Water Advisory Committee of Orange County June 7, 2013

Size: px
Start display at page:

Download "Water Advisory Committee of Orange County June 7, 2013"

Transcription

1 Water Advisory Committee of Orange County June 7, 2013

2 Background System Reliability Diemer Plant Reliability Conveyance and Distribution System Reliability Seismic Vulnerability Study Next Steps

3 Special district of the State of California Formed in 1928, under authority of MWD Act Primary purpose: provide supplemental water at wholesale rates to its member agencies 26 member public agencies 14 cities 11 municipal water districts one county water authority Governed by 37-member Board of Directors

4 LAKE SHASTA LAKE OROVILLE Bay-Delta LOS ANGELES AQUEDUCTS STATE WATER PROJECT COLORADO RIVER AQUEDUCT METROPOLITAN WATER DISTRICT SERVICE AREA LOCAL GROUNDWATER

5 MWD Service Area Six-County Service Area: 5,200 square miles Population: 19 million Gross Domestic Product: $1 Trillion Projected growth: ~220,000 people/year MWD provides 40 to 60 percent of Southern California s water supply

6 The mission of the Metropolitan Water District of Southern California is to provide its service area with adequate and reliable supplies of high-quality water to meet present and future needs in an environmentally and economically responsible way.

7 Water Supply System Capacity Emergency Response Infrastructure Reliability System Flexibility

8 Water Treatment Plants 87% (299) of MWD s service connections have full backup capability MWD service connections with full backup capability

9 Treatment Plants Water Treatment Plants <10 cfs 17% (45) of MWD s service connections have limited or no backup capability 117 cfs 0 cfs 107 cfs MWD service connection demands without backup capability > 20 cfs 5 to 20 cfs < 5 cfs 119 cfs 310 cfs

10 Is designed to maintain our facilities in a state of readiness to ensure system deliveries Infrastructure Reliability Maintenance Management Program Infrastructure Protection Plan Routine Monitoring, Inspection & Maintenance CMMS (Maximo) Special Investigations/ Condition Assesments Vulnerability Assessments Water System Operations (WSO) Engineering Service Group (ESG)

11 Whittier Fault

12 Major Rehabilitation, Replacement and Upgrade Projects (Since 2001) Completed On-going Up-coming North Access Road Chlorine Containment Plant Maintenance Facility Basin Rehabilitation Chemical System Upgrades Thickeners Yorba Linda Power Plant Modifications 66 KV Sub Station Solids Handling Vehicle Maintenance Center Filter Valve Replacement Electrical System Improvements New Plant Entrance

13 Emergency road to Diemer WTP Access to main plant s facilities, lagoons and pipelines Improved security Fire break Carbon Canyon Road CHSP Discovery Ctr Diemer North Access Road Valley View Avenue

14 Construction

15 Evaluate vulnerability to hazards Seismic events Flooding Vehicle impact Hydraulic surge Equipment failure Fire Assess impact to facility operation Propose mitigation options

16 Example: Electrical Reliability Improvements Provide new 66kV power supply from Edison (completed) Provide critical systems with dual power sources Upgrade emergency generators Upgrade grounding system Replace obsolete equipment 66 kv sub-station equipment 66 Kv Transmission Towers

17 North Slope Remediation WWRP #2 Slope Stabilization Filter Bldgs Seismic Upgrade Filter Outlet Conduit Seismic Upgrade East WW Tank Seismic Upgrade Admin Bldg Seismic Upgrade FWR Seismic Upgrade Completed Design / Construction On-Going Study West WW Tank Seismic Upgrade ORP Site Preparation Entrance Fill Slope Stabilization South West Pad Stabilization

18 Benching of Native Soil RCC Placement Stabilized South Slope Ozone Buildings

19 In a major seismic event Concrete cracking could occur Foundation caissons may displace outward Extended shutdown required for repairs Reservoir would remain intact Thicken Floor Slabs Fill Colluvium New Retaining Wall Bedrock Section of South Wall Caissons

20 New Retaining Wall Thicken Floor Slab Seismic Retrofit Install new retaining wall Thicken 3 sections of slab

21 In a major seismic event: Soil below tank could slide & leave voids under tank Foundation caissons could rotate & shear Risk to tank foundation New Retaining Wall Fill Bedrock Foundation Caissons Tank Section

22 Finished Water Reservoir New Retaining Walls Seismic Retrofit & Upgrades Install new shear walls & plates Recoat tank

23 Anchor bolts and plates installed at base to transfer seismic forces to foundation Anchorage Upgrade

24 Ozone Facilities ORP Ozone Generators Contactors Building ORP LOX Tank Farm

25 Category Capital Investments Expenditures FY 01/02 to FY 11/12 ($M) Planned FY 12/13 to FY 16/17 ($M) Seismic Upgrades $ 87 $ 33 Infrastructure Improvements Oxidation Retrofit Program Other Total $ 522 $ 208

26 Projects Going Forward Seismic Upgrades ($33 M) Filter Outlet Conduit Administration Building Finished Water Reservoir South Slope & East Washwater Tank Filter Buildings No. 1 & 2 Infrastructure Improvements ($136 M) Basin Rehabilitation Electrical Improvements Filter Valve Refurbishment Washwater Reclamation Plant Chemical Feed System Improvements Chemical Tank Farm Improvements Other Other ($18M) Yorba Linda Power Plant Modifications $ 11.5 M 6.6 M 5.5 M 9.4 M $ 50.2 M 30.2 M 26.0 M 13.6 M 4.5 M 1.8 M 9.7 M $ 18.0 M

27

28 Total pipeline length = 830 miles Reinf. Conc. 234 mi Steel 354 mi PCCP 163 mi Other 79 mi

29 Cross Section Prestressed Steel Wires Mortar Coating Broken Prestressing Wires Concrete Core Mortar Lining Steel Cylinder

30 60-inch Diameter PCCP

31

32 Concrete Encasement Crack PCCP PCCP Broken Back Disturbed Soil

33 Inspections initiated in 2000 Visual - broken back cracks Electromagnetic broken prestressing wires 3 rd set of inspection (5 year cycle) Stray Current Testing Surveyed every 1 to 2 years Repairs completed on individual distressed pipe segments Collaboration w/ PCCP owners & AWWA

34

35 2 nd Lower Feeder Robert B. Diemer Water Treatment Plant PCCP Lines All Other Distribution Lines Yorba Linda Feeder ORANGE COUNTY SERVICE AREA Allen McColloch Pipeline 99.1% No Wirebreaks 0.6% Repaired Irvine Cross Feeder 0.3% Wirebreaks; continue monitoring

36 Pipeline Repaired Length (ft) Allen-McColloch Pipeline 831 Auld Valley Pipeline & San Diego Pipeline No. 4 Repair Dates 1999, 2002, 2003, 2010, 2012 Total Repair Costs $11,381, , 2012 $560,000 Box Springs Feeder ,2007,2011 $6,642,491 Calabasas Feeder , 2005, 2011 $5,012,678 Foothill Feeder , ,865,637 Lake Skinner Outlet Conduit & San Diego Pipeline No , 2006 $5,176,612 Rialto Pipeline , 2005, 2006, 2007 $12,309,508 Second Lower Feeder 4, , 1996, 2011 $6,850,000 Sepulveda Feeder , 2006, 1998, 1995, 1978 $6,919,083 West Valley Feeder No ,000 TOTAL 7,534 $64,706,150

37 Infrastructure Rehabilitation and Replacement Projects Expenditures (FY01/02 to FY11/12) OC-88 Pump Station Improvements $ 14.6 M Allen-McColloch Pipeline Repairs 11.4 Service Connection Improvements 1.0 EOCF No. 2 Pressure Relief Structure 0.9 Other 2.6 Total $ 30.5 M Planned/In Progress (FY12/13 to FY16/17) Orange County Feeder Relining $ 36.0 M Distribution System Infrastructure Protection 5.2 Orange County C&D Electrical Improvement 3.4 Allen-McColloch Stray Current Drain Station 1.3 Other 7.2 Total $ 53.1 M

38 Assessment Assess access, erosion, security issues Review right-of-way encroachments Recommend infrastructure improvements & R/W Regional Environmental Documentation & Permitting Programmatic EIR Resource agency permitting Program-wide mitigation

39 Improvements Right-of-way resolution Acquisitions Design & construction Program Implemented 3 Phases 6 regions (Orange, West San Bernardino, Los Angeles. Riverside, San Diego, Colorado River Aqueduct)

40 Lower Feeder 2 nd Lower Feeder Diemer Plant East OC Feeder No.1 Santiago Lateral Lower Feeder West OC Feeder Orange County Feeder East OC Feeder No.2 Allen-McColloch Pipeline

41 Distribution System Infrastructure Protection Access Road near Mud Canyon Erosion Over Lower Feeder Lower Feeder Alignment

42 Access Road Santiago Lateral

43 Metropolitan right-of-way Portion of pipeline outside of right-ofway

44 2008 USGS Study 97% probability of an earthquake of Magnitude 6.7 or greater in So. California within the next 30 years 37% probability of an earthquake of Magnitude 7.5 or greater in So. California within the next 30 years

45 Potential Effects of So Cal Seismic Events on MWD Deliveries Task 1 Identify Seismic Faults Task 2 Estimate Earthquake Damage + Time to Restore Service Task 3 Assess Impacts on Water Delivery San Andreas Fault Task 4 Identify Potential Mitigation

46 High-Level Estimated Outage Durations Facility Moderate Earthquake (M 6.7) Extreme Earthquake (> M7.0) MWD - CRA 1 month 6 months DWR Up to 6 months 6 + months MWD - Conveyance & Distribution 1 week to 2 months 1 week to 3 months MWD Treatment Plants Up to 1 month Up to 6 months

47 Fault Whittier (M 7.2) Peralta Hills (M 6.7) Impacts on Diemer Water Service Area Components Damaged Diemer Water Treatment Plant Yorba Linda Feeder Lower Feeder (Raw Water) Diemer Water Treatment Plant East OC No. 2 AMP Estimated Repair Duration Conclusions * Diemer Up to 6 months 1 week Pipelines 1 to 2 months 1 week to 1 month Regional and Local Flexibility Important Local Flexibility Important * Regional Flexibility / Emergency Response Partial backup from common pool area (Jensen) Raw water bypass capability at Diemer Upgraded emergency response capabilities * Local Flexibility Reliability Projects (e.g., Baker WTP, Upper Chiquita Reservoir) Member agency interconnections Member agency wells

48 The unthinkable occasionally happens 2011 Great East Japan Earthquake and Tsunami 2011 Christchurch, New Zealand earthquakes Disaster planning should consider extreme events

49 Vulnerability Study Re-evaluate potential impact of extreme seismic events on water delivery capability CRA Tunnels Conveyance and Distribution System Continue to coordinate with DWR on seismic assessment of the California Aqueduct Continue R&R and seismic upgrade programs

50

Meeting the Challenge of Pipeline Emergency Repair

Meeting the Challenge of Pipeline Emergency Repair Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider

More information

Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel

Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel OAWWA 73 rd Annual Conference Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel By Jason DeLaet, P.E. Supervising Engineer Greater Cincinnati Water Works & Michael J. Livermore

More information

MokeWISE Program Scope of Work: Project 8b: Rehabilitation of Transmission Main

MokeWISE Program Scope of Work: Project 8b: Rehabilitation of Transmission Main MokeWISE Program Scope of Work: April 2015 Abstract... 2 Background Information... 2 Calaveras Public Utility District... 2 Water Rights... 2 Water Supply... 2 Project Information... 3 Project Description...

More information

Apprenticeship Programs

Apprenticeship Programs METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA Apprenticeship Programs Career Paths to Success What is Apprenticeship? Through Metropolitan's Apprentice Mechanical and Electrical Operations Technician

More information

WSSC Ad-Hoc Committee on Large Diameter Water Mains. August 2, 2013

WSSC Ad-Hoc Committee on Large Diameter Water Mains. August 2, 2013 WSSC Ad-Hoc Committee on Large Diameter Water Mains August 2, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to PCCP Inspections, Monitoring and Repair/Replacement 2 PCCP Management

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System

Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System Luis Aguiar Miami-Dade Water & Sewer Department Anna Pridmore, PhD Structural Technologies PROJECT BACKGROUND Miami-Dade Water & Sewer Department

More information

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University

More information

Securing California s Water Future

Securing California s Water Future T H E M E T R O P O L I TA N W AT E R D I S T R I C T O F SOUTHERN CALIFORNIA Securing California s Water Future John Arena, Business Outreach Program Manager Presented to SAME Orange County Post February

More information

CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES FREQUENTLY ASKED QUESTIONS (FAQ) REGARDING ORANGE S PROPOSED WATER RATES AND CHARGES

CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES FREQUENTLY ASKED QUESTIONS (FAQ) REGARDING ORANGE S PROPOSED WATER RATES AND CHARGES CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES On Tuesday March 27, 2012, the Orange City Council will hold a public hearing to consider a rate adjustment for water service rates and charges.

More information

JUNIOR ENGINEER (11 Positions)

JUNIOR ENGINEER (11 Positions) JOB INFORMATION JUNIOR ENGINEER (11 Positions) Job Announcement No.: 5726 GN/LM Application Filing Period: April 24, 2008 May 22, 2008, 4:45 pm Monthly Salary Range: $4,560 - $6,008 ($54 - $72K) Hourly

More information

CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION

CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION DISCUSSION OF INFORMATION PRESENTED IN THIS CHAPTER This chapter contains information regarding the operation of the Los Angeles District of California American Water as well as tables that summarize the

More information

RESUME Lee A. Knuppel, P.E.

RESUME Lee A. Knuppel, P.E. RESUME Lee A. Knuppel, P.E. OFFICE: EDUCATION: LEE A. KNUPPEL AND ASSOCIATES, Inc. 7770 Cooper Road, Suite 7 Montgomery, Ohio 45242 (513) 793-4222 Graduate: UCLA, Los Angeles, CA M.S. in Civil Engineering,

More information

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA

More information

Black Mountain Reservoir Land Rezoning

Black Mountain Reservoir Land Rezoning Black Mountain Reservoir Rezoning Information Meeting Black Mountain Reservoir Rezoning 1.0 Black Mountain Reservoir What the reservoir provides The Black Mountain Reservoir will be a low-elevation raw

More information

Drinking Water Sector - Damage Assessment Report

Drinking Water Sector - Damage Assessment Report Drinking Water Sector - Damage Assessment Report The Division s Drinking Water Sector Damage Assessment Report (available on-line at the Division s Website http://www.state.nj.us/dep/watersupply ) and

More information

ASSET MANAGEMENT PLAN Published January 2009

ASSET MANAGEMENT PLAN Published January 2009 San Diego County Water Authority 2 0 1 1 ASSET MANAGEMENT PLAN Published January 2009 4677 Overland Avenue San Diego, CA 92123 858-522-6600 www.sdcwa.org This page intentionally left blank. Table of Contents

More information

Understanding the Seismic Vulnerability of Water Systems

Understanding the Seismic Vulnerability of Water Systems Understanding the Seismic Vulnerability of Water Systems Lessons Learned and What You Can Do Donald Ballantyne October 2, 2013 Regional Water Providers Consortium Board Overview Oregon Resilience Plan

More information

Tokyo Waterworks supports the capital of Tokyo

Tokyo Waterworks supports the capital of Tokyo Tokyo Waterworks supports the capital of Tokyo Tokyo, the Japanese capital, is the largest city in Japan with a population of about 13.16 million, which is about 10% of the country s entire population

More information

WATER SUPPLY CONTINGENCY PLAN CITY OF LAKE WOBEGON, MINNESOTA

WATER SUPPLY CONTINGENCY PLAN CITY OF LAKE WOBEGON, MINNESOTA WATER SUPPLY CONTINGENCY PLAN CITY OF LAKE WOBEGON, MINNESOTA INDEX A. PURPOSE B. PUBLIC WATER SUPPLY CHARACTERISTICS 1. Current Supply Source 2. Treatment 3. Storage and Distribution 4. Maps and Plans

More information

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) Site Biography Market Area: San Diego, CA Location: San Diego, CA 92121 Address: 5732 Pacific Center Blvd CLLI,POP, NPA/NXX Code:

More information

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and

More information

ARIZONA HISTORICAL SOCIETY 949 East Second Street Library and Archives Tucson, AZ 85719 (520) 617-1157 Fax: (520) 629-8966 ahsref@azhs.

ARIZONA HISTORICAL SOCIETY 949 East Second Street Library and Archives Tucson, AZ 85719 (520) 617-1157 Fax: (520) 629-8966 ahsref@azhs. ARIZONA HISTORICAL SOCIETY 949 East Second Street Library and Archives Tucson, AZ 85719 (520) 617-1157 Fax: (520) 629-8966 ahsref@azhs.gov DESCRIPTION MS 1429 City of Tucson. Water Department Records,

More information

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate AGENDA ITEM C9 DATE: February 2, 2015 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles Carden, Chief Operating Officer South Pasco Transmission Main Condition Assessment Services with Pure Technologies

More information

San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m.

San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. Needs Assessment and Recommendation - Wholesale Water Utility Billing and Information Management Software Application

More information

WSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013

WSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013 WSSC Ad-Hoc Committee on Large Diameter Water Mains November 22, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to Prioritizing PCCP Inspections and Repairs 2 PCCP Inspection Prioritization

More information

Cornell University LADWP SHORT COURSE & WORKSHOP

Cornell University LADWP SHORT COURSE & WORKSHOP CASE STUDY: LIFELINE RESILIENCE- LOS ANGELES DEPARTMENT OF WATER & POWER Tom O Rourke Cornell University 1200 km2 Los Angeles N 200 km 40 km Los Angeles Department of Water and Power (LADWP) Serves 4.0

More information

1-800-927-4357. www.insurance.ca.gov. Earthquake. Insurance. California Department of Insurance

1-800-927-4357. www.insurance.ca.gov. Earthquake. Insurance. California Department of Insurance 1-800-927-4357 www.insurance.ca.gov Earthquake Insurance California Department of Insurance Table of Contents Page 2 Before You Buy Earthquake Insurance 4 Basic Earthquake Insurance 6 What Earthquake Insurance

More information

Measuring the Condition of Prestressed Concrete Cylinder Pipe

Measuring the Condition of Prestressed Concrete Cylinder Pipe Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder

More information

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to

More information

Greater Los Angeles County Region Attachment 3

Greater Los Angeles County Region Attachment 3 Introduction The (Project) includes improvement of three existing Los Angeles County Flood Control District facilities and the construction of a new interconnecting pipeline. The existing facilities are

More information

Standard Operating Guideline Maintenance Management System

Standard Operating Guideline Maintenance Management System Standard Operating Guideline (SOG) Title: MAINTENANCE MANAGEMENT SYSTEM District Name: Date Prepared: Date Revised: OBJECTIVE: A Maintenance Management System is an organized method of collecting documentation

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email kaweraudc@kaweraudc.govt.nz

More information

Pipeline Asset Management: From Assessment to Prioritized Projects List

Pipeline Asset Management: From Assessment to Prioritized Projects List PROGRAM MANAGEMENT INEERING Pipeline Asset Management: From Assessment to Prioritized Projects List TAWWA / WEAT Summer Seminar July 28, 2011 PLANN NING ENG Andrew Hunt, PE Asset Management Project Manager

More information

John P. Masek, PE, SE Summary of Education and Experience

John P. Masek, PE, SE Summary of Education and Experience EDUCATION Washington University, Saint Louis, Missouri, B.S. Civil Engineering, 1981 Washington University, Saint Louis, Missouri, M.S. Structural Engineering, 1981 GPA= 3.6/4.0 Thesis: A Comparison of

More information

OWOW Proposition 84, Round 2 Master Project List

OWOW Proposition 84, Round 2 Master Project List OWOW Proposition 84, Round 2 Master List Name s Recommended for Prop 84 Round 2 Funding 1 2071 Inland Empire Utilities Agency 2 2068 USDA Forest Service San Bernardino National Forest Wineville Regional

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408]

Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408] Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408] ORDER NUMBER: 4408 DATE AVAILABLE: July 2012 PRINCIPAL INVESTIGATORS: John Eidinger and Craig A. Davis PROJECT PURPOSE: The purpose

More information

EWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness

EWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness EWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness 2015 PNWS-AWWA Annual Conference Bellevue, WA W a l l y M c C u l l o u g h, P E Presentation Outline EWEB s Water System

More information

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR ABSTRACT Phil Hubbard, P.E., HRSD Paul Wilson, P.E., Brown and Caldwell* Mark Harber, P.E., Brown and Caldwell *301 Bendix Road, Suite 400 Virginia

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Prestressed Storage Tanks

Prestressed Storage Tanks Prestressed Storage Tanks Mike Harper Regional Manager mike.harper@dntanks.com / 714 767 1313 Kevin Peacock Regional Manager kevin.peacock@dntanks.com / 949 698 2740 DN Tanks overview Construction Procedures

More information

ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES

ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES Jose L. Villalobos, P.E. 1 and Carl Perry 2 Abstract: This paper presents strategies for the control of external corrosion on municipal

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Proposed Rates 2012-2014. Mandates & Reliability

Proposed Rates 2012-2014. Mandates & Reliability Proposed Rates 2012-2014 Mandates & Reliability For over a year, we have been discussing the fundamental reasons why LADWP needs to increase Power & Water rates Legal mandates are driving a complete transformation

More information

SOCALGAS APROACH TO PIPELINE INTEGRITY

SOCALGAS APROACH TO PIPELINE INTEGRITY SUMMER 2011 SOCALGAS APROACH TO PIPELINE INTEGRITY Southern California Gas Company (SoCalGas ) is committed to providing clean, safe and reliable natural gas to its customers and takes important steps

More information

Altoona Water Authority. Infrastructure Overview

Altoona Water Authority. Infrastructure Overview Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater

More information

American Society of Civil Engineers

American Society of Civil Engineers American Society of Civil Engineers Technical Council on Lifeline Earthquake Engineering Earthquake Investigation Committee Lifelines Water and Wastewater Electric Power and Communication Gas and Liquid

More information

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice M. R. Zare 1, S. Wilkinson 2, R. Potangaroa 3 1. PhD candidate, University of Auckland, Auckland, New

More information

Outdoor Storage of Raw Materials SC-33

Outdoor Storage of Raw Materials SC-33 Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.

More information

THE CALIFORNIA STATE UNIVERSITY ANNUAL REPORT OF EXEMPTIONS FROM THE BIDDING PROCESS DUE TO UNEXPECTED CAUSES. 2/11/2011 Page 1

THE CALIFORNIA STATE UNIVERSITY ANNUAL REPORT OF EXEMPTIONS FROM THE BIDDING PROCESS DUE TO UNEXPECTED CAUSES. 2/11/2011 Page 1 Bakersfield Channel Islands Chico Dominguez Hills Belfor USA Group 13767 9/20/2010 $ 136,000.00 East Bay Davis Moreno Construction Inc. 58933A 6/22/2010 6,725.00 Fresno Electric Motor Shop and Supply 58930

More information

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to

More information

Critical Facility Round Table

Critical Facility Round Table Critical Facility Round Table October 16, 2003 San Francisco Seismic Risk for Data Centers David Bonneville Senior Principal Degenkolb Engineers San Francisco, California Presentation Outline Seismic Risk

More information

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA College of Marin c/o Swinerton Management & Consulting P.O. Box 144003 835 College Avenue, Building MS-3 Kentfield, California

More information

CITY OF BEVERLY HILLS URBAN WATER MANAGEMENT PLAN

CITY OF BEVERLY HILLS URBAN WATER MANAGEMENT PLAN 2005 URBAN WATER MANAGEMENT PLAN Mayor Linda J. Briskman Vice Mayor Stephen P. Webb City Council Jimmy Delshad Frank M. Fenton Barry Brucker City Manager Roderick J. Wood Director of Public Works David

More information

DOMESTIC WATER POLICY COMMITTEE MODESTO IRRIGATION DISTRICT 1231 Eleventh Street, Modesto, California August 4, 2014 1:00 p.m.

DOMESTIC WATER POLICY COMMITTEE MODESTO IRRIGATION DISTRICT 1231 Eleventh Street, Modesto, California August 4, 2014 1:00 p.m. Nick Blom, Chairman, MID Dave Cogdill, Vice-Chairman, City of Modesto John Mensinger, Board Member, MID Bill Zoslocki, Councilmember, City of Modesto DOMESTIC WATER POLICY COMMITTEE MODESTO IRRIGATION

More information

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION

More information

EMERGENCY STORAGE PROJECT

EMERGENCY STORAGE PROJECT EMERGENCY STORAGE PROJECT San Vicente Pipeline San Vicente Pumping Facilities San Vicente Interconnect Pipeline San Vicente Dam Raise Carryover Storage Project Briefing Summary DATE: May 21, 2008 ORGANIZATION:

More information

San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission

San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 January

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

Section 2. Mono Basin Operations

Section 2. Mono Basin Operations Section 2 Mono Basin Chapter 2 Mono Basin Compliance with State Water Resources Control Board Decision 1631 and Order Nos. 98-05 and 98-07 May 2008 Los Angeles Department of Water and Power Table of Contents

More information

El Nino in the OC. Orange County Sheriff s Department Emergency Management Division

El Nino in the OC. Orange County Sheriff s Department Emergency Management Division El Nino in the OC Orange County Sheriff s Department Emergency Management Division The mission of the Orange County Sheriff s Department s Emergency Management Division is to promote, facilitate, and support

More information

KHATRI STRUCTURAL AND CIVIL ENGINEERS

KHATRI STRUCTURAL AND CIVIL ENGINEERS TABLE OF CONTENTS SECTION TITLE 1.0 INTRODUCTION AND EXECUTIVE SUMMARY 2.0 PROJECT TEAM 3.0 EXPERIENCE AND PROJECTS 4.0 PHOTO CREDITS 2 Page 1.0 INTRODUCTION AND EXECUTIVE SUMMARY We are pleased to introduce

More information

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall

More information

Prestressed Concrete Pipe Fitness for Service and Repair

Prestressed Concrete Pipe Fitness for Service and Repair Prestressed Concrete Pipe Fitness for Service and Repair Rasko Ojdrovic rpojdrovic@sgh.com 781-907-9231 IAEA - EPRI 15 October 2014 www.sgh.com SGH Pipeline Experience More than 25 years of research, analysis,

More information

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick

More information

Highly Colored Water Removal Using Nanofiltration Membranes at the Colored Water Treatment Facility. Adam Zacheis, Project Manager Carollo Engineers

Highly Colored Water Removal Using Nanofiltration Membranes at the Colored Water Treatment Facility. Adam Zacheis, Project Manager Carollo Engineers Highly Colored Water Removal Using Nanofiltration Membranes at the Colored Water Treatment Facility Adam Zacheis, Project Manager Carollo Engineers Topics 1. Background - Mesa Water District (Mesa) Water

More information

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans

More information

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer

More information

SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM

SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Page 1 of 9 SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Program Overview: The Distribution Integrity Management Program ( DIMP ) activities are focused on obtaining and evaluating information

More information

This presentation premiered at WaterSmart Innovations. watersmartinnovations.com

This presentation premiered at WaterSmart Innovations. watersmartinnovations.com This presentation premiered at WaterSmart Innovations watersmartinnovations.com Cutting Our Losses: The Los Angeles Water Loss Audit Experience WaterSmart Conference October 2, 2013 Penny Falcon, P.E.

More information

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By Project Structural Conditions Survey and Seismic Vulnerability Assessment For SFCC Civic Center Campus 750 Eddy Street San Francisco, California 94109 Prepared For San Francisco Community College District

More information

KCC Event Brief: 2014 La Habra Earthquake

KCC Event Brief: 2014 La Habra Earthquake KAREN CLARK & COMPANY KCC Event Brief: 2014 La Habra Earthquake June 2014 2 COPLEY PLACE BOSTON, MA 02116 T: 617.423.2800 F: 617.423.2808 Overview On Friday, March 28, 2014 at 9:09pm, a magnitude 5.1 earthquake

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012

NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012 NRCS Overview National Dam Safety Program Technical Workshop #19 February 22-23, 2012 Thomas Brown National Design, Construction, and Soil Mechanics Center (NDCSMC) Fort Worth, Texas NRCS Dam Inventory

More information

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) Site Biography Market Area: New York City, New Jersey, Upstate NY and Lower Connecticut Location: Secaucus, NJ 07094 Address: 15

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02. L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -

More information

Case Study: Los Angeles Water Services Restoration Following the 1994 Northridge Earthquake

Case Study: Los Angeles Water Services Restoration Following the 1994 Northridge Earthquake Case Study: Los Angeles Water Services Restoration Following the 1994 Northridge Earthquake C.A. Davis, Los Angeles Department of Water and Power, Los Angeles, CA, USA T.D. O Rourke Cornell University,

More information

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee City of Inglewood Well No. 2 Rehabilitation City of Inglewood Thomas Lee Project Location (Photos and location maps of the project) Project Description The City of Inglewood (City)receives its annual potable

More information

Colorado River Commission of Nevada. Presentation for Water Education Foundation March 11, 2015

Colorado River Commission of Nevada. Presentation for Water Education Foundation March 11, 2015 Colorado River Commission of Nevada Presentation for Water Education Foundation March 11, 2015 State agency established to manage Nevada s allocation of Colorado River water resources and hydroelectric

More information

Aquatera 2015/16 Business Plan Highlights

Aquatera 2015/16 Business Plan Highlights Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality

More information

How To Visit An Internet Data Center

How To Visit An Internet Data Center AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA) Site Biography Market Area: Atlanta and surrounding areas (Georgia, Alabama, Tennessee, Florida, North and South Carolina

More information

Attachment 6: Monitoring, Assessment, and Performance Measures

Attachment 6: Monitoring, Assessment, and Performance Measures Attachment 6: Monitoring, Assessment, and Performance Measures Contents Monitoring, Assessment and Performance Measures... 1 Monitoring, Assessment and Performance Measures Attachment 6 presents the anticipated

More information

THE OPERATIONS AND MAINTENANCE DEPARTMENT AN INSIDE LOOK

THE OPERATIONS AND MAINTENANCE DEPARTMENT AN INSIDE LOOK THE OPERATIONS AND MAINTENANCE DEPARTMENT AN INSIDE LOOK Fiscal Years 2010-2011 OPERATIONS AND MAINTENANCE DEPARTMENT MISSION STATEMENT Operate and maintain the Aqueduct Delivery System in a reliable fashion

More information

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike

More information

Building Resilient Infrastructure for the 21 st Century

Building Resilient Infrastructure for the 21 st Century Building Resilient Infrastructure for the 21 st Century 1 Maria Mehranian Cordoba Corporation & Los Angeles Regional Water Quality Control Board October 19, 2014 24 th Annual Lake Arrowhead Symposium:

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information

Syed Ahmed Richard Krause Southern California Edison

Syed Ahmed Richard Krause Southern California Edison An Electric Utility s Power Transmission Modernization Needs Syed Ahmed Richard Krause Southern California Edison 2 Presentation Outline Existing System Electric System Components, Basic Power System,

More information

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment WATER AND SEWER UTILITY OPERATION AND MAINTENANCE Although sewage systems the operation and maintenance of public utilities are not considered themselves are not a chronic sources of stormwater pollution,

More information

HISTORICAL FLOODS: 1861 1862

HISTORICAL FLOODS: 1861 1862 USGS Mission The USGS serves the Nation by providing reliable scientific information to describe and understand the Earth; minimize loss of life and property from natural disasters; manage water, biological,

More information

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.

More information

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS 2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include

More information

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Vallecitos Water District Rock Springs Sewer Replacement Project Vallecitos Water District has prepared a Draft Mitigated Negative Declaration

More information

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s

More information

SECTION 8 Industrial Facilities Field Investigation

SECTION 8 Industrial Facilities Field Investigation SECTION 8 Industrial Facilities Field Investigation Types of Data to Be Collected and Recorded Warehouses, manufacturing facilities, energy-producing facilities, and factories should be inspected for performance

More information

4 Water supply description

4 Water supply description 4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps

More information

Figure 11.1 Changes in California Gross State Product versus Changes in U.S. Gross Domestic Product, 1980 1994. California U.S.

Figure 11.1 Changes in California Gross State Product versus Changes in U.S. Gross Domestic Product, 1980 1994. California U.S. Figure 11.1 Changes in California Gross State Product versus Changes in U.S. Gross Domestic Product, 1980 1994 Percent 8 California 4 0 U.S. -4 1980 1982 1984 1986 1988 1990 1992 1994 Source: U.S. Department

More information