Wrocław/Poznań Łódź Warszawa High Speed Line Project

Size: px
Start display at page:

Download "Wrocław/Poznań Łódź Warszawa High Speed Line Project"

Transcription

1 Andrzej Massel Wrocław/Poznań Łódź Warszawa High Speed Line Project The development of the railway network in Poland has not been a continuous process. It was subject to many perturbations resulting from the changes in the political and economic situation. Its major part was built before World War I, in the period of the Partitions.* Therefore, it comes as no surprise that the routing of many railway lines does not correspond to the country s needs in its contemporary borders. The railway investments developed between WWI and WWII, and after 1945 did not manage to change this situation. In the layout of the railway network, we can clearly see that there is no convenient connection between Wrocław and Warszawa. Carriage between these cities is performed on three routes with various characteristics: Wrocław Ostrów Wlkp. - Łódź Kaliska Warszawa Wrocław Opole Częstochowa - Warszawa Wrocław Poznań - Warszawa While the distance from Wrocław to Warsaw is less than 300 km in a straight line, the length of the shortest railway line which connects these cities (via Ostrów Wielkopolski) exceeds 377 km. The length of the route via Poznań, in turn, which currently has the shortest journey time, is as much as 465 km. According to the 2006 timetable, the shortest journey time of InterCity trains which go via Poznań is: Warszawa Wrocław 5 hours westbound, 4 hours 50 minutes eastbound. Journey times via Ostrów Wielkopolski and Częstochowa in both directions exceed 6 hours. Such long journey times are not attractive to passengers and are the reason for changes in the modal split in favour of passenger car and air traffic. The current journey times are the result of not only the considerable length of the route but also the unsatisfactory condition of the railway infrastructure. The times are ca. 30 minutes longer than in , which follows from the fact that scheduled speeds have been reduced in recent years on a number of line sections, while the number of speed restriction is very large. It needs to be emphasised that replacement investment, albeit in great demand, cannot ensure the appropriate conditions for rail transport in the long term. A radical improvement of railway connections between Wrocław, Poznań, Łódź and Warszawa is of vital importance. In the Autumn of 2005, the Railway Scientific and Technical Centre performed a Pre-Feasibility Study (PFS) for the construction of Wrocław/Poznań Łódź Warszawa High Speed Line (HSL). The study was commissioned by PKP Polskie Linie Kolejowe S.A. (PKP Polish Railway Lines S.A.). The line which is the subject of the project will be used for 300+ km/h train traffic. Its importance will stem from the fact that it will become a key element of the rail system connecting the major Polish urban areas. It is assumed that high speed passenger traffic from many directions will focus on this line, which will make it possible to use its capacity to the maximum. In the demand analyses within the PFS, it was assumed that the new line will carry passenger flows between Warszawa (as well as Lublin, Białystok, Olsztyn), Łódź, Wrocław (and Legnica, Wałbrzych, Jelenia Góra) and Poznań (and Szczecin, Gorzów Wielkopolski, Zielona Góra). It will also become part of the international network, especially Warszawa Berlin, Warszawa Dresden and Warszawa Prague. Moreover, the already existing Central Trunk Line (CMK) will interoperate with the Wrocław/Poznań Łódź Warszawa High Speed Line. An upgrading programme is under way on CMK, which will eventually increase its maximum speed to km/h. A link between CMK and the Warszawa Łódź Poznań line should make it possible to run high speed services between Małopolska (Kraków), Wielkopolska (Poznań) and Western Pomerania (Szczecin) via Łódź. Variant specification The PFS for the Wrocław/Poznań Łódź Warszawa HSL specifies two groups of variants for such a connection. The differences between the variants pertain to the routing and the degree to which parts of the existing rail infrastructure will be used. The first group includes the construction variants for HSLs for high speed passenger traffic only, at a speed of 300+ km/h. These variants are designated as 1, 2, 3, 4. In Variants 1 and 2, newly built sections cover practically the whole route, except for short sections adjacent to nodes in which the existing line sections are used, often extended by extra tracks. The fork junction of the Wrocław- and Poznań-bound line sections is located near Kalisz, which will ensure the best service possible for this area. The difference between Variants 1 and 2 lies in the routing between the Łódź urban area and Kalisz (a route length difference of ca. 6.5 km). Variant 1 places the route north of the Jeziorsko Lagoon, while Variant 2 south of the Lagoon. Variant 3 differs from the first two in the routing of the Łódź Wrocław section. It is to run north-east of Sieradz, via Wieruszów and Kępno (partly using the existing Kępno Oleśnica line). Variant 4 takes into account the existing plans for HSLs in the A2 Motorway corridor between Warszawa and Poznań (the 1993 Kolprojekt Study). The way in which Warszawa is connected to Wrocław in this variant results from the Local Master Plans in place for the Łódź and Dolnośląskie Provinces (Voivodeships). * The period when Poland was divided between Austria, Germany and Russia and did not exist as a state ( ).

2 The upgrading of the Łódź Sieradz and Wieruszów Wrocław sections has been planned, with an extension of the Sieradz Wieruszów section. In practice, this means an intermediate variant between HSL variants and upgrading variants. The second group of variants is based primarily on the upgrading of all the existing railway lines. Three such variants have been provided, while in two of them the construction of new supplementary sections was also included. Variant 5 is an upgrading variant which uses the entire existing railway line via Koluszki Łódź Ostrów Wielkopolski; Variants 6 and 7, in turn, opt for the construction of new sections: Łask Wieluń and Sieradz Wieruszów, respectively. In all the upgrading variants, mixed traffic on railway lines has been planned, including high speed passenger trains, regional passenger trains and freight trains. A speed of km/h has been assumed for the upgraded sections, and km/h for the newly build sections (Łask Wieluń or Sieradz Wieruszów). It needs to be emphasised that service provision on the new line for all four of the urban areas under analysis, i.e. Wrocław, Poznań, Łódź and Warszawa, is possible only in the HSL construction variants. The adoption of any of the upgrading variants means in practice that the Poznań Warsaw service will still have to be operated via Kutno (line E20). Multi-Criteria Analysis (MCA) MCA was the appraisal and ranking/rating tool for the Variants. This method makes it possible for the investor to make strategic decisions even at an early stage of the investment cycle, when many possibilities and solutions with diverse parameters are analysed. The MCA performed within the PFS singled out 6 groups of criteria. These were: financial criteria, formal and legal criteria, social criteria, environmental criteria, technical criteria, transport criteria. In order to obtain total values for criteria groups, each particular criterion was assigned a weight to reflect their role and importance in the project, and in a given area. Then a preference assessment was performed to characterise certain scenarios of the analysis from the point of view of specific social groups (opinion-forming circles). Due to the specific nature of the project, the following groups (scenarios) were singled out: environmental protection point of view of pro-environmental organisations and groups related to environmental activities, local self-government point of view of local self-government as representatives of local communities, transport industry point of view of transport operators and carriers, engineers technical feasibility of the project as the main criterion, economists special importance of financial issues. Moreover, an average preference scenario and an equal weight scenario were also taken into account. The MCA showed the advantage of Variants 1, 2, 3, which assume the construction of a High Speed Line, with the most advantageous results in Variants 1 and 3. Variant 1 comes out best in the majority of categories, while Variant 3 stands out positively as regards environmental impact. That is why the recommendation for Variants 1 and 3 for further and more detailed analysis (at the stage of the Feasibility Study proper) was recognised as the main conclusion of the PFS. Below you can see the characteristics of the two recommended variants. In these variants, the construction of an HSL has been assumed practically on the entire length of the line, from Warszawa to Wrocław and Poznań, excluding only the sections adjacent to nodes. Variant 1 The key features of Variant 1 are as follows: Fig.1. Route variants 10

3 n a new line from the Warszawa node, the Warszawa Gołąbki diversion post (a sub-variant was also discussed with a line from Pruszków station or Grodzisk Mazowiecki station) n line routing in the corridor of the planned A2 Motorway between Warszawa and the Zgierz region n line location north of the Jeziorsko Lagoon on the River Warta n fork junction: Wrocław- and Poznań-bound, near Kalisz (plans for a new Kalisz Północny (North) station) n location of the Wrocław branch between Kalisz and Ostrów Wielkopolski, construction of links near Ociąż and Antonin to ensure connection with the Ostrów Wielkopolski node via the existing line sections n Oleśnica by-pass in the east, construction of a links to Oleśnica station (Wrocław service option via Wrocław Nadodrze) n approach of a line to the Wrocław node from the south-east, upgrading of the existing section: Czernica Wrocławska Siechnice Wrocław Brochów Wrocław Główny n approach of a line to Poznań Główny from the direction of Poznań Starołęka station, construction of a grade separated crossing with CE20 line, construction of a bridge with a new set of tracks on the River Warta and a new station for trains by-passing Poznań Główny, located on the PSK Poznań Górczyn siding, at the crossing with the (planned) fast tram. Two options of connecting the Łódź node with the new line have been developed for Variant 1 (for Variants 2 and 3 likewise). These are: n Option I: the line runs along the northern outskirts of the Łódź urban area (north of Zgierz); construction of link from the direction of Warszawa to Zgierz station, upgrading of the existing Zgierz Łódź Kaliska section, upgrading of the Zgierz Łódź Widzew section, construction of link towards Łódź Fabryczna station, construction of a siding from Łódź Kaliska (Łódź Żabieniec) westbound. n Option II: approach of an HSL to the node near Łódź Widzew station and further in a tunnel under the centre of the city of Łódź; construction of a new underground Łódź Fabryczna station. Fig. 2. Crossing through the Łódź node (option I) Fig. 3. Crossing through the Łódź node (option II) The length of the Warszawa Centralna Wrocław line in Option I will be km; the Warszawa Poznań line: km. The routing via Łódź Fabryczna (Option II) is 7 km longer. Variant 3 The features of Variant 3: n a new line from the Warszawa node, Warszawa Gołąbki diversion post (sub-variants were also discussed, as in Variant 1) n line routing in the corridor of the planned A2 Motorway between Warszawa and the Zgierz region n line location south of the Jeziorsko Lagoon on the River Warta n fork junction: Wrocław- and Poznań-bound, near Sieradz plans for a new Sieradz Północny (North) n construction of a diversion post on the Wrocław-bound branch, west of Sieradz, and the inclusion of link from Sieradz station 11

4 Fig. 4. Suggested location of Kalisz Północny station and line fork junction (Variant 1) a new line, partially using the existing line, in the section from Wieruszów, via Kępno, Syców in the direction of Oleśnica a new station east of Oleśnica connected via a terminating line with Oleśnica station (Wrocław service option via Wrocław Nadodrze) approach of an HSL to Czernica Wrocławska station (diversion post at the bridge on the River Odra) approach of a line to the Wrocław node from the south-east, upgrading of the existing section: Czernica Wrocławska Siechnice Wrocław Brochów Wrocław Główny (as in Variant 1) Poznań-bound branch from Sieradz Północny station north of Kalisz with Kalisz station located as in w Variant 1 approach of a line to the Poznań Główny node from the direction of Poznań Starołęka station, construction of a grade separated crossing with CE20 line from Poznań Franowo in the direction of Poznań Górczyn, construction of a bridge with a new set of tracks on the River Warta The crossing options for the Łódź in Variant 3 are the same as in Variant 1. The length of the Warszawa Centralna Wrocław line in Option I will be km; the Warszawa Poznań line: km. As in Variant 1, the routing via Łódź Fabryczna (Option II) is 7 km longer. The Łódź Central Trunk Line (CMK) link The establishing of a link between Łódź and the Central Trunk Line (CMK) is closely connected to the Wrocław/Poznań Łódź Warszawa HSL Project. The plan for such a link covers the following three tasks: existing line upgrade, section: Łódź Tomaszów Mazowiecki upgrade and electrification of the Tomaszów Mazowiecki Opoczno section construction of the Słomianka Opoczno Południe link (ca. 3 km in length). The upgrading of the Łódź Opoczno section and the construction of the siding to CMK Opoczno Południe station will facilitate greatly the Łódź Kraków service. The distance from Łódź Kaliska station to Kraków Główny (Centre) station will be shortened to ca. 253 km at a considerable improvement in maximum speed in the particular line sections. Taking into account the introduction of 250 km/h speed on the CMK and the upgrading of the Psary Kraków section to higher speeds than at present (the Starzyny Kozłów section has a minimum speed capacity of 160 km/h), it will be possible to have a Łódź Kaliska Kraków journey time of 2 hours, or even a few minutes less. The upgrading of the Łódź Kraków link, coupled with the construction of a Łódź Poznań HSL, will create a new important transport route: Kraków Łódź Poznań Szczecin. 12

5 Railroad parameters It will be possible to specify the design parameters of the new line at the stage of the Feasibility Study proper. It is then that the appropriate technical standards will be developed. However, we can provide suggested values of the key parameters even today. They are listed in the table below. Table 1 Basic design parameters for the Wrocław/Poznań Łódź Warszawa line No. Parameter Suggested value 1 Superelevation Preferred value 160 mm Maximum value 180 mm 2 Unbalanced acceleration adop = 0.6 m/s 2 3 Minimum horizontal radius Base value R = 6,000 m Exceptional value R = 4,500 m 4 Gradient Preferred value 15 Maximum value 20 5 Vertical curve radius Base value 25,000 m Exceptional value 20,000 m 6 Distance between running tracks 4.75 m 7 Turnouts for 160 km/h in reverse direction: radius of 10,000/4,000 m, crossing angle of 1:32,050 for 100 km/h in reverse direction: radius of 1,200 m, crossing angle of 1:18.5 or radius of 3,000/1,500 m, crossing angle of 1: The construction and operation practice of high speed lines in Europe indicates that despite the development of balastless track, tracks with concrete sleepers on ballast are still the most common. This pertains mainly to all the lines operated and under construction in France, Spain, Italy and Belgium. Balastless tracks are mainly used on HSLs in Germany (Berlin Hannover, Köln - Frankfurt). The track selection process for the Wrocław/Poznań Łódź Warszawa HSL will have to involve factors such as: investment cost, expected labour time, availability of maintenance technology. At the present stage we need to assume the necessity to maintain a two-variant track structure: track with ballast and ballastless track. The construction heights need to be assumed as corresponding to track with ballast and pre-tensioned concrete sleepers, plus a 350 mm nominal layer of ballast. Power supply system A 2 25 kv 50 Hz system with sub-stations located every km and powered by a dedicated 220 kv AC power line is the basic power system for a 300+ km/h line. Between the sub-stations, there are sectioning points equipped with autotransformers. This system assumes the construction of catenary equipment mm 2 in diameter. The parameters of the overhead contact system and its power supply should allow train operation at a maximum speed of 350 km/h. The upgraded and newly built lines of up to 250 km/h (sections adjacent to nodes) can have a 3 kv DC power supply to a ca. 600 mm 2 dia. overhead contact system via sub-stations located every km. These sub-stations should be equipped with rectifier sets with one-step 110/3 kv voltage transformation. Rectifier sets with 15 kv power supply are allowed. The parameters of the overhead contact system and its power supply in both power supply systems should provide electric power supply to the trains in compliance with the provisions of acts of law, relevant official standards and technical standards. In the 2 25 kv 50 Hz power supply system, non-catenary power consumption can be fed from the overhead contact system or 27.5 kv buses in sub-stations and sectioning points via monophase transformers. In the 3 kv DC system, in turn, non-catenary power consumption is fed from a system of non-catenary requirement lines with MV/LW transformers. In both systems, the public power grid can be the source of back-up supply. Control system The mandatory application of centralised level 2 ERTMS/ETCS equipment is the primary requirement for HSL control devices and systems; this equipment is a train control system based on track vehicle data transmission. Running at a speed over 160 km/h will take place only based on the readings of on-board train control devices. The train control system must control the running speed, halt at a Stop sign, and intervene in the case of failure to follow speed limits by the driver, up to the point of enforced braking and stop. The sections in which the speed is 300 km/h or more there is no need of trackside signalling devices (semaphore signals). Semaphore signals must, however, indicate every post (including the stations). Operation outline It has been assumed that the line will be serviced by trains operated by multi system motor train sets with identical characteristics and the speed of 300 km/h. On the basis of forecasted carriage volumes on the particular lines, the main services and their running frequencies have been suggested. The train distribution will depend of the adopted route variant and on the selection of the crossing through the Łódź node. An example distribution scheme for Variant 1 (Option I) is as follows: Warszawa Poznań every hour all day (alternately Warszawa Szczecin and Warszawa Berlin trains), every 30 minutes in peak hours (cycle densification by Warszawa Poznań trains), Warszawa Wrocław every 2 hours all day (trains via Łódź Kaliska), every hour in peak hours (cycle densification), Warszawa Łódź Fabryczna every hour all day, Warszawa Szczecin przez every 2 hours all day, Warszawa Berlin every 2 hours all day, Kraków - Łódź Kaliska Poznań Szczecin every 2 hours all day, Łódź Kaliska Wrocław every 2 hours all day (Warszawa Wrocław shuttle trains). It has been assumed that all the trains in the Warszawa Poznań section will run with no stopovers at intermediate stations. Trains which run in the basic Warszawa Wrocław cycle will service Łódź Kaliska and Kalisz stations. In this way Łódź Kaliska will get a link to Wrocław and Kalisz. The Łódź and Kalisz link to Poznań will be serviced by Kraków Szczecin trains. In order to increase the availability of HSLs, selected train services will be extended beyond their standard terminuses: from Warszawa to Lublin and Białystok, from Poznań to Zielona Góra, 13

6 from Wrocław to Prague and Dresden The journey times for services between Wrocław, Poznań, Łódź and Warszawa were determined on the basis of theoretical journeys made for the assumed scheduled speeds, taking into account the appropriate reserve time. So these journey times can be realistically achieved. For instance, the Warszawa Wrocław journey time with no stopovers at intermediate stations was estimated at 100 minutes, although the theoretical journey yielded 82 minutes (for the ICE3 train characteristics). Table 2 Journey times (fastest trains) in the particular services from to 2005 Variant 1 Variant 3 Warszawa Łódź 1:50 0:45 0:45 Warszawa Kalisz 3:57 1:23 1:23 Warszawa Ostrów Wlkp. 4:19 1:39 1:39 Warszawa Wrocław 4:50 1:40 1:40 Warszawa Poznań 2:47 1:35 1:35 Warszawa Szczecin 5:18 3:20 3:20 Warszawa Zielona Góra 5:14 3:05 3:05 Warszawa Gorzów Wlkp. 5:23 3:19 3:19 Warszawa Berlin 5:51 3:45 3:45 Warszawa Dresden 4:40 4:40 Warszawa Praha 8:48 6:10 6:10 Łódź Kalisz 1:39 0:34 0:34 Łódź Ostrów Wlkp. 2:01 0:49 0:49 Łódź Poznań 3:27 1:11 1:11 Łódź Wrocław 3:35 1:16 1:16 Łódź Szczecin 6:26 3:01 3:01 Kraków Poznań 5:46 3:15 3:15 Kraków Szczecin 8:19 5:05 5:05 Białystok Wrocław 8:26 3:45 3:45 Lublin Poznań 6:02 3:20 3:20 Fig. 5. Possible connection between main cities in Poland after building new lines and modernisation others. The remaining journey times were estimated assuming that other upgrading projects would be carried out, for instance the upgrading of the Wrocław Zgorzelec line, Poznań Szczecin line, etc. Conclusions From the analyses performed under the Pre-Feasibility Study, it follows that the construction of a High Speed Line to link Wrocław, Poznań, Łódź and Warszawa is feasible. It has been assumed that the line will be used only for passenger traffic serviced mainly by motor train sets but with the possibility of locomotive-driven train traffic. High speed lines are characterised by different technical parameters than those applicable to the lines operated thus far. What follows are specific requirements as to field line routing, especially as regards the appropriate curve radiuses, gradient, space between running tracks. Moreover, it is necessary to use traffic control systems and power supply to make speeds of 300+ km/h possible. For these reasons, investment costs related to the construction of high speed lines exceed the relevant costs incurred while upgrading the existing lines. Building such lines, however, makes it possible to shorten journey times greatly, to an extent which is impossible on upgraded lines. The shortest journey times for key services are: Wrocław Warszawa 1 hour 40 minutes, Poznań Warszawa 1 hour 35 minutes, Łódź Warszawa 45 minutes. The Wrocław/Poznań Łódź Warszawa HSL will not only link 4 urban areas; it will become the main component of a railway network of an international significance and will enter the network of Pan-European Corridors. We need to emphasise the east-west axis from Berlin via Poznań, Warszawa to Moscow and the extension of Corridor I from the Baltic States via Warszawa to Wrocław and further to Prague and Dresden. The construction of the new railway line will benefit the regional centres of Szczecin, Zielona Góra, as journey time from these cities to Warszawa may be shortened to a little over 3 hours. The importance of the link between the new HSL and the upgraded Central Trunk Line (CMK) also needs to be indicated. As a result of these combined efforts, the construction of the Wrocław/Poznań Łódź Warszawa HSL will in practice mean the commencement of an HSL network in Poland. q Literature 1. Massel A.: Linia dużych prędkości Wrocław/Poznań Łódź Warszawa prezentacja projektu. Konferencja Nowoczesne technologie and zarządzanie w transporcie. Rytro, November Massel A.: Linia dużych prędkości Wrocław/Poznań Łódź Warszawa. Technika transportu szynowego 2005, No Wstępne studium wykonalności budowy linii dużych prędkości Wrocław/Poznań Łódź Warszawa. Centrum Naukowo-Techniczne Kolejnictwa. Warszawa, September 2005 Author Eng. Andrzej Massel Sc.D. Railway Scientific and Technical Centre 14

7 CNTK Railway Scientific and Technical Centre CNTK Railway Scientific and Technical Centre is a research and development unit subordinated to Polish Ministry of Transport. The Centre is involved in research and development as well as conformity assessment of products for rail transport The fields of our activities are: Railway infrastructure research permanent way infrastructure (e.g. concrete sleepers) control command and signalling (e.g. electronic interlocking tests) electric traction and power supply systems (e.g. energy quality assessments) telecommunication and telematics (e.g. mobile radio system change strategy) environment protection Rolling stock research materials and construction elements type certification tests for rail passenger cars, freight wagon, locomotives and traction units Consulting activities feasibility studies for railway investment projects feasibility studies for urban transport project environmental impact analyses CNTK holds: German Eisenbhn Bundesamt (EBA) acceptance for 14 research procedures and Polish Centre for Accreditation (PCA) certificate for 4 laboratories: Metrology Laboratory AP 024 Signalling and Telecommunication Laboratory AB 310 Materials and Construction Elements Laboratory AB 369 Rolling Stock Testing Laboratory AB 742 Centrum Naukowo-Techniczne Kolejnictwa ul. Chłopickiego 50, Warszawa tel , fax: cntk@cntk.pl, For over five years CNTK experts have been present in the so-called European Research Area participating in the Framework Programme of the European Union and in the process of adjusting technical requirements of Polish railways to the European standards. On the CNTK experimental track were performed the crashworthiness tests of natural scale rail vehicles in SA- FETRAIN project and also urban rail vehicle in SAFETRAM project. CNTK is the first polish notified body (NB No 1467) for EU Railway directives 96/48/EC and 2001/16/EC. The Institute is also authorised on national level to issue technical approvals for rail infrastructure.

CENTRUM NAUKOWO-TECHNICZNE KOLEJNICTWA HIGH SPEED RAILWAY LINE WROCŁAW/POZNAŃ ŁÓDŹ - WARSAW

CENTRUM NAUKOWO-TECHNICZNE KOLEJNICTWA HIGH SPEED RAILWAY LINE WROCŁAW/POZNAŃ ŁÓDŹ - WARSAW CENTRUM NAUKOWO-TECHNICZNE KOLEJNICTWA HIGH SPEED RAILWAY LINE WROCŁAW/POZNAŃ ŁÓDŹ - WARSAW JUSTIFICATION OF THE PROJECT Strategy of Lower Silesia region: Existing layout of transport connections discriminates

More information

Traffic Forecasting Prospects for high speed rail in Poland forecasting demand

Traffic Forecasting Prospects for high speed rail in Poland forecasting demand Fast track to Sustainable Mobility Traffic Forecasting Prospects for high speed rail in Poland forecasting demand Andrzej Żurkowski CNTK Railway Scientific & Technical Centre Warsaw Poland 1 Contents Planning

More information

Investment projects on PKP Polish Railway Lines network

Investment projects on PKP Polish Railway Lines network Railway Kolej of the nowoczesnych new technologies technologii Railway of the new technologies Investment projects on PKP Polish Railway Lines network Warsaw, October 2012 Jacek Poniewierski Director of

More information

High Speed Rail in Poland plans & activities

High Speed Rail in Poland plans & activities High Speed Rail in Poland plans & activities UN ECE TER Project Workshop Master Plan for the future High Speed Rail network in Central and Eastern Europe Timisoara, 10 14 September 2012 Jerzy Kleniewski

More information

Construction programme of high speed railways in Poland July 2011

Construction programme of high speed railways in Poland July 2011 Construction programme of high speed railways in Poland July 2011 2008 The resolution of Council of Ministers 276/2008 - acceptance of overregional strategy in terms of constructing and launching high

More information

Railway Institute research and implementation

Railway Institute research and implementation Railway Institute research and implementation Characteristics of Railway Institute (IK) We cover all branches of railway transport. We possess unique test posts and specialised laboratories. We are the

More information

Wojciech Rybak Dyrektor Biura Realizacji Inwestycji. INVESTMENT PLANS CONCERNING MODERNISATION OF THE PAN-EUROPEAN TRANSPORT CORRIDOR no VI

Wojciech Rybak Dyrektor Biura Realizacji Inwestycji. INVESTMENT PLANS CONCERNING MODERNISATION OF THE PAN-EUROPEAN TRANSPORT CORRIDOR no VI Wojciech Rybak Dyrektor Biura Realizacji Inwestycji INVESTMENT PLANS CONCERNING MODERNISATION OF THE PAN-EUROPEAN TRANSPORT CORRIDOR no VI Warszawa, 27 28 November 2008 PAN-EUROPEAN TRANSPORT CORRIDOR

More information

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV A. Stephan & E. Fritz IFB Institut für Bahntechnik GmbH, Niederlassung, Germany

More information

Alignment design for Citybanan in Stockholm

Alignment design for Citybanan in Stockholm Alignment design for Citybanan in Stockholm B. Kufver Halcrow, Vineyard House, 44 Brook Green, Hammersmith, London W6 7BY, United Kingdom Abstract The Western Main Line into Stockholm Central Station was

More information

PASSENGER RAIL TRANSPORT IN POLAND. Katarzyna Dohn

PASSENGER RAIL TRANSPORT IN POLAND. Katarzyna Dohn PASSENGER RAIL TRANSPORT IN POLAND Katarzyna Dohn Silesian University of Technology, Faculty Of Organization And Management, Roosevelta 26 Str., 41-800 Zabrze, Poland; e-mail: Katarzyna.Dohn@polsl.pl Abstract

More information

VBB Cross-border railcars Core Output INTER-Regio-Rail Removing barriers to regional rail transport

VBB Cross-border railcars Core Output INTER-Regio-Rail Removing barriers to regional rail transport > www.interregiorail.eu VBB Cross-border railcars Core Output INTER-Regio-Rail Removing barriers to regional rail transport Contents 1. Summary... 3 2. Introduction... 5 3. Summary of the feasibility study

More information

Possibilities for short-term improvements Strengthening the interchange points

Possibilities for short-term improvements Strengthening the interchange points Possibilities for short-term improvements Strengthening the interchange points Dr. Jürgen Murach, Senate of Berlin 2 nd Polish-German Interregional Roundtable Lódz, 31.05.2012 First Rail Baltica meeting

More information

IMPACT OF URBAN TRANSPORT SYSTEMS ON THE ATTRACTIVENESS OF POLISH AIRPORTS

IMPACT OF URBAN TRANSPORT SYSTEMS ON THE ATTRACTIVENESS OF POLISH AIRPORTS TRANSBALTICA 20 The 7 th International Conference May 56, 20, Vilnius, Lithuania Selected papers ISSN 2029-2376 print / ISSN 2029-2384 online ISBN 978-9955-28-840-4 http://transbaltica.vgtu.ltt Vilnius

More information

A Proven. Partner. Bombardier Transportation in Poland

A Proven. Partner. Bombardier Transportation in Poland A Proven Partner Bombardier Transportation in Poland Bombardier Investments, Products, and Skills for Poland Bombardier is the principal foreign investor in the railway market in Poland. Our four sites

More information

Estimation of electrical losses in Network Rail Electrification Systems

Estimation of electrical losses in Network Rail Electrification Systems Estimation of electrical losses in Network Rail Electrification Systems Page 1 of 16 Contents 1. BACKGROUND...3 2. PURPOSE...3 3. SCOPE...3 4. DEFINITIONS & ABBREVIATIONS...4 5. NETWORK RAIL INFRASTRUCTURE

More information

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T "Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T Gorzów Wielkopolski Gorzów Wielkopolski is an important regional city centre

More information

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Policy package: 2A: Rail liberalisation and harmonisation Measure 9: Updating the interoperability

More information

Railway network. [and you drive??] PhD CE Jarosław Zwolski. 1. Railway network in Poland and in Europe. 2. Safety and traffic control

Railway network. [and you drive??] PhD CE Jarosław Zwolski. 1. Railway network in Poland and in Europe. 2. Safety and traffic control Railway network 1. Railway network in Poland and in Europe 2. Safety and traffic control 3. Intermodal transportation [and you drive??] PhD CE Jarosław Zwolski A transportation network consists of linear

More information

WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE

WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE - 20 - WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE F. Diernhofer 1, C. Sommerlechner 2, B. Fößleitner 2 1 ILF Consulting Engineers, Austria 2 ÖBB-Infrastruktur

More information

Study on development potentials for long-distance passenger rail transport along TEN-T Corridor III

Study on development potentials for long-distance passenger rail transport along TEN-T Corridor III Study on development potentials for long-distance passenger rail transport along TEN-T Corridor III Responsible body: Biuro Rozwoju Wrocławia ul. Świdnicka 53 PL 50-030 Wrocław Elaboration: ETC Transport

More information

ACTION PLAN 2008-2013

ACTION PLAN 2008-2013 RAIL FREIGHT CORRIDOR CZECH REPUBLIC - NETHERLANDS ACTION PLAN 2008-2013 July 2006 DRAFT This action plan has been decided upon by the Ministries of Transport from the Czech Republic and the Netherlands.

More information

Trade & Transport Corridors. European Projects & Initiatives

Trade & Transport Corridors. European Projects & Initiatives Trade & Transport Corridors European Projects & Initiatives Trade Corridors A concept in evolution WORLD BANK Assisting land-locked countries which depend on overland routes to access sea-ports for international

More information

POLAND Modern and Strong Economy

POLAND Modern and Strong Economy POLAND Modern and Strong Economy Business opportunities for Korean companies in Poland Consulate General of the Republic of Poland in Istanbul Mr Grzegorz Rybarski 1st Counsellor/Consul Filip Hewelke Embassy

More information

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008 Network Rail Consultation on Traction Electricity Consumption Rates for Train Operating Companies August 2008 2 1 Introduction... 3 Context & background... 3 2 Calculation of The New Electricity Consumption

More information

ERTMS for a competitive railway

ERTMS for a competitive railway ERTMS for a competitive railway A joint cross-border traffic management system for railways Sweden and Europe need a competitive railway system. With the focus on this, EU decided in 1996 that a standardized

More information

Fit for the European Rail Market Training Competence - Certification

Fit for the European Rail Market Training Competence - Certification SIAFI Europe Seminar Paris, 29 September 2008 Fit for the European Rail Market Training Competence - Certification European Railway Agency Interoperability Unit n 1 EU Rail Policy: The Core Aim To adapt

More information

HSR THE TRAIN OF THE FUTURE New technologies and research trends

HSR THE TRAIN OF THE FUTURE New technologies and research trends HSR THE TRAIN OF THE FUTURE New technologies and research trends Manuel S. Pereira* * ERRAC Vice-Chairman JUL 2008 The third dimension: Competitiveness & innovation ENERGY/POWER BIOMECHANICS HUMAN/MACHINE

More information

VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s.

VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s. VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s. Railway Research Institute, j.s.c. www.cdvuz.cz Test Centre VUZ Velim Who we are A joint stock profit making company The shares are owned by Czech Railways, j.s.c. VUZ is

More information

For over 20 years, we have specialized in complex implementation of projects in the field of transport construction.

For over 20 years, we have specialized in complex implementation of projects in the field of transport construction. For over 20 years, we have specialized in complex implementation of projects in the field of transport construction. In particular in: railway lines tram tracks roads and streets civil engineering Our

More information

The future is already here

The future is already here Transrapid International A joint company of Siemens and ThyssenKrupp The future is already here The Transrapid maglev system in Shanghai The future is already here in Shanghai Shanghai is a city of superlatives

More information

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS.

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS. Simulation models: important aids for Banverket's planning process M. Wahlborg Banverket Swedish National Rail Administration, Planning Department, S-781 85 Borlange, Sweden Abstract When making decisions

More information

High speed railway principles

High speed railway principles High speed railway principles Ignacio Barrón de Angoiti, Director High Speed, International Railway Association (UIC) Professional Conference on High Speed In the World and in the Czech Republic Praha,

More information

The Ministry of Transport, Public Works and Water Management of the Netherlands

The Ministry of Transport, Public Works and Water Management of the Netherlands Memorandum of Understanding on the implementation of approval procedures for rolling stock and cross-acceptance of approval procedures of the competent supervisory authorities between The Ministry of Transport,

More information

SCI/VERKEHR COLOGNE 2008 THE WORLD MARKET FOR ELECTRIC LOCOMOTIVES. Rolling Stock, Procurements, Manufacturers, Market Development

SCI/VERKEHR COLOGNE 2008 THE WORLD MARKET FOR ELECTRIC LOCOMOTIVES. Rolling Stock, Procurements, Manufacturers, Market Development SCI/VERKEHR COLOGNE 2008 THE WORLD MARKET FOR ELECTRIC LOCOMOTIVES Rolling Stock, Procurements, Manufacturers, Market Development THE WORLD MARKET FOR ELECTRIC LOCOMOTIVES Rolling Stock, Procurements,

More information

White Paper European Railway Traffic Management System - ERTMS

White Paper European Railway Traffic Management System - ERTMS Kapsch CarrierCom White Paper European Railway Traffic Management System - ERTMS always one step ahead ERTMS: A common signaling and communication system. Railways operate in a competitive environment

More information

Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives

Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives Timisoara - 13 th of September 2012 1 The European Vision for Railway Transport The European Commission's

More information

Success with three networks: SBB Infrastructure. InnoTrans 2012.

Success with three networks: SBB Infrastructure. InnoTrans 2012. Success with three networks: SBB Infrastructure. InnoTrans 2012. 2 SBB is playing a central role in the success for Swiss economy. The efficient rail network and reliable transport services facilitate

More information

The German High Speed Rail System. DB International GmbH Ottmar Grein Bilbao, 24.02.2015

The German High Speed Rail System. DB International GmbH Ottmar Grein Bilbao, 24.02.2015 The German High Speed Rail System DB International GmbH Ottmar Grein Bilbao, 24.02.2015 High Speed Rail Senior Consultant Ottmar Grein Personal Data Professional Experience: >30 Years Position: Senior

More information

Airports, Intermodal and Intelligent Transport Systems (ITS) projects: Recommendations to Project Beneficiaries

Airports, Intermodal and Intelligent Transport Systems (ITS) projects: Recommendations to Project Beneficiaries Airports, Intermodal and Intelligent Transport Systems (ITS) projects: Recommendations to Project Beneficiaries Seminar on State Aid for Transport Projects co-financed by EU Structural Funds in Poland

More information

Transport planning in the Stockholm Region

Transport planning in the Stockholm Region Stockholm County Council Office of Regional Planning and Urban Transportation Hans Hede Transport planning in the Stockholm Region METREX/Moscow International workshop June 2006 A region with great potential

More information

C a b l i n g s o l u t i o n s a t t h e c o r e o f R a i l w a y N e t w o r k s

C a b l i n g s o l u t i o n s a t t h e c o r e o f R a i l w a y N e t w o r k s C a b l i n g s o l u t i o n s a t t h e c o r e o f R a i l w a y N e t w o r k s High Speed Line (HSL) Zuid The Netherlands - Siemens project Dedicated 100 km high speed rail line between Antwerp (Belgium)

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

''The construction of the Public Urban Centre in Sikorskiego St. and Legionów Ave. in Łomża

''The construction of the Public Urban Centre in Sikorskiego St. and Legionów Ave. in Łomża ''The construction of the Public Urban Centre 12 10 8 Kolumna 1 Kolumna 2 Kolumna 3 6 4 2 0 Wiersz 1 Wiersz 2 Wiersz 3 Wiersz 4 The location of Łomża The city is located in the north-east of Poland in

More information

Railway Business Strategy and R&D in Europe

Railway Business Strategy and R&D in Europe Railway Business Strategy and R&D in Europe Hitachi Review Vol. 61 (2012), No. 5 190 Keith Jordan Yoichi Sugita, Dr. Eng. Takayoshi Nishino Toshiaki Kono Kiyoshi Morita OVERVIEW: Hitachi s European railway

More information

How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, VeloForum, 16 Oct.

How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła,  VeloForum, 16 Oct. How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, www.miastadlarowerow.pl VeloForum, 16 Oct. 2010 th What has communism to do with cycling? No free flow

More information

Report on structure and functionalities of the new online energy efficiency screening tool for railways

Report on structure and functionalities of the new online energy efficiency screening tool for railways Railenergy Calculator Report on structure and functionalities of the new online energy efficiency screening tool for railways Project No. FP6 031458 Railenergy Innovative Integrated Energy Efficiency Solutions

More information

World Bank Transport Forum, April 2009

World Bank Transport Forum, April 2009 0 Railways for Development An overview of China s Railway Development Program World Bank Transport Forum, April 2009 John Scales: Transport Coordinator, Beijing. Paul Amos: Strategy and Management Consultant

More information

Your Power. Traction energy

Your Power. Traction energy Your Power Traction energy Table of content 1. What is traction energy? 3 1.1 From producer to train 1.2 Advantages 1.3 Energy, voltage or current 1.4 Transport and distribution 1.5 Supply of traction

More information

2015 CEF Transport Calls for Proposals COUNTRY FICHE. Czech Republic

2015 CEF Transport Calls for Proposals COUNTRY FICHE. Czech Republic Millions Millions Millions 2015 CEF Transport Calls for s COUNTRY FICHE Czech Republic Key facts and figures Evaluation results Eligible vs Recommended proposals by call 700 600 500 400 300 200 100 0 32

More information

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage Document comes into force on 05/12/15 Supersedes GKRT0075 Iss 3 on 05/12/15 Date September 15 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that must be provided

More information

A comprehensive information system for railway networks

A comprehensive information system for railway networks A comprehensive information system for railway networks Bin Ning', Xuewei Li2 'Department of Control Engineering, School of Electronics and Information Engineering, Northern Jiaotong University 2School

More information

DLA THESIS HIGH-SPEED INTERCITY PASSENGER RAIL CARRIAGES FOR MÁV BALÁZS LENKEI SUPESRVISOR: PROF. JÓZSEF SCHERER

DLA THESIS HIGH-SPEED INTERCITY PASSENGER RAIL CARRIAGES FOR MÁV BALÁZS LENKEI SUPESRVISOR: PROF. JÓZSEF SCHERER HIGH-SPEED INTERCITY PASSENGER RAIL CARRIAGES FOR MÁV BALÁZS LENKEI DLA THESIS SUPESRVISOR: PROF. JÓZSEF SCHERER MOHOLY-NAGY UNIVERSITY OF ART AND DESIGN BUDAPEST DOKTORAL SCHOOL DEPARTMENT OF DESIGN BUDAPEST,

More information

2013 On track for more!

2013 On track for more! 2013 On track for more! Parliament Government Jernbaneverket in Norwegian society Ministry of Fisheries and Coastal Affairs Ministry of Transport and Communications Norwegian Railway Inspectorate Norwegian

More information

IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa

IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa July 2006 (Initial Document) August 2008 (Update) The action plan has been decided upon by the Ministries of Transport from Germany,

More information

PRAGUE AIRPORT KLADNO RAILWAY LINK

PRAGUE AIRPORT KLADNO RAILWAY LINK PRAGUE AIRPORT KLADNO RAILWAY LINK Investor: SŽDC s.o. (Railway Infrastructure Administration) Project manager: METROPROJEKT Praha a.s. (some parts in consortium with SUDOP Praha a.s.) PRAGUE AIRPORT KLADNO

More information

The UK Rail Industry: A Showcase of Excellence

The UK Rail Industry: A Showcase of Excellence The UK Rail Industry: A Showcase of Excellence 1 The UK Rail Industry: A Showcase of Excellence Today, nearly 20% of all European passenger journeys take place within the UK The UK Rail Industry: A Showcase

More information

Power transformers. Special transformers Railway

Power transformers. Special transformers Railway Power transformers Special transformers Railway A leader in railway systems Our compact and low-weight transformers fully comply with the customer s specifications. The products are developed together

More information

Green Buildings in Poland 2015

Green Buildings in Poland 2015 Building Consultancy Services Green Building Certification Warsaw 05 Green Buildings in Poland 05 Certification in numbers Last year the total number of projects announced by certification bodies granting

More information

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage Document to be withdrawn as of 03/12/11 To be superseded by GKRT0075 Iss 2 published on 03/09/11 Date March 11 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that

More information

Financing investments supported by EU funds The role of mbank

Financing investments supported by EU funds The role of mbank Financing investments supported by EU funds The role of mbank Jarosław Fordoński Head of European Union Office June 24th, 2015, Zurich mbank in Poland Profile of an innovative universal bank the first

More information

Rail research Successes and challenges

Rail research Successes and challenges Rail research Successes and challenges DEUFRAKO 30 ans de coopération francoallemande dans le domaine de la recherche sur les transports Alain Le Guellec, SNCF Direction de l Innovation et de la Recherche

More information

Presentation of the Shift2Rail Multi-Annual Action Plan

Presentation of the Shift2Rail Multi-Annual Action Plan Presentation of the Shift2Rail Multi-Annual Action Plan Shift2Rail Information Day for non-ju members (Open calls for proposals) 20 January 2016 Giorgio TRAVAINI, S2R Programme Coordinator 1 S2R Multiannual

More information

Regional Water Management Board in Gdańsk. ul. F. Rogaczewskiego 9/19 80-804 Gdańsk

Regional Water Management Board in Gdańsk. ul. F. Rogaczewskiego 9/19 80-804 Gdańsk Regional Water Management Board in Gdańsk ul. F. Rogaczewskiego 9/19 80-804 Gdańsk 7 RZGW in Poland Vistula River Basin District: RZGW Gliwice RZGW Kraków RZGW Warszawa RZGW Gdańsk Oder River Basin District:

More information

moving Vienna region! ÖBB suburban & urban trains

moving Vienna region! ÖBB suburban & urban trains moving Vienna region! suburban & urban trains moving Vienna region! train services moving Vienna region! 51 years of Suburban Railways in Wien und Niederösterreich Over 330.000 passengers daily ~ 150.000

More information

References: Fully automated metro lines worldwide

References: Fully automated metro lines worldwide References: Fully automated metro lines worldwide Automation projects Paris, France, Metro Line 1 Siemens has equipped one of the oldest and most popular Paris Metro lines for driverless operation with

More information

Analysing the Metro Cityring in Copenhagen

Analysing the Metro Cityring in Copenhagen Computers in Railways XI 45 Analysing the Metro Cityring in Copenhagen A. H. Kaas & E. M. Jacobsen Atkins, Denmark Abstract When planning new infrastructure it is important that the infrastructure is well

More information

POLAND CEE & CIS GATEWAY. www.suus.com

POLAND CEE & CIS GATEWAY. www.suus.com POLAND CEE & CIS GATEWAY www.suus.com EXPRESS ROADS & HIGHWAYS 2007 / before crisis 2013 / after crisis increase POLAND HANDLINGS IN POLISH SEAPORTS SUPPLY OF RETAIL SPACE Cushman & Wakefield, Emmerson

More information

Appendix A. About RailSys 3.0. A.1 Introduction

Appendix A. About RailSys 3.0. A.1 Introduction Appendix A About RailSys 3.0 This appendix describes the software system for analysis RailSys used to carry out the different computational experiments and scenario designing required for the research

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

Your Multimodal Partner. IBS, the 08/10/10

Your Multimodal Partner. IBS, the 08/10/10 GEFCO Your Multimodal Partner IBS, the 08/10/10 Summary 1. GEFCO some figures 2. GEFCO strategy and Know-how 3. GEFCO concept 4. GEFCO multimodal corridors 1. GEFCO some figures GEFCO key figures One of

More information

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)

More information

2012 On track for more!

2012 On track for more! 2012 On track for more! Parliament Government Jernbaneverket in Norwegian society Ministry of Fisheries and Coastal Affairs Ministry of Transport and Communications Norwegian Railway Inspectorate Norwegian

More information

Introducing Mazovia to the THE ISSUE project

Introducing Mazovia to the THE ISSUE project THE ISSUE Transport Health Environment Intelligent Solutions Sustaining Urban Economies Introducing Mazovia to the THE ISSUE project Agata Ciołkosz-Styk Institute of Geodesy and Cartography Warsaw, Poland

More information

China Railways Development, Financing and Challenges

China Railways Development, Financing and Challenges China Railways Development, Financing and Challenges Zhang, Jianping Depart. of Development & Planning Ministry of Railway, P. R. China March 31, 2006 Transport Forum, World Bank 1. Current Situation of

More information

Efficient recovery of braking energy through a reversible dc substation

Efficient recovery of braking energy through a reversible dc substation Efficient recovery of braking energy through a reversible dc substation DANIEL CORNIC Senior R&D Engineer. Alstom Transport Daniel.Cornic@transport.alstom.com Abstract The full regeneration of the braking

More information

DC Traction Power Supply. Powerful, efficient and safe. siemens.com/mobility

DC Traction Power Supply. Powerful, efficient and safe. siemens.com/mobility DC Traction Power Supply Powerful, efficient and safe siemens.com/mobility 2 DC traction power supply More people, more challenges, one solution: Complete mobility. Needed more than ever before: Not only

More information

12/6/2006. European Railway Agency

12/6/2006. European Railway Agency 12/6/2006 European Railway Agency How it started : Legal Basis A first proposal by the Commission from 23 January 2002 in the framework of the Second Railway Package and on 29 April 2004 adoption of Regulation

More information

SWEDEN SWEDEN DENMARK CZECH REP. CZECH REP. AUSTRIA AUSTRIA CROATIA CROATIA ITALY TURKEY GREECE PORTUGAL TURKEY GREECE PORTUGAL

SWEDEN SWEDEN DENMARK CZECH REP. CZECH REP. AUSTRIA AUSTRIA CROATIA CROATIA ITALY TURKEY GREECE PORTUGAL TURKEY GREECE PORTUGAL UNITED KINGDOM FRANCE BELGIUM NETHERLANDS GERMANY POLAND RUSSIA LITHUANIA LATVIA CZECH REP. SLOVAKIA AUSTRIA SWITZERLAND HUNGARY CROATIA ROMANIA BULGARIA UKRAINE RUSSIA TURKEY GREECE PORTUGAL SPAIN ITALY

More information

The Shanghai Maglev Route

The Shanghai Maglev Route The Shanghai Maglev Route 1 Contents 1. About the Shanghai Maglev... 3 2. Background information about EMS Technology... 4 3. Your train... 5 3.1 Getting to know the cab... 5 3.2 Central DMI screen additional

More information

European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R

European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R Basis for interoperability European Rail Traffic Management System from Siemens Transportation Systems and Nokia Siemens

More information

This is why the Swedish Transport Administration was formed

This is why the Swedish Transport Administration was formed This is why the Swedish Transport Administration was formed An approach that embraces all means of transportation A clearer customer perspective Strong regional ties A more efficient organisation To support

More information

Presentation of the Polimex-Mostostal Group April 2012

Presentation of the Polimex-Mostostal Group April 2012 Presentation of the Polimex-Mostostal Group April 2012 Table of contents Activity of the Polimex Mostostal Group Portfolio of orders Accomplishments and development directions Financial results 3 14 17

More information

Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund

Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund Concept for Railway and Transportation in Southern Norway High Speed Line with High Speed Line Oslo Trondheim / Ålesund DB International GmbH Ottmar Grein Gjøvik, 28.10.2011 Concept for Railway and Transportation

More information

Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013

Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013 Briefing Note The Use of Standard Gauges for New Non-Passenger Rail Vehicles March 2013 1. Purpose This briefing note is written to guide the manufacturers and introducers of non-passenger rail vehicles

More information

European Strategy 2050 TEN-T Methodology: Italian TEN-T network proposal

European Strategy 2050 TEN-T Methodology: Italian TEN-T network proposal TEN-T Italian Transport Programme European Strategy 2050 TEN-T Methodology: Italian TEN-T network proposal Green Corridors in the TEN Network 6-7 September 2011 TRENTO Ministero delle Infrastrututre e

More information

Arriving to Warsaw. We recommend you choosing Warsaw Chopin Airport (WAW) as it is closer to the city centre and has more connections.

Arriving to Warsaw. We recommend you choosing Warsaw Chopin Airport (WAW) as it is closer to the city centre and has more connections. Arriving to Warsaw By plane: There are two main airports in Warsaw: Warsaw Chopin Airport operating all major airlines and located near the city centre: http://www.lotnisko-chopina.pl/en/passenger?cl=en&set_language=en

More information

PROPOSAL FOR A EUROPEAN ACCESSIBILITY ACT DIRECTIVE: UITP COMMENTS

PROPOSAL FOR A EUROPEAN ACCESSIBILITY ACT DIRECTIVE: UITP COMMENTS MAY 2016 PROPOSAL FOR A EUROPEAN ACCESSIBILITY ACT DIRECTIVE: UITP COMMENTS In the European Union, UITP brings together more than 400 urban, suburban and regional public transport operators and authorities

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS E Economic and Social Council Distr. GENERAL Informal Document No. 2 16 August 2007 ENGLISH ONLY ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE Working Party on Transport Trends

More information

- WHERE DID WE COME FROM? -

- WHERE DID WE COME FROM? - - WHERE DID WE COME FROM? - Zuiderzee line Amsterdam-Lelystad-Emmeloord-Heerenveen-Drachten-Groningen (-northern Germany) Ambitious magnetic-levitation train High-speed railway line High-quality intercity

More information

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa Integrated Public Transport National workshop on promoting sustainable transport solutions for East Africa Carly Koinange, GEF Sustran Consultant UN-HABITAT Urban Mobility Unit Urban Basic Services Branch

More information

DISCONNECTORS AND LOAD SWITCHES for railways

DISCONNECTORS AND LOAD SWITCHES for railways DISCONNECTORS AND LOAD SWITCHES for railways GRID Disconnectors and load switches for railways Alstom Grid delivers transmission solutions worldwide to utility and large industrial customers seeking smarter,

More information

ENVILINE Reliable and efficient solutions for DC rail transportation

ENVILINE Reliable and efficient solutions for DC rail transportation ENVILINE Reliable and efficient solutions for DC rail transportation ENVILINE For metro, light rail and intercity transportation ABB s ENVILINE product portfolio offers a full spectrum of solutions and

More information

Possibilities and benefits for Poznan as part of TEN-T core network corridor

Possibilities and benefits for Poznan as part of TEN-T core network corridor Possibilities and benefits for Poznan as part of TEN-T core network corridor Tomasz J. Kayser Deputy Mayor of Poznań Berlin, 14 June 2013 Agenda: Poznań - basic data Poznań at the TEN-T network Rail freight

More information

TEN-T guidelines and CEF

TEN-T guidelines and CEF TEN-T guidelines and CEF 2e TEN-T CONFERENTIE Duurzame samenwerking in de logistieke sector Nederland Noordrijn-Westfalen Horst Herald Ruijters MOVE B1, 30 October 2014 What is the new trans-european transport

More information

Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu

Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Abstract This article summarises the general situation of Shanghai s integrated transport system and then determines the trends

More information

Automated underground transportation of cargo

Automated underground transportation of cargo Automated underground transportation of cargo the 5th transportation alternative for the transport of goods in congested urban areas www.cargocap.com W H At I S C A r G O C A P? the Problem Barely 150

More information

ENGINEERING TOMORROW...TODAY

ENGINEERING TOMORROW...TODAY ENGINEERING TOMORROW...TODAY Meeting national needs through the delivery of integrated consulting, project delivery and operational solutions MEETING CUSTOMERS NEEDS The secret to building long-lasting

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS E Economic and Social Council Distr. GENERAL TRANS/SC.2/2003/15 4 August 2003 Original: ENGLISH ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE Working Party on Rail Transport

More information

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations Guidelines for the Application of Asset Management in Railway Infrastructure Organisations INTERNATIONAL UNION OF RAILWAYS (UIC) 16 rue Jean Rey - F-75015 PARIS Tel: +33 (0)1 44 49 20 20 Fax: +33 (0)1

More information

PUBLIC TRANSPORT SYSTEMS IN POLAND: FROM BIAŁYSTOK TO ZIELONA GÓRA BY BUS AND TRAM USING UNIVERSAL STATISTICS OF COMPLEX NETWORKS

PUBLIC TRANSPORT SYSTEMS IN POLAND: FROM BIAŁYSTOK TO ZIELONA GÓRA BY BUS AND TRAM USING UNIVERSAL STATISTICS OF COMPLEX NETWORKS Vol. 36 (2005) ACTA PHYSICA POLONICA B No 5 PUBLIC TRANSPORT SYSTEMS IN POLAND: FROM BIAŁYSTOK TO ZIELONA GÓRA BY BUS AND TRAM USING UNIVERSAL STATISTICS OF COMPLEX NETWORKS Julian Sienkiewicz and Janusz

More information