1 The Impact of the new Directive 2014/33/EU and Standard EN81-20 on New Lifts Malta Lift Association Workshop Ing Ray Spiteri DMS, MBA (Brunel), B.Sc.. Mech Eng (Hons), EUR Ing, MIMechE, MASHRAE, MIAEE, MCIBSE. 58/1, Triq Giuseppe Cali, Ta Xbiex XBX1424, Malta. Tel.: Fax: Mob.:

2 Directive 2014/33/EU IMPLICATIONS TO INDUSTRY Owners, Lift Installers, Banks, Insurers, etc.

3 THE WORD LIFTSIS RE-DEFINED Lifts: they exist as finished products only after their permanent installation Lifts: they cannot be imported in the EU They are only placed on the market and they are not subsequently made available There are neither «Importers» nor «Distributors» of lifts

4 LIFT INSTALLERS OBLIGATIONS & RESPONSIBILITES In relation to their role in the supply chain they must adopt appropriate measures to place on the market Lifts and Safety Components only if they are in compliance with the Directive Importers must ensure to place on the market Safety Components in compliance with the Directive and must not place on the market Components which are not compliant or present a risk Importers must ensure that Conformity Assessment procedures have been performed and that EC marking and relevant documentation are available for inspection by the National Authorities When placing on the market a Safety Component, every Importer should indicate on it his name, the registered trade name or mark and the postal address

5 LIFT INSTALLERS OBLIGATIONS & RESPONSIBILITES Installer is responsible for design, manufacturing, installation, tests More detailed information (Installer address) to be indicated and clearly visible on the Lift (not necessarily on the car plate) Installer details in documentation or register available on site Installers shall indicate, on the lift, their name, registered trade name or registered trade mark and the postal address at which they can be contacted. The address shall indicate a single point at which the installer can be contacted. The contact details shall be in a language easily understood by end-users and market surveillance authorities.

6 QUESTION? Distributors should be able to supply Safety Components already placed on the market, (stocks in the supply chain) before the date of application of the national measures transposing the Directive What is going to happen after 20 th April 2016 for lift installers who assemble lifts locally?

7 Manufacturer Obligations Responsible for design and manufacturing of Safety Components If Importer or Distributor makes available (with his name or his registered trade mark) a Safety Component, or Modifies the product in such a way that conformity is involved, Importer or Distributor will be considered as the Manufacturer and fully responsible of the SC

8 Standard EN81-20 IMPLICATIONS TO INDUSTRY Owners, Lift Installers, Banks, Insurers, etc.

9 EN 81-1 and EN 81-2 are merged into the following new parts New Structure of the EN81 Family 1. EN Passenger and goods passenger lifts contains requirements for complete passenger or goods passenger lift installations independent of the driving system, taking over the general design requirements from EN 81-1 /2:1998 and all their amendments. 2. EN Examinations, calculations and tests of lift components Contains description of the examinations, calculations and tests of lift components used in any type of lift (passenger, goods passenger, goods only lift, etc.)

10

11 Status The new standards will come into force on the 1 ST September 2017.

12 RESPONSIBILITIES of BUILDING DESIGNERS, ARCHITECTS, DEVELOPERS / OWNERS & CONSULTANTS 1. Compliance to building regulations. 2. Environmental conditions e.g. temperature, humidity, exposure to sun & wind, corrosive atmosphere, etc. 3. Intended use of lift e.g. commercial application, hospital, etc. 4. Dissipation of heat in machine rooms and lifts shafts. 5. Ventilation of lift shafts (1% of CSA). 6. Building structure including underground for pits. 7. Electrical and telecommunications installation. 8. Means of accessibility for installation, use of lift & maintenance of lift. 9. Plumbing / drain installations for Fire Fighting Lifts. 10. Noise & Vibrations transmitted to building. 11. Maintenance of lift.

13 Major Changes MAJOR CHANGES OF PARTICULAR IMPORTANCE TO DEVELOPERS, ARCHITECTS, ETC

14 LIFT MACHINE ROOM & WELL a. The machine room and lift well is for the exclusive use of the lift and shall not contain ducts, cables or other devices than for the lift. b. Machine room is defined as a fully enclosed space with ceiling, walls, floor and access door(s) in which machinery as a whole or in parts is placed. It is for the exclusive use of the lift and not for storage, meters, etc. c. A machinery cabinet is considered as a machinery space. d. Machine room door to be 2.0mH x 0.6m W and must open outwards.

15 Machinery Spaces Clear height for working is 2.1m. Where working areas in the well are from the car roof (e.g. MRLs) and blocking devices are employed to prevent car movement, then there must be a means of escape to prevent personnel from becoming trapped in these areas. Access to working areas is now allowed via private premises on agreement with the building owner concerning provision of access for maintenance and rescue. Machine room size parameters remain the same e.g. 0.7m from panel, 0.5m from sheave, etc.

16 Lift Well The ventilation of the well is now considered as an architectural issue rather than the concern of the lift designer. The manufacturer is to give details of the heat output of the lift installation to the architect. Lift wells made of glass must be of laminate material throughout their full height to protect from breakage of panels. Pits deeper than 2.5m must have an access at the base of the pit. Access ladders to pits less tan 2.5m are now fully defined in EN Pits must be sealed. Water seepage will no longer be allowed.

17 HORIZONTAL PROJECTIONS INTO THE WELL Where there is no car roof balustrade and ledges exist in the well greater than 0.15m, to prevent persons from standing in these areas a. The edge of the protection must be chamfered ( 45 degrees), or b. A deflector to be provided with 45 degrees inclination, withstanding 300N applied to 5 cm 2 - Without permanent deformation - -With 15mm elastic deformation

18 Doors for Access, Inspection & Rescue

19 WELL STRENGTH

20 A refuge space will be required for each person present in the headroom and pit. REFUGE SPACES Manufacturers must declare how many persons are included in their designs. A notice will be displayed in each area stating how many persons are present and the position to adopt in case of emergency. Refuge Spaces are defined as standing, crouching and laying positions with signs stating which is provided. 2 Persons Allowed All refuge spaces in the same area must be of the same type. Headroom refuge cube one shall take 1.0m as the height.

21 HEADROOM CLEARANCES

22 PIT CLEARANCES

23 Lift Car Lift Car Materials used inside a car are now subject to fire rating classifications. Decorative mirrors are to be made from safety glass. Cars are to have increased normal use lux lighting levels and a defined emergency lighting level. There shall be at least 2 lamps connected in parallel. The car shall be continuously illuminated except when the car is parked and the doors are closed.

24 SURFACE OF WALLS, FLOOR & CEILING

25 Building Interfaces It is recommended that a slight counter slope be provided in front of each landing sill to avoid water from washing, sprinkling, etc., draining into the well. The natural or artificial lighting of the landings in the vicinity of landing doors shall be at least 50 lux at floor level, such that a user can see ahead when he is opening the landing door to enter the lift, even if the car light has failed.

26 FIRE FIGHTING LIFTS EN81-72 Key 1 Firefighter's lift 2 Fire level 3 Bridge-head 4 Hot gases 5 Water on floor 6 Fire resistant door 7 Fire protected lobby 8 Stairway (Escape route) Key 1 Firefighter's lift 2 Fire level 6 Fire resistant door 7 Fire protected lobby 8 Stairway (Escape route) 9 Destroyed fire resistant door or wall

27 Water protection in the lift well Concepts of fire compartments Key 1 Firefighter's lift car 2 Fire level 3 Bridge-head 4 Leakage water from fire level floor 5 Water-protected zone in the well and on the car 6 Max leakage water level in the pit Key 1 Lift well, forming a single and separate fire compartment through all floors 2 Staircase (escape route), forming a single and separate fire compartment through all floors 3 Fire protected lobbies, each forming a separate fire compartment on each floor 4 Usage areas, containing one or more separate fire compartments on each floor 5 Machinery space, is not shown here. It can be situated in different places, but belongs normally to the same fire compartment as the lift well

Planning Information. Passenger and Freight Elevators.

Planning Information. Passenger and Freight Elevators. A company of ThyssenKrupp Elevator Thyssen Aufzüge tk This planning information will give you an overview of the most important planning criteria of passenger and freight elevators. However you should

More information

Lift and Escalator Installations

Lift and Escalator Installations Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-29 Lift and Escalator Installations Building Works Requirements The

More information

Introduction to EN 81-20/-50. Issue: 2015-03-27

Introduction to EN 81-20/-50. Issue: 2015-03-27 Introduction to EN 81-20/-50 Issue: 2015-03-27 Background CEN/TC 10 Technical Committee 10 (TC10) in CEN Developing and maintaining European standards for lifts, escalators and moving walks Established

More information

Recommendations to improve the safety of existing lifts

Recommendations to improve the safety of existing lifts Recommendations to improve the safety of existing lifts Lift & Escalator Industry Association Lift Safety an introduction Lifts are amongst the very few modes of transport available for continuous unsupervised

More information

ITEM DESCRIPTION SPECIFICATION TENDER OFFER

ITEM DESCRIPTION SPECIFICATION TENDER OFFER TECHNICAL SPECIFICATIONS PL1 & PL2 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER Make (please specify) 1.0 Type Duplex Passenger Lift 2.0 Minimum

More information

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company RISK MANAGEMENT PLAN is an integral part of a modernized and sophisticated residential complex. No efforts will be spared in identifying the all possible risks and disasters, evaluating them, installing

More information

Safety rules for the construction and installation of lifts Part 72: Firefighters lifts

Safety rules for the construction and installation of lifts Part 72: Firefighters lifts CEN TC 10 Date: 2001-03 pren 81-72 CEN TC 10 Secretariat: AFNOR Safety rules for the construction and installation of lifts Part 72: Firefighters lifts Sicherheitsregeln für die Konstrukion und den Einbau

More information

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can

More information

GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA)

GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA) GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA) Chapter 1 : Definitions clause 1.2.10 : circulation space OLD CLAUSE A space mainly used as means of access between a room or protected shaft

More information

Walking and Working Surface Checklist:

Walking and Working Surface Checklist: Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:

More information

Fire Safety Risk Assessment Checklist for Residential Care Premises

Fire Safety Risk Assessment Checklist for Residential Care Premises Checklist for Residential Care Premises Name of Premises: Address of Premises: Name of Responsible Person: What area / location does the assessment cover? Does the assessment cover the whole site YES or

More information

S WORK CATALOGUE FAA29100H_BWC

S WORK CATALOGUE FAA29100H_BWC MACHINE ABOVE - 2, m/s BUILDER S WORK CATALOGUE FAA29100H_BWC 07-04-15 Version: a-e 800 kg 0 kg Otis Elevator Company 2007, All rights reserved MAIN 2/38 This catalogue summarizes useful information for

More information

The replacement or modification of existing windows shall comply with the following requirements:

The replacement or modification of existing windows shall comply with the following requirements: City of La Habra Heights Building Division 1245 N. Hacienda Road La Habra Heights, CA 90631 Office: (562) 694-6302 ext. 228 Fax: (562) 690-5010 WINDOW REPLACEMENT 2010 CALIFORNIA RESIDENTIAL CODE (CRC)

More information

Decree of the Ministry of the Environment on fire safety of ventilation systems

Decree of the Ministry of the Environment on fire safety of ventilation systems THE NATIONAL BUILDING CODE OF FINLAND MINISTRY OF THE ENVIRONMENT Housing and Building Department Decree of the Ministry of the Environment on fire safety of ventilation systems Adopted in Helsinki, 18

More information

Certification of construction products - Fire dampers. Certification Rules 032

Certification of construction products - Fire dampers. Certification Rules 032 Certification of construction products - Fire dampers Certification Rules 032 1 Contents Contents 1 0 Preface 1 1 Scope and intended application 2 2 Technical requirements 2 2.1 Properties 2 2.1.1 Protection

More information

Emergency Lighting Practices in the UAE. Richard Caple MSc MSLL Lighting Applications Manager SLL Vice President

Emergency Lighting Practices in the UAE. Richard Caple MSc MSLL Lighting Applications Manager SLL Vice President Emergency Lighting Practices in the UAE Richard Caple MSc MSLL Lighting Applications Manager SLL Vice President Agenda UAE emergency lighting requirements Emergency systems and luminaires Emergency lighting

More information

Building Control Guidance Note

Building Control Guidance Note Issued 01/01/13 Rev Page 1 of 5 If you intend to convert an existing loft space into additional rooms you will need to apply for Building Regulation Approval. You may also need Planning Permission if you

More information

Ministry of the Environment Decree on accessible building

Ministry of the Environment Decree on accessible building F1 THE FINNISH BUILDING REGULATIONS 1 Barrier-free Building Regulations and 2005 Ministry of the Environment Decree on accessible building adopted in Helsinki on the 1 st of October 2004 In accordance

More information

Safety rules for the construction and installation of lifts Lifts for the transport of persons and goods Part 20: Passenger and goods passenger lifts

Safety rules for the construction and installation of lifts Lifts for the transport of persons and goods Part 20: Passenger and goods passenger lifts EN 81-20 Safety rules for the construction and installation of lifts Lifts for the transport of persons and goods Part 20: Passenger and goods passenger lifts Changes from EN 81-11 / 2 Prepared by: I.

More information

Fire Safety In High Rise Building

Fire Safety In High Rise Building Fire Safety In High Rise Building CLASSIFICATION OF BUILDINGS AS PER NATIONAL BUILDING CODE 1. GROUPING. Group A - Residential : Lodgings, Dwellings, Dormitories, Flats, Hotels. Group B Group C - Educational

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

CITY OF TORONTO. BY-LAW No. 349-2008

CITY OF TORONTO. BY-LAW No. 349-2008 Authority: Licensing and Standards Committee Item 12.3, adopted as amended, by City of Toronto Council on April 28 and 29, 2008 Enacted by Council: April 29, 2008 CITY OF TORONTO BY-LAW No. 349-2008 To

More information

5-8.1.4* Any required illumination shall be arranged so that the failure of any single lighting unit shall not leave any area in darkness.

5-8.1.4* Any required illumination shall be arranged so that the failure of any single lighting unit shall not leave any area in darkness. NFPA 101 Life Safety Code Section 5-8 Illumination of Means of Egress 5-8.1 General. 5-8.1* Illumination of means of egress shall be provided in accordance with this section for every building and structure

More information

- 5 - Table1. Maximum Compartment Volumes

- 5 - Table1. Maximum Compartment Volumes - 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,

More information

GUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS

GUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS GUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS All Guardian Refuge and EVC Systems are BS9999 & BS5839 Pt9. 2010 compliant, and we offer our consultants assistance for BS5839, BS9999, (Fire safety

More information

Decree of the Ministry of the Environment. on fire safety of garages

Decree of the Ministry of the Environment. on fire safety of garages E4 THE NATIONAL BUILDING CODE OF FINLAND Fire safety of garages Guidelines 2005 Decree of the Ministry of the Environment on fire safety of garages Adopted in Helsinki, 22 March 2005 Pursuant to the Decision

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

Hanson Building Products. precast basement solutions

Hanson Building Products. precast basement solutions Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

ON MOST schemes, the architectural design of. Flexible strategy. Case study. The Forum

ON MOST schemes, the architectural design of. Flexible strategy. Case study. The Forum Flexible strategy ON MOST schemes, the architectural design of a building is influenced by fire engineering strategy. This could be in the form of visual, physical elements such as fire doors, fire curtains,

More information

ENVIRONMENTAL HEALTH PROFESSIONAL PRACTICE VOL II CHAPTER III. HOUSES IN MULTIPLE OCCUPATION Space Standards

ENVIRONMENTAL HEALTH PROFESSIONAL PRACTICE VOL II CHAPTER III. HOUSES IN MULTIPLE OCCUPATION Space Standards ENVIRONMENTAL HEALTH PROFESSIONAL PRACTICE VOL II CHAPTER III HOUSES IN MULTIPLE OCCUPATION Space Standards ADOPTED HOUSING STANDARDS:CATEGORY F HOUSES Houses within this category would be of a low priority

More information

BS5839 Part 1:2002 Overview

BS5839 Part 1:2002 Overview BS5839 Part 1:2002 Overview 1 Contents Introduction So why is the current standard being revised? The brief for the new standard Changes to structure of current Standard Enhanced certification of Fire

More information

BEDFORDSHIRE FIRE AND RESCUE SERVICE FIRE SAFETY GUIDANCE NOTE NO 40

BEDFORDSHIRE FIRE AND RESCUE SERVICE FIRE SAFETY GUIDANCE NOTE NO 40 BEDFORDSHIRE FIRE AND RESCUE SERVICE FIRE SAFETY GUIDANCE NOTE NO 40 DANGEROUS SUBSTANCES AND EXPLOSIVE ATMOSPHERES REGULATIONS 2002 STORAGE OF PETROLEUM SPIRIT AND OTHER HIGHLY FLAMMABLE LIQUIDS IN CANS,

More information

Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2

Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2 Pollution CO CO 2 Carbonaceo us soot H 2 S, NOX, SO2 The National Building Code (NBC) contains set of minimum provisions, designed to protect the safety of the public with regard to structural sufficiency,

More information

GENERAL FIRE SAFETY TERMS & DEFINITIONS

GENERAL FIRE SAFETY TERMS & DEFINITIONS UCL Fire Technical Note - TN006 Fire Safety Technical Guide GENERAL FIRE SAFETY TERMS & DEFINITIONS Reference: BS4422-2005 Fire Safety Vocabulary - for further information and definitions BS EN ISO 13943-2000:

More information

FIRE-FIGHTING DESIGN BRIEF REPORT

FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM

More information

Area of Rescue Assistance Communication System ADA Code Applicable excerpts:

Area of Rescue Assistance Communication System ADA Code Applicable excerpts: Area of Rescue Assistance Communication System ADA Code Applicable excerpts: CONTENTS (Guidelines and Definitions) Page 1 Area of Rescue Assistance Requirements Page 2 Emergency Communication Equipment

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS D E F Y I N G C O N V E N T I O N Congratulations on your new Corner Fridge Your new corner fridge may have different functions

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

Interfacing Elevators with Fire Alarm and Sprinklers

Interfacing Elevators with Fire Alarm and Sprinklers Interfacing Elevators with Fire Alarm and Sprinklers IEEE Atlanta Chapter May 15, 2006 Brian K Fabel, PE Agenda Today s Codes NFPA, ASME, IBC/IFC Conflicts/Issues Tomorrow s Codes? Applicable Codes NFPA

More information

Fire. The Fire Installers Mate. A guide to fire alarm systems design

Fire. The Fire Installers Mate. A guide to fire alarm systems design Fire The Fire Installers Mate A guide to fire alarm systems design BS 5839 Part 1:2002 A guide to BS 5839 Part 1:2002 Disclaimer This booklet is not intended to be a comprehensive guide to all aspects

More information

Excerpts from the Canadian National Building Code (NBC)

Excerpts from the Canadian National Building Code (NBC) Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more

More information

Making Your Home Ready For Solar Water Heating

Making Your Home Ready For Solar Water Heating Making Your Home Ready For Solar Water Heating During construction or a major renovation, making a home ready to use solar energy can be easy and inexpensive. When the time comes to install your solar

More information

SERVER ROOM CABINET INSTALLATION CONCEPTS

SERVER ROOM CABINET INSTALLATION CONCEPTS SERVER ROOM CABINET INSTALLATION CONCEPTS SERVER ROOM CABINET INSTALLATION CONCEPTS SERVER ROOM CABINET INSTALLATION CONCEPTS ZPAS 169 EXAMPLES OF SERVER ROOMS PROJECTS WITH ZPAS CABINETS Data Box in the

More information

Summary of Preliminary Assessment on Structural, Fire and Electrical Safety

Summary of Preliminary Assessment on Structural, Fire and Electrical Safety Name of the Factory Address of the Factory Present Status of the Factory Structural Assessment Conducted by : Galaxy Stitch Ltd. : BSCIC Industrial Estate, Plot no. A102, Tongi Gazipur Bangladesh : Under

More information

We hope these Frequently Asked Questions will be of use both to municipal officials and fire inspectors.

We hope these Frequently Asked Questions will be of use both to municipal officials and fire inspectors. September 14, 2012 Dear AMM Member: Please see the attached Fire Code Frequently Asked Questions. This document was compiled by the Office of the Fire Commissioner at the AMM s request to help clarify

More information

FIRE RISK ASSESSMENT

FIRE RISK ASSESSMENT The Regulatory Reform (Fire Safety) Order 2005 FIRE RISK ASSESSMENT Employer or other responsible person Name of Premises Address Post Code Telephone N o Name of Assessor(s) Date of Assessment Date of

More information

2001/069. Decks, stairways,gangways and their associated handrails OFFSHORE TECHNOLOGY REPORT HSE

2001/069. Decks, stairways,gangways and their associated handrails OFFSHORE TECHNOLOGY REPORT HSE HSE Health & Safety Executive Decks, stairways,gangways and their associated handrails Prepared by Bomel Ltd for the Health and Safety Executive OFFSHORE TECHNOLOGY REPORT 2001/069 HSE Health & Safety

More information

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010 Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

Squash Court Design general points

Squash Court Design general points Squash Court Design general points Contents: Contents:... 1 1. Squash Court Dimensions... 2 2. CourtTech Walls... 3 3. Dimensional requirements for courts with CourtTech Walls... 3 4. Loading of CT System

More information

Guidance on loft conversions in two-storey houses

Guidance on loft conversions in two-storey houses Guidance on loft conversions in two-storey houses Technical guidance for building control surveyors, designers and installers 01 Guidance on loft conversions in two-storey houses Technical guidance for

More information

Workshop Self Inspection Checklist WORK01

Workshop Self Inspection Checklist WORK01 Workshop Self Inspection Checklist WORK01 General Mechanical Workshops Location Assessor Date This core checklist is provided by the Health and Safety Department as a template, which provides a basic framework

More information

How To Build A Basement House

How To Build A Basement House Single Family Basement Finish Purpose of Guide The purpose of this guide is to assist you in the permit process for your project. This handout is intended as a basic plan submittal under the 2009 International

More information

ACCESS AUDIT OF WESTPORT HOUSE

ACCESS AUDIT OF WESTPORT HOUSE ACCESS AUDIT OF WESTPORT HOUSE Large sign on the highway to indicate the entrance to Purbeck District Council Large and wide entrance Entrance showing sign for opening times Entrance sign Main entrance

More information

Introduction. CE marked construction products

Introduction. CE marked construction products Introduction This Technical Booklet has been prepared by the Department of Finance and Personnel and provides for certain methods and standards of building which, if followed, will satisfy the requirements

More information

50 St Mary Axe London EC3

50 St Mary Axe London EC3 50 St Mary Axe London EC3 Letting specification 1.Structure and Envelope The main superstructure comprises of a braced steel fame (app 7m span / 90min fire rated) and the elevations are formed from a series

More information

Cheshunt Fabrications Ltd

Cheshunt Fabrications Ltd Cheshunt Fabrications Ltd Unit 9a & 9b, Quickbury Farm Hatfield Heath Road Sawbridgeworth Hertfordshire CM21 9HY Phone: 01279 600866 Fax: 020 8609 0050 01279 600868 www.fabber.co.uk Quality in the making

More information

Single Family Residential Basement Finish

Single Family Residential Basement Finish How to Use This Guide Building Guide Pottawattamie County Planning & Development Department Building & Safety Division Single Family Residential Basement Finish Provide two (2) sets of plans and complete

More information

Guidance Document on Fire Safety Signs and Notices FIA Guidance for the Fire Protection Industry

Guidance Document on Fire Safety Signs and Notices FIA Guidance for the Fire Protection Industry Guidance Document on Fire Safety Signs and Notices FIA Guidance for the Fire Protection Industry This Guidance Note is intended as a general guidance and is not a substitute for detailed advice in specific

More information

How To Write A Home Protection Insurance Policy

How To Write A Home Protection Insurance Policy Argus Insurance Agencies Limited La Concorde Tel: +356 2342-2000 Triq Abate Rigord Fax: +356 2342-2190 Ta Xbiex XBX 1121 home@argus.com.mt www.argus.com.mt THE NEW HOME PROTECTOR EXTRA INSURANCE PROPOSAL

More information

Building Department John Fiedler Construction Official Ext. 211. SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev 4-3-2014

Building Department John Fiedler Construction Official Ext. 211. SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev 4-3-2014 TOWNSHIP OF HILLSBOROUGH COUNTY OF SOMERSET Hillsborough Township Municipal Complex The Peter J. Biondi Building 379 South Branch Road Hillsborough, NJ 08844 P: (908) 369-4313 F: (908) 369-3954 Building

More information

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use. Walmart Standards for Suppliers Section 7. Health and Safety 7. Health and Safety Suppliers must provide workers with a safe and healthy work environment. Suppliers must take proactive measures to prevent

More information

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS ELECTRIC HEATING UNITS MODEL: ETA / EKI

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS ELECTRIC HEATING UNITS MODEL: ETA / EKI INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS ELECTRIC HEATING UNITS MODEL: ETA / EKI Page 2 / 16 CONTENTS 1 GENERAL... 3 2 SAFETY... 3 2.1 Safety instructions... 3 2.2 Correct use... 3 3 DESCRIPTION

More information

Safety Storage Cabinets

Safety Storage Cabinets Safety Storage Cabinets Safe storage of flammables? The workplace without a fire resistant Safety Storage Cabinet Dangers, risks and your disadvantages... STORAGE ROOM Transport/working time - Increased

More information

GUIDE TO APPLICATION OF THE LIFTS DIRECTIVE 95/16/EC

GUIDE TO APPLICATION OF THE LIFTS DIRECTIVE 95/16/EC GUIDE TO APPLICATION OF THE LIFTS DIRECTIVE 95/16/EC 15 May 2007 GUIDE TO APPLICATION OF THE LIFTS DIRECTIVE 95/16/EC Table of contents Introduction Preamble Citations 1 The citations 2 The legal basis

More information

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website www.iomfire.com

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website www.iomfire.com ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK Website www.iomfire.com ADDRESS OF PREMISES FIRE CERTIFICATE No. (where applicable).. LOCATION OF LOG BOOK. CONTENTS OF LOG BOOK Useful telephone

More information

BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS.

BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS. Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS. Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance

More information

Lee Baron FIRE RISK ASSESSMENT

Lee Baron FIRE RISK ASSESSMENT FIRE RISK ASSESSMENT, 13/21 Cantelupe Road, East Grinstead Prepared for: Lee Baron 7 Swallow Place Oxford Circus London W1B 2AG Prepared by: Violet McIntyre CMIOSH William Martin Compliance Solutions Limited

More information

The KONE Motala 2000 platform lift suits the architecture of any building, thanks to the wide range of car and shaft design options.

The KONE Motala 2000 platform lift suits the architecture of any building, thanks to the wide range of car and shaft design options. A solution for making all premises accessible KONE Motala 2000 The KONE Motala 2000 platform lift suits the architecture of any building, thanks to the wide range of car and shaft design options. This

More information

ABB Stotz-Kontakt GmbH ABB safe&smart Project planning of security systems

ABB Stotz-Kontakt GmbH ABB safe&smart Project planning of security systems ABB Stotz-Kontakt GmbH ABB safe&smart Project planning of security systems Content Introduction Preventing unauthorized access by perimeter surveillance Monitoring unauthorized access by indoor surveillance

More information

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances. Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org

More information

City of St. Charles Basement Finish or Remodel

City of St. Charles Basement Finish or Remodel City of St. Charles Basement Finish or Remodel Building & Code Enforcement Division 2 East Main Street St. Charles IL 60174 630.377.4406 (Office) 630.443.4638 (Fax) http://www.stcharlesil.gov Please direct

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

SOME HELP WITH BRITISH STANDARD BS EN 1570:1999 Safety requirements for lifting tables

SOME HELP WITH BRITISH STANDARD BS EN 1570:1999 Safety requirements for lifting tables SOME HELP WITH BRITISH STANDARD BS EN 1570:1999 Safety requirements for lifting tables This is intended to help as a brief guide / overview through some selected parts of the current Scissor Lift Table

More information

Extracts from BUILDING REGULATIONS

Extracts from BUILDING REGULATIONS Page 1 of 3 UNotes on Building Regulations Please note that British building regulations are complex and that they may vary from area to area. It is your responsibility to ensure that your chosen stair

More information

QUOTATION FOR UPGRADING OF LIFT AT BINJA SAN DAVID, TRIQ SAN DAVID, MTARFA

QUOTATION FOR UPGRADING OF LIFT AT BINJA SAN DAVID, TRIQ SAN DAVID, MTARFA Housing Authority AWTORITÀ TAD-DJAR HOUSING AUTHORITY 22, Pietro Floriani Street, Floriana Telephone: (356) 22991000 Fax: (356) 21243284 E-mail: procurement.ha@ha.gov.mt Website: http://www.housingauthority.gov.mt/

More information

Hotel Accessibility Pack

Hotel Accessibility Pack Hotel Accessibility Pack Thank you for considering the Hilton Dublin City. We are pleased to provide you with some information regarding our hotel that you may find useful when planning your visit to our

More information

RESIDENTIAL WINDOW REPLACEMENT

RESIDENTIAL WINDOW REPLACEMENT 3S258 MANNING AVENUE WARRENVILLE, IL 60555 PH: 630.393.9050 FAX 630.393.1531 RESIDENTIAL WINDOW REPLACEMENT A building permit is required for the installation or replacement of windows in a residence.

More information

FAQs-Main switchboard design criteria

FAQs-Main switchboard design criteria FAQs-Main switchboard design criteria Q: What is the Australian standard for main switchboards? Current Australian standard is AS/NZS 3439.1: 2002 originating from IEC 60439. The new series of standard

More information

Report on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No.

Report on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No. Report on Sanctuary/Chancel Crawl Space Inspection St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove Project No. E112056 1. Background St. John in the Wilderness (SJITW) is considering

More information

Fire safety in timber buildings

Fire safety in timber buildings Fire safety in timber buildings Introduction Fire spread in buildings is a risk to life safety for which the Building Regulations (for England and Wales 1,2, Scotland 3 and Northern Ireland 4 ) aims to

More information

Safety and Health Office WORKPLACE SAFETY CHECKLIST

Safety and Health Office WORKPLACE SAFETY CHECKLIST Location: Date: Inspected by: Safety and Health Office WORKPLACE SAFETY CHECKLIST WORK ENVIRONMENT Ventilation Removal of fumes and dust Temperature and humidity control Noise levels Vibration Lighting

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements Fixed Access Ladders Engineering Data Sheet 2-04 Revised: January 1997 Table of Contents 1. Legislative Requirements 2. General 3. Rungs 4. Side Rails 5. Safety Cages 6. Attachment & Anchoring 7. Platforms

More information

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839 AVAILABLE TO DOWNLOAD ON THE APOLLO APP a guide to Fire Alarm Systems Design BS5839 Part1:2013 The Regulatory Reform (Fire Safety) Order (FSO) became law on 1 October 2006 Legally you must comply! What

More information

Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS

Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS Technical Information sheet 0001/07/Rev01 ENG FUNCTION Series S001 and S002 circulation units are applied to the primary circuit of solar

More information

Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria

Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria Appendix B 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria 423.25 Public shelter design criteria. 423.25.1 New facilities. New educational facilities for school boards

More information

Basics of planning for escalators and moving walks.

Basics of planning for escalators and moving walks. Basics of planning for escalators and moving walks. The universal guideline for ThyssenKrupp elevator (ES/PBB) products. ThyssenKrupp Elevator (ES/PBB) ThyssenKrupp 2 Index Upwards and onwards! I Overview

More information

Sun Vinyl New Construction Windows Homeowner's Warranty

Sun Vinyl New Construction Windows Homeowner's Warranty Sun Windows Sun Vinyl New Construction Windows Homeowner's Warranty Vinyl Sun Windows, Inc. warrants for a period of 2 years that the quality of workmanship and materials of vinyl items shall be free from

More information

The Danish Enterprise and Construction Authority to inspect CE marking of windows and pedestrian doors

The Danish Enterprise and Construction Authority to inspect CE marking of windows and pedestrian doors 23. december 2010 The Danish Enterprise and Construction Authority to inspect CE marking of windows and pedestrian doors The Danish Enterprise and Construction Authority s market surveillance of construction

More information

Page 4 of 17. Committee Input NFPA 101 Coordinate Smoke detector versus smoke alarm terminology.

Page 4 of 17. Committee Input NFPA 101 Coordinate Smoke detector versus smoke alarm terminology. Page 1 of 17 Page 2 of 17 Committee Input NFPA 101 Coordinate Smoke detector versus smoke alarm terminology. CODE PARAGRAPH WITH SUGGESTED CHANGES: 6.4.6.1.2 Residents should be rated as response probable

More information

FURNITURE & FURNISHINGS - FIRE SAFETY STANDARDS

FURNITURE & FURNISHINGS - FIRE SAFETY STANDARDS Fire Safety Technical Guide FURNITURE & FURNISHINGS - FIRE SAFETY STANDARDS 1.0. Introduction 1.1. Furniture and furnishings may significantly increase fire spread in rooms and those circulation spaces,

More information

Minimum Housing and Health Standards

Minimum Housing and Health Standards APPENDIX M.O. 57/2012 Minimum Housing and Health Standards Original version July 20, 1999. Revisions to Part lll, Housing Premises, sections 3 and 4, June 30, 2012 (all revisions are bolded and underlined).

More information

European Technical Approval ETA 13/0526

European Technical Approval ETA 13/0526 European Technical Approval ETA 13/0526 Trade Name Holder of the approval Website Generic type and use of construction product DOLCEA i3 PCIM S.A. Rue du Péquet 54 5590 Achene (Ciney) Belgium www.isoproc.eu

More information

FINISHED BASEMENT SUBMITTAL GUIDE

FINISHED BASEMENT SUBMITTAL GUIDE FINISHED BASEMENT SUBMITTAL GUIDE The text and illustrations included in this submittal guide represent the opinions of the Manheim Township Code Compliance Department. This guide is for education and

More information

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated

More information