1 External Wrapping of Steel Riser Pipe Case Study HJ3 CS Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water throughout the plant. Twelve of the Steel Riser Pipes showed signs of below grade water leakage and in response the refinery scheduled an engineering survey to determine the cause of the problem. Problem The engineering survey showed that a high percentage of steel on the pipes had corroded resulting in pitted areas and ultimately water leakage. The pipes were ¾ -inch thick. Given the extent of the damage, several solutions were considered including: replacement, welded steel, and HJ3 Carbon Composite System. The Project Engineers specified HJ3 s Carbon Composite System because it offered savings of 50% to 75% over alternative methods and 400 psi strengthening to the existing pipe. In addition, the system could be installed within 5 to 7 days with no resulting down time. Installation The steel riser pipes were first excavated to a depth of 10 feet and the mortar surrounding the pipes was removed to access the steel surface. An abrasive blast was performed to clean the pipe to a white metal finish with a 3 mil profile. After surface preparation, 2 layers of HJ3 CF528 carbon fabric were saturated and applied to the damaged pipe area. Conclusion In total, 12 steel riser pipes were repaired and strengthened with the HJ3 Pipe Repair System. The total installation was completed over 7days and resulted in 50% cost savings for the client over Steel Clamp Repairs or Replacement. The main advantages of the HJ3 Carbon Composite System were as follows: 10 x Tensile Strength of Steel Corrosion Resistant Installed in the presence of moisture Impermeable to Pressurized Water Speed of Installation 50% to 75% Cost Savings over Alternatives Including Replacement Copyright, March HJ3 Composite Technologies, LLC. All Rights Reserved
2 TM TM Composite Technologies The Strongest Name in Carbon Fiber PIPE REPAIR CONCRETE, STEEL & CLAY Advantages 10 ft Diameter PCCP Repaired using HJ3 CF516 Carbon Fiber 5 to 10 times stronger than steel Weighs 4 ounces per square foot Corrosion Resistant Chemical Resistant to Acidic & Alkali Environments Minimizes Downtime 30% to 40% Cost Savings over alternative repairs or replacement!
3 STEEL PIPE Corrosion of steel reduces pipe strength and service life. Traditionally, owners are forced to replace the damaged pipe, requiring extensive downtime, the use of heavy equipment and excavation. HJ3 Composite Systems structurally repair damaged pipe. Installed internally or externally, HJ3 Composite Systems return the pipe to its original design strength without costly downtime, heavy equipment or excavation. HOW IT WORKS HJ3 Composite Systems are reinforced with high tensile strength fibers. When these fibers are bonded to the circumference of the pipe they resist the internal hoop stress from the pipe operating pressure. The cured HJ3 Composite System also protects the pipe from further corrosion and impact. PCCP & RCP HJ3 Composite Systems are excellent repair solutions for damaged pipes below grade with limited access and can be used to repair Pre-stressed Concrete Cylinder Pipe and Reinforced Concrete Pipe. In both PCCP & RCP repair appliations the carbon fiber replaces the tensile strength lost by corrosion of the existing steel pre-stressing wires or steel rebar. HOW IT WORKS HJ3 Composite Systems can be installed on the internal or external face of the pipe to create proper tensile reinforcement necessary to repair cracks, increase flexural and sheer capacity, and proivde a waterproofing membrane to the internal pipe surface. HJ3 Composite Systems can also be used to increase the compressive strenth of pipe to overcome loads such as soil and mobile equipment. HJ3 Quikfix STOPS LEAKS HJ3 Composite Systems are now available in easy to use kits. These kits provide carbon or glass materials that are 2-inches to 10-inches wide. The carbon or glass fabrics are pre-impregnated with a water activated urethane and vacuum packaged. To install the urethane carbon or glass systems simply dip the rolls in water for 30 seconds, wrap the pipe and allow the system to cure for 30 minutes. The carbon or glass fabrics can also be packaged in 5 gallon buckets with the traditional HJ3 resins, mixing tools and application tools necessary to install the wet lay up systems. HOW IT WORKS The Quikfix repair systems are perfect for repair of small diameter pipe, pipe joints and riser pipes. Copyright 2008 HJ3 Composite Technologies, LLC. All Rights Reserved. All trademarks are the property of HJ3 Compsoite Technoloies, LLC. The TMI Logo is a trademark of Tankhouse Maintenance, Inc.
4 TM TM Composite Technologies The Strongest Name in Carbon Fiber PIPE REPAIR KIT Step 1: Apply QuikFix Step 2: Wrap 1 st Layer of QuikFix Carbon Step 3: Saturate 1 st Layer of Carbon Fiber Step 4: Wrap a 2 nd or 3 rd Layer if necessary
5 HJ3 Uni-Directional Carbon Properties Corrosion Resistance Yes Chemical Resistance ph2-ph12.5 Tensile Strength (PSI) design 108,000 Modulus of Elasticity (ksi) 9,500 Effictive Ply Thickness (in).047 Installation Time per roll 20 Minutes Cure Time 6 to 8 hours Temperature 280 F HJ3 Bi-Directional Carbon Properties Corrosion Resistance Yes Chemical Resistance ph2-ph12.5 Tensile Strength (PSI) design 41,400 Modulus of Elasticity (ksi) 2,800 Effictive Ply Thickness (in).051 Installation Time per roll 20 Minutes Cure Time 6 to 8 hours Temperature 280 F HJ3 Pipe Repair Kits Contain: Uni-Directional or Bi-Directional Carbon Kits for Repairing Welds, Joints and Elbows Custom Designed Resin Systems for Chemical and High Temperature Applications Thixotropic Base Coats to fill pits and dimples Gloves Measuring Bucket Mixing Stick 5 Gallon Bucket for mixing resins and clean up Copyright 2008 HJ3 Composite Technologies, LLC. All Rights Reserved. All trademarks are the property of HJ3 Compsoite Technoloies, LLC. The TMI Logo is a trademark of Tankhouse Maintenance, Inc.
6 Internal Lining of Pre-Stressed Concrete Cylinder Pipe (PCCP) Case Study HJ3 CS Introduction Coal Fire Power Plants rely on large diameter Pre-Stressed Concrete Cylinder Pipe (PCCP) to transmit water to the plant cooling towers. Over time, the pre-stressing wires wrapped around the external circumference of the Pipe corrode causing pipe failures as the pipe cannot resist high internal pressures. The particular plant facility in this case required over 1000 linear feet of 12- Foot Diameter PCCP to be lined with carbon fiber to resist over 150-psi internal pressures. Problem Active Corrosion of the existing pre-stressing wires reinforcement was detected throughout the 300 linear feet of PCCP. Analysis of corroded areas showed that significant degradation had occurred and continued corrosion could result in loss of capacity and failure. Both carbon fiber and steel were initially considered to repair the PCCP. The repair had to be completed in 3 weeks during a plant shut-down. The repair also had to incorporate epoxy injection systems to eliminate leaking caused by hydrostatic pressure during the installation. Solution HJ3 engineers designed a repair that included two layers of HJ3 CF-516 to strengthen the pipe against internal hoop stress and 15-Foot of soil. Access to the pipe was granted in 3 separate locations through 36-inch manholes. The installation was staged in three steps: (1) abrasive blast, (2) Patch and Prime surface with HJ3 PM-100 and PC-200 Series resins, and (3) Installation of HJ3 CF-516 Carbon Fiber. Quality Control checks were instituted each day by HJ3 representatives to assure good adhesion (minimum of 250-psi) and eliminate all voids and air bubbles. The total installation was completed in 20 days. Conclusion The carbon fiber repair offered by HJ3 and its certified contractor created over 50% cost savings over the steel alternative repairs. The carbon system also minimized the flow restrictions created by steel slip-lined systems. The carbon installation also eliminated any need for welding or excavation. The repair was completed within the planned shut down window provided by the client. Copyright, All Rights Reserved. HJ3 Composite Technologies, LLC Jan. 1, 2003
7 Introduction Coal Fire Power Plants rely on large diameter Pre-Stressed Concrete Cylinder Pipe (PCCP) to transmit water to the plant cooling towers. Over time, the pre-stressing wires wrapped around the external circumference of the Pipe corrode causing pipe failures from failure to resist high internal pressures. The particular plant facility in this case required over 1000 linear feet of 12-Foot Diameter PCCP to be lined with carbon fiber to resist over 150-psi internal pressures. Problem Active Corrosion of the existing steel reinforcement was detected throughout the 1000 feet of PCCP. Analysis of corroded areas showed that significant degradation had occurred and continued corrosion could result in loss of capacity and failure. Both carbon fiber and steel were initially considered to repair the PCCP. One of the main difficulties on this project was the requirement that any repair be fully completed in the 14-day plant shut-down. When time of repair was considered carbon fiber became significantly cheaper than the steel alternatives. Solution HJ3 engineers designed a repair that included two layers of HJ3 CF-516 to strengthen the pipe against internal hoop stress. Access to the pipe was granted in 3 separate locations through 30-inch manholes. The installation was staged in three steps: (1) abrasive blast, (2) Patch and Prime surface with HJ3 PM-100 and PC-200 Series resins, and (3) Installation of HJ3 CF-516 Carbon Fiber. Quality Control checks were instituted each day by HJ3 representatives to assure good adhesion (minimum of 250-psi) and eliminate all voids and air bubbles. The total installation was completed in 11 days. Conclusion Over 100,000 square feet of carbon fiber was installed in less than 11 days to repair over 1000 linear feet of 12 foot diameter pipe. The project proves that carbon fiber is an efficient repair system for long runs of large diameter pipe that need to be repaired in a short period of time. The carbon fiber repair created over $2,000,000 in cost savings when compared to other steel alternatives each of which could not be installed in the time permitted. Internal Lining of Pre-Stressed Concrete Cylinder Pipe (PCCP) Case Study HJ3 CS Copyright, All Rights Reserved. HJ3 Composite Technologies, LLC Jan. 1, 2003
The Original Carbon Fiber Reinforced Polymer System
Infrastructure The Original Carbon Fiber Reinforced Polymer System Phone: 52.292.39 Toll Free: 866.38.269 Fax: 52.48.5274 282 E. Fort Lowell Rd. Tucson, AZ 8576 www.dowaksausa.com Test results are supported
More informationUsing StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System
Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System Luis Aguiar Miami-Dade Water & Sewer Department Anna Pridmore, PhD Structural Technologies PROJECT BACKGROUND Miami-Dade Water & Sewer Department
More informationbeams columns blast walls slabs pipes protective coatings polymer concrete Solutions Looking for Problems...
beams columns blast walls slabs pipes protective coatings polymer concrete Solutions Looking for Problems... CarbonWrap Solutions Services Turnkey Innovative Solutions and Products CarbonWrap Solutions,
More informationMeeting the Challenge of Pipeline Emergency Repair
Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider
More informationNAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
More informationWaterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
More informationREHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
More informationRehabilitation of corroded pipelines and pipes with FibaRoll
Rehabilitation of corroded pipelines and pipes with FibaRoll Available exclusively from FTi Ltd Adheres to steel High tensile strength High flexural strength Corrosion protection Cost effective Simple
More informationPrestressed Concrete Pipe Fitness for Service and Repair
Prestressed Concrete Pipe Fitness for Service and Repair Rasko Ojdrovic rpojdrovic@sgh.com 781-907-9231 IAEA - EPRI 15 October 2014 www.sgh.com SGH Pipeline Experience More than 25 years of research, analysis,
More informationPIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
More informationSPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
More informationIntroduction to Pressure Pipe Rehabilitation with CIPP
Introduction to Pressure Pipe Rehabilitation with CIPP Founded in early 1990 s RS Technik is a global leader in the rehabilitation of underground pipes RS Technik uses Cured-in- Place (CIPP) technology
More informationOil and Gas Pipeline Design, Maintenance and Repair
Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University aelsayed@mail.eng.cu.edu.eg
More informationINSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
More informationHow To Repair A Steel Pier With A Watertight Frame
INNOVATIVE FRP PILING REPAIR WITHOUT THE USE OF COFFER DAMS Steve Bazinet, Larry Cercone, Franz Worth Air Logistics Corporation Field-Applied Composite Systems Group Pasadena, California 91107 ABSTRACT
More informationMeasuring the Condition of Prestressed Concrete Cylinder Pipe
Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder
More informationBefore H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick
More informationINDEX. Sec. No. Items Page Nos.
INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............
More informationRehabilitation of an Aging Concrete Reservoir Adit Tower
Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationTECHNICAL REQUIREMENTS AND SPECIFICATIONS
TECHNICAL REQUIREMENTS AND SPECIFICATIONS REHABILITATION OF CONCRETE AND MASONRY MANHOLES OR UNDERGROUND VAULTS WITH A PROTECTIVE COATING (As Provided by Raven Lining Systems) FOREWORD This specification
More informationSpecification for Pipe Coating Repairs Offshore
Specification for Pipe Coating Repairs Offshore Specification for Pipe Coating Repairs Offshore 1 of 6 Table of Contents 1.0 SCOPE... 3 2.0 REFERENCE DOCUMENTS... 3 3.0 MATERIALS... 3 4.0 EQUIPMENT AND
More informationChesapeake Section AWWA Symposium
PRESTRESSED CONCRETE CYLINDER PIPE (PCCP) Chesapeake Section AWWA Symposium HANSON PRESSURE PIPE Steve Smith January 16,2014 Interpace Projects with Problems INTERPACE 45 MILLION FEET 11,500 PROJECTS Slide
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More informationNorth American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show. Orlando, Florida April 13-17, 2014
North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 Miami Thrice; Lanzo, HJ3, and Carbon Fiber combine to preempt Catastrophic Line Breaks
More informationWATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
More informationWATERPROOFING OF WET ROOMS
WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof
More informationSection 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
More informationDocument Library TS Data Sheet 46012 46013 46014
Document Library TS Data Sheet 46012 46013 46014 Rev:2 Effective: 01/11/2002 3M Marine High Strength Repair Filler Data Sheet Status: Active 3M Part No.(s) 46012 46013 46014 3M Part Descriptor(s) Pint
More informationRelining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014
Relining of Water Mains with Flexible High Pressure Pipelines Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Aging water main infrastructure The American Society of Civil Engineers
More informationOVERVIEW. 1 Intent:... 2. 2 Applicability:... 2. 3 Referenced Standards... 2. 5 Invert Repair Mortar... 3
PERMACAST CENTRIFUGALLY CAST CONCRETE PIPE (CCCP) OVERVIEW 1 Intent:... 2 2 Applicability:... 2 3 Referenced Standards... 2 5 Invert Repair Mortar... 3 6 Centrifugally Cast Concrete Pipe (CCCP)... 3 7
More informationFire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete
Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete Ming-Gin Lee 1,a, Yi-Shuo Huang 1,b 1 Department of Construction Engineering, Chaoyang University of Technology,Taichung
More informationConstruction. 3-part thixotropic epoxy patching mortar. Product Description. Tests
Product Data Sheet Edition 05/12/2014 Identification no: 020204030010000044 Sikadur -41 CF Rapid 3-part thixotropic epoxy patching mortar Construction Product Description Uses Characteristics / Advantages
More informationDemonstration of an Innovative Large-Diameter Sewer Rehabilitation Technology in Houston, Texas
North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 Paper TA-T3-03 Demonstration of an Innovative Large-Diameter Sewer Rehabilitation Technology
More informationThe AQUAFIN Approach to Concrete Repair
Concrete Repair Building Product Systems Waterproofing & Concrete Restoration Decorative Coatings Moisture Vapor Remediation & Flooring Injection Grouting The AQUAFIN Approach to Concrete Repair www.aquafin.net
More informationRehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009
Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of
More informationA JACKET FOR ALL OCCASIONS Newly developed system offers unique solution for quick retrofit of deteriorated columns
A JACKET FOR ALL OCCASIONS Newly developed system offers unique solution for quick retrofit of deteriorated columns Mo Ehsani, PhD, PE, SE, Majid Farahani, PE, and Eric Raatz, PE Loss of load-carrying
More informationSECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
More informationSECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
More informationConcrete Repair. Applications and Procedures
Concrete Repair Applications and Procedures Objectives Identify what surface preparation is needed Identify typical modes of failure and testing methods How to choose the correct material for the repair
More informationHigh Performance PSA in Sheet Membrane in Water Protection
High Performance PSA in Sheet Membrane in Water Protection Xia Cao, Senior R&D Chemist, W. R. Grace, Cambridge MA 02140 Jyoti Seth, Strategic Program Leader, W. R. Grace, Cambridge MA 02140 Concrete is
More informationGENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS
GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION OF MASTERLINER CURED-IN-PLACE PIPE SYSTEMS 34 TABLE OF CONTENTS 1.00 INTRODUCTION 2.00 SITE WORK PREPARATIONS 3.00 THE PRODUCT AND COMPONENT MATERIALS
More informationAIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
More information2009-12-23 ICS: 93.160. Strengthening retrofitting of reinforced concrete structures by gluing of fibre reinforced polymeric fabrics (FRP fabrics)
36888 ежглеяис тгс йубеямгсеыс (теувос еутеяо) 20091223 ICS: 93160 150114010801:2009 H HELLENIC CHNICAL SPECIFICATION (FRP ) Strengthening retrofitting of reinforced concrete structures by gluing of fibre
More informationAPE T CFRP Aslan 500
Carbon Fiber Reinforced Polymer (CFRP) Tape is used for structural strengthening of concrete, masonry or timber elements using the technique known as Near Surface Mount or NSM strengthening. Use of CFRP
More informationPROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationCIPP for Large Diameter Pressure Pipes. Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng.
CIPP for Large Diameter Pressure Pipes Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng. Pressure Pipe Lining What Does it Mean? What is It? No
More informationAPPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING
APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING Appendix C Moisture Guidelines Determining moisture content is an essential part of quality control within the flooring installation process. Flooring
More informationStrengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps
Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning May 7th 2013: Dominique Deschamps Scope of the paper Presentation of the project Cause of cracks
More informationChapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
More informationProposed Revision to Bridge Design & Drafting Manual
INTEROFFICE MEMO TECHNICAL SERVICES Bridge Engineering Section Office Phone: (503) 986-4200 Fax Number: (503) 986-3407 DATE: February 5, 2014 TO: Scott Liesinger Bridge Design Standards Engineer FROM:
More informationEpoxy Crack Injection (the basics)
Epoxy Crack Injection (the basics) John Bors ChemCo Systems Introduction Overview of pressure crack injection Practical and technical issues Choose a primary repair technique Epoxy properties ChemCo Systems
More informationSTAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.
More informationSECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES
1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other
More information07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying
More informationWSSC Ad-Hoc Committee on Large Diameter Water Mains. August 2, 2013
WSSC Ad-Hoc Committee on Large Diameter Water Mains August 2, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to PCCP Inspections, Monitoring and Repair/Replacement 2 PCCP Management
More informationComposite Materials. Mary P. Shafer. Fabric Development, Inc. Quakertown, PA 18951
Composite Materials Mary P. Shafer Fabric Development, Inc. Quakertown, PA 18951 Composite Material Two inherently different materials that when combined together produce a material with properties that
More informationFY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationGreen Thread Product Data
Green Thread Product Data Applications Dilute Acids Caustics Produced Water Industrial Waste Hot Water Condensate Return Materials and Construction All pipe manufactured by filament winding process using
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationCulvert Repair, Materials, and Structural Design 4.4-1
Culvert Repair, Materials, and Structural Design 4.4-1 4.4 Culvert Materials 4.4.1 General Culverts are primarily made with reinforced concrete, corrugated metal, and more recently, solidwall, profile
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationC. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
More informationSources A recent survey of leaking basements showed water comes from a variety of sources, but walls are the usual culprit: Occurrence of moisture
NEGATIVE SIDE WATERPROOFING»»»»»»»»»»»»»» NEGATIVE SIDE WATERPROOFING NEGATIVE SIDE WATERPROOFING NEGATIVE SIDE WATERPROOFING It s Possible to Waterproof Leaking Basements From the Inside By Basil Mewes
More informationUNIVERSITY OF CHICAGO ELEVATOR PIT LEAK REPAIR
ITEM: UNIVERSITY OF CHICAGO ELEVATOR PIT LEAK REPAIR DESCRIPTION: General Furnish all labor, equipment, and materials necessary and incidental thereto to perform all required operations to eliminate the
More informationPipe Repair Strategies on I-29
Pipe Repair Strategies on I-29 Research Advisory Committee 2012 Andy Mastel NDDOT- Materials and Research Division Pipe Location In the Fargo District Along Interstate 29 RP 75, North Bound Pipe Description
More information1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona
for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety
More informationPipe Protection Tape System
Pipe Protection Tape System PASCO All Weather Pipe Protection Tape is a pure physical barrier that is moisture proof, inert and non-conducting. Whether the need is to protect overhead piping in industrial
More informationSewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
More informationCondition assessment and repair of antenna towers concrete foundations
Condition assessment and repair of antenna towers concrete foundations I. Banjad Pecur, N. Stirmer & B. Milovanovic Department of materials, Faculty of Civil Engineering, University of Zagreb, Zagreb,
More informationENGINEERING SPECIFICATION PULTRUDED DYNAFORM FIBERGLASS STRUCTURAL SHAPES. July 1, 2008 Revision 2
ENGINEERING SPECIFICATION PULTRUDED DYNAFORM FIBERGLASS STRUCTURAL SHAPES 1 PART 1 - GENERAL 1.0 GENERAL 1.1 REFERENCES: SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS PULTRUDED FIBERGLASS
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationSECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
More informationPC-Concrete Injectable Concrete Anchoring and Repair System
PC-Concrete Injectable Concrete Anchoring and Repair System DESCRIPTION: PC-Concrete is a two component (1:1 ratio), 100% solids, high modulus, structural epoxy paste. PC-Concrete is a solvent free, no
More informationStructural Retrofitting Process and Techniques
Structural Retrofitting Process and Techniques Md. Mostafizur Rahman Sr. Business Consultant Fosroc Chemicals (I) Pvt Ltd Brief over view of FOSROC Construction Products Supplier with Manufacturing facilities
More informationSpecification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
More informationThe Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space
The Stabilizer TM Supplemental support system for sagging beams and floor joists within a crawl space Pre-drilled holes in steel plate allow for connection to beam or floor joists. Benefits Levels and
More informationSECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE)
SECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE) PART 1 GENERAL 1.1 DESCRIPTION 1. Fluid applied flexible acrylic waterproofing system over concrete. This work shall include the
More informationT R A N S F E R A B L E F U L LY
HSTOPS A WALL OF WATER 22 FT. HIG! F U L LY T R A N S F E R A B L E RESISTS10 PSI ! 1 F U L LY T R A N S F E R A B L E HSTOPS A WALL OF WATER 22 FT. HIG RESISTS10 PSI Guaranteed To Stop Water Even Under
More informationCITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
More informationForce Main Condition Assessment: New Technologies & Case Studies
Force Main Condition Assessment: New Technologies & Case Studies Andy Dettmer, Ph.D., P.E. CMOM Workshop August 19, 2014 2 1 Three takeaways 1. Most of your force mains are good 2. We can pinpoint the
More informationSTANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete
More informationSTANDARD SPECIFICATION SECTION 15257 STEEL PIPE, FUSION-BONDED EPOXY LINED AND COATED
STANDARD SPECIFICATION SECTION 15257 STEEL PIPE, FUSION-BONDED EPOXY LINED AND COATED PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, installation, and testing of fusion-bonded
More informationHow to Build a Printed Circuit Board. Advanced Circuits Inc 2004
How to Build a Printed Circuit Board 1 This presentation is a work in progress. As methods and processes change it will be updated accordingly. It is intended only as an introduction to the production
More informationHigh Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial
More informationGuide for SOLID CONCRETE BLOCK SEALS
Guide for SOLID CONCRETE BLOCK SEALS July, 2006 Mine Safety and Health Administration SOLID CONCRETE BLOCK SEAL Formersection 30 CFR 75.335(a)(1) specifies requirements for seals constructed using solid
More information738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)
POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay
More informationSummary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort
Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort June 25, 2012 Thomas Gossiaux, PE (AECOM) Matt Raysin, PE (GCDC-WWS) Dave Barnas, PE (AECOM) Ed Tharp, PE (AECOM) Summary
More informationWESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM
WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC
More informationIndustrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.
Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers
More informationCHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
More informationProduct Guide Specification
Reef Industries, Inc. 9209 Almeda Genoa Rd. Houston, Texas 77075 Toll Free (800) 231-6074 Phone (713) 507-4251 Fax (713) 507-4295 Web Site www.reefindustries.com E-Mail ri@reefindustries.com Product Guide
More information49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards
49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards THIS DOCUMENT CONTAINS ONLY THE SECTIONS NEEDED FOR THE API 1169 ICP EXAMS Subpart G General Construction
More informationCity of Lincoln, Nebraska STEVENS CREEK BASIN TRUNK SEWER TECHNICAL MEMORANDUM NO. 5 PIPE MATERIAL SELECTION TABLE OF CONTENTS
City of Lincoln, Nebraska STEVENS CREEK BASIN TRUNK SEWER TECHNICAL MEMORANDUM NO. 5 PIPE MATERIAL SELECTION TABLE OF CONTENTS Page No. 1.0 INTRODUCTION...2 2.0 PIPE MATERIAL CONSIDERATIONS...3 2.1 RCP...
More informationFlowtite Jacking Pipe
U.S. COMPOSITE PIPE SOUTH, LLC. MEMBER OF KTI PIPE GROUP OF COMPANIES Flowtite Jacking Pipe 18585 Samuels Rd. Zachary, La. 70791 PH. 225-658-6166 Fax 225-658-0947 www.flowtitepipe.com Flowtite GRP Pipe
More informationDIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
More informationCA-48 TECHNICAL SPECIFICATION
CA-48 TECHNICAL SPECIFICATION SafeLane surface overlay Pavement Substrate A Cargill Deicing Technology Product Providing customers with deicing solutions that save lives and enhance commerce. Helping to
More informationENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24, 2014 06610-1
ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING January 24, 2014 06610-1 SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS MOLDED GRATING PART 1 - GENERAL 1.1 SCOPE OF WORK A. The CONTRACTOR
More information