Welcome. The Fifth Abell and Cleland Community Liaison Group Meeting

Size: px
Start display at page:

Download "Welcome. The Fifth Abell and Cleland Community Liaison Group Meeting"

Transcription

1 Welcome The Fifth Abell and Cleland Community Liaison Group Meeting

2 Welcome & Introductions David McFarlane - SP Broadway (Chairman) Apologies for absence Review of Minutes from Fourth CLG Update on recent Community Working Group Meetings

3 CLG 13 th June 2013 Update David Palmieri - Berkeley Homes. Environmental Monitoring Demolition Update: Abell House Demolition Update: Cleland House Forthcoming works Utility diversion works and road closures

4 Environmental Monitoring Environmental Reports are produced fortnightly and submitted to the Environmental Health Officer at Westminster City Council. These reports are also uploaded on to the Abell and Cleland web site for general viewing.

5

6

7

8

9

10

11 Demolition Update Abell House Structural demolition now down to the 1 st floor. Building now being demolished from ground level.

12

13 Demolition Update Cleland House Structural demolition down to 6 th Floor.

14

15 Delays to demolition programme. Abell House The late decommissioning of the existing substation by UKPN; 25 th June 2013, has delayed the demolition works which will not now be complete until the end of July 2013, with the demolition contractors due to be off site by the 9th August 2013.

16 Delays to demolition programme. Cleland House The demolition contractors have encountered delays in demolishing the upper floors of the building. This, along with UKPN works around the building, has resulted in the demolition programme not now expected to be complete until end September 2013.

17 Next Steps. Sheet Piling Abell House; 2 3 weeks July Secant Wall piling; Abell House w/c 12 th August 2013, 14 weeks. Cleland House end September 2013, 14 weeks.

18 Next Steps. Secant Wall Piling We have appointed Expanded Piling, part of the Laing O'Rourke Group to undertake the Secant Wall Piling at Abell and Cleland.

19 EXPANDED PILING F. Smith & Son (Grimsby) Limited established, operating as a well-drilling company, out of which grew Expanded Piling First piling contract undertaken Formation of a separate company; The Expanded Piling Company Limited We have been constructing piles for quite a while, however we understand it is the first time working adjacent to yourselves.

20 Piling Discipline Selection Secant Wall Imperial College, London Croydon Council HQ, London

21 Secant Walls The wall is built by drilling alternate male and female piles. The female piles act as a water cut off barrier On excavation the male piles take the lateral load from the surrounding ground

22 Operation 1 - Guide Walls The guide wall is a shallow excavation, designed to keep the piles in the correct position i.e. within 25mm of the planned position.

23 Operation 2- Mobilise Piling Plant 2 no. high torque rotary piling rigs and 2 no. crawler cranes will be deployed onto site. Each rig weighs in at approximately 100T. They move out of hours under police escort. Once on site they will stay on site until the piling is completed.

24 Operation 3 Installation of Rotary Bored Piles Steel casing installed to prevent undermining of surrounding assets The bore is progressed through the casing Drilling continues to the required design depth A steel cage (welded off site) is then installed The concrete is then poured through a centralising funnel The casing is then removed

25

26

27 HEALTH AND SAFETY First concern - TOP of the priority list Zero Tolerance Changing Behaviours Leading AFR Drive Down Gold Award for Safety Management and Performance (RoSPA) 100% CSCS Carded Workforce Working Platform Initiative Incident & Injury Free initiative

28 Utilities Update and Road Closures UK Power Networks are due to complete their Civils works in John Islip Street by the end of June 13, and Thorney Street in early July 13. There are no planned road closures in the coming months.

29 Planning Update Travis Crawford - Development Manager, Berkeley Homes

30 Questions

31 Any Other Business

32 Next Meetings Date of Next CLG Meetings: Wednesday 18 September 2013 at 6.30pm. Wednesday 4 December 2013 at 6.30pm.

33 Thank You.

Permits to Dig / Permits to Excavate / Permits to work near underground services

Permits to Dig / Permits to Excavate / Permits to work near underground services Permits to Dig / Permits to Excavate / Permits to work near underground services Aim and purpose The aim of this guidance is to identify what should be included in a permit to excavate / dig and additional

More information

CONTRACTORS INSURANCE SPECIFIC CONTRACT INSURANCE PROPOSAL

CONTRACTORS INSURANCE SPECIFIC CONTRACT INSURANCE PROPOSAL CONTRACTORS INSURANCE SPECIFIC CONTRACT INSURANCE PROPOSAL A FULL POLICY WORDING IS AVAILABLE ON REQUEST PLEASE COMPLETE IN CAPITAL LETTERS USING AN INK PEN AND TICK BOXES AS APPROPRIATE Where requested,

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations

Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-137 Ground-borne Vibrations and Ground Settlements Arising from Pile

More information

Construction and Civil Work Management

Construction and Civil Work Management STANDARD LME-12:001901 Uen Rev A Contents 1 Introduction... 3 2 Definitions... 3 3 Requirements... 4 3.1 General... 4 3.2 Responsibilities... 4 3.3 OHS Safety Plan... 5 3.4 Start of Construction Phase...

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

and the design of construction working platforms

and the design of construction working platforms Federation A presentation to the Australian Geomechanics Society Victoria i Branch 11 August 2010 Dr Stephen Buttling Piling rig bearing pressures and the design of construction working platforms 1 The

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12 If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need

More information

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.

More information

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located

More information

CONTRACTORS ALL RISKS / PUBLIC LIABILITY / WORK INJURY COMPENSATION INSURANCE PROPOSAL FORM

CONTRACTORS ALL RISKS / PUBLIC LIABILITY / WORK INJURY COMPENSATION INSURANCE PROPOSAL FORM CONTRACTORS ALL RISKS / PUBLIC LIABILITY / WORK INJURY COMPENSATION INSURANCE PROPOSAL FORM IMPORTANT NOTICE 1) Statement pursuant to Section 25 (5) of the Insurance Act (Cap. 142) (or any subsequent amendments

More information

How To Safely Dig For Natural Gas

How To Safely Dig For Natural Gas PNG DIAL B4-U-DIG book_final_nu 5/1/05 3:24 PM Page 2 Phoenix Natural Gas,197 Airport Road West, Belfast BT3 9ED. Tel. 08454 55 55 55. www.phoenix-natural-gas.com PNG DIAL B4-U-DIG book_final_nu 5/1/05

More information

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

Knock Down Rebuild. Building Process Building process - knock down rebuild 1 Knock Down Rebuild Building Process Building process - knock down rebuild 1 Building Process Your action Our action REMINDER Pre site Step 1 New Home Selection Congratulations. This marks the start of

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

APPENDIX J INCIDENT MANAGEMENT

APPENDIX J INCIDENT MANAGEMENT APPENDIX J INCIDENT MANAGEMENT THE BACKGROUND TO INCIDENT MANAGEMENT This guideline plan is designed to help emergency services manage incidents. PURPOSE OF THE GUIDELINE PLAN The plan provides: A step-by-step

More information

Risk Management Strategy

Risk Management Strategy Risk Management Strategy A Summary for Patients & Visitors This leaflet has been designed to provide information on the Trust s Risk Management Strategy and how we involve patients and the public in reducing

More information

Privacy, dignity and respect for patients, relatives and staff in Hospital

Privacy, dignity and respect for patients, relatives and staff in Hospital Privacy, dignity and respect for patients, relatives and staff in Hospital This leaflet has been designed to provide you with information about the standards of privacy, dignity and respect that you, your

More information

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013 How to Estimate the Cost of Support of Excavation for Foundation Installation CPE Candidate No. 0113013 May 15, 2013 1 How to Estimate the Cost of Support of Excavation for Foundation Installation Table

More information

CONTRACTORS COMBINED SUPPLEMENTARY PROPOSAL FORM THE RIGHT TOOL FOR THE JOB

CONTRACTORS COMBINED SUPPLEMENTARY PROPOSAL FORM THE RIGHT TOOL FOR THE JOB CONTRACTORS COMBINED SUPPLEMENTARY PROPOSAL FORM THE RIGHT TOOL FOR THE JOB Introduction Clause 21.2.1 In the Joint Contracts Tribunal (JCT) Standard Form of Building Contract there are a number of clauses

More information

Resource Piling Large Load Tests using a Reaction System

Resource Piling Large Load Tests using a Reaction System Resource Piling Large Load Tests using a Reaction System RESOURCE PILING S BACKGROUND Core businesses Bored Piles Reaction System Load Test Secant Piles RESOURCE PILING Contiguous Bored Pile Wall Kentledge

More information

The anglo american Safety way. Safety Management System Standards

The anglo american Safety way. Safety Management System Standards The anglo american Safety way Safety Management System Standards 2 The Anglo American Safety Way CONTENTS Introduction 04 Anglo American Safety Framework 05 Safety in anglo american 06 Monitoring and review

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy. Offshore Renewables Tidal Energy Transmission & Distribution Network Offshore Substation Wind Energy Onshore Substation Tidal Stream Energy Consumer Atkins in Offshore Renewables The offshore wind journey

More information

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

CONTRACTOR SAFETY MANAGEMENT PROCEDURE CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,

More information

Contract Works. Proposal Form

Contract Works. Proposal Form Proposal Form Contract Works Specified Contract Works and Legal Liability Arranged through ASR Underwriting Agencies Pty Ltd Underwritten by Certain Underwriters at Lloyd s IMPORTANT NOTES TM PLEASE READ

More information

Health Policy & Scrutiny Urgency Sub-Committee MINUTES OF PROCEEDINGS

Health Policy & Scrutiny Urgency Sub-Committee MINUTES OF PROCEEDINGS CITY OF WESTMINSTER MINUTES Health Policy & Scrutiny Urgency Sub-Committee MINUTES OF PROCEEDINGS Minutes of a meeting of the Health Policy & Scrutiny Urgency Sub-Committee Committee held on Thursday 7th

More information

CONTROL OF POLLUTION ACT 1974, SECTION 61 PRIOR CONSENT APPLICATION CONSTRUCTION AND DEMOLITION SITE NOISE

CONTROL OF POLLUTION ACT 1974, SECTION 61 PRIOR CONSENT APPLICATION CONSTRUCTION AND DEMOLITION SITE NOISE CONTROL OF POLLUTION ACT 1974, SECTION 61 PRIOR CONSENT APPLICATION CONSTRUCTION AND DEMOLITION SITE NOISE I/WE HEREBY MAKE APPLICATION to the London Borough of Merton Council for Prior Consent under Section

More information

High Capacity Helical Piles Limited Access Projects

High Capacity Helical Piles Limited Access Projects High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices

More information

Site Layout & Traffic Plan

Site Layout & Traffic Plan Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction

More information

GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005

GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13 Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if

More information

2013 Pile Driving Safety Presentation

2013 Pile Driving Safety Presentation 2013 Pile Driving Safety Presentation Introductions Bryan Stone Safety Manager Graduated from FSU in 1997 13 years experience OTI 502 certified Member National Safety Council Dean Sims II VP Marketing

More information

FATAL CRANE INCIDENT 22 nd nd October 2007

FATAL CRANE INCIDENT 22 nd nd October 2007 FATAL CRANE INCIDENT 22 nd nd October 2007 Germano Construction Site Brazil LESSONS LEARNED INCIDENT DESCRIPTION DATE: 22 nd October 2007 TIME: 1126 hours. Incident Description: During the construction

More information

Buildings Department Practice Note for Registered Contractors 38. Registration of General Building Contractors and Specialist Contractors

Buildings Department Practice Note for Registered Contractors 38. Registration of General Building Contractors and Specialist Contractors Buildings Department Practice Note for Registered Contractors 38 Registration of General Building Contractors and Specialist Contractors This practice note covers solely the registration of general building

More information

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-

More information

Electricity Gas. Application for utility connections Business premises. Section E PME (Protective Multiple Earthing)

Electricity Gas. Application for utility connections Business premises. Section E PME (Protective Multiple Earthing) Electricity Gas Send your completed application form with supporting documentation to: Thank you for considering Energy Services as your utility provider. In the East and West Midlands, electricity connections

More information

Machine Foundation Design

Machine Foundation Design Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other

More information

Forensic engineering of a bored pile wall

Forensic engineering of a bored pile wall NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Forensic engineering of a bored pile wall Willem Robert de Bruin Geovita AS, Norway,

More information

Report to INFRASTRUCTURE SERVICES Committee for noting

Report to INFRASTRUCTURE SERVICES Committee for noting 15-377 Subject: Prepared by: Capital Works Programme 2015/16 Tairāwhiti Roads Alexios Kavallaris (Capital Manager - Tairāwhiti Roads) Meeting Date: 22 October 2015 Report to INFRASTRUCTURE SERVICES Committee

More information

building on success Trees and Basements Partial Review of the Core Strategy February 2014

building on success Trees and Basements Partial Review of the Core Strategy February 2014 building on success Trees and Basements Partial Review of the Core Strategy February 2014 Regulation 19, Town and Country Planning (Local Planning) (England) Regulations 2012. 2 Contents 1. Introduction...

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

Management of Health and Safety for Work and Services Contractors Policy June 2010

Management of Health and Safety for Work and Services Contractors Policy June 2010 June 2010 Contents 1. Introduction 3 2. Policy Statement 4 3. Policy Objectives 5 4. Application 6 5. Organisational Responsibilities 7 6. Glossary of Terms 11 7. Authorised Directors Appendix 1 2 www.surrey.ac.uk

More information

Demolition & Construction Management Plan

Demolition & Construction Management Plan Demolition & Construction Management Plan 72 76 Cadogan lane SW1 Demolition & Construction Management Plan Issue Date: March 2013 Contents: 1.0 Introduction 1.1 Objectives of the Plan 1.2 Project Overview

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

Health and safety management. Cardinus Risk Management explain why safety comes first with JobWatch powered by BigChange

Health and safety management. Cardinus Risk Management explain why safety comes first with JobWatch powered by BigChange Health and safety management Cardinus Risk Management explain why safety comes first with JobWatch powered by BigChange Contents 3 Introduction 4 How it works 5 Benefits 6 Improving behaviour and communication

More information

The Physiotherapy Pilot. 1.1 Purpose of the pilot

The Physiotherapy Pilot. 1.1 Purpose of the pilot The Physiotherapy Pilot 1.1 Purpose of the pilot The purpose of the physiotherapy pilot was to see if there were business benefits of fast tracking Network Rail employees who sustained injuries whilst

More information

R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction

R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction Building Engineer UK Registration Board n.075077h Design and Access Statement for Application for Planning Permission for demolition of a garage and construction of an extension to an existing Victorian

More information

GRI CONTENT INDEX 2015

GRI CONTENT INDEX 2015 GRI CONTENT INDEX 2015 This table sets out how the GRI Reporting Framework has been applied across our 2015 Sustainability Report. Where relevant it also includes references to our Annual Report and website.

More information

SERVICES 2015 ISO 18001

SERVICES 2015 ISO 18001 SERVICES 2015 A family business with a solid foundation of experience, we handle all aspects of site investigation.... Phase 1 Environmental Studies Phase 2 Intrusive Investigations Phase 3 Remediation

More information

Piling Datasheets. Continuous flight auger (CFA) Driven Rotary

Piling Datasheets. Continuous flight auger (CFA) Driven Rotary Piling Datasheets Continuous flight auger (CFA) Driven Rotary Continuous Flight Auger Piles (CFA) Technical Data Application Well suited to soft and/or water bearing ground where deep casings or bentonite

More information

SUPPLY CHAIN PREQUALIFICATION PACKAGE

SUPPLY CHAIN PREQUALIFICATION PACKAGE SUPPLY CHAIN PREQUALIFICATION PACKAGE 2015 PREQUALIFICATION AS AN APPROVED SUBCONTRACTOR / SUPPLIER In order for your company to be registered as an approved Vendor with StructureTone Limited, we require

More information

TABLE OF CONTENTS 4. CONTRACTOR SHE MANAGEMENT PROGRAM R1400.00 --MANAGEMENT STATEMENT

TABLE OF CONTENTS 4. CONTRACTOR SHE MANAGEMENT PROGRAM R1400.00 --MANAGEMENT STATEMENT 4. CONTRACTOR SHE MANAGEMENT PROGRAM R1400.00 TABLE OF CONTENTS --MANAGEMENT STATEMENT ADMINISTRATIVE 1. SHE AND ACCIDENT PREVENTION 1-A Discipline 2. NEW HIRE ORIENTATION (Outline) 2-A New Hire Orientation

More information

INTRODUCTION... 3. 1.0 Purpose... 4. 2.0 Policy... 4. Exception for Short-Term Workplace Visits... 4. Relevant Legislation and Regulations...

INTRODUCTION... 3. 1.0 Purpose... 4. 2.0 Policy... 4. Exception for Short-Term Workplace Visits... 4. Relevant Legislation and Regulations... March 2006 INTRODUCTION... 3 1.0 Purpose... 4 2.0 Policy... 4 Exception for Short-Term Workplace Visits... 4 Relevant Legislation and Regulations... 5 Definitions... 5 Contractor Safety Coordination Overview...

More information

Muddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015

Muddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015 Muddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015 General: The Muddy River Flood Risk Management (FRM) & Environmental Restoration

More information

DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL 21.11.2013

DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL 21.11.2013 DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL 21.11.2013 1. EN 16228-1../7 & EN 791 & EN 996 2. STABILITY OF THE RIGS; 3. AUSTRALIAN STANDARDS AND REGULATION RELATED

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management

More information

ZERO TOLERANCE POLICY

ZERO TOLERANCE POLICY ZERO TOLERANCE POLICY Revised: July 2012 1. Introduction In line with the Department of Health, Social Services and Public Safety Circular HSS (Gen) (3) 2007 Zero Tolerance on Abuse of Staff, Protecting

More information

Explanatory Notes on Accident/Incident Reporting for Construction Sites These notes are to be read in conjunction with the Flow Chart at Annex 2.

Explanatory Notes on Accident/Incident Reporting for Construction Sites These notes are to be read in conjunction with the Flow Chart at Annex 2. Explanatory Notes on Accident/Incident Reporting for Construction Sites These notes are to be read in conjunction with the Flow Chart at Annex 2. (0) Introduction 0.1 The explanatory notes outline the

More information

2010-2011 Contractor of the Year

2010-2011 Contractor of the Year U.S. Army Corps of Engineers: Little Calumet River Stage VII Steel Sheet Piling Installation Hammond, Indiana Thatcher worked two rigs concurrently one on the north side and one on the south. The United

More information

Twenty-four contracting services environmental claim scenarios you may not have thought about.

Twenty-four contracting services environmental claim scenarios you may not have thought about. Environmental DIVISION Twenty-four contracting services environmental claim scenarios you may not have thought about. Contracting Services Environmental Liability Policy Great American Insurance Group

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

RAVENSCOTE JUNIOR SCHOOL. Security POLICY. Headteacher

RAVENSCOTE JUNIOR SCHOOL. Security POLICY. Headteacher RAVENSCOTE JUNIOR SCHOOL Security POLICY 2015 Date of Approval Date of Review Signed Mr D Harris Signed Mrs J. Brill Headteacher Chair of Governors Ravenscote Junior School Security Policy At Ravenscote

More information

Forward. A message from the Managing Director. George Maltabarow Managing Director Ausgrid

Forward. A message from the Managing Director. George Maltabarow Managing Director Ausgrid Electrical Safety Survey 2011 Forward A message from the Managing Director Electricity is an essential service relied upon for a strong economy and the basic necessities inside our homes. Distributing

More information

PROPOSAL FOR CONTRACTORS ALL RISKS

PROPOSAL FOR CONTRACTORS ALL RISKS PROPOSAL FOR CONTRACTORS ALL RISKS 1. Title of contract (If project consist of several sections, specify section(s) to be insured) 2. Location of site Country/Province/district City/town/village 3. Name

More information

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 Building and Housing has published technical guidance for foundation repairs and reconstruction for residential properties in green zone Foundation Technical

More information

Demolition Works Measures for Public Safety

Demolition Works Measures for Public Safety Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-21 Buildings Department Practice Note

More information

TNBA 2015 National Golf Tournament A fundraiser sponsored by JP & SP

TNBA 2015 National Golf Tournament A fundraiser sponsored by JP & SP If you enjoy being with great friends, or would just like to PRIZES contribute to a good cause, The Junior Program & Scholarship Program (JP & SP) of The National Bowling Association, Inc. (TNBA) has the

More information

Management of Lifting with Mobile Cranes

Management of Lifting with Mobile Cranes Management of Lifting with Mobile Cranes IOSH Eastern Branch 9 th December 2011 Tim Watson CPA Technical Consultant Topics Construction Plant-hire Association LOLER and Planning Lifting Operations Contract

More information

Quick fix for frost heave:

Quick fix for frost heave: Quick fix for frost heave: HELICAL PILES Megan Milbradt Civil Engineer Basin Electric Power Shane Vasbinder Civil Engineer Basin Electric Power Concrete piers were 6 inches to 2 feet out of the ground.

More information

Sany Heavy Industry Co., Ltd. (600031) - Financial and Strategic SWOT Analysis Review

Sany Heavy Industry Co., Ltd. (600031) - Financial and Strategic SWOT Analysis Review Sany Heavy Industry Co., Ltd. (600031) - Financial and Strategic SWOT Analysis Review Sany Heavy Industry Co., Ltd. (600031) - Financial and Strategic SWOT Analysis Review Sector Publishing Intelligence

More information

Environmental Management System

Environmental Management System Environmental Management System Heron Island Research Station (HIRS) Environmental Noise Program 1. Scope The Environmental Noise Program is limited to the following noise sources: Machinery owned by the

More information

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA John R. Wolosick, P.E.,D.GE 1, Michael W. Terry, P.E. 2, W. David Kirschner 3 and Robert F. Scott Jr. P.E. 4 SYNOPSIS In

More information

Incident Management: Before and After Storm Events. Caroline Barford & Caroline Timlett Coastal Engineers

Incident Management: Before and After Storm Events. Caroline Barford & Caroline Timlett Coastal Engineers Incident Management: Before and After Storm Events Caroline Barford & Caroline Timlett Coastal Engineers Presentation Overview Overview of Area concerned Before & During Storm Events Coastal Flood Response

More information

City of Fort Smith Building Permit Process Frequently Asked Questions

City of Fort Smith Building Permit Process Frequently Asked Questions Question: W ho must obtain a building permit? City of Fort Smith Building Permit Process Frequently Asked Questions Answer: This answer is the same for residential or commercial building. Any owner or

More information

Construction Industry Profile

Construction Industry Profile Construction Industry Profile KEY FACTS 30% of falls injuries were caused by ladders 31% decrease in the rate of serious claims in the construction industry between 2001 02 and 2011 12 20% of serious claims

More information

Construction Management Plan (CMP) Application

Construction Management Plan (CMP) Application About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

1 - SOGS_General Presentation_V1 1-15 06 2011. SPIE Oil & Gas Services

1 - SOGS_General Presentation_V1 1-15 06 2011. SPIE Oil & Gas Services 1 - SOGS_General Presentation_V1 1-15 06 2011 SPIE Oil & Gas Services SPIE Group figures & organization Key figures & Range of competencies Organization Gauthier Louette Chairman and CEO Human Resources

More information

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY

More information

Pollution & Noise from Demolition & Construction Sites

Pollution & Noise from Demolition & Construction Sites CONTROL OF Pollution & Noise from Demolition & Construction Sites N oi se Co ns tru ct io n MAY 2008 THE LONDON BOROUGH 3 CONTENTS Part 1 Introduction Page 1. Background 4 2. Purpose of the code 5 3.

More information

SITE CONTRACTOR PROCEDURES

SITE CONTRACTOR PROCEDURES SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment

More information

OAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure

OAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure OAKPARK SECURITY SYSTEMS LIMITED Requests or suggestions for amendment to this procedure should be submitted to the owner of the process PROCESS OWNER: MANAGEMENT TEAM Current version: PREVIOUS VERSION

More information

COSVR404 Erect and dismantle plant (cranes and rigs)

COSVR404 Erect and dismantle plant (cranes and rigs) Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting materials, components, plant, tools and ancillary equipment, preparing

More information

Specialist Lifting Solutions

Specialist Lifting Solutions Specialist Lifting Solutions Lifting you where others can t www.selectcranes.com Service and Experience with Accreditation At Select Specialist Lifting Services we provide a complete service for your project

More information

County Of Sonoma Agenda Item Summary Report

County Of Sonoma Agenda Item Summary Report County Of Sonoma Agenda Item Summary Report Department: General Services Contact: Rob Kambak Phone: (707) 565-3211 Board Date: 10/27/2009 4/5 Vote Required Deadline for Board Action: AGENDA SHORT TITLE:

More information

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE FOR COMPANIES EMPLOYING FIVE OR LESS EMPLOYEES

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE FOR COMPANIES EMPLOYING FIVE OR LESS EMPLOYEES CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE FOR COMPANIES EMPLOYING FIVE OR LESS EMPLOYEES GENERAL INFORMATION Company Name: Company Address: Telephone No. Fax No. Mobile No. Email Address Year Company

More information

Contractors' Combined Liability Insurance Summary

Contractors' Combined Liability Insurance Summary Contractors' Combined Liability Underwritten by a member of the QBE Insurance Group (QBE) This insurance is an annual contract unless stated otherwise in the quotation or renewal documentation and as confirmed

More information

WHS Inspector. This is a re-advertised position. Closing date Wednesday 06 June 2012 at 11.00pm (Australian Western Standard Time)

WHS Inspector. This is a re-advertised position. Closing date Wednesday 06 June 2012 at 11.00pm (Australian Western Standard Time) WHS Inspector APS Level 6 Position Number: 00931 Regional Services WA Regulatory Services Group Ongoing Vacancy Full-time Perth $74,592 to $82,770 plus 15.4% superannuation This is a re-advertised position

More information

CITB CITB. Grants Scheme 2015-2016 CONSTRUCTION INDUSTRY TRAINING BOARD NI CONSTRUCTION INDUSTRY TRAINING BOARD NI

CITB CITB. Grants Scheme 2015-2016 CONSTRUCTION INDUSTRY TRAINING BOARD NI CONSTRUCTION INDUSTRY TRAINING BOARD NI Grants Scheme 2015-2016 www.citbni.org.uk Grants booklet 2015/2016 Contents Page Introduction 2 Tier 1 Direct Grants to Employers 3-8 Tier 1 Essential Information Summary of Terms & Conditions 9 Tier 2

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

Schedule - Tradesman Insurance Essentials

Schedule - Tradesman Insurance Essentials Schedule - Tradesman Insurance Essentials The Insured The Insured's Business Mr Arthur Dube Arthur Contracting Services Cleaning - general services Landscaping and drainage The Insured's Postal Address

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

CONSTRUCTION INSURANCE OWNER BUILDER APPLICATION

CONSTRUCTION INSURANCE OWNER BUILDER APPLICATION SURA CONSTRUCTION PTY LTD LEVEL 13 / 141 WALKER ST NORTH SYDNEY NSW 2060 P O BOX 1813 NORTH SYDNEY NSW 2059 CONSTRUCTION INSURANCE OWNER BUILDER APPLICATION CONSTRUCTION INSURANCE OWNER BUILDER APPLICATION

More information

(IM) Lead - Direct Support Professional Position Description

(IM) Lead - Direct Support Professional Position Description (IM) Lead - Direct Support Professional Position Description Dept/Service: (IM) Personalised Supports Version:1.004048 Issued:6/01/2015 Stage: Issued Position Title: Lead Direct Support Professional Location:

More information

GeoDrill. Geotechnical & Environmental Drilling Specialists

GeoDrill. Geotechnical & Environmental Drilling Specialists GeoDrill Drilling Specialists GEODRILL services GEODRILL specialises in the following methods for Geotechnical and drilling and other services. Drilling Methods Solid Flight Augering (100 and diameter)

More information

EFFICIENT, EFFECTIVE, RESPONSIVE QUALIFICATIONS FOR INDUSTRY

EFFICIENT, EFFECTIVE, RESPONSIVE QUALIFICATIONS FOR INDUSTRY EFFICIENT, EFFECTIVE, RESPONSIVE QUALIFICATIONS FOR INDUSTRY Regulated Qualifications - June 2016 June Focus Advanced Learner Loans SFA Learner Loan funding is available for many of our and Level 4 qualifications,

More information

Building Pit Roche Building 1 Basel, Switzerland

Building Pit Roche Building 1 Basel, Switzerland Building Pit Roche Building 1 Basel, Switzerland Implenia Spezialtiefbau GmbH Infrastructure - Central Branch Mannheim Office Diffenéstraße 14 D-68169 Mannheim GERMANY T +49 621 70014-250 F +49 621 70014-260

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information