Tips and Tricks for Estimating Energy Savings. Celeste Cizik, P.E. Project Manager E M C Engineers, Inc.
|
|
- Emery Bryan
- 8 years ago
- Views:
Transcription
1 Tips and Tricks for Estimating Energy Savings Celeste Cizik, P.E. Project Manager E M C Engineers, Inc.
2 AIA Quality Assurance Learning Objectives 1. Understand the pros and cons of various energy calculation approaches. 2. Learn how to use trend data and utility bills to match calculations with actual operation. 3. Learn the issues, errors, and limitations associated with spreadsheet calculations. 4. Get tips on estimating savings for common RCx measures.
3 Getting Started with Analysis Overview of steps so far: Utility Analysis Field Survey and Data Collection Data Trending and Analysis Identification of Measures Analyze Energy and Cost Savings
4 Getting Started with Analysis Defining the scope - Match the effort and detail with project requirements Expense of implementation, economic evaluation Potential rebates and program requirements Performance guarantees Client expectations
5 Getting Started with Analysis Putting savings in perspective Project potential savings base on total utility bill Energy Conservation Measure potential savings base on total equipment energy use Spending $1,000 in consulting fees to save $100 in energy costs
6 Getting Started with Analysis
7 Degree Day Calculations Simplified form of historical weather data Heating Degree Days (HDD), Cooling Degree Days (CDD) How much (in degrees), and for how long (in days), the outside temperature was below (or above) the base temperature. Base temp - 65F typical, varies with building properties and internal loads (building balance point ) Source for degree day data:
8 Applications Degree Day Calculations Monitoring and targeting energy consumption Rough calculation for energy savings Efficiency improvements Changes in heat transfer (envelope properties) Temperature setpoint adjustments Not applicable for most EBCx measures
9 Degree Day Calculations Weather normalization - Monitoring Like-for-like energy comparison different periods or places Is there really savings? Average degree days: 2,027 Year Total energy consumption (kwh/yr.) Total heating degree days/yr kwh per degree day Normalized kwh/yr (Avg Deg Days) ,441 2, , ,312 1, ,660 % Difference: 6% % Difference: -1%
10 Weekly or monthly energy data from past 1-2 yrs, corresponding degree days Linear regression of energy consumption New set of degree days, what is the expected energy use? Degree Day Calculations Weather normalization - Targeting
11 Advantages Degree Day Calculations Easy to get, easy to work with basic equations Good for normalization Disadvantages Approximate calculations Base temperature varies - internal gains, setpoints Assumes 24/7 operation, only heating or cooling at any given time, no detailed control Not good basis for most EBCx energy savings measures
12 Overview Disaggregation and Percent Savings Annual utility data Allocate energy use and demand Power measurements, trend data or estimates and hours of operation Commercial Buildings Energy Consumption Survey (CBECS): emeu/cbecs/
13 Disaggregation and Percent Savings Benchmarking overall energy use Benchmark performance with EnergyStar (or other source), check against CBECS categories
14 Disaggregation and Percent Savings Energy Disaggregation Measured or estimated equipment demand (kw, btuh) and operating hours per year Check against CBECS
15 Disaggregation and Percent Savings Estimate % savings for equipment overall energy savings % of Total Demand Cost % of Total Annual Energy Cost % kwh Equipment Demand Pk kw ($/month) Energy Total kwh ($/yr) Savings Savings $ Savings Fans 22% 30 $ % 179,400 $ 6,346 35% 62,790 $ 4,165 Mech Cooling 30% 41 $ % 143,520 $ 5,076 25% 35,880 $ 3,162 Heating 0% - $ - 0% - $ - 0% 0 $ - Lighting 22% 30 $ % 233,220 $ 8,249 15% 34,983 $ 2,070 Kitchen 0% - $ - 0% - $ - 0% 0 $ - Pumps 10% 14 $ % 89,700 $ 3,173 15% 13,455 $ 855 Plug Loads 10% 14 $ % 161,460 $ 5,711 5% 8,073 $ 412 Misc 6% 8 $ % 89,700 $ 3,173 5% 4,485 $ % 138 $ 2, % 897,000 $ 31, ,666 $ 10,898 % Savings: 18% 19%
16 Disaggregation and Percent Savings Estimate % savings by measure Example - Chilled Water Plant Run Time Reduction, Hawaii State Capitol Building
17 Disaggregation and Percent Savings Chilled Water Plant Run Time Reduction Equip. Chilled water plant run time baseline: 6,300 hrs Proposed: 2,860 hrs % Hours Reduction: 55% Electric - Demand Savings Allocated Demand (kw) Estimated % Demand Savings Demand Savings (kw) Electric - Energy Savings Allocated Energy Use (kwh/ yr) Estimated % Energy Savings Energy Savings: 418,885 kwh/yr Honolulu Electricity Cost: $ $/kwh Energy Cost Savings: $ 98,019 $/Yr Elec Energy Savings (kwh/yr) Measure #1- Reduce Chilled Water Plant Run Time Chillers 250 0% ,413 35% 328,445 CHW Pumps % ,438 55% 90, ,102,851 38% 418,885
18 Disaggregation and Percent Savings Fast Savings Estimates: Energy Management Handbook, Turner and Doty Chilled water/condenser water temperature reset: 1-1.5% chiller energy (kw/ton) reduction per degree the chilled water temperature is raised or condenser water temperature is lowered Night setback: 1% savings per degree of setback, if kept there for at least 8 hours. Occupied setpoint adjustment: 2% savings per degree of setback for continuous operation Heating Water System Lockout: 30% gas savings compared with boilers idling all summer
19 Disaggregation and Percent Savings Advantages Good starting point for savings in general Gets within range of savings with limited effort Utility bill basis keeps estimates in check Works for projects/measures with: Limited savings justification requirements Low cost implementation, fast payback Phased approach rough estimate then detail
20 Disaggregation and Percent Savings Disadvantages Rough estimates No detail on specific equipment operation or measure interaction Often not acceptable for utility EBCx rebate programs Takes experience to appropriately disaggregate energy and assign appropriate savings
21 Dry Bulb Bin (F) Weather Bin Calculations Common approach for EBCx analysis Detailed equipment control can be analyzed Not extensive effort Column by column calculations for equipment load at each temperature bin Hours in each bin used to get energy use and savings (Bin hour source: Bin Inputs System Temps and Airflow OSA Damper Control Energy Totals Cooling Perimeter Perimeter Perimeter (1) Total Average Core Total Total Zone Core Zone Zone Total Core Zone Zone Fixed Mixed Outside Outside Sensible Bin Zone Zone Load 1 Load 1 Airflow Airflow Airflow Supply Air Supply Air Mixed Air Temp Airflow Airflow Load Cooling Hours Temp (F) (Btuh) (Btuh) (CFM) (CFM) (CFM) Temp (F) Temp (F) Temp (F) Used (F) (CFM) (%) (Btuh) kw (56,512) (28,256) 4,500 2,250 6, % (100,940) (53,845) (26,923) 4,500 2,250 6, % (95,742) (51,179) (25,589) 4,500 2,250 6, % (90,544) (48,512) (24,256) 4,500 2,250 6, % (85,346) (45,845) (22,923) 4,500 2,250 6, % (80,148) (43,179) (21,589) 4,500 2,250 6, % (74,950) (40,512) (20,256) 4,500 2,250 6, % (69,753) (37,845) (18,923) 4,500 2,250 6, % (64,555) (35,179) (17,589) 4,500 2,250 6, % (59,357) (32,512) (16,256) 4,500 2,250 6, % (54,159) (29,845) (14,923) 4,500 2,250 6, % (48,961) Heating Total Load (Btuh)
22 Weather Bin Calculations Trend data regression Correlate parameter with outside air temperature Fan, pump, chiller power System temperatures air/water supply and return, mixed air Use correlation equations in bin calculations Y=mX+B Parameter =slope*(oat)+y-intercept R 2 = 1: Perfect Correlation Beware of using relationships that don t correlate
23 Weather Bin Calculations Documented correlations Fan/pump power vs. % flow (not just fan/pump laws) ASHRAE 90.1 curves DOE-2 curves Manufacturer s Data Use correlations for measures affecting motor variation and power Adjust min or operating % flow Correct VFD operation Adjust/reset static pressure setpoint Reduce loads Fan Curve Constants - ASHRAE Standard User's Manual A B C Min Turndown AFor BI Inlet Guide Vanes ( ) % AF or BI riding curve ( ) 45% Constant Volume % FC riding curve % FC Inlet Guide Vanes ( ) % Variable Speed Drive ( ) % Vane Axial Variable Pitch Blades ( ) % % Fan Power = A + B *%CFM + C *%CFM^2
24 Weather Bin Calculations Documented correlations Boiler and chiller efficiency vs. % load or operating temperatures Varies with chiller type DOE-2 curves Manufacturer s data (hard to get) Measures affecting efficiency or part load Chilled water/condenser water setpoint adjust/reset, load reductions DOE-2 Performance Curves - Centrifugal Chiller Constant CHWT CHWT^2 CWT CWT^2 CHWT*CWT a b c d e f Capacity Correction CAPCOR1_* Performance Correction (Temp) PERCOR1_T_* PLR - % of total load Constant PLR PLR^2 T T^2 PLR* T T - delta between CHWT and CWT , Performance Correction (PLR) PERCOR1_P_* Capacity/Temp Performance Correction (%) = a + b*chwt + c*chwt 2 + d*cwt + e*cwt 2 + f*chwt*cwt Part Load (PLR) Performance Correction (%) = a + b*plr + c*plr 2 + d* T + e* T 2 + f*plr* T
25 Weather Bin Calculations EXAMPLE Optimize Economizer Operation 53,000 sq.ft. office building in Denver Occupied 3,380 hours/yr. (7am-8pm M-F) Outside damper control broken - fixed at 10% of 43,000 CFM (constant volume) Chiller operating year round
26 Weather Bin Calculations Optimize Economizer Operation Baseline All cooling from chiller, no outside air free cooling Outside air measures good for weather bin calcs Bin Temps and System Calculations General Inputs Baseline Load Calculations Baseline Calculations Dry Bulb Bin OSA % Min, No Airflow Mon. OSA Fraction Used MAT With OSA %Used Supply Air Temp Actual Unit Heat/Cool Load Unit Heating Load Unit Cooling Load Zone Air Flow Supply Air Cooling Temp Air Flow Fraction Setpoint Input (F) (F) (cfm) (%) (F) (%) (%) (F) (F) (Btuh) (Btuh) (Btuh) (kw) , % 55 10% 10% (545,630) - (545,630) , % 55 10% 10% (553,261) - (553,261) , % 55 10% 10% (560,892) - (560,892) , % 55 10% 10% (568,524) - (568,524) , % 55 10% 10% (576,155) - (576,155) , % 55 10% 10% (583,786) - (583,786) , % 55 10% 10% (591,417) - (591,417) , % 55 10% 10% (599,048) - (599,048) , % 55 10% 10% (606,680) - (606,680) , % 55 10% 10% (614,311) - (614,311) , % 55 10% 10% (621,942) - (621,942) , % 55 10% 10% (629,573) - (629,573) , % 55 10% 10% (637,204) - (637,204) , % 55 10% 10% (644,836) - (644,836) 37.62
27 Weather Bin Calculations Optimize Economizer Operation Proposed Reduced cooling - zone temp to supply air temp No mechanical cooling below supply air temperature Bin Temps and System Calculations General Inputs Proposed System Calculations Proposed Load Calculations Dry Bulb Bin OSA % Min No Airflow Mon. OSA Fraction Used MAT With OSA %Used Supply Air Temp Actual Unit Heat/Cool Load Unit Heating Load Unit Cooling Load Zone Air Flow Supply Air Cooling Temp Air Flow Fraction Setpoint Input (F) (F) (cfm) (%) (F) (%) (%) (F) (F) (Btuh) (Btuh) (Btuh) (kw) , % 55 10% 63% , % 55 10% 68% , % 55 10% 74% , % 55 10% 81% , % 55 10% 89% , % 55 10% 100% , % 55 10% 100% (76,312) - (76,312) , % 55 10% 100% (152,624) - (152,624) , % 55 10% 100% (228,936) - (228,936) , % 55 10% 100% (305,248) - (305,248) , % 55 10% 100% (381,560) - (381,560) , % 55 10% 100% (457,871) - (457,871) , % 55 10% 100% (534,183) - (534,183) , % 55 10% 10% (644,836) - (644,836) 37.62
28 Weather Bin Calculations Optimize Economizer Operation - Results Savings of 69,604 kwh/yr; 61% reduction in cooling energy Cost savings of $2,840/yr. (cooling energy and winter demand) Considerations for economizer measure: o Match mixed air temperature setpoint with supply air temperature setpoint o Possible humidity concerns above 55F OAT
29 Checks and errors Weather Bin Calculations Use utility data and disaggregation to check savings Consider measure interaction stack proposed changes and/or use factors Beware ERRORS Most spreadsheets have errors check carefully Organized, labeled inputs and equations, named cells no hard coded values in equations Calculation templates Legend Input ECM Parameter Pasted Value Calculated/Output Dry Bulb Wet Bulb Temp Temp Equations Used: Eq 1a Eq 1b Eq 1c Eq 1d Eq 1e Eq 1f Eq 1g Load Model Internal Cooling Load Envelope Cooling Load Cooling System Flag Cooling Load Fraction Load Delta-T (2-way Valves) Day of Ambient Cooling RH Week Enthalpy Load F F % Btu/lbm tons tons ON=1 tons % % 2.5
30 Weather Bin Calculations Advantages System level detailed calculations with operating parameters General accuracy around 20%, improves with higher outside air correlation Flexible, usable for most EBCx measures Accepted by utility EBCx rebate programs Manageable effort less time than hourly spreadsheet or energy model
31 Weather Bin Calculations Disadvantages Loads and energy have to vary with outside air dry bulb temperature only Assumes constant internal gains multiple bin models may be needed Humidity/solar loads can t vary independently not good for mild humid climates or solar driven loads Load response not well captured No exact time of day peaks
32 8,760 Hourly Models Spreadsheet hourly models - Advantages Similar to bin model, all hours of the year Multiple schedules possible internal loads, equipment operation, setpoints, etc. Humidity, solar loads can be included better for mild humid climates Actual time of day peaks
33 8,760 Hourly Models Spreadsheet hourly models - Disadvantages Time consuming to create more inputs and calculations Difficult to verify calculations with 8,760 lines more errors, need charts to check MODEL - System Temperatures, Power, and Load Temperature (deg F) Power (kw) and Load (Tons) Date/Time Dry Bulb Temp Chilled Water Supply Temp Chilled Water Return Temp Condenser Water Supply Temp RH Total Chiller Load All Chillers Power Evaporator Pumps Power Cooling Tower Fans Power Condenser Pumps Power
34 8,760 Hourly Models Full Building Energy Model (DOE-2/EQuest, Energy Plus, etc.) Advantages Detailed and accurate load modeling Allows measure interaction Can be used for ongoing Cx expected operating correlations (kwh relative to cooling degree days) Weekly Building kwh Versus Cooling Degree-Days Museum of Space History, Alamogordo, NM Weekly Building kwh Deviant Operation Cooling Degree Days Projected Normal Operation
35 8,760 Hourly Models Full Building Energy Model - Disadvantages Detailed building envelope and equipment inputs not analysis of one system Difficult to calibrate to utility bills Not as flexible designed for systems that work Most time consuming option, beyond typical EBCx Museum of Natural History, Albuquerque, NM
36 Summary Statements Key Tips Select appropriate calculation approach match the effort with requirements Use utility bills and disaggregation for benchmarking and savings estimates/limits Incorporate operating characteristics and correlations Stay careful and organized, beware of ERRORS Be creative and continue to save energy and reduce operating costs!
37 AIA Quality Assurance Portland Energy Conservation, Inc is a registered provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-aia members are available on request. This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
38 Thank You! Celeste Cizik, P.E
IDEA Presentation SMALL CAMPUS CHILLED WATER PLANT OPTIMIZATION.
IDEA Presentation SMALL CAMPUS CHILLED WATER PLANT OPTIMIZATION. Pre-Project Details Hawaiian Community College Campus consisting of 16 individual buildings totaling 308,000 sq.ft of conditioned space.
More informationConsiderations for Building Controls
Considerations for Building Controls Does Nighttime Setback really save energy? Natalia Camblor, CEM Project Engineer Sustainable Engineering Group LLC AIA Quality Assurance Learning Objectives 1. Recognize
More informationChilled Water System Commissioning: Variable Primary Flow. John D. Villani, P.E. Associate Grumman/Butkus Associates
Chilled Water System Commissioning: Variable Primary Flow John D. Villani, P.E. Associate Grumman/Butkus Associates AIA Quality Assurance Learning Objectives 1. History of chilled water system configurations
More informationBenefits of Water-Cooled Systems vs. Air-Cooled Systems for Air-Conditioning Applications
Benefits of Water-Cooled Systems vs. Air-Cooled Systems for Air-Conditioning Applications Kavita A. Vallabhaneni U. S. Government commitment to reduce greenhouse gas emissions can have a significant impact
More informationMaximize energy savings Increase life of cooling equipment More reliable for extreme cold weather conditions There are disadvantages
Objectives Increase awareness of the types of economizers currently used for data centers Provide designers/owners with an overview of the benefits and challenges associated with each type Outline some
More informationREAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS Ken L. Hansen P.E. University of Nebraska Medical Center hansenkl@unmc.edu 402-559- 5301 402-630-
More informationCURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers
CURBING THE COST OF DATA CENTER COOLING Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers OVERVIEW Compare Cooling Strategies in Free- Standing and In-Building
More informationDigital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is
More information85 F 80 F 50% 75 F 70 F 73.0/61.8 45 F 10% Figure 1
Feb. 07 INTRODUCTION: Wrap around heat pipes are air-to-air heat exchangers that are installed in the airstream upstream and downstream of a cooling coil to deliberately reduce the Sensible Heat Ratio
More informationRole of Economizers in Dedicated Outdoor Air Systems
Introduction: Role of Economizers in Dedicated Outdoor Air Systems A question that frequently arises when a dedicated outdoor air system (DOAS) (Mumma, 2001) is discussed, particularly when the parallel
More informationSTULZ Water-Side Economizer Solutions
STULZ Water-Side Economizer Solutions with STULZ Dynamic Economizer Cooling Optimized Cap-Ex and Minimized Op-Ex STULZ Data Center Design Guide Authors: Jason Derrick PE, David Joy Date: June 11, 2014
More informationOptimizing Design & Control Of Chilled Water Plants Part 5: Optimized Control Sequences
This article was published in ASHRAE Journal, June 212. Copyright 212 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission
More informationCOMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN
COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN Umesh Atre Innovative Design Inc 850 W Morgan St Raleigh, NC 27603 umesh@innovativedesign.net
More informationBenefits. Air-Cooled Systems
Benefits of Water-Cooled Systems vs Air-Cooled Systems for Air-Conditioning Applications Written by: Michael D.Pugh U.S. Government commitment to reduce greenhouse gas emissions can have a significant
More informationHines Property Management, NYC
Energy Science Division Hines Property Management, NYC Energy Performance Report Summary Results PermaFrost NMR Performance Report Hines - Data Center Chiller January, 2012 This Hines Property Management
More informationFree Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions
Free Cooling in Data Centers John Speck, RCDD, DCDC JFC Solutions Why this topic Many data center projects or retrofits do not have a comprehensive analyses of systems power consumption completed in the
More informationAgenda. Part I: Introduction to OptimumHVAC. Part II: Initial Energy Savings Analysis for MCO Main Terminal. Part III: Case Studies & Conclusion
OptimumHVAC Prepared for the: GOAA Energy Conservation & Environmental Initiatives Forum April 27, 2010 Jamie Wiecks Enterprise Account Manager Optimum Energy Mike Dillard Vice President, Business Development
More informationHVAC Systems: Overview
HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct
More informationOptimization of Water - Cooled Chiller Cooling Tower Combinations
Optimization of Water - Cooled Chiller Cooling Tower Combinations by: James W. Furlong & Frank T. Morrison Baltimore Aircoil Company The warm water leaving the chilled water coils is pumped to the evaporator
More informationAPPLICATION GUIDE. Comparison of Latent Cooling Performance of Various HVAC systems in a Classroom Application
APPLICATION GUIDE Comparison of Latent Cooling Performance of Various HVAC systems in a Classroom Application Section Comparison of Latent Cooling Performance of Introduction Most commercial HVAC systems
More informationMeeting the Challenge of Persistence Energy Efficiency in Rooftop Units
Meeting the Challenge of Persistence Energy Efficiency in Rooftop Units Reid Hart, PE Associate Director PECI Karen des Sr. Program Manager PECI AIA Quality Assurance Learning Objectives 1. Identify the
More informationWet Bulb Temperature and Its Impact on Building Performance
Wet Bulb Temperature and Its Impact on Building Performance By: Kurmit Rockwell, PE, CEM, LEED AP and Justin Lee, PE, LEED, AP BD+C Energy Solution Services, AtSite, Inc. 1 What is Wet Bulb Temperature?
More informationAir Side Economizers and Energy Recovery - Improvements and New Regulations. Richard Lord 09-20-2012
Air Side Economizers and Energy Recovery - Improvements and New Regulations Richard Lord 09-20-2012 Introduction For commercial buildings the use of outside air for cooling and ventilation is an important
More informationTim Facius Baltimore Aircoil
Presented By: Tim Facius Baltimore Aircoil Slide No.: 1 CTI Mission Statement To advocate and promote the use of environmentally responsible Evaporative Heat Transfer Systems (EHTS) for the benefit of
More informationCommercial & Municipal Retrofit 2015 VFD Rebate
2015 VFD Rebate Section A: MEMBER INFORMATION Member Name Electric Account Number Rate Number Facility Address City State Zip Code Service Location Identification Email Mailing Address (if different from
More informationImpacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions
Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions M. Liu, Y. Zhu, D. E. Claridge Energy Systems Laboratory Texas A&M University Ed. White Energy Management Operation
More informationPreliminary Final Proposal
1 Butler Memorial Hospital New Inpatient Tower Senior Capstone Project Mechanical Option Preliminary Final Proposal Mechanical System Re-design and Breadth Topics Butler Memorial Hospital New Inpatient
More informationAIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the
More informationL ABORATORIES FOR THE 21ST C ENTURY: ENERGY ANALYSIS. U.S. Department of Energy Energy Efficiency and Renewable Energy
L ABORATORIES FOR THE 21ST C ENTURY: ENERGY ANALYSIS U.S. Department of Energy Energy Efficiency and Renewable Energy st Laboratories for the 21 Century: Energy Analysis Prepared for st Laboratories for
More informationSTANDARD COMMISSIONING PROCEDURE FOR PACKAGED HEAT PUMP (AIR-TO-AIR) & AIR CONDITIONING UNITS
STANDARD COMMISSIONING PROCEDURE FOR PACKAGED HEAT PUMP (AIR-TO-AIR) & AIR CONDITIONING UNITS BUILDING NAME: APPLICATION #: BUILDING ADDRESS: NAME & FIRM OF PERSON(S) DOING TEST: DATE(S) OF TEST: General
More informationHow to Build a Data Centre Cooling Budget. Ian Cathcart
How to Build a Data Centre Cooling Budget Ian Cathcart Chatsworth Products Topics We ll Cover Availability objectives Space and Load planning Equipment and design options Using CFD to evaluate options
More informationData Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling
Data Center Design Guide featuring Water-Side Economizer Solutions with Dynamic Economizer Cooling Presenter: Jason Koo, P.Eng Sr. Field Applications Engineer STULZ Air Technology Systems jkoo@stulz ats.com
More informationULTRA-EFFICIENT HVAC DESIGN AND CONTROL
CASE STUDY ULTRA-EFFICIENT HVAC DESIGN AND CONTROL MAJOR HEATING, VENTILATING AND AIR- CONDITIONING REPLACEMENT AT THE COUNTY OF SAN DIEGO CRIME LAB December 30, 2005 8520 Tech Way, Suite 110 San Diego,
More informationContinuous Energy Management at UC San Diego. Anna Levitt, P.E. Assistant Energy Manager June 13, 2013
Continuous Energy Management at UC San Diego Anna Levitt, P.E. Assistant Energy Manager June 13, 2013 UC San Diego: A 42 megawatt Microgrid With a daily population of over 45,000, UC San Diego is the size
More informationChapter 3.4: HVAC & Refrigeration System
Chapter 3.4: HVAC & Refrigeration System Part I: Objective type questions and answers 1. One ton of refrigeration (TR) is equal to. a) Kcal/h b) 3.51 kw c) 120oo BTU/h d) all 2. The driving force for refrigeration
More informationAdvanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings
Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager
More informationOutline. CC objectives Site and building description Typical data floor overview CC measures Results Lessons learned
Outline CC objectives Site and building description ypical data floor overview CC measures Results Lessons learned 2 CC Objectives Identify and solve existing operating problems Improve building thermal
More informationNational Grid Your Partner in Energy Solutions
National Grid Your Partner in Energy Solutions National Grid Webinar: Enhancing Reliability, Capacity and Capital Expenditure through Data Center Efficiency April 8, 2014 Presented by: Fran Boucher National
More informationPharmaceutical central utility plants
Reprinted from PHARMACEUTICAL ENGINEERING The Official Magazine of ISPE May/June 2011, Vol. 31 No. 3 www.ispe.org Copyright ISPE 2011 This article presents annual energy savings of more than $600,000 per
More informationBelow are detailed instructions for using the EMS load calculator.
Introduction The EMS load calculator is designed to make load calculating as painless as possible. For sizing the equipment, only the first three tabs (Steps 1, 2 & 3) need to be completed. This process
More informationPresentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks
Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same
More informationNew Jersey BPU Energy Audits CHA #19860 Building: Kingwood Township School
New Jersey BPU Energy Audits CHA #19860 Building: Kingwood Township School ECM10 Install Demand Controlled Ventilation Demand Control Ventilation Multipliers Material: 0.98 Labor: 1.21 Equipment: 1.07
More informationHIGH PERFORMANCE CHILLED WATER SYSTEMS. EarthWise HVAC. EarthWise HVAC High Performance CHW Plants
HIGH PERFORMANCE CHILLED WATER SYSTEMS EarthWise HVAC Simon Ho e: Simon.Ho@irco.com 2012 EarthWise HVAC High Performance CHW Plants Low Flow Low Temperature Systems Variable Flow Systems Variable CHW Variable
More informationCompany name Date submitted. Building address City State ZIP. E-mail* Building Sq. Ft.
Recommissioning Application Business Customer Information Company name Date submitted Building address City State ZIP Mailing address (if different) City State ZIP Contact person (print) Phone Fax E-mail*
More informationCommissioning - Construction Documents (Page 1 of 6)
Commissioning - Construction Documents (Page 1 of 6) A. General Information Climate Zone: Building Type: Conditioned Area (sf): Reviewer's Name: Reviewer's Agency: Note: Design Review for each system/subsystem
More informationCHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS
CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS By: Michael J. Bitondo, Mark J. Tozzi Carrier Corporation Syracuse, New York August 1999 INTRODUCTION In December of 1998, the American Refrigeration Institute
More informationM&V of Hot Water Boiler Plant. Boban Ratkovich, P. Eng, CEM, BESA, LEED AP President CES Engineering Ltd
M&V of Hot Water Boiler Plant Boban Ratkovich, P. Eng, CEM, BESA, LEED AP President CES Engineering Ltd AIA Quality Assurance Learning Objectives 1. Case study examples of procedures and obstacles in measuring
More informationSmart School Symposium Heating Ventilation and Air Conditioning Session HVAC Products. Richard Lord
Smart School Symposium Heating Ventilation and Air Conditioning Session HVAC Products Richard Lord Overview and Agenda My goal today is to give you quick an overview of the current status of HVAC products
More informationHOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY
HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY Benson Kwong, CVS, PE, CEM, LEED AP, CCE envergie consulting, LLC Biography Benson Kwong is an independent consultant providing
More informationHVAC Efficiency Definitions
HVAC Efficiency Definitions Term page EER - 2 SEER - 3 COP - 4 HSPF - 5 IPLV - 6 John Mix May 2006 Carrier Corporation 1 Energy Efficiency Ratio (EER) The energy efficiency ratio is used to evaluate the
More informationMultifamily Central Heat Pump Water Heating
Multifamily Central Heat Pump Water Heating Elizabeth Weitzel Davis Energy Group Alliance for Residential Building Innovation (ARBI) January, 2015 The work presented in this presentation does not represent
More informationENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM
ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM J.S. Hu, Philip C.W. Kwong, and Christopher Y.H. Chao Department of Mechanical Engineering, The Hong Kong University of Science and Technology Clear Water Bay,
More informationData Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures
Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle
More informationHeating, Ventilation & Air Conditioning Equipment
FinAnswer Express Utah Incentive Catalog Effective as of May 19, 2012 Heating, Ventilation & Air Conditioning Equipment Rocky Mountain Power provides incentives for many types of energy-efficient technologies.
More informationHVAC Simplified Approach Option
HVAC Simplified Approach Option Part I Project Address: City: HVAC System Designer of Record: Date: Zip: Qualification The building is 2 stories or less in height and has a gross floor area is less than
More informationFLORIDA SOLAR ENERGY CENTER
FLORIDA SOLAR ENERGY CENTER Creating Energy Independence Since 1975 Impact of Energy-Efficiency Parameters on Home Humidity Rob Vieira Florida Solar Energy Center A Research Institute of the University
More information9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS
9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS 9.1 Introduction Air conditioning and refrigeration consume significant amount of energy in buildings and in process industries. The energy consumed in
More informationHeating & Cooling Efficiency
Heating & Cooling Efficiency Advantages of Geothermal HVAC Efficiency Keith Swilley Gulf Power Company Why Gulf Power Promotes Energy Efficiency? Customer Satisfaction Education Help Customers Make Smart
More informationArizona State University. Understanding the Impact of Urban Heat Island in Phoenix
Understanding the Impact of Urban Heat Island in Phoenix ( ) Summer Night-time 'min-low' temperatures and its impact on the energy consumption of various building typologies Presented By: Sandeep Doddaballapur
More informationExample Retrocommissioning Measure: Opening Throttled Discharge Valves
Opening Throttled Discharge Valves This 21-story building, constructed in 1997, is located in Oregon and contains 589,000 gross square feet of mostly office occupancy. The HVAC system includes six large
More informationPresented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE <walterjohnston@bellsouth.net
Presented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE
More informationCommissioning and Maintenance: Two Sides of the Same Coin? Kristin Heinemeier, PE, PhD Principal Engineer UC Davis WCEC
Commissioning and Maintenance: Two Sides of the Same Coin? Kristin Heinemeier, PE, PhD Principal Engineer UC Davis WCEC AIA Quality Assurance The Building Commissioning Association is a Registered Provider
More informationEnclosed Football Stadium Design History and Lessons Learned
Enclosed Football Stadium Design History and Lessons Learned Robert L. Towell, P.E., LEED AP, QCxP btowell@cxegroup.com CxE Group LLC St. Louis, Missouri 314-436-6543 With thanks to the St. Louis Convention
More informationBy Tom Brooke PE, CEM
Air conditioning applications can be broadly categorized as either standard or critical. The former, often called comfort cooling, traditionally just controlled to maintain a zone setpoint dry bulb temperature
More informationOPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa
OPTIMIZING CONDENSER WATER FLOW RATES W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa T.A. Brown, P.E. Thermal Energy Corporation Houston, Texas ABSTRACT Most chillers are designed for a
More informationSPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP
research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design
More informationFlorida Power & Light Company. Business Heating Ventilation & Air Conditioning ( HVAC ) Program Standards. Effective: November 9, 2015
Florida Power & Light Company Business Heating Ventilation & Air Conditioning ( HVAC ) Program Standards Effective: November 9, 2015 Table of Contents Eligibility Requirements - Chiller... 2 Rebate Amount
More informationAnalysis of data centre cooling energy efficiency
Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe
More informationCRITICAL COOLING FOR DATA CENTERS
IDEA 100 th Annual Conference & Trade Show CRITICAL COOLING FOR DATA CENTERS Presented by Ron Johanning, PE, LEED AP Mission Critical Market Leader Agenda EPA Report Data Center Energy Trends IT Best Practice
More informationKU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM
KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...
More informationThe sample report format is applicable to many different building types and systems and the examples provided cover a variety of applications.
Purpose Power Smart s Minimum Requirements for an Energy Study (see Appendix) provides a comprehensive list of the basic elements which must be included in an Energy Study Report. The intent of this sample
More informationData Center Infrastructure Management (DCIM) Utility Energy Efficiency Opportunities Discussion & Demos July 2, 2013
Data Center Infrastructure Management (DCIM) Utility Energy Efficiency Opportunities Discussion & Demos July 2, 2013 Ted Brown Sr. Energy Management Analyst Data Center / IT Energy Efficiency ted.brown@seattle.gov
More informationUNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationEconomic Evaluation of Residential Air Conditioner Designs for Hot and Dry Climates
Economic Evaluation of Residential Air Conditioner Designs for Hot and Dry Climates Arthur Rosenfeld, California Energy Commission Gregory Rosenquist, Lawrence Berkeley National Laboratory C. Keith Rice,
More informationEnergy Efficient Grain Drying. Kenneth Hellevang, Ph.D., P.E. Professor & Extension Engineer
Energy Efficient Grain Drying Kenneth Hellevang, Ph.D., P.E. Professor & Extension Engineer Estimated Corn Field Drying PET=Potential Evapotranspiration EMC (%) PET (in) Est. Drying (%pt) Month Week Sep
More informationDefining Quality. Building Comfort. Precision. Air Conditioning
Defining Quality. Building Comfort. Precision Air Conditioning Today s technology rooms require precise, stable environments in order for sensitive electronics to operate optimally. Standard comfort air
More informationDATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER
DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER DATA CENTERS 2009 IT Emissions = Aviation Industry Emissions Nations Largest Commercial Consumers of Electric Power Greenpeace estimates
More informationDenver International Airport Total Facility Optimization. Josh Foerschler Aurom Mahobian
Denver International Airport Total Facility Optimization Josh Foerschler Aurom Mahobian AGENDA DIA Intro BMcD-DIA History Optimization Projects Results Conclusion Denver International Airport Opened February
More informationXcel Business Customers: Program and Rebate Summary
Xcel Business Customers: Program and Rebate Summary Rebates for New Energy-Efficient Equipment Xcel offers prescriptive rebates to its business customers. What s a prescriptive rebate? It simply means
More informationWalnut Drying Design and Operation. Selecting Dryer Type. Tray Drying Before 1920. Don Osias Jim Thompson
Walnut Drying Design and Operation Don Osias Jim Thompson Selecting Dryer Type Tray Drying Before 1920 1 Stack Dryer Energy efficient High capital cost Pothole For small lots High labor cost Hopper-bottom
More informationSelecting the Supply Air Conditions for a Dedicated Outdoor Air System Working in Parallel with Distributed Sensible Cooling Terminal Equipment
AT-01-7-3 Selecting the Supply Air Conditions for a Dedicated Outdoor Air System Working in Parallel with Distributed Sensible Cooling Terminal Equipment Kurt M. Shank Student Member ASHRAE Stanley A.
More informationHVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems
HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems Fundamental Principles of Environmentally Responsible, Energy Efficient Buildings 1. Energy efficiency is
More informationHeating, Ventilation and Air Conditioning Rebate Catalog Saving energy for a brighter future
Pacific Gas and Electric Company Energy-Efficiency s for Your Business Heating, Ventilation and Air Conditioning Catalog Saving energy for a brighter future Customers may be eligible to participate in
More informationCatalyst RTU Controller Study Report
Catalyst RTU Controller Study Report Sacramento Municipal Utility District December 15, 2014 Prepared by: Daniel J. Chapmand, ADM and Bruce Baccei, SMUD Project # ET13SMUD1037 The information in this report
More informationCase Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia
Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program
More informationCreating Efficient HVAC Systems
Creating Efficient HVAC Systems Heating and Cooling Fundamentals for Commercial Buildings Heating, ventilating, and air conditioning (HVAC) systems account for nearly half of the energy used in a typical
More informationCONDENSER AIR PRE-COOLER RETROFITS FOR ROOFTOP UNITS
PROJECT REPORT CONDENSER AIR PRE-COOLER RETROFITS FOR ROOFTOP UNITS Contrails Dining Facility Beale Air Force Base Marysville, California May 13, 213 WESTERN COOLING EFFICIENCY CENTER PREPARED FOR: Karl
More informationEnergy Efficiency in New and Existing Data Centers-Where the Opportunities May Lie
Energy Efficiency in New and Existing Data Centers-Where the Opportunities May Lie Mukesh Khattar, Energy Director, Oracle National Energy Efficiency Technology Summit, Sep. 26, 2012, Portland, OR Agenda
More informationThe New Data Center Cooling Paradigm The Tiered Approach
Product Footprint - Heat Density Trends The New Data Center Cooling Paradigm The Tiered Approach Lennart Ståhl Amdahl, Cisco, Compaq, Cray, Dell, EMC, HP, IBM, Intel, Lucent, Motorola, Nokia, Nortel, Sun,
More informationFACILITY A BUILDING 3
LAWRENCE BERKELEY NATIONAL LABORATORY HIGH TECH BUILDINGS PROGRAM CLEANROOM BENCHMARKING PROJECT SITE REPORT FACILITY A BUILDING 3 FREMONT, CA SPONSORED BY: PACIFIC GAS AND ELECTRIC COMPANY MARKET TRANSFORMATION
More informationHow To Design A Building In New Delhi
ENERGY EFFICIENT HVAC DESIGN FOR COMPOSITE CLIMATE Overview of Design Conditions: Air conditioning system consumes most of the energy that a building needs in its operation. In order to reduce energy consumption
More informationENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE
ENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE Overview of Design Conditions: Air conditioning system consumes most of the energy that a building needs in its operation. In order to reduce
More informationData Center. Ultra-Efficient chilled water system optimization. White paper. File No: 9.236 Date: december 03, 2015 Supersedes: new Date: new
Data Center Ultra-Efficient chilled water system optimization White paper File No: 9.236 Date: december 03, 2015 Supersedes: new Date: new Data Center - Ultra-Efficient white paper 3 abstract The primary
More informationWhite Paper #10. Energy Efficiency in Computer Data Centers
s.doty 06-2015 White Paper #10 Energy Efficiency in Computer Data Centers Computer Data Centers use a lot of electricity in a small space, commonly ten times or more energy per SF compared to a regular
More informationData Centers WHAT S ONTHEHORIZON FOR NR HVAC IN TITLE 24 2013? SLIDE 1
WHAT S ONTHEHORIZON FOR NR HVAC IN TITLE 24 2013? SLIDE 1 Data Center CASE Scope Existing Title 24 2008 Scope Current scope ( 100 T24-2008) exempts process space from many of the requirements, however
More informationENHANCED LABORATORY HVAC SYSTEM
ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of
More informationDEEMED SAVINGS TECHNICAL ASSUMPTIONS
Product: - Direct-Evaporative Pre-cooling for Air-Cooled Condensers (DEPACC) Prescriptive rebates will be offered for Direct Evaporative Pre-cooling Technology for Air Cooled Condensers (DEPACC) for Rooftop
More informationImpacts of Refrigerant Charge on Air Conditioner and Heat Pump Performance
Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2010 Impacts of Refrigerant Charge on Air Conditioner and Heat Pump Performance
More informationSOLEL SUNCOOLER SOLAR-POWERED AIR-CONDITIONING / HEATING SYSTEM
SOLEL SUNCOOLER SOLAR-POWERED AIR-CONDITIONING / HEATING SYSTEM organization / project coordinator (address, telephone, email) Solel Solar Systems Ltd./ Mr. Avi Brenmiller 3, Hac'shara St, Industrial Zone
More informationfor Plans Examiners and Building Inspectors
Building Technologies Program HVAC Controls Guide for Plans Examiners and Building Inspectors September 2011 Authors: Eric Makela, PNNL James Russell, PECI Sarah Fujita, PECI Cindy Strecker, PECI Prepared