ELEKTROBUDOWA SA for 15 years listed on WSE ELEKTROBUDOWA SA POLISH LEADER IN POWER ENGINEERING. 4th October

Size: px
Start display at page:

Download "ELEKTROBUDOWA SA for 15 years listed on WSE ELEKTROBUDOWA SA POLISH LEADER IN POWER ENGINEERING. 4th October 2011. www.elbudowa.com."

Transcription

1 ELEKTROBUDOWA SA POLISH LEADER IN POWER ENGINEERING 4th October 2011

2 Agenda GENERAL INFORMATION ABOUT COMPANY BUSINESS SEGMENTS ELEKTROBUDOWA FOR NUCLEAR PP ELEKTROBUDOWA SA GROUP FINANCIAL STATEMENTS BENCHMARKING INTEGRATED MANAGEMENT SYSTEM October

3 GENERAL INFORMATION ABOUT COMPANY October

4 ELEKTROBUDOWA SA The company was established in A joint stock company listed at the Warsaw Stock Exchange. A leading company in power engineering in Poland. Nowadays is recognized as the most significant contractor for almost all power plants and co-generation plants in Poland, for lignite and hard coal mines, and for the whole industrial environment. October

5 Business areas of ELEKTROBUDOWA SA Contracting, Manufacturing, Systems Integration Power Generation Division Industry Division Power Distribution Division Automation Division October

6 Key Competences Provides comprehensive construction and installation services for projects carried out in the power sector, petrochemical industry, mining as well as turnkey erection of public utility facilities. The company also manufactures medium and low voltage switchgear panels and supplies electric power substations and systems. It is also a leading manufacturer of high-current busducts. Civil construction projects on turnkey basis: public utility facilities, office buildings, shopping centres, industrial facilities, special structures, residential buildings,military facilities. October

7 Human Resources/Segments Power Generation Division Industry Division Power Distribution Division Erection Workforce Production Project/Contract Managers Site managers Tests and commissioning Tests and commissioning mgrs 11-1 Marketing Logistics Finance Quality Occupational Safety Total October

8 Power Generation Division ELEKTROBUDOWA SA for nuclear power industry October

9 ELEKTROBUDOWA SA for nuclear power station The KHMELNITSKY NPP in the former Soviet Union /now Ukraine/. PAKS NPP, Hungary (1654MW). KOZLODUY Nuclear Power Plant, Bulgaria (3760MW). OLKILUOTO 3, Finland 1600 MW European Pressurized water Reactor /EPR/. October

10 OLKILUOTO 3 with 1600 MW EPR /European Pressurized Water Reactor/ (AREVA NP) ERECTION OF ELECTRICAL SYSTEMS, INCLUDING CABLES AND DISTRIBUTION EQUIPMENT; INSTRUMENTATION, CONTROL AND AUTOMATION SYSTEMS; PARTICIPATION IN COLD COMMISSIONING OF THE NUCLEAR ISLAND SUPPLY OF GOODS AND SERVICES RELATED TO THE INSTALLATION OF SENSING LINES. About 350 employees in peak. October

11 Power Distribution Division October

12 Manufacturing plant Konin Plant (618 employees, area m 2 ) October

13 Major products of ELEKTROBUDOWA SA market share Medium voltage switchgear 35% 65% ELEKTROBUDOWA Other MANUFACTURERS air-insulated switchgear panels with single or double busduct system in this metal-clad draw-out 45% 55% 60% 40% October

14 Major products of ELEKTROBUDOWA SA market share Low voltage switchgear 20% 80% withdrawable, plug-in or fixed-type cubicle switchgear (heavy) ELEKTROBUDOWA Other MANUFACTURERS 40% 60% October

15 Major products of ELEKTROBUDOWA SA market share Isolated Phase Busduct 90% 10% ELEKTROBUDOWA Other MANUFACTURERS October

16 High-current busducts ISOLATED-PHASE BUS NON-SEGREGATED SEGREGATED- PHASE BUS ELPO type ELPE type U n up to 36 kv I n up to 20 ka i p up to 400 ka October PELPO type U n up to 36 kv I n up to 5 ka i p up to 200 ka

17 New plant High-current Busduct October

18 ELEKTROBUDOWA`s busducts in Belgium for ELECTRABEL October

19 Industry Division October

20 The Underground station Plac Wilsona - a prize-winner in 2008 This underground station executed by ELEKTROBUDOWA SA was rewarded as the most beautiful underground station in the world by the architects participating in the MetroRail 2008 Conference, Copenhagen. October

21 National Stadium, Warsaw electrical, low current, automation and BMS installations of Stage 2 construction of the National Stadium October

22 Financial Statements October

23 Orders received (PLNm) 900,0 800,0 700,0 600,0 739,1 45,8 710,9 500,0 888,7 696,6 400,0 777,7 300,0 566,2 200,0 100,0 436,9 262,9 198,1 287,6 226,2 328,4 376,1 0, Budget 2011 Budget Actual 8 months October

24 Order backlog (PLNm) 1000,0 900,0 800,0 700, ,0 500,0 400,0 539,1 591,5 618,8 582,3 300,0 200,0 100,0 0,0 136,9 123,7 100,7 133,7 128,6 177,1 229, Budget ,7 455,8 Budget Actual 8 months October

25 Revenues (PLNm) 900,0 800,0 700,0 805,3 600,0 500,0 667,6 644,3 711,8 400,0 449,9 745,2 300,0 200,0 100,0 217,5 261,2 319,0 346,2 249,7 234,3 254,6 231,4 279,9 323,9 0, Budget 2011 October

26 Export (PLNm) 200,0 180,0 160,0 140,0 120,0 100,0 177,7 80,0 60,0 40,0 42,4 71,6 86,0 123,7 20,0 0,0 10,5 7,9 21,9 23,5 35, Budget 2011 October

27 Benchmarking October

28 2009 & 2010 revenues: ELEKTROBUDOWA SA and selected companies - electrical services providers (in PLNm) ELEKTROBUDOWA SA ZUE Włoszczow a Qumak-Sekom ElektromontaŜ Poznań ElektromontaŜ Rzeszów Atrem Agat Elektrotim TP-Elbud Energoaparatura ElektriMont ElektromontaŜ Kraków Elektromont 1 Elektromont 50,00 58,00 43,60 56,00 43,00 46,80 30,00 27,40 28,80 26,40 19,00 16,20 135,20 149,20 127,00 141,90 136,80 112,90 116,40 109,00 200,80 199,30 310,30 282,50 329,10 293,40 661,80 752, October

29 INTEGRATED MANAGEMENT SYSTEM October

30 INTEGRATED MANAGEMENT SYSTEM The Integrated Management System is built and operates basing on the standards: PN EN ISO 9001 : 2009, PN EN ISO : 2005, OHSAS : 2007, PN N : Complementary to the Integrated Management System are the following, implemented and certified, systems: - the NATO requirements specified in the document AQAP-2110:2009 NATO Quality Assurance Requirements for Design, Development and Production ; - quality requirements in welding, specified in the standard PN-EN ISO :2007: Quality requirements for fusion welding of metallic materials - Part 2: Comprehensive quality requirements ; - quality requirements in construction and operation of nuclear power plants specified in the document KTA 1401 (06/96) General Requirements Regarding Quality Assurance. October

31 Management Systems Improvement Managing the noncormormance, including: - correction, - corrective actions. Preventive actions. October

32 Procedure For Handling Nonconformity And For Corrective Or Preventive Actions The purpose of this procedure is to ensure that: - Nonconformity resulting from processes, products or services are controlled and the actions taken prevent their unintended use or supply. - Handling quality, health and safety or environmental nonconformity will eliminate or mitigate any impacts caused. - Causes of nonconformity will be identified, and the actions taken will result in reducing the likelihood of their recurrence to the minimum. October

33 Managing Nonconformance Review and classfication of nonconformance. Corrections made in order to eliminate a detected nonconformance, such as rework or regrade. Remedial and corrective actions taken in order to eliminate the causes of existing nonconformance. Review of effectiveness of actions taken. October

34 Preventive actions Identification of a potential nonconformance, such as - near misses, - risk related to project execution, etc. Identification of causes of potential nonconformance. Planning of actions eliminating the causes of potential nonconformance. Execution of plans. Review of effectiveness of the actions taken. October

35 Quality Management System DIN EN ISO 9001:200, IAEA 50-C-Q, FRA/N/100/OL3 Safety Class 1 to 4 and EYT Safety Class 1 and 2 (subcontractors already qualified acc. to nuclear specific rules as NQA 1, KTA 1401 are accepted to comply with IAEA 50-C/SG-Q provided that in addition their Quality Management System acc. to EN ISO 9001:2000 is certified) October DIN EN ISO 9001:2000 IAEA 50-C-Q (1996) FRA/N/100/OL3

36 Quality Reguirments ACC.TO Project OL3 Quality Assurance Plan has to be issued for OL3 Project Only for SC1 and SC2 and safety related activities Content is defined in FRA/N/100/OL3 acc. to IAEA 50-C-Q Graded approach Verification and review of documents by independent individuals Language of documentation Training of Safety Culture Design validation and verification Contractual requirements Verification of purchased products Product identification and traceability Internal Audits by qualified personnel independent from the area audited Inspections and verifications shall be recorded Notification of nonconforming situations October

37 Graded Approach Depending on the Safety Class of equipment or system, different quality and reliabilty requirements must be met with respect to their design, engineering, manufacture, installation and operation. In practice, the highest class, SC1, comprises equipment and systems which have direct influence on safety of the reactor s operation. For example, in the case of class SC1, SC2 inspection and acceptance tests of the equipment or system are more detailed and have more participants, while the inspection of EYT equipment, which do not have impact on safety) is performed by contractor. SC1 and SC2 equipment inspections are participated by: Contractor, AREVA NP, TVO (Owner) and STUK or another body appointed by it. ELEKTROBUDOWA SA performs works on equipment classified to Safety Class 2, 3, 4 i EYT. October

38 Nuclear Safety Culture To Clarify the topics seven key issues are described: Commitment Use of procedures Conservative decision making A reporting culture Challenging unsafe acts and conditions The learning organization Underpinning issues: communication, clear priorities and organization. October

39 Handling of Nonconformances October

ELEKTROBUDOWA SA POLISH LEADER IN POWER ENGINEERING. Warsaw 2010

ELEKTROBUDOWA SA POLISH LEADER IN POWER ENGINEERING. Warsaw 2010 ELEKTROBUDOWA SA POLISH LEADER IN POWER ENGINEERING Warsaw 2010 December 2010 1 1 Jacek Faltynowicz President and C.E.O. 1974 1990 1990 1995 Director of 1995-1997 President and C.E.O. 1998 1999 President

More information

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011 Olkiluoto 3 Project AREVA Suppliers Day Warsaw October 4, 2011 Virginie MOUCQUOT-LAIHO AREVA OL3 Project Management Office & Communications Manager AREVA Reactor & Services - New Builds EPR Project Fleet

More information

Olkiluoto 3 Experience

Olkiluoto 3 Experience Olkiluoto 3 Experience CNRA International Workshop on New Reactor Siting, Licensing and Construction Experience Hosted by the State Office for Nuclear Safety Prague, Czech Republic 15-17 September 2010

More information

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems Safe energy distribution that meets the highest industrial requirements NATUS switchgear systems your advantages minimal use of insulant

More information

Safety culture in the construction phase lessons learned from Olkiluoto 3 Pia Oedewald, Senior scientist VTT Technical Research Centre of Finland

Safety culture in the construction phase lessons learned from Olkiluoto 3 Pia Oedewald, Senior scientist VTT Technical Research Centre of Finland Safety culture in the construction phase lessons learned from Olkiluoto 3 Pia Oedewald, Senior scientist VTT Technical Research Centre of Finland IAEA Technical meeting on Safety culture in pre-operational

More information

AREVA: supply chain network principles and company s vision

AREVA: supply chain network principles and company s vision AREVA: supply chain network principles and company s vision Virginie MOUCQUOT-LAIHO AREVA Finland Communications Director & Vice Country Manager Oulu, Finland 18.09.2012 1 AREVA & nuclear industry The

More information

Application of FPGA-based Safety Controller for Implementation of NPPs I&C Systems Vladimir Sklyar, Technical Director

Application of FPGA-based Safety Controller for Implementation of NPPs I&C Systems Vladimir Sklyar, Technical Director Application of FPGA-based Safety Controller for Implementation of NPPs I&C Systems Vladimir Sklyar, Technical Director Seminar FPGA-based I&C Systems in Nuclear Applications February 4, 2015, Energiforsk,

More information

Olkiluoto 3 Project June 2010

Olkiluoto 3 Project June 2010 Olkiluoto 3 Project June 2010 Author: R&S Communications Department, La Défense, France. The reproduction, transmission or use of this document or its contents is not permitted without express written

More information

Building New Generation Nuclear Plants Worldwide : AREVA's Experience

Building New Generation Nuclear Plants Worldwide : AREVA's Experience Building New Generation Nuclear Plants Worldwide : AREVA's Experience Philippe Guay Senior Vice President, New Builds Offers AREVA 37 th WNA Symposium 12-14 September 2012 LONDON Projects status The value

More information

MANAGEMENT REPORT on the Activity of the ELEKTROBUDOWA SA GROUP

MANAGEMENT REPORT on the Activity of the ELEKTROBUDOWA SA GROUP MANAGEMENT REPORT on the Activity of the ELEKTROBUDOWA SA GROUP for the six month ended 30 June 2014 This document is a translation from the Polish original. In case of discrepancies between the Polish

More information

The World Nuclear Supply

The World Nuclear Supply The World Nuclear Supply Chain An Overview Greg KASER Staff Director NEA International WPNE Workshop Paris 11 March 2014 Outline of Presentation 1. About WNA 2. Value of: New construction Early dismantlement

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

PGE - Polish Energy Group. Nuclear power development in Poland - we need decision today. Organisation of the Polish Power Sector After Consolidation

PGE - Polish Energy Group. Nuclear power development in Poland - we need decision today. Organisation of the Polish Power Sector After Consolidation Nuclear power development in Poland - we need decision today Hanna Trojanowska Director of International Affairs and New Technologies Department PGE Polska Grupa Energetyczna S.A. Organisation of the Polish

More information

Flamanville 3 Nuclear Power Plant

Flamanville 3 Nuclear Power Plant Flamanville 3 Nuclear Power Plant Prepared by: Giorgio Locatelli (University of Lincoln) and Mauro Mancini (Politecnico di Milano) Contacts: Giorgio Locatelli University of Lincoln Lincoln School of Engineering

More information

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard.

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard. Summary of OHSAS 18001:2007 Requirements With this article, the 18000 store provides a brief and clear summary of the OHSAS 18001:2007 requirements. First of all, OHSAS 18001 is an international standard

More information

MANAGEMENT REPORT on the Activities of the ELEKTROBUDOWA SA GROUP

MANAGEMENT REPORT on the Activities of the ELEKTROBUDOWA SA GROUP MANAGEMENT REPORT on the Activities of the ELEKTROBUDOWA SA GROUP for the six months ended 30 June 2013 Index to the Report on the Activities 1. STRUCTURE OF THE ELEKTROBUDOWA SA GROUP... 3 1.1 The Parent,

More information

AREVA, an unparalleled experience in building nuclear reactors

AREVA, an unparalleled experience in building nuclear reactors AREVA, an unparalleled experience in building nuclear reactors Frank APEL Senior Vice President Sales Central Europe and Nordic Countries AREVA, International Commercial Organisation 9 th Annual European

More information

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document. 2 of 34 Revision Summary Revision Number Date Description of Revisions Initial issue of the document. Table of Contents Item Description Page 1. Introduction and Purpose... 5 2. Project Management Approach...

More information

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM CONTENTS Page No 1 GENERAL REQUIREMENTS 1 1.1 Requirements 1

More information

Process Plant Construction: A Handbook for Quality Management

Process Plant Construction: A Handbook for Quality Management Process Plant Construction: A Handbook for Quality Management Process Plant Construction: A Handbook for Quality Management Patrick Noble ISBN: 978-1-4051-8725-1 Hardcover 232 pages January 2009, Wiley-Blackwell

More information

Electrical Systems. Emergency Diesel Generator Solutions

Electrical Systems. Emergency Diesel Generator Solutions Electrical Systems Emergency Diesel Generator Solutions AREVA Competence in Emergency Power Supply Emergency Diesel Generators (EDGs) Business Areas e Modernization of existing EDGs p Customer support

More information

e 2 ALPHA Medium Voltage Switchgear Data Sheet K-1.1.2 EN

e 2 ALPHA Medium Voltage Switchgear Data Sheet K-1.1.2 EN e 2 ALPHA Medium Voltage Switchgear Data Sheet K-1.1.2 EN We create ideas with power! ELEKTROMETAL ENERGETYKA SA is a new Polish company providing solutions for electrical power engineering. Our services

More information

Swiss media visit to Olkiluoto August 15, 2014

Swiss media visit to Olkiluoto August 15, 2014 Swiss media visit to Olkiluoto August 15, 2014 Käthe Sarparanta Senior Adviser, Project Department Teollisuuden Voima Oyj NUCLEAR POWER PLANTS IN FINLAND Olkiluoto, Eurajoki Population 5.4 million Power

More information

Nuclear Safety. Policy 2013-2016

Nuclear Safety. Policy 2013-2016 Nuclear Safety Policy 2013-2016 Nuclear Safety Policy 2013-2016 T he organisational principles and actions defined in the Nuclear Safety Charter and applied within the group have achieved significant improvements

More information

Jonathan Wilson. Sector Manager (Health & Safety)

Jonathan Wilson. Sector Manager (Health & Safety) Jonathan Wilson Sector Manager (Health & Safety) OHSAS 18001:2007 Making Life Easier For Health & Safety Managers Workshop Agenda 1. Introduction 2. Why Manage Health & Safety 3. OHSAS 18001 and OHSMS

More information

NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012

NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012 NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012 Tanhua Jarmo Teollisuuden Voima Oyj 2 EU ENERGY ROADMAP 2050 NUCLEAR POWER IN ALL SCENARIOS Consumption of electricity

More information

STEEL fabrication quality SySTEmS guideline

STEEL fabrication quality SySTEmS guideline STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written

More information

COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE

COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) GREECE COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE EVANGELOS DIALYNAS Professor NTUA Director of Electric Power Division 1 Competitive Electric European

More information

A seismic switch. Certified switchgear for nuclear power plants is providing a critical link in the chain

A seismic switch. Certified switchgear for nuclear power plants is providing a critical link in the chain A seismic switch Certified switchgear for nuclear power plants is providing a critical link in the chain Renato Piccardo, Annunzio Regantini, Davide Cattaneo, Luciano Di Maio A nuclear power plant must

More information

NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION AQAP 2110 (June 2003) I ORIGINAL Page blank II ORIGINAL NORTH ATLANTIC TREATY ORGANIZATION NATO STANDARDISATION AGENCY (NSA) NATO

More information

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES This presentation covers some safety aspects

More information

Join the UK Nuclear Renaissance. Procurement & Quality Process

Join the UK Nuclear Renaissance. Procurement & Quality Process Join the UK Nuclear Renaissance Procurement & Quality Process 1 AREVA NP UK Supplier Day, March 16th Birmingham EPR is a trademark of the AREVA Group 1 The Process: AREVA Supply Chain Strategy Didier David

More information

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained

More information

UniGear ZS1. Medium voltage, arc proof, air insulated switchgear for primary distribution

UniGear ZS1. Medium voltage, arc proof, air insulated switchgear for primary distribution UniGear ZS1 Medium voltage, arc proof, air insulated switchgear for primary distribution UniGear ZS1: an innovative solution for all installation requirements ABB UniGear is medium voltage metal-clad,

More information

DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation

DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard

More information

Switchgear and Metal-Enclosed Bus

Switchgear and Metal-Enclosed Bus Section 18 Switchgear and Metal-Enclosed Bus 180. SWITCHGEAR ASSEMBLIES 180A. General Requirements for All Switchgear. This rule covers general requirements for all switchgear. Examples of switchgear found

More information

Structural Integrity and NDE Reliability II

Structural Integrity and NDE Reliability II Structural Integrity and NDE Reliability II Preparing for EPR TM Reactor Vessel Inspection J. Laube, AREVA NDE Solutions / intelligendt, Germany Y. Bouveret, AREVA NDE Solutions / Intercontrole, France

More information

Supplier Quality Requirements (SQR) for External Process and/or Product Providers

Supplier Quality Requirements (SQR) for External Process and/or Product Providers Supplier Quality Requirements (SQR) for External Process and/or Product Providers Document Revision History Revision No Revision Date Revision Description Approved By Apr 2, 2 Initial Release Joel Sodowsky

More information

Responsibilities of Engineering Surveyors under ISO 9000 in Hong Kong Construction Industry

Responsibilities of Engineering Surveyors under ISO 9000 in Hong Kong Construction Industry Responsibilities of Engineering Surveyors under ISO 9000 in Hong Kong Construction Industry Steve Y. W. Lam and Conrad H. W. Tang Department of Land Surveying & Geo-Informatics Hong Kong Polytechnic University,

More information

CERTIFICATE ISO 9001:2008 ISO 14001:2004 BS OHSAS 18001:2007. hereby certifies that the company

CERTIFICATE ISO 9001:2008 ISO 14001:2004 BS OHSAS 18001:2007. hereby certifies that the company CERTIFICATE ISO 9001:2008 ISO 14001:2004 BS OHSAS 18001:2007 hereby certifies that the company ABB AG - Energietechnik Division Energietechnik Produkte/-Systeme business field: Development, Marketing,

More information

Gas turbine power plants

Gas turbine power plants Gas turbine power plants A global challenge Apart from other sources of energy such as water, coal and uranium, the use of natural gas and fuel oil is an important factor in assuring a reliable supply

More information

Corrective Actions ISO 7. 2009 Coca Cola Company and Michigan State University, original at http://www.fskntraining.org, CC BY SA

Corrective Actions ISO 7. 2009 Coca Cola Company and Michigan State University, original at http://www.fskntraining.org, CC BY SA Corrective Actions ISO 7 HACCP Principle 5 Establish corrective actions to be taken when monitoring indicates that there is a deviation from an established critical limit. Corrective Actions NACMCF Definition

More information

TUV HELLAS IS: COMPANY PROFILE PRESENTATION OF ACTIVITIES

TUV HELLAS IS: COMPANY PROFILE PRESENTATION OF ACTIVITIES COMPANY PROFILE PRESENTATION OF ACTIVITIES TUV HELLAS IS: Subsidiary wholly owned by TUV NORD Operating in Greece since 1987 One of the most reliable Inspection and Certification Organizations in the Country

More information

NOT PROTECTIVELY MARKED

NOT PROTECTIVELY MARKED Title of document ONR GUIDE Supply Chain Management Arrangements for the Procurement of Nuclear Safety Related Items or Services Document Type: Unique Document ID and Revision No: Nuclear Safety Technical

More information

SUPPLIER QUALITY SYSTEM AUDIT

SUPPLIER QUALITY SYSTEM AUDIT Company Name: Date: Company Address: Quality Assurance Mgr: President: Number of employees: Is your company receptive to source inspection? List all standards the quality system is based on Web Page: Company

More information

The OL3 Nuclear Power Plant Construction Project. A Learning Experience

The OL3 Nuclear Power Plant Construction Project. A Learning Experience The OL3 Nuclear Power Plant Construction Project A Learning Experience OL3 One of the biggest construction sites in Europe Begun 2005 ready in 2016? Cost 8,5 billion original estimate 3,5 billion > 2000

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

MANAGEMENT REPORT on the Activities of the ELEKTROBUDOWA SA GROUP

MANAGEMENT REPORT on the Activities of the ELEKTROBUDOWA SA GROUP MANAGEMENT REPORT on the Activities of the ELEKTROBUDOWA SA GROUP for the six months ended 30 June 2012 Index to the Report on the Activities 1. STRUCTURE OF THE ELEKTROBUDOWA SA GROUP... 3 1.1 The Parent,

More information

Business Management System Manual. Context, Scope and Responsibilities

Business Management System Manual. Context, Scope and Responsibilities Business Management System BMS Manual Page 1 of 11 Business Management System Manual Context, Scope and Responsibilities ISO 9001:2015 BMS.0100 R1 MAS Solutions LLC 29810 FM 1093 Suite C Fulshear, TX 77441

More information

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Published in the Official State Gazette (BOE) number 270 of November

More information

Quality & Safety Manual

Quality & Safety Manual Purpose: This Quality & Safety Manual is intended to clarify and document the Quality and Health & Safety policies of GGS Oil and Gas Systems and to describe how the organization organizes its activities

More information

NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS

NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS Edition A Version 1 April 2013 NORTH ATLANTIC TREATY ORGANIZATION ALLIED ADMINISTRATIVE PUBLICATION

More information

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction

More information

RELIABLE INNOVATION PERSONAL SOLUTIONS

RELIABLE INNOVATION PERSONAL SOLUTIONS RELIABLE INNOVATION PERSONAL SOLUTIONS EN AS A GLOBAL PROVIDER OF SOLUTIONS FOR THE GENERATION, TRANSMISSION AND DISTRIBUTION OF THE ELECTRICAL NETWORK, WE CONTRIBUTE TO A RESPONSIBLE AND SUSTAINABLE USE

More information

DEVELOPMENT OF A QUALITY MANAGEMENT SYSTEM FOR BRAZILIAN NUCLEAR INSTALLATIONS

DEVELOPMENT OF A QUALITY MANAGEMENT SYSTEM FOR BRAZILIAN NUCLEAR INSTALLATIONS 2005 International Nuclear Atlantic Conference - INAC 2005 Santos, SP, Brazil, August 28 to September 2, 2005 ASSOCIAÇÃO BRASILEIRA DE ENERGIA NUCLEAR - ABEN ISBN: 85-99141-01-5 DEVELOPMENT OF A QUALITY

More information

Nuclear Design Practices and the Case of Loviisa 3

Nuclear Design Practices and the Case of Loviisa 3 Nuclear Design Practices and the Case of Loviisa 3 Harri Tuomisto Fortum Power, Finland Third Nuclear Power School, 20-22 October 2010, Gdańsk, Poland 22 October 2010 Harri Tuomisto 1 Objectives The objective

More information

NUCLEAR NEW BUILD Presentation to NucSIG December 9 th,2009

NUCLEAR NEW BUILD Presentation to NucSIG December 9 th,2009 NUCLEAR NEW BUILD Presentation to NucSIG December 9 th,2009 Gautier COSSART Quality Assurance / Safety & Regulations Division ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND)

More information

Nuclear Consultancy & Engineering Services

Nuclear Consultancy & Engineering Services Insert a caption to go with the photograph in here ITER, France Wednesday, 14 December 2011 Nuclear Consultancy & Engineering Services T H E N U C L E A R A T K I N S A S S Y S T E M A L L I A N C E CONSTRUCTION

More information

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS Meher Capacitors offers reliable and innovative products and solutions in the fields of Reactive Power Compensation, Power Quality and Energy

More information

AREVA Advanced nuclear power plants

AREVA Advanced nuclear power plants AREVA Advanced nuclear power plants Bernard Bastide AREVA Brazil and South America VP University of Rio de Janeiro III Semana da Engenharia Nuclear UFRJ August 2013 AREVA presentation AREVA EPR projects

More information

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G 414.1-2A, Appendix A, 6-17-05)

QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G 414.1-2A, Appendix A, 6-17-05) QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G 414.1-2A, Appendix A, 6-17-05) This review template is intended for use by the DOE for evaluating a DOE Site Office or Contractor Quality Assurance

More information

Office for Nuclear Regulation

Office for Nuclear Regulation ONR GUIDE LC17 Management Systems Document Type: ONR Nuclear Safety Technical Inspection Guide Unique Document ID and Revision No: NS-INSP-GD-017 Revision 2 Date Issued: November 2012 Review Date: November

More information

MNS is Switchgear System Technical Overview

MNS is Switchgear System Technical Overview Switchgear System Technical Overview Innovative Design ABB s innovative MNS is concept combines the long term experience, energy efficiency, grid reliability and industrial productivity of the well-known

More information

About us. Eugensa is an ISO 9001:2008 certified company. CERT

About us. Eugensa is an ISO 9001:2008 certified company. CERT About us CERT Eugensa JSC was established in Lithuania in 1996 and since then has become one of the regions largest electrical contractors specialising in the design, installation and maintenance of electrical,

More information

OHSAS 18001 OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS

OHSAS 18001 OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS , Certification & Training Services , Certification & Training Services , Certification & Training Services , Certification & Training Services WHAT MAKES YOUR OCCUPATIONAL HEALTH AND SAFETY SYSTEMS BEST-IN-CLASS?

More information

HSEQ MANAGEMENT MANUAL

HSEQ MANAGEMENT MANUAL HSEQ MANAGEMENT MANUAL AHRENS SAFE EVERY INDIVIDUAL IS IMPORTANT Note that all printed paper/hard copies of this document and related procedures are uncontrolled. The Controlled copy is found on the Ahrens

More information

Rockwell Automation Quality Management System

Rockwell Automation Quality Management System Rockwell Automation Quality Management System Our Quality Policy Rockwell Automation is committed to a global quality system focused on customer solutions. We achieve this through superior products and

More information

Power - Tech. Professional Staffing Solutions

Power - Tech. Professional Staffing Solutions Power - Tech Professional Staffing Solutions PT - Executive summary Power Tech provides professional staffing solutions services for large and medium size projects in the energy and oil & gas sector at

More information

Teollisuuden Voima Oyj - General Presentation January 2009. Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj

Teollisuuden Voima Oyj - General Presentation January 2009. Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj Teollisuuden Voima Oyj - General Presentation January 2009 Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj Nuclear Power Plants in Finland in 2008 Olkiluoto OL1 BWR 860 MW 1978

More information

ABB Power Systems. Substations References

ABB Power Systems. Substations References ABB Power Systems Substations References Jingzhou, China BA PTPS - 2 - Connection of power from the 3-Gorges-Project to Guandong province (940km away) HVDC Transmission station, Filter banks and GIS Extremely

More information

Minimizing Impact of Electric Utility Outages with Backup Generation

Minimizing Impact of Electric Utility Outages with Backup Generation Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility

More information

Sellafield Ltd, Registered in England number 1002607

Sellafield Ltd, Registered in England number 1002607 SLF 4.05.03 Issue 8 Effective date 04/2014 SLM 4.06.02 Issue 3 Effective date: 06/2014 Page 2 of 39 Contents Introduction 3 1 Nuclear Safety Requirements 5 2 Quality Management System Requirements 12 3

More information

Choosing for tranquility

Choosing for tranquility Medium voltage switchgear with withdrawable circuit breakers MCset Choosing for tranquility Web enabled Power & Control Building a New Electric World Innovation at every level Busbar compartment This section

More information

Best Practices and Approaches to Supply Chain Management

Best Practices and Approaches to Supply Chain Management Best Practices and Approaches to Supply Chain Management ATOMEX Forum 2012 Moscow 12.12. 14.12.2012 AF-Consult Switzerland Ltd Jan Kocourek 1 Objectives Provide information available regarding both the

More information

ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE

ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE 1 Statement of Intent Corps Security aims to create and maintain through staff awareness, the highest level of environmental responsibility. We regard the

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

Product overview brochure. ABB Medium Voltage Products Our one-stop approach for every medium voltage application

Product overview brochure. ABB Medium Voltage Products Our one-stop approach for every medium voltage application Product overview brochure ABB Medium Voltage Products Our one-stop approach for every medium voltage application Overview ABB meets every need for reliable, safe and energy-efficient medium voltage switchgear,

More information

THE CONSTRUCTION OF. Natural Gas 11% Coal 12% Industry 49% Nuclear 18%

THE CONSTRUCTION OF. Natural Gas 11% Coal 12% Industry 49% Nuclear 18% THE CONSTRUCTION OF OLKILUOTO 3 IN FINLAND ND A CASE STUDY Summary The recent publication of the energy review and CoRWM s findings have ensured nuclear is currently top of the news agenda. With new build

More information

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6 Related To FEWA Electricity Network (Transmission & Distribution) Version 1.0 December 2014 TABLE OF CONTENTS Page I. Introduction 3 II. Contractor Pre-Qualification Criteria 4 III. Procedure for Application

More information

NATUS SOLUTIONS Turnkey Project Management Project Engineering and Industrial Installations. Electrotechnical Solutions at the Highest Level

NATUS SOLUTIONS Turnkey Project Management Project Engineering and Industrial Installations. Electrotechnical Solutions at the Highest Level NATUS SOLUTIONS Turnkey Project Management Project Engineering and Industrial Installations Electrotechnical Solutions at the Highest Level State-of-the-art production processes, innovative products and

More information

Investor day. November 17, 2010. Energy business Michel Crochon Executive Vice President

Investor day. November 17, 2010. Energy business Michel Crochon Executive Vice President Investor day November 17, 2010 Energy business Michel Crochon Executive Vice President We built a global leadership in medium voltage and grid automation with Areva Distribution MV switchgears & systems

More information

Steven A. Arndt Division of Engineering Office of Nuclear Reactor Regulation

Steven A. Arndt Division of Engineering Office of Nuclear Reactor Regulation Current and Future Use of IEEE and IEC Consensus Standards in the Regulation of Digital Instrumentation and Control Systems in the Nuclear Power Industry Steven A. Arndt Division of Engineering Office

More information

Piping Systems for Nuclear Power Industry. Prague, October 2011

Piping Systems for Nuclear Power Industry. Prague, October 2011 Piping Systems for Nuclear Power Industry Prague, October 2011 Introduction of the company Leading Czech supplier of piping systems for power engineering 60 years of experience in the field of power industry

More information

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services SpecialistS IN ELECTRICAL SUPPORT SERVICES TO MINING, UTILITIES & industry Ampcontrol is committed to supporting our customers to maintain efficient

More information

Emirates Aluminium starts up World s first fully integrated power distribution system from ABB

Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Reprint from Aluminium World 2009, Volume 2 Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Emirates Aluminium (EMAL), a joint venture between Abu Dhabi s

More information

Procedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue

Procedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue Procedure Work Health and Safety Contractor Management Document number: PRO-00808 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority

More information

ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER. Occupation Specific Technical Requirements

ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER. Occupation Specific Technical Requirements ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER Responsible for performing entry level engineering analysis, design, plan, review and inspection for small to medium projects and/or designated segments of

More information

EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A.

EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A. EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A. 89 CHLOIS & LIKOVRISEOS STR. - 144 52 METAMORFOSI TEL: +30 210 6253927, 210 6252495 INTERNET SITE: www.eurocert.gr E-mail: eurocert@otenet.gr FAX: +30

More information

THE INTEGRATED MANAGEMENT SYSTEM POLICY

THE INTEGRATED MANAGEMENT SYSTEM POLICY N E W S B U L L E T I N ISSN 1428-3328 www.komunikacja.elbudowa.com.pl January February N o 1/88 Safe Year 2009 Certification of the management systems in 2010 N E W S B U L L E T I N January - February

More information

Implenia Real Estate. As a full-service provider we will accompany your property for its entire life cycle. Sustainably and customer-oriented.

Implenia Real Estate. As a full-service provider we will accompany your property for its entire life cycle. Sustainably and customer-oriented. Implenia Real Estate As a full-service provider we will accompany your property for its entire life cycle. Sustainably and customer-oriented. 2 4 Implenia Development Ltd. 6 Implenia General Contracting

More information

QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010

QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010 Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power

More information

Correspondence between ISO 9001:2008 and 14001:2004, OHSAS 18001:2007, ISM and the SeaBird Management System

Correspondence between ISO 9001:2008 and 14001:2004, OHSAS 18001:2007, ISM and the SeaBird Management System Correspondence between ISO 9001:2008 and 14001:2004, OHSAS 18001:2007, ISM and the SeaBird Management System Introduction (title Introduction Introduction Preamble Introduction General 0.1 --- --- ---

More information

The TVEL Fuel Company of Rosatom CREATING FUTURE TODAY

The TVEL Fuel Company of Rosatom CREATING FUTURE TODAY The of Rosatom CREATING FUTURE TODAY For complete and current information, visit the company s website: www.tvel.ru TVEL_Nuclear 2 3 TVEL Fuel company Russian nuclear fuel designer, manufacturer and supplier

More information

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4 CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,

More information

ENERGY NETWORKS ASSOCIATION. Electricity Industry EMF Measurement Protocol for High Field Areas

ENERGY NETWORKS ASSOCIATION. Electricity Industry EMF Measurement Protocol for High Field Areas ENERGY NETWORKS ASSOCIATION Electricity Industry EMF Measurement Protocol for High Field Areas Contents 1 Introduction 1.1 Background 1.2 High Field Areas 2 High Field Area - Generation Businesses 2.1

More information

New nuclear project financing Warsaw, June 26, 2013 p. 1

New nuclear project financing Warsaw, June 26, 2013 p. 1 New nuclear project financing Warsaw, June 26, 2013 p. 1 The EPR design: a reference technology Loïc ELOY Director of New Builds Offers Poland Platts Conference Warsaw, 26 June 2013 EPR reactor design

More information

Table of Contents INTEGRATED MANAGEMENT SYSTEM MANUAL

Table of Contents INTEGRATED MANAGEMENT SYSTEM MANUAL Table of Contents INTRODUCTION... 4 COMMON REQUIREMENTS... 5 1. SCOPE... 7 1.1 DESCRIPTION OF ORGANIZATION... 7 1.2 SCOPE OF CERTIFICATION... 7 1.3 THIRD PARTY CERTIFICATION... 7 2. REFERENCES... 8 3.

More information

TVO and Nuclear Waste Management at Olkiluoto. Corporate Adviser

TVO and Nuclear Waste Management at Olkiluoto. Corporate Adviser Olkiluoto, 28 October 2008 TVO and Nuclear Waste Management at Olkiluoto Corporate Adviser Nuclear Power Plants in Finland Olkiluoto OL1 BWR 860 MW 1979 OL2 BWR 860 MW 1982 Population 5.3 million Power

More information