1 Designing Fault-Tolerant Power Infrastructure System Analysis and New Standards Enable Maximization of Operating Dependability for Data Centers & Other Mission Critical Facilities J.F. Christin (Author) Enterprise & Systems Solutions APC-MGE Critical Power & Cooling Services Montbonnot, France Jordi Sallent and Angel Perez (Authors) Business Development Manager and Technical Director APC-MGE Power & Cooling Services Barcelona, Spain and Madrid, Spain Abstract In today s mission critical computing environments, achieving a tolerant infrastructure is essential to smooth operation. Unfortunately, many users don t completely grasp the full meaning of tolerance as a comprehensive solution with a defined architecture to maximize operating dependability. All too often, it is viewed as a collection of -mitigating products that can end up being more of a Band-Aid than a truly effective strategy for process improvement. Keywords Fault tolerance, dependability, reliability, data center infrastructure. I. INTRODUCTION Although many view it as an art, operating dependability is actually a generic term relating to the science of failure analysis and typically encompasses four key areas: reliability availability maintainability safety The study of operating dependability aims to model system behavior in order to define a system s probable capacity to fulfill its function at a given moment in time. As a "science" based on probability and statistical calculations, users can apply established data to device, unit and system populations in accordance with the Law of Large Numbers, a fundamental statistical concept that describes how the average of a random sample from a large population will likely be close to the average of the whole population. Understanding operating dependability provides many advantages to those responsible for critical systems. These include: Enabling forecasting of the time over which a system will function correctly Selection of optimum architecture by comparing the reliability or availability of systems sharing the same function Contributions to improved product quality Improved productivity resulting from maximized uptime Using probability calculations involves making predictions that an event will happen assuming that the chance an event will happen can be quantified. This can only be verified by carrying out a large number of tests. A statistical approach consists of measuring the periodicity or recurrence of events on a sample population of devices. The statistical view obtained through in-the-field measurements accounts for the number of samples in order to determine confidence intervals for these measurements. Each measurement will always have a predicted value and a measured value. Fortunately, the recent release of the ANSI/TIA-942 Standard developed by the Telecommunications Industry Association has helped greatly in providing guidelines to achieve the various levels of tolerance. While it is still useful to have a grasp of the underlying factors that impact

2 operating dependability, this standard can greatly simplify planning and implementation. This paper has been developed to assist users achieve optimized operating dependability by removing the mystery surrounding operating dependability concepts and techniques. II. FOUNDATIONS OF AVAILABILITY A. What is Availability? Availability is closely related to maintainability, the reliability of the equipment, and overall safety. It requires a thorough understanding of the electrical architecture along with a dependability study. Too often, users are satisfied with simply installing an uninterruptible power supply (UPS) recommended by a contractor and thinking that they have addressed their availability requirements. While a UPS is an essential ingredient to any uptime strategy, it s only one component in the overall architecture. B. Mission of the UPS Just as a roof is vital to the structural integrity of your home, a UPS is required to assure the integrity of a data or telecommunications network. t only does it address a number of power quality needs, it supplies sufficient time to assure the start of a motor generator in the event of an extended power outage and can provide a short period of redundancy with the genset for more common short-term power anomalies. B. What is dependability? According to the International Electrotechnical Commission (IEC), operating dependability is made up of four key components [2]: Reliability: the probability that an entity is able to accomplish a required function in given conditions, and during a given time interval [t 1,t 2 ]. It is written as R(t 1,t 2 ). In general t 1 = 0 and the reliability is written as R(t). The concept of failure rate completes the notion of reliability. Failure rate: to simplify, it is the probability that an entity, in given conditions and at a given instant in time, is subject to a failure in the next time interval. It is expressed as an hourly rate, proportional to the inverse of time. It is written as λ(t). The failure rate can be defined as: λ(t) = Number of failures per unit of time Number of devices operating at time t e.g. for 1000 installed units, with 10 s observed in a period of 1 month (1month = 720 H), the failure rate is equal to H -1. For a constant failure rate, reliability is written as: III. DEPENDABILITY STUDIES R(t) = e λt A. Why study dependability? Studying dependability in a systematic manner serves as a decision-making tool that: provides the ability to assess needs and identify risks allows comparison of functions and values of various architectures enables justification of decisions based on rational, proven data rather than advertising hype facilitates optimized design costs by rating equipment and architecture Once systems are in place, or for existing installations, evaluation of dependability is typically used to optimize infrastructure in order to: decrease the number and duration of failures better target maintenance requirements enhance overall system efficiency anticipate required backup resources such as spare parts [1] The failure rate of a system is not constant and changes over time. For all components, the failure rate at the start of service life is high, but quickly decreases. This is the period in which early failure problems of components appear. This period can be reduced by accelerated aging of components, referred to as "burn-in". For an electronic component, the failure rate then remains somewhat constant during its useful service life, after which the failure rate increases again. For a mechanical device, after early failure problems, the failure rate increases as wear and tear takes its toll. (i.e. Weibull s law) Maintainability: the probability that a given active maintenance operation can be accomplished within a time interval [t 1,t 2 ]. It is written as M(t 1,t 2 ). In general, t 1 = 0 and so maintainability is written as M(t). The concept of repair rate completes the notion of maintainability. Safety: the probability of avoiding a catastrophic event. It is linked to the notion of risk and is application dependent Availability: the probability that an entity is in a state to accomplish a required function, in given conditions

3 and at a given instant in time t. It is written as D(t). As this probability is always very close to 1, it is the notion of unavailability I(t) that is used in practice where I(t) = 1 - D(t). This notion is not the same as reliability which concerns a time period and not a particular instant in time. Simplify complex systems for analysis by breaking elements into simple systems (series / parallel) whenever possible. Such systems can be described as a series/parallel model using minimum cut logic. C. Methodologies and tools 1) Databases: Most major components, or component types are catalogued in databases (the most well known being Military Handbook 217) that maintain records of specifications, product life, failure rates and other useful information. These can be used for comparison and evaluation of different products. Calculations using this type of data allow assumed constant failure rates of components to be calculated according to their use. Such evaluations can be used with supplier data, if reliable, and factored based on experience with given devices. 2) Analysis methods: PHD method (Preliminary Hazard Analysis), the aim of which is to identify the potential hazards of an industrial installation and to evaluate the seriousness of the consequences. It is especially of interest at the start of a project. It presupposes the failure of each element (without taking into account the failure modes) and translates the consequences for the system. FMECA method (Failure Modes, their effects and their Criticality Analysis), which allows the influence component failures have on the system to be known. Although exhaustive, it must be completed in order to combine effects and evaluate reliability. It is the subject of the methods detailed below. 3) Reliability diagrams Reliability diagrams enable assessment of systems using both formulas and visual analysis of components. [3] Series systems: Two elements are said to be in series if both have to operate for the system to function. As both have to function, reliability is written as: R(t) = R (t). R (t) and availability: D(t) = D (t).d (t) A B A B 4) Fault trees A tree is derived from the system analysis and selection of the most likely undesirable events such as a break in UPS output voltage. This device identifies the minimum number of combinations that lead to the event and enables creation of a system reliability diagram. A quantitative analysis can then be carried out according to the probabilities of basic events occurring. This in turn allows calculation of the probability of an undesirable event. In the first instance, only non-spreadable subassembly failures are taken into consideration, i.e. failures that only affect the function concerned and do not prevent the others from functioning. Spreadable subassembly failures are then taken into consideration. These are essentially short-circuits. When this type of occurs, it prevents the other functions from functioning. Hence, a rectifier short-circuit prevents operation via the battery. All inverter s lead to the loss of output voltage, even if this does not spread; this is the reason it appears simply as "inverter ". Inverter System OR DC voltage A B AND Parallel systems: Two elements are said to be in parallel if at least one has to operate for the system to function. Reliability can now be written as: Battery Rectifier shutdown R(t) = R (t) + R (t) - R (t). R (t) A B A B and Availability now becomes: D(t) = D (t) + D (t) - D (t). D (t) A B A B Complex systems: These systems can be depicted for the general case of N elements in series or in parallel, but the general formulae are cumbersome and difficult to handle. Some systems cannot be immediately transformed into a series/parallel model. A B Utility input OR Rectifier Figure 1. Example of a tree applied to a single UPS without a standby supply.

4 5) State or MARKOV chains These chains represent all the system states and possible transitions between the various states. The transitions correspond to events that typically represent failures or repairs. For a system to be Markovian, transition laws must, in particular, be carried out in accordance with constant failure rate λ and repair rate µ exponential laws. 6) PETRI nets In this case, the system is represented by positions, transitions and tokens. A token that crosses a transition corresponds to a possible system event. The value of this method lies in the fact that transition laws can be of any probabilistic type, unlike Markov chains. Their disadvantage is that simulations are required to perform calculations, making this type of analysis too complex and expensive for most applications. D. Don t underestimate experience While calculations and analysis tools are important tools in optimizing system dependability, experience in providing dependability solutions is a factor that cannot be underestimated. It is vital that users identify providers with extensive background designing large system infrastructure architecture. Just because a vendor makes a solid product, is not necessarily a qualification to provide a total solution that will truly optimize dependability. Total solution providers such as Schneider Electric and MGE offer decades of real world experience with the most sensitive large-scale global applications including nuclear, military, finance, co-location and large data centers. IV. GUIDELINES FOR DESIGNING ELECTRICAL ARCHITECTURE As you can see by now, site availability and dependability represent far more than simple mean time between failure (MTBF) calculations. According to The Uptime Institute, availability reflects a combination of infrastructure design topology and sustainability. They warn that simple component counts or MTBF analysis fail to include sustainability factors that represent as much as 70% of infrastructure failures. [4] The Uptime Institute defines four levels of data center infrastructure: : Basic Site where any capacity component or distribution path failure will impact computer systems and planned work will require shutdown of computer systems : Redundant Capacity Component Site which incorporates redundant capacity components and a single, non-redundant distribution path where a component failure may impact operation and a distribution path failure will result in equipment shutdown. I: Concurrently Maintainable Site with redundant components and multiple distribution paths where unplanned activities may still disrupt operations and planned maintenance elevates risk. V: Fault-Tolerant Site with redundant capacity systems and multiple distribution paths simultaneously serving the computer equipment. More specifically: A single worst-case component or distribution failure will not impact operation. Each component and element of the distribution path can be removed from service on a planned basis without requiring system shutdown. All IT equipment must be dual-powered and installed properly to be consistent with the site s architecture. Complementary systems and distribution paths must be physically separated to prevent any single event from impacting both simultaneously. [5] Recognizing that at least 25% of information downtime results from interactions between computer hardware and it s physical environment, [6] typical large datacenters supporting mission critical applications target V compliance and in many cases are required to certify this compliance. These installations follow the V rules by: Implementing redundant sources to the critical applications, for safer maintenance operations Segmenting protection and distribution paths to avoid any critical points in the installation. Installing UPS systems in a dedicated room, away from the gensets Designing the installation for comfortable operation recognizing that a majority of power outages are the result of human error Favoring equipment with few components recognizing that they will offer a lower probability of failures, lower maintenance effort and faster mean time to repair (MTTR). Implementing comprehensive power management at all levels of the electrical architecture, including final distribution to the loads (e.g. rackable and networkable power distribution units). Assuring computer-grade power and minimizing harmonic distortion for all sensitive IT loads. Genset Genset N+1 N+1 Figure 2. Example of V Fault- Tolerant Site configuration with redundant capacity systems and multiple distribution paths.

5 V. STANDARDS SIMPLIFY IMPLEMENTATION Faced with all of these issues of dependability, reliability and tolerance, the Telecommunications Industry Association (TIA) defined guidelines for planning and building data centers, especially concentrating on network design and cabling systems. In mid-2005, this specification completed the ANSI approval process and is now available as ANSI/TIA/EIA- 942 Telecommunications Infrastructure Standard for Data Centers (TIA-942). [7] This Standard specifies minimum requirements for telecommunications infrastructure of data centers and computer rooms and proposes topologies intended to be applicable to any size data center. Recognizing that consideration of cost, risk tolerance and best practices, TIA- 942 identifies a range of site infrastructure characteristics that go beyond the Tier classification to include minimum requirements for: Infrastructure architecture Electrical design Environmental and mechanical design (HV) System redundancy and infrastructure Tier Cabling systems Access control and security Environmental control Power management Protection against physical hazards (fire, flood, windstorm) A. Tiering overview The tier rating used in the standard corresponds to the industry data center tier ratings as defined by the Uptime Institute. [4] It is important to note that while a data center may have different tier ratings for different portions of its infrastructure, the overall tier rating is equal to the lowest rating across all areas of its infrastructure. In addition the standard points out that system mechanical and electrical system capacity must be maintained at the correct tier level as the data center load increases over time. See Appendix A for Tiering Reference Guide. B. General electrical requirements The general electrical requirements cover several areas summarized below: Standby generation: Generators should be designed to supply the harmonic current imposed by the UPS system or computer equipment loads. Interactions between the UPS and generator may cause problems unless the generator is specified properly. Where a generator is provided, standby power should be provided to all air-conditioning equipment. Uninterruptible power supply: UPS systems can be static, rotary or hybrid type and can either be online, offline or line interactive but static UPS systems have been used almost exclusively in the United States. Static UPS systems are the only systems described in detail in the TIA standard. The UPS system selection should be based on a UPS system kw rating with a minimum 20% allowance for peak loads and modest system expansion. Batteries: Individual battery systems or multiple battery strings may be provided for each module. However, a single battery system for several UPS modules is not recommended due to the very low expected reliability. If a generator is installed, the batteries should be specified for a minimum of 5 to 30 minute capacity. If no generator is installed, sufficient batteries will range from 30 minutes to 8 hours. Battery monitoring: Consideration should be given to a battery monitoring system capable of recording and trending individual battery cell voltage and impedance or resistance. Such battery monitoring systems are strongly recommended where a single, non-redundant battery system and V have been provided. Computer Power Distribution: Power Distribution Units (PDUs) should be considered for distribution to critical electronic equipment in any data center installation. PDUs should be provided complete with an isolation transformer, transient voltage surge suppression (TVSS), output panels and power monitoring. Rack Power Distribution: In rack installations, power strips should be either a single 20 A / 120V or 16A / 230V device or two if redundancy is required and should incorporate: Power strip with indicator on/off switch/breaker Power strip label with the PDU/panel identifier Electrical control equipment: The electrical control equipment power distribution, conditioner systems and UPS up to 100 kva are permitted in the computer room unless they include flooded-cell batteries. UPS with flooded-cell batteries or exceeding 100 kva and any UPS containing internal flooded-cell batteries should be located in a separate room. Environmental operating conditions: Dry Bulb Temperature: 20 C to 25 C Relative Humidity: 40% to 55% Maximum Rate of Change: 5 C per hour VI. STATIC UPS: KEY ELEMENT OF FAULT-TOLERANT ARCHITECTURE While this paper demonstrates a holistic view of obtaining optimum operational dependability and stresses the fact that no single product is a solution in itself, it is important to note that the first building block of a truly tolerant system will typically be a static, double-conversion UPS. After all, the architecture, genset, energy storage, cabling, monitoring and other factors can all be compromised if this key area is not addressed properly. [8] The static double-conversion UPS system, discussed in depth in other papers in this series, is the most desirable cornerstone for power infrastructure for a number of reasons. The low component counts and lack of moving parts assure the

6 highest MTBF ratings while being easy to maintain with the lowest MTTR ratings. Separate rating of individual modules allow segmented architecture and also facilitates expansion for future growth. In addition, they tolerate wide variations in load levels and types (including non-linear loads) with the best power quality and harmonic distortion limited to approximately 3% while optimizing efficiency to assure the lowest total cost of operation. This type of performance is unmatched by any other backup power technology including so-called dynamic UPS systems that may be appropriate for less critical or other specialized applications. VII. CONCLUSION As security, safety, cost of down time and total cost of operation become more important in IT operations, the concept of operating dependability becomes ever more critical. Knowing that it can be controlled and calculated gives users the ability to assure maximum compliance with defined standards when designing architectures and selecting system hardware and components. Whether using the tiered specifications referenced here or other qualifications, requirements for certification of tolerance or adherence to defined operation specifications is becoming increasingly common. Fortunately, established computational methods and analytic tools permit the systematic study of dependability during system design phases and facilitate quality assurance monitoring throughout system lifetimes. Understanding of the factors involved combined with exact or approximate calculations allow comparison of various configurations while enabling evaluation of risk factors and total cost of ownership. At the same time, the ANSI/TIA-942 Standard has captured the best practices in a manner that simplifies implementation of systems with appropriate levels of tolerance. REFERENCES [1] S. Logiaco, "Electrical installation dependability studies," Merlin Gerin, Grenoble [2] P. Bonnefoi, "Introduction to dependability design," Merlin Gerin, Grenoble [3] G. Gatine, "High availability electrical power distribution," Merlin Gerin, Grenoble [4] W. P. Turner, J. H. Seader, and K. G. Brill, "Tier Classifications Define Site Infrastructure Performance," The Uptime Institute, Santa Fe, NM [5] [5] The Uptime Institute, "Site Uptime Procedures and Guidelines for Safely Performing Work in an Active Data Center," The Uptime Instittute, Santa Fe, NM [6] K. G. Brill, E. Orchowski, and L. Strong, "Fault-Tolerant Power Certification is Essential when Buying Products for High Avaialbility," The Uptime Institute, Santa Fe, NM [7] "Telecommunications Infrastructure Standard for Data Centers," 5th ed. vol. 942, T. I. Association, Ed.: Telecommunications Industry Association, 2005, p [8] O. Bouju, "Dependability and LV switchboards," Merlin Gerin, Grenoble APPENIX A. TIERING REFERENCE GUIDE [5] A. Generalities General I V Number of Delivery Paths Only 1 Only 1 1 active 1 passive 2 active Utility Entrance Single Feed Single Feed Dual Feed (400Volts or higher) Dual Feed (400Volts or higher) from different utility substations Concurrently Maintainable System IT & Telco Equipment Power Cords Single Cord Feed with 100% capacity Dual Cord Feed with 100% capacity on each cord Dual Cord Feed with 100% capacity on each cord Dual Cord Feed with 100% capacity on each cord Generator Fuel Capacity (at full load) 8 hours (no generator required if UPS has 8 minutes of backup time) 24 hours 72 hours 96 hours B. Battery Features Battery configuration I V One battery string per module Minimum full load standby time 5 minutes 10 minutes 15 minutes 15 minutes Battery type Flooded type batteries Mounting Racks or cabinets Racks or cabinets Open racks Open racks Wrapped plates Battery full load testing Every 2 years Every 2 years Every 2 years Every 2 years or annually

7 C. UPS & Battery Rooms UPS and Battery Rooms I V Aisle widths for maintenance, repair or equipment removal requirement requirement requirements (not less than 1m clear) requirements (not less than 1.2m clear) Proximity to computer room requirement requirement Immediately adjacent Immediately adjacent Fire separation from computer room and other areas requirement requirement requirements (not less than 1hour) requirement (not less than 2hours) Battery Rooms Separate from UPS rooms Individual battery strings isolated from each other Battery monitoring system UPS self monitoring UPS self monitoring UPS self monitoring Centralized automated systems to check each cell for temperature, voltage and impedance D. Other general requirements Security Access Control / Monitoring at: I V Generators Industrial grade lock UPS, Telephone & MEP Rooms Industrial grade lock Card access Card access CCTV Monitoring UPS, Telephone & MEP Rooms requirement requirement System Monitoring Central Power and Environmental Monitoring and Control System ( PEMCS) Interface with BMS

Power protection for data centers

Power protection for data centers Power protection for data centers Power protection for data centers Data centers are major power users, with larger installations consuming tens of megawatts. As customers are often highly reliant on the

More information

Building a Tier 4 Data Center on a Tier 1 Budget

Building a Tier 4 Data Center on a Tier 1 Budget Building a Tier 4 Data Center on a Tier 1 Budget A Walk Through of TIA-942 Peter P. Charland III, RCDD/NTS/WD, CET RTKL Associates Inc. March 27, 2008 BICSI South Central Region Meeting Denver, CO TIA-942

More information

Designed for uptime. Defining data center availability via a tier classification system

Designed for uptime. Defining data center availability via a tier classification system Defining data center availability via a tier classification system MIETEK GLIKOWSKI All systems can fail this is a simple fact that every industry must deal with. The paramount concern for the data center

More information

Data Center Management. Didik Partono Rudiarto CDCP, ITIL-F, COBIT5, CITM

Data Center Management. Didik Partono Rudiarto CDCP, ITIL-F, COBIT5, CITM Data Center Management Didik Partono Rudiarto CDCP, ITIL-F, COBIT5, CITM A physical place that houses a computer network's most critical systems, including back-up power supplies, air conditioning, and

More information

Increased power protection with parallel UPS configurations

Increased power protection with parallel UPS configurations Increased power protection with parallel UPS configurations Making the selection between Centralized Bypass and Distributed Bypass systems Janne Paananen Application Engineer, Large Systems Group Eaton

More information

Presented by Edward P. Rafter, P.E., CxAP Tier IV Consulting Group

Presented by Edward P. Rafter, P.E., CxAP Tier IV Consulting Group Presented by Edward P. Rafter, P.E., CxAP Tier IV Consulting Group The data center industry has experienced several evolutions over the past 20 years. One principal change has been the development of the

More information

Calculating Total Power Requirements for Data Centers

Calculating Total Power Requirements for Data Centers Calculating Total Power Requirements for Data Centers By Richard Sawyer White Paper #3 Executive Summary Part of data center planning and design is to align the power and cooling requirements of the IT

More information

The Data Center Tier Performance Standards and Their Importance to the Owner s Project Requirements

The Data Center Tier Performance Standards and Their Importance to the Owner s Project Requirements The Data Center Tier Performance Standards and Their Importance to the Owner s Project Requirements Edward P Rafter, P.E. CxAP Tier IV Consulting Group Synopsis The data center industry has experienced

More information

The Quest for Energy Efficiency. A White Paper from the experts in Business-Critical Continuity

The Quest for Energy Efficiency. A White Paper from the experts in Business-Critical Continuity The Quest for Energy Efficiency A White Paper from the experts in Business-Critical Continuity Abstract One of the most widely discussed issues throughout the world today is the rapidly increasing price

More information

Modular architecture for high power UPS systems. A White Paper from the experts in Business-Critical Continuity

Modular architecture for high power UPS systems. A White Paper from the experts in Business-Critical Continuity Modular architecture for high power UPS systems A White Paper from the experts in Business-Critical Continuity Abstract Today, more than ever before, energy efficiency and cost-savings are among the top

More information

Avoiding AC Capacitor Failures in Large UPS Systems

Avoiding AC Capacitor Failures in Large UPS Systems Avoiding AC Capacitor Failures in Large UPS Systems White Paper #60 Revision 0 Executive Summary Most AC power capacitor failures experienced in large UPS systems are avoidable. Capacitor failures can

More information

Data Center Site Infrastructure Tier Standard: Topology

Data Center Site Infrastructure Tier Standard: Topology U P T I M E I N S T I T U T E, L L C Data Center Site Infrastructure Tier Standard: Topology Prepared by Uptime Institute Professional Services, LLC Copyright 2010 by Uptime Institute, LLC 20 West 37th

More information

A Quick Primer on Data Center Tier Classifications

A Quick Primer on Data Center Tier Classifications A Quick Primer on Data Center Tier Classifications What You Should Know Before Starting a Data Center Project White Paper Abstract Data center facility projects are often driven by the Uptime Institute

More information

Power to the adaptable data center

Power to the adaptable data center Business Unit Manager, Data Center Solutions, Eaton s electrical group IT managers have more options than ever to tailor the power infrastructure to their unique data center and business requirements.

More information

plantemoran.com {Data center. } Design standards

plantemoran.com {Data center. } Design standards plantemoran.com {Data center. } Design standards IT systems have become critical for the day-to-day operations of today s organizations. {Data center.} Design standards IT systems are critical for the

More information

IT White Paper. N + 1 Become Too Many + 1?

IT White Paper. N + 1 Become Too Many + 1? IT White Paper Balancing Scalability and Reliability in the Critical Power system: When Does N + 1 Become Too Many + 1? Summary Uninterruptible Power Supply (UPS) protection can be delivered through a

More information

Opportunity of Energy Saving in electrical path is lesser as compared to other areas

Opportunity of Energy Saving in electrical path is lesser as compared to other areas Data Centre Power Map ` Energy Optimization Techniques Data Center Power Chain Venkat Rao B Country Manager Power Products Data Center Power Draws Cooling About 35 40 % Sources of Energy Waste Fans / Blowers

More information

BICSI 002 / TIA 942 / Uptime

BICSI 002 / TIA 942 / Uptime BICSI 002 / TIA 942 / Uptime Which Data Center Standard Should I Follow Phil Isaak, PE, P.Eng., RCDD, DCDC President, Master Instructor Isaak Technologies Inc. Standards Who are these People Standards

More information

Data Center Commissioning: What you need to know

Data Center Commissioning: What you need to know Data Center Commissioning: What you need to know Course # CXENERGY1511 AIA Provider # 50111116 AABC Commissioning Group CxEnergy Conference Henderson, NV April 30, 2015 Presented by: Judson H. Adams, P.E.,

More information

Qualitative Analysis of Power Distribution Configurations for Data Centers

Qualitative Analysis of Power Distribution Configurations for Data Centers Qualitative Analysis of Power Distribution Configurations for Data Centers White Paper #4 2007 The Green Grid. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted,

More information

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services About Injazat Injazat Data Systems is an industry-recognized market leader in the region for Information Technology Outsourcing, Cloud and Data Center Managed Services delivered from the region s 1st Tier

More information

NO-BREAK KS 7e. Concentrated Energy. 2750 kva (50Hz) 3000 kva (60Hz) DIESEL ROTARY UNINTERRUPTIBLE POWER SUPPLY SYSTEM

NO-BREAK KS 7e. Concentrated Energy. 2750 kva (50Hz) 3000 kva (60Hz) DIESEL ROTARY UNINTERRUPTIBLE POWER SUPPLY SYSTEM NO-BREAK KS 7e Concentrated Energy e 2750 kva (50Hz) 3000 kva (60Hz) DIESEL ROTARY UNINTERRUPTIBLE POWER SUPPLY SYSTEM Data Centre owners, operators and designers are required to meet ever increasing and

More information

Standardization and modularity as the foundation of data center UPS infrastructure

Standardization and modularity as the foundation of data center UPS infrastructure ABB White Paper Standardization and modularity as the foundation of data center UPS infrastructure - ABB Power Protection Product Group Doc name: Advantages of modular and standardized UPS Date: 19.11.2013

More information

Data Center Site Infrastructure Tier Standard: Topology

Data Center Site Infrastructure Tier Standard: Topology U P T I M E I N S T I T U T E, L L C Data Center Site Infrastructure Tier Standard: Topology Prepared by Uptime Institute Professional Services, LLC Copyright 2009-2012 by Uptime Institute, LLC 20 West

More information

Mixing Sodium and Lead Battery Technologies in Telecom Applications

Mixing Sodium and Lead Battery Technologies in Telecom Applications Mixing Sodium and Lead Battery Technologies in Telecom Applications Paul Smith Shanon Kolasienski Technical Marketing Manager Application Engineer GE Critical Power GE Energy Storage Plano, TX 75074 Schenectady,

More information

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus. DATA CENTER The current Campus Data Center is located within historic Founders Hall which is in a less-than ideal location for a variety of reasons, but is typical of an existing campus IT infrastructure

More information

IT White Paper IP TELEPHONY AND RELIABILITY: PROTECTING MISSION-CRITICAL PHONE SYSTEMS FROM POWER THREATS

IT White Paper IP TELEPHONY AND RELIABILITY: PROTECTING MISSION-CRITICAL PHONE SYSTEMS FROM POWER THREATS IT White Paper IP TELEPHONY AND RELIABILITY: PROTECTING MISSION-CRITICAL PHONE SYSTEMS FROM POWER THREATS Executive Summary IT managers who are used to implementing power protection for IT network or data

More information

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY The Aegis Services Power and Assessment Service provides an assessment and analysis of your data center facility and critical physical

More information

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America 7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer

More information

Guidelines for Specifying Data Center Criticality / Tier Levels

Guidelines for Specifying Data Center Criticality / Tier Levels Guidelines for Specifying Data Center Criticality / Tier Levels By Victor Avelar White Paper #122 Executive Summary A framework for benchmarking a future data center s operational performance is essential

More information

How To Write An Infrastructural Standard For Data Center Infrastructure

How To Write An Infrastructural Standard For Data Center Infrastructure Infrastructure Standard for Data Centers ANSI/CSA/EIA/TIA-942 (PN-3-0092) Introduction When approved, the standard will be: ANSI/CSA/EIA/TIA-942 Telecommunications Infrastructure Standard for Data Centers

More information

CEMEP UPS. The high environmental performance solution for power supply to high-availability data centers

CEMEP UPS. The high environmental performance solution for power supply to high-availability data centers CEMEP UPS The high environmental performance solution for power supply to high-availability data centers Exchanges of information and communication needs are growing at an exponential rate. That growth

More information

DDesign collaboration between the owner/operator. Good things happen when the design team organizes around a plan. BY KEITH LANE

DDesign collaboration between the owner/operator. Good things happen when the design team organizes around a plan. BY KEITH LANE Good things happen when the design team organizes around a plan. BY KEITH LANE Keith Lane has over 20 years of experience in the design and implementation of mission-critical facilities. He is a professional

More information

D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.

D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify. SECTION 263354 STATIC UPS TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. System start-up services. 2. Battery charging. 3. Load bank testing. 4. Battery load testing. 5.

More information

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your

More information

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013 Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013 Mark Siira ComRent International 1 8/1/2013 Agenda Introduction Overview of Load Bank Testing Benefits

More information

Top 12 Questions to Consider When Choosing UPS Systems for Network/Server Applications

Top 12 Questions to Consider When Choosing UPS Systems for Network/Server Applications W H I T E P A P E R Top 12 Questions to Consider When Choosing UPS Systems for Network/Server Applications Executive Summary One of the fundamental decisions in the design of data centers, server rooms

More information

Datacenter Hosting and Cloud Computing Services

Datacenter Hosting and Cloud Computing Services Datacenter Hosting and Cloud Computing Services Overview Background Founded in 1995, Lore Systems operates an international datacenter network which today includes full service 3+ datacenter facilities

More information

Colt Colocation Services. 2010 Colt Technology Services Group Limited. All rights reserved.

Colt Colocation Services. 2010 Colt Technology Services Group Limited. All rights reserved. Colt Colocation Services 2010 Colt Technology Services Group Limited. All rights reserved. Award winning Colt Data Centre Solutions 2012: Modular Data Centre Solution of the year winner at 5 th Datacentre

More information

DISTRIBUTED REDUNDANCY:

DISTRIBUTED REDUNDANCY: DISTRIBUTED REDUNDANCY: MAXIMUM AVAILABILITY AT MINIMAL COST A White Paper by: Liebert Corporation As the need for greater system availability intensifies across virtually every industry from global banking

More information

An Uninterruptible Power Supply Topology to Manage the Arrival of Big Data Kenny Green

An Uninterruptible Power Supply Topology to Manage the Arrival of Big Data Kenny Green An Uninterruptible Power Supply Topology to Manage the Arrival of Big Data Kenny Green Biography Kenny Green is Technical Support Manager for Uninterruptible Power Supplies Ltd. He is a graduate of Imperial

More information

Distributed versus centralized power backup strategies

Distributed versus centralized power backup strategies Distributed versus centralized power backup strategies Choosing the right UPS deployment architecture for your data center By Ed Spears Product Manager, Eaton Power Quality Solutions Operation Eaton Corporation

More information

Maximizing UPS Availability

Maximizing UPS Availability Maximizing UPS Availability A comparative assessment of UPS designs and deployment configurations for the highavailability data center By Chris Loeffler Product Manager, BladeUPS & Data Center Applications

More information

Security+ Guide to Network Security Fundamentals, Fourth Edition. Chapter 13 Business Continuity

Security+ Guide to Network Security Fundamentals, Fourth Edition. Chapter 13 Business Continuity Security+ Guide to Network Security Fundamentals, Fourth Edition Chapter 13 Business Continuity Objectives Define environmental controls Describe the components of redundancy planning List disaster recovery

More information

Data Center Trend: Distributed Power in the White Space

Data Center Trend: Distributed Power in the White Space Data Center Trend: Distributed Power in the White Space By Jason Anderson Product Line Manager Eaton Executive summary Cloud computing vendors and colocation data centers make every effort to maximize

More information

TIA-942 Data Centre Standards Overview WHITE PAPER

TIA-942 Data Centre Standards Overview WHITE PAPER TIA-942 Data Centre Standards Overview WHITE PAPER TIA-942 Data Centre Standards Overview For the past 20 years, cabling standards have been the cornerstone of ensuring proper design, installation, and

More information

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features

More information

Power backup in data centers. Something going on. 24 I MTU Report 03/10

Power backup in data centers. Something going on. 24 I MTU Report 03/10 Power backup in data centers Something going on 24 I MTU Report 03/10 Energy All over the world, Internet commerce is growing at an incredibly rapid rate as more and more people become accustomed to banking,

More information

Electrical Systems. <Presenter>

Electrical Systems. <Presenter> Review Root Causes of Energy Inefficiency Roadmap to Maximize Energy Efficiency Best Practices Alternative Energy Sources Controls Take Aways Seek Professional Help. ENERGY INEFFICIENCY OF

More information

Data Center Overview Document

Data Center Overview Document Overview NetSource is a Chicago area (Naperville) hosting company that owns and operates its own world class datacenter. The initial datacenter buildout was put into operation in 2007 and expanded in 2013.

More information

National Aluminium Co. Ltd.

National Aluminium Co. Ltd. National Aluminium Co. Ltd. [NALCO] EXPRESSION OF INTEREST FOR DATA CENTRE CO-LOCATION SERVICES Address for Communication The Project Manager ERP P/1, NALCO BHAWAN NAYAPALLI, BHUBANESWAR 751061 E mail:

More information

Diesel Rotary UPS reliability and process availability

Diesel Rotary UPS reliability and process availability Diesel Rotary UPS reliability and process availability Availability in datacenter UPS infrastructures compared Summary The typical characteristics of a DRUPS system are advantageous for the reliability

More information

Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME

Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME 2 AGENDA SESSION -1 What is Data Center? SESSION -2 Equipment and Components SESSION -3 Standard in designing Data Center

More information

Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive

Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive Co-Location Services Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive optimum performance 24x7. SERVICE

More information

UPS For Efficient Data Data Centers Centers

UPS For Efficient Data Data Centers Centers UPS For Efficient Data Centers Eaton Corporation Agenda (1) Introduction Basics About UPS s (2) Trends and Challenges Affecting The Power Infrastructure Of Your Data Center (3) Selecting The Right Power

More information

Dedicated Hosting Services

Dedicated Hosting Services Dedicated Hosting Services Protect and manage your Servers/ Routers/ Switches/ storage devices/ security devices under a highly secure hosting space and get the finest performances out of them. SERVICE

More information

How To Write A Data Center Specification

How To Write A Data Center Specification Guidelines for Specifying Data Center Criticality / Tier Levels White Paper 122 Revision 2 by Victor Avelar > Executive summary A framework for benchmarking a future data center s operational performance

More information

LTR Series Uninterruptible Power Systems 700 VA - 2.1 KVA. General Specification

LTR Series Uninterruptible Power Systems 700 VA - 2.1 KVA. General Specification 08/17/12 Rev2 LTR Series General Specification 700 VA to 2.1 KVA 1.0 General LTR Series Uninterruptible Power Systems 700 VA - 2.1 KVA General Specification This specification describes the features and

More information

Power Distribution Considerations for Data Center Racks

Power Distribution Considerations for Data Center Racks Power Distribution Considerations for Data Center Racks Power Distribution Considerations for Data Center Racks Table of Contents 3 Overview 4 At what voltage do you run all the IT equipment? 4 What electrical

More information

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy

More information

ACTURA 4855. -48 V DC, 3-40 kw, 60-800 A. The Regional DC power system with Global Muscle

ACTURA 4855. -48 V DC, 3-40 kw, 60-800 A. The Regional DC power system with Global Muscle ACTURA 4855-48 V DC, 3-40 kw, 60-800 A The Regional DC power system with Global Muscle Reliability or Price Efficiency? Now you can have both! Customized power systems with high reliability at a competitive

More information

PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER

PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER UNIVERSITY OF WASHINGTON OFFICE OF THE VICE PROVOST PLANNING AND BUDGETING Capital and Space Planning PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER JULY 31, 2006 University of Washington

More information

High-Efficiency AC Power Distribution for Data Centers

High-Efficiency AC Power Distribution for Data Centers High-Efficiency AC Power Distribution for Data Centers White Paper 128 Revision 2 by Neil Rasmussen > Executive summary The use of 240 volt power distribution for data centers saves floor space, simplifies

More information

RVH/BCH Data Centres Proposals for Surge Protection and Ventilation

RVH/BCH Data Centres Proposals for Surge Protection and Ventilation REPORT Proposals for Surge Protection and Ventilation BELFAST HEALTH AND SOCIAL CARE TRUST ROYAL GROUP OF HOSPITALS GROSVENOR ROAD BELFAST BT12 6BA Rev. 01 6th September 2013 Table of Contents 1.0 Ventilation

More information

Scalable. Affordable. Flexible. Fast.

Scalable. Affordable. Flexible. Fast. Modular Data Center Solutions Scalable. Affordable. Flexible. Fast. Build the data center you need today with the flexibility to meet tomorrow s challenges The only constant in business is change. Fluctuations

More information

Hybrid Power Considerations for Today s Telecommunications

Hybrid Power Considerations for Today s Telecommunications Hybrid Power Considerations for Today s Telecommunications A White Paper by Liebert Corporation Modern telecommunications facilities are faced with the dilemma of how to power a variety of equipment as

More information

Datacentre London 1. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk

Datacentre London 1. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk Dedicated managed environment for mission critical services www.6dg.co.uk Our datacentres are the core of our business. At we own and manage 30,000 square feet of highly available, geographically diverse

More information

Reliability Block Diagram RBD

Reliability Block Diagram RBD Information Technology Solutions Reliability Block Diagram RBD Assess the level of failure tolerance achieved RELIABIL ITY OPTIMIZATION System reliability analysis for sophisticated and large scale systems.

More information

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk Dedicated managed environment for mission critical services www.6dg.co.uk Our datacentres are the core of our business. At we own and manage 30,000 square feet of highly available, geographically diverse

More information

Power Management Strategies for High-Density IT Facilities and Systems. A White Paper from the Experts in Business-Critical Continuity TM

Power Management Strategies for High-Density IT Facilities and Systems. A White Paper from the Experts in Business-Critical Continuity TM Power Management Strategies for High-Density IT Facilities and Systems A White Paper from the Experts in Business-Critical Continuity TM Executive Summary Increases in data center density and diversity

More information

GE Digital Energy. TLE Series UPS. 160-400 kw three phase 400 Vac. with best-in-class efficiency. gimagination at work

GE Digital Energy. TLE Series UPS. 160-400 kw three phase 400 Vac. with best-in-class efficiency. gimagination at work GE Digital Energy TLE Series UPS 160-400 kw three phase 400 Vac with best-in-class efficiency gimagination at work GE provides clean, efficient and reliable power for today s digital world with the ultra

More information

Common Power Problems & Power Protection Solutions

Common Power Problems & Power Protection Solutions W H I T E P A P E R Common Power Problems & Power Protection Solutions Executive Summary All systems, from home theaters and office desktops to enterprise IT equipment in data centers, are prone to downtime,

More information

International Standards for Data Centre Electrical Design. Developed from The Uptime Institute & TIA942 concepts

International Standards for Data Centre Electrical Design. Developed from The Uptime Institute & TIA942 concepts International Standards for Data Centre Electrical Design Developed from The Uptime Institute & TIA942 concepts Benchmarking Data-Centre Quality There has long been the need to be able to measure the quality

More information

An Empirical Study on Data Center System Failure Diagnosis

An Empirical Study on Data Center System Failure Diagnosis The Third International Conference on Internet Monitoring and Protection An Empirical Study on Data Center System Failure Diagnosis Montri Wiboonrat Graduate School of Information Technology, Assumption

More information

S c h n e i d e r E l e c t r i c BUSINESS IMPACT. Jack Hack Enterprise System Engineer 19 November 2015

S c h n e i d e r E l e c t r i c BUSINESS IMPACT. Jack Hack Enterprise System Engineer 19 November 2015 S c h n e i d e r E l e c t r i c BUSINESS IMPACT Datacenter means business - create the bridge between IT en Facilities. Jack Hack Enterprise System Engineer 19 November 2015 1 Your ability to compete

More information

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime GPX India Pvt Ltd The Leader In Carrier Neutral TIER IV IDC s In Emerging Markets Incorporated in August 2002,

More information

Galaxy VM. Three-phase power protection. schneider-electric.com

Galaxy VM. Three-phase power protection. schneider-electric.com Galaxy VM Three-phase power protection schneider-electric.com 2 schneider-electric.com schneider-electric.com 3 Galaxy VM trusted partner for your business continuity Features and benefits Highly efficient,

More information

30-120 3 Phase Modular Finally the benefits of Modular ups are for all

30-120 3 Phase Modular Finally the benefits of Modular ups are for all MUST 30-120 3 Phase Modular UPS Finally the benefits of Modular ups are for all MUST 30-120 MUST means Modular UPS System Three-phase MUST 30-120 is an uninterruptible power supply with double conversion

More information

Intelligent Power Distribution in the Data Center

Intelligent Power Distribution in the Data Center Rack Power Intelligent Power Distribution in the Data Center Agenda Data Centre Power UPS Power Distribution Rack Mount PDU s UPS Power problems Configuration Capacity Power Distribution Types of Distribution

More information

High availability From Wikipedia, the free encyclopedia

High availability From Wikipedia, the free encyclopedia High availability From Wikipedia, the free encyclopedia High availability is a system design approach and associated service implementation that ensures a prearranged level of operational performance will

More information

Building a data center. C R Srinivasan Tata Communications

Building a data center. C R Srinivasan Tata Communications Building a data center C R Srinivasan Tata Communications Introduction Data Center as defined by TIA 942 A building or a portion of a building whose primary function is to house a computer room and its

More information

Increasing safety, reliability and efficiency for today s data centers

Increasing safety, reliability and efficiency for today s data centers Increasing safety, reliability and efficiency for today s data centers Products and expertise for data center success Drawing upon vast experience in complex industries where uptime is critical, ABB provides

More information

Five Essential Components for Highly Reliable Data Centers

Five Essential Components for Highly Reliable Data Centers GE Intelligent Platforms Five Essential Components for Highly Reliable Data Centers Ensuring continuous operations with an integrated, holistic technology strategy that provides high availability, increased

More information

Data Centre Outsourcing a Buyer s Guide

Data Centre Outsourcing a Buyer s Guide Data Centre Outsourcing a Buyer s Guide The inside guide to deciding whether to outsource your data centre facility and operations and how to select an appropriate partner. This Guide will help you Determine

More information

Tier Standards. Eric Maddison CEng. CEnv. MBA MSc. MCIBSE MEI. Consultant EMEA

Tier Standards. Eric Maddison CEng. CEnv. MBA MSc. MCIBSE MEI. Consultant EMEA Tier Standards Eric Maddison CEng. CEnv. MBA MSc. MCIBSE MEI Consultant EMEA Uptime Institute Unbiased and vendor neutral Global thought leadership for the data center industry Founded 1993 Standards and

More information

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Tier 3+ 1 Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Abstract: Schoolcraft College is constructing a High Availability (HA) Data Center

More information

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS Allen Wood Vice President Data Center Division Engineering Design Group INTRODUCTION It can be very effectively

More information

Reducing Data Center Energy Consumption

Reducing Data Center Energy Consumption Reducing Data Center Energy Consumption By John Judge, Member ASHRAE; Jack Pouchet, Anand Ekbote, and Sachin Dixit Rising data center energy consumption and increasing energy costs have combined to elevate

More information

Tier Classification of Data Centres. Eric Maddison Senior Consultant, The Uptime Institute

Tier Classification of Data Centres. Eric Maddison Senior Consultant, The Uptime Institute Tier Classification of Data Centres Eric Maddison Senior Consultant, The Uptime Institute Uptime Institute Unbiased and vendor neutral Global thought leadership for the data center industry Founded 1993

More information

Essential NCPI Management Requirements for Next Generation Data Centers

Essential NCPI Management Requirements for Next Generation Data Centers Essential NCPI Requirements for Next Generation Data Centers By Ted Ives White Paper #14 1 Executive Summary The management of physical infrastructure in data centers can no longer be considered independently

More information

Data Center Infrastructure & Managed Services Outline

Data Center Infrastructure & Managed Services Outline Data Center Infrastructure & Managed Services Outline The 360 Technology Center Solutions Data Center is located in Lombard, IL, USA. We are 20 minutes outside of downtown Chicago. The 360TCS staff consists

More information

High-Availability Power Systems, Part II: Redundancy Options

High-Availability Power Systems, Part II: Redundancy Options Liebert July 2003 High-Availability Power Systems, Part II: Redundancy Options SUMMARY High-Availability power systems require Reliability, Functionality, Maintainability, and Fault Tolerance. A few UPS

More information

Keyword: TIA 942, Tier level, Nuclear Data Center. Introduction

Keyword: TIA 942, Tier level, Nuclear Data Center. Introduction Nuclear Data Center International Standard Towards TSO Initiative Raja Murzaferi Raja Moktar, Mohd Fauzi Haris, Siti Nurbahyah Hamdan, Saaidi Ismail,Radhiah Jamaluddin, Nursuliza Samsudin. IT Center, Technical

More information

Data Centre Services. JT Rue Des Pres Data Centre Facility Product Description

Data Centre Services. JT Rue Des Pres Data Centre Facility Product Description JT Rue Des Pres Data Centre Facility Product Description JT s Data Centre Hosting Service provides a secure computer room environment with protected and backup power, security and bandwidth. Data Centre

More information

Five Nines and Infrared (IR) Testing at Data Centers

Five Nines and Infrared (IR) Testing at Data Centers Five Nines and Infrared (IR) Testing at Data Centers By Gregory R. Stockton 99.999% uptime five nines. That is what IT (information technology) customers are looking for. Uptime or availability at data

More information

Onsite Support: 24/7/365 onsite team. Security: 24/7/365 onsite manned security and CCTV. Monitoring: 24/7/365 Environmental monitoring and management

Onsite Support: 24/7/365 onsite team. Security: 24/7/365 onsite manned security and CCTV. Monitoring: 24/7/365 Environmental monitoring and management Zen DC1 Our Services: Colocation Cloud Solutions Managed Hosting Dedicated Servers Zen DC1 - Key Facts Size: 10,000 sq ft Capacity: 150 rack capacity Ownership: 100% independently owned, operated and managed

More information

How to Meet 24 by Forever Cooling Demands of your Data Center

How to Meet 24 by Forever Cooling Demands of your Data Center W h i t e P a p e r How to Meet 24 by Forever Cooling Demands of your Data Center Three critical aspects that are important to the operation of computer facilities are matching IT expectations with the

More information

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service vcloud SERVICES vcloud SERVICE Virtual Tech offers competitive pricing on vcloud hosted services at our world class Tier 4 data centre facility fully equipped with redundant power, cooling, internet connectivity

More information

Solution Analysis White Paper CHOOSING THE RIGHT UPS FOR SMALL AND MIDSIZE DATA CENTERS: A COST AND RELIABILITY COMPARISON

Solution Analysis White Paper CHOOSING THE RIGHT UPS FOR SMALL AND MIDSIZE DATA CENTERS: A COST AND RELIABILITY COMPARISON Solution Analysis White Paper CHOOSING THE RIGHT UPS FOR SMALL AND MIDSIZE DATA CENTERS: A COST AND RELIABILITY COMPARISON Introduction A dependable uninterruptible power supply (UPS) system is essential

More information

Influence of Availability on the Cost Analysis of Solar Powered Data Centers with AC and DC Architecture and Mirroring Functionality

Influence of Availability on the Cost Analysis of Solar Powered Data Centers with AC and DC Architecture and Mirroring Functionality Influence of Availability on the Cost Analysis of Solar Powered Data Centers with and Architecture and Mirroring Functionality Domagoj Talapko, Ph.D. Candidate Emerson Network Power Selska 93, Zagreb,

More information