1 Evaluation and Retrofitting of Building Foundations 1. Survey on the Integrity of Building Foundations 1.1 Introduction 1.2 Survey on the ground surface 1.3 Survey on the underground foundations 1.4 Survey on Bearing Capacity 1.5 Evaluation of degree of damage 2. Restoration and reinforcement of building foundations 2.1 Outline 2.2 Repair, reinforce, settlement restoration 2.3 Restoring the settled, detached houses Annexes Annex 1 Integrity Investigation Techniques Annex 2 The Techniques of Restoration, Reinforcement and Settlement Restoration Annex 3 Countermeasure Techniques Against Differential Sedimentation 1

2 1. Survey on the integrity of foundations 1.1 Introduction Generally, in the case where any of such damages as differential sedimentation, inclination, cracks, and defects has been caused to foundations by an earthquake or consolidation settlement, a survey on the integrity of foundations is required. Great attentions should be paid to the sites, which may involve the risk of liquefaction or a settlement disaster, even if no differential settlement has been actually occurred. Nevertheless, for existing buildings, the actually-occurring phenomena such as differential settlement and inclination of the buildings and cracks in the foundation members tend to attract greater attention than the results of evaluations based on design calculation. In contrast, recently, precast piles and improved soil materials have been increasingly used in housing renewal and therefore, the supporting performance of precast piles needs to be confirmed. The evaluation items of foundation integrity may be largely classified as shown below: 1) Location of a foundation 2) Dimensions and geometry of the foundation 3) Quality of the foundation (strength/rigidity) 4) Bearing performance of the foundation Data on the location of the foundation in 1) and the dimensions and geometry of the foundation in 2) are useful at the stage of survey if design documents and construction execution reports are available. In many cases, no detailed record has been stored. The design documents used for building construction authorization may be kept by the owner but the construction execution reports have not kept anywhere in many cases except for special cases. In the survey on the earthquake damages, the foundation might have to be digging out for visual check. On the other hand, in some cases, the dimensions and geometries of foundation slabs and footings are different from those described in the design drawing in some cases and thereby, it is very important that the detail of the foundation referring not only to the design document but also to the construction execution report. The length of the pile may be roughly estimated by the IT test (PI test). For a bearing pile, its length may be different from the measured length depending on the depth of the bearing stratum and therefore, it is necessary to confirm it referring to the construction execution report. To determine the quality of the foundation, the strength test and the neutralization test are conducted using coarse samples for concrete, and the strength test as well as the check test for any corrosion are require for reinforcement. With an exception of the case where: 1) reuse of the existing foundation is required, 2) differential settlement and inclination has occurred, or 3) cracks or defects is found in the rising part of the foundation on the surface of the ground which may be visually checked, almost no survey on the quality of the foundation is conducted (Photo 1.1.1). The bearing performance of the foundation is generally evaluated based on the differential settlement or inclination if any. Thereby, the integrity is not considered in reusing the existing piles with the exception when the bearing force needs to be verify by the loading test. 2

3 Photo Method of conducting a survey on concrete integrity (general survey on concrete structures) 1) core recovery 2) core strength test 3) reinforced concrete gauge 4) reinforced concrete gauge 5) carbonation test (peeled off) 6) carbonation test (drilled out) 7) carbonation test (sampled core) 8) impact strength measurement Supplied by: Hitoshi HAMAZAKI (Building Research Institute) (excluding 2) and 4)) 3

4 In conducting the survey on the integrity of the existing foundation, the sampling test or the nondestructive test is compelling to be carried out in many cases because it is difficult to conduct in-depth survey on the entire foundation under the ground, which cannot be visually checked. In making an attempt to improve the reliability of this type of test, analysis using execution management data is useful and it is important to get deep inside into variations and differences in executed construction based on the result of execution management. At the present time, however, almost no construction execution report is prepared for evaluating variations and differences in executed construction and therefore, there is an urgent need to develop any technique for solving this problem. Building Research Institute is making efforts in developing a quality control system (3- DQC) for visualizing information on construction execution in cooperation with Koda/Satoh s Laboratory. This system provides correlated information on parameters such as excavation resistance per unit depth and material input relative to any of vertical and horizontal cross sections in the area under construction for easy identification (for example, M. Tamura, H. Sato et al, A 3-Dimensional Quality Control System in Foundation Construction, ISOPE, Toulon, France, 2004). Fig shows an example of the results from the management process of the deep mixing method of soil stabilization. Any of methods, which can automatically acquire and manage data on construction execution, may give similar views to the view shown above including the deep mixing method of soil stabilization and the penetration method of rotating piles using stirring blades. This management method provides such a function that a group of piles are managed together rather than individuals, allowing the constructor to grasp any variations in the geological stratum and any differences in construction during or immediately after construction and therefore, is expected to be useful in evaluating the integrity of the existing foundations. 4

5 Depth (m) Column Number Fig. 11 Number of mixing per 1 meter advance at X-3 Depth (m) Column Number Fig Example of the result of quality control for visualizing any change or variation in construction (3-DQC) (Example of correspondence between the number of rotations/the state of running and column numbers/depth torque or in the deep mixing method of soil stabilization) Besides, it is also effective to use any method for easy survey on the integrity of the foundations when new piles are constructed. Photo shows a marker for measuring any differential settlement installed on the rising part of the house foundation at the completion of construction. It is strongly recommended that this type of marker to be used to verify the horizontal plane prior to construction. 5

6 Marker 定 点 マーカー Photo Marker put the periphery of the house foundation for settlement monitoring Alternatively, to sense damages in addition to differential settlement and inclination, sensors and inspection windows may be prepared on the foundation members such as piles prior to construction. Several methods have been proposed for attaching optical fibers or carbon fibers to the pile bodies or winding them around the piles. Photo is an example of PHC piles with optical fibers buried inside, method still under development. It has been verified that the optical fibers can endure centrifugal fabrication. Fig shows a schematic drawing explaining this type of damage detection technique. Photo Example of PHC piles damage device survey method using optical fibers. Any cracks are checked by the bending test on piles with optical fibers attached Fig Example of pile foundation damage detection system Difficulties may arise not only in the evaluation of where responsibility for repair of damages lies or how severe of damages, but also in the determination of whether the repair work is required and in the repair work itself. Accordingly, if the damage detection system for the structures such as foundations as shown in the figure is required, this type of piles are expected to be put into practical use in future considering their importance/use and user s expectation to reusability. Unfortunately, such piles are not commonly used. In the case where any of construction methods, where piles and other members are built on site, such as the cast in-place concrete pile methods the procedure may be the following: two or more inspection windows 6

7 (steel pipes or PVC pipes) are buried inside the pile bodies along reinforced concrete baskets and then a transmitter/receiver is inserted into each of the inspection windows as in the case of nondestructive integrity surveys (see Annex 1) such as borehole sonar detection and ultrasound or gamma logging to evaluate the integrity of the pile bodies between two windows at each of predetermined depths. It is assumed that the actual state of the foundation will be confirmed at the completion of construction through this survey. The result of the confirmation may allow for easy recognition of the integrity and deterioration of the existing foundation when it is reused later. 1.2 Survey on the ground surface In the survey on the ground surface, 1) any differential settlement/inclination and 2) crack/defect in the foundation are checked. To check for any differential settlement and inclination, a level tube is used in many cases. Recently, an auto level may be used to check to see if any differential settlement and inclination have occurred in a short period of time. In an example of settlement restoration done in a foreign country introduced in Section 2.4, the leveling tube or manometer is used to manage and display the presence of differential settlement using contours. It is required that on the ground surface, not only the foundations but also the floors and columns to be checked for any inclination (Photo 1.2.1). Photo Example of method for measuring foundation integrity (simple measurement, for example, visual check or non-destructive test) Inclination measurement using a auto level or leveling tube, crack width measurement using a crack gauge, repulsive strength measurement, etc. 7

8 In most of standard buildings, the rising element of the foundation can not be visually checked. On the other hand, for small-sized houses such as detached houses, cracks or flaws of the external portion of the foundation are used as an indicator of possible defects. Accordingly, it is important that the survey on the element of the foundation, which may be visually checked, to be conducted. To check to see if defects have occurred for confirmation of the integrity of the concrete foundations on the ground surface, simple instruments such as an insert clearance gauge, as well as magnifying mirrors for check the widths of cracks, repulsive strength measuring devices, and reinforced concrete exploration devices may be used. In recent years, any soft coating material has been applied to the external elements of the foundations in some cases and therefore, it is required that the widths of cracks and other flaws to be measured fully considering the kind and properties of a finishing material. 1.3 Survey on the underground foundations One of the direct foundations structure representative damage is inclination of rigid members witch is usually evaluated to be minor, even if the building differentially settles. This type of damage is not representative for pile foundations. For direct type, the underground part of the foundation is buried near the surface and can the ground can be excavated to check the integrity of them visually. It may be difficult to visually check the foundation integrity for the old buildings because the survey require dig-out the piles and loading test. Recently for direct and piles foundations much frequently are used soil improvements technique. Accordingly it is more important than ever to evaluate the integrity of the improved soil if differential settlement or any other damage occurs. During the Miyagi Prefecture Earthquake (1978) and Southern Hyougo Earthquake (1995) many piles have been damaged. The damages were found not only at the heads but also in the middle portions of the piles. To estimate or visually checked for any damage in the middle portions and heads of piles, surveys and tests are conducted from the heads of the piles or through the hollow portions or bore holes, which have been opened in the piles. The terms of survey are classified largely into 1) those on the foundations directly beneath the building and 2) those on the underground foundations. For the direct type, the survey on the directly beneath the building is generally conducted, while any other inspection is required depending on the pile type if soil improvement or reinforcement such as the deep mixing method of soil stabilization have been employed to protect the piles. Table summarizes the individual surveys. In conducting the survey, it is always required to allow for determining whether the damages to the foundation have been caused due to insufficient bearing capacity of the foundation or due to the defect in the pile, as well as checking to see if the precast piles may be reused for selecting appropriate restoration method. To determine whether the precast piles may be reused, the survey on the integrity of the pile bodies as foundation members by the non-destructive test and the bearing capacity of the foundation by the loading test must be conducted in some cases. One of the methods for roughly examining the states and positions of the damages of the underground piles is the non-destructive test. The non-destructive methods use low-strain elastic undulation, or earthquake generating equipment installed at the top of the pile produce vibration or an impact given on the top of the pile to measure the force exerted and vibrations. Another 8

9 method, where various types of sensors are inserted into a bore holes formed in the hollow portions of the piles or in the piles themselves, or inspection windows previously formed during construction, may be included in the non-destructive test. Table Underground survey method (mainly pile foundations, see Annex 1) Method Description Drilling survey Visually checks the states of foundations. Leveling survey Measures inclination or differential settlement of underground foundations and others. IT test (PI test) Surveys the integrity of the pile bodies by carefully hitting the heads of piles. Borehole camera Observes piles through their hollow portions, boreholes, and gaps/cavities and others. Borehole radar Surveys the positions of damages in the piles, if any, through boreholes and others. Borehole sonar Surveys the integrity of pile bodies through the boreholes and the hollow portions of the piles. Ultrasonic measurement Surveys the integrity of pile bodies through the hollows of the pile bodies. Caliper logging Measures any variation in diameter of minute holes of the hollow portion at the cracks or cross sections of pile bodies. Used in conducting the surveys on damages/integrity through the hollow portions of piles. Gamma-ray density logging Identifies gaps, if any, in the concrete elements using the dependency of the result of measuring the gamma-ray dose density. It is difficult to detect such a variation in density that may be caused by a crack. AE measurement Detects damages to pile bodies, if any, through an elastic (acoustic emission) wave induced by a crack. Inclinometer Used in estimating the positions of the damages to pile bodies based on L-discontinuous points for inclination. Loading test Estimates bearing capacity (static, quick, impact, etc.) Others Estimates the positions and sizes of the damages through surface wave measurement. (1) Survey from the heads of piles IT test. This method uses elastic undulation in a low-strain region to estimate the lengths and damaged portions of piles based on the profile of its reflected wave. If a survey can be conducted on the piles after being removed from the footing, the result may be easily obtained. In contrast, even if the piles remain attached to the footing, this method enables the test to be conducted. With the footing attached to the tops of the piles, an impact is generally applied on the footing or the anchors installed on pile heads. With the pile heads being not open, a signal reflected from the lower portion of the pile, as well as a signal reflected from the footing or 9

10 column in the upper part is mixed into the resulting signal. Alternatively, another method (stereo measurement method) may be used. This method involves the following steps: 1) installing sensors at two test points on the piles, 2) separating a falling wave and arriving wave based on the phase contrast between elastic undulations measured at these points, and 3) evaluating the integrity of the piles based on information from the arriving wave. (2) Survey through the hollow portions of piles The non-destructive tests conducted from the heads of piles, such as the IT test, is effective as a primary method for estimating actual states of the damages to pile bodies. In some cases, however, any more direct method for grasping the damaged positions and the actual states of damages is required. Various types of measurements may be conducted through the hollow portions for precast piles and core holes formed in the pile bodies for cast-in-place piles, respectively, which gives deeper insight into the actual states of the piles. These survey methods, however, are generally effective only when the heads of piles are open. If a footing or any other member has been constructed, boreholes need to be drilled in it. In this type of measurement method, sensors (or cameras) and others are inserted into the hollow portions of piles, where measurements are conducted. In this method, 1) borehole cameras, 2) inclinometers, 3) gamma-ray densiometer, 4) caliper (hole or diameter) gauges, 5) ultrasound (acoustic intensity) measuring devices, 6) borehole sonars, etc., may be used. When the devices listed in 2), 3), and 4) are used, the sensors should be brought into contact with the sides of the holes and then slid on them for measurement (Photo 1.3.1, Annex 1). Fig Example of a survey on the underground foundation (borehole camera, IT test, and bore sonar) One, which allows for most direct measurements and give distinctive results, is observation of hole walls using 1) the borehole cameras. The borehole camera is a kind of video camera and several types have been developed including those integrating a fiber scope. Some enables measurements at an angle of 360 all at once. If the boring step is required in making measurement on the cast-in-place piles and others, the states of the concrete elements may be determined to some degree by observing core samples collected. Cracks, however, may occur in 10

11 boring and thereby, it is difficult to correctly distinguish between the cracks caused by the earthquake and those occurring later by boring in some cases. If there is no information about the construction of pile or foot foundation, methods like the borehole radar and surface wave exploration should be used and after a rough inspection with these method, the integrity of the piles need to be checked by another method. Some of the individual survey methods are described in Annex 1. See Damage to Building Foundations and Their Restoration (Kenchikugijyutsu, 1995, Special Issue, 1) and other literatures as the need arises. 1.4 Survey on Bearing Capacity Possible causes for differential settlement of buildings and the damages to the pile bodies, is insufficient bearing capacity. Once differential settlement has occurred, the loading test may be used to ensure the direct understanding of the bearing capacity of existing piles. In some cases, before the loading test on the existing piles, the load supported by the piles must have been temporarily up borne by some way. In the commonly used method (the steel pier technique), steel pipe piles are pressed into the bearing stratum using jacks by means of reactive force from the footing to support the load applied on the footing. The reactive force will be supported by the load on the footing and the piles in the vicinity of it in the loading test. Photo shows an example of the static loading test, which is most commonly used. The loading test includes the static loading test (the reactive pile method), as well as the rapid loading test and the impact loading test. Among them, the test, which recently has attracted attention, is the rapid loading test. Photo shows an example of the rapid loading test, where almost all the load-displacement relations may be obtained. Photo is referred only for reference instead of exemplification. In this figure, a kind of pile construction method commonly used in China, by which piles are pressed in by applying static force. In the case where the pile diameter is small, it may be possible to conduct the test under press-in force for complementing the loading test. The steel pier technique commonly used in restoring the settled pile foundations is similar to this static steel pier technique, by which the bearing capacity is estimated, confirmed, and managed based on the relation between the press-in force and the amount of settlement and other parameters, if applicable. Loading equipment (5000kN class) Loading equipment (50000kN class) 載 荷 装 置 (50000kN 級 ) 載 荷 装 置 (5000kN 級 ) Fig Vertical loading test on repulsive force piles (see Annex 2-1) 11

12 Monogen モンケン Pile strain gauge 杭 体 内 歪 ゲージ Accelertor 加 速 度 計 Dynamic strain amp AD converter Cellasto buffer チェラストバッファー Load cell (1000tf) ( 緩 衝 材 ) ロードセル (1000tf) H Load cell ロードセル GL Cussion クッション 材 material 試 験 杭 Test pile Bridge フ リッシ ホ ックス box 動 歪 アンフ AD コンハ ータ Optical displacement gauge target 光 学 式 変 位 計 ターゲット AD converter ADコンハ ータ Optical 光 学 式 変 位 計 displacementgauge OD-SYSTEM CD system Exampleof 500tf 500tf 実 施 例 モンケン5tf Fig Example of the quick loading test method (see Annex 2-3) Optical 光 学 式 変 位 計 displacement gauge (ターゲット 部 ) Pile stress 杭 体 内 応 力 Fig Static steel pier technique (Push piles, Shanghai, China) 1.5 Evaluation of degrees of damages Outline The integrity of the building foundations is basically evaluated by checking for any differential settlement or inclination of buildings and for any crack or defect in their foundations. The parameters including an angle of inclination and a crack width may be used. The criteria for determining whether any defect has occurred are applicable only to the members, on which visual check may be easily done, such as the raising portions of the continuous footing foundation of a detached house. For underground piles, it is important to evaluate their integrity and the degree of damages to them depending on the type of piles. Similarly, for pile caps and foundation slabs, may need to be evaluated considering the type of piles, the location of piles, and the effects of the technique used for attaching the pile heads. As an institutional method for evaluating the degree of damages and severity of disaster damages to foundations, an evaluation method using the parameters such as the state and angle of deformation of foundation and the state of settlement in surrounding ground as indexes has been proposed for determining rapidly the risk level and severity of disaster damages of buildings after an attack of earthquake. Only a few studies have been conducted on the degree of damages to the underground slabs and piles of buildings and thereby, definitive data is almost not available. 12

13 It should be noted that it is possible to evaluate the degree of damages to building foundations and the integrity of them based on the state of piles and the result of structural calculation in a certain way, while unlike the foundations of structures constructed by public works, the necessity of restoration and recovery and the intent and degree of restoration may be dependent on a case-by-case basis in determining the severity of disaster damages to buildings and handling the result of determination. In the case where not only an earthquake but also settlement damages due to consolidation settlement have occurred, if the damages to the upper structures are not severe, inclination, if any, is perhaps restored only by replacing the floor materials with new ones to flatten in many cases because restoration of the settled foundations requires a large amount of money. Also, it should be noted that the pile heads are seldom dug out to make closer inspection unless serious building settlement or inclination occurs. The guideline 2) mentioned above assumes that the conditions (condition A) described below may be applicable to the buildings, of which foundations was damaged. For the buildings including those which satisfy the condition A, those for which settlement or inclination was detected in the rapid determination the dig-out survey it is require to be conducted. Conditions which implicitly indicate damages to foundations 2) 1. Buildings situated in the area where a geotechnical flow due to the land slide or liquefaction was observed. 2. Buildings without being damaged, which are situated in the area where a earthquake with a magnitude of VI+ or larger attacked and their surrounding buildings were seriously damaged. 3. Buildings with an aspect ratio of 2.5 or higher, which are situated in the area where an earthquake of a magnitude of V+ or larger attacked Evaluation of degree of damages to foundation slabs Table and Figure show the degrees of damages to foundation slabs. Any crack width was evaluated by ranking in four levels: 0.2 mm or less, 0.2 to 1 mm, 1 to 2 mm, and 2 mm or more. On the other hand, the severity of damages was evaluated by roughly ranking in five levels: rank I (mild), rank II (minor), rank III (moderate), rank IV (serious) and rank V (destructed). 13

14 Degree of damage I II III IV V Table Scheme of degree of damages to foundation slabs 2) Symptoms 0.2 mm or less of fine crack occurred. No concrete material fallen off. Approx. 0.2 to 1 mm of crack occurred. No concrete material fallen down. Concrete material slightly fallen off with reinforcing steels not visible. Approx. 1 to 2 mm of crack occurred. Concrete material very slightly fallen off. Reinforcing steels may be slightly visible. 2 mm or more of crack occurred. Concrete material significantly fallen off. Reinforcing steels seriously exposed. Reinforcing steels have bent and internal concrete structure collapsed. Foundation slabs deformed in the direction of its height. Settlement and/or inclination detected. In some cases, reinforcing steels broken. 14

15 Degree Symptom 0.2 mm or less Approx mm Minor peeled surface No reinforcing steel observed Approx. 1-2 mm Minor peeled concrete No reinforcing steel 2 mm or more of reinforcing steel observed reinforcing steel not bent 2 mm or more Reinforcing steel observed Deformation in height Settlement/ inclination Broken Broken Internal concrete reinforcing reinforcing Reinforcing steel bent and internal concrete Evaluation of degree of damages completely steel steel completely separated to pile foundations broken Fig Example of degrees of damages to foundation slabs 2) 15

16 Table and Figure show the scheme for evaluating the degree of damages to cast-in-place concrete piles and examples of evaluation. As in the case of foundation slabs, crack widths were ranked at four levels: 0.2 mm or less, 0.2 to 1 mm, 1 to 2 mm, and 2 mm or more. Precast concrete piles (e.g., PHC piles), as shown in Table , were ranked at three levels: 0.1 mm or less, 0.5 mm or less, and 1 mm or less. Smaller crack widths were used in evaluating the degree of damages when the degree of damages were at the same level considering that the effects might exert on a prestressed, high-strength concrete material. Table Scheme for evaluating the degree of damages to cast-in-place concrete piles 2) Damages due to axial tension or bending (in the case where a crack has occurred at an angle of 45 to almost the horizontal line) I 0.2 mm or less of fine bending crack (horizontal crack) occurred. 0.2 mm or less of fine bending shearing crack (at an angle of 45 ) occurred. One to three cracks occurred within 1.5D on one side. No concrete material fallen off. II 1 mm of horizontal crack occurred. Approx. 1 mm of crack occurred at an angle of 45. One to three cracks occurred within 1.5D on one side. No concrete material fallen off, or only the surface material fallen off. Reinforcing steels not visible. III Approx. 1 to 2 mm of horizontal crack occurred. 1 to 2 mm of crack occurred at an angle of 45. Three or more cracks occurred within 1.5D or cracks occurred at an interval of approx. 20 to 30 cm. Surface concrete material locally fallen off (approx. 10 cm in height, or within 0.2D) Reinforcing steels may be slightly visible. Damages due to axial tension or shearing stress (in the case where a crack has occurred at an angle of 45 to almost the vertical line) 0.2 mm or less of fine crack occurred. One or more cracks occurred within 1 to 3D. No concrete material fallen off. Approx. 1 mm of fine crack occurred. One or more cracks within 1 to 3D occurred. No concrete material fallen off. Approx. 1 to 2 mm of crack occurred. One or two cracks occurred within 1 to 3D. Oblique crack occurred with concrete material fallen off from its top. Horizontal reinforcing steel not visible. Damages due to axial tension (in the case where only a horizontal crack occurred) 0.2 mm or less of fine horizontal cracks occurred. Cracks occurred at an interval of approx. 1D or more. No concrete material fallen off. 1 mm or less of fine horizontal crack occurred. Cracks occurred at an interval of 0.5 to 1D or less. No concrete material fallen off. Approx. 2 mm of horizontal crack occurred. Cracks occurred at an interval of 0.5 to 1D or less. Only 10 cm-width of concrete material fallen off along crack. Reinforcing steels are slightly visible through a gap left after concrete material was fallen off. 16

17 IV 2 mm or more of horizontal crack occurred. 2 mm or more crack occurred at a angle of 45. Five or more cracks occurred within 1.5D. Cracks occurred at an interval of approx. 20 to 30 cm. Surface concrete material fallen off. Approx. 20 to 30 cm of crack occurred or crack occurred within approx. 0.5D. Concrete material remains inside reinforcing steel members. Local buckling found in reinforcing steels. Vertical crack occurred. V Pile axially compressed. Concrete material broken down and buckling found in all the reinforcing steels. Reinforcing steels broken down. 2 m or more crack occurred. Two or three cracks occurred within 1 to 3D. Concrete material fallen off along oblique crack. Reinforcing steels are visible along oblique crack. Buckling not found in reinforcing steels. Buckling found in reinforcing steels along oblique crack. Vertically compressed. Reinforcing steels broken down. Note) D indicates the diameter of a pile in the table. Concrete material fallen off along crack (approx. 10 cm in width). Reinforcing steels exposed along gap left after concrete material was fallen off. Clearance left between pile head and footing, through which fixed concrete material is visible. Buckling found in reinforcing steels. Axially compressed. Pile clinched. Reinforcing steels broken down. 17

18 Degree A Foundation slab Foundation slab Foundation slab Foundation slab Foundation slab 3 cracks within Peeled surface 1.5D concrete 1-3 cracks within 1.5D 0.2 mm or less 1-3 cracks within 1.5D App. 1mm Peeled surface, No reinforcing steel observed Approx. 10 cm or 0.2D Approx.1-2 mm Local peeled concrete, reinforcing steel partially observed Vertical crack Reinforcing steel partially bucked Vertica lly contrac ted All the reinforcing steel bucked B Foundation slab Foundation slab Foundation slab Foundation slab Foundation slab Pile foundation 0.2mm 1mm or less Peeled concrete, No reinforcing steel observed Approx. 1-2mm 2 mm or more Peeled concrete Reinforcing steel observed, not buckled Axially contracted Reinforcing steel buckled, reinforcing steel broken C Foundation slab Foundation slab Foundation slab Foundation slab Foundation slab Reinforcing Separated 0.5-1D or steel slightly from footing, 0.5-1D or less observed fixed Axially less reinforcing contracted 0.2 mm or less 1 mm or less steel Approx. 1D Peeled concrete Approx. 10 mm (minor) Approx 2mm Peeled concrete Exposed reinforcing steel Bent pile Reinforcing steel buckled Fig Example of evaluation of degrees of damages to cast in place concrete piles 2) A=Damages due to axial force and bending force B=Damages due to axial force and shear force C=Damages due to axial force 18

19 Table Scheme for evaluating the degree of damages to precast concrete piles (PC, PHC, PRC) 2) Degree of damage I III V Damages due to axial tension or bending stress. (in the case where crack occurred at an angle of horizontal line to almost 45 ) 0.1 mm or less of fine bending crack (horizontal crack) occurred. 0.1 mm or less of fine bending shearing crack occurred (at an angle of 45 ). Two or three cracks occurred within 1.5D on one side. No concrete material fallen off. Approx. 1 mm or less of horizontal crack occurred. Approx. 1 mm or less of crack occurred at an angle of 45. Three or more cracks occurred within 1.5D on one side. Or, cracks occurred at an angle of approx. 20 to 30 cm or less. Local surface concrete material may be fallen off (10 cm in height or within 0.2D). Steel material may be slightly visible. 1 mm or more of horizontal crack occurred. 1 mm or more of crack occurred at an angle of 45. Type of damage Damages due to axial\tension or shearing stress. (in the case where crack occurred at an angle of 45 to almost vertical line) 0.1 mm of fine crack occurred. One or more cracks occurred within 3D on one side. No concrete material fallen off. 0.5 mm or less of fine crack occurred. Three or less cracks occurred within 3D on one side. No concrete material fallen off. 0.5 mm or more crack occurred. Three or more cracks occurred within 3D on one side. Damages due to axial tension. (in the case where only horizontal cracks occurred) 0.1 mm of fine horizontal crack occurred. Cracks occurred at an interval of approx. 0.5D or more. No concrete material fallen off. Approx. 1 mm of horizontal crack occurred. Cracks occurred at an interval of 0.5D or less. Concrete material slightly fallen off along crack (10 cm in width). Concrete material fallen off along crack (10 cm in width). Steel material exposed along gap left after 19

20 Five or more cracks occurred within 1.5D on one side. Cracks occurred at an interval of 20 to 30 cm or less. Local buckling or breakage found in copper material. Vertical crack occurred. Pile axially compressed. Concrete material broken down. Concrete material fallen off along oblique crack. Buckling or breakage found in steel material along oblique crack. Pile axially compressed. concrete material was fallen off. Clearance formed between pile and footing, through which fixed reinforcing steels are visible. Buckling or breakage found in steel material. Pile axially compressed. Pile clinched. 2. Restoration and reinforcement of building foundations 2.1 Outline To restore and reinforce foundations, first of all it is necessary to determine whether the damaged elements will be restored for reusing, whether they are replaced with new ones, and whether the damaged elements will be left with no restoration for retrofitting using additional piles. If differential sedimentation occurred, needs to be corrected. For the foundations, the restoration of damages are usually done in parallel with the correction of differential sedimentation without an exception of repairing works on the raising elements of foundations and cracks and defects on foundation slabs because the differential sedimentation occurs in most cases. Generally, the foundation members (composed mainly of concrete) are repaired in the same way commonly used as that for the structural members on the ground. On the other hand, at deep points under the ground, usually, repair works are not easily done and thereby, the use of additional piles may be basically useful in repairing when the members have been apparently damaged. If no other methods are available, such a method may be used that the surrounding area around the damages member is compacted by improving the ground (e.g., the grouting technique). This method is difficult to apply to structural computation and usually, is considered to be a quick fix or reserve-capacity one. Resin injection (the automatic low-pressure grouting technique) may be essentially used in repairing cracks in concrete materials and cross-section repairing with high-strength mortar or concrete in repairing defects. In some cases, however, steel pipes are attached to the damaged piles to restore or reinforce depending on the degree of damages and the type of piles. The methods for restoring settlements may be classified mainly into two: jack up and grouting. Herein, the outline and basics of settlement restoring methods will be described. The 20

21 individual rearing, reinforcing, and settlement restoring methods are introduced in Annex 3. In addition, they are also described in References 1 and Repair, retrofitting, settlement restoration To restore damaged foundations, various types of methods are used depending on the factors, such as the foundation form, building size, and desired restoration level, especially mainly on the foundation form (pile foundation/direct foundation). It is unlikely that broken direct foundations lead to functionality deterioration even if the foundation members themselves incline to the same extent as in the case of pile foundations. In many cases, insufficient bearing capacity tends to incline the entire building together with its foundation and therefore, differential sedimentation needs to be restored from the standpoint of the functionality and dwelling performance. Expectation on restoration considerably varies on a case by case basis. To restore the settled buildings, the most commonly used methods are jacking-up or grouting and the level is adjusted to use the existing bearing layer with no modification. In some cases new piles may be used, depending on the state of the ground. In the case where the buildings incline with minor damage, a simple method, by which the upper part above the foundation of its settled portion is jacked up and mortar is filled in clearances, or a method, by which differential sedimentation is restored using the grouting technique. On the other hand, in the case where settlement or differential sedimentation is severe with many cracks in the foundation, the upper side of the foundation may be jacked up construct a new foundation. If it is difficult to jack up the foundation due to the site condition or any other factor, it may be jacked down to adjust the level. Note that methods for restoring settlement commonly used in foreign countries are introduced in Section 2.5. Among them, one of the methods used in China involves digging out soil under the foundation on the raised side (on the not-settled side) by boring to restore to the horizontal level. To prevent middle size of detached houses and RC buildings from settling in the future, new piles are pressed into the ground to modify the form of the foundation. To press piles into the ground for stabling the entire ground under the foundation by means of improvement, various methods are used; for example, 1) actual piles are used, 2) mortar is injected into the ground to form pile-like cement bodies, smalldiameter of steel pipes are pressed into the ground, or 3) post ground improvement (in the methods 1) to 3), virtual piles are used). The jack-up and grouting techniques are described below Jack-up technique The jack-up technique, by which buildings are lifted, is the most used method for restoring the settled buildings and may be classified into several groups depending on the size of a building, site conditions, actual damages, and actual factors. The jack-up technique involves lifting up the settled portion of a building or the entire building using jacks literally. Hydraulic jacks are commonly used. The jacks with capacity two to three times the building load should be correctly inserted so that the same level of post load is applied on each of jacks. The jacks are usually inserted beneath the foundation footing supporting the posts. In some cases, however, they may be inserted beneath the underground beams. A special important factor is the capacity and arrangement of jacks to be used. 21

22 For jacking-up the building, reaction force is requiring. The reaction force can be obtained in three ways described below depending on the size of a building and the ground state around it: 1) The existing foundation is used as reaction force as it is. 2) A mechanical jacking is used to ensure reaction force. 3) New piles are pressed into the ground to ensure reaction force. The method 1) is used to easily and speedy restore settlement in the relatively small-sized buildings (detached houses, steel-structured warehouses, etc.) with minor damages. This technique does not restore substantially the settled building and thereby, the building may settle again depending on the cause of the initial settlement. The method 2) is useful in the case where the ground around the settled building is relatively stable and the possibility of resettlement is low. The method 3) is used when reaction force can not be ensured on the existing foundation or ground, or when future settlement needs to be prevented in any way possible. The most commonly used method for restoring differential sedimentation of buildings using jacks is the steel pier technique. This technique involves a process, in which steel pipes with φ 200 to 400 mm in diameter, 1 m in length, are pressed into the ground one after another, up to the bearing layer using the building load as reaction force. It may be assumed that 1/2 to 1/3 times the maximum press-in force is set for long-term permissible bearing capacity. When the piles are pressed into the ground, the pressing-in force can be read using a manometer. This means that the technique has an advantage in that most of bearing force may be verified as in the load test (note that it is not complete unlike the standard load test). Moreover, construction is made only under the foundation and thereby, the building can be used as usual. The working space under the foundation is about 1.5 m. Photos and show the states of the steel pier technique and the building restored by this technique in Niigata Earthquake in Photo shows the building restored by the mechanical jacking technique. In addition to the steel pier technique, typical jack-up techniques include the techniques of mechanical jacking, saddle technique, shed restoration technique, and nekagami technique, of which outlines are described in Fig For more information, refer to Annex 3 if necessary. Photo Example of construction by steel pipe press-in technique 22

23 Photo Examples of settlement restoration by steel pier technique and lifting technique Examples of settlement restoration of direct foundation type buildings settled by an attack of Niigata Earthquake by steel pier technique while being used. As a part of construction management in settlement restoration, any vertical and horizontal displacement was automatically measured using a slide meter and a seismometer. Photo Example of settlement restoration by pressure board technique The ground in the vicinity of the periphery of the building was dug out and concrete was cast on a suitable natural ground. Then, jacks were inserted between the concrete board and the bracket attached to the side wall of the periphery of the foundation to lift the foundation. 23

24 Steel pier Pressure board Sandle Support jack Hydraulic jack Hydraulic jack Pressure board Steel pipe piles are cast to reinforce the foundation and use as a repulsive force in restoration. Prevents resettlement from occurring. Concrete board (pressure board) is cast under the foundation to use as a repulsive force in restoration. In many cases, used for prefabricated and reinforced concrete houses. Uses the ground as a repulsive force in restoration. Shed restoration Negarami Base Bracket Reinforcing steel post Negarami steel Hydraulic jack Often used for buildings constructed by conventional methods such as timbered axis. Note that it is prerequisite that the ground is stable. Often used for large-scale reinforced concrete buildings (factories and warehouses). It is also prerequisite that the ground is stable. Fig Outline of jack-up technique (Supplied by: Mase Construction) 24

25 2.2.2 Grouting technique Most of restoring techniques basically involves a mechanical process for lifting the foundation up using jacks, ensuring high certainty. In some cases, the grouting technique, by which grout is injected into the ground for raising it, lifting the building, is also used for direct foundation buildings. This technique has a reduce reliability and certainty; however, it may be useful when easy and speedy restoration is required. The grouting technique is largely classified into two types: in one type, the grout is permeated into the ground and in the other type it is solidified by itself without permeating. To improve safety of the entire foundation ground, the former may be used under the foundation or around piles. To restore differential settlement, the latter is suitable. Cement grout is used as grout because of its excellent durability (Photo ). The chemical grouting technique involves a process for injecting a chemical (for jacking up, cement flash-set chemical), which requires a given time for curing when injected, to compact the ground (the chemical can not permeate into the viscous soil layer and thereby, it enters into the ground in the form of nervation). Recently, a new grouting technique has been put into practical use by which highly illiquid grout with a slump of almost zero is pushed into the ground under high pressure (Photo ). To restore differential settlement by grouting, it is required that the impermeable grout be pressed into the ground on the depressed side to increase the volume of the ground causing the ground to rise. This results in the raising ground. In the chemical grouting technique, several grouting works are used. To restore settlement, the simple rod technique or the double packer technique, which allows for close construction management, is used. The chemical is in a liquid state and has high fluidity, when injected, even if an impermeable one is used and therefore, it tends to travel in the form of nervation or layer. Accordingly, it is difficult to artificially control the degree to which the ground is raised. Depending on the ground condition, no effect of grouting is observed. On the other hand, unlike chemical grouting, in compaction grouting, illiquid (slump being almost zero) cement mortar is pushed into the ground under high pressure (approx. 100 kgf/cm2 of max. discharge pressure) and so, it is unlikely that the grout travels in the form of nervation or layer and a mass (bulb-like) of cemented bodies are usually formed. Note that if the ground, into which the grout is injected, is heterogeneous, the injected grout deforms. Since for the grout is hard to travel out from a given area, the degree to which the ground is raised can be easily controlled. Accordingly, the settled building may be restored if construction is carefully made while the lifting condition and effects of lifting on the periphery of the building are being monitored. Determining from the past results, the foundation form, to which compaction grouting is applicable, is the direct foundation (especially, raft foundation). For a larger size of building, the vertical load under the foundation is also large. This means that the ground tends to expand laterally when the foundation is raised. In this case, simply the ground around the building may be raised without the building itself being lifted. This technique is only applicable to a moderate size of buildings. It should be sufficiently noted that compared with the jacking up technique, the grouting technique has an advantage in time for completion and construction cost, while depending on the ground condition/foundation form/size of building, no effect of grouting is expected. It is required to consider the ground environment because: 1) the grout may enter the neighboring sites across the boundary; 2) a water survey is conducted when a grouting work is made in the 25

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage 3.3. Evaluation of Building Foundation Damage Basic Terminology: Damage: Destruction, deformation, inclination and settlement of a building foundation caused by an earthquake. Damage grade: Degree of danger

More information

The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space

The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space The Stabilizer TM Supplemental support system for sagging beams and floor joists within a crawl space Pre-drilled holes in steel plate allow for connection to beam or floor joists. Benefits Levels and

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Technical Notes 3B - Brick Masonry Section Properties May 1993

Technical Notes 3B - Brick Masonry Section Properties May 1993 Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch USE OF MICROPILES IN TEXAS BRIDGES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch DEFINITION OF A MICROPILE A micropile is a small diameter (typically less than 12 in.), drilled and

More information

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Lecture No. # 13 (Refer Slide Time: 00:18) So last class, it was

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

Seismic Risk Prioritization of RC Public Buildings

Seismic Risk Prioritization of RC Public Buildings Seismic Risk Prioritization of RC Public Buildings In Turkey H. Sucuoğlu & A. Yakut Middle East Technical University, Ankara, Turkey J. Kubin & A. Özmen Prota Inc, Ankara, Turkey SUMMARY Over the past

More information

Chapter. Earthquake Damage: Types, Process, Categories

Chapter. Earthquake Damage: Types, Process, Categories 3 Chapter Earthquake Damage: Types, Process, Categories Earthquakes leave behind a trail of damage and destruction. People s lives are affected by the loss of loved ones, destruction of property, economic

More information

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14 Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318

More information

Structural Failures Cost Lives and Time

Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one

More information

BUTE Department of Construction Management and Technology

BUTE Department of Construction Management and Technology BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

PDCA Driven-Pile Terms and Definitions

PDCA Driven-Pile Terms and Definitions PDCA Driven-Pile Terms and Definitions This document is available for free download at piledrivers.org. Preferred terms are descriptively defined. Potentially synonymous (but not preferred) terms are identified

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

ALLOWABLE LOADS ON A SINGLE PILE

ALLOWABLE LOADS ON A SINGLE PILE C H A P T E R 5 ALLOWABLE LOADS ON A SINGLE PILE Section I. BASICS 5-1. Considerations. For safe, economical pile foundations in military construction, it is necessary to determine the allowable load capacity

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and

More information

Meeting the Challenge of Pipeline Emergency Repair

Meeting the Challenge of Pipeline Emergency Repair Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider

More information

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China

Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147

More information

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE Pei-Chang Huang 1, Graduate Research Assistant / MS Candidate Yao T. Hsu 2, Ph.D., PE, Associate

More information

SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS

SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS Fracture Mechanics of Concrete Structures Proceedings FRAMCOS-3 AEDIFICA TIO Publishers, D-79104 Freiburg, Germany SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS H.

More information

Elevating Your House. Introduction CHAPTER 5

Elevating Your House. Introduction CHAPTER 5 CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information

symptoms of a faulty foundation

symptoms of a faulty foundation symptoms of a faulty foundation How does drought impact your home's foundation? For many Texas families, their home becomes the single largest investment and also the family fortune. The home's foundation

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

The advantages and disadvantages of dynamic load testing and statnamic load testing

The advantages and disadvantages of dynamic load testing and statnamic load testing The advantages and disadvantages of dynamic load testing and statnamic load testing P.Middendorp & G.J.J. van Ginneken TNO Profound R.J. van Foeken TNO Building and Construction Research ABSTRACT: Pile

More information

(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line

(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line Report by the First Joint Survey Team of the JSCE Concrete and Structural Engineering Committees on the damage caused by the Great East Japan Earthquake April 5, 2011 (First Report) 1. Survey team members

More information

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com

More information

Forensic engineering of a bored pile wall

Forensic engineering of a bored pile wall NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Forensic engineering of a bored pile wall Willem Robert de Bruin Geovita AS, Norway,

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures

1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures Prof. Oral Buyukozturk Massachusetts Institute of Technology Outline 1 1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures

More information

CONDITION ASSESSMENT, REPAIR STRATEGY AND BUDGET ESTIMATE FOR OLP PIER 1 RMG YARD AREA

CONDITION ASSESSMENT, REPAIR STRATEGY AND BUDGET ESTIMATE FOR OLP PIER 1 RMG YARD AREA OLP Piraeus Port Authority S.A. Greece CONDITION ASSESSMENT, REPAIR STRATEGY AND BUDGET ESTIMATE FOR OLP PIER 1 RMG YARD AREA Draft Final Report December 2015 OLP Piraeus Port Authority S.A. Greece CONDITION

More information

Design and Construction of Cantilevered Reinforced Concrete Structures

Design and Construction of Cantilevered Reinforced Concrete Structures Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures

More information

Wisconsin Building Products Evaluation

Wisconsin Building Products Evaluation Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation

More information

Detailing of Reinforcment in Concrete Structures

Detailing of Reinforcment in Concrete Structures Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For

More information

Structural Axial, Shear and Bending Moments

Structural Axial, Shear and Bending Moments Structural Axial, Shear and Bending Moments Positive Internal Forces Acting Recall from mechanics of materials that the internal forces P (generic axial), V (shear) and M (moment) represent resultants

More information

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN. A Solid Foundation Solution for Homeowners from Our products are made with 90% Recycled Material Down. Right. Solid. GREEN. Stop the damaging effects of foundation settling... Sinking foundations, cracked

More information

Seismic Isolation Retrofitting of Japanese Wooden Buildings

Seismic Isolation Retrofitting of Japanese Wooden Buildings Seismic Isolation Retrofitting of Japanese Wooden Buildings Summary Junko Suga Building Design Department Takenaka Corporation, Osaka Main Office Osaka, Japan Hiroyuki Ueda Building Design Department Takenaka

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1 Chapter 5 Bridge Deck Slabs Bridge Engineering 1 Basic types of bridge decks In-situ reinforced concrete deck- (most common type) Pre-cast concrete deck (minimize the use of local labor) Open steel grid

More information

Designed and Engineered to Perform

Designed and Engineered to Perform History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the

More information

Rehabilitation of Existing Foundation Building to Resist Lateral and Vertical Loads

Rehabilitation of Existing Foundation Building to Resist Lateral and Vertical Loads International Journal of Current Microbiology and Applied Sciences ISSN: 2319-7706 Volume 3 Number 12 (2014) pp. 950-961 http://www.ijcmas.com Original Research Article Rehabilitation of Existing Foundation

More information

CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests

CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the

More information

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and

More information

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE

More information

Structural Integrity Analysis

Structural Integrity Analysis Structural Integrity Analysis 1. STRESS CONCENTRATION Igor Kokcharov 1.1 STRESSES AND CONCENTRATORS 1.1.1 Stress An applied external force F causes inner forces in the carrying structure. Inner forces

More information

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT Property Inspection 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT March 2013 This document has been prepared for the benefit of Clint Marston. No liability is accepted by this company

More information

Embedded Parts Introduction - Anchors

Embedded Parts Introduction - Anchors In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges 7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience

More information

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE To satisfy the performance goals of the NEHRP Recommended Seismic Provisions, a number of characteristics are important to the

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA 1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:

More information

1.2 Advantages and Types of Prestressing

1.2 Advantages and Types of Prestressing 1.2 Advantages and Types of Prestressing This section covers the following topics. Definitions Advantages of Prestressing Limitations of Prestressing Types of Prestressing 1.2.1 Definitions The terms commonly

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information

Structural Audit of Buildings

Structural Audit of Buildings International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 4 (2014), pp. 411-416 Research India Publications http://www.ripublication.com/ijcer.htm Structural Audit of Buildings

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...

More information

How to Design Helical Piles per the 2009 International Building Code

How to Design Helical Piles per the 2009 International Building Code ABSTRACT How to Design Helical Piles per the 2009 International Building Code by Darin Willis, P.E. 1 Helical piles and anchors have been used in construction applications for more than 150 years. The

More information

How To Design A Foundation

How To Design A Foundation The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural

More information

PILE TESTING SPECIFICATION

PILE TESTING SPECIFICATION PILE TESTING SPECIFICATION 1.0 GENERAL This specification deals with the testing of a pile by the application of an axial load or force. It covers vertical and raking piles tested in compression (i.e.

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

ATLAS RESISTANCE Pier Foundation Systems

ATLAS RESISTANCE Pier Foundation Systems ATLAS RESISTANCE Pier Foundation Systems Foundation Repair Systems for Civil Construction Applications: Residential, Commercial, Industrial Atlas Resistance Piers have been used to restore and/or stabilize

More information

Drained and Undrained Conditions. Undrained and Drained Shear Strength

Drained and Undrained Conditions. Undrained and Drained Shear Strength Drained and Undrained Conditions Undrained and Drained Shear Strength Lecture No. October, 00 Drained condition occurs when there is no change in pore water pressure due to external loading. In a drained

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer HS-4210_MAN_09.08 product manual HS-4210 Digital Static Cone Penetrometer Introduction This Manual covers the measurement of bearing capacity using the Humboldt Digital Static Cone Penetrometer (DSCP).

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Visualization of the healing process on reinforced concrete beams by application of Digital Image Correlation (DIC)

Visualization of the healing process on reinforced concrete beams by application of Digital Image Correlation (DIC) Materials Characterisation VI 283 Visualization of the healing process on reinforced concrete beams by application of Digital Image Correlation (DIC) E. Tsangouri 1, K. Van Tittelboom 2, D.Van Hemelrijck

More information

3. Observed Damage in Railway Viaducts

3. Observed Damage in Railway Viaducts Structural Damage of Tohoku Shinkansen Viaducts by the Off the Pacific Tohoku Earthquake First Report on March 16, 2011 Dr. Yoshikazu Takahashi, Associate Professor Disaster Prevention Research Institute,

More information

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Peyman Amini Motlagh, Ali Pak Abstract Seismic retrofitting of important structures is essential in seismological

More information

In-situ Load Testing to Evaluate New Repair Techniques

In-situ Load Testing to Evaluate New Repair Techniques In-situ Load Testing to Evaluate New Repair Techniques W.J. Gold 1 and A. Nanni 2 1 Assistant Research Engineer, Univ. of Missouri Rolla, Dept. of Civil Engineering 2 V&M Jones Professor, Univ. of Missouri

More information

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections. Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls

More information

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 (PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals

More information

bi directional loading). Prototype ten story

bi directional loading). Prototype ten story NEESR SG: Behavior, Analysis and Design of Complex Wall Systems The laboratory testing presented here was conducted as part of a larger effort that employed laboratory testing and numerical simulation

More information

Chapter 2 Basis of design and materials

Chapter 2 Basis of design and materials Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural

More information

Measuring the Condition of Prestressed Concrete Cylinder Pipe

Measuring the Condition of Prestressed Concrete Cylinder Pipe Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder

More information

METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by

METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE Prepared by Infratech ASTM CO., LTD. Contents Chapter Description Page Contents...... 1 List of Appendix. 1 1. Introduction.. 2 2. Test Method..2 3.

More information

SEISMIC RETROFITTING OF EARTHQUAKE-DAMAGED CONCRETE COLUMNS BY LATERAL PRE-TENSIONING OF FRP BELTS. K. Nasrollahzadeh Nesheli 1 and K.

SEISMIC RETROFITTING OF EARTHQUAKE-DAMAGED CONCRETE COLUMNS BY LATERAL PRE-TENSIONING OF FRP BELTS. K. Nasrollahzadeh Nesheli 1 and K. Proceedings of the 8 th U.S. National Conference on Earthquake Engineering April 18-22, 26, San Francisco, California, USA Paper No. 841 SEISMIC RETROFITTING OF EARTHQUAKE-DAMAGED CONCRETE COLUMNS BY LATERAL

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire

More information

Pro-Lift Steel Pile Foundation Repair

Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration

More information

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile J. Sherstobitoff Ausenco Sandwell, Vancouver, Canada P. Cajiao AMEC, Vancouver, Canada P. Adebar University of British

More information

Step 11 Static Load Testing

Step 11 Static Load Testing Step 11 Static Load Testing Test loading is the most definitive method of determining load capacity of a pile. Testing a pile to failure provides valuable information to the design engineer and is recommended