1 A technical publication by the Water Group of HDR fall 2012

2 contents Extending Reservoir Service Life Miles and Counting: Large Diameter Water Pipeline Condition Assessment 12 City of Scottsdale Reclaimed Water Distribution System (RWDS) Evaluation, Condition Assessment and Conceptual Design Improvements 16 Rehabbing a Rehab in South Carolina 11 Comprehensive Engineering Review for Metropolitan Utilities District s Florence Water Treatment Plant 20 Johnson County Unified Wastewater Districts Pumping Station Rehabilitation Projects

3 message from technical editor fall 2012 Waterscapes is a technical publication produced and distributed by HDR. Address changes and correspondence should be sent to the attention of: waterscapes@hdrinc.com or Waterscapes Editor Engineering Marketing Services 8404 Indian Hills Drive Omaha, NE Technical Editor Graham Bell, Ph.D. Waterscapes Editor Steve Beideck Editing & Design Engineering Marketing Services Our ability to live together and form civilized society is directly the result of engineers to provide, process and remove water and waste streams for human populations. The systems which facilitate our civilization are pipelines, storage and treatment facilities. As these systems age, decisions need to be made when to renew or how to extend the useful lives of these facilities. When economies are flourishing, replacement is an option. With diminishing resources, decisions have to be made based on information on which facilities need to be replaced or rehabilitated, or which operations/maintenance procedure(s) should be modified to extend the useful life to meet the owner s needs. The process by which we gather data and process information for those decisions is called condition assessment. In this issue of Waterscapes, we highlight projects from each type of water system facility for which condition assessments are conducted. The first article by Tim Thomure focuses on the City of Tucson s reservoir assessment project which includes steel and concrete reservoirs. Reservoirs often are forgotten in condition assessments since they are visible above ground and have few, if any, moving parts. However, reservoirs are critical to the consistency of water operations HDR, Inc., all rights reserved For information on career opportunities at HDR, please visit: We practice increased use of sustainable materials and reduction of material use. Waterscapes is offset printed on Utopia Two Xtra Green 100# Dull text, which is FSCcertified paper manufactured with electricity in the form of renewable energy (wind, hydro, and biogas) and includes a minimum of 30% post-consumer recovered fiber. [ front cover photo ] One of four primary basins used for the split lime softening process at the Metropolitan Utilities District s Florence Water Treatment Plant in Omaha, Neb. A condition assessment revealed that repairs to the bridges and mechanisms of each basin were necessary. This facility is the oldest in MUD s system, which has components that date back to Scott Christensen and Steven Fox detail the three-year program to assess the Southern Nevada Water Authority s transmission piping system which consists of almost every type of pipe material. Glenn Dostal contributed two articles. His stories describe the multidisciplinary approach of condition assessment necessary for the water and wastewater plant facilities at MUD s Florence Water Treatment Plant in Omaha, Neb., and the Unified Wastewater District Pump Station in Johnson County, Kan., in suburban Kansas City. Ed Junod details the process of condition assessment to conceptual design for the City of Scottsdale Reclaimed Water Distribution System while Ken Von Aspern, Tracy Lewis and Walt Fletcher discuss when one rehabilitation project begets another. The engineer s role is to turn data in to actionable information for the owner to use in asset management or facility life extension. These case studies highlight the processes and difficulty in conducting condition assessments on water system facilities. Complementing this issue is HDR s new condition assessment wall chart, Extending Asset Life, which details some of the technologies for condition assessment. While technologies are valuable in providing data for analysis and consideration, condition assessment creates the needed actionable information. Using a combination of the appropriate technologies and engineering analysis, we can continue to be good stewards of the public trust and civilized society. Graham Bell, Ph.D. Condition Assessment & Rehabilitation Practice Lead 1

4 [ reservoir and tank rehabilitation ] A raft inspection is performed with the reservoir still in service to minimize operational impacts while collecting critical data on roofing system conditions. Extending Reservoir Service Life The Tucson Water Reservoir and Tank Rehabilitation Program By Timothy M. Thomure, P.E., P.M.P., Arizona Water Business Group Manager, Tucson, Ariz. Jim Pembroke, P.E., Vice President, Southwest Area Water Marketing Manager, Phoenix, Ariz. The City of Tucson Water Department (Tucson Water) is entering the third year of a five-year initiative to develop a comprehensive reservoir management program. The initiative consists of multiple phases, including: Program development Condition assessments of 68 water storage reservoirs Preparation of rehabilitation designs for priority sites Construction activities to execute the repairs Tucson Water s decision to develop this program reflects a wider industry trend toward infrastructure reinvestment. The reservoir inventory is valued at over $250 million and includes all storage sites on Tucson Water s potable and reclaimed water systems. There are 34 concrete/earth embankment reservoirs (0.65 mg to 60 mg capacity) and 34 steel storage tanks (10 kg to 2 mg capacity). These facilities were installed from the 1950s to the recent past, and over 50 percent of the sites are 25 years old or older. 2 waterscapes fall 2012

5 Services provided by HDR and its subconsultants have included: Steel tank triage assessments Concrete reservoir condition assessments Data management Rehabilitation capital planning Rehabilitation design Construction inspection Planning and Program Management HDR worked closely with Tucson Water staff to develop the program from its inception. Key planning elements included development of a standardized condition assessment rating system (CARS), balancing repair priorities against the available capital budget, and goal-setting for targeted rehabilitation levels. Since the utility did not have a prior reservoir assessment program, HDR implemented a triage approach that consisted of site visits with expedited data collection to create a preliminary prioritization of all reservoirs for subsequent complete condition assessment and rehabilitation. During triage assessments, the reservoir was kept in service and the following evaluations were conducted: Perimeter and site walk (safety, security, lighting, signage, access, drainage and yard piping) Exterior visual assessment (with spot dry film thickness measurements on steel tanks) Tank climb and exterior roof assessment Interior visual inspection from the hatch (non-entry) All 68 reservoirs were visited for triage within the first three months of the contract, greatly increasing the utility s confidence in the initial capital planning effort. All work was conducted under a programspecific safety plan developed by HDR in compliance with OSHA and Tucson Water requirements. Condition Assessments HDR adapted its assessment techniques to match the utility s program goals and the unique characteristics of steel tanks versus concrete reservoirs. Concrete reservoirs tend to have a much wider variety of design approaches, construction specifications and roofing systems, among other factors, than steel storage tanks. The relative consistency of steel tank construction coupled with our experience in efficient assessment tools and techniques allowed HDR to perform triage assessments on six to eight steel tanks each working day. As the steel tanks move into rehabilitation design based on their initial prioritization, dry tank inspections will be conducted to directly assess the floor, take steel thickness measurements and calculate seismic code compliance. The concrete reservoirs underwent a similar triage assessment with consideration given to the wider variety of structural elements. To gather the remainder of the required assessment information on concrete sites, interior raft inspections are conducted (28 of 34 inspections have been completed to date). Condition Maintain Deferred Maintenance Rehabilitate With the reservoir full, the assessment team inspects the interior with specific emphasis on the columns, roofing system and liner (where present). There were 72-hour static leak tests performed, and previous dive inspections were reviewed to complete the data collection. Upon completion of condition assessment activities on both the steel tanks and the concrete reservoirs, recommendations for rehabilitation are documented in comprehensive condition assessment reports. Areas for improvement include: Structural repairs Weather tightness Site conditions Safety/security performance Water quality Planning level cost opinions are developed at the condition assessment stage to aid in capital planning for the utility. Information Management Information collected and developed during the program is documented in condition assessment reports for each reservoir with planning level cost opinions for rehabilitation. Preventive Maintenance Replace Water agencies have shifted their focus from meeting growth demands to extending infrastructure service life. In short, a change in attitude from deferred to preventive maintenance. Replace 3

6 [ reservoir and tank rehabilitation ] 100% Steel Tank / Site Condition Information 0% Code Compliance Steel Thickness Floor Condition Water Clarity Visual Interior Visual Structural Ventilation Cathodic Protection Interior Coating (Indirect) Exterior Roof Coating Exterior Shell Coating Ladders & Rails Yard Piping Signage Site Drainage Security & Fencing Prior Work Age & Materials As-Builts Level of Investment 100% 5% 20% Through triage, HDR assessment teams gather approximately 80 percent of the data an owner may need to know about the asset at approximately 20 percent of the resource investment of a full condition assessment (steel tank example). That format of documentation is useful to a point; however, many stakeholders require access to only certain parts of the information contained in the reports and/or find other media more useful than binders on the shelf. In addition, it is critical to long-term program success to store the information in a consistent, accessible and updatable system. To facilitate access, HDR provides condensed executive summary data sheets for each reservoir site (useful to management) and houses a SharePoint website dedicated to the program that allows end users access to navigate to all known data from asbuilt drawings, condition assessment reports, rehabilitation designs and daily construction inspection reports. Rehabilitation Design and Construction HDR has completed rehabilitation designs for three concrete reservoirs with two additional designs at 90 percent completion as of Aug. 1, Additional rehabilitation designs are added to the program each year for construction during the following winter season. Rehabilitation designs to date have addressed issues including: Roof improvements (cast-in-place concrete, precast concrete single/doubletee, and standing seam aluminum) Installation of spray applied and membrane liners Corrosion repair and prevention Ventilation improvements Miscellaneous site improvements HDR and our subconsultants provided engineering support through construction, construction observation and full-time third party inspection during coatings applications. Two reservoir rehabilitations have been completed to date totaling about $1.5 million. Projects currently scheduled for winter total an additional $1.5 million. Ultimately, the goals of the program are to extend the service life of the storage facilities, minimize water losses and protect water quality and public health. Through a phased approach of condition assessment, rehabilitation and planned maintenance, these goals will be achieved. For additional information about this article, please contact Tim Thomure at Timothy.Thomure@hdrinc.com or Jim Pembroke at Jim.Pembroke@hdrinc.com. 4 waterscapes fall 2012

7 [ pipeline condition assessment ] & 108 miles counting Large Diameter Water Pipeline Condition Assessment By Scott Christensen, P.E., Project Manager, Las Vegas, Nev. Steven Fox, P.E., Vice President and Project Manager, San Diego In May 2007, pooling water on the desert floor was observed in the vicinity of the Las Vegas Lateral, a 90-inch diameter cement-mortar lined and coated steel pipe constructed in The subsequent investigation revealed that the exterior mortar had lost all alkalinity, the cement mortar coating had cracked, and the soils in the vicinity were extremely corrosive. Up to 80 percent wall thinning of the 9/16 thick steel can and three holes had formed, resulting in the wet spot and critical system downtime. Repairs were initiated and completed by the owner and a local contractor. Following the repair and subsequent investigation on the Las Vegas Lateral, the Southern Nevada Water Authority (SNWA) initiated a program to assess water transmission laterals that were constructed prior to 2000 and retained the services of HDR to provide a condition assessment of approximately 108 miles of pipe in Las Vegas (Table 1). The program was scheduled to be completed over a three-year period. year I II diameter range inches inches pipe materials Asbestos, Steel, Reinforced Concrete Pipe, Pre-stressed Concrete Cylinder Pipe Pre-stressed Concrete Cylinder Pipe, Pre-tensioned (bar wrap) Concrete Cylinder Pipe, Steel length 24 miles 34 miles III inches Steel 50 miles [ table 1 ] Summary of Laterals During the Year III work, the client requested that additional pipe be added to the investigation, bringing the Year III length to approximately 80 miles. The project team included specialized sub-consultants Schiff Associates (now HDR Schiff), Pressure Pipe Inspection Company (now PURE Technologies), Echologics, Kleinfelder, TRC Solutions, Rafael Civil, Rock Solid Group, and Cardno TBE for several tasks, including: Corrosion testing and evaluation Internal inspection of pre-stressed concrete cylinder pipe (PCCP) Acoustic testing Geotechnical investigation Surveying Test station installation and excavations Broadband electromagnetic testing Potholing Criticality Evaluation The initial project was envisioned to span three years. The first step was to determine the order in which laterals would be inspected and evaluated. A criticality evaluation, using Pairwise comparison to weigh and compare factors, was performed to prioritize the laterals for inspection. The required criteria for evaluation were developed along with specific scoring methodology for each criterion. The results of the criticality evaluation provided a prioritized listing of the laterals to be inspected each year of the program. As seen in Table 2, criteria were developed for the evaluation and resulted in the following: Age All pipes are pre-2000, but were defined by four age categories, based on the installing authority: Stage 1, installed Stage 2, installed CRC, installed CIP, installed Coatings Various pipe configurations have different types of applied (or manufactured) coatings. Coatings are divided into cement-mortar applied; coatings integral with pipe structure such as PCCP; dielectric only and dielectric with mortar overcoats. Cathodic protection Some of the laterals have cathodic protection (CP) systems installed; others do not. Test stations were initially on some laterals, but may have been removed, destroyed or lost. This category was divided into five categories no cathodic protection and no test stations; no cathodic protection but has test stations; sacrificial cathodic protection with zinc or magnesium anodes; older impressed current system; and new impressed current system. System importance As the only delivery system into the Las Vegas Valley, all transmission laterals are important to the welfare of the valley. However, three categories were identified main 5

8 [ pipeline condition assessment ] laterals with no backup or redundancy, main laterals with backup or redundancy, or secondary laterals. External conditions This criterion addresses the potential aggressiveness and non-aggressiveness of the lateral s environment. Factors include soil and backfill conditions adjacent to the lateral in terms of soil resistivity (an indicator of soil and groundwater conditions meaning low soil resistivity would fall under aggressive external conditions and high soil resistivity falls under non-aggressive external conditions); trench backfill material (CLSM, native, import); and potential stray current influence by nearby utilities. If the lateral is parallel to or crossed by another utility equipped with a cathodic protection system, this adjacent system can potentially expose the lateral stray currents, impacting the deterioration rates of the lateral. Pipe type This category addresses the predicted performance of specific pipe types. Lateral types include steel pipe, reinforced concrete pipe, asbestos cement pressure pipe, pre-stressed and pre-tensioned concrete cylinder pipe. Pre-stressed pipe is further defined by whether it was installed in the 1970s or pre- or post Other criteria that were considered, but not used, included internal pressures; transient pressures; linings; recent construction; future CIP; maintenance history; and accessibility. For this evaluation, a score of 1 indicates high priority and 5 indicates low priority. The Pairwise Comparison Decision Support Tool is used to provide a relative weighting of the criteria used for the criticality evaluation. This tool provides a simple way to compare criteria or alternatives against each other. Using numeric values between 1 and 5, with 5 being more important and 1 less important, a comparison is made between each of the criteria (Table 3) and a weighting factor is applied. Weighting factors were applied to the scores for each criterion, and a total score was determined for each of the laterals to identify which year inspection work should be scheduled. Due to the variety of materials included in this project, a number of inspection technologies were required. high low Criteria Age Stage 1 Stage 2 CRC CIP (not used) Pipe Coating Mortar coating Coating with structural Dielectric (not used) Cathodic Protection No CP, without test stations No CP, without test stations Sacrificial CP with anodes Older impressed current system, with sacrificial anodes Dielectric with mortar overcoat New impressed current system System Importance Main with no backup Main with backup Secondary (not used) (not used) External Conditions Aggressive Possible stray current (not used) Non-aggressive CLSM backfill Pipe Material [ table 2 ] Criteria Scoring Asbestos Pre-stressed (installed in 1970s) Pre-stressed (pre- or post 1970s) RCP Steel Age Coatings CP System Importance External Conditions Pipe Materials Sum Weighting Factor Age Coatings CP System Importance External Condition Pipe Material [ table 3 ] Pairwise Comparison Results Total waterscapes fall 2012

9 Inspection Summary Lateral evaluations were based on conditions that impact the structural properties of the pipe. For example, for steel pipe, soil chemical and physical properties, ph, presence of groundwater and stray currents can impact the structural integrity of the pipe (AWWA Manual of Water Supply Practices M11, 2004), as well as impacting ferrous metals (steel cans ) and reinforcing bars/wires. Both direct and indirect techniques were used to evaluate two key parameters chemical and physical soil properties and operational pipeline parameters. These indicators provided information and data necessary to evaluate the ability of the lateral to perform satisfactorily, as well as possible risk to future operational life. Table 4 presents the proposed inspection/evaluation technology by pipe material. Prior to conducting fieldwork, the project team developed a detailed fieldwork plan for the work to be performed. This plan identified the procedures and requirements for the various field work activities. This plan was implemented throughout the project to assess the various laterals. Pipe Material Asbestos-cement Pressure Pre-stressed Concrete Cylinder Steel with Cement Mortar Coating, Coal Tar Epoxy or Tape Coating Reinforced Concrete Pipe Implemented Technologies Soil Resistivity Testing Emag Soil Sampling and Testing Groundwater Sampling and Testing (if present) Potholing Acoustic Testing Direct Assessment (Excavations) Coring Petrographic Analysis Soil Resistivity Testing - Emag & Wenner 4-pin Soil Sampling and Testing Groundwater Sampling and Testing (if present) Electrical Continuity Survey Remote Field Transformer Coupling (RFTC) Survey Direct Assessment (Excavations) Broadband Electromagnetic (BEM) Hand Scanning Kit (HSK) (Optional) Soil Resistivity Testing Emag & Wenner 4-pin Soil Sampling and Testing Groundwater Sampling and Testing (if present) Test Station Installation Electrical Continuity Survey Potential Survey Stray Current Survey Direct Assessment (Excavations) BEM HSK Survey Ultrasonic Thickness (UT) Testing (Optional) Soil Resistivity Testing Emag & Wenner 4-pin Soil Sampling and Testing Groundwater Sampling and Testing (if present) Direct Assessment (Excavations) Ground Penetrating Radar (GPR) LVL Failure Soil Corrosivity Evaluation As the first field testing method required on all pipes regardless of pipe type or material the soil corrosivity evaluation included an electromagnetic (Emag) conductivity survey per ASTM G (2012) and Wenner 4-pin testing per ASTM G (2012). The Emag survey provided for the rapid collection of a soil resistivity profile along the alignment. If the Emag results were below 1,500 ohms-cm, Wenner 4-pin testing was conducted to obtain a stratified soil resistivity profile at that location. Based on the Emag and Wenner 4-pin results, soil samples and groundwater (if encountered), samples are obtained. All of the in situ and laboratory data is analyzed to classify the soil in one of the following groups: Severely corrosive, corrosive, moderately corrosive, or mildly corrosive to ferrous metals Negligible, moderate, severe with respect to sulfate attack for concrete or cement-mortar coated structures Aggressive with respect to the migration of chloride ions Potential for microbial induced corrosion Potential aggressiveness towards copper and brass Potential ramifications of fluctuating groundwater Acoustic Testing In Year I, three locations of asbestos-cement pressure pipe and one location of pre-tensioned concrete cylinder pipe were tested acoustically. Acoustic testing is a noninvasive method that does not require the pipe to be out of service for testing to be performed. [ table 4 ] Summary of Inspection Technologies Used by Material 7

10 A DC mv DC [ pipeline condition assessment ] Sensors are attached to the lateral at access points (valve vaults, AVAR/BO installations) or thru potholes constructed to the top of the pipe. Initial evaluation uses 300- to 700-foot-long sections. If necessary, a higher resolution can be obtained by moving the acoustic sensors closer together. One leak was identified in a 24-inch asbestos-cement lateral, which identified the soil as being predominately moderatelycorrosive but can subject the pipe to severe sulfate attacks. Recently, after obtaining permissions and during a planned outage, it was EQU d P1 C1 NULL d d OHMS P2 C2 RESISTANCE METER C1 P1 P2 C2 SURFACE I POT ENT I A L d later determined that a leak did not exist. A sample of the pipe was obtained to estimate the remaining competent wall thickness to better evaluate its remaining service life. Results of this effort are still pending. Electrical Continuity A test for the state of the electrical continuity along metallic and pre-stressed concrete cylinder pipelines was completed to validate the installed condition (based on available design drawings, as-constructed documentation and shop drawings). Electrical continuity testing is conducted along entire lateral alignments where rubber gasketed joints or noncircumferentially welded pipeline specials exist, where feasible. The testing hinges on adequate access to pipeline appurtenances such as blowoffs and air vacuum/air release valves, pumping and monitoring facilities, and test stations. This testing is completed prior to implementing a close-interval survey (CIS). During the Years I and II evaluations, additional test stations were installed to facilitate the electrical continuity evaluation and identify potentially harmful unknown electrical current flowing on the pipeline and its direction of movement. Further continuity testing confirmed that some pipes were electrically discontinuous requiring repair for proper operation of a corrosion mitigation system. An electrically continuous pipe is required for cathodic protection (CP). If CP is not installed (and operating), the lateral is susceptible to long-line corrosion cell as a function of soil parameters. [ figure 1 ] Wenner 4-Pin Test - DC POWER SOURCE + C U R R E N T AMMETER VOLTMETER L I N E VARIABLE RESISTOR Pipe Potential Survey Baseline potential testing was conducted to establish baseline conditions on metallic and pre-stressed concrete cylinder laterals to monitor future changes. Comparing potentials over time helps estimate the probability that corrosion is occurring and evaluate the status of the corrosion mitigation system, if installed. Depending on how the lateral has been identified electrically continuous or discontinuous the close-interval survey methodology is determined and conducted. The CIS identifies anodic areas where the pipe is likely experiencing corrosion and helps to identify locations of possible stray current discharge points. [ figure 2 ] Electrical Continuity Test 8 waterscapes fall 2012

11 Internal PCCP Inspection Internal inspections using remote field eddy current/transformer coupling (RFEC/TC) were previously completed by PPIC (now PURE Technologies) to help evaluate the PCCP alignments. Different internal inspection tools are currently available, and the selection of one over the other is a function of access, pipe size, hydraulic pressures and velocities. This equipment is placed in the pipe and creates an electromagnetic field with a transmitter and monitors secondary fields with the receiver while traveling the length of the pipe. If there are any breaks in the wire in the PCCP section, the resulting electromagnetic field signature is detected and correlated to pipeline stationing. Two laterals in the project were previously inspected by PPIC and the results of these inspections were used when evaluating the Main Aqueducts A and B. Because of safety concerns for pipe entry, large costs associated with the pipe section rehabilitation and advancements in PPIC s evaluation algorithms the data was re-evaluated and pipe that was previously identified as potentially severely distressed was reduced to having minimal wire breaks that only required future monitoring. Direct Assessment Based on the results of the indirect pipeline inspection (soil corrosivity, acoustic testing, electrical continuity and potentials), locations exhibiting a high potential for deterioration or corrosion were identified for an additional investigation or direct assessment. After excavation of pipe at the identified location, a direct assessment was made using methodologies based on the pipe material: Asbestos Core sampling, petrographic analysis Steel Broadband electromagnetic (BEM), Ultrasonic testing (UT) (optional) PCCP BEM, UT (optional) RCP Ground Penetrating Radar Asbestos One site was identified for direct assessment where acoustic testing indicated a potential leak site and was expected that the pipe would need to be replaced. Although not performed, petrographic analysis, in addition to the acoustic testing, is available to help determine the health of ACP. Petrographic analysis provides material characterization analysis by using a combination of optical microscopy, scanning electron microscopy, and chemical analysis. Petrographic analysis, from geology meaning the systematic diameter 96, 90 PCCP Steel mortar lines and coated Soil corrosivity severe corrosion potential; high sulfates one location indicates potential for severe sulfate attack; nine test stations installed; future inspection recommended 24, 24 Asbestos Steel coal tar enamel lined Asbestos internal leeching suspected based on water quality; recommendation AC pipe coring and petrographic analysis Steel Two test stations installed, pipe in good condition, cathodic protection system recommended 16 Asbestos Soil corrosivity severe corrosion potential; internal water quality corrosive; approach for all AC pipes, 24 Asbestos Soil corrosivity moderately corrosive; internal water quality moderately corrosive; acoustic monitoring leak identified; approach for all AC pipes 48 Pre-tensioned CCP Soil corrosivity severely corrosive; potential survey results for partial pipe only, recommended to wait and perform testing on entire alignment in Year II work 96, 108 PCCP Class III wire, two bonding straps, shorting rods to steel can, internal Z joint bonds; recommendation to install electrical insulating device, design stray current mitigation system 96 Pre-tensioned CCP Class II wire, no bonding straps, no shorting rods to steel can, no joint bonds; PPIC (PURE) re-evaluated 2004 data using current analysis tool and wire breaks were significantly reduced; recommended to reinspect in the future. 120 RCP Soil corrosivity mildly corrosive except at land/water interface area along Lake Mead; direct assessment with GPR survey at four locations indicates small degradation of reinforcing steel, but not significant; reinspect at future date. [ table 5 ] Results and Recommendations for Year I Laterals 9

12 [ pipeline condition assessment ] During UT testing, samples of the mortar coating are taken for chemical testing. If chloride concentrations are sufficient enough to overcome the alkalinity of the cement paste s ph, chloride ion can create a highly localized attack or pitting. Corrosion of the steel may also occur when the ph of the cement-mortar is insufficient to passivate the steel can. LVL Coupon Failure characterization of rocks in hand specimen and thin section, provides information about the failure mechanism. Steel If a steel pipe with a cement-mortar coating is subjected to a direct assessment, the pipe is excavated to the pipe s spring line and its steel wall thickness measured to determine the loss of steel. Previous work on the Las Vegas Valley Lateral has shown that the use of broadband electromagnetic (BEM) equipment over the entire exposed surface of the lateral provided a good assessment of the average wall thickness of the pipe. If BEM was used, a hand scanning kit (HSK) was used with data analysis turnaround provided by the equipment manufacturer within 24 hours. It was decided to use the HSK as a screening tool and prior to removal of the cement-mortar coatings and perform UT testing in areas indicated by the HSK where significant thinning of the wall or a pin hole was developing. The use of HSK is considered non-destructive because it does not generally require removal of the protective coating, scanning through coatings such as mortar (up to approximately 3 inches or 76.2 mm), paint and tar. The HSK system is generally considered accurate to within ±40 mils (0.040 inches or mm) and requires data processing using a multi stage screening and processing procedure. Ultrasonic Thickness (UT) Testing UT results are significantly more precise than HSK, but the measurements are limited to a test window where the mortar has been removed to expose the steel pipe and identify an area with the highest probability of corrosion. UT testing is technically considered non-destructive because it does not harm the steel pipe wall, but does require the removal of pipe s protective cement-mortar coating to allow the transducer to contact the pipe s steel can. Ground-Penetrating Radar (GPR) When soil corrosivity testing indicates a corrosive condition adjacent to a reinforced concrete pipe (RCP), a direct assessment is conducted. GPR can detect subsurface voids (delaminations) within concrete pipes and structures. GPR radiates short pulses of high-frequency electromagnetic (EM) energy into the pipe s surface from a transmitting antenna. This EM wave propagates into the concrete at a velocity that is related to the electrical properties of subsurface materials (specifically, the material s relative dielectric permittivity). When this wave encounters the interface of two materials having different dielectric properties (i.e., voids or delamination), a portion of the energy is reflected back to the surface, where it is detected by a receiver antenna and transmitted to a control unit for processing and display. Results An example of some of the results from the Year 1 evaluation are presented in Table 5 (on page 9). Conclusion Inspection and evaluation of existing underground infrastructure requires the understanding and application of available technology for correctly interpreting the information, access to existing design, construction and shop data, and a willingness to look at results with openness to accept the results. As an example, based on preliminary results from Years I and II, work on the Year III laterals investigation was modified and expanded modified to conduct an enhanced CP survey of the condition of existing facilities, and expanded to include all remaining laterals not identified in the criticality evaluation and constructed after the 2000 cutoff. For this project, each lateral examined in the first two years of the project has its own separate report, providing available information about the lateral, including all test results and measurements, and a discussion of results, including deficiencies and concerns. The report then provides possible courses of action to mitigate or correct problems, including a range of planning level cost estimates. For additional information about this article, please contact Scott Christensen at Scott.Christensen@hdrinc.com, or Steven Fox at Steven.Fox@hdrinc.com. 10 waterscapes fall 2012

13 [ treatment facility condition assessment ] Comprehensive Engineering Review for Metropolitan Utilities District s Florence Water Treatment Plant By Glenn Dostal, P.E., Senior Vice President, Omaha, Neb. The Florence Water Treatment Plant, located in northeast Omaha, Neb. is the oldest water treatment facility in the Metropolitan Utility District (MUD) system with components dating back to Located along the Missouri River, the plant has a maximum day capacity of approximately 158 mgd. Concerns with the water treatment plant age and condition, along with increasingly stringent regulatory requirements, were the driving forces for this comprehensive condition assessment and evaluation project. MUD retained HDR to conduct a comprehensive engineering review for the Florence Water Treatment Plant (WTP) to form a master plan for the facility. This master plan provided general project descriptions and the associated costs for incorporation into the capital improvements plan for MUD. The major components of the comprehensive engineering review included the consideration and evaluation of the following: Multi-disciplined detailed assessment of all existing structures and equipment at the water treatment plant Detailed review of the capacity of all individual treatment units to determine the facility limitations and constraints Hydraulic model of plant capacity including a survey of key water elevations to calibrate the model Evaluation of water demands to determine the capacity requirements and staging of facility improvements projects Comprehensive review of raw water quality, finished water quality goals and SDWA compliance issues Development of concepts/alternatives to upgrade the individual treatment units to restore the condition of existing units, improve treatment capability for regulatory compliance and expand existing capability as required for desired capacity Completion of a detailed phasing plan to implement the improvements taking into consideration MUD s regulatory requirements, condition of facilities, facility expansion and treatment requirements, and financial constraints One of the first steps of the review was to conduct a condition assessment of the existing facility components. This assessment included architectural, structural, mechanical, electrical, instrumentation and process reviews of each of the facility components to identify deficiencies or needed improvements for the existing facility components. Condition assessment forms were completed for each treatment process, equipment and structure at the WTP. Interviews with plant operating and maintenance staff, review of equipment maintenance logs and review of past reports of the facility were completed for the condition assessment. (continued on back cover) 11

14 [ reservoir and pump station assessments ] City of Scottsdale Reclaimed Water Distribution System (RWDS) Evaluation, Condition Assessment and Conceptual Design Improvements By Ed Junod, Senior Project Manager, Phoenix [ from left ] Photograph 1. Leaking APS Transformer at RWDS PS96; Metals, Photograph 2. Connections and Fitting at the Pump Discharge Pipe to ARV The City of Scottsdale, Ariz., is home to a vibrant yearround golfing industry. Numerous public and private courses attract players from around the world. From a water engineering perspective, the challenge of maintaining this industry in a desert environment is to avoid use of potable water for irrigation. Approximately 22 years ago, the City of Scottsdale (city) decided to implement a reclaimed water system so that the local golf industry could continue to expand without consuming precious potable water sources. The planned system, called the Reclaimed Water Distribution System (RWDS), was designed to provide up to 1 million gallons per day (mgd) of irrigation water per golf course for as many as 20 golf courses. The planned 20 mgd system comprised the following major facilities as depicted in Figure 1: Water Campus Water Reclamation Plant (WRP) Reservoir B Pump Station CAP (PS95) Reservoir A Pump Station A (PS96) Pump Station B (PS97) Pump Station C (PS98) Reservoir D Pump Station D (PS99) In addition to these facilities, there are over 14.3 miles of transmission lines (trunk lines) and 11.8 miles of branch lines (main lines) to convey water to the 20 golf courses. There are three inline RWDS stations (PS96, PS97 and PS98) and no appreciable storage within the system. The RWDS design (not including Water Campus WRP) was completed in 1991, and system operation commenced in waterscapes fall 2012

15 Scottsdale s Water Campus WRP and its associated Sewage PumpBack system was the planned source of reclaimed water and did not come online until From 1993 until 1998, the sole source of RWDS supply was water taken from the Central Arizona Project (CAP) canal, and pumped northward by PS95 to Reservoir A. Since 1998, RWDS is supplied with a blend of CAP canal water and product water (tertiary effluent and/or advanced water treatment (AWT) water) derived from Water Campus WRP. After nearly 20 years of operation, RWDS is still able to provide its maximum design pumping rate. But it has become challenging to manage and control due to the early adjustment of the final location of a number of golf courses from one pumping zone to another pumping zone, frequency of reclaimed water orders, the aging infrastructure and complexity of the system. Though the full-range of irrigation water demands are being met, the system is doing so with a smaller margin of safety. RWDS was designed to deliver maximum demands with at least one standby pump at each pump station. There is currently no redundancy in the system. City officials retained HDR in June 2011 to evaluate the condition of the RWDS and to recommend the improvements needed to restore the original degree of system reliability and capability. RWDS Condition Assessment In July 2011, HDR conducted a triage, or abbreviated condition assessment of all the pump stations in the RWDS to assess the current condition and performance of the system. A secondary objective was to discover potential operational improvements that were identified by HDR s use of the InfoWater hydraulic model. To set a baseline of RWDS conditions and performance, previous evaluations and reports were reviewed by the study team. These reports assigned a condition rating and an estimated remaining useful life to the systems and their components. The ratings were based on visual inspection and interviews with operations and maintenance staff. In addition, assets were assigned a level of criticality based on the consequence of failure such as effects to public health and safety, environmental impacts, cost of repairs and effects on customers. Neither performance testing nor non-destructive testing was conducted on the RWDS in any of the previous reports. To assess the existing RWDS condition, HDR performed a number of activities, including: Conducting interviews with city and golf course officials to identify the historical problems they were facing, including RWDS operating characteristics that are good, bad or in need of improvement Reviewing previously performed condition assessment reports Reviewing and analyzing city-conducted RWDS deadhead/shutoff/efficiency tests Conducting triage condition assessments of RWDS components Performing an evaluation of the city s existing InfoWater hydraulic model, then updating that model so it could accurately predict system performance Conducting a land survey to confirm the horizontal and vertical location of all major system features Assisting the city s job order contracting (JOC) services to identify system valve and appurtenance conditions; calibration of field instruments and field performance testing A significant observation was that the RWDS PS96 utility transformer appeared to have internal damage and subsequent leakage, as shown in Photograph 1. This finding was communicated to city staff as well as the Arizona Public Service (APS). The possible internal damage and apparent leak can be attributed to transformer overloading that takes place during golf course over seeding operations. Loss of this transformer would completely shut down the RWDS. Other significant observations included: Identification of multiple dissimilar metals connections and fittings at the surge tanks and the pump discharge pipe to ARVs; brass, steel and galvanized fittings were used. This combination of dissimilar metals will accelerate the rate of corrosion. An example of this corrosion is shown in Photograph 2. Surface corrosion on numerous PS discharge spools as they enter the concrete pump slab, as shown in Photograph 3 on page 15 RWDS Performance Testing City staff conducts individual pump performance testing approximately every two years. This test measures the pumping flow rate, total dynamic head, voltage and amperage to calculate overall efficiency. The test results identify which pumps have excessively worn impellers and are in need of overhaul. Several pumps and motors throughout the system have been rehabilitated based on the test results or upon failure. Because the previous reports and assessments were fairly recent and city staff had conducted a recent individual pump performance test (Nov. 30, 2009), HDR s approach involved testing the performance of the entire system in operational modes that mimic actual system performance requirements. This type of testing would be more useful for identifying system deficiencies; rather than duplicating previous assessments that were focused on individual pump performance. HDR conducted a system-wide performance test of the RWDS pump stations 96 through 99 over two consecutive days in December The purpose of the performance (flow) test was to demonstrate system performance and to verify the accuracy of the InfoWater model to predict system performance. The field performance test was conducted based on test protocol developed by the HDR Condition Assessment/Operations Group. Pump shut-off head testing was not conducted during 13

16 [ reservoir and pump station assessments ] *Mirabel *Legend Trail *Desert Mountain 5.8 MGD Total *Troon North *Estancia *Terravita *Boulders North & South *Whisper Rock Upper/Lower 6.6 MGD Total Raw water to CAP WTP CAP1 Site 130 [ figure 1 ] Facility Overview Res A CAP Canal IWDS Site 130B RWDS PS99 (D) 5.8 MGD Res D RWDS PS98 (C) MGD RWDS PS97 (B) 14.0 MGD RWDS PS96 (A) 18.0 MGD Water Campus WRP Effluent RWDS PS95 (CAP) 20.0 MGD the performance test as originally proposed, because the city had already done this in October The December 2011 performance test confirmed several operational limitations and also indicated operational changes that could be put into effect immediately. The emphasis of the flow test was confirmation of system performance, as opposed to individual pump performance (the focus of the city s bi-annual performance tests). In addition to confirming system performance under controlled operating scenarios, the system test also provided data useful for final calibration of the InfoWater hydraulic model. Confidence in the hydraulic model allowed for better analysis of potential improvements such as increasing pump motor horsepower, adding VFDs, expanding Reservoir D capacity and other improvements. The hydraulic analyses also showed that increasing the pump motor horsepower at PS96 will result in an Res B *Troon East *Desert Highland 1.65 MGD Total *DC Ranch *Silver Leaf *Grayhawk: Talon & Raptor 4 MGD Total To Irrigation Water Distribution System (IWDS) [ key ] *Golf Course increase of the hydraulic grade line (HGL) of the trunk line. As a direct result, this provided the required redundant pumps at RWDS pump stations 96 through 98 without adding any new pumping equipment or gear. The system was tested in three operating scenarios low, medium and high demand. RWDS PS99 also was tested with varying site turnout demand flows and system pressures to demonstrate that station s operating capacity at varying discharge pressure set points. As part of the performance test, power transducers were installed at service entrance sections at RWDS pump stations 96 through 99. The power transducers were connected to power quality analyzers and data was recorded at one minute intervals during the test. Data recorded included voltage, current, apparent power, real power, power factor and frequency. The power data was analyzed and graphs were generated for each pump station that illustrates power consumed in kilowatts (KW) vs. pump start times. Also, a KW/Gallon efficiency graph was generated for each pump station to illustrate the efficiency of each during the test with respect to the total number of pumps running. RWDS Proposed Improvements A three-phase improvement program was recommended to restore the RWDS to a reliable level of service and maintain its design maximum pumping capacity. As part of the condition assessment report, a listing of the recommended improvements was provided. Additional descriptions, discussions, engineering background, etc., of each recommended improvement phase was provided in a follow-up report titled, RWDS Improvement Recommendations. 14 waterscapes fall 2012

17 The following is a brief description of each of the recommended improvement phases: Phase 1 Immediate Improvements Those urgently required to reliably provide the maximum pumping capacity for Summer Peak pumping requirements can be met with the existing system. However, pump performance has deteriorated to such an extent that there are no standby pumps available during maximum demand conditions. Thus, failure of a single pump can diminish overall pumping capacity. The proposed Phase 1 improvements entail replacement of 18 of 29 pumping units (for RWDS pump stations 96 thru 99). This limited replacement of pumps is consistent with the immediately available budget and schedule (January to May 2012). Phase 2 Short-Term Improvements These are intended to complete the replacement of remaining pumps (for RWDS pump stations 96 through 99), as well as address other system shortcomings. It is recommended that these improvements be implemented by Summer Once implemented, the short-term improvements will simplify system control and strengthen the system s overall ability to meet maximum demands by eliminating unnecessary headloss at certain golf course turnouts. Recommendations also will be made to system control pressure setpoints to further increase system capacity and reduce pump energy costs. The one-year window to implement this program will allow time for required engineering design services and to obtain approval of the improvement budget from the RWDS golf course participants and the city. Phase 3 Long-Term Improvements These entail replacement of specific pump station features to further enhance system reliability. Some of these improvements will be done under the city s maintenance contract (JOC), such as: Trunk line and main line valve replacement Electrical panel inspections and repairs/replacement Magnetic flow meter replacement at RWDS pump stations 95 and 99 Various electrical improvements Addition of second VFDs to RWDS pump stations 97 and 98 Only one VFD is required for proper system operation and control. However, without an installed second (i.e., standby) VFD at those stations, VFD failure precludes maintaining setpoint pumping rates. Conclusions The City of Scottsdale s Reclaimed Water Distribution System was assessed for its overall condition and production capacity. The condition assessment included review of prior work conducted on the system, and investigations, field activities and hydraulic modeling conducted by HDR over the past several months. Due to its age (20 years) and the deterioration of identified system components (aged pumps, valves, electrical gear and SCADA), the system was found to be marginally capable of meeting seasonal Photograph 3. Corrosion on the Discharge Spool as it Enters the Concrete Slab high demands. There currently is no redundancy in the system and several components were identified that, if any of them failed, could prevent the system from meeting full contracted customer deliveries. A three-phase improvement program was recommended to restore the RWDS to a reliable level of service and maintain its design maximum pumping capacity. The immediate improvements identified in the condition assessment report are underway and will improve the system s ability to meet Summer 2012 demands. The short- and long-term improvements will restore the system s original design capacity and provide pumping redundancy while also improving system reliability, along with operational efficiency and flexibility. Though the improvement recommendations proposed by HDR were intended to occur over the next few years, in reality, RWDS operational and maintenance budget constraints dictate that both the short- and long-term improvements to the RWDS be spread over a longer period. HDR and city officials will be conducting a workshop to prioritize the improvements and customize an improvement schedule to match the anticipated RWDS budget. For more information about this article, please contact Ed Junod at Ed.Junod@hdrinc.com. 15

18 [ sewer system assessment & rehabilitation ] Rehabbing a Rehab in South Carolina By Kent Von Aspern, Northern California Pump Stations/Pipeline Lead, Walnut Creek, Calif. Tracy Lewis, Senior Project Manager, North Charleston, S.C. Walt Fletcher, Environmental Engineer, North Charleston, S.C. In March 2008, the Beaufort-Jasper Water and Sewer Authority (BJWSA) won a contract with the Naval Facilities Engineering Command (NAVFAC) Southeast to operate and maintain the water distribution and the wastewater collection and treatment systems serving the Marine Corps Air Station and Naval Hospital in Beaufort, S.C., the Laurel Bay Housing area, and the Marine Corps Recruiting Station in Parris Island, S.C., for the next 50 years. This project, part of the Utility System Privatization Program, was a major endeavor for BJWSA and represented a significant expansion of their service area. However, the entire sewer system for the Laurel Bay Housing area, which comprises the largest portion of the collection system, had been almost entirely rehabilitated in So what could possibly go wrong? Shortly after taking over the utility systems, BJWSA officials had to begin dealing with numerous sanitary sewer overflows. Operations and maintenance requirements were much higher than anticipated, and the problems encountered were more indicative of a sewer system in serious disrepair than one that had been rehabilitated. So BJWSA conducted a pilot condition assessment study to see what issues could be identified. The results were alarming. Major failures of the liners installed in the sewers to correct previous problems were observed. Defects noted included buckled liners (hot dogging), as shown in Figure 1, areas where the liner had torn away from the laterals and places where it looked like the liner had actually melted (see Figure 2). Similar defects were observed throughout the pilot study area. In November 2010, BJWSA officials issued a request for proposals to perform a comprehensive sanitary sewer condition assessment of the Laurel Bay Housing collection system and to develop a recommended improvement program. The Laurel Bay collection system serves 1,405 military housing residences and one school, and consists of approximately 79,500 linear feet of sanitary sewer lines ranging in size from 8 to 30 inches and 320 manholes (see Map 1 on page 18). HDR s proposal team blended with experienced sewer assessment and rehabilitation staff in Walnut Creek, Calif., and Las Vegas, Nev. This team presented a project approach that was thorough, inclusive of BJWSA s engineering and O&M staff, and costeffective. Condition Assessment The first thing the project team needed to do was find out what was going on inside the pipelines. CCTV was used to observe, identify, and quantify defects in the sewer pipelines. An important component of HDR s approach was to use a recognized reference standard for completing the CCTV inspection and recording and evaluating all observed defects. The National Association of Sewer Service Companies (NASSCO) Pipeline Assessment and Certification Program (PACP) is a standardized observation and defect coding system that met these requirements. The use of a standardized defect coding system allows the inspection to be completed in a defensible and repeatable manner. The NASSCO defect codes are divided into four primary categories: Structural defects that are used to note structural deficiencies that have occurred within the pipe due to use, such as cracks Operational and maintenance defects that are used to note observations pertaining to issues with operation and maintenance of the sewer mains Construction features that are used to note service connections and other items such as location of manholes 16 waterscapes fall 2012

19 [ figure 1 ] Observation Defect Code Definition No. of Observations Structural Defectsx LFBK Lining Failure Buckled Lining 1,078 LFDE Lining Failure Defective End 286 LFW / LFB Lining Failure Wrinkled Lining, Blistered Lining 163 LFCS / LFOC / LFUC Lining Failure Service Cut Shifted / Overcut Service / Undercut Service 92 LFBU Lining Failure Bulges 56 LFPH Lining Failure Pinholes 44 LFZ Lining Failure Other 27 LFAS Lining Failure Annual Space 25 RPR / RPRD Pipe Replaced /Pipe Replaced Defective 21 B / BSV / BVV Broken Pipe / with Soil Visible / with Void Visible 17 JOL / JOM Joint Offset Large / Medium 17 LFAC Lining Failure Abandoned Connection 13 H / HSV / HVV Hole in Pipe / with Soil Visible / with Void Visible 13 LFD / LFDL Lining Failure Detached Lining / Delamination 10 CL Longitudinal Crack 10 D Deformed 6 CC Circumferential Cracks 5 WFC Circumferential Weld Failure 4 FL / FS Fracture Longitudinal / Fracture Spiral 3 XP Pipe Collapse 2 RPPD Point Repair Patch Repair, Defective 2 CM Multiple Cracks 1 Operation and Maintenance Defects I-D / G / R / S / W Infiltration Dripper / Gusher / Runner /Stain / Weeper 188 DA-E / GS / Z Deposits Attached Encrustation / Grease / Other 173 RFB / C / J / L Roots Fine Barrel, Connection / Joint / Lateral 74 RBB / C / J / L Roots Ball Barrel / Connection / Joint / Lateral 35 RMC / J / L Roots Medium Connection / Joint / Lateral 30 DS-F / Z Deposits Settled Fine / Other 10 OBR / Z Obstruction Rocks / Other 7 RTC / J / L Roots Tap Connection / Joint / Lateral 6 VC / VZ Vermin Cockroach / Other 5 Construction Features TRI Tap Rehabilitated Intruding 27 TBD/ I Tap Break In Defective / Intruding 26 TFC / D / I Tap Factor Made Capped / Defective / Intruding 15 LD / L / RD / U Line Down / Left / Right Down / Up 8 ISSR / L Intruding Sealing Ring / Loose 2 Miscellaneous Features MWLS Miscellaneous Water Level Sag 151 MCU Camera Underwater 66 [ table 1 ] CCTV Inspection Data Summary Ridge Line Failure at Crown: Typically caused by failure to achieve cure temperature of at least 235⁰F and/or cooling cycle pressure of 33 psig. [ figure 2 ] Liner Creep and Tear: In this failure, the liner pipe has slipped and the material has failed at a lateral. This type of failure is caused by an inappropriate lateral reconnection method, failure to stop infiltration, lack of an end seal at the upstream manhole, and substandard liner thickness. [ figure 3 ] Liner Structural Failure: Caused by infiltration through host pipe and substandard liner thickness. [ figure 4 ] Top of Pipe Failure: Unlike the ridge line failure at the crown, this failure is typically caused by hydrostatic pressure from groundwater entering through leaks in the host pipe exceeding the structural capacity of the liner. [ figure 5 ] Missing End Seal: Lack of an end seal at the manholes allows wastewater to enter the annular space between the host pipe and the new liner. 17

20 [ sewer system assessment & rehabilitation ] [ map 1 ] System Map [ map 2 ] Recommended Improvements Map CCTV inspection was completed for about 90 percent of the sewers. Obstructions in the pipes and lost manholes made it impossible to inspect the remaining portion of the sewer system, so an automated system was developed. This automated system was adapted to meet the specific requirements of the Laurel Bay project, resulting in a very consistent and cost-effective analysis of defects. The observed defects are listed in Table 1. Clearly, the most frequent source of defects was associated with failures of the previous attempts at rehabilitating the collection system. Understanding the Problems Now that we had a catalog of defects, the next thing the project team needed to do was explain how those defects had occurred. It was considered important to understand how the failures had occurred before attempting to identify improvements. Unfortunately, there were no records of the previous rehabilitation projects. From the CCTV inspection, however, the project team identified three methods of rehabilitation: 1. Fold-and-form lining Involves heating a polyethylene pipe and deforming the pipe into a U or C shape so that it can be inserted into an existing pipeline. After the deformed pipe is inserted into the host pipe, hot air or hot water is introduced into the deformed pipe to heat and expand the pipe to its original shape. The reformed pipe should fit tightly against the host pipe, but there is no mechanical bonding between the new and old pipes. Laterals must be reinstated by cutting holes in the new pipe at appropriate locations. 2. Roll-down lining Involves mechanical compressing of a polyethylene pipe using a series of dies and rollers. The temporarily smaller pipe is inserted into the host pipe and soon relaxes to its original size, expanding to fit tightly against the host pipe. As with fold-andform, there is not a mechanical bond between the new and old pipes, and laterals are reconnected by cutting holes in the polyethylene. 3. Cured-in-place pipe (CIPP) lining Involves insertion of a soft epoxy or polyester resin liner into a host pipe, then inflating and curing the liner with hot water or hot air. The heat initiates an exothermic reaction that hardens the resin, creating a new pipe inside the old pipe. Unlike the previous methods, the CIPP liner is mechanically bonded to the host pipe. Laterals are reinstated by cutting holes in the new pipe. In general, it was found that the pipelines rehabilitated using the roll-down method or CIPP were in good shape. There were several characteristics of these methods that appear to have led to the more successful result. Each seemed to be designed as a full structural replacement for the sewer, which resulted (especially in the case of the rolldown pipe) in a thicker pipe. Another key feature of these methods was the reinstatement of the laterals. For the roll-down and CIPP methods, the laterals were reinstated using external means, with positive reconnections made between the lateral pipe and the new sewer. Failures were largely concentrated in the sewers that had been rehabilitated using the fold-and-form system. These failures were attributed to the following. 18 waterscapes fall 2012

Measuring the Condition of Prestressed Concrete Cylinder Pipe

Measuring the Condition of Prestressed Concrete Cylinder Pipe Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder

More information

Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel

Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel OAWWA 73 rd Annual Conference Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel By Jason DeLaet, P.E. Supervising Engineer Greater Cincinnati Water Works & Michael J. Livermore

More information

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick

More information

Meeting the Challenge of Pipeline Emergency Repair

Meeting the Challenge of Pipeline Emergency Repair Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider

More information

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University

More information

Corrosion Control & Cathodic Protection for Water & Wastewater Systems

Corrosion Control & Cathodic Protection for Water & Wastewater Systems Corrosion Control & Cathodic Protection for Water & Wastewater Systems Presented By: James T Lary Corrpro Companies, Inc 1090 Enterprise Dr. Medina, OH 44256 Tel. 330-723 723-5082 (x1215) email: jlary@corrpro.com

More information

WSSC Ad-Hoc Committee on Large Diameter Water Mains. August 2, 2013

WSSC Ad-Hoc Committee on Large Diameter Water Mains. August 2, 2013 WSSC Ad-Hoc Committee on Large Diameter Water Mains August 2, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to PCCP Inspections, Monitoring and Repair/Replacement 2 PCCP Management

More information

Pipeline Asset Management: From Assessment to Prioritized Projects List

Pipeline Asset Management: From Assessment to Prioritized Projects List PROGRAM MANAGEMENT INEERING Pipeline Asset Management: From Assessment to Prioritized Projects List TAWWA / WEAT Summer Seminar July 28, 2011 PLANN NING ENG Andrew Hunt, PE Asset Management Project Manager

More information

ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES

ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES Jose L. Villalobos, P.E. 1 and Carl Perry 2 Abstract: This paper presents strategies for the control of external corrosion on municipal

More information

CATHODIC PROTECTION SYSTEM DESIGN

CATHODIC PROTECTION SYSTEM DESIGN CATHODIC PROTECTION SYSTEM DESIGN Presented By DENIS L ROSSI P.E. CORROSION ENGINEER New England C P Inc. Corrosion Fundamentals What is corrosion? It is defined as the degradation or deterioration of

More information

Building Foundation and Structure

Building Foundation and Structure Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original

More information

Force Main Condition Assessment: New Technologies & Case Studies

Force Main Condition Assessment: New Technologies & Case Studies Force Main Condition Assessment: New Technologies & Case Studies Andy Dettmer, Ph.D., P.E. CMOM Workshop August 19, 2014 2 1 Three takeaways 1. Most of your force mains are good 2. We can pinpoint the

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS Shiwei William Guan, Ph.D. Vice President, R&D and International Business Madison Chemical Industries Inc. 490

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants

Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants PG&E Office San Francisco January 18, 2007 Craig K. Meier Corrosion Control Incorporated Corrosion process for tanks

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks Aboveground Storage Tanks Aboveground Storage Tank Inspection This Standard Operating Procedure describes the steps that campus units that manage aboveground oil storage tanks (ASTs) or containers must

More information

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage University of Missouri Hospitals and Clinics Structural Repair and Protection of Post-tensioned Parking Garage 1 University of Missouri Project The University of Missouri Health Care Patient and Visitor

More information

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS 2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

How To Install An Overhead Sewer

How To Install An Overhead Sewer Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles. Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to

More information

Water Advisory Committee of Orange County June 7, 2013

Water Advisory Committee of Orange County June 7, 2013 Water Advisory Committee of Orange County June 7, 2013 Background System Reliability Diemer Plant Reliability Conveyance and Distribution System Reliability Seismic Vulnerability Study Next Steps Special

More information

Outdoor Storage of Raw Materials SC-33

Outdoor Storage of Raw Materials SC-33 Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.

More information

PROJECT NAME BACKGROUND STATUS

PROJECT NAME BACKGROUND STATUS Utilities Department Projects This report reflects the status of Utility Capital Improvement Projects, Rehabilitation and Maintenance Programs of the City s water, wastewater, and reclaimed infrastructure

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Underground Storage Tanks

Underground Storage Tanks Underground Storage Tanks An Informational and Guidance Document for the University Community. Please contact Yale Environmental Health and Safety for latest Regulatory Requirements. A typical UST installation

More information

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls Reference: BRM-00220488-A0 July 18 th, 2014 Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario M2N 6E8 Re: 1.0 Introduction Exp Services Inc. (exp) was retained by the Toronto

More information

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems Page 1 of 5 Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems New Hampshire Department of Environmental Services

More information

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23 COMMERCIAL REPORT / STOCK CONDITION SURVEY For Sydenham Hill Estate Sydenham Hill London SE 23 Submission Prepared by Gas Advisory Services Limited Date: 4 th June 2013 Gas Advisory Services Limited Phoenix

More information

MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS

MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS Presented at: WEFTEC 2006 Dallas, TX October 24, 2006 New England Water Environment Association Meeting Westford, MA September 12, 2006 Virginia

More information

SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM

SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Page 1 of 9 SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Program Overview: The Distribution Integrity Management Program ( DIMP ) activities are focused on obtaining and evaluating information

More information

Appendix S Pump Station Evaluation

Appendix S Pump Station Evaluation Appendix S Pump Station Evaluation Technical Memorandum Date: October 12, 2001 To: Re: Orange County Utilities Task 6.4 Raw Wastewater Pump Stations 1.0 Summary In accordance with Task 6.4 of the Orange

More information

Photos showing the change in condition from 2006 to 2012 are located in Appendix A.

Photos showing the change in condition from 2006 to 2012 are located in Appendix A. January 27, 2012 Ms. Theresa Gallavan Economic Development Director City of Lompoc 100 Civic Center Plaza Lompoc, California 93436 RE: Lompoc Theater Limited Visual Condition Assessment Dear Theresa: Representatives

More information

MONITORING THE GPR RESPONSE OF CURING CONCRETE T. De Souza 1, A.P. Annan 1, J.D. Redman 1, and N. Hu 1 1 Sensors & Software Inc., Mississauga, Canada

MONITORING THE GPR RESPONSE OF CURING CONCRETE T. De Souza 1, A.P. Annan 1, J.D. Redman 1, and N. Hu 1 1 Sensors & Software Inc., Mississauga, Canada MONITORING THE GPR RESPONSE OF CURING CONCRETE T. De Souza 1, A.P. Annan 1, J.D. Redman 1, and N. Hu 1 1 Sensors & Software Inc., Mississauga, Canada Abstract: Ground penetrating radar (GPR) is becoming

More information

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902 External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water

More information

Rehabilitation of an Aging Concrete Reservoir Adit Tower

Rehabilitation of an Aging Concrete Reservoir Adit Tower Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco

More information

Appendix A: Acceptable pipe and fitting materials

Appendix A: Acceptable pipe and fitting materials Watercare Services Limited Water and Code of Practice Content from the NZS 4404:2010 Land development and subdivision infrastructure has been reproduced for use in the Infrastructure Design s Manual for

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin 1-800-432-8373. Anode Rods, Cathodic Protection and the Porcelain (glass) Lining

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin 1-800-432-8373. Anode Rods, Cathodic Protection and the Porcelain (glass) Lining Corrosion can be defined as the destructive attack of a metal by an electrochemical reaction with its environment. Steel exposed to moisture and oxygen will rust and corrode. Corrosion is defined as the

More information

Asset Management Answering the 5 Core Questions

Asset Management Answering the 5 Core Questions Asset Management Answering the 5 Core Questions by Timothy Taber, PE Barton & Loguidice Page 1 Drivers Asset Management Case Study 1. What is the current state of my assets? 2. What is my required sustainable

More information

Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions

Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Seth Anderson, GISP Management Consultant Celine Hyer, P.E. Associate Vice President Presentation Topics The Infrastructure

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized

More information

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington

More information

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

NON-DESTRUCTIVE METHODS. CE 165: Concrete Materials and Concrete Construction

NON-DESTRUCTIVE METHODS. CE 165: Concrete Materials and Concrete Construction NON-DESTRUCTIVE METHODS NON-DESTRUCTIVE METHODS Purpose: quick assessment of the structure Non-Destructive Techniques Many industrialized nations currently dedicate a considerable portion of the construction

More information

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02. L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Chapter 7 Plumbing Connections

Chapter 7 Plumbing Connections Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions

More information

Dewatering - Time and Cost Relief by way of Trenchless Construction

Dewatering - Time and Cost Relief by way of Trenchless Construction North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 TA-T3-04 Dewatering - Time and Cost Relief by way of Trenchless Construction Jenn Stillman,

More information

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice M. R. Zare 1, S. Wilkinson 2, R. Potangaroa 3 1. PhD candidate, University of Auckland, Auckland, New

More information

WSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013

WSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013 WSSC Ad-Hoc Committee on Large Diameter Water Mains November 22, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to Prioritizing PCCP Inspections and Repairs 2 PCCP Inspection Prioritization

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate AGENDA ITEM C9 DATE: February 2, 2015 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles Carden, Chief Operating Officer South Pasco Transmission Main Condition Assessment Services with Pure Technologies

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

Effective Microbial Control Strategies for Main Breaks and Depressurization

Effective Microbial Control Strategies for Main Breaks and Depressurization Effective Microbial Control Strategies for Main Breaks and Depressurization Project 4307 Sponsored by the Water Research Foundation and the U.K. Drinking Water Inspectorate Presented by: Pierre Kwan, PE

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

APPENDIX B. Magna Reservoir Leak Detection & Water Quality Sampling Plan (Revised June 2011)

APPENDIX B. Magna Reservoir Leak Detection & Water Quality Sampling Plan (Revised June 2011) APPENDIX B Magna Reservoir Leak Detection & Water Quality Sampling Plan (Revised June 2011) 1.0 Introduction The Magna Reservoir System, located in the North Concentrator facilities area, acts as a central

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN Adopted October 5, 2009 Table of Contents Chapter Description Page 1 Facility Descriptions... 3 1.1 Municipal Power Plant, 1001 Park

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside

More information

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG WHY IS THERE WATER IN MY BASEMENT? There are two major sources of water in a basement as the

More information

SECTION 22 LIGHTNING PROTECTION SYSTEM

SECTION 22 LIGHTNING PROTECTION SYSTEM SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for

More information

Prefill and Water Balance Criteria. Division of Water Quality Municipal Wastewater Treatment

Prefill and Water Balance Criteria. Division of Water Quality Municipal Wastewater Treatment Prefill and Water Balance Criteria Division of Water Quality Municipal Wastewater Treatment December 2010 Authors Brett Ballavance, P.E. Gene Erickson Nathan Groh Pamela Meyer, P.E. Dave Sahli, P.E. Vinod

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Oxford Hills Bus Garage 36 Brown St, Norway, ME Oil Storage Inspection 2/20/14 CONDITIONS OBSERVED Underground Oil Storage: 12,000 gallon underground oil storage tank (split 10,000 gallon diesel/2,000

More information

Evaluating the Condition of Seawalls/Bulkheads

Evaluating the Condition of Seawalls/Bulkheads Volume 2 Evaluating the Condition of Seawalls/Bulkheads By: Coastal Systems International, Inc. Typical bulkhead under construction Seawalls and bulkheads (walls) provide shoreline stabilization for many

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System

Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System Luis Aguiar Miami-Dade Water & Sewer Department Anna Pridmore, PhD Structural Technologies PROJECT BACKGROUND Miami-Dade Water & Sewer Department

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

Amendment 1 Preliminary Engineering Report for the City of Salida

Amendment 1 Preliminary Engineering Report for the City of Salida Amendment 1 Preliminary Engineering Report for the City of Salida Galleries Water Tank Rehabilitation Project February 11, 2010 Prepared by 1.0 Executive Summary The work of this Preliminary Engineering