1 APPENDIX A: ASSET INFORMATION STRATEGY A1

2 1 Appendix A: Asset Information Strategy A1.0 Highway Assets For the purpose of this plan the Highway assets within Coventry have been broken down into nine groupings comprising: Carriageways - Footways & Cycleways Drainage - Structures - Carriageway Construction High Friction Surfacing Traffic Calming Measures Central Reserve Kerbing Road markings Footway construction Cycleway construction Footpath construction Gullies Kerb Drains Piped Systems Inspection Chambers Footway Gully Linear Footway Drainage Ditches Catchpits / Interceptors Road Bridge Footbridge Culvert Retaining Wall Subway High Mast Lighting Column Multi Storey Car Park Overbridge Building Sign Gantry Private Bridges, Basements & Access Tunnels Traffic signals - Street lighting - Signalised junctions Pelican Crossings Toucan Crossings Puffin Crossings School crossing lights Controllers CCTV Variable Message Signs Communications Equipment Scoot apparatus Lighting Columns Luminaires Lamps Cabling Feeder Pillars A2

3 Subway Lights Illuminated signs Illuminated bollards Non-illuminated Signs, Barriers & Street furniture Arboriculture - Planted Areas - Advance Direction signs Direction signs Warning signs Information signs Sign posts Street name plates Non-illuminated Bollards Seats Litter Bins Cycle Racks Grit Bins Pedestrian barriers Safety Barriers Planters Boundary Fencing Noise Barriers Other street furniture Trees Hedges Verges Planted Areas A 1.1 Introduction Coventry City Council (CCC) have decided to use the Confirm database system as their central highway asset information storage and retrieval system, the system at present holds details of some of the asset groups but still requires the input of data for a large number of asset attributes. This asset information strategy (AIS) will describe what information is currently available within the authority, where it is stored and the confidence in the data held; the AIS will go on to identify where data is missing, the priority and method for collecting missing information and how CCC intend to populate the confirm database over a period of time. Full details of which can be found in the attached spreadsheets. Details of the information held regarding the above asset groups and the improvement processes for each grouping are set out below. 2 A2.0 Carriageway Asset Classification: Asset Hierarchy: Asset Elements: Principal Roads Classified Roads Unclassified Roads Back Lanes 2, 3a, 3b, 4a & 4b Carriageway Construction High Friction Surfacing A3

4 A2.1 Carriageway construction Traffic Calming Measures Central Reserve Kerbing Road markings A2.1.1 Records Held & Format: At present most of the information held with regard to the carriageway is held in the MarchPMS suite this database holds details of; USRN, section label, hierarchy, classification, start chainage, end chainage, description, length, start width, end width, start co-ordinate, end co-ordinate, construction type, ward area and locale (urban/rural). Also held within MarchPMS are records and results of the condition surveys undertaken (SCANNER, DVI & Griptester) and the date of the last safety inspection. Additional information is presently recorded within an EXCEL spreadsheet, which contains some details of the works history including the date of the last surfacing. A2.1.2 Coverage: It is believed that records relating to 99% of the carriageway asset are currently held within the MarchPMS system, with the only missing information being road sections that may not have yet been recorded within the database. At present the database also holds approximately 25% of the required SCANNER and Griptester information and approximately 75% of the required DVI survey information. The excel spreadsheet however contains only about 5% of the works history information. A2.1.3 Missing Information: Information relating to the carriageway that is currently missing from within Coventry City Council records and is believed to be of use consists of; the specific type of surfacing material laid, the missing condition survey information and the missing works history information as related above. A2.1.4 Collection of missing information: The collection of missing information in regard to the carriageway construction and condition will entail recording works as they are undertaken henceforth and will not deal with Partial condition surveys will be undertaken annually to fully populate the records and then to maintain their accuracy using external survey providers. A2.1.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the MarchPMS database will be directly transferable into the Confirm database; records held externally to this will require manual input. A target date for the initial population of the Confirm system has been set for October A2.2 High Friction Surfacing A2.2.1 Records Held & Format: At present the records relating to the high friction surfacing are held within the Council s GIS mapping system these include details of; USRN, section label, hierarchy, classification, start chainage, end chainage, description, length, start co-ordinate and end co-ordinate. A2.2.2 Coverage: It is believed that records relating to 99% of the high friction surfacing are currently held within the GIS system, with the only missing information being those newly laid sections that may not have yet been recorded. A2.2.3 Missing Information: Information relating to the high friction surfacing that is currently missing from within Coventry City Council records and is believed to be of use consists of; start width, end width, colour, date of application and additional works history. A2.2.4 Collection of missing information: The collection of missing information in regard to the high friction surfacing will entail recording works as they are undertaken henceforth and will not deal with A4

5 A2.2.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this and new information recorded will require manual input. A target date for the initial population of the Confirm Database has been set for October A2.3 Traffic Calming Measures A2.3.1 Records Held & Format: At present the records relating to the traffic calming measures of; road humps, road tables, speed cushions and build outs are held within the Council s GIS mapping system these include details of; USRN, section label, hierarchy, classification, start chainage, and co-ordinate. A2.3.2 Coverage: It is believed that records relating to 99% of the traffic calming features are currently held within the GIS system, with the only missing information being those newly constructed features that may not have yet been recorded. A2.3.3 Missing Information: Information relating to the traffic calming measures that is currently missing from within Coventry City Council records and is believed to be of use consists of; description, length, width, construction material, date of construction and additional works history. A2.3.4 Collection of missing information: The collection of missing information in regard to the traffic calming features will entail recording works as they are undertaken henceforth and will not deal with A2.3.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this and new information recorded will require manual input. A target date for the initial population of the Confirm Database has been set for October A2.4 Kerbing A2.4.1 Records Held & Format: At present the information held with regard to the carriageway kerbing is held within the MarchPMS database that holds details of; USRN, section label, hierarchy, classification, start chainage, end chainage, length and kerb material. A2.4.2 Coverage: It is believed that records relating to 99% of the kerbing asset are currently held within the MarchPMS system, with the only missing information being road sections that may not have yet been recorded within the database. A2.4.3 Missing Information: Information relating to the kerbing that is currently missing from within Coventry City Council records and is believed to be of use consists of; kerb type, start co-ordinate, end co-ordinate, date of installation and works history. A2.4.4 Collection of missing information: The collection of missing information in regard to the kerbing will entail recording works as they are undertaken henceforth and will not deal with attempting to ascertain details of previous works that have not been recorded. A2.4.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the MarchPMS database will be directly transferable into the Confirm database; records held externally to this and newly collected data will require manual input. A target date for the initial population of the Confirm system has been set for October A2.6 Carriageway Markings A2.6.1 Records Held & Format: The information held with regard to carriageway markings is limited to that relating to Traffic Regulation Orders (TROs) and consists of detailed descriptions of location and type of marking. This information is held by the parking enforcement team in hard copy format. A5

6 A2.6.2 Coverage: As stated above only those markings associated with TROs have any records kept, other markings which form the majority have no records whatsoever. A2.6.3 Missing Information: Information relating to the markings that is currently missing from within Coventry City Council records and is believed to be of use consists of; USRN, section label, hierarchy, classification, start chainage, end chainage, length start co-ordinate, end co-ordinate, diagram No., colour, description, date of installation and works history. A2.6.4 Collection of missing information: The collection of missing information in regard to the carriageway markings will entail recording works as they are undertaken henceforth and will not deal with A2.6.5 Transfer of Data into Confirm Database: The existing hard copy records held and newly collected data will require manual input. A target date for the initial population of the Confirm system has been set for October A3.0 Footway, Footpath & Cycleway Asset Classification: Principal Roads Classified Roads Unclassified Roads Back Lanes Asset Hierarchy: 1, 1a, 2, 3, 4 Asset Elements: Footway construction Cycleway construction Footpath construction A3.1 Footway & Footpath construction A3.1.1 Records Held & Format: At present most of the information held with regard to the footway & footpath is held in the MarchPMS suite this database holds details of; USRN, section label, hierarchy, classification, start chainage, end chainage, description, length, start width, end width, start co-ordinate, end co-ordinate, ward area and locale (urban/rural). Also held within MarchPMS are records and results of the condition surveys undertaken (DVI, & CVI), with the date of the last safety inspection being held in hard copy format. A3.1.2 Coverage: It is believed that records relating to 99% of the footway and footpath asset are currently held within the MarchPMS system, with the only missing information being footway & footpath sections that may not have yet been recorded within the database. At present the database also holds 99% of the required DVI & CVI survey information. Approximately 90% of the safety inspection information is currently recorded. A3.1.3 Missing Information: Information relating to the footway and footpath that is currently missing from within Coventry City Council records and is believed to be of use consists of; the type and colour of surfacing material laid, the construction materials, date of construction & surfacing and any other works history information. A3.1.4 Collection of missing information: The collection of missing information in regard to the footway& footpath construction and condition will entail recording works as they are undertaken henceforth and will not deal with attempting to ascertain details of previous works that have not been recorded. Partial condition surveys will be undertaken annually to fully populate the records and then to maintain their accuracy using external survey providers. A6

7 A3.1.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the MarchPMS database will be directly transferable into the Confirm database; records held externally to this and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A3.2 Cycleway A3.2.1 Records Held & Format: At present there are no records available relating to the cycleways within the City of Coventry. A3.2.2 Coverage: None. A3.2.3 Missing Information: Information relating to the cycleway that is currently missing from within Coventry City Council records and is believed to be of use consists of; USRN, section label, hierarchy, classification, start chainage, end chainage, description, length, start width, end width, start co-ordinate, end co-ordinate, ward area and locale (urban/rural), the type and colour of surfacing material laid, the construction materials, date of construction & surfacing and any other works history information. A3.2.4 Collection of missing information: The collection of missing information in regard to the cycleway construction and condition will entail recording works as they are undertaken henceforth and will not deal with A3.2.5 Transfer of Data into Confirm Database: all newly collected information will require manual input as and when the information becomes available. 4 A4.0 Drainage Asset Elements: Gullies Kerb Drains Piped Systems Inspection Chambers Footway Gully Linear Footway Drainage Ditches Catchpits / Interceptors A4.1 Gullies A4.1.1 Records Held & Format: All information currently held with regard to the carriageway gullies is held within the Council s GIS mapping system. The data is restricted to details of numbers and location recording USRN, section label and co-ordinate data, A4.1.2 Coverage: It is believed that records relating to 90% of the carriageway gullies are currently held within the GIS system, with the missing information being gullies that have not been picked up on previous surveys or those that have not yet been recorded within the GIS system. A4.1.3 Missing Information: Information relating to the carriageway gullies that is currently missing from within Coventry City Council records and is believed to be of use consists of; description, chainage, gully type, pot type, cleaning regime, installation date and any other works history information. A7

8 A4.1.4 Collection of missing information: The collection of missing information in regard to the carriageway gullies will entail recording works as they are undertaken henceforth and will not deal with A4.1.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A4.2 Kerb Drains A4.2.1 Records Held & Format: All information currently held with regard to the kerb drains is held within the Council s GIS mapping system. The data consists of; USRN, section label, start chainage, end chainage, length, start co-ordinate, and end co-ordinate. A4.2.2 Coverage: It is believed that records relating to 90% of the kerb drains are currently held within the GIS system, with the missing information being those that have not been picked up on previous surveys or those that have not yet been recorded within the GIS system. A4.2.3 Missing Information: Information relating to the carriageway gullies that is currently missing from within Coventry City Council records and is believed to be of use consists of; description, cleaning regime, installation date and any other works history information. A4.2.4 Collection of missing information: The collection of missing information in regard to the kerb drains will entail recording works as they are undertaken henceforth and will not deal with attempting to ascertain details of previous works that have not been recorded. A4.2.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A4.3 Piped Systems A4.3.1 Records Held & Format: All information currently held with regard to the piped drainage systems is held on historical hard copy plans. The data consists of; USRN, section label, depth to invert at start and end of pipe run, start and end chainage, length, start & end co-ordinates and pipe diameter. A4.3.2 Coverage: It is believed that records relating to 50% of the piped system information are currently held on the hard copy plans, however this information is from some years ago and thus the confidence levels with regard to the accuracy of the information is poor. A4.3.3 Missing Information: Information relating to the piped drainage systems that is currently missing from within Coventry City Council records and is believed to be of use consists of; 50% of the records relating to the above information, and 100% of the data relating to pipe gradient, cleaning regime, installation date and any other works history information. A4.3.4 Collection of missing information: The collection of missing information in regard to the piped drainage systems will entail recording works as they are undertaken henceforth and will not deal with A4.3.5 Transfer of Data into Confirm Database: All records held on the drainage plans and any newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October 2008, with additional data being added as and when it is acquired. A4.4 Ditches A8

9 A4.4.1 Records Held & Format: All information currently held with regard to the drainage ditches is held in an Excel spreadsheet. The data consists of; USRN, section label, and description. A4.4.2 Coverage: It is believed that records relating to 70% of the drainage ditch information are currently held on the Excel spreadsheet. A4.4.3 Missing Information: Information relating to the drainage ditches that is currently missing from within Coventry City Council records and is believed to be of use consists of; 30% of the records relating to the above information, and 100% of the data relating to start & end chainage, length, start & end co-ordinates, cleaning regime, construction date and any other works history information. A4.4.4 Collection of missing information: The collection of missing information in regard to the drainage ditches will entail recording works as they are undertaken henceforth and will not deal with A4.4.5 Transfer of Data into Confirm Database: All records held on the Excel spreadsheet and any newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October 2008, with additional data being added as and when it is acquired. A4.5 Inspection Chambers A4.5.1 Records Held & Format: There is currently no information available in regard to the inspection chambers located within Coventry. A4.5.2 Coverage: None. A4.5.3 Missing Information: Information relating to the inspection chambers that is currently missing from within Coventry City Council records and is believed to be of use consists of; USRN, section label, description, ID number, chamber type, number of connections, depth to invert, chainage, co-ordinates, cleaning regime, construction date and any other works history information. A4.5.4 Collection of missing information: The collection of missing information in regard to the inspection chambers will entail recording works as they are undertaken henceforth and will not deal with A4.5.5 Transfer of Data into Confirm Database: All newly acquired additional data will be manually added to the database as and when it is acquired. A4.6 Footway Gullies A4.6.1 Records Held & Format: All information currently held with regard to the footway gullies is held within the Council s GIS mapping system. The data is restricted to details of numbers and location recording USRN, section label and co-ordinate data, A4.6.2 Coverage: It is believed that records relating to 90% of the footway gullies are currently held within the GIS system, with the missing information being gullies that have not been picked up on previous surveys or those that have not yet been recorded within the GIS system. A4.6.3 Missing Information: Information relating to the footway gullies that is currently missing from within Coventry City Council records and is believed to be of use consists of; description, chainage, gully type, pot type, cleaning regime, installation date and any other works history information. A4.6.4 Collection of missing information: The collection of missing information in regard to the footway gullies will entail recording works as they are undertaken henceforth and will not deal with A9

10 A4.6.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A4.7 Linear Footway Drainage A4.7.1 Records Held & Format: All information currently held with regard to the linear footway drainage is held within the Council s GIS mapping system. The data records details of; USRN, section label start and end chainage, length, and start & end co-ordinate. A4.7.2 Coverage: It is believed that records relating to 90% of the linear footway drainage are currently held within the GIS system, with the missing information being linear footway drainage that has not been picked up on previous surveys or those that have not yet been recorded within the GIS system. A4.7.3 Missing Information: Information relating to the linear footway drainage that is currently missing from within Coventry City Council records and is believed to be of use consists of; description, type, cleaning regime, installation date and any other works history information. A4.7.4 Collection of missing information: The collection of missing information in regard to the carriageway gullies will entail recording works as they are undertaken henceforth and will not deal with A4.7.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A4.8 Catchpits and Interceptors A4.8.1 Records Held & Format: There is currently no information available in regard to the catchpits and interceptors located within Coventry. A4.8.2 Coverage: None. A4.8.3 Missing Information: Information relating to the catchpits and interceptors that is currently missing from within Coventry City Council records and is believed to be of use consists of; USRN, section label, description, ID number, type, depth to invert, chainage, co-ordinates, cleaning regime, construction date and any other works history information. A4.8.4 Collection of missing information: The collection of missing information in regard to the catchpits and interceptors will entail recording works as they are undertaken henceforth and will not deal with A4.8.5 Transfer of Data into Confirm Database: All newly acquired additional data will be manually added to the database as and when it is acquired. 5 A5.0 Street Lighting Asset Elements: Lighting Columns Luminaires Lamps A10

11 A5.1 Street Lighting Installations Cabling Feeder Pillars Subway Lights Illuminated signs Illuminated bollards A5.1.1 Records Held & Format: The street lighting asset information for Coventry is held within the Confirm database, which holds details of; USRN, road name, asset ID numbers, feature type, description, contract area, ward, total number of lamps, wattage per lamp, number of lamps per luminaire, number of luminaires, mounting height, mounted fitting, column cross section, column material, lantern manufacturer, lantern model reference, lamp type, lamp control gear type, burning hours, switching regime, switching device, service owner, charging code, installation date, warranty expiry date, lantern conversion date, sign description, type of bollard, type of illumination (internal/external), and sign replacement date. A5.1.2 Coverage: It is believed that records relating to 99% of the street lighting asset are currently held within the Confirm database, with the only missing assets being those that are awaiting recording in the database as changes are made. A5.1.3 Missing Information: Information relating to the lighting columns that is currently missing from within Coventry City Council records and is believed to be of use consists of; date of last survey, coordinate information, lighting category, column manufacturer, protective coating, column fixing, column root protection, date commissioned, bracket type, number of brackets, bracket protection, bracket installation date, lantern distribution and profile, lantern protection, total circuit wattage, supply point, number of outgoing circuits at supply point, traffic sign diagram number, traffic sign category, number of approved attachments, type of approved attachment and attachment size. A5.1.4 Collection of missing information: The collection of missing information in regard to the street lighting asset will entail recording works as they are undertaken henceforth and will not deal with A5.1.5 Transfer of Data into Confirm Database: All data is already stored within Confirm all new asset information will be recorded as it is acquired. 6 A6.0 Non-illuminated Signs Asset Elements: Advance Direction signs Direction signs Warning signs Information signs Sign posts Street name plates A6.1 Signs A6.1.1 Records Held & Format: All information currently held with regard to the non-illuminated signs is held within the Council s GIS mapping system. The data provides details of USRN, section label, asset ID number, sign diagram number, co-ordinates, sign height, sign width, sign diameter, description/legend, supplementary plates, availability of photograph and number of supporting posts. A11

12 A6.1.2 Coverage: It is believed that records relating to 99% of the non-illuminated signs are currently held within the GIS system, with the missing information being signs that have not been picked up on previous surveys or those that are awaiting recording within the GIS system. A6.1.3 Missing Information: Information relating to the non-illuminated signs that is currently missing from within Coventry City Council records and is believed to be of use consists of; mounting height, post height, post diameter, post type, post material, cleaning regime, condition rating, installation date and any other works history information. A6.1.4 Collection of missing information: The collection of missing information in regard to the nonilluminated signs will entail recording works as they are undertaken henceforth and will not deal with A6.1.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A7.0 Barriers & Street Furniture Asset Elements: Non-illuminated Bollards Seats Litter Bins Cycle Racks Grit Bins Pedestrian barriers Safety Barriers Planters Boundary Fencing Noise Barriers Other street furniture A7.1 Non-illuminated bollards A7.1.1 Records Held & Format: All information currently held with regard to the non-illuminated bollards is held within the Council s GIS mapping system. The data recorded is restricted to details of USRN, section label, and co-ordinate information. A7.1.2 Coverage: It is believed that records relating to 99% of the non-illuminated bollards are currently held within the GIS system, with the missing information being bollards that have not been picked up on previous surveys or those that are awaiting recording within the GIS system. A7.1.3 Missing Information: Information relating to the non-illuminated signs that is currently missing from within Coventry City Council records and is believed to be of use consists of; asset ID number, description, material, supplier, height, installation date and any other works history information. A7.1.4 Collection of missing information: The collection of missing information in regard to the nonilluminated bollards will entail recording works as they are undertaken henceforth and will not deal with A7.1.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this A12

13 and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A7.2 Seats A7.2.1 Records Held & Format: All information currently held with regard to the seats is held within an Excel spreadsheet. The data recorded is restricted to details of location by USRN and section label. A7.2.2 Coverage: It is believed that records relating to 99% of the seats are currently held within the Excel spreadsheet, with the missing information being seats that have not been picked up on previous surveys or those that are awaiting recording within the spreadsheet. A7.2.3 Missing Information: Information relating to the seats that is currently missing from within Coventry City Council records and is believed to be of use consists of; asset ID number, description, coordinate information, material, supplier, height, installation date and any other works history information. A7.2.4 Collection of missing information: The collection of missing information in regard to the seats will entail recording works as they are undertaken henceforth and will not deal with attempting to ascertain details of previous works that have not been recorded. A7.2.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the spreadsheet and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A7.3 Litter Bins A7.3.1 Records Held & Format: Information currently held with regard to the bins is held within the Council s GIS mapping system and on an Excel spreadsheet. The data recorded within the GIS system provides details of USRN, section label, Asset ID number, and co-ordinate information. In addition the Excel spreadsheet also holds details of material and mounting method. A7.3.2 Coverage: It is believed that records relating to 99% of the litter bins are currently held within the GIS system & the Excel spreadsheet, with the missing information being litter bins that have not been picked up on previous surveys or those that are awaiting recording within the GIS system. A7.3.3 Missing Information: Information relating to the litter bins that is currently missing from within Coventry City Council records and is believed to be of use consists of; description, supplier, installation date and any other works history information. A7.3.4 Collection of missing information: The collection of missing information in regard to the litter bins will entail recording works as they are undertaken henceforth and will not deal with attempting to ascertain details of previous works that have not been recorded. A7.3.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A7.4 Cycle Racks A7.4.1 Records Held & Format: At present Coventry City Council have no records of the Cycle Racks within the city A7.4.2 Coverage: None. A13

14 A7.4.3 Missing Information: Information relating to the cycle racks that is currently missing from within Coventry City Council records and is believed to be of use consists of; USRN, section label, asset ID number, description, co-ordinate information, material, supplier, mounting method, installation date and any other works history information. A7.4.4 Collection of missing information: The collection of missing information in regard to the cycle racks will entail recording works as they are undertaken henceforth and will not deal with A7.4.5 Transfer of Data into Confirm Database: It is anticipated that all newly acquired data will require manual input. A7.5 Grit Bins A7.5.1 Records Held & Format: All information currently held with regard to the grit bins is held within an Excel spreadsheet. The data recorded is restricted to details of location by USRN, section label, material and works history. A7.5.2 Coverage: It is believed that records relating to 99% of the grit bins are currently held within the Excel spreadsheet, with the missing information being grit bins that have not been picked up on previous surveys or those that are awaiting recording within the spreadsheet. A7.5.3 Missing Information: Information relating to the grit bins that is currently missing from within Coventry City Council records and is believed to be of use consists of; asset ID number, description, coordinate information, supplier, mounting method, installation date and any other works history information. A7.5.4 Collection of missing information: The collection of missing information in regard to the grit bins will entail recording works as they are undertaken henceforth and will not deal with attempting to ascertain details of previous works that have not been recorded. A7.5.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the spreadsheet and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A7.6 Pedestrian Guardrail A7.6.1 Records Held & Format: All information currently held with regard to the pedestrian guardrail is held within the Council s GIS mapping system. The data recorded is restricted to details of USRN, section label, start & end co-ordinates, start and end chainage and length. A7.6.2 Coverage: It is believed that records relating to 99% of the pedestrian guardrail are currently held within the GIS system, with the missing information being pedestrian guardrail that have not been picked up on previous surveys or those that are awaiting recording within the GIS system. A7.6.3 Missing Information: Information relating to the pedestrian guardrail that is currently missing from within Coventry City Council records and is believed to be of use consists of; asset ID number, description, material, supplier, height, installation date and any other works history information. A7.6.4 Collection of missing information: The collection of missing information in regard to the pedestrian guardrail will entail recording works as they are undertaken henceforth and will not deal with A7.6.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this A14

15 and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A7.7 Safety Fencing A7.7.1 Records Held & Format: All information currently held with regard to the safety fencing is held within the Council s GIS mapping system. The data recorded is restricted to details of USRN, section label, description, material, start & end co-ordinates, start and end chainage, length, set back, class of working width, mounting method and terminal end type. A7.7.2 Coverage: It is believed that records relating to 99% of the safety fencing are currently held within the GIS system, with the missing information being safety fencing that have not been picked up on previous surveys or those that are awaiting recording within the GIS system. A7.7.3 Missing Information: Information relating to the safety fencing that is currently missing from within Coventry City Council records and is believed to be of use consists of; manufacturer, installation date and any other works history information. A7.7.4 Collection of missing information: The collection of missing information in regard to the safety fencing will entail recording works as they are undertaken henceforth and will not deal with A7.7.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the GIS mapping system will be directly transferable into the Confirm database; records held externally to this and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A7.8 Planters A7.8.1 Records Held & Format: All information currently held with regard to the planters is held within an Excel spreadsheet. The data recorded is restricted to details of location by USRN, section label, material and mounting method. A7.8.2 Coverage: It is believed that records relating to 99% of the planters are currently held within the Excel spreadsheet, with the missing information being planters that have not been picked up on previous surveys or those that are awaiting recording within the spreadsheet. A7.8.3 Missing Information: Information relating to the planters that is currently missing from within Coventry City Council records and is believed to be of use consists of; asset ID number, description, coordinate information, supplier, installation date and any other works history information. A7.8.4 Collection of missing information: The collection of missing information in regard to the planters will entail recording works as they are undertaken henceforth and will not deal with attempting to ascertain details of previous works that have not been recorded. A7.8.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the spreadsheet and newly collected information will require manual input. A target date for the initial population of the Confirm system has been set for October A7.9 Boundary fencing, noise barriers and other street furniture A7.9.1 Records Held & Format: At present Coventry City Council have no records of the Boundary fencing, noise barriers and other street furniture within the city A7.9.2 Coverage: None. A15

16 A7.9.3 Missing Information: Information relating to the boundary fencing, noise barriers and other street furniture that is currently missing from within Coventry City Council records and is believed to be of use consists of; USRN, section label, asset ID number, description, co-ordinate information, chainage information, length, material, supplier, mounting method, installation date and any other works history information. A7.9.4 Collection of missing information: The collection of missing information in regard to the boundary fencing, noise barriers and other street furniture will entail recording works as they are undertaken henceforth and will not deal with attempting to ascertain details of previous works that have not been recorded. A7.9.5 Transfer of Data into Confirm Database: It is anticipated that all newly acquired data will require manual input. 8 A8.0 Traffic Signals Asset Elements: Signalised junctions Pelican Crossings Toucan Crossings Puffin Crossings School crossing lights Controllers CCTV Variable Message Signs Communications Equipment Scoot apparatus A8.1 Traffic Signal Installations A8.1.1 Records Held & Format: The traffic signal asset information for Coventry is held within an Access database maintained by the Council s external consultant partner, this holds details under a number of headings; Site - location, site number, co-ordinates, number of poles number of detectors, Nos. of other equipment, date of installation, date of major item replacement, power usage, date of last electrical test, location of electrical test certificate, date of last inspection and location of inspection reports. Pole reference number, number of signal heads, number of pedestrian heads, number of pedestrian push buttons, number of wait lamp indicators, height of pole, coating colour, No. of solar cells, No. of vehicle detectors on pole, manufacturer and installation date. Controller ref No., model No., manufacturer, installation date, presence of scoot detector, presence and installation date of prism detector, presence and installation date of outstation monitoring unit, presence and installation date of outstation transmission unit, presence of remote monitoring system, presence of fault monitoring system and unit power usage. CCTV ref No., location description, installation date, manufacturer and model number. Variable Message Signs - ref No., location description, installation date, manufacturer and model number. Communications Equipment location description, installation date and manufacturer. A16

17 A8.1.2 Coverage: Records coverage for the traffic signal assets varies across the asset items and attributes, full details of the coverage breakdown can be seen in the attached spreadsheet. Generally the coverage is between 70% and 100% of the assets with the lesser figures relating in the main to dates of installation and power usage. A8.1.3 Missing Information: Information relating to the traffic signals that is currently missing from within Coventry City Council records and is believed to be of use consists of; Site USRN, section label, date of next electrical test, date of next routine inspection and date of next additional inspection. Pole USRN, section label, coating colour and estimated power usage. Controller USRN, section label, installation date of scoot detector, installation date of remote monitoring system and installation date of fault monitoring system. CCTV Co-ordinate information, USRN, section label and power usage. Variable Message Signs - USRN, section label, ref No., location description, installation date, manufacturer and model number. Communications Equipment USRN, section label, ref No., co-ordinates, model number and power usage. A8.1.4 Collection of missing information: The collection of missing information in regard to the traffic signal asset will entail recording works as they are undertaken henceforth and will not deal with A8.1.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the access database will be directly transferable into the Confirm database; records held externally to this and newly collected information will require manual input. At this time no target date has been decided for the initial population of the Confirm system with the traffic signal information. 9 A9.0 Structures Asset Elements: Road Bridge Footbridge Culvert Retaining Wall Subway High Mast Lighting Column Multi Storey Car Park Overbridge Building Sign Gantry Private Bridges, Basements & Access Tunnels A9.1 Road & Foot Bridges A9.1.1 Records Held & Format: The Structures asset information for Coventry is held within an Excel Spreadsheet or in hard copy format maintained by the Council s external consultant partner; the information contained in these records is currently being transferred into an Access Database that holds details under a number of headings; A17

18 Inventory Data owner, unique structure identifier, route carried, co-ordinates, description, date of construction, location of hard copy structure details, headroom envelopes, presence of utility services, structural arrangement. Then for each span or panel; structural form, construction material, obstacle crossed, length, width, height and list of major components. For each component details are also kept of; materials, dimensions/specification, date of construction/installation and manufacturer. Condition & Performance Data date of last inspection, date and type of next inspection, condition of each span or major component, defect priority, general inspection pro forma, principal/special inspection reports, testing and monitoring reports, performance indicators for individual structures & reports of damage during service. Assessment & Restriction Data original design live loading, outcome of structural review, date of last structural assessment, assessment code/standard/procedure, assessor or checker, vehicle loading requirements, critical assessment component, assessed capacity and/or live load capacity rating, reserve structural capacity, assessment report, current loading restriction, details of interim measures, & signed height and width restrictions. Maintenance Data description of maintenance need, maintenance priority score, proposed/planned date for maintenance, date maintenance carried out, routine maintenance requirements and maintenance history. Cost Data inspection costs. Other Management Data technical approval records, validation data. A9.1.2 Coverage: Records coverage for the bridges assets varies across the asset items and attributes, full details of the coverage breakdown can be seen in the attached spreadsheet. For most attributes the coverage is 100% however there are a number of attributes where information relating to only 50% or less of the assets are recorded. A9.1.3 Missing Information: Information relating to the bridges that is currently completely missing from within Coventry City Council records and is believed to be of use consists of; Inventory Data historic listing or scheduled monument, special access requirements & any external considerations. Condition & Performance Data Performance indicators for bridge stock. Assessment & Restriction Data date of last structural review, date of next structural review & details of traffic diversion routes. Maintenance Data deterioration rates & service lives. Cost Data project outturn costs, construction unit rates, maintenance unit rates, annual maintenance costs, testing & monitoring costs, access costs, estimated stats diversion costs & estimated traffic delay costs. Other Management Data areas served by structure, future demand or life requirements & legal data. A9.1.4 Collection of missing information: The collection of missing information in regard to the bridges asset will entail recording works as they are undertaken henceforth and will not deal with A18

19 A9.1.5 Transfer of Data into Confirm Database: It is anticipated that the data held within the access database will be directly transferable into the Confirm database; records held externally to this and newly collected information will require manual input. At this time no target date has been decided for the initial population of the Confirm system with the bridges information. Additional structures asset information to be added as it becomes available. 10 A10.0 Arboriculture Asset Elements: Trees A10.1 Trees A Records Held & Format: The arboriculture asset information for Coventry is held within the Confirm database, this holds details under a number of headings; Site USRN, road name, asset ID, asset number and road category. Text Attributes Weather conditions at time of inspection, species, height, spread, decay fungi, number of stems, pollard cycle, epicormic growth removal, localised surface layer, hedgerow tree, tree preservation order, memorial tree, conservation area, local nature reserve, SSSI and tree category. Measurements Number of trees, diameter, height, spread and proximity to structure. Dates planting date and any subsidence claim dates. Defects Defect No., defect type, defect code and date of defect inspection. Condition assessment observation type, grade, score, weighting and condition rating. A Coverage: At present approximately 50% of the arboriculture assets are recorded within the Confirm database, from an ongoing inventory and condition survey. A Missing Information: A further 50% of the arboriculture asset records are presently not held within any system. In addition records of works undertaken are currently not entered onto the database. A Collection of missing information: The collection of missing information is ongoing as part of the arboriculture inventory and condition survey currently being undertaken, it is anticipated that this survey will be completed by August 2009 at which time all works undertaken will also be recorded within the confirm database. A Transfer of Data into Confirm Database: Data is already stored within Confirm all new asset information will be recorded and loaded into the database as it is acquired. 11 A11.0 Planted Areas Asset Elements: Hedges Verges Planted Areas A11.1 Hedges, Verges & Planted Areas A19

20 A Records Held & Format: At present Coventry City Council have no records of the Hedges, verges & planted areas within the city. A Coverage: None. A Missing Information: Information relating to the hedges, verges & planted areas that is currently missing from within Coventry City Council records and is believed to be of use consists of; USRN, section label, description, co-ordinate information, chainage information, length, ownership, maintenance arrangement, installation date and any other works history information. A Collection of missing information: The collection of missing information in regard to the hedges, verges & planted areas will entail recording works as they are undertaken henceforth and will not deal with A Transfer of Data into Confirm Database: It is anticipated that all newly acquired data will require manual input. A12.0 Data Management It is imperative that following the input of information into the Confirm database or other holding media that that information is then maintained such that it remains accurate, relevant and usable by the organisation. This section of the asset information strategy describes how Coventry City Council proposes to update, maintain and validate the information held about their highway assets. A12.1 Roles and Responsibilities Coventry City Council are developing a Highway Asset Management Planning team whose responsibility it will be, amongst other things, to maintain the information held in the Confirm database. The Highway Asset Manager along with a dedicated Data Manager will ensure that information held in the system is current and to acceptable levels of accuracy (95%). A12.2 Asset Champions CCC have appointed a number of asset champions who will be responsible for collating all information regarding activities undertaken on their asset group and providing the information to the HAMP team on a 2 monthly basis and on completion of major schemes. The format of the information provided may differ due to the reporting methods available, where possible as built drawings should be made available (generally for larger schemes), otherwise records of changes and works undertaken may be reported on a data template (excel spreadsheet) developed by the HAMP team appropriate to each asset group, or in descriptive written format to a sufficient level of detail such that the information can be easily entered onto the database. The asset champions for each asset group are: Table A1.0 Coventry City Council Asset Champions Asset Group Carriageways Footways, Footpaths & Cycleways Drainage Street Lighting Non-illuminated signs Structures Traffic Signals Asset Champion A20

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

Highway Infrastructure Asset Management Strategy

Highway Infrastructure Asset Management Strategy Highway Infrastructure Asset Management Strategy City Development Highways and Transportation Highways Asset Management Page i Asset Management Strategic Documents Contents Page Foreword 4. 1 Introduction)...)))))))))))))))))))))))...

More information

Highway Asset Management Strategy

Highway Asset Management Strategy September 2015 SECTION DESCRIPTION 1 Foreword by Councillor Simon Jones, Portfolio Holder for Highways and Transport. PAGE 3 2 ASSET MANAGEMENT POLICY 3 3 ALIGNMENT TO SHROPSHIRE CORPORATE OBJECTIVES 5

More information

Draft Terms of References (ToRs) for Road Asset Management Act ROAD ASSET MANAGEMENT ACT

Draft Terms of References (ToRs) for Road Asset Management Act ROAD ASSET MANAGEMENT ACT Draft Terms of References (ToRs) for Road Asset Management Act ROAD ASSET MANAGEMENT ACT 1. ROAD ASSET MANAGEMENT SYSTEM (RAMS): A systematic process of maintaining, upgrading and operating assets, combining

More information

6 Streetscape character 6.1

6 Streetscape character 6.1 6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London

More information

GUIDELINES FOR WORKING ON ROADS

GUIDELINES FOR WORKING ON ROADS GUIDELINES FOR WORKING ON ROADS Guide to the Safety, Health and Welfare at Work (Construction)(Amendment)(No. 2) Regulations 2008 (S.I. No. 423 of 2008) 7 CONTENTS Page Introduction.....................................................

More information

Highway Asset Management Plan Summary Document

Highway Asset Management Plan Summary Document Highway Asset Management Plan Summary Document www.bolton.gov.uk BOLTON S HIGHWAY ASSET MANAGEMENT PLAN Foreword by the Executive Member, Councillor Nicholas Peel: SUMMARY AND IMPROVEMENT ACTIONS The highways

More information

Slough Borough Council. Highway Asset Management Strategy

Slough Borough Council. Highway Asset Management Strategy Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand

More information

LIFECYCLE PLAN: STREET FURNITURE

LIFECYCLE PLAN: STREET FURNITURE LIFECYCLE PLAN: STREET FURNITURE Version Date Signed Checked Status 0.1 April 2011 Draft 0.2 February 2012 2 nd Draft Table of Contents 1. Current Status (February 2012)... 2 1.1. Current Issues... 2 1.2.

More information

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 5.3: Condition

More information

Government of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL

Government of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL Government of the People s Republic of Bangladesh Ministry of Communications PAVEMENT INVENTORY SURVEY MANUAL MAY 2005 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. ROAD NUMBERING... 4 2.1 OBJECTIVE...4 2.2

More information

Leicester City Council Transport Asset Management Plan 2011 to 2015

Leicester City Council Transport Asset Management Plan 2011 to 2015 Leicester s Local Transport Plan 2011-2026 Leicester City Council Transport Asset Management Plan 2011 to 2015 2011-2015 Regeneration, Highways and Transportation Division Leicester City Council New Walk

More information

Highway Asset Management Strategy 2014-15

Highway Asset Management Strategy 2014-15 Highway Asset Management Strategy 2014-15 - 0 - P a g e Record of Amendments Issue No.: 6.0/2015 Status: Final Date: January 2015 Author: Reviewed by: Mark Evans (Asset Management Engineer) David Kinsey

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

Specialised Data Specifications

Specialised Data Specifications Version 4.6.0 26 01 March 2015 SPECIALISED DATA SPECIFICATION have been created to document standards for specific types of spatial data that have requirements that may differ from, or be additional, to

More information

Hampshire s Highway Asset Management Strategy. 1 Implementing Effective Asset Management

Hampshire s Highway Asset Management Strategy. 1 Implementing Effective Asset Management Hampshire s Highway Asset Management Strategy 1 Implementing Effective Asset Management 1.1 Hampshire County Council recognises the importance of the highway infrastructure in the context of the well being

More information

Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:

Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to: Electricity Thank you for considering for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information for your application

More information

Interim Advice Note 105/08 Implementation of Construction (Design and Management) 2007 And the withdrawal of SD 10/05 and SD 11/05

Interim Advice Note 105/08 Implementation of Construction (Design and Management) 2007 And the withdrawal of SD 10/05 and SD 11/05 Interim Advice Note 105/08 Implementation of Construction (Design and Management) 2007 And the withdrawal of SD 10/05 and SD 11/05 IAN 105/08 1 of 7 Jan 2008 1. Introduction The Construction (Design and

More information

Highway Asset Management Strategy

Highway Asset Management Strategy Highway Asset Management Strategy April 2015 to March 2021 WiganCouncilOnline wigancouncil @wigancouncil wigan.gov.uk Highway Asset Management Strategy 1. Background This document forms our Highway Asset

More information

Highway Asset Management Strategy

Highway Asset Management Strategy w Highway Asset Management Strategy May 2014 - Version 2 Page 5 Surrey County Council Asset Management Strategy 1 Priorities, Vision and Objectives 1.1 Surrey County Council (SCC) recognises the importance

More information

IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES

IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES Information from Suffolk County Council Information publicly available - free of charge Information available - with

More information

HIGHWAY DESIGN GUIDE 1 PRINCIPLES AND RESPONSIBILITES

HIGHWAY DESIGN GUIDE 1 PRINCIPLES AND RESPONSIBILITES 1 PRINCIPLES AND RESPONSIBILITES CONTENT 1.1 Purpose and Format 1.2 Role of the Highway Authority 1.3 Road Hierarchy 1.4 Fitting Developments into the existing highway network 1.5 Highway Agreements 1.6

More information

Arriving at Depreciated Replacement Cost. Supported by HAMFIG

Arriving at Depreciated Replacement Cost. Supported by HAMFIG Arriving at Depreciated Replacement Cost Supported by HAMFIG What is DRC? a method of valuation which provides the current cost of replacing an asset with its modern equivalent asset less deductions for

More information

Highway Asset Management Strategy Growth & Neighbourhoods Directorate December 2015

Highway Asset Management Strategy Growth & Neighbourhoods Directorate December 2015 Highway Asset Management Strategy Growth & Neighbourhoods Directorate December 2015 V2.0 Table of Contents Record of Amendments... 3 Introduction... 4 1 The Importance of Highway Infrastructure to Manchester...

More information

HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL

HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL Rev Purpose of Issue Originated Reviewed Authorised Date 0 First issue Anil Kumar Ken Duguid Stephen Pottle 21-07-2010

More information

24 Vesting of Assets and Asset Data

24 Vesting of Assets and Asset Data P age 892 24 Vesting of Assets and Asset Data 24.1 Asset Ownership Guidelines It is essential that AT's Asset Ownership Guidelines are read before reading the rest of this chapter. 24.2 Overview This Chapter

More information

Section 18.1.3 below clarifies which chapter should be consulted for different types of structure.

Section 18.1.3 below clarifies which chapter should be consulted for different types of structure. P age 647 18 Structures 18.1 General 18.1.1 Introduction and Governing Principles AT structures consist of road structures (structures associated with roads) and public transport structures (stations and

More information

eastsussex.gov.uk Highway Asset Management Strategy 2015-2022

eastsussex.gov.uk Highway Asset Management Strategy 2015-2022 eastsussex.gov.uk Highway Asset Management Strategy 2015-2022 Contents Foreword... 1 Introduction... 3 Asset Management Framework... 6 Strategy for Main Asset Groups... 8 Data Management... 22 Best Practice

More information

Millennium Quarter Public Realm Guidance Manual 2008

Millennium Quarter Public Realm Guidance Manual 2008 Millennium Quarter Public Realm Guidance Manual 2008 Table of Contents Introduction Purpose of guide How to use this guide Background and Vision Studies Conservation and Heritage Biodiversity Strategic

More information

2016-2021 Highway Asset Management Strategy

2016-2021 Highway Asset Management Strategy 2016-2021 Highway Asset Management Strategy Barnsley MBC 2016-2021 v0.1 0 BARNSLEY COUNCIL ASSET MANAGEMENT IMPLEMENTATION STRATEGY Contents 1.0 Introduction 2 Page 2.0 Legislative Requirements 2 3.0 Planning

More information

Parking On-street parking Front garden parking Off-street parking

Parking On-street parking Front garden parking Off-street parking Nae place mair braw A guide to placemaking in Perth and Kinross Whan I haik't up to Craigie Hill And lookit east and west; "In a' the world," said I to mysel', "My ain shire is the best." Parking On-street

More information

Highway Asset Management Strategy 2014-2019

Highway Asset Management Strategy 2014-2019 MK Highways Highway Asset Management Strategy 2014-2019 www.milton keynes.gov.uk/highways Final October 2015 Distribution The master copy of this document is held by MKC Highway electronically, a signed

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Transport and Highways June 2013 Asset Management Strategy (June 2013) Page 1 of 10 CONTENTS INTRODUCTION 3 SECTION 1: WHY ASSET MANAGEMENT 4 1.1 Background 4 1.2 Strategic Framework

More information

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take

More information

Road asset management project Data template guidance notes

Road asset management project Data template guidance notes Road asset management project Data template guidance notes If you cannot see these notes in full please click on View Zoom and select 'Fit selection' (Excel 2003) or View Zoom to selection (Excel 2007/10)

More information

NCHRP 08-36 TASK 114

NCHRP 08-36 TASK 114 NCHRP 08-36 TASK 114 Transportation Asset Management for Ancillary Assets Primary Authors: Keyur Shah, PMP John Patrick O Har, Ph.D. 2015 AASHTO Subcommittee on Maintenance Meeting July 21, 2015 Overview

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

Business Life Insurance Procurement Plans - County Level Planning

Business Life Insurance Procurement Plans - County Level Planning Signs & Street Furniture Lifecycle Management Plan Contents: 13.1 Introduction 13.2 Inventory 13.3 Condition Assessment 13.4 Service Standards (Maintenance Management) 13.5 Performance Monitoring 13.6

More information

Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)

Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Examining Authority s (ExA) Record of Unaccompanied Inspection of Sites to Which the Application or

More information

This document provides a guide to the attendant, casualty and vehicle variables available in csv format.

This document provides a guide to the attendant, casualty and vehicle variables available in csv format. Transport for London Surface Transport Data Guide Surface Planning June 2013 This document provides a guide to the attendant, casualty and vehicle variables available in csv format. As stated in the Department

More information

Environment Committee 11 January 2016

Environment Committee 11 January 2016 Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment

More information

Chapter III Preparation of Bill of Quantities

Chapter III Preparation of Bill of Quantities Chapter III Preparation of Bill of Quantities (including Preambles to Bill of Quantities) Preparation of Bill of Quantities Sub-division of Bill of Quantities 1 The Bill of Quantities is to be divided

More information

Highways Asset Management Plan Version 3. August 2009

Highways Asset Management Plan Version 3. August 2009 Highways Asset Management Plan Version 3 August 2009 London Borough of Hounslow Streetcare Services Highways Asset Management Plan Version 3: 2009 Foreword to HAMP Version 1 At Hounslow we are continuously

More information

HIGHWAY NETWORK MANAGEMENT PLAN

HIGHWAY NETWORK MANAGEMENT PLAN NOTTINGHAMSHIRE COUNTY COUNCIL HIGHWAY NETWORK MANAGEMENT PLAN December 2014 Andrew Warrington Service Director Highways HIGHWAY NETWORK MANAGEMENT PLAN Amendments NOTE Appendices 5, 3 and 2 are revised

More information

HIGHWAYS. Drainage design on M25 motorway widening project (J16 - J23) Brijesh Vats

HIGHWAYS. Drainage design on M25 motorway widening project (J16 - J23) Brijesh Vats Drainage design on M25 motorway widening project (J16 - J23) 76 Brijesh Vats Drainage Engineer Highways & Transportation Abstract Drainage design on the M25 motorway comprises complex drainage networks

More information

Cycle Safety. Some tips on safer cycling. Údarás Um Shábháilteacht Ar Bhóithre Road Safety Authority

Cycle Safety. Some tips on safer cycling. Údarás Um Shábháilteacht Ar Bhóithre Road Safety Authority Cycle Safety Some tips on safer cycling Údarás Um Shábháilteacht Ar Bhóithre Road Safety Authority Be safe For further information on safe cycling, please look at the Rules of the Road website at www.rulesoftheroad.ie

More information

For further information, contact the Access Officers and/or the Access Group

For further information, contact the Access Officers and/or the Access Group Although the standards in are intended to provide best practice at the time of publication, the requirements of further legislation, and legal decisions arising from the operation of the 1995 Disability

More information

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES ROAD PAVEMENTS FORUM TWENTY-FIFTH MEETING 7 May 2013 OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES Michael Roux (CSIR Built Environment) Acknowledgements SANRAL Team Members:

More information

Pavement Asset Management Guidance Section 3: Inventory and Data Management

Pavement Asset Management Guidance Section 3: Inventory and Data Management Pavement Asset Management Guidance Section 3: Inventory and Data Management December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 3: Inventory and Data

More information

Transport Asset Management Plan. Worcestershire Local Transport Plan 3. Worcestershire Local Transport Plan 3

Transport Asset Management Plan. Worcestershire Local Transport Plan 3. Worcestershire Local Transport Plan 3 Worcestershire Local Transport Plan 3 Worcestershire Local Transport Plan 3 Transport Asset Management Plan Find out more online: www.worcestershire.gov.uk/ltp3 Definition of Transport Asset Management...

More information

TORBAY COUNCIL HIGHWAYS DESIGN GUIDE FOR NEW DEVELOPMENTS

TORBAY COUNCIL HIGHWAYS DESIGN GUIDE FOR NEW DEVELOPMENTS TORBAY COUNCIL HIGHWAYS DESIGN GUIDE FOR NEW DEVELOPMENTS Revision 1 November 2015 1 VERSION DETAILS REVISION DATE PAGE AMENDMENT 1 Nov 2015 36 Drainage Design details updated 2 Contents DESIGN CRITERIA

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

Transport Asset Management Plan. 2nd Edition

Transport Asset Management Plan. 2nd Edition Transport Asset Management Plan 2nd Edition Contents 1 Chapter 1 Introduction 6 1.1 Background 6 1.2 Goals And Objectives 7 1.3 What Is Asset Management 8 1.4 Why Do We Need A TAMP 9 1.5 Where We Are Now

More information

Monitoring Highway Assets with Remote Technology

Monitoring Highway Assets with Remote Technology Monitoring Highway Assets with Remote Technology For the Michigan Department of Transportation July 2013 DYE MANAGEMENT GROUP, INC. Project Scope Summary of Technologies Aerial Imagery with LiDAR Mobile

More information

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment

More information

GLAMORGAN SPRING BAY COUNCIL. Asset Management Strategy

GLAMORGAN SPRING BAY COUNCIL. Asset Management Strategy GLAMORGAN SPRING BAY COUNCIL Asset Management Strategy Table of Contents Introduction... 3 Vision... 3 Objective of the Asset Management Strategy... 4 Aim of the Asset Management Strategy... 4 Links to

More information

GIS a Tool for Transportation Infrastructure Planning in Ghana A Case Study to the Department of Feeder Roads

GIS a Tool for Transportation Infrastructure Planning in Ghana A Case Study to the Department of Feeder Roads GIS a Tool for Transportation Infrastructure Planning in Ghana A Case Study to the Department of Stephen Yao FIATORNU, Ghana Key words: SUMMARY With the development of GIS technology, network transportation

More information

Capital Expenditure. The common definition of capital expenditure is

Capital Expenditure. The common definition of capital expenditure is Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local

More information

A Code of Practice for Highway Structures An Asset Management Approach

A Code of Practice for Highway Structures An Asset Management Approach A Code of Practice for Highway Structures An Asset Management Approach Dick Feast Principal Consultant Whole Life Asset Management Amey Infrastructure Services The Code of Practice Code of Practice for

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13 Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if

More information

11. Managing our Transport Assets

11. Managing our Transport Assets 11. Managing our Transport Assets 11.1 The Need for an Asset Management Plan 11.1.1 A key challenge is to make transport assets work for the city in a way which fully contributes to the delivery of corporate

More information

Wiltshire Highways Asset Management Strategy

Wiltshire Highways Asset Management Strategy Wiltshire Highways Asset Management Strategy May 2015 1 Wiltshire Highways Asset Management Strategy Contents 1. Introduction 3 The Importance of Highway Infrastructure to Wiltshire 3 Contribution of Highways

More information

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

Rotherham Metropolitan Borough Council. Appendix A. Street Lighting. Sustainable Energy Action Plan

Rotherham Metropolitan Borough Council. Appendix A. Street Lighting. Sustainable Energy Action Plan Rotherham Metropolitan Borough Council Appendix A Street Lighting Sustainable Energy Action Plan October 2010 Streetpride Service Summary Modern street lighting provides many benefits to the community

More information

ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK

ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK Siegfried GROSSKOPF, Tawab KAZEMI*, John HUGHES* & Sami ALMUSAWI Bani Hashim # Parsons International Limited,

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

To invite the Planning and Environment Committee to decide on an approach to dealing with pavement obstructions in the centre of town.

To invite the Planning and Environment Committee to decide on an approach to dealing with pavement obstructions in the centre of town. Report to P&E Committee 12-Aug-14 Report No. 1 Pavement Obstructions 1. Purpose of Report To invite the Planning and Environment Committee to decide on an approach to dealing with pavement obstructions

More information

Ardessie Hydro Electric Project

Ardessie Hydro Electric Project Ardessie Hydro Electric Project Appendix T - Traffic Management Plan 13 th December 2014 V1.0 Jacinta MacDermot DHG Hydro Ltd 7 St James s Gardens London W11 4RB Jacinta.macdermot@dhghydro.com 077 888

More information

HA Strategic Network General Asbestos Management Plan (GAMP)

HA Strategic Network General Asbestos Management Plan (GAMP) HA GENERAL ASBESTOS MANAGEMENT PLAN PAGE: Page 1 of 15 HA Strategic Network General Asbestos Management Plan (GAMP) HA GENERAL ASBESTOS MANAGEMENT PLAN PAGE: Page 2 of 15 CONTENTS ABBREVIATIONS LIST 3

More information

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY

More information

Household waste & recycling storage requirements

Household waste & recycling storage requirements South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd

More information

TREE RISK MANAGEMENT DOCUMENT

TREE RISK MANAGEMENT DOCUMENT TREE RISK MANAGEMENT DOCUMENT INTRODUCTION The Council has a statutory duty of care under the Health and Safety at Work Act 1974 and the Occupiers Liability Act 1999 to ensure that members of the public

More information

London Borough of Enfield Highway Asset Management Plan 2008-2011

London Borough of Enfield Highway Asset Management Plan 2008-2011 London Borough of Enfield Highway Asset Management Plan 2008-2011 .. London Borough of Enfield s Highway Asset Management Plan 2008-2011 London Borough of Enfield Highway Services Civic Centre Silver Street

More information

CHECKLIST FOR DC SUBMISSION - CONVENTIONAL HOUSING DEVELOPMENT WITH OPEN SPACE PROVISION

CHECKLIST FOR DC SUBMISSION - CONVENTIONAL HOUSING DEVELOPMENT WITH OPEN SPACE PROVISION 1 General NPARKS-0-DCS03 CHECKLIST FOR DC SUBMISSION - CONVENTIONAL HOUSING (a) The following plans are provided: Key and location plans of scale 1 : 10,000 or 1 : 5,000 showing access to the site from

More information

TRANSPORT ASSET MANAGEMENT PLAN STRATEGIC VERSION. Residents & Visitor Services

TRANSPORT ASSET MANAGEMENT PLAN STRATEGIC VERSION. Residents & Visitor Services TRANSPORT ASSET MANAGEMENT PLAN STRATEGIC VERSION Foreword I am very pleased to be able to introduce Torbay Council s first published Strategic dealing with the Highway Asset which records our strategies

More information

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS QUALITY ASSURANCE and QUALITY CONTROL PROCESS GUIDE for PROJECT MANAGERS MDOT Trunkline Projects January 2005 TABLE OF CONTENTS Discussion.. 2 Scope Verification Meeting..... 3 Overview 3 Procedure...

More information

Bracknell Forest Council. Highways Infrastructure Asset Management Plan

Bracknell Forest Council. Highways Infrastructure Asset Management Plan Bracknell Forest Council Highways Infrastructure Asset Management Plan October 2015 Contents Main and Appendices Executive Summary... 1 Executive Overview... 2 HIGHWAYS INFRASTRUCTURE ASSET MANAGEMENT

More information

Transport Asset Management Plan. Suffolk County Council

Transport Asset Management Plan. Suffolk County Council Transport Asset Management Plan 2011 2024 Suffolk County Council Contents 1 Introduction p.3 2 Key Asset Performance Measures p.5 3 Policy Context p.12 4 Asset management in Suffolk p.17 5 Data management

More information

Volume 1 NJUG GUIDELINES ON THE POSITIONING AND COLOUR CODING OF UNDERGROUND UTILITIES APPARATUS

Volume 1 NJUG GUIDELINES ON THE POSITIONING AND COLOUR CODING OF UNDERGROUND UTILITIES APPARATUS Volume 1 NJUG GUIDELINES ON THE POSITIONING AND COLOUR CODING OF UNDERGROUND UTILITIES APPARATUS PLEASE ENSURE THAT YOU READ THE LEGAL NOTICE AND DISCLAIMER WHICH APPEARS IN APPENDIX A OF THIS PUBLICATION

More information

APPENDIX K: HIGHWAY MAINTENANCE STRATEGY

APPENDIX K: HIGHWAY MAINTENANCE STRATEGY APPENDIX K: HIGHWAY MAINTENANCE STRATEGY K1 1. INTRODUCTION 2. VISION HIGHWAY MAINTENANCE STRATEGY 2004-2011 3. EXECUTIVE SUMMARY 4. OBJECTIVES 5. HIGHWAY AUTHORITY OBLIGATIONS 5.1 Legislation 5.2 Transport

More information

Transport for London. Accessible bus stop design guidance. Bus Priority Team technical advice note BP1/06 January 2006 MAYOR OF LONDON

Transport for London. Accessible bus stop design guidance. Bus Priority Team technical advice note BP1/06 January 2006 MAYOR OF LONDON Transport for London Accessible bus stop design guidance Bus Priority Team technical advice note BP1/06 January 2006 MAYOR OF LONDON Accessible bus stop design guidance Further information For further

More information

Ausgrid s Policy on Public Lighting - Contestable Projects. AUSPL CONPOL01 September 2012

Ausgrid s Policy on Public Lighting - Contestable Projects. AUSPL CONPOL01 September 2012 Ausgrid s Policy on Public Lighting - Contestable Projects AUSPL CONPOL01 September 2012 Ausgrid s Policy on Public Lighting - Contestable Projects September 2012 Contents 1 OBJECTIVE... 3 2 SCOPE AND

More information

LONDON BOROUGH OF BARNET ENVIRONMENT, PLANNING & REGENERATION DIRECTORATE

LONDON BOROUGH OF BARNET ENVIRONMENT, PLANNING & REGENERATION DIRECTORATE LONDON BOROUGH OF BARNET ENVIRONMENT, PLANNING & REGENERATION DIRECTORATE TRAFFIC & DEVELOPMENT SECTION NORTH LONDON BUSINESS PARK BUILDING 4, 2 nd Floor D6, OAKLEIGH ROAD SOUTH LONDON N11 1NP GUIDANCE

More information

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT 1 This General Guide provides information on how to manage traffic risks at a workplace. It is supported by specific guidance material on traffic management for shopping centres, construction workplaces,

More information

Verge Cutting & Drain Cleaning Contract 2014

Verge Cutting & Drain Cleaning Contract 2014 Verge Cutting & Drain Cleaning Contract 2014 Tender for the Area Old Bank of Montserrat to Brades Intersection JULY 2014 Instructions to Tenderers: 1. The contract conditions adopted for this project

More information

2 Basic human factors information

2 Basic human factors information 1 Introduction The Government is committed to comprehensive civil rights for disabled people. An integrated transport policy, which encompasses accessible public transport, public transport infrastructure

More information

Civil Engineering Information System Roads Database Project Management Structures Register Green Spaces Register

Civil Engineering Information System Roads Database Project Management Structures Register Green Spaces Register Civil Engineering Information System Roads Database Project Management Structures Register Green Spaces Register Doppik in the Public Works Department Experience pays nts with head offices in Münster was

More information

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877

More information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular

More information

ITS specification Jointing chambers and pull pits (ITS-02-02)

ITS specification Jointing chambers and pull pits (ITS-02-02) ITS specification Jointing chambers and pull pits (ITS-02-02) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material

More information

Footpath Seating for Restaurants

Footpath Seating for Restaurants Waverley Development Control Plan 2010 E3 Footpath Seating for Restaurants Contents 1.0 Introduction............................................. 2 1.1 Designated Areas for Footpath Restaurants................

More information

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 ASSET MANAGEMENT STRATEGY 2010-2020 November 2009 1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 4. WESTERN AUSTRALIAN ASSET MANAGEMENT IMPROVEMENT PROGRAM

More information

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road Signs giving orders Signs with red circles are mostly prohibitive. Plates below signs qualify their message. Entry to 20 mph zone End of 20 mph zone Maximum speed National speed limit applies School crossing

More information

Temporary Traffic Management

Temporary Traffic Management Temporary Traffic Management Tom Kiddle 4 th July 2012 Temporary Traffic Management Auckland Transport TTM Operation Requirements AT TTM Audits Qualified Persons on site Pedestrian Management 1 AT Temporary

More information

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum

More information

TLILIC3003A Licence to operate a bridge and gantry crane

TLILIC3003A Licence to operate a bridge and gantry crane TLILIC3003A Licence to operate a bridge and gantry crane Release: 1 TLILIC3003A Licence to operate a bridge and gantry crane Modification History Not Applicable Unit Descriptor Unit Descriptor This unit

More information

Waste Storage and Collection Guidance for new Developments

Waste Storage and Collection Guidance for new Developments Waste Storage and Collection Guidance for new Developments Waste and Outdoor Services Mid Sussex District Council Revision Schedule Revision Date Details Prepared by Approved by V. 1 22/05/2015 First Published

More information