1 Welcome The Fifth Abell and Cleland Community Liaison Group Meeting
2 Welcome & Introductions David McFarlane - SP Broadway (Chairman) Apologies for absence Review of Minutes from Fourth CLG Update on recent Community Working Group Meetings
3 CLG 13 th June 2013 Update David Palmieri - Berkeley Homes. Environmental Monitoring Demolition Update: Abell House Demolition Update: Cleland House Forthcoming works Utility diversion works and road closures
4 Environmental Monitoring Environmental Reports are produced fortnightly and submitted to the Environmental Health Officer at Westminster City Council. These reports are also uploaded on to the Abell and Cleland web site for general viewing.
5
6
7
8
9
10
11 Demolition Update Abell House Structural demolition now down to the 1 st floor. Building now being demolished from ground level.
12
13 Demolition Update Cleland House Structural demolition down to 6 th Floor.
14
15 Delays to demolition programme. Abell House The late decommissioning of the existing substation by UKPN; 25 th June 2013, has delayed the demolition works which will not now be complete until the end of July 2013, with the demolition contractors due to be off site by the 9th August 2013.
16 Delays to demolition programme. Cleland House The demolition contractors have encountered delays in demolishing the upper floors of the building. This, along with UKPN works around the building, has resulted in the demolition programme not now expected to be complete until end September 2013.
17 Next Steps. Sheet Piling Abell House; 2 3 weeks July Secant Wall piling; Abell House w/c 12 th August 2013, 14 weeks. Cleland House end September 2013, 14 weeks.
18 Next Steps. Secant Wall Piling We have appointed Expanded Piling, part of the Laing O'Rourke Group to undertake the Secant Wall Piling at Abell and Cleland.
19 EXPANDED PILING F. Smith & Son (Grimsby) Limited established, operating as a well-drilling company, out of which grew Expanded Piling First piling contract undertaken Formation of a separate company; The Expanded Piling Company Limited We have been constructing piles for quite a while, however we understand it is the first time working adjacent to yourselves.
20 Piling Discipline Selection Secant Wall Imperial College, London Croydon Council HQ, London
21 Secant Walls The wall is built by drilling alternate male and female piles. The female piles act as a water cut off barrier On excavation the male piles take the lateral load from the surrounding ground
22 Operation 1 - Guide Walls The guide wall is a shallow excavation, designed to keep the piles in the correct position i.e. within 25mm of the planned position.
23 Operation 2- Mobilise Piling Plant 2 no. high torque rotary piling rigs and 2 no. crawler cranes will be deployed onto site. Each rig weighs in at approximately 100T. They move out of hours under police escort. Once on site they will stay on site until the piling is completed.
24 Operation 3 Installation of Rotary Bored Piles Steel casing installed to prevent undermining of surrounding assets The bore is progressed through the casing Drilling continues to the required design depth A steel cage (welded off site) is then installed The concrete is then poured through a centralising funnel The casing is then removed
25
26
27 HEALTH AND SAFETY First concern - TOP of the priority list Zero Tolerance Changing Behaviours Leading AFR Drive Down Gold Award for Safety Management and Performance (RoSPA) 100% CSCS Carded Workforce Working Platform Initiative Incident & Injury Free initiative
28 Utilities Update and Road Closures UK Power Networks are due to complete their Civils works in John Islip Street by the end of June 13, and Thorney Street in early July 13. There are no planned road closures in the coming months.
29 Planning Update Travis Crawford - Development Manager, Berkeley Homes
30 Questions
31 Any Other Business
32 Next Meetings Date of Next CLG Meetings: Wednesday 18 September 2013 at 6.30pm. Wednesday 4 December 2013 at 6.30pm.
33 Thank You.
Permits to Dig / Permits to Excavate / Permits to work near underground services
Permits to Dig / Permits to Excavate / Permits to work near underground services Aim and purpose The aim of this guidance is to identify what should be included in a permit to excavate / dig and additional
More informationCONTRACTORS INSURANCE SPECIFIC CONTRACT INSURANCE PROPOSAL
CONTRACTORS INSURANCE SPECIFIC CONTRACT INSURANCE PROPOSAL A FULL POLICY WORDING IS AVAILABLE ON REQUEST PLEASE COMPLETE IN CAPITAL LETTERS USING AN INK PEN AND TICK BOXES AS APPROPRIATE Where requested,
More informationHigh Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
More informationGround-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-137 Ground-borne Vibrations and Ground Settlements Arising from Pile
More informationConstruction and Civil Work Management
STANDARD LME-12:001901 Uen Rev A Contents 1 Introduction... 3 2 Definitions... 3 3 Requirements... 4 3.1 General... 4 3.2 Responsibilities... 4 3.3 OHS Safety Plan... 5 3.4 Start of Construction Phase...
More informationCITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
More informationand the design of construction working platforms
Federation A presentation to the Australian Geomechanics Society Victoria i Branch 11 August 2010 Dr Stephen Buttling Piling rig bearing pressures and the design of construction working platforms 1 The
More informationCONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12
If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need
More informationMEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525
1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.
More informationSHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
More informationCONTRACTORS ALL RISKS / PUBLIC LIABILITY / WORK INJURY COMPENSATION INSURANCE PROPOSAL FORM
CONTRACTORS ALL RISKS / PUBLIC LIABILITY / WORK INJURY COMPENSATION INSURANCE PROPOSAL FORM IMPORTANT NOTICE 1) Statement pursuant to Section 25 (5) of the Insurance Act (Cap. 142) (or any subsequent amendments
More informationHow To Safely Dig For Natural Gas
PNG DIAL B4-U-DIG book_final_nu 5/1/05 3:24 PM Page 2 Phoenix Natural Gas,197 Airport Road West, Belfast BT3 9ED. Tel. 08454 55 55 55. www.phoenix-natural-gas.com PNG DIAL B4-U-DIG book_final_nu 5/1/05
More informationKnock Down Rebuild. Building Process Building process - knock down rebuild 1
Knock Down Rebuild Building Process Building process - knock down rebuild 1 Building Process Your action Our action REMINDER Pre site Step 1 New Home Selection Congratulations. This marks the start of
More informationARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION
More informationAPPENDIX J INCIDENT MANAGEMENT
APPENDIX J INCIDENT MANAGEMENT THE BACKGROUND TO INCIDENT MANAGEMENT This guideline plan is designed to help emergency services manage incidents. PURPOSE OF THE GUIDELINE PLAN The plan provides: A step-by-step
More informationRisk Management Strategy
Risk Management Strategy A Summary for Patients & Visitors This leaflet has been designed to provide information on the Trust s Risk Management Strategy and how we involve patients and the public in reducing
More informationPrivacy, dignity and respect for patients, relatives and staff in Hospital
Privacy, dignity and respect for patients, relatives and staff in Hospital This leaflet has been designed to provide you with information about the standards of privacy, dignity and respect that you, your
More informationHow to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013
How to Estimate the Cost of Support of Excavation for Foundation Installation CPE Candidate No. 0113013 May 15, 2013 1 How to Estimate the Cost of Support of Excavation for Foundation Installation Table
More informationCONTRACTORS COMBINED SUPPLEMENTARY PROPOSAL FORM THE RIGHT TOOL FOR THE JOB
CONTRACTORS COMBINED SUPPLEMENTARY PROPOSAL FORM THE RIGHT TOOL FOR THE JOB Introduction Clause 21.2.1 In the Joint Contracts Tribunal (JCT) Standard Form of Building Contract there are a number of clauses
More informationResource Piling Large Load Tests using a Reaction System
Resource Piling Large Load Tests using a Reaction System RESOURCE PILING S BACKGROUND Core businesses Bored Piles Reaction System Load Test Secant Piles RESOURCE PILING Contiguous Bored Pile Wall Kentledge
More informationThe anglo american Safety way. Safety Management System Standards
The anglo american Safety way Safety Management System Standards 2 The Anglo American Safety Way CONTENTS Introduction 04 Anglo American Safety Framework 05 Safety in anglo american 06 Monitoring and review
More informationTriton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
More informationTidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.
Offshore Renewables Tidal Energy Transmission & Distribution Network Offshore Substation Wind Energy Onshore Substation Tidal Stream Energy Consumer Atkins in Offshore Renewables The offshore wind journey
More informationCONTRACTOR SAFETY MANAGEMENT PROCEDURE
CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,
More informationContract Works. Proposal Form
Proposal Form Contract Works Specified Contract Works and Legal Liability Arranged through ASR Underwriting Agencies Pty Ltd Underwritten by Certain Underwriters at Lloyd s IMPORTANT NOTES TM PLEASE READ
More informationHealth Policy & Scrutiny Urgency Sub-Committee MINUTES OF PROCEEDINGS
CITY OF WESTMINSTER MINUTES Health Policy & Scrutiny Urgency Sub-Committee MINUTES OF PROCEEDINGS Minutes of a meeting of the Health Policy & Scrutiny Urgency Sub-Committee Committee held on Thursday 7th
More informationCONTROL OF POLLUTION ACT 1974, SECTION 61 PRIOR CONSENT APPLICATION CONSTRUCTION AND DEMOLITION SITE NOISE
CONTROL OF POLLUTION ACT 1974, SECTION 61 PRIOR CONSENT APPLICATION CONSTRUCTION AND DEMOLITION SITE NOISE I/WE HEREBY MAKE APPLICATION to the London Borough of Merton Council for Prior Consent under Section
More informationHigh Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
More informationSite Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
More informationGUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF
More informationCONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13
Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if
More information2013 Pile Driving Safety Presentation
2013 Pile Driving Safety Presentation Introductions Bryan Stone Safety Manager Graduated from FSU in 1997 13 years experience OTI 502 certified Member National Safety Council Dean Sims II VP Marketing
More informationFATAL CRANE INCIDENT 22 nd nd October 2007
FATAL CRANE INCIDENT 22 nd nd October 2007 Germano Construction Site Brazil LESSONS LEARNED INCIDENT DESCRIPTION DATE: 22 nd October 2007 TIME: 1126 hours. Incident Description: During the construction
More informationBuildings Department Practice Note for Registered Contractors 38. Registration of General Building Contractors and Specialist Contractors
Buildings Department Practice Note for Registered Contractors 38 Registration of General Building Contractors and Specialist Contractors This practice note covers solely the registration of general building
More information-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-
More informationElectricity Gas. Application for utility connections Business premises. Section E PME (Protective Multiple Earthing)
Electricity Gas Send your completed application form with supporting documentation to: Thank you for considering Energy Services as your utility provider. In the East and West Midlands, electricity connections
More informationMachine Foundation Design
Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other
More informationForensic engineering of a bored pile wall
NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Forensic engineering of a bored pile wall Willem Robert de Bruin Geovita AS, Norway,
More informationReport to INFRASTRUCTURE SERVICES Committee for noting
15-377 Subject: Prepared by: Capital Works Programme 2015/16 Tairāwhiti Roads Alexios Kavallaris (Capital Manager - Tairāwhiti Roads) Meeting Date: 22 October 2015 Report to INFRASTRUCTURE SERVICES Committee
More informationbuilding on success Trees and Basements Partial Review of the Core Strategy February 2014
building on success Trees and Basements Partial Review of the Core Strategy February 2014 Regulation 19, Town and Country Planning (Local Planning) (England) Regulations 2012. 2 Contents 1. Introduction...
More informationConstruction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West
More informationManagement of Health and Safety for Work and Services Contractors Policy June 2010
June 2010 Contents 1. Introduction 3 2. Policy Statement 4 3. Policy Objectives 5 4. Application 6 5. Organisational Responsibilities 7 6. Glossary of Terms 11 7. Authorised Directors Appendix 1 2 www.surrey.ac.uk
More informationDemolition & Construction Management Plan
Demolition & Construction Management Plan 72 76 Cadogan lane SW1 Demolition & Construction Management Plan Issue Date: March 2013 Contents: 1.0 Introduction 1.1 Objectives of the Plan 1.2 Project Overview
More informationDesign, Testing and Automated Monitoring of ACIP Piles in Residual Soils
Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore
More informationHealth and safety management. Cardinus Risk Management explain why safety comes first with JobWatch powered by BigChange
Health and safety management Cardinus Risk Management explain why safety comes first with JobWatch powered by BigChange Contents 3 Introduction 4 How it works 5 Benefits 6 Improving behaviour and communication
More informationThe Physiotherapy Pilot. 1.1 Purpose of the pilot
The Physiotherapy Pilot 1.1 Purpose of the pilot The purpose of the physiotherapy pilot was to see if there were business benefits of fast tracking Network Rail employees who sustained injuries whilst
More informationR&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction
Building Engineer UK Registration Board n.075077h Design and Access Statement for Application for Planning Permission for demolition of a garage and construction of an extension to an existing Victorian
More informationGRI CONTENT INDEX 2015
GRI CONTENT INDEX 2015 This table sets out how the GRI Reporting Framework has been applied across our 2015 Sustainability Report. Where relevant it also includes references to our Annual Report and website.
More informationSERVICES 2015 ISO 18001
SERVICES 2015 A family business with a solid foundation of experience, we handle all aspects of site investigation.... Phase 1 Environmental Studies Phase 2 Intrusive Investigations Phase 3 Remediation
More informationPiling Datasheets. Continuous flight auger (CFA) Driven Rotary
Piling Datasheets Continuous flight auger (CFA) Driven Rotary Continuous Flight Auger Piles (CFA) Technical Data Application Well suited to soft and/or water bearing ground where deep casings or bentonite
More informationSUPPLY CHAIN PREQUALIFICATION PACKAGE
SUPPLY CHAIN PREQUALIFICATION PACKAGE 2015 PREQUALIFICATION AS AN APPROVED SUBCONTRACTOR / SUPPLIER In order for your company to be registered as an approved Vendor with StructureTone Limited, we require
More informationTABLE OF CONTENTS 4. CONTRACTOR SHE MANAGEMENT PROGRAM R1400.00 --MANAGEMENT STATEMENT
4. CONTRACTOR SHE MANAGEMENT PROGRAM R1400.00 TABLE OF CONTENTS --MANAGEMENT STATEMENT ADMINISTRATIVE 1. SHE AND ACCIDENT PREVENTION 1-A Discipline 2. NEW HIRE ORIENTATION (Outline) 2-A New Hire Orientation
More informationINTRODUCTION... 3. 1.0 Purpose... 4. 2.0 Policy... 4. Exception for Short-Term Workplace Visits... 4. Relevant Legislation and Regulations...
March 2006 INTRODUCTION... 3 1.0 Purpose... 4 2.0 Policy... 4 Exception for Short-Term Workplace Visits... 4 Relevant Legislation and Regulations... 5 Definitions... 5 Contractor Safety Coordination Overview...
More informationMuddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015
Muddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015 General: The Muddy River Flood Risk Management (FRM) & Environmental Restoration
More informationDRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL 21.11.2013
DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL 21.11.2013 1. EN 16228-1../7 & EN 791 & EN 996 2. STABILITY OF THE RIGS; 3. AUSTRALIAN STANDARDS AND REGULATION RELATED
More informationCONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management
More informationZERO TOLERANCE POLICY
ZERO TOLERANCE POLICY Revised: July 2012 1. Introduction In line with the Department of Health, Social Services and Public Safety Circular HSS (Gen) (3) 2007 Zero Tolerance on Abuse of Staff, Protecting
More informationExplanatory Notes on Accident/Incident Reporting for Construction Sites These notes are to be read in conjunction with the Flow Chart at Annex 2.
Explanatory Notes on Accident/Incident Reporting for Construction Sites These notes are to be read in conjunction with the Flow Chart at Annex 2. (0) Introduction 0.1 The explanatory notes outline the
More information2010-2011 Contractor of the Year
U.S. Army Corps of Engineers: Little Calumet River Stage VII Steel Sheet Piling Installation Hammond, Indiana Thatcher worked two rigs concurrently one on the north side and one on the south. The United
More informationTwenty-four contracting services environmental claim scenarios you may not have thought about.
Environmental DIVISION Twenty-four contracting services environmental claim scenarios you may not have thought about. Contracting Services Environmental Liability Policy Great American Insurance Group
More informationGreater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
More informationRAVENSCOTE JUNIOR SCHOOL. Security POLICY. Headteacher
RAVENSCOTE JUNIOR SCHOOL Security POLICY 2015 Date of Approval Date of Review Signed Mr D Harris Signed Mrs J. Brill Headteacher Chair of Governors Ravenscote Junior School Security Policy At Ravenscote
More informationForward. A message from the Managing Director. George Maltabarow Managing Director Ausgrid
Electrical Safety Survey 2011 Forward A message from the Managing Director Electricity is an essential service relied upon for a strong economy and the basic necessities inside our homes. Distributing
More informationPROPOSAL FOR CONTRACTORS ALL RISKS
PROPOSAL FOR CONTRACTORS ALL RISKS 1. Title of contract (If project consist of several sections, specify section(s) to be insured) 2. Location of site Country/Province/district City/town/village 3. Name
More informationFOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012
FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 Building and Housing has published technical guidance for foundation repairs and reconstruction for residential properties in green zone Foundation Technical
More informationDemolition Works Measures for Public Safety
Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-21 Buildings Department Practice Note
More informationTNBA 2015 National Golf Tournament A fundraiser sponsored by JP & SP
If you enjoy being with great friends, or would just like to PRIZES contribute to a good cause, The Junior Program & Scholarship Program (JP & SP) of The National Bowling Association, Inc. (TNBA) has the
More informationManagement of Lifting with Mobile Cranes
Management of Lifting with Mobile Cranes IOSH Eastern Branch 9 th December 2011 Tim Watson CPA Technical Consultant Topics Construction Plant-hire Association LOLER and Planning Lifting Operations Contract
More informationQuick fix for frost heave:
Quick fix for frost heave: HELICAL PILES Megan Milbradt Civil Engineer Basin Electric Power Shane Vasbinder Civil Engineer Basin Electric Power Concrete piers were 6 inches to 2 feet out of the ground.
More informationSany Heavy Industry Co., Ltd. (600031) - Financial and Strategic SWOT Analysis Review
Sany Heavy Industry Co., Ltd. (600031) - Financial and Strategic SWOT Analysis Review Sany Heavy Industry Co., Ltd. (600031) - Financial and Strategic SWOT Analysis Review Sector Publishing Intelligence
More informationEnvironmental Management System
Environmental Management System Heron Island Research Station (HIRS) Environmental Noise Program 1. Scope The Environmental Noise Program is limited to the following noise sources: Machinery owned by the
More informationUNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA
UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA John R. Wolosick, P.E.,D.GE 1, Michael W. Terry, P.E. 2, W. David Kirschner 3 and Robert F. Scott Jr. P.E. 4 SYNOPSIS In
More informationIncident Management: Before and After Storm Events. Caroline Barford & Caroline Timlett Coastal Engineers
Incident Management: Before and After Storm Events Caroline Barford & Caroline Timlett Coastal Engineers Presentation Overview Overview of Area concerned Before & During Storm Events Coastal Flood Response
More informationCity of Fort Smith Building Permit Process Frequently Asked Questions
Question: W ho must obtain a building permit? City of Fort Smith Building Permit Process Frequently Asked Questions Answer: This answer is the same for residential or commercial building. Any owner or
More informationConstruction Industry Profile
Construction Industry Profile KEY FACTS 30% of falls injuries were caused by ladders 31% decrease in the rate of serious claims in the construction industry between 2001 02 and 2011 12 20% of serious claims
More informationConstruction Management Plan (CMP) Application
About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction
More informationSAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
More informationBuildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
More information1 - SOGS_General Presentation_V1 1-15 06 2011. SPIE Oil & Gas Services
1 - SOGS_General Presentation_V1 1-15 06 2011 SPIE Oil & Gas Services SPIE Group figures & organization Key figures & Range of competencies Organization Gauthier Louette Chairman and CEO Human Resources
More informationDe Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value
De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY
More informationPollution & Noise from Demolition & Construction Sites
CONTROL OF Pollution & Noise from Demolition & Construction Sites N oi se Co ns tru ct io n MAY 2008 THE LONDON BOROUGH 3 CONTENTS Part 1 Introduction Page 1. Background 4 2. Purpose of the code 5 3.
More informationSITE CONTRACTOR PROCEDURES
SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment
More informationOAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure
OAKPARK SECURITY SYSTEMS LIMITED Requests or suggestions for amendment to this procedure should be submitted to the owner of the process PROCESS OWNER: MANAGEMENT TEAM Current version: PREVIOUS VERSION
More informationCOSVR404 Erect and dismantle plant (cranes and rigs)
Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting materials, components, plant, tools and ancillary equipment, preparing
More informationSpecialist Lifting Solutions
Specialist Lifting Solutions Lifting you where others can t www.selectcranes.com Service and Experience with Accreditation At Select Specialist Lifting Services we provide a complete service for your project
More informationCounty Of Sonoma Agenda Item Summary Report
County Of Sonoma Agenda Item Summary Report Department: General Services Contact: Rob Kambak Phone: (707) 565-3211 Board Date: 10/27/2009 4/5 Vote Required Deadline for Board Action: AGENDA SHORT TITLE:
More informationCONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE FOR COMPANIES EMPLOYING FIVE OR LESS EMPLOYEES
CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE FOR COMPANIES EMPLOYING FIVE OR LESS EMPLOYEES GENERAL INFORMATION Company Name: Company Address: Telephone No. Fax No. Mobile No. Email Address Year Company
More informationContractors' Combined Liability Insurance Summary
Contractors' Combined Liability Underwritten by a member of the QBE Insurance Group (QBE) This insurance is an annual contract unless stated otherwise in the quotation or renewal documentation and as confirmed
More informationWHS Inspector. This is a re-advertised position. Closing date Wednesday 06 June 2012 at 11.00pm (Australian Western Standard Time)
WHS Inspector APS Level 6 Position Number: 00931 Regional Services WA Regulatory Services Group Ongoing Vacancy Full-time Perth $74,592 to $82,770 plus 15.4% superannuation This is a re-advertised position
More informationCITB CITB. Grants Scheme 2015-2016 CONSTRUCTION INDUSTRY TRAINING BOARD NI CONSTRUCTION INDUSTRY TRAINING BOARD NI
Grants Scheme 2015-2016 www.citbni.org.uk Grants booklet 2015/2016 Contents Page Introduction 2 Tier 1 Direct Grants to Employers 3-8 Tier 1 Essential Information Summary of Terms & Conditions 9 Tier 2
More informationSUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
More informationSchedule - Tradesman Insurance Essentials
Schedule - Tradesman Insurance Essentials The Insured The Insured's Business Mr Arthur Dube Arthur Contracting Services Cleaning - general services Landscaping and drainage The Insured's Postal Address
More informationAPPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
More informationCONSTRUCTION INSURANCE OWNER BUILDER APPLICATION
SURA CONSTRUCTION PTY LTD LEVEL 13 / 141 WALKER ST NORTH SYDNEY NSW 2060 P O BOX 1813 NORTH SYDNEY NSW 2059 CONSTRUCTION INSURANCE OWNER BUILDER APPLICATION CONSTRUCTION INSURANCE OWNER BUILDER APPLICATION
More information(IM) Lead - Direct Support Professional Position Description
(IM) Lead - Direct Support Professional Position Description Dept/Service: (IM) Personalised Supports Version:1.004048 Issued:6/01/2015 Stage: Issued Position Title: Lead Direct Support Professional Location:
More informationGeoDrill. Geotechnical & Environmental Drilling Specialists
GeoDrill Drilling Specialists GEODRILL services GEODRILL specialises in the following methods for Geotechnical and drilling and other services. Drilling Methods Solid Flight Augering (100 and diameter)
More informationEFFICIENT, EFFECTIVE, RESPONSIVE QUALIFICATIONS FOR INDUSTRY
EFFICIENT, EFFECTIVE, RESPONSIVE QUALIFICATIONS FOR INDUSTRY Regulated Qualifications - June 2016 June Focus Advanced Learner Loans SFA Learner Loan funding is available for many of our and Level 4 qualifications,
More informationBuilding Pit Roche Building 1 Basel, Switzerland
Building Pit Roche Building 1 Basel, Switzerland Implenia Spezialtiefbau GmbH Infrastructure - Central Branch Mannheim Office Diffenéstraße 14 D-68169 Mannheim GERMANY T +49 621 70014-250 F +49 621 70014-260
More informationUp-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet
More information