Metrolink Positive Train Control Program May 2012

Size: px
Start display at page:

Download "Metrolink Positive Train Control Program May 2012"

Transcription

1 Metrolink Positive Train Control Program May 2012 Metrolink s aggressive Positive Train Control (PTC) program calls for installing a back-office system, replacing the current computeraided dispatch system, installing on-board equipment on 57 cab cars and 52 locomotives, installing stop enforcement systems at 476 wayside signals, and implementing a six-county specialized communication network to link the wayside signals, trains and centralized dispatch office. The Metrolink system operates seven routes providing 165 weekday commuter trains on more than 388 route miles through six counties in Southern California and carrying over average weekday riders. The Metrolink Operations Center is the dispatching hub for SCRRA, and handles all trains which traverse Metrolink property. This includes other passenger and freight carriers, making it one of the nation s busiest and most complex rail networks. The total number of Metrolink, Amtrak, BNSF UPRR trains dispatched on a daily basis exceeds 300. In October 2010, Metrolink procured a Vendor/Integrator (V/I) contractor to design, install and test the agency s PTC system. Given the significant challenges to implement the program, the contract s aggressive schedule has been impacted by a number of delays, including the development of the core interoperable back office server (BOS) for the major freight railroads. In addition, national industry standards for PTC messaging and product development for PTC radios have experienced challenges. As a result, the original December 2012 revenue service goal is now forecasted to be achieved by late However, steady progress is being made toward the revised completion milestone. Status of PTC Implementation: Below is the current status of some of the V/I s main system components: Metrolink formally submitted its request to the FRA to begin witnessing field validation of Metrolink s PTC database. The request marks an important milestone, as it signifies that a number of associated components are mature and ready for FRA review, including the development of test plans, the implementation of a Change & Configuration Management Plan, and the new Timetable No. 8. The draft PTC Safety Plan (PTCSP) was prepared to make the common product elements consistent with a template being developed by the Joint Rail Safety Team. The SCRRA-specific components are under review by SCRRA management prior to submitting to the FRA for informal review in July. The V/I contractor issued a purchase order for the production ITC 220 MHz radios which are expected to be delivered in July and August. The V/I contractor also participated with BNSF, UPRR, Meteorcomm and PTC 220 in radio testing that assessed radio propagation and handoffs between the different railroads. After participating in the FRA-witnessed ETMS VII brake testing in the February/March period, SCRRA again mobilized a test train and resources in preparation of ETMS VII functional testing to measure the train s response to wayside signals, dispatcher restrictions, and prove the crew authentication system. This testing is anticipated to begin the first week of June and continue through July. The installation of on-board equipment is well underway with twelve locomotives/cab cars and three hy-rails now equipped with Kit 1 hardware. A second round of pilot (prototypical) installations are being completed along with design documentation as the V/I contractor proceeds into full production installation. In order to overcome delays, plans are being developed to add additional installation crews to perform on-board installations.

2 The V/I contractor is in full testing and debugging mode as it continues its efforts to develop a new SCRRA CAD system. The system continues to face challenges as new issues are found during the testing which require additional software releases and testing. Although the V/I contractor is unlikely to meet its CAD Phase I cut-over milestone date in July, it is not anticipated that a delay would impact the overall PTC schedule. Radio Spectrum in the 220 MHz band is required to allow the wireless portion of the PTC to function. This function includes train to wayside signal links and train and signal to base station links. Although there are no updates at this time on SCRRA s acquisition of 220MHz radio spectrum and FCC licensure, SCRRA has negotiated a five-year lease of spectrum held by PTC 220 LLC. The agreement will be presented to the SCRRA Board for approval in July. Status of Related Components of PTC: Wayside Interface Unit (WIU) Installations During the period, crews completed nearly all WIU installations on the Valley, Ventura and San Gabriel Subdivisions. Prior to installing the modules, crews are programming, configuring and bench testing the WIUs. WIU installations remain ahead of successor activities on the V/I contractor s schedule. Communications Backhaul PTC project team continues to closely coordinate with the related Communications Backhaul Project for Valley, Ventura and East San Gabriel (VVSG) which has encountered a number of design and construction challenges. As a result, on a number of areas where there is overlap between the two programs, work will be performed under the PTC contract, in order to get the work completed sooner. Pomona Hardened Train Control Building A down-scoped version of the project was advertised for re-bid in April with bids due on June 8 th. Bids will be reviewed and Pre-Qualified responsible and responsive bids will be opened on June 15 th. Metrolink will be seeking Board approval in July for the award of a design/build construction contract for the TCOSF facility. Challenges: Spectrum Acquisition The planned purchase of 220MHz spectrum which began in 2009 was challenged by a third party, which may then result in impacts to the V/I system testing, acceptance and implementation of the PTC system. As the holding firm has since gone into bankruptcy, SCRRA and outside Counsel are pursuing legal remedy for both the spectrum purchase and subsequent FCC licensing process. SCRRA is developing alternative strategies should this purchase approach prove to be unsuccessful. Additionally, SCRRA is finalizing a lease agreement with the Class 1 freights regarding the shared use of frequencies that they control. PTC Radios PTC requires special radios that are being developed by Meteorcomm, a firm owned by the four largest freight railroads (BNSF, UPRR, CSX, NS). Software and hardware development delays impose potential impacts on the testing and commissioning process. To limit this risk, SCRRA has committed that prototypical radios will be available for proof of concept/pre testing and that sufficient quantities of approved and tested production radios will be available to support the V/I's implementation schedule. The review and approval of standard releases is now being submitted from the vendor for review by legal councils representing all parties involved. It is anticipated that radios will be available for initial testing on the San Gabriel Subdivison. Computer Aided Dispatch (CAD) The inability of the V/I Contractor to effectively develop the CAD software is impacting the implementation schedule and system certification. A phased installation approach is being followed to minimize

3 impacts to the PTC schedule. Continual issues arising from testing and debugging is threating the cut-over milestone for CAD Phase I however this delay is not anticipated to impact the overall PTC schedule.,. Back Office Server (BOS) In order to achieve interoperability, common standards and requirements must be developed by the ITC committee. The delay in the development in BOS software is on the critical path, resulting in overall project schedule delays. To mitigate additional impacts due to delays in the BOS development for Class 1 freight railroads, a decision has been made by SCRRA and the V/I contractor to implement BOS Version 3.2.M for Metrolink, which is built off of the core BOS and independent of additional administrative functions being developed for the freight railroads. Development of new software and Configuration Management System - Development of new software code carries inherent risks which, in spite of the best configuration management practices by the developer, will typically be released with some discrepancies or flaws ( bugs ). If these flaws are anything other than minor, the functionality of the system may be compromised and re work or re testing of system components may be necessary and could delay the system integration and acceptance testing. A defined set of practices and requirements that comply with SCRRA (and IEEE) standards are included in the V/I contract and will minimize disagreements over any impact resulting from SCRRA provided updates to system information throughout the PTC system lifecycle.

4 Positive Train Control Updated Timeline

5 PTC Funding Update In the April/May period, SCRRA s secured funding remained unchanged; $210.9 million including the $9.3 million in PTMISEA funds presented to the SCRRA Technical Advisory Committee in early April. The additional funds have been allocated to support the Pomona Campus contract re-bid and SCRRA staff, consultant, and V/I contractor staff extensions related to the schedule extension. SCRRA staff is working with the SCRRA Board of Directors on authorization to spend the PTMISEA funds. SCRRA is still concerned that additional delays out of our control may require additional costs not contemplated in our current projections. Next Steps Metrolink believes PTC is a life-saving technology and is committed to implementing PTC on our Southern California rail network in advance of the 2015 federal mandate. We would like to continue working with our Congressional, State Legislative, regulatory, freight and passenger rail partners. We request the support of our partners to be successful in the implementation of PTC. Contact: Metrolink Government Affairs Manager Patricia Torres Bruno at or brunop@scrra.net

Annual PTC Progress Report 2015

Annual PTC Progress Report 2015 Annual PTC Progress Report 2015 Capital Metropolitan Transportation Authority (CMTY) Docket No. FRA-2010-0072 March 28, 2016 Page 1 of 11 Annual PTC Progress Report CMTY Name of Railroad or Entity Subject

More information

Federal Railroad Administration Report to Congress. Positive Train Control Implementation Status, Issues, and Impacts

Federal Railroad Administration Report to Congress. Positive Train Control Implementation Status, Issues, and Impacts Federal Railroad Administration Report to Congress Positive Train Control Implementation Status, Issues, and Impacts August 2012 Contents Executive Summary... 1 1. Introductory Background... 3 1.1 System

More information

Cisco Positive Train Control: Enhancing End-to-End Rail Safety

Cisco Positive Train Control: Enhancing End-to-End Rail Safety Solution Overview Cisco Positive Train Control: Enhancing End-to-End Rail Safety What You Will Learn Positive Train Control (PTC), one of many new safety measures mandated by the U.S. Federal Government,

More information

TESTIMONY OF FRANK LONEGRO VICE PRESIDENT SERVICE DESIGN CSX TRANSPORTATION, INC. BEFORE THE U.S. SENATE

TESTIMONY OF FRANK LONEGRO VICE PRESIDENT SERVICE DESIGN CSX TRANSPORTATION, INC. BEFORE THE U.S. SENATE TESTIMONY OF FRANK LONEGRO VICE PRESIDENT SERVICE DESIGN CSX TRANSPORTATION, INC. BEFORE THE U.S. SENATE COMMITTEE ON COMMERCE, SCIENCE, AND TRANSPORTATION HEARING ON POSITIVE TRAIN CONTROL JANUARY 28,

More information

POSITIVE TRAIN CONTROL

POSITIVE TRAIN CONTROL POSITIVE TRAIN CONTROL Monthly Report CONTENTS 1. EXECUTIVE SUMMARY... 1 1.1. Project Overview... 1 1.1.1. PTC Inter-Agency Coordination... 1 1.1.2. PTC Operations and Maintenance... 2 1.2. Scope of Work

More information

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's

More information

Scalable and Reliable Communications Infrastructure For Positive Train Control (PTC) A Guide to LILEE Systems s PTC/ITCM Solutions and Services

Scalable and Reliable Communications Infrastructure For Positive Train Control (PTC) A Guide to LILEE Systems s PTC/ITCM Solutions and Services Scalable and Reliable Communications Infrastructure For Positive Train Control (PTC) A Guide to LILEE Systems s PTC/ITCM Solutions and Services Table of Contents List of Abbreviations and Acronyms....

More information

Integration of PTC and Ride Quality Data. Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier. and

Integration of PTC and Ride Quality Data. Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier. and Integration of PTC and Ride Quality Data Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier and dfuzion, Inc., rmetrix Ride Performance Assessment System Supplier The FRA mandate to implement

More information

AGREEMENT FOR MOVING OVERSIZED LOADS OVER HIGHWAY-RAIL GRADE CROSSINGS SCRRA FORM NO. 4

AGREEMENT FOR MOVING OVERSIZED LOADS OVER HIGHWAY-RAIL GRADE CROSSINGS SCRRA FORM NO. 4 AGREEMENT FOR MOVING OVERSIZED LOADS OVER HIGHWAY-RAIL GRADE CROSSINGS SCRRA FORM NO. 4 SCRRA File No. SCRRA Project/Task No. CPUC No. Subdivision Thomas Guide Page The Contractor, hereby requests permission

More information

Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety...

Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety... Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents Crossing Safety... 4 Rail Planning, Projects, and Operations... 5 Rail Safety...

More information

Risk Management in the Development of a Penta-P Project

Risk Management in the Development of a Penta-P Project Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don

More information

Experts in Rail Maintenance and Infrastructure

Experts in Rail Maintenance and Infrastructure Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail

More information

Project Management Manual. Volume 1: PM Desk Book

Project Management Manual. Volume 1: PM Desk Book Project Management Manual Volume 1: PM Desk Book Revision 0: July 15, 2011 THE PROJECT MANAGER S TEN COMMANDMENTS PROJECT MANAGERS SHALL: 1. Draft the Project Charter to define the scope, schedule, budget,

More information

Federal Communications Commission Washington, D.C. 20554

Federal Communications Commission Washington, D.C. 20554 Federal Communications Commission Washington, D.C. 20554 Brian W. Higgins Wilkinson Barker Knauer, LLP 2300 N Street, NW Washington, DC 20037-1128 DA No. 16-742 RE: National Railroad Passenger Corporation

More information

METROLINK SAFETY PEER REVIEW PANEL FINAL REPORT

METROLINK SAFETY PEER REVIEW PANEL FINAL REPORT METROLINK COMMUTER RAIL SAFETY PEER REVIEW PANEL SIX-MONTH REPORT CARD ON THE SCRRA S S PROGRESS ON THE PANEL S RECOMMENDED METROLINK ENHANCED SAFETY ACTION PLAN FINAL REPORT DECEMBER 31, 2009 Prepared

More information

Rail Automation. What is ACSES? usa.siemens.com/rail-automation

Rail Automation. What is ACSES? usa.siemens.com/rail-automation Rail Automation What is ACSES? usa.siemens.com/rail-automation What is ACSES? Siemens, a specialist in the area of US Cab Signal design, offers a carborne product that provides both Civil Speed Enforcement

More information

Monterey County Operational Area Emergency Communications System (NGEN) Project Background and Information

Monterey County Operational Area Emergency Communications System (NGEN) Project Background and Information Monterey County Operational Area Emergency Communications System (NGEN) Project Background and Information Background: The Next Generation (NGEN) Radio Project replaces the existing public safety and local

More information

b. Retain the existing maximum of 12 consecutive hours on duty.

b. Retain the existing maximum of 12 consecutive hours on duty. Federal Railroad Administration Overview, Highlights and Summary of the Rail Safety Improvement Act of 2008 (the Act) (Public Law No. 110-432, Division A, enacted Oct. 16, 2008, 122 Stat. 4848-4906) Prepared

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.

More information

TRAIN WRAPS TIMETABLE ADS TICKETS STATION POSTERS METROLINK MATTERS NEWSLETTER STATION SAMPLING WEBSITE: METROLINKTRAINS.COM

TRAIN WRAPS TIMETABLE ADS TICKETS STATION POSTERS METROLINK MATTERS NEWSLETTER STATION SAMPLING WEBSITE: METROLINKTRAINS.COM METROLINK MATTERS TIMETABLES METROLINKTRAINS.COM HOW-TO-RIDE GUIDE DESTINATION GUIDE TICKETS TRAIN WRAPS STATION POSTERS ON-BOARD BANNERS & POSTERS STATION SAMPLING ADVERTISING RATES & INFORMATION METROLINK

More information

(This page intentionally left blank.)

(This page intentionally left blank.) (This page intentionally left blank.) BROWARD COUNTY TRANSIT Information Technology (IT) Systems Plan July 26, 2013 TRANSIT INFORMATION TECHNOLOGY SYSTEMS PLAN INTRODUCTION In order to develop an appropriate

More information

Railway Age, Passenger Trains on Freight Railroads. Negotiating Insurance and Liability Issues: Constructive Solutions. October 21-22, 2008

Railway Age, Passenger Trains on Freight Railroads. Negotiating Insurance and Liability Issues: Constructive Solutions. October 21-22, 2008 Railway Age, Passenger Trains on Freight Railroads Negotiating Insurance and Liability Issues: Constructive Solutions October 21-22, 2008 Kevin M. Sheys 1 My topic today is Constructive Solutions for Negotiating

More information

DRAFT Alternatives Analysis

DRAFT Alternatives Analysis DRAFT Alternatives Analysis for the Coachella Valley-San Gorgonio Pass Corridor Rail Service Study October 12, 2015 Contents ES Executive Summary... ES-1 ES.1 Study Area... ES-1 ES.2 Purpose and Need for

More information

UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK

UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK UNITED STATES SENATE COMMITTEE ON COMMERCE, SCIENCE AND TRANSPORTATION HEARING ON THE FUTURE OF INTERCITY RAIL PASSENGER SERVICE AND AMTRAK Testimony of HERZOG TRANSIT SERVICES, INC. Tuesday April 29,

More information

Metro. Board Report. C. Authorize the Chief Executive Officer, or his designee, to negotiate and execute all agreements necessary for this action.

Metro. Board Report. C. Authorize the Chief Executive Officer, or his designee, to negotiate and execute all agreements necessary for this action. Metro Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA 23 File #: 2015-0269, Version: 1 Planning and Programming May 20,2015

More information

Office of Safety and Compliance

Office of Safety and Compliance The Federal Railroad Administration (FRA) was created by the Department of Transportation Act of 1966. It is one of ten agencies within the U.S. Department of Transportation concerned with intermodal transportation.

More information

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)

More information

Securing Wireless Access for Vehicular Environments (WAVE)

Securing Wireless Access for Vehicular Environments (WAVE) Securing Wireless Access for Vehicular Environments (WAVE) May 7, 2009 CTST, New Orleans Tim Weil CISSP/CISA Security Architect ITS Engineering Booz Allen Hamilton 0 The concept of VII started upon the

More information

Positive Train Control

Positive Train Control Positive Train Control White Paper May 2012 TRANSIT TECHNOLOGY SERIES Contents Summary!... 3 About this White Paper... 3 About The Joint Council on Transit Wireless... 3 About the Author... 3 Acknowledgements...

More information

IDOT Chicago - St. Louis High-Speed Rail Program Management

IDOT Chicago - St. Louis High-Speed Rail Program Management 1 www.idothsr.org www.connectthemidwest.com IDOT Chicago - St. Louis High-Speed Rail Program Management Lessons Learned: Sealing the Corridor For 110 MPH Operations Thomas W. Hunter Parsons Brinckerhoff

More information

Student team: Ryan P. Griswold, Thomas Lai, Chris W. Pritcher, Dong Shao

Student team: Ryan P. Griswold, Thomas Lai, Chris W. Pritcher, Dong Shao 2002 IEEE Systems and Information Design Symposium University of Virginia SYSTEMS INTEGRATION REVIEW: REQUIREMENTS TRACEABILITY, FUNCTIONAL ANALYSIS, AND DESIGN EVALUATION ON THE ILLINOIS DEPARTMENT OF

More information

Information Security Assessment and Testing Services RFQ # 28873 Questions and Answers September 8, 2014

Information Security Assessment and Testing Services RFQ # 28873 Questions and Answers September 8, 2014 QUESTIONS ANSWERS Q1 How many locations and can all locations be tested from a A1 5 locations and not all tests can be performed from a central location? central location. Q2 Connection type between location

More information

49 USC CHAPTER 211 HOURS OF SERVICE 2008 ( RSIA

49 USC CHAPTER 211 HOURS OF SERVICE 2008 ( RSIA 49 USC CHAPTER 211 HOURS OF SERVICE (as amended by the Rail Safety Improvement Act of 2008 ( RSIA 2008 ), Public Law 110 432, signed October 16, 2008) 1 Sec. 21101. Definitions 21102. Nonapplication, exemption,

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

ARA Digital Train Radio System Functional Requirements For Australian Metropolitan Railway Operators. 19 September 2005

ARA Digital Train Radio System Functional Requirements For Australian Metropolitan Railway Operators. 19 September 2005 ARA Digital Train Radio System Functional Requirements For Australian Metropolitan Railway Operators 19 September 2005 1. General 1.1 General 1.1.1 Scope and Standard The Australian Metropolitan Railway

More information

APPLICATION FOR THE E911 RURAL COUNTY GRANT PROGRAM

APPLICATION FOR THE E911 RURAL COUNTY GRANT PROGRAM APPLICATION FOR THE E911 RURAL COUNTY GRANT PROGRAM W Form 1A, incorporated by reference in Florida Administrative Code Rule 60FF1-5.002 Rural County Grants, E911 Rural County Grant Application, effective

More information

Risk Identification and Mitigation

Risk Identification and Mitigation California High- Speed Rail Authority Revised 2012 Business Plan Chapter 8 Risk Identification and Mitigation Introduction Undertaking a program as large as the California high-speed rail (HSR) system

More information

Enhancing Railroad Hazardous Materials Transportation Safety Rail Routing

Enhancing Railroad Hazardous Materials Transportation Safety Rail Routing Enhancing Railroad Hazardous Materials Transportation Safety Rail Routing Kevin R. Blackwell Radioactive Materials Program Manager Hazardous Materials Division Federal Railroad Administration Presentation

More information

Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015

Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015 Title: Integrating Management of Truck and Rail Systems in LA Project Number: 3.1a Year: 2013-2017 INTERIM REPORT August 2015 Principal Investigator Maged Dessouky Researcher Lunce Fu MetroFreight Center

More information

Around 33 million journeys are currently made on Metrolink every year. This is forecast to increase to 44 million journeys by 2019.

Around 33 million journeys are currently made on Metrolink every year. This is forecast to increase to 44 million journeys by 2019. 1. Introduction Transport for Greater Manchester oversees transport and travel across Greater Manchester, home of the UK s largest regional economy outside London and a diverse population of over 2.7 million

More information

Joseph W. Luchi, Economic Development Coordinator

Joseph W. Luchi, Economic Development Coordinator NEW BUSINESS Agenda Item No. : CC Mtg.: 11/8/05 DATE: August 18, 2005 TO: FROM: Mayor and City Council Joseph W. Luchi, Economic Development Coordinator SUBJECT: PRESENTATION REGARDING FEASIBILITY STUDY

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information

U.S. System Summary: EMPIRE CORRIDOR

U.S. System Summary: EMPIRE CORRIDOR U.S. System Summary: EMPIRE CORRIDOR Empire Corridor High-Speed Rail System (Source: NYSDOT) The Empire Corridor high-speed rail system is an established high-speed rail system containing 463 miles of

More information

Memorandum. Date: 11.12.08 RE: Plans and Programs Committee

Memorandum. Date: 11.12.08 RE: Plans and Programs Committee Memorandum Date: 11.12.08 RE: Plans and Programs Committee November 18, 2008 To: From: Through: Subject: Plans and Programs Committee: Commissioners Dufty (Chair), Peskin (Vice Chair), Daly, Elsbernd,

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 13 DIVISION: Transit Services BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving Amendment #1 to Contract 2015-16 with Trapeze Software Group,

More information

SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development

SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development Draft 06162009 SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of

More information

Basic Network Design

Basic Network Design Frequency Reuse and Planning Cellular Technology enables mobile communication because they use of a complex two-way radio system between the mobile unit and the wireless network. It uses radio frequencies

More information

EXHIBIT "A" INSURANCE REQUIREMENTS FOR RIGHT OF ENTRY AGREEMENTS

EXHIBIT A INSURANCE REQUIREMENTS FOR RIGHT OF ENTRY AGREEMENTS EXHIBIT "A" INSURANCE REQUIREMENTS FOR RIGHT OF ENTRY AGREEMENTS Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to Property,

More information

FRA s Enforcement Process

FRA s Enforcement Process FRA s Enforcement Process Prepared by: Stephen N. Gordon Trial Attorney Office of Chief Counsel Federal Railroad Administration stephen.n.gordon@dot.gov (202) 493-6001 1 Summary of Discussion Topics Organizational

More information

Montgomery County Bus Rapid Transit System Information Technology Needs

Montgomery County Bus Rapid Transit System Information Technology Needs Montgomery County Bus Rapid Transit System Information Technology Needs Department of Technology Services Department of Transportation Montgomery County Government, MD 3/7/2012 2011 by Montgomery County

More information

STATE OF NORTH CAROLINA

STATE OF NORTH CAROLINA STATE OF NORTH CAROLINA INFORMATION SYSTEMS AUDIT OFFICE OF INFORMATION TECHNOLOGY SERVICES INFORMATION TECHNOLOGY GENERAL CONTROLS OCTOBER 2014 OFFICE OF THE STATE AUDITOR BETH A. WOOD, CPA STATE AUDITOR

More information

Southern California Regional Rail Authority

Southern California Regional Rail Authority Southern California Regional Rail Authority Fiscal Year 2014-15 Adopted Budget SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY FISCAL YEAR 2014-15 ADOPTED BUDGET June 15, 2014 Adopted June 27, 2014 Los Angeles

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM EMT Radio Frequency (RF) Spectrum Acquisition Strategy TM 300.03 Prepared by: Signed document on file 05 May 11_ Bradley Banks, PE, Communications Manager Checked by: Signed document

More information

Invitation for Proposal NOTICE IS HEREBY GIVEN THAT SEALED PROPOSALS ARE SOUGHT AND REQUESTED FOR THE FOLLOWING:

Invitation for Proposal NOTICE IS HEREBY GIVEN THAT SEALED PROPOSALS ARE SOUGHT AND REQUESTED FOR THE FOLLOWING: Invitation for Proposal Date: 11/09/2015 NOTICE IS HEREBY GIVEN THAT SEALED PROPOSALS ARE SOUGHT AND REQUESTED FOR THE FOLLOWING: RFP NAME: Interoperable Radio Grant Consultant Tioga County, NY request

More information

SAFETY & SECURITY NEWSLETTER

SAFETY & SECURITY NEWSLETTER NATIONAL TRANSIT DATABASE SPRING 2004 VOLUME 2 ISSUE 1 SNAP SHOT The most recent NTD data indicate that in 2003 the rates of major safety & security incidents held steady or declined for all major transit

More information

NORTH COUNTY TRANSIT DISTRICT

NORTH COUNTY TRANSIT DISTRICT NORTH COUNTY TRANSIT DISTRICT 810 Mission Avenue Oceanside, CA 92054 CONTRACTS & PROCUREMENT DEPARTMENT NORTH COUNTY TRANSIT DISTRICT CONTRACTS & PROCUREMENT DEPARTMENT 1. CONTACT INFORMATION Larry Frum

More information

An Overview of Federal Railroad Administration Research

An Overview of Federal Railroad Administration Research PHOTO: METROLINK Railroads and Research Sharing Track Crash Energy Management An Overview of Federal Railroad Administration Research The Metrolink train accident in Glendale, California, in 2005 involved

More information

CERTIFICATION, DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE GUIDELINES for BRITISH COLUMBIA COMMUTER RAILWAYS

CERTIFICATION, DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE GUIDELINES for BRITISH COLUMBIA COMMUTER RAILWAYS CERTIFICATION, DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE GUIDELINES for BRITISH COLUMBIA COMMUTER RAILWAYS Part 3 Accident/Incident Reporting for Commuter Railways NOTE: On the issuance of a minister

More information

Motorola AirDefense Network Assurance Solution. Improve WLAN reliability and reduce management cost

Motorola AirDefense Network Assurance Solution. Improve WLAN reliability and reduce management cost Motorola AirDefense Network Assurance Solution Improve WLAN reliability and reduce management cost The challenge: Ensuring wireless network performance and availability Wireless LANs help organizations

More information

ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER. Occupation Specific Technical Requirements

ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER. Occupation Specific Technical Requirements ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER Responsible for performing entry level engineering analysis, design, plan, review and inspection for small to medium projects and/or designated segments of

More information

Distinguishing Characteristics:

Distinguishing Characteristics: VENTURA COUNTY SHERIFF INVITES APPLICATIONS FOR: Sheriff's Senior Manager II - 9-1-1 Communication Center 0524SHF-14AA (GC) An Equal Opportunity Employer SALARY RANGE (approximate) $43.42 - $60.79 Hour

More information

Metro REVISED PLANNING AND PROGRAMMING COMMITTEE JANUARY 14, 2015 SUBJECT: METROLINK REHABILITATION AND RENOVATION PROGRAM

Metro REVISED PLANNING AND PROGRAMMING COMMITTEE JANUARY 14, 2015 SUBJECT: METROLINK REHABILITATION AND RENOVATION PROGRAM 21 Metro Los Angeles County One Gateway Plaza zi3.gzz.z000 ',.:, Metropolitan Transportation Authority Los Angeles, CA gooiz-z952 metro.net REVISED PLANNING AND PROGRAMMING COMMITTEE JANUARY 14, 2015 SUBJECT:

More information

Available online at www.sciencedirect.com. ScienceDirect. Procedia Technology 16 (2014 ) 186 191

Available online at www.sciencedirect.com. ScienceDirect. Procedia Technology 16 (2014 ) 186 191 Available online at www.sciencedirect.com ScienceDirect Procedia Technology 16 (2014 ) 186 191 CENTERIS 2014 - Conference on ENTERprise Information Systems / ProjMAN 2014 - International Conference on

More information

Movement Planner * System

Movement Planner * System GE Transportation Optimization Solutions Movement Planner * System Rail s breakthrough network optimization solution GE imagination at work GE Transportation a leader in transforming rail For more than

More information

Routing on Empirical Data (RED) Project

Routing on Empirical Data (RED) Project 2011 NASCIO RECOGNITION AWARD NOMINATION Nomination Category: Cross-Boundary Collaboration and Partnerships Routing on Empirical Data (RED) Project California Technology Agency Public Safety Communications

More information

English. Trapeze Rail System. www.trapezegroup.com

English. Trapeze Rail System. www.trapezegroup.com English Trapeze Rail System www.trapezegroup.com Trapeze Rail System Enabling future railway, tram and metro transport The worldwide growth in demand for travel and increasing competition between all modes

More information

Statement of Objectives. Special Notice D15PS00295 Nationwide Public Safety Broadband Network (NPSBN)

Statement of Objectives. Special Notice D15PS00295 Nationwide Public Safety Broadband Network (NPSBN) Special Notice D15PS00295 Nationwide Public Safety Broadband Network (NPSBN) 4/27/2015 C Statement of Objectives First Responder Network Authority (FirstNet) Nationwide Public Safety Broadband Network

More information

Skilled and Trained Workforce Mandates coming for School Construction. Contact your State Senator today (Sample Letter at end of message)

Skilled and Trained Workforce Mandates coming for School Construction. Contact your State Senator today (Sample Letter at end of message) Skilled and Trained Workforce Mandates coming for School Construction Contact your State Senator today (Sample Letter at end of message) Three bills this year, AB 566, 1185 and 1358 containing skilled

More information

State of South Carolina Policy Guidance and Training

State of South Carolina Policy Guidance and Training DRAFT For Discussion Purposes Only State of South Carolina Policy Guidance and Training Policy Workshop All Agencies Information Systems (IS) Acquisitions, Development, and Maintenance Policy April/May

More information

Railroad Job Vacancies Reported to the RRB June 21, 2016

Railroad Job Vacancies Reported to the RRB June 21, 2016 The following list provides information about job vacancies reported to the Railroad Retirement Board's (RRB) field offices. The list includes orders that the receiving field office does not expect to

More information

The advantages of high accuracy GIS field data collection in the Transportation Industry. MGIS Overview Sergio Hernández

The advantages of high accuracy GIS field data collection in the Transportation Industry. MGIS Overview Sergio Hernández The advantages of high accuracy GIS field data collection in the Transportation Industry. MGIS Overview Sergio Hernández The big question: Where are our assets? Where do we need improvements? WHERE? Where

More information

DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION 49 CFR PARTS 229, 234, 235, AND 236 [DOCKET NO. FRA-2006-0132, NOTICE NO

DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION 49 CFR PARTS 229, 234, 235, AND 236 [DOCKET NO. FRA-2006-0132, NOTICE NO DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION 49 CFR PARTS 229, 234, 235, AND 236 [DOCKET NO. FRA-2006-0132, NOTICE NO. 1] RIN 2130-AC03 POSITIVE TRAIN CONTROL SYSTEMS REGULATORY IMPACT

More information

Preapplication for HSIPR Program OMB No. 2130 0583

Preapplication for HSIPR Program OMB No. 2130 0583 U.S. Department of Transportation Federal Railroad Administration Preapplication for HSIPR Program OMB No. 2130 0583 Preapplication instructions: For each question, enter the appropriate information in

More information

Section 2: Overview of Wireless Broadband Networks

Section 2: Overview of Wireless Broadband Networks Section 2: Overview of Wireless Broadband Networks 2.1 Introduction to Broadband Network Elements Over the past decade, technological innovation and a motivation to deploy broadband in new, efficient ways

More information

TAVORMINA & YOUNG, L.L.P. E-NEWS MARCH 2011 USE OF ELECTRONIC DEVICES ON THE RAILROAD

TAVORMINA & YOUNG, L.L.P. E-NEWS MARCH 2011 USE OF ELECTRONIC DEVICES ON THE RAILROAD TAVORMINA & YOUNG, L.L.P. E-NEWS MARCH 2011 The new FRA regulations on Electronic Devices go into effect on March 26, 2011. The following article contains the entire regulation as well as explanatory questions

More information

CHICAGO REGION S INTEROPERABLE TRANSIT SIGNAL PRIORITY PROGRAM

CHICAGO REGION S INTEROPERABLE TRANSIT SIGNAL PRIORITY PROGRAM CHICAGO REGION S INTEROPERABLE TRANSIT SIGNAL PRIORITY PROGRAM Daryl Taavola URS Corporation 25 th Annual Transportation Research Conference May 21, 2014 Presentation Overview Background Program Update

More information

*HB0380S03* H.B. 380 3rd Sub. (Cherry) LEGISLATIVE GENERAL COUNSEL Approved for Filing: C.J. Dupont 03-09-16 7:25 PM

*HB0380S03* H.B. 380 3rd Sub. (Cherry) LEGISLATIVE GENERAL COUNSEL Approved for Filing: C.J. Dupont 03-09-16 7:25 PM LEGISLATIVE GENERAL COUNSEL Approved for Filing: C.J. Dupont 03-09-16 7:25 PM H.B. 380 3rd Sub. (Cherry) Senator Kevin T. Van Tassell proposes the following substitute bill: 1 UTAH COMMUNICATIONS AUTHORITY

More information

SOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE CHAPTER IV

SOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE CHAPTER IV Application No.: A.0-0-0 Exhibit No.: SCG Date: March, 00 Witness: Christopher R. Olmsted SOUTHERN CALIFORNIA GAS COMPANY ADVANCED METERING INFRASTRUCTURE CHAPTER IV INFORMATION SYSTEMS, APPLICATION DEVELOPMENT

More information

Table 10-1 Travel Times Between Stations 1 10. OPERATING & MAINTENANCE PLAN

Table 10-1 Travel Times Between Stations 1 10. OPERATING & MAINTENANCE PLAN 10. OPERATING & MAINTENANCE PLAN This section describes an operating plan that responds directly to anticipated commuter ridership patterns. Train schedules, type and capacity of rolling stock, and likely

More information

2011/12 ANNUAL UPDATE EXHIBIT F6. TECHNOLOGICAL NEEDS NEW and EXISTING PROJECT DESCRIPTION

2011/12 ANNUAL UPDATE EXHIBIT F6. TECHNOLOGICAL NEEDS NEW and EXISTING PROJECT DESCRIPTION County: County of Santa Clara TECHNOLOGICAL NEEDS NEW and EXISTING PROJECT DESCRIPTION Project Name: Electronic Health Record Project Number: (EHR) Select One: New Existing Completed Project (PIER) TECHNOLOGICAL

More information

Section ALTERNATIVES. 3. Alternatives

Section ALTERNATIVES. 3. Alternatives Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of

More information

SOUTH SHORE BIKES ON TRAINS STUDY BIKES ON TRAINS STUDY PROJECT SUMMARY 3/17/2015

SOUTH SHORE BIKES ON TRAINS STUDY BIKES ON TRAINS STUDY PROJECT SUMMARY 3/17/2015 SOUTH SHORE BIKES ON TRAINS STUDY Jack Eskin Northwestern Indiana Regional Planning Commission March 18, 2015 BIKES ON TRAINS STUDY Project Summary Project Team Project Context Project Scope Tasks Completed

More information

Wireless Ethernet LAN (WLAN) General 802.11a/802.11b/802.11g FAQ

Wireless Ethernet LAN (WLAN) General 802.11a/802.11b/802.11g FAQ Wireless Ethernet LAN (WLAN) General 802.11a/802.11b/802.11g FAQ Q: What is a Wireless LAN (WLAN)? Q: What are the benefits of using a WLAN instead of a wired network connection? Q: Are Intel WLAN products

More information

Arkansas Wireless Information Network

Arkansas Wireless Information Network Arkansas Wireless Information Network Report to the Joint Interim Committee on Advanced Communications and Information Technology For the period ending January 31, 2008 This report contains the following

More information

Network Certification Body

Network Certification Body Network Certification Body Scheme rules for assessment of railway projects to requirements of the Railways Interoperability Regulations as a Notified and Designated Body 1 NCB_MS_56 Contents 1 Normative

More information

Los Angeles County Metropolitan Transportation Authority Office of the Inspector General. Review of Metrolink Outsourced Service Areas

Los Angeles County Metropolitan Transportation Authority Office of the Inspector General. Review of Metrolink Outsourced Service Areas Los Angeles County Metropolitan Transportation Authority Review of Metrolink Outsourced Service Areas December 10, 2014 TABLE OF CONTENTS Page EXECUTIVE SUMMARY............. 1 OBJECTIVE, SCOPE, AND METHODOLOGY.........

More information

Questions and Responses For Vehicle Tracking System, Software & Maintenance Service T-23189

Questions and Responses For Vehicle Tracking System, Software & Maintenance Service T-23189 1.0) 1. 2.0 2.1.1 20 2. 2.0 2.1.2 20 3. 2.0 2.1.7 20 4. s and s Should the unit be MIL spec or is there a definition of extremely durable? This should be waterproof to how many atmospheres? 1. Is the purpose

More information

February 20, 2012. Proposals must be received on or before March 19, 2012. Proposals received after this date will be disqualified.

February 20, 2012. Proposals must be received on or before March 19, 2012. Proposals received after this date will be disqualified. E-Rate YEAR 15 (2012-2013) REQUEST FOR PROPOSAL Chicago Charter School Foundation / Chicago International Charter Schools (CICS) Internal Connections Reference # CICS 2012 Equipment - Quest Form 470 Application

More information

SYSTEM SAFETY PROGRAM PLAN. Florida Department of Transportation District 5

SYSTEM SAFETY PROGRAM PLAN. Florida Department of Transportation District 5 SYSTEM SAFETY PROGRAM PLAN Florida Department of Transportation District 5 Draft Prepared By Revision # Date Issue / Revision Description Bombardier Rev A (O&M 9/4/13 revert to Original when no longer

More information

ADVISORY MEMORANDUM REPORT ON DEVELOPMENT OF THE LOAN MONITORING SYSTEM ADVISORY REPORT NUMBER A1-03 FEBRUARY 23, 2001

ADVISORY MEMORANDUM REPORT ON DEVELOPMENT OF THE LOAN MONITORING SYSTEM ADVISORY REPORT NUMBER A1-03 FEBRUARY 23, 2001 ADVISORY MEMORANDUM REPORT ON DEVELOPMENT OF THE LOAN MONITORING SYSTEM ADVISORY REPORT NUMBER A1-03 FEBRUARY 23, 2001 This report may contain proprietary information subject to the provisions of 18 USC

More information

Failure-proofing Next Gen 9-1-1 Networks

Failure-proofing Next Gen 9-1-1 Networks Failure-proofing Next Gen 9-1-1 Networks A Talari Networks White Paper INSIDE Accomplishing the mandated level of network reliability as Public Safety Answering Points (PSAPs) move to VoIP, add support

More information

FloridaNOTAllAboard RESOLUTION NO. 28-15

FloridaNOTAllAboard RESOLUTION NO. 28-15 RESOLUTION NO. 28-15 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DELRAY BEACH, FLORIDA, EXPRESSING CONCERN WHETHER ALL ABOARD FLORIDA WILL HAVE AN ADVERSE IMPACT ON THE CITY; STATING THAT THE CITY

More information

Open Payment Fare Systems Save money through operational efficiencies.

Open Payment Fare Systems Save money through operational efficiencies. Open Payment Fare Systems Save money through operational efficiencies. Open Payment Fare Systems Save money and allow transit agencies to focus on their core mission. Like many businesses worldwide, transit

More information

Case Study CENTRAL FLORIDA REGIONAL TRANSIT AUTHORITY (LYNX) ORLANDO, FLORIDA. Transit Agency Profile and Reason for Selection of Transit Agency

Case Study CENTRAL FLORIDA REGIONAL TRANSIT AUTHORITY (LYNX) ORLANDO, FLORIDA. Transit Agency Profile and Reason for Selection of Transit Agency Case Study CENTRAL FLORIDA REGIONAL TRANSIT AUTHORITY (LYNX) ORLANDO, FLORIDA Transit Agency Profile and Reason for Selection of Transit Agency Overview The Central Florida Regional Transportation Authority

More information

Contact: Henry Torres, (870) 972-3033

Contact: Henry Torres, (870) 972-3033 Information & Technology Services Management & Security Principles & Procedures Executive Summary Contact: Henry Torres, (870) 972-3033 Background: The Security Task Force began a review of all procedures

More information

Radio Frequency (RF) Survey

Radio Frequency (RF) Survey Municipal Wireless Broadband and the Digital Community Report Radio Frequency (RF) Survey for the City and County of San Francisco July 21, 2006 Preface This document describes Civitium s findings and

More information

GOVERNMENT USE OF MOBILE TECHNOLOGY

GOVERNMENT USE OF MOBILE TECHNOLOGY GOVERNMENT USE OF MOBILE TECHNOLOGY Barriers, Opportunities, and Gap Analysis DECEMBER 2012 Product of the Digital Services Advisory Group and Federal Chief Information Officers Council Contents Introduction...

More information

December 21, 2012. The services being procured through the proposed amendment are Hosting Services, and Application Development and Support for CITSS.

December 21, 2012. The services being procured through the proposed amendment are Hosting Services, and Application Development and Support for CITSS. Justification for a Contract Amendment to Contract 2012-01: Interim Hosting and Jurisdiction Functionality for the Compliance Instrument Tracking System Service (CITSS) December 21, 2012 Introduction WCI,

More information

Planned Safety and Security Systems. Jon Tapping, Director of Risk Management Board Meeting: Agenda Item 4 August 4, 2015 Sacramento, CA

Planned Safety and Security Systems. Jon Tapping, Director of Risk Management Board Meeting: Agenda Item 4 August 4, 2015 Sacramento, CA Planned Safety and Security Systems Jon Tapping, Director of Risk Management Board Meeting: Agenda Item 4 August 4, 2015 Sacramento, CA HIGH-SPEED RAIL: Around the World 12 Countries with High-Speed Rail

More information

FSCJ Spectrum Information Memorandum Page 7 of 11 Attachment 1 to FSCJ ITN #2014-33 EDUCATIONAL BROADBAND SERVICE SPECTRUM INFORMATION MEMORANDUM: JACKSONVILLE, FL AND ENVIRONS April 30, 2014 Robert Finch

More information