1 Nuclear Safety Policy
2 Nuclear Safety Policy T he organisational principles and actions defined in the Nuclear Safety Charter and applied within the group have achieved significant improvements in terms of nuclear safety. In accordance with the Charter, this Policy sets out the group s priorities in the area of nuclear safety for the period 2013 to 2016; this aligns with the timetable within the Strategic Action Plan. The Policy covers all of the activities undertaken by entities of the group in its responsibilities as a nuclear operator, an industrial operator and as a provider of nuclear services in France and worldwide. It applies to all phases of the facility life cycle from design to decommissioning. It applies to both operational activities and to all functions which support these activities. The Policy incorporates recent regulatory developments in France and internationally. It also takes account of the initial recommendations following the post Fukushima accident evaluation studies and review and the recommendations of the Permanent Group of Experts to the French nuclear safety regulatory body (ASN) in relation to the group s management of safety and radiological protection. The objectives envisaged are to provide assurance of a high level of nuclear safety across all our facilities, products and services and to promote a strong safety culture which is shared by all our subcontractors so that nuclear safety is integrated in all processes. These objectives are founded on the principles of transparency and high quality dialogue with internal and external stakeholders together with a commitment to continuous improvement where ongoing review and the sharing of experiences and lessons learnt are key drivers. The current Policy is incorporated within the Objectives Charter of all operational units and is subject to regular monitoring at group level. It aims at ensuring that the actions taken to achieve the objectives are both appropriate and effective and that they comply with the regulations applicable to all licensed nuclear installations in France, referred to as INBs. The Policy is applicable to external contractors and is included in all contracts covering AREVA activities defined in this Policy. The group Nuclear Safety Policy and the group HSE Policies cover all the interests protected by the Law. Luc Oursel, AREVA Chief Executive Officer
3 The objectives of this Nuclear Safety Policy cover three areas: 01 SAFETY OF FACILITIES 02 OPERATIONAL SAFETY 03 SAFETY MANAGEMENT EPR construction site, Olkiluoto, Finland. August 2012.
4 IN THE FRAMEWORK OF THIS 01 SAFETY OF FACILITIES Establish a group wide process to maintain the regulatory compliance of facilities and to ensure the execution of improvements required by periodic reviews of safety. Put in place proactive measures to reduce source terms present in facilities, and in particular with regard to fire, operational waste and legacy waste on AREVA sites. Ensure the performance of arrangements and activities central to risk prevention, in particular in the areas of containment, criticality safety and radiological protection through compliance with the associated safety requirements. Strengthen the emergency planning arrangements to be implemented in case of accidents and test these through regular exercises.
5 POLICY, AREVA IS COMMITTED 02 OPERATIONAL SAFETY Develop and verify the level of safety culture of our staff and subcontractors and increase the presence of operational managers on the ground. Improve the requirements and responsibilities within documentation associated with operations and interventions on the basis of a significant involvement of our staff and subcontractors. Implement robust and formal risk prevention processes to manage temporary or transitional situations, uncommon situations, or specific risks, including but not limited to parallel activities, administrative lockout/tag-out, working with naked flames, gamma radiation, work in a radioactive environment. Integrate human and organizational factors (HOF) in the analysis of safety-related modifications of facilities; undertake detailed reviews of the causes of all significant events inside the group and improve the communication and implementation of operating experience within all group entities.
6 TO: 03 SAFETY MANAGEMENT Maintain an organization based on clear principles of shared responsibility and delegation of authority, and have in place a robust process to assess the impact on safety of any organizational change. Strengthen the quality of internal audits and inspections and the traceability of the corresponding follow up actions. Develop the safety competencies within operational positions and recognize the safety, health, occupational safety, and sustainable development positions through the promotion of pathways leading to qualifications and through the reinforcement of specific training. Define the commercial policy of the group, and ensure that considerations of safety requirements are fully integrated with the procurement process including but not limited to specifications, choice of external provider, monitoring and evaluation of the service provided.
7 GROUP KEY PERFORMANCE INDICATORS To assess the achievement of these objectives, AREVA has defined 7 group key performance indicators covering each of the 3 areas of the Policy, against which performance will be reviewed twice yearly for the General Directorate: 1 Number of significant events involving the safety function of criticality; 2 Number of significant events involving loss of containment 1 ; 3 Number of people who have received an effective whole body dose higher than 14 msv per year; 4 No significant events of Level 2 on the INES scale; 5 Ratio of the number of reclassifications 2 by ASN to the number of significant events involving safety and protection systems (France perimeter); 6 Ratio of the number of significant events at Level 1 to the number of significant events at Level 0 (incident prevention rate); 7 Proportion of new managers of facilities (with nuclear safety, health, occupational safety and environment risks) who have undergone a course of formal qualification. Three additional indicators will be monitored by the operational units and reported once a year: 8 Rate of implementation of programs of compliance of engineered safety and protection systems (SSCs); 8 Rate of implementation of programs of internal reviews and audits; 10 Rate of implementation of processes to monitor the activities of external contractors according to the group s directive. 1 Including events leading to a stress/demand on a secondary confinement system. 2 Including ASN requests following an inspection. GLOSSARY Criticality safety: This is the study and control of conditions to protect in normal, incident or accident conditions against the occurrence of an accident of criticality due to an uncontrolled nuclear fissions reaction. Effective dose: This is the sum of internal and external exposure of an individual to radiation (the energy received and the effects related to the type of radiation). It sums the effects on the whole body of an individual by taking into account differences of sensivity between different organs. It is expressed in millisieverts (msv), a subunit of the sievert (1 Sv = 1,000 msv). Equipment important for the protection (EIP) of the people and environment under the legal framework: Concept introduced by the INB Order (France) or the national licensing regulation, which followed the concept of Safety-related Equipment. The EIP and the associated defined requirements must be identified and their list must be updated by the operator; the latter must put in place an adequate organization to ensure the qualification of the EIP and the compliance with the defined requirements. External contractor: Physical or legal entity, other than the operator and its employees, implementing operations or supplying goods or services which contribute to an activity or an EIP or a planned action required by the INB Order in connection with such an activity. The contractors and subcontractors, the research staffs and the users are concerned in particular according to the INB Order (France). Facility with Safety Health Occupational Safety Environmental aspects: these are in particular nuclear sites, sites with facilities representing major manmade risk per Seveso regulations, operating mine sites, plant sites with facilities subject to public inquiry. Nuclear safety: Encompasses all of the technical provisions and organizational measures pertinent to the design, construction, operation, shut-down and decommissioning of regulated nuclear facilities, as well as the transportation of radioactive materials, in order to prevent accidents and limit their consequences. Significant event: Event having a real or potential impact on nuclear safety or occupational safety of the facility or on the environment (natural or human), being subject to a declaration to the competent regulatory Authorities.
8 AREVA supplies solutions for power generation with less carbon. Its expertise and unwavering insistence on safety, security, transparency and ethics are setting the standard, and its responsible development is anchored in a process of continuous improvement. Ranked first in the global nuclear power industry, AREVA s unique integrated offering to utilities covers every stage of the fuel cycle, nuclear reactor design and construction, and related services. The group is also expanding its operations to renewable energies wind, solar, bioenergy, energy storage to be one of the leaders in this sector worldwide. With these two major offers, AREVA s 47,000 employees are helping to supply ever safer, cleaner and more economical energy to the greatest number of people. AREVA Address: 33 rue La Fayette Paris - France - Tel.: +33 (0) Fax: +33 (0) Energy is our future, don t waste it! Safety, Health, Security, Sustainable Development Department - March Design & Production: BLEU CERISE - Photo credits: AREVA, AREVA, HOUNSFIELD PIERRE - LARRAYADIEU ERIC - PETITOT NICOLAS Printing: Groupe LECAUX - Chlorine-free, ISO certified paper
Environmental Policy 2014-2016
Environmental Policy 2014-2016 Our responsibility to the environment is a sustainable commitment inscribed in AREVA's Value Charter. The deep involvement of AREVA sites in improving environmental risk
More informationQ1 2013 Q1 2012 1 Change Change LFL
At March 31, 2013: Strong revenue growth of 12.5% to 2.279bn (+15.5% like for like) Stable backlog year on year: 44.9bn (-1.0% over the quarter) Paris, April 25, 2013 Luc Oursel, Chief Executive Officer,
More informationHow To Manage Health, Safety, Security And Environment
Health, Safety, Security and Environmental Management System Management Standards and take c&re of yourself, others and the environment Health, Safety, Security and Environment Policy E.ON Climate & Renewables
More informationSafePoint RMS. Sustainable Committed Secure. SafePoint. Monitoring Solutions
SafePoint RMS Sustainable Committed Secure SafePoint SafePoint Radiation Monitoring Solutions Nuclear Measurements Business Unit of AREVA www.canberra.com SafePoint RMS Radiation Monitoring Solutions Nuclear
More informationThe EPR reactor the reference for New Build
The EPR reactor the reference for New Build The reference for New Build The Reference for Safety The EPR design offers the highest level of safety: Already licensed in France, Finland and China Strong
More informationSolutions for Nuclear & Renewable Power Generation
Solutions for Nuclear & Renewable Power Generation Integrated Business Model Luc Oursel AREVA CEO AREVA has become the undisputed global leader in low carbon power generation solutions through its unique
More informationRC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay
RC-17 Radiation Protection in Waste Management and Disposal Implementing the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Alejandro V. Nader
More informationAppointments within the AREVA group
Appointments within the AREVA group Paris, July 18, 2011 Luc Oursel, Chief Executive Officer, wishes to involve the following persons in supporting the work of the Executive Board: Pierre Aubouin is appointed
More informationOther provisions in force on qualification or training in relation to radiological protection are the following:
Instruction IS-12, of 28 th February 2007, of the Nuclear Safety Council, defining the qualification and training requirements of non-licensed staff and non-licensed off-site personnel of nuclear power
More informationOlkiluoto 3 Experience
Olkiluoto 3 Experience CNRA International Workshop on New Reactor Siting, Licensing and Construction Experience Hosted by the State Office for Nuclear Safety Prague, Czech Republic 15-17 September 2010
More informationR000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.
2 of 34 Revision Summary Revision Number Date Description of Revisions Initial issue of the document. Table of Contents Item Description Page 1. Introduction and Purpose... 5 2. Project Management Approach...
More informationGovernment Degree on the Safety of Nuclear Power Plants 717/2013
Translation from Finnish. Legally binding only in Finnish and Swedish. Ministry of Employment and the Economy, Finland Government Degree on the Safety of Nuclear Power Plants 717/2013 Chapter 1 Scope and
More informationHEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM September 2011 OUR HEALTH, SAFETY AND ENVIRONMENT POLICY OUR PRINCIPLE OF DUE CARE We care about the wellbeing of our people and our impact on the environment.
More informationMANAGEMENT SYSTEM FOR A NUCLEAR FACILITY
GUIDE YVL A.3 / 2 June 2014 MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY 1 Introduction 5 2 Scope of application 6 3 Management system 6 3.1 Planning, implementation, maintenance, and improvement of the management
More informationHealth, safety and environment policy and management arrangements
Health, safety and environment policy and management arrangements An overview of how Rolls-Royce Group plc delivers its policy commitments on health, safety and environment Issue 6 October 2006 Contents
More informationNuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system
Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Published in the Official State Gazette (BOE) number 270 of November
More information15 Guiding Principles
Health, Safety, Environment and Corporate Social Responsibility 15 Guiding Principles 2013 Message from President and CEO 0 New Gold has a complementary portfolio of assets in different countries and cultures
More information13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM This ESIA has identified impacts (both positive and negative) to the physical, natural and socio-economic environments, as well as to community and worker
More informationPOWER & RENEWABLE ENERGY SERVICES
POWER & RENEWABLE ENERGY SERVICES Siting - Assistance to permitting Environmental Impact Assessment Safety and environmental audits Construction code compliance and design review Supplier Technical Assessment
More informationParis, April 26, 2012
At March 31, 2012: 2.4% revenue growth to 2.026bn (+1.3% like for like) Backlog growth year on year to 45.1bn (+3.7%), down slightly over 3 months (-1.0%) Paris, April 26, 2012 AREVA generated consolidated
More informationCommitted to Environment, Health, & Safety
Committed to Environment, Health, & Safety Environment, Health, and Safety Management System and Policy of W.R. Grace & Co. January 1, 2015 The Grace Environment, Health, and Safety Management System,
More informationFWK Contract - Support for safety and accident analyses
IDM UID SKKZDR VERSION CREATED ON / VERSION / STATUS 19 Feb 2016 / 1.0 / Approved EXTERNAL REFERENCE / VERSION Technical Specifications (In-Cash Procurement) FWK Contract - Support for safety and accident
More informationScience, Values and Stakeholder Dialogue: NEA Experience in Fukushima. Dr Ted Lazo Radiation Protection and Radioactive Waste Management Division
Science, Values and Stakeholder Dialogue: NEA Experience in Fukushima Dr Ted Lazo Radiation Protection and Radioactive Waste Management Division International Experts Meeting on Radiation Protection after
More informationINTERIM WASTE STORE CONSTRUCTION LICENCE EFFECTIVE CONTROL PLAN
Interim Waste Store Construction Licence Application Document IWS-C-LA-D1 INTERIM WASTE STORE CONSTRUCTION LICENCE EFFECTIVE CONTROL PLAN (rev 2) Prepared By Australian Nuclear Science and Technology Organisation
More informationHow To Decommission A Nuclear Plant
International Atomic Energy Agency Decommissioning of Nuclear Facilities Management of Decommissioning Projects Lawrence E. Boing Manila, Philippines, October 2006 1 Lesson Objectives Understand the management
More informationOverview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station. March 29, 2013 Tokyo Electric Power Company
Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station March 29, 2013 Tokyo Electric Power Company Purpose of Installing the Multi-nuclide Removal Equipment Installation
More informationPOWER & RENEWABLE ENERGY SERVICES
POWER & RENEWABLE ENERGY SERVICES Nuclea Siting - Assistance to permitting Environmental Impact Assessment Safety and environmental audits Construction code compliance and design review Supplier Technical
More informationInternational Action Plan On The Decommissioning of Nuclear Facilities
International Action Plan On The Decommissioning of Nuclear Facilities A. Introduction Decommissioning is defined by the International Atomic Energy Agency (the Agency) as the administrative and technical
More informationHow To Improve Safety At A Nuclear Power Plant
OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE August 6, 2015 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs Program Overview Bill Dean Director Office of Nuclear Reactor
More informationOperating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2
Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2 September 2013 Accident Management: Severe Accident Regulatory Document REGDOC-2.3.2 Canadian
More informationI.A.E.A. Responsible Parties
I.A.E.A. Responsible Parties The principal parties having the main responsibilities for the application of these Regulations shall be: (a) those authorized by registration or license; and (b) employers
More informationEvents reported to the Nuclear Safety Regulator in the period of 1 April 2001 to 31 March 2015
Events reported to the Nuclear Safety Regulator in the period of 1 April 2001 to 31 March 2015 Office for Nuclear Regulation page 1 of 27 Executive summary The Office for Nuclear Regulation (ONR) is the
More informationNuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants
Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction
More informationBonn Call-for-Action Joint Position Statement by the IAEA and WHO
Bonn Call-for-Action Joint Position Statement by the IAEA and WHO The International Atomic Energy Agency (IAEA) held the International Conference on Radiation Protection in Medicine: Setting the Scene
More informationPolicy on Safety, Security, Health and Environmental Protection (SHE) in the Roche Group. 2012 Edition
Policy on Safety, Security, Health and Environmental Protection (SHE) in the Roche Group 2012 Edition Obligation to Society Excerpts from the Roche Corporate Principles: Mission Our aim as a leading healthcare
More informationHealth, Security, Safety and Environment (HSE)
Health, Security, Safety and Environment (HSE) Content: 1 Objective 2 Application and Scope 21 Application of HSE Directive with underlying documents 22 Scope of HSE Management system 3 Framework for our
More informationAREVA: supply chain network principles and company s vision
AREVA: supply chain network principles and company s vision Virginie MOUCQUOT-LAIHO AREVA Finland Communications Director & Vice Country Manager Oulu, Finland 18.09.2012 1 AREVA & nuclear industry The
More informationNGSS. Evolutionary Safeguards Surveillance. Nuclear measurement solutions for safety and security. NUCLEAR MEASUREMENTS BUSINESS UNIT OF AREVA NAS
Nuclear measurement solutions for safety and security. NAS DCM-C5 Camera NAS Reader UPS NGSS Evolutionary Safeguards Surveillance NUCLEAR MEASUREMENTS BUSINESS UNIT OF AREVA NGSS The NGSS is a modular,
More informationSAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
More informationEnvironmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1
Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1 September 2013 Environmental Protection: Policies, Programs and Procedures Regulatory Document REGDOC-2.9.1
More informationINDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT
INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT 2.0 HEALTH, SAFETY & ENVIRONMENT MANUAL 2.1 HAZARD MANAGEMENT
More informationSHE Standards. Safety, Health and Environmental Protection Standards
SHE Standards Safety, Health and Environmental Protection Standards Revision 2.01 December 2010, Valid from December 01, 2010 2 Contents SHE Standards Contents Foreword 3 1 Management Process 1.1 Policy,
More informationHealth, Safety and Environment Management System
Health, Safety and Environment Management System For Bridgeport Energy Ltd Level 7, 111 Pacific Highway North Sydney 2011 June, 2010 DOCUMENT CONTROL Title: Document Number: Health, Safety and Environmental
More informationV1.0 - Eurojuris ISO 9001:2008 Certified
Risk Management Manual V1.0 - Eurojuris ISO 9001:2008 Certified Section Page No 1 An Introduction to Risk Management 1-2 2 The Framework of Risk Management 3-6 3 Identification of Risks 7-8 4 Evaluation
More informationHorizon NSL Pre-Application Intervention Strategy
CIVIL NUCLEAR REACTOR PROGRAMMME NEW REACTOR LICENSING HORIZON NUCLEAR POWER COMPANY LIMITED S APPLICATION FOR A NUCLEAR SITE LICENCE TO INSTALL AND OPERATE TWO ADVANCED BOILING WATER REACTOR UNITS AT
More informationHEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT STANDARDS. OCTOBER 2011- ISSUE No 01. Doc No: HSEC MS 001
HEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT S OCTOBER 2011- ISSUE No 01 Doc No: MS 001 Introduction Celtique Energie is in the business of exploring for oil and gas in proven basins in Europe.
More informationNuclear Consultancy & Engineering Services
Insert a caption to go with the photograph in here ITER, France Wednesday, 14 December 2011 Nuclear Consultancy & Engineering Services T H E N U C L E A R A T K I N S A S S Y S T E M A L L I A N C E CONSTRUCTION
More informationOffice for Nuclear Regulation
ONR GUIDE LC17 Management Systems Document Type: ONR Nuclear Safety Technical Inspection Guide Unique Document ID and Revision No: NS-INSP-GD-017 Revision 2 Date Issued: November 2012 Review Date: November
More informationSEC. Specialist Engineering Contractors Group HEALTH AND SAFETY STRATEGY GROUP. www.secgroup.org.uk
Specialist Engineering Contractors Group HEALTH AND SAFETY www.secgroup.org.uk Message from the Group Chairman The Specialist Engineering Contractors Group ( Group) is the focal point for the sector s
More informationPosition Description Manager, Health, Safety and Environment Services
Accountabilities About the Position About the Business Unit About Arts Centre Melbourne Position Description Manager, Health, Safety and Environment Services Situated in the heart of Melbourne s cultural
More informationIAEA Action Plan on Nuclear Safety 1
IAEA Action Plan on Nuclear Safety 1 In June 2011 a Ministerial Conference on Nuclear Safety was convened to direct, under the leading role of the IAEA, the process of learning and acting upon lessons
More informationHealth and Safety Policy and Procedures
Health and Safety Policy and Procedures Health & Safety Policy & Procedures Contents s REVISION AND AMENDMENT RECORD : Summary of Change Whole Policy 4.0 05 Nov 08 Complete re-issue Whole Policy 4.1 10
More informationConfident in our Future, Risk Management Policy Statement and Strategy
Confident in our Future, Risk Management Policy Statement and Strategy Risk Management Policy Statement Introduction Risk management aims to maximise opportunities and minimise exposure to ensure the residents
More informationThe Asset Management Landscape
The Asset Management Landscape ISBN 978-0-9871799-1-3 Issued November 2011 www.gfmam.org The Asset Management Landscape www.gfmam.org ISBN 978-0-9871799-1-3 Published November 2011 This version replaces
More informationISRS. For the health of your business SAFER, SMARTER, GREENER
ISRS TM For the health of your business SAFER, SMARTER, GREENER 1 BEST PRACTICE ISRS Best practice safety and sustainability management ISRS is a world leading system to assess, improve and demonstrate
More informationSafety Analysis Probabilistic Safety Assessment (PSA) for Nuclear Power Plants REGDOC-2.4.2
Safety Analysis Probabilistic Safety Assessment (PSA) for Nuclear Power Plants REGDOC-2.4.2 May 2014 Probabilistic Safety Assessment (PSA) for Nuclear Power Plants Regulatory Document REGDOC-2.4.2 Canadian
More informationAudit, Risk Management and Compliance Committee Charter
Audit, Risk Management and Compliance Committee Charter Woolworths Limited Adopted by the Board on 27 August 2013 page 1 1 Introduction This Charter sets out the responsibilities, structure and composition
More informationMeasurement solutions for nuclear safety and security. software customization services. Nuclear MeasureMeNts BusiNess unit of areva
Measurement solutions for nuclear safety and security. software customization services Nuclear MeasureMeNts BusiNess unit of areva CANBERRA Services 1-800-225-6370 software customization services our software
More informationCode of Conduct on the Safety and Security of Radioactive Sources
FOREWORD In recent years there has been a growing awareness of the potential for accidents involving radiation sources, some such accidents having had serious, even fatal, consequences. More recently still,
More informationIAEA Safety Standards for Regulatory Activities
Safety Standards for Regulatory Activities April 2010 Gustavo Caruso Regulatory Activities Section Division of Nuclear Installation Safety International Atomic Energy Agency Content Safety Standards and
More informationTitle: Rio Tinto management system
Standard Rio Tinto management system December 2014 Group Title: Rio Tinto management system Document No: HSEC-B-01 Standard Function: Health, Safety, Environment and Communities (HSEC) No. of pages: 23
More informationHuman Resource Management in Nuclear Safety
Human Resource Management in Nuclear Safety Christer Viktorsson Nuclear Installations Safety Role of the (IAEA) Established in 1957 143 Member States 2,200 staff Three Pillars: Safeguards Nuclear Technology
More informationFlamanville 3 Nuclear Power Plant
Flamanville 3 Nuclear Power Plant Prepared by: Giorgio Locatelli (University of Lincoln) and Mauro Mancini (Politecnico di Milano) Contacts: Giorgio Locatelli University of Lincoln Lincoln School of Engineering
More informationCOMMISSION REGULATION (EU)
L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and
More informationEnsuring Quality Going Down the Supply Chain
Ensuring Quality Going Down the Supply Chain (Including Vendor Qualification) What is the Role of Operators, Vendors and Regulators? April 21, 2015 DAE-HEE LEE Contents Nuclear Quality Issues The Role
More informationApplication for Consultant Accreditation for Land Development Work
Application for Consultant Accreditation for Land Development Work Do you need to complete this form? If you are a consulting engineering company and wish to seek accreditation with Barwon Water for Land
More informationOlkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011
Olkiluoto 3 Project AREVA Suppliers Day Warsaw October 4, 2011 Virginie MOUCQUOT-LAIHO AREVA OL3 Project Management Office & Communications Manager AREVA Reactor & Services - New Builds EPR Project Fleet
More informationBuilding New Generation Nuclear Plants Worldwide : AREVA's Experience
Building New Generation Nuclear Plants Worldwide : AREVA's Experience Philippe Guay Senior Vice President, New Builds Offers AREVA 37 th WNA Symposium 12-14 September 2012 LONDON Projects status The value
More informationMeasuring your capabilities in Fleet Safety Management
Page 1 Measuring your capabilities in Fleet Safety Management ACC Fleet Saver programme for rental fleets Audit Standards 1 July 2014 V2.0 Page 2 Table of Contents 1 Introduction... 3 2 Critical Element
More informationExecutive Director for Operations AUDIT OF NRC S CYBER SECURITY INSPECTION PROGRAM FOR NUCLEAR POWER PLANTS (OIG-14-A-15)
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OFFICE OF THE INSPECTOR GENERAL May 7, 2014 MEMORANDUM TO: Mark A. Satorius Executive Director for Operations FROM: Stephen D. Dingbaum
More informationGFMAM Competency Specification for an ISO 55001 Asset Management System Auditor/Assessor First Edition, Version 2
GFMAM Competency Specification for an ISO 55001 Asset Management System Auditor/Assessor First Edition, Version 2 English Version PDF format only ISBN 978-0-9871799-5-1 Published April 2014 www.gfmam.org
More informationCorporate Communications Strategy
Corporate Communications Strategy 2014 Office for Nuclear Regulation page 1 of 6 Introduction Effective communications is an important part of ONR s success and supports our reputation as a trusted, independent
More informationPRESS RELEASE. At September 30, 2015: Progress on the transformation plan in the third quarter:
At September 30, 2015: Rise in revenue to 2.947bn: +10.3% vs. September 2014 (+8.7% like for like) Backlog of 31.595bn Discontinued operations, including AREVA NP: Revenue of 2.732bn: -7.5% vs. September
More informationSafety culture in the construction phase lessons learned from Olkiluoto 3 Pia Oedewald, Senior scientist VTT Technical Research Centre of Finland
Safety culture in the construction phase lessons learned from Olkiluoto 3 Pia Oedewald, Senior scientist VTT Technical Research Centre of Finland IAEA Technical meeting on Safety culture in pre-operational
More informationJonathan Wilson. Sector Manager (Health & Safety)
Jonathan Wilson Sector Manager (Health & Safety) OHSAS 18001:2007 Making Life Easier For Health & Safety Managers Workshop Agenda 1. Introduction 2. Why Manage Health & Safety 3. OHSAS 18001 and OHSMS
More informationDraft IAEA Action Plan on Nuclear Safety
Atoms for Peace Board of Governors General Conference GOV/2011/59-GC(55)/14 Date: 5 September 2011 For official use only Item 3(b) of the Board's provisional agenda (GOV/2011/46) Item 14(b) of the Conference's
More informationMeasuring your capabilities in Fleet Safety Management ACC Fleet Saver
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety
More informationOperations Integrity Management System
Operations Integrity Management System OPERATIONS INTEGRITY MANAGEMENT SYSTEM: chairman s message 3 ExxonMobil remains steadfast in its commitment to excellence in Safety, Security, Health and Environmental
More informationThis document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.
Introduction This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site. It was put together by members of the Food & Drink
More informationmonitoring events inspections findings safety health operating experience improvements management occupational safety
inspections operating experience improvements management monitoring safety events findings occupational safety radiation protection health 2014 AREVA General Inspectorate Annual Report Status of safety
More informationINTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600
INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600 - CRAFT - The International Project on COMPLIMENTARY SAFETY
More informationSUB-CONTRACTOR/VENDOR PRE-QUALIFICATION QUESTIONNAIRE
Page 1 of 7 SUB-CONTRACTOR/VENDOR PRE-QUALIFICATION QUESTIONNAIRE GENERAL INFORMATION 1. Company Name/Contractors License No.: Telephone: SIC(s): Street Address: Mailing Address: 2. Officers: Years With
More informationHEALTH AND SAFETY MANAGEMENT
Health & Safety Services Unit name goes here Safety Code of Practice 2 Part A 5 th Edition, November 2015 Unit name goes here HEALTH AND SAFETY MANAGEMENT Organisation and Responsibilities University of
More informationImplementation of a Quality Management System for Aeronautical Information Services -1-
Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services Chapter IV, Quality Management
More informationOrders of Interest to the Board Current as of October 20, 2010
Orders of Interest to the Board Group 1. Currently Active Orders Order Number Title O151.1C Comprehensive Emergency Management System O153.1 Departmental Radiological Emergency Response Assets O210.2 DOE
More informationIBC 2100. Nuclear Energy Liability Exclusion. Explained
IBC 2100 Nuclear Energy Liability Exclusion Explained By Colleen DeMerchant Assistant Manager Nuclear Insurance Association of Canada June 22, 2005 Nuclear Energy Liability Exclusion (IBC 2100 CGL form)
More informationTraining in Emergency Preparedness and Response
Working to Protect People, Society and the Environment Training in Emergency Preparedness and Response Nuclear Safety and Security Programme Nuclear Safety and Security Programme Training in Emergency
More informationHAZARDOUS MATERIALS MANAGEMENT ISSUE 2
CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASON FOR INCLUSION 2 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM AND PROCEDURAL REQUIREMENTS 5 8 PEOPLE REQUIREMENTS 7 APPENDIX
More informationInformation Governance Strategy :
Item 11 Strategy Strategy : Date Issued: Date To Be Reviewed: VOY xx Annually 1 Policy Title: Strategy Supersedes: All previous Strategies 18/12/13: Initial draft Description of Amendments 19/12/13: Update
More informationAREVA. Solutions for Nuclear & Renewable Power Generation
AREVA Solutions for Nuclear & Renewable Power Generation 1 AREVA Group Arlit, Niger Melox, France La Hague, France Lynchburg, U.S.A. Alpha Ventus, Germany 2 AREVA Group 2011 Key Figures 8.872Bn in Annual
More informationStandard 1 Governance Standard
Standard 1 Governance Standard The Sustainable Development Management System provides the mechanism by which Mondi ensures strong corporate governance in the area of Sustainable Development, an issue which
More informationGENERAL REGULATIONS ON ENSURING SAFETY OF NUCLEAR POWER PLANTS OPB-88/97, NP-001-97 (PNAE G- 01 011-97) Cover page. Contents
GENERAL REGULATIONS ON ENSURING SAFETY OF NUCLEAR POWER PLANTS OPB-88/97, NP-001-97 (PNAE G- 01 011-97) Cover page Contents Federal Nuclear and Radiation Safety Authority of Russia (Gosatomnadzor of Russia)
More informationENTERPRISE RISK MANAGEMENT FRAMEWORK
ROCKHAMPTON REGIONAL COUNCIL ENTERPRISE RISK MANAGEMENT FRAMEWORK 2013 Adopted 25 June 2013 Reviewed: October 2015 TABLE OF CONTENTS 1. Introduction... 3 1.1 Council s Mission... 3 1.2 Council s Values...
More informationAPPENDIX 50. Enterprise risk management - Risk management overview
APPENDIX 50 Enterprise risk management - Risk management overview Energex regulatory proposal October 2014 ENTERPRISE RISK MANAGEMENT Risk Management Overview (RMO) 06 11 2013 Table of Contents 1. INTRODUCTION...
More informationSafety Management System (SMS) Guidelines
Safety Management System (SMS) Guidelines Pursuant to section 9D (2) (c) of the Passenger Transport Act 1990 For Bus and Coach Operators in NSW Roads and Maritime Services Level 5, 27-31 Argyle Street
More informationRENCEE SAFETY MARIES
IAEA MINISTE ERIAL CONFE RENCEE ON NUCLEAR SAFETY Vienna,, 20 24 June 2011 CHAIRPERSONS SUMM MARIES 1 The attached texts are the Chairpersons summaries of the main proposals that emerged from the Working
More informationNOT PROTECTIVELY MARKED
Title of document ONR GUIDE Supply Chain Management Arrangements for the Procurement of Nuclear Safety Related Items or Services Document Type: Unique Document ID and Revision No: Nuclear Safety Technical
More informationPrincipal Designer Guidance
Principal Designer Five or more employees 1 CONTENTS INTRODUCTION 3 Further reading / additional resources 3 QUESTION 1: POLICY AND ORGANISATION 4 4 4 QUESTION 2: ARRANGEMENTS/PROCEDURES FOR HEALTH AND
More informationManagement System Manual International Nuclear Services Ltd and Pacific Nuclear Transport Ltd
PROM 000 M01 Issue 4 August 2015 Management System Manual International Nuclear Services Ltd and Pacific Nuclear Transport Ltd Delivering Specialist Nuclear Services with Pride 2 Management System Manual