1 UNIVERSITYOFCALICUT (Engineering Department) SUPPLYING, INSTALLING, TESTING AND COMMISSIONING OF PASSENGER LIFT AT LANGUAGE BLOCK SPECIFICATIONS and AMC Sl.No. Description Specification A 1 Description of Lift Passenger Automatic 2 No. Of Elevators 01 (MONOSPACE) 3 Type and capacity 5 Passenger 340 Kgs 4 Speed 1 m/s (GEARLESS) 5 Type of Drive V3f 6 Location of Machine room Machine-Room-Less. 7 Travel 10 Meters (Approximately) 8 No. Of Stops 03 (0,1,2) 9 Well Size 1800mm Width x 1500mm Depth 10 Available Well size 1300mm Width x 2100mm Depth 11 Power supply 415 Volts Three - Phase 50 cycles Ac 12 Auxiliary Single Phase 220 V 50 Cycles A.C 13 Car size 950mm Width x 1000 mm Depth 14 Pit Depth Head room Car enclosure Car ceiling Stainless Steel ceiling with CF Lights and fan Car Panels Stainless Steel Vandal proof finish Car Flooring PVC Flooring/Granite flooring by customer Car illumination Florescent light fittings 17 No. Of Entrance One location in front 18 Car entrance Automatic Centre Opening Doors in stainless steel vandal Proof finish with provision for mechanical opening key for emergency with full length infra red light curtains. 19 Door Safety Full length infra Red light curtain 20 Landing entrance Automatic centre opening doors in stainless steel vandal proof finish 21 Clear opening 1000mm Width x 2000 mm height 22 Controls Selective Collective Simplex 23 Car indicator D & P 7 segment 25mm Display Landing indicators D & P 7 segment 25mm Display a) Call registration by High intensity LED luminous push buttons, Two numbers for intermediate landings and single push button for terminal landings with indication for UP and DOWN direction of motion, b) Digital car position and direction indicators at all landings above the entrance with LED display in Ground floor and LED display in all other floors, c) Visual flashing indiaction on all landing for pre - arrival of car. 24 Buttons in Car All buttons in car and all landings should have Braille sign. 25 Infra red door opening system To be provide for entire length of the door
2 26 Ropes Hoisting suspension ropes shall be of steel of suitable size,construction and number as per IS and designed as per IS Part III: 2000 amended till date. Governer ropes shall be of steel. 26 Construction: Design and furnishing of car body work Stainless steel cabinet (scratch proof finish) with push to talk, emergency light, alarm, Stabilizer, LCD display in car & landing, floor announcement system with music, mirror finish ceiling, LED lights, antiskid SS flooring etc. 27 Indications in Car a) Car position b) Call indicator c) Door close/open push button d) Emergency stop button e) Flush mounted switch for fan and light f) Non stop button g) Battery operated emergency lamp with rechargeable batteries. h) Battery operated alarm bell i) Intercom wiring with one master unit with two slaves j) Fireman's switch at main lobby k) Auto attendant control (inside the car) 28 Safeties a) Over speed governor, operated safety gear b) Buffers c) Motor over load protection d) Phase reversal protection e) Other safeties as per ISS f) Single phase preventor g) Final limit switch 29 Levelling Automatic leveling at all landing as per IS 30 Guarantee Company shall carry out free maintenance during warranty period of 36 months which also includes a) Cleaning lift equipment b) Lubrication of all moving parts c) Replacing of lubricating oil when required d) Checking and adjusting contacts e) Replacing fusible item alarm etc. f) Recharging batteries in case of drain/ renewing batteries g ) Replacing /rewinding of all defective parts of the lift including motors and V3F unit. 31 Control Panel Control panel will be dust and vermin proof of sheet metal enclosure 32 Announcement System To provide lift announcement system. 33 Tests At site test as per IS to be carried out and approval from Electrical Inspectorate to be
3 submitted before Handing over. 34 SCOPE OF WORK: a) Supply of lift materials. b) Minor civil works such as construction of buffer block in the pit machine foundation in the machine room, cutting pockets and grounding brackets for the guide rails, grouting boxes for control units in the front side of the wall. c) Scaffolding d) Door frames e) Supporting Steel f) Intercom facilities with one master and two slaves. g) Battery operated Alarm. h) Obtaining Scheme approval as well as energization Certificate from the electrical Inspectorate including preparation of necessary drawing for the same. Necessary fee shall remitted to the Inspectorate by the firm for which no refund will be made from the department including taking insurance for one year as per new lift rule. i) Supply of booklet with complete details of maintenance schedule and control diagram. j) Giving training to department staff for attending trouble shooting. k) Free servicing for 36 months after handing over l) All exposed metal parts shall be properly painted with good quality paint after erection and before commissioing the lift. STANDARD FEATURES INCLUDED 1. Direction & Position indicator in Car 2. Emergency Alarm 3. Full height infra Red Door Curtain 4. Pit ladder 5. Tubular hand Rail. 6. Integral hand winding facility 7. UPS operated emergency light 8. Attended operation 9. Door open and Door close in car 10. Fan switch in car/auto Fan off. 11. Intercom. 12. Mirror on three sides of car.
4 SPECIAL FEATURES INCLUDED 1. Overload indicator with Buzzer. 2. Fireman s drive with 2 phase operation. 3. Lift Announcing System (LAS) 4. Stainless Steel Vandal Proof (Scratch Resistant) finished car interiors and landing doors at all floors. 5. Automatic Rescue Device (ARD). ANNUAL MAINTENANCE CONTRACT FOR 6 YEARS: 1 All inclusive comprehensive maintenance contract of 1 No passenger lift (13 Passenger) having a speed of 1m/sec with V3F drive serving 5 floors including repairs/replacement of all items of required excluding the following. a Main Suspension ropes b Elevator car door and landing door panels/gates c Incoming electrical wiring upto main switches in the machine room d Main switches in the machine room. The servicing shall be attended at least once in a month and the break down calls shall be attended immediately on report. The lift shall be regularly and systematically examined and put to proper condition at all times during the period of contract. Quoted Rate (in figures and words) For Ist Year - Free Service For 2nd Year - Free Service For 3rd Year - Free Service For 4th Year For 5th Year For 6th Year Declaration I/We do hereby declare that we shall carryout the comprehensive maintenance contract of the above elevators for the next 6 year as per the rates quoted in the schedule
5 Name of Bidder LIST OF APPROVED MAKES 1. Kone Elevators India Pvt Ltd 2. Schindler India Pvt Ltd 3. OTIS Elevator Company(India) Pvt Ltd 4. Thyssenkrupp Elevators (India) 5. Mitsubshi Electric 6. Hitachi Or Equivalent.
ITEM DESCRIPTION SPECIFICATION TENDER OFFER
TECHNICAL SPECIFICATIONS PL1 & PL2 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER Make (please specify) 1.0 Type Duplex Passenger Lift 2.0 Minimum
More informationSchindler 3300 AP A remarkable style that suits the building. The machine room-less passenger elevator that unifies form and function.
A remarkable style that suits the building. The machine room-less passenger elevator that unifies form and function. Schindler Passenger Elevators Key figures Capacity Travel height One- or two-sided entrance*
More informationGUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS
GUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS All Guardian Refuge and EVC Systems are BS9999 & BS5839 Pt9. 2010 compliant, and we offer our consultants assistance for BS5839, BS9999, (Fire safety
More informationDEPARTMENT OF CORRECTIONS
Elevator Consulting, LLC. Post Office Box 464 Mequon, WI 53092-0464 Voice/Fax: 262-242-3077 Mobile No: 262-853-1054 E-mail: PerformElevCons@wi.rr.com DEPARTMENT OF CORRECTIONS MILWAUKEE SECURE DETENTION
More informationSchindler 3100 Simple and practical. Our passenger elevator for small residential buildings really gets you moving.
Simple and practical. Our passenger elevator for small residential buildings really gets you moving. Schindler Passenger Elevators 2 We keep what we promise. And we promise alot. A sensible choice Are
More informationS WORK CATALOGUE FAA29100H_BWC
MACHINE ABOVE - 2, m/s BUILDER S WORK CATALOGUE FAA29100H_BWC 07-04-15 Version: a-e 800 kg 0 kg Otis Elevator Company 2007, All rights reserved MAIN 2/38 This catalogue summarizes useful information for
More informationBIHAR SCHOOL EXAMINATION BOARD (SS), PATNA TENDER DOCUMENT
BIHAR SCHOOL EXAMINATION BOARD (SS), PATNA TENDER DOCUMENT FOR SUPPLY AND INSTALLATION OF 2 PASSENGER NEW LIFT UNDER BUYBACK OF EXISTING LIFT AT BIHAR SCHOOL EXAMINATION BOARD, BUDH MARGE, PATNA Last date
More informationKONE EN81-71 CAtegory 1. Vandal Resistant Lift
KONE EN81-71 CAtegory 1 Vandal Resistant Lift Car Finishing Options: MonoSpace Standard Ceilings LF94 Doors Asturias Satin (F) Walls Stainless steel Asturias Satin (F) Flemish Linen (M) Scottish Quad (K)
More informationV1504 Vertical Platform Lift OWNER S MANUAL
V1504 Vertical Platform Lift OWNER S MANUAL (To Be Retained by Owner After Installation by Authorized Savaria Dealer) Part No. 000692 01-m03-2016 2 IMPORTANT Ensure that only an authorized Savaria Dealer
More informationV1504 Vertical Platform Lift OWNER S MANUAL
V1504 Vertical Platform Lift OWNER S MANUAL (To Be Retained by Owner After Installation by Authorized Savaria Dealer) Part No. 000692 03-m12-2013 2 IMPORTANT Ensure that only an authorized Savaria Dealer
More informationAll work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
More informationCalvert USA, Inc. Attic Stairs
Calvert USA, Inc. Attic Stairs Instructions for installation of vertical opening access stairs Model numbers: 7035 through 7047 Calvert USA, Inc., P.O. Box 841, Solomons, MD 20688, Tel. (410) 286-1430,
More informationP.A.L. S SPECIFICATIONS
PART 1- GENERAL 1.1 SCOPE To furnish all labor, materials and equipment necessary or required to complete the installation of the lift as indicated on the Drawings and Specifications. This specification
More informationThe KONE Motala 2000 platform lift suits the architecture of any building, thanks to the wide range of car and shaft design options.
A solution for making all premises accessible KONE Motala 2000 The KONE Motala 2000 platform lift suits the architecture of any building, thanks to the wide range of car and shaft design options. This
More informationSECTION 14 21 00 TRACTION ELEVATORS
SECTION 14 21 00 TRACTION ELEVATORS PART 1 GENERAL 1.01 SUMMARY A. Section includes: 1. Provide passenger and service traction elevators. 2. Due to maintenance area concerns, MRL elevators will be considered
More informationTECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)
TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) 1. Requirement: Two (02) Nos. DC Type, 3 phase, 3 wire Projection Welding Machine is required for welding of ventilation M.S. / Stainless
More informationPlanning Information. Passenger and Freight Elevators.
A company of ThyssenKrupp Elevator Thyssen Aufzüge tk This planning information will give you an overview of the most important planning criteria of passenger and freight elevators. However you should
More informationMACHINE ROOM-LESS PERFORMANCE IN A HYDRAULIC ELEVATOR HOISTWAY. KONE EcoSpace
MACHINE ROOM-LESS PERFORMANCE IN A HYDRAULIC ELEVATOR HOISTWAY KONE EcoSpace The revolutionary machine room-less elevator concept KONE s machine room-less (MRL) technology eliminates the need for a machine
More informationSECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL
SECTION 14 20 10 - FREIGHT & PARKING GARAGE PART I - GENERAL 1.1 SECTION INCLUDES [NOTE to AE: The following lists requirements that are specific to freight elevators. These requirements are in addition
More informationAssessment of Elevator and Escalator Maintenance & Repair Program Final Elevator Audit Submission Bethesda Station - Escalator A09X04 (Station)
Bethesda Station - Escalator A09X04 (Station) Ride Quality Test Results The Parametricoder is a time and displacement encoding system that measures mechanical performance characteristics on escalators.
More informationPUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE
Multilift PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: ASME A17.1 ASME A18.1 CSA B613 CSA B355-09 19-m01-2015 Part No. 000790 Copyright 2015 Savaria Corporation All rights reserved. Printed
More informationSPECIFICATIONS FOR TENDER NO: PSNR/SCP/VKS/E 1635 ANNEXURE I TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST
TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST ANNEXURE I Sl.No. Description for BHEL Requirement Offered Deviation Scope of supply, erection and commissioning: 1 The scope of this specification covers
More informationQUOTATION FOR UPGRADING OF LIFT AT BINJA SAN DAVID, TRIQ SAN DAVID, MTARFA
Housing Authority AWTORITÀ TAD-DJAR HOUSING AUTHORITY 22, Pietro Floriani Street, Floriana Telephone: (356) 22991000 Fax: (356) 21243284 E-mail: procurement.ha@ha.gov.mt Website: http://www.housingauthority.gov.mt/
More informationDisabled Toilet Alarm. Contractor Pack. Installation & Operating Instructions
Disabled Toilet Alarm Installation & Operating Contractor Pack Installation & Operating Instructions 1 Overview The Channel Safety Systems Disabled Toilet alarm contractor Packs are an efficient way of
More informationRoped Hydraulic Residential Elevator Specifications
January 1, 2004 Roped Hydraulic Residential Elevator Specifications P.O. Box 749, 5191 Stump Rd., Plumsteadville, PA 18949 Toll Free: 888-443-2800, Phone: 215-766-3380, Fax: 215-766-3385 CONTENTS Part
More informationThyssenKrupp Company Name
synergy ONE WORLD. ONE ELEVATOR. A ThyssenKrupp Elevator Company ThyssenKrupp Company Name TK 1 Nothing above. synergy is the passenger elevator without shaft head. Nothing below. synergy is the passenger
More informationProject Close Out Summary
Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As
More information-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX
-1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.
More informationOperating manual L / XL / XXL 212 Facelift
Operating manual L / XL / XXL 212 Facelift +49 (0)2058 89 80-0 www.rappold-karosserie.de info@rappold-karosserie.de 0 +49 (0)2058 89 80-0 www.rappold-karosserie.de info@rappold-karosserie.de 1 Table of
More informationService manual. Website: www.andico.com.au CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL.
Website: www.andico.com.au Service manual CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL. - ONLY FOR AUTHORISED SERVICE PERSONNEL. MODELS: MPK1-09CR-QB8 MPK1-12ER-QB6
More informationOPTIONS Living Collection and Prime Series
OPTIONS Living Collection and Prime Series 1 Content LIVING COLLECTION LIVING CL4000...4 LIVING M4000...6 LIVING C4000... 10 LIVING C7000... 13 LIVING XTR 2000... 16 LIVING XTR7000... 18 PRIME SERIES PRIME
More informationUBC Technical Guidelines Division 14 2016 Edition CONVEYING EQUIPMENT Page 1 of 1 INDEX. Section 14 40 00
UBC Technical Guidelines Division 14 2016 Edition CONVEYING EQUIPMENT Page 1 of 1 INDEX Section 14 20 00 Section 14 40 00 Elevators Lifts Page 1 of 14 1.0 GENERAL 1.1 Related UBC Guidelines.1 Division
More informationMODEL HSR-007 Direct Drive Rolling Steel
MODEL HSR-007 Direct Drive Rolling Steel 200 Fairview Road, Unit #2, Barrie, Ontario L4N 8Z8 Tel: 866-792-9968 or 705-792-9968 Fax: 705-735-9564 www.tnrdoors.com email: info@tnrdoors.com Model HSR-007
More informationTESTING AND COMMISSIONING PROCEDURE FOR LIFT, ESCALATOR AND PASSENGER CONVEYOR INSTALLATION GOVERNMENT BUILDINGS
TESTING AND COMMISSIONING PROCEDURE FOR LIFT, ESCALATOR AND PASSENGER CONVEYOR INSTALLATION IN GOVERNMENT BUILDINGS OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION 2012 EDITION ARCHITECTURAL SERVICES DEPARTMENT
More informationLocal supplier shall be ISO 9001 & OHSAS 18001 Certified Company.
VIDEO INTERCOM SYSTEM Introduction: The contractor shall supply, install, test and commission a modern Electronic Digital Open Voice Color Video Entry Phone System of an approved manufacturer and design
More informationSpetec. Laminar Flow Box. Portable Clean Room Technology
Spetec Laminar Flow Box Portable Clean Room Technology 1 Fundamentals Portable Clean Room Technology Laminar Flow The basis for the development of the clean room technology was first established in the
More informationCONTIENTS. 1. SPECIFICATIONS (mm)---------- 2 2. CAUTIONS--------------------- 3 3. INSTALLATION INSTRUCTION----- 3
CONTIENTS 2008.4 1. SPECIFICATIONS (mm)---------- 2 2. CAUTIONS--------------------- 3 3. INSTALLATION INSTRUCTION----- 3 4. PANEL LAYOUT----------------- 4 5. BUTTON FUNCTIONS------------- 5 6. OPERATING
More informationFIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.
Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's
More informationSwitch. Building technology for the real world.
Switch Building technology for the real world. S A F E S I M P L E S U S T A I N A B L E Technology that s designed to work for you. Special power requirements. Subcontractor s schedules. Frequent power
More informationLOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete.
LOADING DOCK EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Loading dock equipment of the following types: 1. Dock lifts. 2. Control stations. 1.2 RELATED SECTIONS A. Section 03100 - Concrete Forms and
More informationinstabus KNX / EIB System System E F G H
Product name: Uninterruptible power supply (USV) 640 ma Design: REG (rail-mounted device) Article-no.: 1079 00 ETS search path: Gira Giersiepen / system components / power supply / power supply 640mA DRA
More informationCold Room & Refrigeration System (Casserole Assembly) No of units: 1
Technical Specifications Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 For chiller storage of all sorts of items Chiller storage temperature: 2-5 C Provides excellent thermal efficiency
More informationEmergency Voice Communication Systems EVCS Network 8 Data Sheet
Emergency Voice Communication Systems EVCS Network 8 Data Sheet The Emergency Voice Communications System (EVCS) Network 8 is for use as a Fire Telephone system, Disabled Refuge Call system or as a combined
More informationThe Impact of the new Directive 2014/33/EU and Standard EN81-20 on New Lifts
The Impact of the new Directive 2014/33/EU and Standard EN81-20 on New Lifts Malta Lift Association Workshop Ing Ray Spiteri DMS, MBA (Brunel), B.Sc.. Mech Eng (Hons), EUR Ing, MIMechE, MASHRAE, MIAEE,
More informationLift and Escalator Installations
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-29 Lift and Escalator Installations Building Works Requirements The
More informationCITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT SUBMITTAL OF CONVEYANCE INSTALLATION/ALTERATION PLANS
Subject: SUBMITTAL OF CONVEYANCE INSTALLATION/ALTERATION PLANS Reference: Denver Fire Code Section 105.7.29 Approved: Joseph L. Gonzales, Division Chief, Fire Prevention Division Number: 105-1 Effective
More informationSchindler 5500 Efficiency. Flexibility. Performance.
Efficiency. Flexibility. Performance. Schindler Passenger Elevators Key figures Capacity 2100 lb (950 kg) to 5000 lb (2270) kg Travel height Up to 350 ft (107 m) Door width Up to 4 6 Door height Up to
More information32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw
,1'8675,$/#*(16(7 6HULHV#'9#448 32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw Generator set consisting of engine and alternator mounted
More informationDESIGN CLARIFICATION (DC)
DESIGN CLARIFICATION (DC) Owner: Victor Valley Wastewater Reclamation Authority Date: 03/03/2015 Contractor: W M Lyles Carollo Project No.: 8299A.20 Project Name: Subregional WRPs DC No.: 001 DC Title:
More informationLITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -
The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior
More informationSPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
More informationTESTING AND COMMISSIONING PROCEDURE FOR LIFT, ESCALATOR AND PASSENGER CONVEYOR INSTALLATION GOVERNMENT BUILDINGS
TESTING AND COMMISSIONING PROCEDURE FOR LIFT, ESCALATOR AND PASSENGER CONVEYOR INSTALLATION IN GOVERNMENT BUILDINGS OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION 2007 EDITION ARCHITECTURAL SERVICES DEPARTMENT
More informationACCESS AUDIT OF WESTPORT HOUSE
ACCESS AUDIT OF WESTPORT HOUSE Large sign on the highway to indicate the entrance to Purbeck District Council Large and wide entrance Entrance showing sign for opening times Entrance sign Main entrance
More informationConventional Fire Detection and Extinguishant Control System Specification
Conventional Fire Detection and Extinguishant Control System Specification Page 1 of 9 Scope Furnish a complete 24VDC Conventional, electrically supervised, combined fire detection and extinguishant release
More informationVISUAL OPTIONS, CAR AND SHAFT DIMENSIONS FOR. KONE elevators for transit centers. Versie 15-2.1 Uitvoering volgens NEN-EN 81-20
VISUAL OPTIONS, CAR AND SHAFT DIMENSIONS FOR KONE elevators for transit centers Versie 15-2.1 Uitvoering volgens NEN-EN 81-20 KONE elevators for transit centers A smooth, safe flow of people and goods
More informationTown House 11265 Center Highway North Huntingdon, PA 15642
APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House
More informationMagnum Mobile Generator MMG55 Specifications
Empowering Real People Magnum Mobile Generator MMG55 Specifications ENGINE John Deere PE5030TF270 - turbocharged, diesel engine o Prime - 72 hp @ 1800 rpm o Standby - 80 hp @ 1800 rpm o 4 cylinder o 3.0
More informationSECTION 16721 FIRE ALARM AND DETECTION SYSTEM
1. GENERAL 1.1. Related Documents: 1.2. Scope: 1.1.1. The general provisions of the Contract, including General and Supplementary Conditions and General Requirements apply to the work specified in this
More informationWireless Home Security Alarm System AM 500
Wireless Home Security Alarm System AM 500 12 MONTH GUARANTEE Installation & Operating Instructions INTRODUCTION The AM500 is a simple self-contained alarm system. It protects the home by sounding a siren
More informationOTIS. Lumina. LUMINA. We set out to meet your design expectations. Then we endeavoured to exceed them.
OTIS Lumina LUMINA. We set out to meet your design expectations. Then we endeavoured to exceed them. LUMINA LUXURY APARTMENTS PRESTIGE OFFICES LUXURY HOTELS CAR DESIGNS CAPACITY CAR WALL FINISHES 4 4-26
More informationCardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com
CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can
More informationDUOTOUR WITH SLIDING DOORS OPERATING MANUAL
DUOTOUR WITH SLIDING DOORS OPERATING MANUAL Duotour DT with Sliding Doors 2 Contents PREFACE... 4 Copyright... 4 Symbols... 4 1 INTRODUCTION... 6 1.1. Options... 6 2 SAFETY FEATURES... 8 2.1. Safety Rail
More informationTMS TANK MANAGEMENT SYSTEM
TMS TANK MANAGEMENT SYSTEM Page 1 of 9 Operating Instructions GENERAL The Tank Management System is a bespoke design to control, monitor and accommodate efficient storage and dispensing of TMS. FUNCTIONS
More information12 Volt 30 Amp Digital Solar Charge Controller
12 Volt 30 Amp Digital Solar Charge Controller User s Manual WARNING Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions
More informationER-1 Emergency Response System INSTALLATION & PROGRAMMING GUIDE
Emergency Response System INSTALLATION & PROGRAMMING GUIDE Copyright micron 2005 Contents Product Description 3 Console Operation Overview 4 Console Wiring Diagram 5 User Manual 6 Transmitter Assembly
More informationCB200W Water Leak Detection Panel Application Guide
Checked by: AJC Approved by: JBJ Contents CB200W Water Leak Detection Panel Application Guide 1. Cabinet Specifications... 2 2. Panel Hardware Specifications... 3 3. Panel Configuration... 4 4. Technical
More informationDIVISION H VERTICAL TRANSPORTATION REQUIREMENTS INDEX H.1 INTRODUCTION...2 H.2 GENERAL... 2 H.3. PRODUCTS...4 H.4 PASSENGER ELEVATORS...
DIVISION H VERTICAL TRANSPORTATION REQUIREMENTS INDEX H.1 INTRODUCTION........2 H.2 GENERAL......... 2 H.3. PRODUCTS............4 H.4 PASSENGER ELEVATORS..........5 H.5 FREIGHT AND COMBINATION PASSENGER/FREIGHT
More informationLIFT CONTROL SYSTEMS CATALOGUE 2007
LIFT CONTROL SYSTEMS CATALOGUE 2007 All Your Needs For Elevators INDEX 1. Lift Control Cards... 3 2. Speed Control Units... 7 3. Emergency Rescue Cards... 8 4. Lift Control Panels... 10 5. Photocells...
More informationRADAR. 227 www.ncdirect.co.uk
RADAR solutions RADAR RADAR Key System 228 RADAR Lockset 229 RADAR Cover Plate 229 RADAR Padlock 230 RADAR Automatic Toilet Entry System 231 RADAR Ramp 231 RADAR Ramp Sign 231 227 www.ncdirect.co.uk RADAR
More informationSecurity Systems Intrusion Alarm
Dufferin-Peel Catholic District School Board STANDARD TEXT GUIDELINE FOR Security Systems for SECONDARY AND ELEMENTARY SCHOOLS Prepared by the Plant Department With Assistance from Vision Dynamics Formatted
More informationInstallation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step
More informationSETTING UP YOUR 6000 SERIES TIME RECORDER
INTRODUCTION The Pyramid 6000 Series Time Recorder is an electronic time recorder designed to make payroll processing easier and more efficient. The 6000 series will meet your business needs whether your
More informationOwner s Manual. Walk-in Monitoring System 100. Cooler is Better! TM. Used in UL Listed Door Panel Assemblies
REV. G Cooler is Better! TM Owner s Manual Walk-in Monitoring System 100 Used in UL Listed Door Panel Assemblies American Panel Corporation 5800 S.E. 78th Street, Ocala, Florida 34472-3412 Phone: (352)
More informationRFQ # PR5006805 Replace Kitchen Equipment in the CGR
RFQ # PR5006805 Replace Kitchen Equipment in the CGR GENERAL The Consulate General of the United States of America has a requirement to furnish and install new kitchen equipment at the Consul General s
More informationInterfacing Elevators with Fire Alarm and Sprinklers
Interfacing Elevators with Fire Alarm and Sprinklers IEEE Atlanta Chapter May 15, 2006 Brian K Fabel, PE Agenda Today s Codes NFPA, ASME, IBC/IFC Conflicts/Issues Tomorrow s Codes? Applicable Codes NFPA
More information(B613) VERTICAL PLATFORM LIFT PLANNING GUIDE
Multilift (B613) VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: CSA B613 01-m06-2011 Part No. 000790 Copyright 2011 Savaria Corporation All rights reserved. Printed in Canada Purpose of this guide
More informationFA-300 Series. LCD Fire Alarm Control Panel. User Guide. LT-954 Rev. 0.1 February 2013. FA-300 SERIES Fire Alarm Control Panel
ABC DEF GHI JKL MNO PQR STU YZ WXY FA-300 Series LCD Fire Alarm Control Panel Advanced Life Safety Solutions System Normal 10:36AM WED 2003-10-01 SYSTEM RESET A.C. ON ALARM SUPV TRBL CPU FAIL SIGNAL SILENCE
More informationHome Inspection Report
4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:
More informationArchitectural Specifications MODEL HDXL 9. 200 Fairview Road, Unit #2, Barrie, Ontario L4N 8Z8
MODEL HDXL 9 200 Fairview Road, Unit #2, Barrie, Ontario L4N 8Z8 Tel: 866-792-9968 or 705-792-9968 Fax: 705-735-9564 www.tnrdoors.com email: info@tnrdoors.com Model HDXL 9 Tech Specs September 4, 2012
More informationNATIONAL INSTITUTE OF BIOLOGICALS
Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in
More informationLIFT CONTROL SYSTEMS CATALOGUE 2007
LIFT CONTROL SYSTEMS CATALOGUE 2007 All Your Needs For Elevators INDEX 1. Lift Control Cards... 3 2. Speed Control Units... 7 3. Emergency Rescue Cards... 8 4. Lift Control Panels... 10 5. Photocells...
More informationProcurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier
Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier A. Requirement This document is to be used to specify the physical and operational
More informationOptiMiziNg the use Of SpacE KONE MaxiSpace
Optimizing the use of space KONE MaxiSpace More space in the car. More space in the building. KONE MaxiSpace is built especially for existing buildings, either to replace an existing elevator or to install
More informationZAPPY 3 OWNER S MANUAL. Read this manual completely before riding your Electric ZAPPY 3.
ZAPPY 3 OWNER S MANUAL Read this manual completely before riding your Electric ZAPPY 3. TECHNICAL INFORMATION Model No. : ZAPPY 3 Product size Type of motor Motor power Battery type Battery Charger Charging
More informationPC INTERFACE MODULES FOR TOLL-PLAZA CLASSIFICATION SENSORS
PC INTERFACE MODULES FOR TOLL-PLAZA CLASSIFICATION SENSORS FRANCE Head office USA 4 Rue du Bois Chêne le loup Parc d Activité de Brabois 54 500 VANDOEUVRE LES NANCY (33) 0383442413, Fax (33) 0383443797
More informationL_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.
L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -
More informationFFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid
Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE
More information3500/93 System Display
3500/93 System Display Bently Nevada* Asset Condition Monitoring Description The 3500/93 System Display is designed to meet the requirements of American Petroleum Institute (API) Standard 670 and provide
More informationFire Alarm System Plans Review Checklist Property location Date of Review
Fire Alarm System Plans Review Checklist Property location Date of Review 1. Is application completed in entirety? 2. Are the plans review fee submitted with the application? 3. Does floor plan include
More informationIntroduction. Safety Guidelines. Part Numbers. Operation and Maintenance Manual. Operation and Maintenance Manual
Operation and Maintenance Manual Introduction Read all instructions thoroughly. Installation of the OilTector must comply with all Federal, State and Local Codes, Regulations and Practices. The OilTector
More information2013 Wireless Video Intercom INSTALLATION GUIDE
2013 Wireless Video Intercom INSTALLATION GUIDE INDEX System configuration and wiring VL-SWD501 System Component.. 4 VL-SWD501EX wiring schematic diagram VL-SWD501EX wiring type and length... 5.... 6 Door
More informationElectric Panel Pump Control System. Operation, Maintenance and Installation Manual
Manual No. 5EP-OM1-1 Electric Panel Pump Control System Operation, Maintenance and Installation Manual INTRODUCTION... 1 RECEIVING AND STORAGE... 1 DESCRIPTION OF OPERATION... 1 INSTALLATION... 2 SEQUENCE
More informationSECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
More informationArchitectural Specifications* MODEL HDE
MODEL HDE 200 Fairview Road, Unit #2, Barrie, Ontario L4N 8Z8 Tel: 866-792-9968 or 705-792-9968 Fax: 705-735-9564 www.tnrdoors.com email: info@tnrdoors.com TNR Model HDE Tech Specs September 4, 2012 Page
More informationSECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled
More informationWE-350 Series ¼ Turn Electric Actuator
WE-350 Series ¼ Turn Electric Actuator Operation and Installation Manual Pg 1 (Rev. 020113) Table of Contents 1.0 General 1.1 Pre-Installation Inspection 1.2 Storage 1.3 Features & General Information
More informationSECTION 11 78 13 MORTUARY REFRIGERATORS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in
More informationUB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
More informationELECTRICIAN TRADE REGULATION
Province of Alberta APPRENTICESHIP AND INDUSTRY TRAINING ACT ELECTRICIAN TRADE REGULATION Alberta Regulation 274/2000 With amendments up to and including Alberta Regulation 122/2014 Office Consolidation
More informationGroup TRAFFIC MANAGEMENT SPECIALIST ACCESS WAY SOLUTIONS CREATIVE SOLUTIONS TO COMMON CHALLENGES. Products
Group Incorporating: Egmont Doors & totaldoors SPECIALIST ACCESS WAY SOLUTIONS TRAFFIC MANAGEMENT CREATIVE SOLUTIONS TO COMMON CHALLENGES 0800 807 753 trafficmanagement@ultigroup.co.nz www.ultigroup.co.nz
More information