 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "Appendix S Pump Station Evaluation"

Transcription

1 Appendix S Pump Station Evaluation

2

3 Technical Memorandum Date: October 12, 2001 To: Re: Orange County Utilities Task 6.4 Raw Wastewater Pump Stations 1.0 Summary In accordance with Task 6.4 of the Orange County Master Plan Update, PBS&J/CH2M Joint Venture (JV) staff supplemented Orange County Utility s (OCU s) TAG pump station inventory with information on privately operated pump stations. Per OCU s request, staff interviews and pump station visits were not completed by the Joint Venture. OCU staff indicated that pump station conditions and rehabilitation needs are well known by OCU staff. The scope of this task, therefore, consisted of updating OCU s existing pump station inventory with data for approximately 400 private pump stations not included within the existing inventory and developing estimates to be included within OCU s Capital Improvements Plan (CIP) for pump station rehabilitation and new construction. Private pump station data were acquired by mailing private pump station owners a questionnaire regarding the pump station equipment and maintenance company information. Data regarding pump type, motor size, pump curve data, and other available information were then added to OCU s existing pump station inventory. Criteria for replacement and major improvements of the pump stations maintained by OCU were determined by OCU staff based on historical rehabilitation/replacement needs. Based on the historical needs, rehabilitation and replacement costs for OCU s existing pump stations were projected over a 20 year period. In addition to the upkeep of current pump stations, new pump station construction, rehabilitation, and replacement costs were also included in the 20 year planning period. 2.0 Pump Station Inventory OCU developed a pump station inventory as part of the Eastern Transmission System analysis. The TAG inventory identified a total of approximately 700 active or inactive pump stations owned by OCU. The TAG inventory indicates that OCU owns 557 duplex, 33 triplex, and 5 quadraplex pump stations, along with 17 pump stations with unknown pump FINAL REPORT (PUBLISHED SEPTEMBER 2006) S -1

4 counts and 80 inactive pump stations. Per Orange County s Wastewater Division, the County actually operates and maintains: 505 duplex; 33 triplex; and 5 quadraplex active pump stations. OCU has not identified the specific pump stations within the TAG inventory that should be removed. As part of this project, data for approximately 400 private pump stations were gathered by sending an information sheet to the pump station owners. The data compiled were then added to the TAG inventory to supplement the OCU pump stations already included. In addition to those pump stations owned by OCU, approximately: 4 simplex; 371 duplex; and 1 triplex active, and 21 inactive, pump stations are privately owned and operated within Orange County. For each of these 1089 pump stations included within the updated TAG inventory, data regarding pump capacities, run times, pump curves, and major equipment are included, based on availability. The inventory in its entirety is attached as a separate file to the transmitting this TM. 3.0 Rehabilitation, Replacement, and Construction Costs As previously stated, OCU staff familiar with historical lift station rehabilitation, replacement, and construction needs identified typical criteria to be used by the JV for planning and cost estimating purposes. The following assumptions for developing a rehabilitation and replacement program were identified: An average of 15 new duplex pump stations are constructed each year An average of 1 new master (triplex) pump station is constructed every other year Comprehensive pump station rehabilitation is required every 20 years Intermediate pump replacements are required every 10 years (and are included as part of the comprehensive pump station rehabilitations) OCU s master pump stations are large, high capacity pump stations with flows of at least 1000 gallons per minute. In general, master pump stations typically are triplex or quadraplex pump stations. As a result of their larger size, fewer master pump stations are constructed each year. Pump replacement generally consists of replacing the pump, elbow, check valve, and control panel replacement. A comprehensive pump station rehabilitation consists of repairing all mechanical, structural, instrumentation, electrical, generators, HVAC, and noise and odor control components. A detailed listing of the items that may be addressed during each type of rehabilitation is provided in Table 1. FINAL REPORT (PUBLISHED SEPTEMBER 2006) S -2

5 3.1 New Pump Station Construction OCU does not typically pay for the construction of duplex pump stations. Approximately 15 new duplex pump stations are constructed each year by developers, and ownership is then conveyed to OCU. As a result, routine operation, maintenance, and rehabilitation become OCU s responsibility. Construction costs provide an indication of average rehabilitation costs, though, so historical cost estimates for the construction of duplex pump stations were evaluated. Approximately one triplex pump station is constructed by the County every other year. Historical construction cost data was reviewed as part of the cost factor development completed in accordance with Task 11 of the Master Plan Update. As part of that task, it was determined that the average pump station construction cost is approximately equal to: PS construction cost = * (capacity of pump station in gpm) Based on the TAG inventory, the average pump sizes for the existing 541 duplex pump stations and 33 triplex pump stations are 361 gpm and 1941 gpm, respectively. The average duplex pump station construction cost is, therefore, approximately $255,000, and the average triplex pump station construction cost is approximately $950, Existing Pump Station Rehabilitation Rehabilitation of existing pump stations consists of replacing pumps every 10 years and completing a comprehensive pump station rehabilitation (which includes pump replacement) every 20 years. Duplex pump station pump replacement costs were determined by reviewing pump data within the TAG inventory. Several size categories were developed, and for each category, the average pump horsepower, flow, and head conditions were determined based on OCU s current pump inventory. Cost quotations were then obtained from vendors for pumps within each size category, and an overall weighted average cost was calculated and utilized to determine average pump replacement costs. Table 2 summarizes the data utilized in the development of the duplex pump station pump replacement costs. Master pump station pump replacement cost estimates were obtained from the Orange County 14 Pump Stations Summary of Findings report prepared by CDM. The report summarized pump replacement costs associated with major pump station rehabilitation. The pump replacement costs from the report were isolated and utilized to determine the average pump replacement costs for the intermediate master pump station pump replacements (Table 3). Comprehensive pump station rehabilitation cost data were also gathered in order to estimate annual rehabilitation costs over the 20 year planning period. Per OCU staff, duplex pump station rehabilitation costs are approximately 80% to 90% of construction costs. An average of $220,000 (which is approximately 85% of the estimated $255,000 construction cost) was, therefore, utilized as the average duplex pump station comprehensive rehabilitation cost. Estimated master pump station rehabilitation costs were based on data provided in the Orange County 14 Pump Stations Summary of Findings report prepared by CDM. The rehabilitation costs presented within the report provide estimates for rehabilitation of 14 of OCU s 38 master pump stations. The rehabilitation cost estimates FINAL REPORT (PUBLISHED SEPTEMBER 2006) S -3

6 presented within the report were based on completing the comprehensive rehabilitation improvements identified in Table 1, as necessary. The costs presented within the referenced report are summarized in Table 4. As indicated within the table, the number of pumps varies between 2 and 4. Average pump station rehabilitation costs were calculated based on the number of pumps within the pump station. These costs are presented in Table 5. The data indicate that the total pump station rehabilitation costs average approximately $540,000 for a triplex pump station and $760,000 for a quadraplex pump station. These rehabilitation costs were, therefore, utilized to develop the 20 year planning rehabilitation cost estimates. 3.3 CIP Costs A matrix (Table 6) was developed to illustrate the pump station needs and develop the planning cost estimates. The rehabilitation and construction criteria discussed at the beginning of this section were used to develop the data included within the matrix. The annual costs for the programmed rehabilitation, replacement, and construction projections developed from the matrix are summarized in Table 7. The cost basis includes the rehabilitation, replacement, and construction costs discussed previously. The costs presented in Table 7 are all in year 2000 dollars, as no cost escalation factor was assumed. The cost matrix does allow inflation and interest rates to be entered, however, so the inflated costs can be easily calculated in the future with the rates determined later in the master planning process. Total expenditures for the 20 year planning period are projected to be approximately $134 million, in year 2000 dollars. 4.0 Conclusions According to the County staff, 543 pump stations are currently maintained by OCU. Private pump station data gathered as part of this study indicates that 397 pump stations are privately owned and maintained within Orange County. Of the 397 privately owned pump stations, 21 of these are currently not active. Based on historical data, rehabilitation and replacement costs for the pump stations maintained by OCU are estimated to total approximately $159 million dollars over the next 20 years. This equates to an average expenditure of $8 million per year in year 2000 dollars. The cost estimate includes the costs for comprehensive rehabilitation of each pump station once every 20 years and pump replacement 10 years before/after the comprehensive rehabilitation. In addition, construction of new duplex and triplex pump stations is included at a rate determined by OCU based on historical construction requirements. Based on the construction criteria provided, it is estimated that OCU will operate approximately 805 duplex, 43 triplex, and 5 quadraplex pump stations 20 years from now. FINAL REPORT (PUBLISHED SEPTEMBER 2006) S -4

7 TABLE 1 Pump Station Rehabilitation Components Description Rehabilitation Event Intermediate (Every 10 Years) Comprehensive (Every 20 Years) Civil and Mechanical Improvements Sump pump replacement Installation of energy dissipaters at wet wells Slide gate installation Line stop installation Installation of in-line valves at bypass piping Removal of existing pumps, shafts, and motors Installation of new pumps and accessories Discharge line replacement Check valve replacement Gate valve replacement Plug valve replacement Installation of concrete vaults and lids Rehabilitation of gravity lines Manhole rehabilitation Installation of electric cranes in drywells Grit chamber removal Removal of chlorine yard piping Comminutor removal Gate removal Structural Improvements Repair of interior wet well walls and pump pedestals Blast cleaning of influent channels, wet wells, screenings rooms, Replacement of brittle or weakened rebar Restoration of concrete to original design thickness Application of new coating on all interior surfaces Dampproofing inside walls of drywells Replacement of wetwell doors Repainting of existing materials for protection Stair handrail replacement New roof Asbestos testing and removal/disposal not included Electrical and Instrumentation System Improvements New odor control system wire and conduit New lighting New generator, generator transfer switch, and generator control New above-ground double-wall fuel tank or generator enclosure Generator controls New conduit and wire Control panel replacement New high-efficiency squirrel cage induction type pump motors VFDs for pumps with solid-state soft start bypass starters Replacement of motor control center (including conduit, wire, New service entrance rated main breakers Flow meter replacement Install hydrostatic level transducers or ultrasonic level sensors Replace existing alarm dialers Install SCADA termination cabinets HVAC, Noise, and Odor Control Improvements Replacement of HVAC drywell ventilation systems Construction of drywell separation walls to improve HVAC Completion of VFD related air conditioning work Installation of noise proof generator enclosures Installation of biofilter odor control systems Replacement of biofilter media Plumbing, Emergency Generator Fuel Tanks, and Fuel Piping Improvements Installation of backflow prevention devices on water connections Replacement of water closet and lavatory fixtures Replacement of sanitary piping New above ground fuel tanks New above ground contained piping meeting current state FINAL REPORT (PUBLISHED SEPTEMBER 2006) S -5

8 TABLE 2 Average Duplex Pump Replacement Cost Pump Size # of PS Average Average Flow TDH Cost 1 Cost * # of PS (hp) Horsepower (gpm) (ft) ($) ($) , , , , , , , , , , , ,500 > ,100 54,100 Total ,675,300 Overall Weighted Average $6,794 1 Costs are based on vendor quotes 2 Total does not match TAG inventory duplex pump station total because pump sizes were not listed for every pump station Add contingency of $3,000 to cover control panel and miscellaneous appurtanance costs Therefore, utilize $10,000 per pump for average duplex pump station pump replacement cost FINAL REPORT (PUBLISHED SEPTEMBER 2006) S -6

9 TABLE 3 OCU Master Pump Station Pump Replacement Costs Costs taken from the Orange County 14 Pump Stations - Summary of Findings report (CDM, May 2000) Lift Station Number of Pumps Total Rehabilitation Cost Pump Cost Only Cost per Pump $555,600 $48, $850,500 $107, $490, $756,600 $78, $850,000 $63, $739,000 $63, $1,004, $324, $255, $450, $346, $296, $516, $490,400 $63,834 Maximum $1,004,300 $107,334 $35,778 Minimum $255,500 $48,834 $16,278 Average $566,207 $71,084 $23,695 Therefore utilize: $25,000 average master pump station pump replacement cost (per pump) (Pump costs include 8 hours labor per pump and miscellaneous equipment cost of $250 per pump) FINAL REPORT (PUBLISHED SEPTEMBER 2006) S-7

10 TABLE 4 OCU Master Pump Station Rehabilitation Costs Taken from Orange County 14 Pump Stations - Summary of Findings (CDM, May 2000) HVAC, Noise, & Odor Control Plumbing and Generators Total Rehab Cost Lift Station # of Pumps Civil/Mechanical Structural Instrumentation Electrical $288,700 $9,600 $25,000 $200,300 $32,000 $0 $555, $417,700 $95,500 $27,500 $267,700 $37,000 $5,000 $850, $121,800 $57,900 $36,900 $256,600 $15,000 $2,000 $490, $393,200 $134,700 $31,900 $158,700 $37,000 $1,000 $756, $329,200 $171,600 $36,100 $275,200 $37,000 $1,000 $850, $311,900 $148,100 $27,000 $214,100 $37,000 $1,000 $739, $236,500 $503,800 $45,800 $201,700 $14,500 $2,000 $1,004, $105,200 $40,000 $21,900 $120,800 $15,000 $22,000 $324, $114,400 $85,300 $25,900 $11,900 $15,000 $3,000 $255, $75,300 $35,800 $46,900 $293,000 $0 $0 $451, $68,900 $96,100 $31,900 $132,300 $15,000 $2,000 $346, $74,000 $63,100 $27,000 $95,400 $15,000 $22,000 $296, $234,900 $103,200 $44,900 $133,600 $0 $0 $516, $224,600 $103,200 $36,900 $105,800 $20,000 $0 $490,500 Total $2,996,300 $1,647,900 $465,600 $2,467,100 $289,500 $61,000 $7,927,400 FINAL REPORT (PUBLISHED SEPTEMBER 2006) S-8

11 TABLE 5 OCU Master Pump Station Rehabilitation Costs Costs taken from the Orange County 14 Pump Stations - Summary of Findings report (CDM, May 2000) Lift Station # of Pumps Total Rehabilitation Cost Estimate Duplex PS Triplex PS Quadplex PS $555, $850, $490, $756, $850, $739, $1,004, $324, $255, $450, $346, $296, $516, $490,400 - Maximum $450,900 $850,500 $1,004,300 Minimum $450,900 $255,500 $516,500 Average $450,900 1 $541,382 $760,400 1 Duplex rehab cost not representative of a typical duplex pump station Therefore utilize: $540,000 triplex pump station rehabilitation cost $760,000 quadplex pump station rehabilitation cost FINAL REPORT (PUBLISHED SEPTEMBER 2006) S -9

12 FINAL REPORT (PUBLISHED SEPTEMBER 2006) S-10

13 Placeholder for Table S-6 (11x17). FINAL REPORT (PUBLISHED SEPTEMBER 2006) S -11

14 Placeholder for Table S-7 (11x17). FINAL REPORT (PUBLISHED SEPTEMBER 2006) S-12

CITY OF WEST PALM BEACH

CITY OF WEST PALM BEACH TYPICAL LIFT STATION SITE PLAN : APR. 2016 SUBMERSIBLE LIFT STATION - TYPICAL LIFT STATION SITE PLAN SLS-1 : APR. 2016 SUBMERSIBLE LIFT STATION - WET WELL SECTION SLS-2 WETWELL DATA PUMP/ELECTRICAL DATA

More information

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering DON T JUST REHAB IT, RENEW IT! WATERFORD TOWNSHIP, MICHIGAN IMPROVEMENTS TO A 3.0 MGD SEWAGE PUMPING STATION Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson

More information

Section XVII SANITARY SEWER PUMP STATION DESIGN GUIDELINES

Section XVII SANITARY SEWER PUMP STATION DESIGN GUIDELINES Section XVII SANITARY SEWER PUMP STATION DESIGN GUIDELINES A. GENERAL 1. The following sanitary sewer pump station design guidelines are based on Federal, State and local health requirements and the Hilton

More information

Waste Water Pumps, Lift Stations, and Controls. A.S.P.E. overview

Waste Water Pumps, Lift Stations, and Controls. A.S.P.E. overview Waste Water Pumps, Lift Stations, and Controls A.S.P.E. overview Applications 4 BASIC TYPES OF WASTE WATER PUMPS Sump Effluent Solids handling - Sewage Grinder Sump Pumps A pump designed to remove water

More information

Waste Collection Systems

Waste Collection Systems Waste Collection Systems Lift Stations Lift Stations Training Objectives To gain an understanding of: Lift Station vocabulary Lift Station components and their function Lift Station operational requirements

More information

Standard Operating Guideline Lift Station Inspection

Standard Operating Guideline Lift Station Inspection Standard Operating Guideline (SOG) Title: LIFT STATION INSPECTION District Name: Date Prepared: Date Revised: OBJECTIVE: Lift stations are used to lift or raise wastewater from a lower elevation to a higher

More information

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Oxford Hills Bus Garage 36 Brown St, Norway, ME Oil Storage Inspection 2/20/14 CONDITIONS OBSERVED Underground Oil Storage: 12,000 gallon underground oil storage tank (split 10,000 gallon diesel/2,000

More information

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

ELECTRIC/DIESEL FIRE PUMP CHECK LIST BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

Village of Broadview Flood Control Assistance Program

Village of Broadview Flood Control Assistance Program Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

Chapter 9 Sanitary Sewers

Chapter 9 Sanitary Sewers Chapter 9 Sanitary Sewers S:/Engineering/Design Standards/Chapter 9 12/29/2014 Section 9.1 Topic General Requirements Chapter 9 Sanitary Sewers Page 9-1 9.2 Plan Submittals 9-1 9.3 Determination of Flow

More information

22) The interior of 750 ft of 24 in. pipe is uniformly coated with 1.5 inches of

22) The interior of 750 ft of 24 in. pipe is uniformly coated with 1.5 inches of 22) The interior of 750 ft of 24 in. pipe is uniformly coated with 1.5 inches of grease. How many gallons will this pipe hold when filled with water? Formula(s) needed: 1ft 3 = 7.48 gal., Area = D 2 x.785

More information

Chapter 4 - Preferred Alternative...25

Chapter 4 - Preferred Alternative...25 Preliminary Design Report Chapter 1 - Background... 1 Introduction... 1 Condition Assessment... 1 Reliable Capacity... 2 Forcemain Header Structural Integrity... 2 Wetwell Corrosion... 2 Manhole Corrosion...

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

GRANT PROGRAM VILLAGE OF WESTCHESTER HOME FLOOD-PROOFING ASSISTANCE PROGRAM

GRANT PROGRAM VILLAGE OF WESTCHESTER HOME FLOOD-PROOFING ASSISTANCE PROGRAM GRANT PROGRAM VILLAGE OF WESTCHESTER HOME FLOOD-PROOFING ASSISTANCE PROGRAM INTRODUCTION The Village of Westchester is served by separate storm and sanitary sewers. During some intense rains, the capacity

More information

CITY OF TAMPA ADDENDUM NO. 1. DATE: November 16, 2012

CITY OF TAMPA ADDENDUM NO. 1. DATE: November 16, 2012 CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT David L. Vaughn, AIA, Director ADDENDUM NO. 1 DATE: November 16, 2012 Contract 12-C-00046; Perry Avenue Pumping Station Rehabilitation

More information

MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS

MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS Presented at: WEFTEC 2006 Dallas, TX October 24, 2006 New England Water Environment Association Meeting Westford, MA September 12, 2006 Virginia

More information

Fire Pump Layout and Sizing. Victoria B. Valentine, P.E.

Fire Pump Layout and Sizing. Victoria B. Valentine, P.E. Fire Pump Layout and Sizing Victoria B. Valentine, P.E. Learning Outcomes Identify the appropriate sections of NFPA 20 that apply to sizing and layout of fire pumps. Identify the components of a fire pump

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

Chapter 7 Collection System Maintenance

Chapter 7 Collection System Maintenance Chapter 7 Collection System Maintenance Chapter Outline This chapter is organized into the following sections: Introduction General Discussion Pumping Station Maintenance Maintenance of Sewers and Force

More information

CONTENTS OF THIS SECTION

CONTENTS OF THIS SECTION UNIT 1 CONTENTS OF THIS SECTION 1 2 3 4 5 6 7 8 UNIT PROCESS DESCRIPTION UNIT SCHEMATIC UNIT EQUIPMENT LIST EQUIPMENT DATA SHEETS EQUIPMENT SCHEMATICS STANDARD OPERATING PROCEDURES UNIT TROUBLESHOOTING

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

4.0 SEWER LIFT STATION AND FORCE MAIN GUIDELINES

4.0 SEWER LIFT STATION AND FORCE MAIN GUIDELINES 4.0 SEWER LIFT STATION AND FORCE MAIN GUIDELINES 4.01 INTRODUCTION Sewage collection within Western Municipal Water District s (Western s) service area shall be provided by the construction of gravity

More information

TWA Construction Review Checklist

TWA Construction Review Checklist TWA Construction Review Checklist General / Miscellaneous Two sets of plans (Forward one set to Gary Basham for Review) Cover sheet with project name, location, vicinity map, Parcel ID, and engineer &

More information

Private Residential Pump Station Design Checklist

Private Residential Pump Station Design Checklist CHECKLIST C4 Revised 5/2/2016 Private Residential Pump Station Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in

More information

Variable Frequency Drives for Water/Wastewater. Discussion on Pump Optimization Principles and Need to Know Drive Technology

Variable Frequency Drives for Water/Wastewater. Discussion on Pump Optimization Principles and Need to Know Drive Technology Variable Frequency Drives for Water/Wastewater Discussion on Pump Optimization Principles and Need to Know Drive Technology Pumps in Water Wastewater 2 WWW Challenges: Drivers/Trends Demand for WWW Age

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Wastewater Collection Practice Test #3 Page 1 of 15

Wastewater Collection Practice Test #3 Page 1 of 15 Wastewater Collection Practice Test #3 Page 1 of 15 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? 13.85 MGD 10.73 MGD 1.85

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

Class Environmental Assessment Schedule B Project File Report

Class Environmental Assessment Schedule B Project File Report R.J. Burnside & Associates Limited 16775 Yonge Street Suite 200 Newmarket ON L3Y 8J4 Canada telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Class Environmental Assessment Schedule B

More information

A. Under Section 553.73(9), Florida Statutes, the following buildings and structures are exempt from compliance with the Florida Building Code:

A. Under Section 553.73(9), Florida Statutes, the following buildings and structures are exempt from compliance with the Florida Building Code: MIAMI-DADE COUNTY BUILDING DEPARTMENT PERMIT EXEMPTIONS Please note that the exemptions listed in this section are from Florida Building Code requirements only. Other State and County regulatory departments

More information

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK C H A P T E R 7 ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK OBJECTIVES After reading this chapter and completing the review questions, you should be able

More information

LEAK DETECTION ALARM SYSTEM GUIDELINES FOR TOXIC HAZARDOUS/MATERIALS STORAGE

LEAK DETECTION ALARM SYSTEM GUIDELINES FOR TOXIC HAZARDOUS/MATERIALS STORAGE Suffolk County Department of Health Services Division of Environmental Quality LEAK DETECTION ALARM SYSTEM GUIDELINES FOR TOXIC HAZARDOUS/MATERIALS STORAGE ~~~~ Mary E. Hibberd, M.D., M.P.H. Suffolk County

More information

Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP)

Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Maine CWSRF Fiscal Sustainability Plan Requirements Starting October 1, 2014, a Fiscal Sustainability

More information

DATA COLLECTION AND PUMP ENERGY SAVING OPPORTUNITIES. Presented By: Rick Rumsey, P.E.

DATA COLLECTION AND PUMP ENERGY SAVING OPPORTUNITIES. Presented By: Rick Rumsey, P.E. DATA COLLECTION AND PUMP ENERGY SAVING OPPORTUNITIES Presented By: Rick Rumsey, P.E. Data Collection Customer Information Pump Motor Information Pump Information Irrigation System Information Historic

More information

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach Fundamentals of Asset Management Step 10. Build Asset Management Plan A Hands-On Approach Tom s bad day Fundamentals of Asset Management 2 AM plan 10-step process Develop Asset Registry Assess Performance,

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations Purpose and Objective The FWEA Utility Council formed the SSO Sub-Workgroup to provide a venue to discuss the increase

More information

A Century of Progress with Pride

A Century of Progress with Pride The City of Berwyn Engineering Department A Century of Progress with Pride November 12, 2014 Re: Waiting List Application I am interested in the following programs and would like to be added to the waiting

More information

OPERATION AND MAINTENANCE MANUAL. Street Address:.

OPERATION AND MAINTENANCE MANUAL. Street Address:. OPERATION AND MAINTENANCE MANUAL Name: Water Works Street Address: City & Zip:, LA PWS# Phone: ( ) FAX: ( ) Note: This manual is intended to be a sample or go-by to help Small Water Systems generate their

More information

Advanced_O&M_Task_List_Example_Tool_06_02_16: O&M Example

Advanced_O&M_Task_List_Example_Tool_06_02_16: O&M Example Name Type of O&M Activity O&M Activity Frequency O&M Tracking Location Runa Valves Exercise mainline valves. Semi Inspect pumps, motors, and controls Once per week / Onsite Kreger 6 inch PVC Lakeview Heights

More information

C. Is the applicable code (NFPA 13, 13R, 13D, 14, 20) and edition correct and shown on the drawing?

C. Is the applicable code (NFPA 13, 13R, 13D, 14, 20) and edition correct and shown on the drawing? Fire Suppression Plan Review General A. Are the shop drawings on the contractor s title block? B. Do the drawings meet the engineer design documents? C. Is the applicable code (NFPA 13, 13R, 13D, 14, 20)

More information

Choosing a Pump for Rainwater Harvesting

Choosing a Pump for Rainwater Harvesting Choosing a Pump for Rainwater Harvesting Introduction Water harvesting is the practice of capturing rainwater runoff, normally from a rooftop, and storing it in a tank or cistern for use around a home

More information

HOUSTON ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

EMERGENCY POWER AND BACKUP REQUIREMENTS FOR WWTPS

EMERGENCY POWER AND BACKUP REQUIREMENTS FOR WWTPS EMERGENCY POWER AND BACKUP REQUIREMENTS FOR WWTPS 217.1 Applicability (a) This chapter applies to any person who proposes to construct, renovate, or re-rate a wastewater collection system or commission

More information

CHAPTER 8 EXISTING SANITARY SEWER SYSTEM FACILITIES

CHAPTER 8 EXISTING SANITARY SEWER SYSTEM FACILITIES Comprehensive Utilities Plan Village of Sister Bay, Wisconsin CHAPTER 8 EXISTING SANITARY SEWER SYSTEM FACILITIES The sanitary sewer collection system and lift station facilities operated and maintained

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

Lift Station Condition Assessment, Repair and Rehab the Full Monty. How to Participate Today

Lift Station Condition Assessment, Repair and Rehab the Full Monty. How to Participate Today Lift Station Condition Assessment, Repair and Rehab the Full Monty This webcast will provide unique perspectives regarding the Condition Assessment of Sewerage Lift Stations. The topics covered include

More information

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods Extreme Wet Weather in Brookfield How to Keep Your Basement Dry During Heavy Rains and Floods Relating Stormwater Drainage to Sewer Backups Brookfield has two separate sewer systems Storm sewer system

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS SECTION 23 22 23 PART 1 GENERAL 1.1 DESCRIPTION A. Steam condensate pumps for Heating, Ventilating and Air Conditioning. B. Definitions: 1. Capacity: Liters per second (L/s) (Gallons per minute GPM) of

More information

Basis of Cost Estimates

Basis of Cost Estimates Wastewater Master Plan DWSD Project No. CS-1314 Technical Memorandum Original Date: May 8, 2003 Revision Date: September 2003 Author: Tucker, Young, Jackson, Tull Inc. Table of Contents 1 Purpose...1 2

More information

6.3.1 Fine Screening Overview

6.3.1 Fine Screening Overview 6.3.1 Fine Screening Overview The fine screens receive flow from the intermediate pumps and provide screening of the MBR feed prior to the MBR aeration basin. The screens are 2mm punch- plate screens that

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Each pump shall have the necessary characteristics and be properly selected to perform under the following conditions:

Each pump shall have the necessary characteristics and be properly selected to perform under the following conditions: 12.01 SCOPE OF WORK The work covered by this section of the specifications consists of furnishing all parts, labor, materials and appliances and performing all operations for the installation of submersible

More information

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana

More information

Cost Estimating Procedures for Raw Sewage Overflow Control Program

Cost Estimating Procedures for Raw Sewage Overflow Control Program Raw Sewage Overflow Control Program April 23, 2004 Raw Sewage Overflow Control Program City of Indianapolis Department of Public Works Table of Contents Section Page 1.0 Introduction... 1 2.0 General Project

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

Accounting and Administrative Manual Section 100: Accounting and Finance

Accounting and Administrative Manual Section 100: Accounting and Finance No.: A-27 Page: 1 of 5 General: In fiscal year 2002, the university implemented Governmental Accounting Standards Board (GASB) Statements 34 Basic Financial Statements and Management's Discussion and Analysis

More information

WATER PUMP STATIONS WATER SYSTEM STANDARDS 1. GENERAL. 1.1 General

WATER PUMP STATIONS WATER SYSTEM STANDARDS 1. GENERAL. 1.1 General Page 1 of 6 1. GENERAL 1.1 General.1 This section presents design guidelines for booster stations installed within the Black Mountain Irrigation District (BMID)..2 Where the water utility infrastructure

More information

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries.

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries. In Partnership with Schedule Contract #GS21F0118X Contract # TXMAS-12-03FAC0110 Schedule 03FAC Facilities Maintenance and Management Federal Supply Service Authorized Federal Supply Schedule Price List

More information

BOWL ASSEMBLY SELECTION Select impeller in exactly the same manner as for lineshaft type pump. Note comments under WELL SIZE.

BOWL ASSEMBLY SELECTION Select impeller in exactly the same manner as for lineshaft type pump. Note comments under WELL SIZE. SUBMERSIBLE PUMP selection A submersible pump consists of the following basic elements: < Bowl Assembly < Motor < Cable < Drop Pipe < Surface Plate (with)(without) discharge elbow DATA REQUIRED FOR SELECTION

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report

ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report These instructions are for homeowners and inspectors completing the onsite wastewater treatment system

More information

Practice Exam #2 1 of 12

Practice Exam #2 1 of 12 Practice Exam #2 1 of 12 1) A pump is delivering less than the expected rate of discharge. What can cause this to happen? A) Discharge head too low B) Discharge head too high C) Check valve open D) Pump

More information

Element D Services Plumbing

Element D Services Plumbing Laboratory Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses laboratory vacuum, compressed air, gaseous nitrogen, and carbon dioxide systems within and to five feet beyond building

More information

Capital Expenditure. The common definition of capital expenditure is

Capital Expenditure. The common definition of capital expenditure is Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local

More information

Review of Footing Drain Disconnection Projects

Review of Footing Drain Disconnection Projects Wastewater Master Plan DWSD Project No. CS-1314 Review of Footing Drain Disconnection Projects Technical Memorandum Original Date: August 8 2002 Revision Date: September 2003 Author: CDM Table of Contents

More information

Feasibility Site Report

Feasibility Site Report Required Document for HomeStyle: Total rehabilitiation cost exceeds 15,000 OR At the recommendation of the HomeBridge Renovation Concierge Department Feasibility Site Report (AKA Feasibility Study) SUBJECT

More information

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to

More information

Design of Lift Station and Wastewater Treatment Facility in Ascension Parish

Design of Lift Station and Wastewater Treatment Facility in Ascension Parish Design of Lift Station and Wastewater Treatment Facility in Ascension Parish Christopher Banks Stephen Webster Brittany Williams Technical Advisors, MWH: Sparkle W. Noble Michael R. Johnston, P.E. Faculty

More information

Sample Private Sewer System Due Diligence Report

Sample Private Sewer System Due Diligence Report Sample Private Sewer System Due Diligence Report Technical Issues WEFTEC 2009 - W209 Private Sewer Systems: Who Owns Them? Who Builds Them? Who Maintains Them? Orlando, Florida October 11, 2009 for System

More information

SANITARY SEWER BACKUP. Causes & Prevention

SANITARY SEWER BACKUP. Causes & Prevention SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides

More information

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,

More information

NFPA 14 3.3.5 4.2.3.2

NFPA 14 3.3.5 4.2.3.2 NFPA 14 3.3.5 3.3.5 High-Rise Building. A building where the floor of an occupiable story is greater than 55 ft (17 m) 75 ft (23 m) above the lowest level of fire department vehicle access. 4.2.3.2 4.2.3.2

More information

City of Elk River BASEMENT Office Use Only

City of Elk River BASEMENT Office Use Only City of Elk River BASEMENT Office Use Only Fire and Building Safety Division (FABS) Building Permit Application Notes Scan Permit Total Date Permit # PID # $ Site Address Suite/Unit Structure Type Single

More information

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist #506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the

More information

Medical Air Systems: Scroll

Medical Air Systems: Scroll GENERAL The Chemetron skid mount scroll medical air system is designed to provide medical breathing air for hospital and medical institutions. This system meets NFPA 99 requirements for Level 1 breathing

More information

City of Elmhurst Southwest Elmhurst Wet-Weather Control Facility (WWCF) September 16, 2013 Project Status Update

City of Elmhurst Southwest Elmhurst Wet-Weather Control Facility (WWCF) September 16, 2013 Project Status Update September 16, 2013 City of Elmhurst Southwest Elmhurst Wet-Weather Control Facility (WWCF) September 16, 2013 Project Status Update Prepared by Southwest Elmhurst Wet-Weather Control Facility._...- Southwest

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

Proposed standard significant deficiency language is provided in italics. Notes to staff are provided in blue and are [bracketed].

Proposed standard significant deficiency language is provided in italics. Notes to staff are provided in blue and are [bracketed]. Significant Deficiencies: A Quick Fact Sheet for Hawaii PWSs Definition: Significant deficiencies are currently defined in HAR 11-20-46.1 as any defect in a system s design, operation and maintenance,

More information

PENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit

PENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit Tab 34 Physical/Capital Needs Assessment & Energy Audit All Preservation developments must submit both of the following: A. Physical/Capital Needs Assessment A Physical/Capital Needs Assessment must be

More information

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES 1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee

More information

Fuel Storage & Control Systems Generator Packaging & Enclosures

Fuel Storage & Control Systems Generator Packaging & Enclosures Fuel Storage & Control Systems Generator Packaging & Enclosures Options Include: Double-Walled & Fire Rated Tanks, Hurricane Rated & Sound Attenuated Enclosures phoenixproducts 1727 Bennett Street, Jacksonville,

More information

FISCAL SUSTAINABILITY PLAN For the Small Town, Kansas, Wastewater Collection and Treatment System

FISCAL SUSTAINABILITY PLAN For the Small Town, Kansas, Wastewater Collection and Treatment System Page 1 of 13 FISCAL SUSTAINABILITY PLAN For the, Wastewater Collection and Treatment System This plan outlines a (FSP) for the City of Small Town, County of Xxxxx, State of Kansas, as required by the Kansas

More information

INSTRUCTIONS/INFORMATION HOW TO PROPERLY FILL OUT THE INDIVIDUAL MECHANICAL TREATMENT PLANT WARRANTY INSPECTION / SERVICE REPORT

INSTRUCTIONS/INFORMATION HOW TO PROPERLY FILL OUT THE INDIVIDUAL MECHANICAL TREATMENT PLANT WARRANTY INSPECTION / SERVICE REPORT INSTRUCTIONS/INFORMATION HOW TO PROPERLY FILL OUT THE INDIVIDUAL MECHANICAL TREATMENT PLANT WARRANTY INSPECTION / SERVICE REPORT Section 1. SITE INFORMATION: All fields in this form must be filled in accurately

More information

Jay R. Smith Mfg. Co.

Jay R. Smith Mfg. Co. Jay R. Smith Mfg. Co. Automatic Backwater Valve SMITH CUSTOMER DRIVEN FLOOD-GATE FEATURES Index Page Flood-Gate Features and Applications 2 How Flood-Gate Works 3 Flood-Gate Operation & Approvals 4 Valve

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Asset Management. Brian Vilmont, P.E. Prein&Newhof

Asset Management. Brian Vilmont, P.E. Prein&Newhof Asset Management Brian Vilmont, P.E. Prein&Newhof 616-250-2468 Common Questions What is Asset Management? Why should we do Asset Management? How do you implement Asset Management? What is Asset Management?

More information

SECTION 9: Pumping Systems

SECTION 9: Pumping Systems SECTION 9: Pumping Systems Overview... 9-1 Pumping Applications... 9-1 Pumping in Gravity Systems...9-1 Pumping in Pressure Systems...9-3 Sump and Pump Tank Specifications... 9-4 Sump Basket...9-4 Specifications...9-5

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

SEWER BACKUP PREVENTION PROGRAM

SEWER BACKUP PREVENTION PROGRAM SEWER BACKUP PREVENTION PROGRAM The Village of La Grange Park is pleased to announce a program to assist single-family homeowners with the cost of plumbing improvements to address sanitary sewer related

More information

Water Loss and Leak Detection. Gary Armentrout, Project Associate Environmental Finance Center Wichita State University

Water Loss and Leak Detection. Gary Armentrout, Project Associate Environmental Finance Center Wichita State University Water Loss and Leak Detection Gary Armentrout, Project Associate Environmental Finance Center Wichita State University Water Meters The Atlanta Journal-Constitution: Thousands of city of Atlanta water

More information

Large Scale CSO Storage Design and Construction

Large Scale CSO Storage Design and Construction Large Scale CSO Storage Design and Construction City of Toledo, OH Robert Stevenson ARCADIS-US 2015 MWEA Annual Conference June 22, 2015 Imagine the result Agenda Agenda Background Consent decree Long

More information

NOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions.

NOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions. ATTACHMENT AA DETAILED SCOPE OF WORK Demolition & Removal Services for SR-7/US-441 from North of Fillmore Street to South of Stirling Road Hollywood, Broward County, Florida 1.0 Structures Structures are

More information

SECTION 027200 CONTROL OF WASTEWATER FLOWS (TEMPORARY BYPASS PUMPING SYSTEMS)

SECTION 027200 CONTROL OF WASTEWATER FLOWS (TEMPORARY BYPASS PUMPING SYSTEMS) SECTION CONTROL OF WASTEWATER FLOWS (TEMPORARY BYPASS PUMPING SYSTEMS) 1. GENERAL 1.1 DESCRIPTION A. This specification shall govern all work necessary for designing, installing, implementing, operating,

More information