1 Building Pit Roche Building 1 Basel, Switzerland Implenia Spezialtiefbau GmbH Infrastructure - Central Branch Mannheim Office Diffenéstraße 14 D Mannheim GERMANY T F mannheim.spezialtiefbau@implenia.com
2 Contract Value (net): 13.4 million CHF (11.1 million Euro) Construction Period: 02/ /2012 Client: F. Hoffmann - La Roche AG, Basel Services: Production of a building pit, foundation of a high-rise, dewatering Production of the foundation piles D=120 cm
3 The company F. Hoffmann-La Roche builds a new group headquarters at its Basel group head office. After completion in 2015 "Building 1" at 41 storeys and 175 m high will be the tallest building in Switzerland and will offer space for approx. 2,000 jobs. The "Baugrube Roche Bau 1" joint venture, consisting of Implenia Spezialtiefbau GmbH and Schleith GmbH, was contracted to produce a turnkey building pit as well as the extensive foundation works. The j.v. exhibits a vertical split, the full foundation engineering is performed by Bilfinger Spezialtiefbau GmbH, which also has technical and commercial direction. The earthworks required to produce the building pit were performed by the company Schleith. In the run-up to the building measure comprehensive proof loads and suitability tests were conducted on large bored piles and installation anchors, in order to verify the soil values or respectively optimize the calculation bases. The building pit has a depth of max m and is enclosed by an up to 4-layer rear-anchored secant bored pile wall D=120 cm. Drilling depth of the installation piles is up to m. The rear-anchoring of the building pit wall consists of 530 pieces grouted anchors having drilled lengths of up to 33.0 m and up to 9 strands as well as test forces of up to 1,200 kn. 80 % of the installation anchors will be stripped back again as the structural work progresses. For this purpose Bilfinger Spezialtiefbau uses the Swiss-patented system CONA-Therm with thermal induction coil. Conducting dynamic pile proof load View of the drilled pile wall with anchor tensioning works
4 The foundation of the structure consists of 143 large bored piles D= 120 cm with pile lengths up to 24 m. Owing to the extreme building pit depth combined with the constricted space the foundation piles were executed from a pre-excavation level using an empty drill hole of approx m. The whole construction measure is equipped with a comprehensive measuring and monitoring concept, making it possible to maintain continuous production with laboratory installations in the directly adjacent existing buildings. In order to limit subsidence and inclines on the directly neighbouring high-rise, the high-rise was underpinned with a sleeve pipe injection. Both temporary and residual dewatering is led via automatic turbidity and ph value measurement, under compliance with all defined limits, the accumulating water is automatically conducted into the outlet into the Rhine, otherwise into the city sewers. In order to achieve ground water flow in the final state, on the northern and southern side of the building pit (flow direction of the ground water) 4 pc. each horizontal filter wells are produced through the installation wall. The ground water is extracted via these wells in the north, conducted through the completed structure and returned to the subsoil in the south. View into building pit Final depth
5 Quantities: 4 pieces dynamic pile proof loads 2 pieces static pile proof load with Osterberg Cells 9 pieces suitability checks on strand anchors 246 pieces / 5,706 rising metres piles for secant bored pile wall D=120 cm, drilling depth down to 32.5 m 143 pieces / 4,423 rising metres foundation piles D=120 cm, drilling depth down to m, empty drill hole ~10m 530 pieces / 13,000 running metres grouted anchors up to 9 strands, length up to 33.0 m, test forces 900 / 1,200 kn, 80 % strippable anchors 10 pieces / 120 m GEWI piles D=63.5 mm 400 m³ sleeve pipe injection for subsidence and incline limitation in a neighbouring existing high-rise 8 pieces pile force gauges for permanent gauging Expanded measuring installations for combined pile-slab foundation such as pore water pressure indicator, bearing-pressure indicator, drill holes to determine water level, inclinometer, sliding deformeter Temporary dewatering with turbidity measurement and neutralization plus residual dewatering during structural work using horizontal filter wells for ground water flow in the final state 15,000 m³ demolition remaining existing buildings 48,000 m³ building pit excavation, depth down to m 125,000 t removal demolition and excavation View into the building pit chipping-off works
Geotechnical Building Works (GBW) Submission Requirements
Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.
More informationHow To Retaining Wall Guide
How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra
More informationMember Nation Report 2010 from Denmark.
Member Nation Report 2010 from Denmark. The has during the year 2010 arranged 6 member meetings including two technical site visits. The first technical site visit covered the 5.3 km long Leipzig City
More informationMonitoring of Tunnel End Plug Performance in ONKALO
Monitoring of Tunnel End Plug Performance in ONKALO Erika Holt, VTT Technical Research Centre of Finland Presentation at IGDTP-Geodisposal 2014 Manchester, UK, 24th to 26th of June 2014 Co-authors: I.
More informationEurocode 7 - Geotechnical design - Part 2 Ground investigation and testing
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering
More informationSPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
More informationA CASE STUDY ON THE USE OF FLEXIBLE EARTH RETAINING STRUCTURE IN UNSTABLE SLOPES
A CASE STUDY ON THE USE OF FLEXIBLE EARTH RETAINING STRUCTURE IN UNSTABLE SLOPES H. Turan DURGUNOGLU Ahmet SAHIN Onder AKCAKAL Zetas Zemin Teknolojisi A.S., TOKI-Housing Development Zetas Zemin Teknolojisi
More informationPro-Lift Steel Pile Foundation Repair
Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the
More informationARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION
More informationBUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
More informationSöderströmtunnel: immersion in downtown Stockholm, Sweden
Söderströmtunnel: immersion in downtown Stockholm, Sweden J. Glückert Dipl.-Ing, Züblin Ground Engineering, Stuttgart, Germany N.H.J. Vink MSe, M. Reijm BSc, P.T. van Westendorp BSc Strukton Immersion
More informationDrainage Solutions and Water Treatment / Single-wall corrugated drainage tubing is ideal for agricultural and. Durable Economical Wide range of sizes
ARMTEC.COM Drainage Solutions and Water Treatment / HDPE DRAINAGE TUBING (BIG O) PRODUCT GUIDE Single-wall corrugated drainage tubing is ideal for agricultural and residential applications Durable Economical
More informationConstruction sites are dewatered for the following purposes:
9. DEWATERING CONTROL OF GROUNDWATER Construction of buildings, powerhouses, dams, locks and many other structures requires excavation below the water table into water-bearing soils. Such excavations require
More information1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum
Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation
More informationINSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!
In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible
More informationPUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
More informationBusiness Unit. Tunnelling & Civil Engineering. Infrastructure solutions from a single source.
Business Unit Tunnelling & Civil Engineering Infrastructure solutions from a single source. 6 14 20 4 Innovative solutions on a sound basis 6 Tunnelling Setting new standards Transportation tunnels Power
More informationMETHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
More informationFoundation engineering
Foundation engineering Milestones 28: SAVA BRIDGE The new cable-stayed bridge over the Sava is one of the most modern bridges of its type anywhere in the world. The 2 m-high pylon, span of 37 m and 4 m-wide
More informationInstallation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale
Installation information METTLER TOLEDO MultiRange DW150 / DW150T wall scale DW150 / DW150T wall scale Contents Contents Page 1. Installation... 2 1.1 Preparatory work... 2 1.2 Installing the wall plates
More information-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-
More informationAttachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits
Attachment G-1: Pit Latrine Diagram Fig E.1a: Pit Latrine Fig E.1b: Plan View of Twin Pits Fig E.1c: Section of a water-sealed pan Fig E.1d: 3D view of Overflow Pipe Fig E.1e: 2D view of Overflow Pipe
More informationFugro monitoring services. If you can t measure it, you can t improve it : Lord Kelvin (1824-1907)
Fugro monitoring services If you can t measure it, you can t improve it : Lord Kelvin (1824-1907) Local presence and global integration Fugro N.V. Onshore Geotechnics Ralf Trapphoff Onshore Geotechnics
More informationSupplier ID: 26421. Local Office: GLASGOW 69 Buchanan Street Glasgow G1 3HL
M D & FOUNDATIONS MIDLANDS Supplier ID: 26421 MINI PILING PILING REINFORCED CONCRETE UNDERPINNING DRILLING & GROUTING SITE INVESTIGATION & PILE TESTING NATIONWIDE SPECIALIST PILING & FOUNDATION SERVICES
More informationProduct Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification
AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING Typical s Table of Contents: No. 4 5 6 7 8 9 0 External waterproofing of below ground concrete wall & slab Internal waterproofing of foundation
More informationSection 02415. Installation of pipe and casing for sanitary sewer by methods of augering.
ITY OF PRLN UGRING PIP OR SING FOR SWRS Section 02415 UGRING PIP OR SING FOR SWRS 1.0 G N R L 1.01 STION INLUS Installation of pipe and casing for sanitary sewer by methods of augering. References to Technical
More informationMicropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com
More informationLOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD
www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The
More informationBUTE Department of Construction Management and Technology
BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):
More informationCIVL451. Soil Exploration and Characterization
CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
More informationOutline MICROPILES SUBJECT TO LATERAL LOADING. Dr. Jesús Gómez, P.E.
MICROPILES SUBJECT TO LATERAL LOADING Dr. Jesús Gómez, P.E. Micropile Design and Construction Seminar Las Vegas, NV April 3-4, 2008 Outline When are micropiles subject to lateral load? How do we analyze
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationDrill Rig Safety. Brian Stringer Former BDA National Secretary British Drilling Association. BDA Driving Site Safety Seminar Manchester United FC
Drill Rig Safety Brian Stringer Former BDA National Secretary British Drilling Association BDA Driving Site Safety Seminar Manchester United FC 9th April 2014 1 Protection against Rotating Parts Biggest
More informationStandard Test Method for Mechanical Cone Penetration Tests of Soil 1
Designation: D 3441 98 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Test Method
More informationStrengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps
Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning May 7th 2013: Dominique Deschamps Scope of the paper Presentation of the project Cause of cracks
More informationDr. Jesús Gómez, P.E. 36th Annual Conference on Deep Foundations, Boston, MA
FHWA Hollow Bar Soil Nail (HBSN) Test Program Dr. Jesús Gómez, P.E. 36th Annual Conference on Deep Foundations, Boston, MA Outline Introduction and motivation Installation methods for testing Testing and
More informationThe International Workshop on Micropiles, 2007
MICROPILE FOUNDATION REPAIR AND UNDERPINNING, ARTS AND SCIENCE MUSEUM, UNIVERSITY OF PUERTO RICO, MAYAGUEZ Presented at: International Society of Micropiles (ISM) The International Workshop on Micropiles,
More information9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of
More informationEvaluation and Retrofitting of Building Foundations
Evaluation and Retrofitting of Building Foundations 1. Survey on the Integrity of Building Foundations 1.1 Introduction 1.2 Survey on the ground surface 1.3 Survey on the underground foundations 1.4 Survey
More informationForensic engineering of a bored pile wall
NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Forensic engineering of a bored pile wall Willem Robert de Bruin Geovita AS, Norway,
More informationJune 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationPlanning Information. Passenger and Freight Elevators.
A company of ThyssenKrupp Elevator Thyssen Aufzüge tk This planning information will give you an overview of the most important planning criteria of passenger and freight elevators. However you should
More informationHow to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013
How to Estimate the Cost of Support of Excavation for Foundation Installation CPE Candidate No. 0113013 May 15, 2013 1 How to Estimate the Cost of Support of Excavation for Foundation Installation Table
More informationSECTION 02200 SUPPORT OF EXCAVATION
SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems
More informationPurpose of the Local Liaison Committee
Agenda 1. Welcome, introductions and purpose of the Local Liaison Committee 2. Introduction to the scheme 3. Progress update 4. Elect a chair for future meetings 5. Agree agenda and terms of reference
More informationCONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationEXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...
More informationHow To Design A Foundation
The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More informationCHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
More informationWATER-SOURCE HEAT PUMPS*
CHAPTER 62, ARTICLE X, DIVISION 7. WATER-SOURCE HEAT PUMPS* * Editors Note: At the request of the county, Ord. No. 85-33, adopted Oct. 8, 1985, has been included in this Code. As the ordinance was not
More informationNow That s IDEAL. Now That s IDEAL. LISTEN. RESEARCH. DESIGN. DELIVER.
The Leading Edge SM At IDEAL, we try not to complicate things. We discover needs and problems, then work out solutions. It takes real teamwork to accomplish truly great things. That s you and us, working
More informationFY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationTECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
More informationSPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
More informationInnovation and Progress in Water Treatment Technology
Innovation and Progress in Water Treatment Technology Degree of separation of ultrafiltration Summary of the various processes The water will be pressed through the between the raw water side and the filtrate
More informationWind Sensor W-RS485 with RS485 Interface
Wind Sensor W-RS485 with RS485 Interface Technical data and notes for installation Elsner Elektronik GmbH Steuerungs- und Automatisierungstechnik Herdweg 7 D-75391 Gechingen Germany Phone: +49 (0) 70 56/93
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationDrain Back systems Made in Germany
Drain Back systems Made in Germany State-of-the-art technology Made in Germany Besides high-performance flat plate collectors the company STI also manufactures Drain Back systems. Many years of experience
More informationSAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
More informationInstallation Instructions for Solar Pumps USER MANUAL FOR SPS, SPC, SPSC SPQB, SPGJ SERIES SOLAR PUMPS AND PUMP CONTROLLERS
Installation Instructions for Solar Pumps USER MANUAL FOR SPS, SPC, SPSC SPQB, SPGJ SERIES SOLAR PUMPS AND PUMP CONTROLLERS PO Box 80, Tuakau 2342 ph 0800 14 48 65 e-mail: hunkin-garden@xnet.co.nz www.hunkin.co.nz
More informationSlab Track Austria. System ÖBB-PORR elastically supported slab
Slab Track Austria System ÖBB-PORR elastically supported slab 5. 2. 3. 4. 7. 6. Five holes for spindles 2. ÖBB-PORR slab 3. elastomeric layer 4. concrete joint sealing compound 5. rail support seat 6.
More informationSECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
More informationEUROCODE 7 & POLISH PRACTICE
EUROCODE 7 & POLISH PRACTICE Implementation of Eurocode 7 in Poland Beata Gajewska Road and Bridge Research Institute In Poland the designing with limit states and partial factors was introduced in 1974.
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationConstruction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description
Product Data Sheet Edition 15/10/2014 Identification no: 02 07 04 10 300 0 000002 SikaProof A Edge SikaProof A-08 Edge, A-12 Edge Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing
More informationBARRIER LIFT SYSTEM 2 BARRIER LIFT SYSTEM
BARRIER LIFT SYSTEM BARRIER LIFT SYSTEM The crash rated elkosta Barrier Lift System BLS offers maximum security for highly sensitive entry or exit points against unauthorised vehicles attempting to break
More informationCivil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationGUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL
More informationThe surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes.
QUALITY INSIDE When it comes to long life piping for drinking water, sewage, industrial water or gas, there is one name that continues to lead the way - ECOPUR by vonroll. Delivering precision-engineered
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationnecessary for years of satisfactory service. SmartBlock insulating form concrete walls share the
Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final
More informationCONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
More informationSUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
More informationITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load
More informationBuildings Department Practice Note for Registered Contractors 38. Registration of General Building Contractors and Specialist Contractors
Buildings Department Practice Note for Registered Contractors 38 Registration of General Building Contractors and Specialist Contractors This practice note covers solely the registration of general building
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationHigh Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
More informationHIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN Research & Development Division RD/GN/012 August 1990 HIGHWAYS DEPARTMENT GUIDANCE NOTES (RD/GN/012) SOIL TEST FOR PAVEMENT DESIGN Prepared
More informationMilan M5 metro extension the construction of Lotto station
Milan M5 metro extension the construction of Lotto station Giuseppe LUNARDI, Rocksoil S.p.A., Italy giuseppe.lunardi@rocksoil.com Luca MANCINELLI, Rocksoil S.p.A., Italy, luca.mancinelli@rocksoil.com Massimiliano
More informationopti-drän system Keeps your basement and building dry
opti-drän system Keeps your basement and building dry Last modified: January 0 DRAINAGE SYSTEMS ELECTRICAL SYSTEMS BUILDING TECHNOLOGY INDUSTRIAL PRODUCTS Professional building drainage with the opti-drän
More informationLEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code
LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900
More informationBUILD OVER SEWER (BOS) ASSESSMENT MANUAL
BRISBNE CITY COUNCIL BUILD OVER SEWER (BOS) SSESSMENT MNUL To be used in conjunction with Council s Build Over Sewer Request for Consent forms: Part 1 Request for Consent Part 2 ssessment VERSION: 02/2010
More informationUse of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair
Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair Eric M. Klein, P. E., Rummel, Klepper & Kahl, LLP, Baltimore, Maryland Kenneth B. Andromalos, P. E., Brayman Environmental,
More informationAmendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
More informationPaper - 4 - The relation of Micropile Diameters in case of Pressure casting and non-pressure casting (30)
Paper - 4 - Elarabi, H.; Abbas A., The relation of Micropile Diameters in case of Pressure casting and non-pressure casting,magnt Research Report (ISSN. 1444-8939), Vol.2 (2) Accepted for publication The
More informationEstimation of Adjacent Building Settlement During Drilling of Urban Tunnels
Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia
More informationMethod Statement for Static Load Testing (Compression) for Micropiles
Method Statement for Static Load Testing (Compression) for Micropiles 1. INTRODUCTION This vertical compression pile maintained load test is usually carried out to ensure the structural and geotechnical
More informationT7560A,B,C Digital Wall Module
T7560A,B,C Digital Wall Module HONEYWELL EXCEL 5000 OPEN SYSTEM BEFORE INSTALLATION All wiring must comply with local electrical codes and ordinances or as specified on installation wiring diagrams. Digital
More informationPART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
More informationExcavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
More informationPreventing Basement Flooding
Preventing Basement Flooding Perry Lindquist Land Resources Manager Waukesha County Dept. of Parks & Land Use Waukesha County Storm Water Workshop April 10, 2013 Presentation Outline Background Case study
More informationPILE TESTING SPECIFICATION
PILE TESTING SPECIFICATION 1.0 GENERAL This specification deals with the testing of a pile by the application of an axial load or force. It covers vertical and raking piles tested in compression (i.e.
More informationV. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials
E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of
More informationDESIGN-BUILD SUPPORT OF EXCAVATION FOR BLOCK 76. Rick Deschamps and Tom Hurley, Nicholson Construction, Pittsburgh, PA USA
DESIGN-BUILD SUPPORT OF EXCAVATION FOR BLOCK 76 Rick Deschamps and Tom Hurley, Nicholson Construction, Pittsburgh, PA USA The Block 76 project includes the demolition and redevelopment of an entire city
More informationStandard terms and conditions
Standard terms and conditions INTRODUCTION For the provision of a water service (Water Supply, Wastewater and Drainage) Under Section 73(2)(a) of the Water Services Act 2012, landowners may be entitled
More informationBAUER. Ground Improvement. Process
BAUER Ground Improvement Process Ground Improvement Characteristic Features Increase in load-bearing capacity Reduction of settlement Reduction of soil liquefaction during earthquakes No excavation no
More information