Tacoma with six daily round trips to Lakewood. Three additional round trips are planned, including a mid-day train, for implementation by late 2017 for a total of seven 7-car train sets. North-line Sounder service offers four 2 and 3-car train sets for daily round trips between Everett and Seattle. There are no service additions scheduled for the North-line. Attachment A contains a map of the Sounder service corridor. RI
2 In 2008, voters approved expansion of Sounder service, increasing the number of round trips and capacity of each train, moving from7-car train sets to 8-car train sets. Sound Transit plans to implement this expansion. Due to the significant growth in ridership over recent years--40% in five years--sound Transit plans to seek voter approval to expand Sounder facilities to accommodate 10-car train sets for the south corridor. Both of these expansions will require the purchase of more rail rolling stock. 1.2 Definitions DBB (Design Bid Build) procurement/delivery method consisting of three contracts with Sound Transit for: 1) Design of maintenance base, consisting of yard and shop; 2) Construction of maintenance base; 3) Maintenance of Sounder Commuter Rail rolling stock fleet of locomotives and cab/coach cars in Lakewood and Everett. DB (Design - Build) procurement/delivery method consisting of two contracts with Sound Transit for: 1) Design and construction of maintenance base, consisting of yard and shop; 2) Maintenance of Sounder Commuter Rail fleet of locomotives and cab/coach cars in Lakewood and Everett. DBOM (Design Build Operate - Maintain) procurement/delivery method consisting of one contract with Sound Transit for: 1) Design and construction of maintenance yard and shop, and operation of the maintenance base, maintaining the Sounder Commuter Rail fleet of locomotives and cab/coach cars. This contract will also include the maintenance of the facility. RI
3 2. Project Requirements 2.1 Maintenance Shop Design and Construction Requirements The new facility will be on approximately a 15 acre site and consist of a shop with a footprint of approximately 37,000 square feet. Facility elements include: Offices Locomotive and coach service bays Truck drop table 35 ton cranes Lube/compressor room Parts storeroom Health and welfare facilities such as restrooms, locker rooms, and a lunchroom kitchenette Electrical substation Hazardous material shed and waste storage Parking lot Track shop lead and shop tracks* A reconfigured access drive off of Steilacoom Boulevard Supporting facilities, such as roadway, site lighting, drainage facilities, landscaping and utility infrastructure Existing Lakewood facilities will include: Access roads Head-end power outlets Illumination Utilities (dry fire line, electrical duct bank, water line, sewer line, and communication lines) 3600 square foot Train and Engineer Crew Building and associated facilities such as parking, drainage, landscaping and building systems Yard Air Compressor Building Layover tracks* Guard booths 1500 square foot storage building Existing Everett facilities currently include: Stub track for four train sets* Toilet dump capabilities Wayside power Compressed air, water supply, and associated utilities Small office building to accommodate train and maintenance crews *All track would be maintained under a separate Sound Transit contract. The facility contractor may be responsible for all embedded shop track. See optional scopes of work under Section 2.3. RI
4 A conceptual drawing of the Lakewood Yard and Shop is shown in Attachment B. 2.2 Rolling Stock Maintenance Service Requirements The selected rolling stock maintenance service provider will be responsible for performing all Federal Railroad Administration (FRA) required maintenance for the entire Commuter Rail fleet which includes rolling stock stored at Sound Transit s Lakewood and Everett facilities. Additional scopes of work will include light overhaul work, such as truck changes, head-end power (HEP) changes, and HVAC service. Currently Amtrak does all of the rolling stock maintenance of the entire Sounder fleet at their Holgate Yard facility on the south side of downtown Seattle. They also provide contract maintenance and coach cleaning at the two layover facilities. Sound Transit will continue to rely on Amtrak for daytime storage at Holgate. In addition, Amtrak personnel will continue to provide Sounder with fueling, switching, sanding, coach cleaning, train washing and wheel truing under the supervision of the new rolling stock maintenance service provider. The makeup of the Sounder Commuter Rail fleet is shown below. Description Quantity In Service Locomotives, F59PHI Cab cars Coaches Locomotives, MP Cab cars Preliminary Project Schedule Sound Transit is anticipating the following schedule milestones: RFEI Responses Due November 5th, 2015 Procurement Method Decision by Sound Transit December 2015 Environmental Clearance and Federal Transit Administration (FTA) Approval December 2015 Issue Contract Solicitation 2016 Construction 2018 to 2020 RI
5 4. Submittal Responses to the information contain in Exhibit A and B is due by November 6, 2015, 12:00 pm Pacific Time. Please submit the requested RFEI materials as an attachment with the subject line Sounder Yard and Shop, and Maintenance Services to Steven Johnson, Design and Construction Contracts Analyst, steven.johnson@soundtransit.org. What should NOT be submitted in your response: Do not submit proposals or offers. Do not submit capability statement, white papers, or other company marketing materials. Do not submit request to be considered for award or to be notified of a future solicitation. Do not submit questions or comments not related to this RFEI. RI
6 ATTACHMENT A SOUNDER SERVICE CORRIDORS RI
7 ATTACHMENT B CONCEPTUAL DRAWING OF THE LAKEWOOD YARD AND SHOPS RI
8 Questions Sound Transit requests your responses to the questions using the form below. Company Name: Contact: Address Phone: # Questions Responses Design Bid Build 1 Would you prefer separate contracts for Design, Construction, and rolling stock maintenance services (Y or N)? 2 Would you submit a proposal for Rolling Stock Maintenance services as prime or sub (P or S)? 3 Would you submit a proposal for Final Design as prime or sub (P or S)? 4 Would you submit a proposal for Construction as prime or sub (P or S)? 5 As a rolling stock maintenance service provider, would you design and provide the equipment required for maintenance activities (Y or N)? Design Build Operate Maintain (DBOM) 1 Would you prefer an RFP that is for DBOM (Y or N)? 2 Would you submit a proposal for a Design-Build--Operate Maintain (DBOM) contract as prime or sub (P or S)? Design Build (DB) 1 Would you submit a proposal for a Design-Build (D-B) contract as prime or sub (P or S)? 2 Would you prefer an RFP that is for DB with a separate contract for rolling stock maintenance services (Y or N)? 3 Indicate the minimum term that would be attractive for a rolling stock maintenance contract. 4 Indicate the preferred term that would be attractive for a rolling stock maintenance contract. 5 As a rolling stock maintenance service provider, would you assist in the design of the facility during pre-construction (Y or N)? RI
9 EXHIBIT B Narrative Responses Sound Transit requests your responses to the following items on corporate letterhead. Responses to Exhibit B Questions are limited to a total of five (5) single-sided pages using 12 pt. Arial font for all questions. 1) Briefly describe your experience and role in DB contracts for similar facilities. 2) Briefly describe your experience and role in provision of rolling stock maintenance services. 3) Briefly describe your experience and role in DBOM contracts including rolling stock maintenance services. 4) What factors would influence your participation in a contract that is DBB, DB or DBOM? 5) Provide specific steps that Sound Transit could take to incentivize innovation and reduce costs, such as through an Alternative Technical Concept mechanism in the proposal process or other mechanisms the Respondent has utilized on similar projects. 6) Identify and discuss topics or issues regarding this project that Respondents believe are important to address for the DBB, DB or DBOM procurement methods. 7) Describe lessons learned from previous similar projects. RI
Table 10-1 Travel Times Between Stations 1 10. OPERATING & MAINTENANCE PLAN
10. OPERATING & MAINTENANCE PLAN This section describes an operating plan that responds directly to anticipated commuter ridership patterns. Train schedules, type and capacity of rolling stock, and likely
More informationRecommendation. Final Action
MOTION NO. M2015-90 Amend Contract for Construction Management Services for the Sounder Point Defiance Bypass, Tacoma Trestle Track and Signal, and Sounder Yard Expansion Projects MEETING: DATE: TYPE OF
More informationRESOLUTION NO. R2014-14 Baseline budget and schedule, approve Gates 4 and 5 of Phase Gate process for the Sounder Yard Expansion Project
RESOLUTION NO. R201414 Baseline budget and schedule, approve Gates 4 and 5 of Phase Gate process for the Sounder Yard Expansion Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board
More informationAASHTO RR101 Webinar Equipment
Presentation to AASHTO RR101 Webinar Equipment M. Bergeron Chief Mechanical Officer April 9, 2013 Agenda Amtrak Mechanical Department Maintenance Plan & Production Capabilities Amtrak Train 5 Bull Gulch,
More informationDoing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs
Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)
More informationLayover Facility Alternatives Analysis
Layover Facility Alternatives Analysis March 2013 Version 0 Back of cover page March 2013 South Station Expansion Massachusetts Department of Transportation Table of Contents 1. Introduction...1 1.1. Layover
More informationPART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express
PART II SCHEDULE SECTION TITLE D E Scope of Services Special Terms and Conditions 11 SECTION D SCOPE OF SERVICES D.1 OVERVIEW A. The selected firm is referred to herein as either the Consultant or the
More informationPerformance Goals and Objectives:
Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,
More informationVRE SYSTEM PLAN SUMMARY
VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial
More informationNotice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01
Notice of Public Hearing Docket B13-01 PROGRAM OF PROJECTS FOR FEDERAL FISCAL YEAR 2013 FUNDS AUTHORIZED UNDER THE MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY ACT (MAP-21) AND THE PASSENGER RAIL INVESTMENT
More informationDRAFT. Operations and Maintenance Cost Methodology Report. ST3 Regional High-Capacity Transit System Plan
ST3 Regional High-Capacity Transit System Plan Operations and Maintenance Cost Methodology Report 401 South Jackson Street Seattle, WA 98104-2826 April 2015 Operations and Maintenance Cost Methodology
More informationPreapplication for HSIPR Program OMB No. 2130 0583
U.S. Department of Transportation Federal Railroad Administration Preapplication for HSIPR Program OMB No. 2130 0583 Preapplication instructions: For each question, enter the appropriate information in
More informationSouthern California International Gateway Project Description
Southern California International Gateway Project Description Introduction This Supplemental Notice of Preparation and Initial Study is to inform Responsible, Trustee Agencies, and the public that the
More informationNY State Rail Summit Alstom Transportation Inc.
NY State Rail Summit Alstom Transportation Inc. Chuck Wochele 06/14/2010 Two main activities 19.7 Billion Euro s in Sales (2009 FY) 81,500 Employees 70 countries Power Sector 13 Billion Euro Transport
More informationHow To Expand Commuter Rail Between Worcester And Boston
AN INDEPENDENT VOICE FOR RESPONSIBLE GOVERNMENT CONNECTING THE HEART OF THE COMMONWEALTH WITH THE HUB OF THE UNIVERSE: MAKING THE CASE FOR EXPANDING COMMUTER RAIL SERVICE BETWEEN WORCESTER AND BOSTON Report
More informationFRA High-Speed Intercity Passenger Rail Program Technical Assistance Webinar. FRA Buy America and Related Requirements
FRA High-Speed Intercity Passenger Rail Program Technical Assistance Webinar FRA Buy America and Related Requirements 1 Overview Purpose Support FRA grantees and partners with technical assistance in understanding
More informationMetrolink Positive Train Control Program May 2012
Metrolink Positive Train Control Program May 2012 Metrolink s aggressive Positive Train Control (PTC) program calls for installing a back-office system, replacing the current computeraided dispatch system,
More informationSYSTEM SAFETY PROGRAM PLAN. Florida Department of Transportation District 5
SYSTEM SAFETY PROGRAM PLAN Florida Department of Transportation District 5 Draft Prepared By Revision # Date Issue / Revision Description Bombardier Rev A (O&M 9/4/13 revert to Original when no longer
More informationREQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office
REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield
More informationGOAL METHODOLOGY Overall DBE Goals For Skagit Transit For the Period:
GOAL METHODOLOGY Overall DBE Goals For Skagit Transit For the Period: October 1, 2013 - September 30, 2016 Overall Goals and Methodology Skagit Transit Federal Fiscal Years 2014-2016 Overall Goals (49
More informationAn Overview of Federal Railroad Administration Research
PHOTO: METROLINK Railroads and Research Sharing Track Crash Energy Management An Overview of Federal Railroad Administration Research The Metrolink train accident in Glendale, California, in 2005 involved
More informationClosed on All City of Buckeye Designated Holidays
CITY OF BUCKEYE Fleet Management PUBLIC WORKS DEPARTMENT DEFINITION OF FLEET MANAGEMENT SERVICES Scope of Services Available Public Works Department Fleet Management Division is an Automotive Service Excellence
More informationAccident / Incident Reporting Guidelines for Provincial Railways
Accident / Incident Reporting Guidelines for Provincial Railways 1) Reportable Railway Accident A reportable railway accident means an accident resulting directly from operation of rolling stock, where:
More informationAsset Management Systems Information
Asset Management Systems Information Required to Maintain Service Delivery and Asset State Of Good Repair Willem Ebersöhn Ph.D. Vice president Encada. LLC. Valerie Marcolongo President Encada. LLC. 4/18/2012
More informationGTA Cordon Count Program
Transportation Trends 2001-2011 Executive Summary Project No. TR12 0722 September 2013 1.0 Introduction The Cordon Count program was established to collect traffic data as a tool for measuring travel trends
More informationNOTICE OF BOARD OF DIRECTORS SPECIAL TELEPHONE MEETINGS
NOTICE OF BOARD OF DIRECTORS SPECIAL TELEPHONE MEETINGS CALL TO ORDER NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT
More informationAMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment to improve reliability, efficiency and mobility
FOR IMMEDIATE RELEASE: May 13, 2013, 5 AM ET ATK-13-039 Media Contact: Amtrak: 202 906.3860 Siemens: 917 622.2413 AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment
More information9314 JEFFERSON BLVD DALLAS, TEXAS 75211 DALLASGLOBAL.COM
9314 JEFFERSON BLVD DALLAS, TEXAS 75211 DALLASGLOBAL.COM Dallas Global Industrial Center is the most unique available industrial site in North America today at the intersection of industrial infrastructure
More informationADDING HIGH-SPEED & COMMUTER RAIL TO A SHORT LINE RR
ADDING HIGH-SPEED & COMMUTER RAIL TO A SHORT LINE RR Hamid Qaasim Sound Transit Seattle, WA Vivian Papen Sound Transit Seattle, WA Todd Popelka Sound Transit Seattle, WA Carol Doering Sound Transit Seattle,
More informationOwner s Procurement Forum
Washington Metropolitan Area Transit Authority Construction Management Association of America National Capitol Chapter Owner s Committee Owner s Procurement Forum February 24, 2015 OVERVIEW of WMATA INFRASTRUCTURE:
More informationAPEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT
PROJECT MANAGEMENT / SUPPORT Capital Cost Savings Construction Monitoring and Assistance In-Plant Production Assistance In-Plant Maintenance Assistance Procurement Assistance Project Cost Estimating o
More informationOffice of Safety and Compliance
The Federal Railroad Administration (FRA) was created by the Department of Transportation Act of 1966. It is one of ten agencies within the U.S. Department of Transportation concerned with intermodal transportation.
More informationSouthwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)
Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations
More informationLegislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
More informationHOURS OF SERVICE ACT REFERENCE MANUAL FOR EMPLOYEES DIRECTLY ENGAGED OR CONNECTED WITH THE MOVEMENT OF PASSENGER TRAINS OR ENGINES
HOURS OF SERVICE ACT REFERENCE MANUAL FOR EMPLOYEES DIRECTLY ENGAGED OR CONNECTED WITH THE MOVEMENT OF PASSENGER TRAINS OR ENGINES Revised by the System Operating Practices Department 03/26/2012 INTRODUCTION
More informationIDOT Chicago - St. Louis High-Speed Rail Program Management
1 www.idothsr.org www.connectthemidwest.com IDOT Chicago - St. Louis High-Speed Rail Program Management Lessons Learned: Sealing the Corridor For 110 MPH Operations Thomas W. Hunter Parsons Brinckerhoff
More informationRequest for Proposal No. RFP02658. Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition
Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Proposal No. RFP02658
More informationStouffville Corridor Rail Service Expansion
Stouffville Corridor Rail Service Expansion Stouffville Corridor Rail Service Expansion Class Environmental Assessment Study WELCOME PUBLIC INFORMATION CENTRE #2 Tuesday January 28, 2014 Agincourt Recreation
More informationS-11: Tacoma Link Extension to Tacoma Community College
Project Number S-11 Subarea Pierce Primary Mode Light Rail Facility Type Corridor Length 3.65 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT
More information5. Builder/Contractor Guidelines/Work Rules
Architectural Standards Committee 5. Builder/Contractor Guidelines/Work Rules 5.1 Builder/Contractor Responsibilities 5.2 Work Time and Days 5.3 Posting of Permits The builder/contractor is responsible
More informationMASSACHUSETTS BAY TRANSPORTATION AUTHORITY (MBTA) BOSTON, MASSACHUSETTS
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY (MBTA) BOSTON, MASSACHUSETTS June 2010 SOUTHAMPTON BUS FACILITY Southampton Maintenance Facility was constructed in 2005 originally designed to handle 76 buses.
More informationRequest for Proposal for Design-Build Services for Construction Package 2-3
California High-Speed Rail Program RFP No.: HSR 13-57 Request for Proposal for Design-Build Services for Construction Package 2-3 Book IV, Part D.2 Master Quality Plan Revision No. Date Description 0 04/02/2014
More informationGreen Line Extension Project Analysis of the Boston Engine Terminal for The Purposes of Siting a Light Rail Vehicle Support Facility
Analysis of the Boston Engine Terminal for The Purposes of Siting a Light Rail Vehicle Support Facility During the alternatives analysis process for the Green Line Extension project, MassDOT and the MBTA
More informationEnvironmental Impact Statement for the Washington Union Station Expansion Project
This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
More informationCentral Puget Sound Regional Transit Authority
Central Puget Sound Regional Transit Authority 2015 Financial Plan (June 2015) 2015 FINAL FINANCIAL PLAN (June 2015) TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 Financial Policies... 1 INTRODUCTION... 3 Description
More informationCity of Albany, Oregon
RFQ Attachment A DRAFT Request for Proposals City of Albany, Oregon REQUEST FOR PROPOSALS ARCHITECTURAL SERVICES FOR FIRE STATION 11 PROPOSALS DUE: SEPTEMBER 30, 2014 Fire Chief... John R. Bradner Project
More informationAdvanced Construction Techniques
Alaskan Way Viaduct Replacement Program Organization University of Washington Date October 20, 2011 Presentation Overview SR 99 south end viaduct replacement. Design-build contracting. SR 99 tunnel project.
More information[Author Name] [Type the abstract of the document here. The abstract is typically a short summary of the contentsof the document.] Utility Take-Home
[Author Name] [Type the abstract of the document here. The abstract is typically a short summary of the contentsof the document.] Utility Take-Home Vehicle Policy Example Fleet Management Approved by:
More informationAnnual PTC Progress Report 2015
Annual PTC Progress Report 2015 Capital Metropolitan Transportation Authority (CMTY) Docket No. FRA-2010-0072 March 28, 2016 Page 1 of 11 Annual PTC Progress Report CMTY Name of Railroad or Entity Subject
More informationNew Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril
New Haven Hartford Springfield Rail Project Gateway to New England Program Update July 2011 1 New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3
More informationSYSTEMWIDE REQUIREMENTS
SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a
More informationPREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS
PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS I. GENERAL A. All work to be performed under the change order must be itemized, including the work of all subcontractors. B. Items must be relevant
More informationUNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK
UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK Testimony of HERZOG TRANSIT SERVICES, INC. Tuesday April 29,
More informationREQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Part I: Proposal Information A. General Information The Berwick Area School District is soliciting proposals for construction management services
More informationSEATTLE STREETCAR FIRST HILL STREETCAR- LINK CONNECTOR PROJECT-TOTAL DEVELOPMENT BUDGET & COST ESTIMATE
FIRST HILL STREETCAR- LINK CONNECTOR PROJECT-TOTAL DEVELOPMENT BUDGET & COST ESTIMATE INTRODUCTION The Total Development Cost Estimate identifies the estimated cost of all phases of development of the
More informationOCCUPATIONAL SAFETY AND HEALTH ACT
OCCUPATIONAL SAFETY AND HEALTH ACT The general duty of an employer under OSHA requires that a worker be provided a place of employment which is "free from recognized hazards that are causing or are likely
More informationContract No. E22PS02 DOCUMENT CONTROL PLAN (DCP) For PRELIMINARY ENGINEERING AND DESIGN/BUIILD PROCUREMENT
Contract No. E22PS02 (DCP) For PRELIMINARY ENGINEERING AND DESIGN/BUIILD PROCUREMENT Prepared By: Paul Eckler Date Project Controls Lead Karen Arpino-Shaffer Deputy Program Manager Date Michael J. McBride,
More informationInternal Safety Audit Criteria MASTER LIST OF PROGRAM ELEMENTS
Internal Safety Audit Criteria MASTER LIST OF PROGRAM ELEMENTS 1.POLICY STATEMENT & AUTHORITY 1.1 Plan approved and policy statement signed by current CEO/President/GM/Board 1.2 Authority and responsibility
More informationFISCAL YEAR 2013 / WORK PLAN
work plan City of Eugene Central Services Department Facility Management Division FISCAL YEAR 2013 / WORK PLAN City of Eugene Central Services Department Facility Management Division 210 Cheshire Avenue
More informationImpact of Reliability Centered Maintenance Program
Impact of Reliability Centered Maintenance Program Long Island Rail Road & Metro-North Railroad Maintenance of Equipment 1 Objective Describe the success of the MNR/LIRR Reliability Centered Maintenance
More informationFLORIDA HIGH SPEED RAIL UPDATE. Presented by:
FLORIDA HIGH SPEED RAIL UPDATE Presented by: AGENDA Florida HSR Update Federal Railroad Approvals Florida HSR Program Overview Phase 1 Tampa Orlando Current Activities 2 FRA Approvals Jan 28, 2010: President
More informationREQUEST for PROPOSALS. Scheduling and Dispatch Software. City of Ionia Dial-A-Ride (IDART) 251 E. Adams Street Ionia, Michigan 48846.
REQUEST for PROPOSALS Scheduling and Dispatch Software City of Ionia Dial-A-Ride (IDART) 251 E. Adams Street Ionia, Michigan 48846 Proposals Due: November 18, 2013 12:00 p.m. Table of Contents PART I Instructions
More informationTable of Contents. 3. The Lessons... 19
Table of Contents Executive Summary... 3 Lessons Learned... 4 FasTracks Program Background... 5 FasTracks 2009 Lessons Learned Master Contact List... 7 Planning/Environmental Studies... 8 1. Overview...
More informationLondon Transit Commission 2015-2018 Asset Management Plan
London Transit Commission 2015-2018 Asset Management Plan Appendix B Asset Management Plan Table of Contents Asset Management Plan and 2015-2018 Business Plan... 1 Asset Management Plan Introduction...
More informationTOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES
TOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES The Town of Farmington Department of Public Works is seeking proposals for the purpose
More information2012 King County Metro Transit Peer Agency Comparison on Performance Measures
2012 Peer Agency Comparison on Performance Measures Department of Transportation Metro Transit Division King Street Center, KSC-TR-0415 201 S. Jackson St Seattle, WA 98104 206-553-3000 TTY Relay: 711 www.kingcounty.gov/metro
More informationCITY OF MILTON REQUEST FOR PROPOSAL #09-001-ITS
CITY OF MILTON REQUEST FOR PROPOSAL #09-001-ITS to provide INFORMATION TECHNOLOGY SUPPORT SERVICES Issued: November 2, 2009 Submit completed application to: City of Milton 1000 Laurel Street Milton, WA
More informationOperations and Maintenance Quantities and Costs LRT
LYNX Blue Line Extension (Northeast Corridor) Light Rail Project Contract #: 08-477 WBS #: 5.05 Operations and Maintenance Quantities and Costs LRT Prepared by: 1000 W. Morehead Street, Suite 200 Charlotte,
More informationRequest for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital
Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital June 21, 2007 The Grossmont Healthcare District (GHD) will accept proposals for Architectural and Engineering
More informationRisk Management in the Development of a Penta-P Project
Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don
More informationGROWTH & INVESTMENT PLAN. September, 2007
GROWTH & INVESTMENT LAN September, 2007 GROWTH & INVESTMENT LAN Overview 1. Setting the Context (pp. 3-10) Benefits of Growth and Investment in MARC Service Objectives Existing Service Major Assumptions
More informationCommuter Rail Vehicle Cleaning Services Question/Answer Pre-Bid Session Dec. 4, 2015
Commuter Rail Vehicle Cleaning Services Question/Answer Pre-Bid Session Dec. 4, 2015 How long are the vehicles? Each vehicle is 85 feet long. Each married pair (two trains connected) is 170 feet long.
More informationOperations Committee Minutes
Minutes September 09, 2015 Attending Committee Members: Jeff Hawker Matt Bell Bret Millburn Missing Committee Members: Other Board Members Present: Robert McKinley Michael Romero Attending Staff: Jerry
More informationWilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
More informationRequest for Proposal for Construction Management Services
Request for Proposal for Construction Management Services Moorhead Area Public Schools is soliciting Construction Management Agent of the Owner (CMa) proposals for the construction of a new K-4 elementary
More information9 th Annual Downtown Elmira Street Painting Festival Saturday, July 9th and Sunday, July 10th, 2016
9 th Annual Downtown Elmira Street Painting Festival Saturday, July 9th and Sunday, July 10th, 2016 Food Vendor Application & Information The Elmira Street Painting Festival is fast becoming Downtown Elmira
More informationLessons Learned/Best Practices: Case Study- Design-Build at SFO
Lessons Learned/Best Practices: Case Study- Design-Build at SFO Speaker(s): Clay Paslay Moderator Ivar Satero, SFO Steven Rule, Turner Bill Hooper, Jr., Gensler SFO s Delivery Options SELECTION TYPES Price
More informationDECEMBER 10, 2014 FINAL AGENDA PUBLIC COMMENTS ON AGENDA ITEMS AND OTHER MATTERS
NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT MORRIS, INC. REGULARLY SCHEDULED BOARD OF DIRECTORS MEETINGS CALL TO ORDER
More informationCapital Improvement at Tampa International Airport Underway
SUMMER 2015 A PUBLICATION BY LEA+ELLIOTT TRANSPORTATION CONSULTANTS Capital Improvement at Tampa International Airport Underway Rendering of the future APM station at Tampa International Airport s Main
More informationWhy NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs
457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS THE NEC IS THE BUSIEST RAIL CORRIDOR IN THE NATION, AND IS VITAL TO THE ECONOMY AND CITIES OF THE NORTHEAST. Why NEC FUTURE? The Northeast United
More informationATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001)
ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) INTRODUCTION To supplement and expand its understanding of available fixed guideway transit system vehicle
More informationInitiate Rail Yard Infrastructure Rehabilitation Project
Planning, Development and Real Estate Committee Board Action Item VI-D September 10, 2009 Initiate Rail Yard Infrastructure Rehabilitation Project Washington Metropolitan Area Transit Authority Board Action/Information
More informationExperts in Rail Maintenance and Infrastructure
Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail
More informationConnecticut s Bold Vision for a Transportation Future
Connecticut s Bold Vision for a Transportation Future 1 Governor s Proposal: Presents bold vision Based on: technical analyses & public outreach done as part of TransformCT o 18-month strategic planning
More informationBid Package #: 2014-01-17
Bid Solicitation Bid Package #: 2014-01-17 o HVAC o Plumbing TABLE OF CONTENTS DESCRIPTION PAGES SECTION 1: BID CRITERIA...2 Subsection I General Bid Criteria 2 Subsection II General Scope Criteria 3 Subsection
More information2012 BIM Guidelines and Standards (Rev. 00) University at Albany
A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested
More informationCity of Santa Ana Sustainability Accomplishments. January 2012
City of Santa Ana Sustainability Accomplishments January 2012 January 1, 2012 ENERGY American Recovery and Reinvestment Act of 2009 Energy Efficiency Conservation Block Grant Funds Santa Ana was allocated
More informationSafety and Health Office WORKPLACE SAFETY CHECKLIST
Location: Date: Inspected by: Safety and Health Office WORKPLACE SAFETY CHECKLIST WORK ENVIRONMENT Ventilation Removal of fumes and dust Temperature and humidity control Noise levels Vibration Lighting
More informationNuclear Energy. The ATLAS Railcar Project. Patrick R. Schwab. January 2016
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy The ATLAS Railcar Project Patrick R. Schwab January 2016 Outline The Need for New ATLAS Railcars
More informationThis document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.
UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract
More informationExhibit Book Metro-North Railroad Committee Meeting 3/23/2015. Table of Contents: April 26 Schedule Change - Page 2
Exhibit Book Metro-North Railroad Committee Meeting 3/23/2015 Table of Contents: April 26 Schedule Change - Page 2 Master Page # 1 of 5 - Metro-North Railroad Committee Meeting 3/23/2015 Memorandum Date:
More informationX Michael J Piselli. May 18, 2016. Dear Sir/Madam
May 18, 2016 Dear Sir/Madam Enclosed is Addendum No. 3 to SEPTA's Sealed Bid No. 16-00091-AMJP Frazer Shop Wheel Truing Supply & Install. The bid opening date and time scheduled for Thursday, May 19, 2016
More informationStorm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
More informationNevada State Museum, Carson City Collections Storage
Nevada State Museum, Carson City Collections Storage Controlling Cubic Feet Current Use Condition Agency Main Building History Collections in Basement NSM 10,111 c.f. 90 % Used Substandard Natural History
More information2010 SECURITY AWARENESS TRAINING
2010 SECURITY AWARENESS TRAINING Hazardous materials are essential to the economy of the United States and the well being of its people. They fuel our cars and trucks and locomotives, heat and cool our
More informationRequest for Qualifications for Disaster Debris Monitoring
Request for Qualifications for Disaster Debris Monitoring Franklin County invites qualified firms to respond to this request for qualifications (RFQ) by providing their qualifications and experience for
More informationLas Vegas to Los Angeles Rail Corridor Improvement Feasibility Study
Regional Transportation Commission of Southern Nevada Las Vegas to Los Angeles Rail Corridor Improvement Feasibility Study ASSESSMENT OF LAS VEGAS TERMINAL NEEDS AND ADDITIONAL RIDERSHIP/REVENUE SENSITIVITY
More informationWest Des Moines Community School District Performance Evaluation Report Support Staff
West Des Moines Community School District Performance Evaluation Report Support Staff Instructions: 1. Within 20 working days of employment or reassignment, the Supervisor will: Provide an evaluation orientation
More informationState of Good Repair Roundtable Chicago, Illinois. Asset Management Systems MBTA Approach and Lessons Learned
State of Good Repair Roundtable Chicago, Illinois Asset Management Systems MBTA Approach and Lessons Learned Eric R. Waaramaa Deputy Director of Financial Planning July 23, 2010 MBTA Profile 5 th largest
More informationREQUEST for STATEMENTS OF QUALIFICATIONS PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FOR. DESIGN of Two Parking Garages:
REQUEST for STATEMENTS OF QUALIFICATIONS PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FOR DESIGN of Two Parking Garages: 1. Expansion of Existing Bexar County Parking Garage (approx. 500 spaces) 2.
More information