Outline. CC objectives Site and building description Typical data floor overview CC measures Results Lessons learned
|
|
|
- Marjorie Sharp
- 10 years ago
- Views:
Transcription
1
2 Outline CC objectives Site and building description ypical data floor overview CC measures Results Lessons learned 2
3 CC Objectives Identify and solve existing operating problems Improve building thermal comfort and indoor air quality Minimize building energy consumption Minimize building energy cost Provide knowledge-based and hands-on training to inhouse facility management staff All of the above without major ECM retrofits 3
4 Site Description Consists of 4 buildings and central plant ~2.54 million square feet of conditioned space Used 132 million kwh of electricity at a cost of $9.4 million in 2010 Site Electricity (kwh) Bldg #2 Electricity (kwh) ,230,491, 10% 27,762,955, 21% 2,281,741, 2% 7,455,829, 10% 9,399,798, 12% 11,939,581, 9% 77,079,962, 58% Central Plant Bldg 4 Bldg 1 Bldg 2 Bldg 3 HVAC load includes fans and pumps. Chiller electricity is included in the Central Plant total. 60,224,336, 78% PDU HVAC 4 Lighting & Plug
5 Building #2 Description Primarily a data center facility ~688,000 ft 2 Basement, concourse, and 14 above grade floors loors 2-7, 9, s (1,920 hp) Raised floor data center space ypical floor: (1) overhead unit serving terminal units and (7-9) underfloor units Underfloor supply fans retrofitted with VDs loors 8, s (130 hp) Administrative space ypical floor: (1) overhead unit serving terminal units 5
6 Data Center ypical HVAC Layout LAN/WAN ** Value from a previous study * 6000 * 14512** 6000 * ** * Design flowrate not measured flowrate ** Value from a previous study * Design flowrate not measured flowrate * in.wg * 1 6 ENCLOSED AREA in. wg DAA & ELEPHONE EQUIPMEN ROOMS X Air from overhead duct discharged under raised floor refer to table X xx.x discharging air into overhead duct Column mounted BAS temperature sensor 3-X discharging air directly under the raised floor x.xxx Under raised floor static pressure 3-8 serving ceiling mounted VAV boxes and PU IGURE LEVEL 3 AIR DISRIBUION, UNDER LOOR SAIC PRESSURES & SPACE EMPERAURES xx.x Overhead duct Ductwork connecting overhead duct with underfloor discharge VAV DDC controller space temperatue
7 Data loor Optimization Overview raditional Cx activities Calibrate HVAC sensors unctional testing Low cost retrofits Seal around equipment and cable openings Install curtain walls to improve containment CC measures Implement and verify optimized control sequences Monitor energy savings 7
8 CC Measures Data loors Implementation Phase 1 CC Measure Baseline Control Current Control Optimize underfloor air distribution Optimize CHW valve control (Underfloor units) Optimize static pressure setpoint control (Underfloor units) Less than optimal (1) tile selection (2) return air grille positioning CHW valve maintained fixed SA setpoint None; VDs commanded to 100%, back-up units offline Replaced perforated tiles and relocated return air grilles CHW valve modulates to maintain SA setpoint which is reset (55-64 ) based on return air temperature (75-82 ) Supply fan VDs modulate to maintain optimized under floor static pressure setpoint 8
9 Data Center loor HVAC Layout 62.3 LAN/WAN X ZONE 8 18,000 ZONE 7 29,062 ZONE 6 60,535 ZONE 5 30, in.wg in. wg ZONE 1 24,322 ZONE 2 43,389 ZONE 3 82,377 ZONE 4 22,688 DAA & ELEPHONE EQUIPMEN ROOMS ,275 UNDER RAISED LOOR AIR LOW AIR LOW ROM OVERHEAD DUC: 149,490 CM AIR LOW DIREC ROM : 167,594 CM OAL AIR LOW: 317,084 CM IGURE 3.2A - LEVEL 3 AIR DISRIBUION, UNDER LOOR SAIC PRESSURES & SPACE EMPERAURES 9
10 CC Measures Admin loors Implementation Phase 2 CC Measure Baseline Control Proposed Control Optimize static pressure setpoint control Optimize SA setpoint control ixed duct static pressure setpoint (measured 2/3 down the duct) ixed SA setpoint Duct static pressure setpoint reset based on terminal box demand (damper position) SA setpoint reset up when duct static setpoint is at minimum limit for specified time period 10
11 Results Electricity 225, Montly Daily Average ELEC Use (kwh/day) 200, , , ,000 Pre CC Baseline Implementation Phase 1 Post CC PDU Load (kwh/day) Whole Building (kwh/day) Outside emperature (Deg) Monthly Average Dry-bulb emperature ( ) Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 eb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 eb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 11
12 Results Chilled Water Montly Daily Average SCHWP ELEC Use (kwh/day) 2,500 2,000 1,500 1, Sensors calibrated Pre CC Baseline Implementation Phase 1 Unreliable trend data SCHWP ELEC (kwh/day) CHWS emp (Deg) CHWR emp (Deg) Post CC Monthly Average CHW emperature ( ) 0 40 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 eb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 eb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 12
13 Results Chilled Water Data Center - Chilled Water low and emperature emperature ( ) ,400 6,300 6,200 6,100 6,000 5,900 5,800 5,700 5,600 5,500 5,400 5,300 GPM 0.0 5, Mar-10 1-Apr-10 8-Apr Apr Apr Apr-10 6-May May May May-10 3-Jun Jun Jun Jun-10 1-Jul-10 8-Jul Jul Jul Jul-10 5-Aug Aug Aug Aug-10 Date OA emp ( ) CHLW ( ) CHLW low (gpm) 13
14 Air Side Results 1,200 Data Center - Electric Service #3 Peak kw and an kw 1, kw Dec-2009 Jan-2010 eb-2010 Mar-2010 Apr-2010 May-2010 Jun-2010 Jul-2010 Aug-2010 Date Optimized an kw Service #3 Peak kw 14
15 Results Increased plant CHW approximately 1 Chiller efficiency improvement: kw/ton (1%) Assumed load: ~3,038 tons Chiller savings: $9,800 (9 months) Oct-10 ~ Jun-11 (9 months) Savings: $213,000 (~3 mil kwh) 2010 HVAC kwh 7,455, Savings kwh (6 months) 2011 Savings (%) (6 months) 1,545,095 21% Combined Savings: ~$223,000 Anticipated Payback: <2 years 15
16 Conclusions It is cost effective to apply the CC process to data center spaces Data center cost savings analysis requires additional metering Calibration of critical sensors related to control and energy monitoring are critical to success of CC process 16
17 Lessons Learned & uture Plans Importance of calibrating key sensors immediately Oversight of controls contractor and other vendors critical to the success of the project during implementation phase Ambient impact on operations Next steps Optimize secondary chilled water pump control Optimize central plant 17
18 Questions? John Hatcher, MBA, PE, CPMP, LEED AP Command Commissioning, LLC 18
Continuous Commissioning of the Dallas/Fort Worth International Airport
Continuous Commissioning of the Dallas/Fort Worth International Airport Jerry R. Dennis, CEM, CEP Rusty T., P.E., CEM, CEP, LEED AP Larry Kramer, P.E., CEM DFW International Airport Energy and Transportation
ULTRA-EFFICIENT HVAC DESIGN AND CONTROL
CASE STUDY ULTRA-EFFICIENT HVAC DESIGN AND CONTROL MAJOR HEATING, VENTILATING AND AIR- CONDITIONING REPLACEMENT AT THE COUNTY OF SAN DIEGO CRIME LAB December 30, 2005 8520 Tech Way, Suite 110 San Diego,
Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX
Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX March 10, 2009 Agenda DFW Capital Development Program
The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.
MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
Enclosed Football Stadium Design History and Lessons Learned
Enclosed Football Stadium Design History and Lessons Learned Robert L. Towell, P.E., LEED AP, QCxP [email protected] CxE Group LLC St. Louis, Missouri 314-436-6543 With thanks to the St. Louis Convention
Continuous Energy Management at UC San Diego. Anna Levitt, P.E. Assistant Energy Manager June 13, 2013
Continuous Energy Management at UC San Diego Anna Levitt, P.E. Assistant Energy Manager June 13, 2013 UC San Diego: A 42 megawatt Microgrid With a daily population of over 45,000, UC San Diego is the size
Second Place: Industrial Facilities or Processes, New
Second Place: Industrial Facilities or Processes, New Photo: Paul Howell Texas Medical Center in Houston is the largest medical center in North America. It has a chilled water system of 160,000 tons. Big
Case Study. Commercial Building Energy Efficiency Retrofit 4 Mort Street, Canberra. Results. Background PEOPLE PRACTICES SYSTEMS
Case Study PEOPLE PRACTICES SYSTEMS Commercial Building Energy Efficiency Retrofit 4 Mort Street, Canberra In 2010, 4 Mort St, Canberra (Figure 1) was upgraded to significantly improve its energy performance.
Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers
Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Prepared for the U.S. Department of Energy s Federal Energy Management Program Prepared By Lawrence Berkeley National
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
Agenda. Part I: Introduction to OptimumHVAC. Part II: Initial Energy Savings Analysis for MCO Main Terminal. Part III: Case Studies & Conclusion
OptimumHVAC Prepared for the: GOAA Energy Conservation & Environmental Initiatives Forum April 27, 2010 Jamie Wiecks Enterprise Account Manager Optimum Energy Mike Dillard Vice President, Business Development
Case Studies: Infrared Heating in Industrial Applications
Case Studies: Infrared Heating in Industrial Applications Chao Chen, Puget Sound Energy ABSTRACT Puget Sound Energy (PSE) is a utility which serves more than one million electric customers and over 700,000
Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia
Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program
International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS
International Telecommunication Union ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU Technical Paper (13 December 2013) SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES
Direct Fresh Air Free Cooling of Data Centres
White Paper Introduction There have been many different cooling systems deployed in Data Centres in the past to maintain an acceptable environment for the equipment and for Data Centre operatives. The
Proper Applications & Sequences for Constant Volume Pressure Dependent Zoning Systems. History
Proper Applications & Sequences for Constant Volume Pressure Dependent Zoning Systems Ryan R. Hoger, LEED AP 708.670.6383 [email protected] History VAV systems came into favor for mid and large size
Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.
Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED. Presentation Goals & Outline Power Density Where we have been- where we are now - where we are going Limitations of Air Cooling
Fundamentals of HVAC Control Systems
ASHRAE Hong Kong Chapter Technical Workshop Fundamentals of HVAC Control Systems 18, 19, 25, 26 April 2007 2007 ASHRAE Hong Kong Chapter Slide 1 Chapter 5 Control Diagrams and Sequences 2007 ASHRAE Hong
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
Subtropical Cities September 2006. Design for Energy Efficiency in Commercial Buildings in Queensland
Subtropical Cities September 2006 Design for Energy Efficiency in Commercial Buildings in Queensland Contents Typical Building Constraints & Requirements Understanding Energy Consumption in Buildings HVAC
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings
Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager
Data Center Airflow Management Retrofit
FEDERAL ENERGY MANAGEMENT PROGRAM Data Center Airflow Management Retrofit Technology Case Study Bulletin: September 2010 Figure 1 Figure 2 Figure 1: Data center CFD model of return airflow short circuit
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS Ken L. Hansen P.E. University of Nebraska Medical Center [email protected] 402-559- 5301 402-630-
Economic Evaluation of Residential Air Conditioner Designs for Hot and Dry Climates
Economic Evaluation of Residential Air Conditioner Designs for Hot and Dry Climates Arthur Rosenfeld, California Energy Commission Gregory Rosenquist, Lawrence Berkeley National Laboratory C. Keith Rice,
AIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the
The sample report format is applicable to many different building types and systems and the examples provided cover a variety of applications.
Purpose Power Smart s Minimum Requirements for an Energy Study (see Appendix) provides a comprehensive list of the basic elements which must be included in an Energy Study Report. The intent of this sample
Tips and Tricks for Estimating Energy Savings. Celeste Cizik, P.E. Project Manager E M C Engineers, Inc.
Tips and Tricks for Estimating Energy Savings Celeste Cizik, P.E. Project Manager E M C Engineers, Inc. AIA Quality Assurance Learning Objectives 1. Understand the pros and cons of various energy calculation
J O U R N A L. Energy Performance for. Proper Specification of Air Terminal Units Future Climate Impacts on Building Design
Copyright 24, American Society of Heating, Refrigerating & Air-Conditioning Engineers, Inc., 79 Tullie Circle NE, Atlanta, GA. 3329. Reprinted by permission from the September 24 Issue of ASHRAE Journal
CONTROL STRATEGIES FOR HVAC SYSTEMS
CONROL SRAEGIES FOR HVAC SYSEMS ZBIGNIEW POPIOLEK Department of Heating, Ventilation and Dust Removal echnology Silesian University of echnology, Poland 1 Definition of control: to apply a regulating influence
Analysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN
COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN Umesh Atre Innovative Design Inc 850 W Morgan St Raleigh, NC 27603 [email protected]
Chilled Water System Commissioning: Variable Primary Flow. John D. Villani, P.E. Associate Grumman/Butkus Associates
Chilled Water System Commissioning: Variable Primary Flow John D. Villani, P.E. Associate Grumman/Butkus Associates AIA Quality Assurance Learning Objectives 1. History of chilled water system configurations
Example Retrocommissioning Measure: Opening Throttled Discharge Valves
Opening Throttled Discharge Valves This 21-story building, constructed in 1997, is located in Oregon and contains 589,000 gross square feet of mostly office occupancy. The HVAC system includes six large
Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001
Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Presented by: Liberty Engineering, LLP 1609 Connecticut Avenue
The Chilled Water and Hot Water Building Deferential Pressure Setpoint Calculation Chilled Water and Hot Water Pump Speed Control
The Chilled Water and Hot Water Building Deferential Pressure Setpoint Calculation Chilled Water and Hot Water Pump Speed Control Chenggang Liu Research Associate Homer L. Bruner, Jr., CEM Mechanical Systems
Florida Power & Light Company. Business Heating Ventilation & Air Conditioning ( HVAC ) Program Standards. Effective: November 9, 2015
Florida Power & Light Company Business Heating Ventilation & Air Conditioning ( HVAC ) Program Standards Effective: November 9, 2015 Table of Contents Eligibility Requirements - Chiller... 2 Rebate Amount
Data Center Energy Profiler Questions Checklist
Data Center Energy Profiler Questions Checklist Step 1 Case Name Date Center Company State/Region County Floor Area Data Center Space Floor Area Non Data Center Space Floor Area Data Center Support Space
EnergyPro Building Energy Analysis. Assisted Living Building
EnergyPro Building Energy Analysis Assisted Living Building EnergyPro Building Energy Analysis for an assisted living building Project Scope The purpose of the EnergyPro energy model was to evaluate the
Centrifugal Fans and Pumps are sized to meet the maximum
Fans and Pumps are sized to meet the maximum flow rate required by the system. System conditions frequently require reducing the flow rate. Throttling and bypass devices dampers and valves are installed
Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability.
Codes and High Performance Hot Water Systems Gary Klein Affiliated International Management, LLC 916 549 7080 [email protected] Annual Energy Use for Heating Water Natural Gas Gallons Per Day
Elevating Data Center & Mission Critical Energy Efficiency
August 13 th, 2014 10:00am 11:30am Elevating Data Center & Mission Critical Energy Efficiency Panelists: Jeff Schnitzer, GE Critical Power, General Manager Mark Acton, CBRE Norland, Critical Product Director
Impact of Control System Technologies on Industrial Energy Savings
Impact of Control System Technologies on Industrial Energy Savings Priyam Parikh Industrial Assessment Center Texas A&M University Bryan P. Rasmussen Industrial Assessment Center Texas A&M University http://farolconsulting.com/?page_id=110
Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client
Order of Magnitude Mechanical Estimating Justin Apprill, P.E. Topics for Today Estimate Goals A Concept for Accurate Conceptual Estimating HVAC Systems Common System Types and Rules of Thumb Pricing Example
for K-12 School Buildings
Advanced Energy Design Guide for K-12 School Buildings HVAC Section John Murphy Applications Engineer, LEED AP Trane La Crosse, Wisconsin [email protected] www.trane.com AEDG-K12 HVAC Subcommittee John
Wet Bulb Temperature and Its Impact on Building Performance
Wet Bulb Temperature and Its Impact on Building Performance By: Kurmit Rockwell, PE, CEM, LEED AP and Justin Lee, PE, LEED, AP BD+C Energy Solution Services, AtSite, Inc. 1 What is Wet Bulb Temperature?
Comparing Energy Savings of Different VAV Systems
Comparing Energy Savings of Different VAV Systems Prepared By: Martyn Dodd [email protected] EnergySoft LLC 1025 5th Street, Suite A Novato, CA 94945 415-897-6400 www.energysoft.com Last Modified: March
How To Test A Theory Of Power Supply
A CASE STUDY ON: THE EFFECTS OF HIGHER OPERATING TEMPERATURES ON DATA CENTER EFFICIENCY Victor Garcia Director of Facilities Brocade October 24, 2012 Jeff Stein, PE Principal Taylor Engineering 2010 Brocade
ENHANCED LABORATORY HVAC SYSTEM
ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of
10 Strategic Steps to Reducing Your Energy Costs AEE Regional Chapter Meeting February 2, 2005
10 Strategic Steps to Reducing Your Energy Costs AEE Regional Chapter Meeting February 2, 2005 Presented by: Gary A. Swanson, PE President Energy Management Solutions (612) 819-7975 10 Step Summary 1.
HIGH PERFORMANCE CHILLED WATER SYSTEMS. EarthWise HVAC. EarthWise HVAC High Performance CHW Plants
HIGH PERFORMANCE CHILLED WATER SYSTEMS EarthWise HVAC Simon Ho e: [email protected] 2012 EarthWise HVAC High Performance CHW Plants Low Flow Low Temperature Systems Variable Flow Systems Variable CHW Variable
Denver International Airport Total Facility Optimization. Josh Foerschler Aurom Mahobian
Denver International Airport Total Facility Optimization Josh Foerschler Aurom Mahobian AGENDA DIA Intro BMcD-DIA History Optimization Projects Results Conclusion Denver International Airport Opened February
National Grid Your Partner in Energy Solutions
National Grid Your Partner in Energy Solutions National Grid Webinar: Enhancing Reliability, Capacity and Capital Expenditure through Data Center Efficiency April 8, 2014 Presented by: Fran Boucher National
Utility Recovery and Continuous Energy Oversight of the Chilled Water Generation for New York Presbyterian
Utility Recovery and Continuous Energy Oversight of the Chilled Water Generation for New York Presbyterian Presented by: Joseph Lorino, PE, LEED AP Corporate Director of Engineering New York Presbyterian
HVAC. Kitchen Exhaust. rooftop equipment! let s drop on a few exhaust fans! it doesn t get easier!
HVAC & Kitchen Exhaust The Heart of Restaurant HVAC rooftop equipment! let s drop on a few exhaust fans! it doesn t get easier! 1 CKV Design: Just not that easy! There is no piece of equipment in the commercial
Existing Building Commissioning (EB Cx) Top 10 Lessons For Commercial Properties
Energy@Work Inc. 2012 Existing Building Commissioning (EB Cx) Top 10 Lessons For Commercial Properties Paul Hollins, CEM Senior Director of Technical Services, Commerce Court Complex, Toronto GWL Realty
Glossary of Heating, Ventilation and Air Conditioning Terms
Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment
Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now
Fact Sheet #6 Air Conditioning In this fact sheet you will discover: The opportunity for energy efficiency How air conditioning works Low cost actions to reduce energy usage now Investments to reduce costs
HVAC Systems: Overview
HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct
Commissioning - Construction Documents (Page 1 of 6)
Commissioning - Construction Documents (Page 1 of 6) A. General Information Climate Zone: Building Type: Conditioned Area (sf): Reviewer's Name: Reviewer's Agency: Note: Design Review for each system/subsystem
5-Minute Primer for Commercial Building Energy Audits
5-Minute Primer for Commercial Building Energy Audits Why Energy Audits? Because an energy audit is the first step to saving energy at your facility. Putting together an energy project can be like finding
TES for Medical Center
First Place: Industrial Facilities or Processes, New This article was published in ASHRAE Journal, November 2012. Copyright 2012 ASHRAE. Reprinted here by permission from ASHRAE at www.tecothermalenergy.com.
Applying ICT and IoT to Multifamily Buildings. U.S. Department of Energy Buildings Interoperability Vision Meeting March 12, 2015 Jeff Hendler, ETS
Applying ICT and IoT to Multifamily Buildings U.S. Department of Energy Buildings Interoperability Vision Meeting March 12, 2015 Jeff Hendler, ETS ETS is an Energy Technology, Behavior Management, and
AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings
WH I TE PAPE R AisleLok Modular Containment vs. : A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings By Bruce Long, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies,
Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina
Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina Public-Private Partnership (P3) Government - provides incentive(s): transfer of asset (land), one time grant,
Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions
Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions M. Liu, Y. Zhu, D. E. Claridge Energy Systems Laboratory Texas A&M University Ed. White Energy Management Operation
CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers
CURBING THE COST OF DATA CENTER COOLING Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers OVERVIEW Compare Cooling Strategies in Free- Standing and In-Building
Professional Report. Map section. Location of the system. Valkkinen Longitude: 23.667 Latitude: 61.267 Elevation: 89 m
Puulämmitys 6 x SF3 Location of the system Map section Valkkinen Longitude: 23.667 Latitude: 61.267 Elevation: 89 m This report has been created by: Samppa Takala Samppa Takala Nyrhintie 14 28760 Pori
Energy Efficient High-tech Buildings
Energy Efficient High-tech Buildings Can anything be done to improve Data Center and Cleanroom energy efficiency? Bill Tschudi Lawrence Berkeley National Laboratory [email protected] Acknowledgements California
UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is
Energy Design Resources Commissioning Plan Outline Template
IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended
APC APPLICATION NOTE #112
#112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.
Georgian Bay General Hospital Strategic Energy Management Plan 2014
Georgian Bay General Hospital Strategic Energy Management Plan 2014 TABLE OF CONTENTS TABLE OF CONTENTS... 2 INTRODUCTION... 3 ENERGY MANAGEMENT VISION... 4 GUIDING PRINCIPLES FOR STRATEGIC ENERGY MANAGEMENT...
Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks
Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same
Hot Water. Heat pump water heaters. Residential and Commercial R410a
Hot Water Heat pump water heaters Residential and Commercial R410a Heat pump technology Heat Pump Water Heating is a new idea using existing technology and is viewed as the latest generation of water heating
Introduction To VRF: System Overview, Applications, & Savings Opportunities
Introduction To VRF: System Overview, Applications, & Savings Opportunities System Overview What is VRF? Zoning System Two-Pipe / Three Pipe System Packaged DDC Control Operates as a Heat Pump Simultaneous
Building Controls MORE than a Time Clock. Building Automation is a Tool for the building to use to manage their environment
Building Controls MORE than a Time Clock Building Automation is a Tool for the building to use to manage their environment Speaker Ken Richardson President of Island Controls Started in the Controls Business
Challenges and Failures in Green Building Design Using Under-Floor Air Distribution. Ken Urbanek, PE, HBDP, LEED AP Director of Engineering
Challenges and Failures in Green Building Design Using Under-Floor Air Distribution Ken Urbanek, PE, HBDP, LEED AP Director of Engineering Agenda UFAD Overview Challenges / Failures Steps for a Successful
SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP
research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design
OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa
OPTIMIZING CONDENSER WATER FLOW RATES W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa T.A. Brown, P.E. Thermal Energy Corporation Houston, Texas ABSTRACT Most chillers are designed for a
Introduction to Building Automation Systems (BAS)
Introduction to Building Automation Systems (BAS) Ryan R. Hoger, LEED AP 708.670.6383 [email protected] Building Automation Systems Centralized controls Change scheduling for multiple HVAC units
Element D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer
Methods for Effective Room Air Distribution. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas
Methods for Effective Room Air Distribution Dan Int-Hout Chief Engineer, Krueger Richardson, Texas Agenda Overview LEED issues and Update Perimeter Acoustics Thermal Comfort IAQ / Standard 62.1 Update
Section 2: Estimating Energy Savings and Incentives
Section 2: Estimating Energy Savings and Incentives 2.1 Estimating Energy Savings and Incentives... 2 2.2 Customized Measures - Estimation Software... 2 2.2.1 AC&R I - High Efficiency Chiller... 3 2.2.2
Energy Efficiency: Integrated Design and HVAC Systems HEALTHCARE - TOP 5 GREEN BUILDING STRATEGIES
EPA Publication 909-F-07-001 What? Energy use in healthcare facilities is higher than nearly all other building types. With rising energy costs and climate change concerns energy efficiency is financially
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the specifier in correctly specifying Mechanical System Testing
International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS
International Telecommunication Union ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU Technical Paper (13 December 2013) SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB
