1 Proceedngs of the 1 st Annual Gas Processng Symposum H. Alfadala, G.V. Rex Reklats and M.M. El-Halwag (Edtors) 2009 Elsever B.V. All rghts reserved. 1 Dynamc optmzaton of the LNG value chan Bjarne A. Foss a and Ivar J. Halvorsen b a NTNU, Department of Engneerng Cybernetcs N-7491 Trondhem, Norway b SINTEF ICT, Appled Cybernetcs, N-7465 Trondhem, Norway Abstract In operaton of a large LNG processng plant there wll be uncertantes related to plannng and realzaton of an optmal operaton strategy. Results show the mportance of ncludng the whole producton chan n the optmzaton. For a test scenaro where we look at the event of delayed shp arrval, ths gves lower losses than a normal approach where the upstream part of the system and the LNG process plant are optmzed ndvdually. The system s modeled by smple models of each man component startng at the wells and near-well regon and endng wth the export tanks for LNG, LPG and condensate. These proxy models can be regarded as frst order approxmatons of the real system. The ndvdual models are nonlnear, some are statc and others are dynamc models. The models have been coarsely valdated usng a hghfdelty smulator of the value chan at the Snøhvt LNG plant. Use of these qute smple models combned wth model-based optmzaton offers and nterestng and feasble approach to optmze producton n case of varous events that requre readjustment of the producton plannng. Keywords: Producton chan, LNG, smplfed models, optmzaton 1. Introducton Optmal operaton of large LNG processng plants may requre a holstc vew of the value chan. Ths s mportant f the LNG plant s tghtly connected to an upstream producton system and/or a downstream consumer. Present ndustral practce typcally takes a slo approach n the sense that one part of the supply chan s treated qute separate from other parts. Ths s pronounced n the upstream area where applcatons for optmally allocatng well producton nclude well models as well as models for some ppelne collecton system. The downstream boundary condton s typcally a constant pressure n a 1 st stage separator. Smlarly model-based optmzers for the separaton plant do not nclude models of the upstream part. Instead nformaton from the upstream part s passed as an exogenous varable ncludng flow rates, pressure and composton to the downstream optmzer. Ths mples that the nlet separator functons as a dvdng wall between the two optmzers even though the two subsystems mght be tghtly connected. An example of the latter arses f part of the gas output from the separaton plant s fed back nto the upstream system through gas-lft wells or gas njectors. There are many reasons for ths slo-lke stuaton. Dfferent parts of the supply chan recrut people wth dfferent backgrounds and they use dfferent tools for optmzaton. Ths lmts ntegraton even n stuatons where ntegraton has an obvous potental.

2 2 Foss and Halvorsen We study how model-based optmzaton can be used to fnd an optmal operaton strategy n the presence of unexpected operatonal events focusng on delayed arrval tmes for shps exportng stored products. In partcular the potental of combnng upstream producton system wth the downstream process plant nto one optmzaton problem and the use of smple models s explored. The system we study s a semrealstc model of the producton chan of StatolHydro s Snøhvt plant n Hammerfest, close to Norway s North Cape. The wells are stuated about 120 km from shore, and gas condensate s transported to the processng plant n Hammerfest through a multphase ppelne drven by the well pressure only. In addton to the central lqufacton unt, the plant conssts of gas pretreatment unts, a gas-fred power plant, a CO 2 separaton unt and storage tanks. LNG and condensate products are shpped to customers worldwde. It may be noted that CO 2 s sequestered n an aqufer. A stylstc vew of the plant s shown n Fg.1. Fgure 1: A stylstc vew of the Snøhvt producton chan (Dahl, 2007) The paper frst places the proposed method nto context by relatng t nto a wellestablshed process control herarchy. Subsequently the modelng approach and the optmzaton approach are presented. Thereafter a plausble test scenaro s descrbed together wth smulated results. The paper ends wth a dscusson and some conclusons. Page constrant lmts the depth of the presentaton. References are therefore gven for readers who seek more detaled nformaton on the method and results. 2. A process control herarchy The Snøhvt reservor flud s extracted subsea, transported n multphase ppelnes, refned and lquefed, stored, shpped, regasfed, stored, transported through some gas ppelne network and before t fnally can be used for heatng or as raw materal. Not only s the chan long and the transport methods vared, there are also many mportant decsons to be made by partners regardng and related to marked, prcng, stockng, producton level and producton securty. Some supply chans are drectly connected

3 Dynamc optmzaton of the LNG value chan 3 (lke natural gas used n fertlzer producton), others are more decoupled (lke the consumpton of electrcty produced at a gas power plant). Hence, not all parts are equally mportant to nclude n a supply chan. There are dfferent methods and applcatons for managng supply chans. We use the well establshed process control herarchy (see e.g. Backx, Bosgra and Marquardt, 2000) as a startng pont keepng n mnd that the process plant s n turn only a part of a larger supply chan, see also Fg.2. The levels are: Regulatory control: The low level control of processes are essental for keepng the plant stable and well functonng. Ths level usually conssts of conventonal PIDcontrollers. Supervsory control: Ths layer usually handles unts and may be based on manual adjustment of the regulatory layer controller setponts or model predctve control (MPC). Local optmzaton: Adjust targets to mantan close to optmal operaton under changng condtons. Ths layer s often based on real tme optmzaton (RTO) wth a model ftted to real tme data. Ste-wde optmzaton: For large plants, there wll usually be a plant wde RTO level, coordnatng sectons and unts. Schedulng and plannng Plannng s closely connected to the whole supply chan. The plannng level can agan be subdvded nto long-term (e.g. nvestment decsons), md-term (e.g. season plannng, sales contracts, mantenance plannng), and short-term plans. The latter ncludes settng targets for the ste-wde optmzaton, handlng dscrete operatons lke shp arrvals and loadng and re-plannng n case of unexpected events. Fgure 2. Control herarchy The focus n ths paper s the connecton between short-term plannng and ste-wde optmzaton. 3. LNG plant modelng approach The choce of model complexty s crtcal for the success of a model-based optmzaton. On the one hand the model must be accurate n the sense that optmzaton provdes reasonable results. On the other hand the model must be smple, or at least

4 4 Foss and Halvorsen computatonally effcent, such that the optmzaton problem can be solved wthn the tme constrants at hand. 3.1 Model structure Our approach s to model the system usng a modular structure wth smple models of each man component startng at the wells and near-well regon, and endng wth the export tanks for LNG, LPG and condensate. More precsely the modules nclude: wells, ppelne, slug catcher, condensate column, condensate tank, CO 2 -separator, LNG and LPG column, gas turbne, LNG and LPG coolng compressors, N 2 separator, LNG tank, and LPG tank, see also Fg.1. Some auxlary systems lke the floe assurance system s not ncluded n the model. The complete model can be vewed as a frst order approxmaton of the real system. The ndvdual models are nonlnear, some are statc and others are dynamc models. The models have been coarsely valdated usng a hgh-fdelty smulator of the value chan at the Snøhvt plant (Dahl, 2007). The smulaton model was created to solve some specfc optmzaton scenaros. Choce of producton strategy when export shps arrve late. Choce of producton strategy when one or more wells unexpectedly shuts down. These are both mportant and plausble scenaros, and producton strateges are chosen so as to mnmze loss n proft compared to the nomnal case. Ths s almost the same as fulfllng future contracts whle mnmzng the plant s operatonal costs lke coolngand electrcty use. 3.2 Model components We assume that t s possble to descrbe plant performance n a meanngful way wthout explctly ncludng detaled pressure-dynamcs. Hence, t s possble to solve the model sequentally startng wth the wells, contnung wth the multphase ppelne, the slug catcher and endng wth the storage tanks as depcted n Fg.1. Ths mples that the whole model can be solved very effcently. In the real plant there are several recycle flows. In the model ths s avoded by operatng wth perfect splts and by aggregatng cost and delays of these recycle flows nto the bgger unts. It s assumed that the aggregated plant model captures these plant dynamcs wth suffcent accuracy wthout ncludng complex recycle flows and mperfect splts. As a sde remark these dynamcs are very mportant to ensure qualty and safety under producton, but do not nfluence the overall dynamcs sgnfcantly. All model components use statc models, except the multphase ppelne, the slug catcher and the storage tanks. The ppelne dynamcs are sgnfcant n some cases snce ts settlng tme s about 10 hours. Instead of resortng to a complex multphase flow model, the ppelne model s a smple 2 nd order system whch accounts for the fact that lqud holdup vares wth the flow rate and t also ncorporates the man ppelne dynamcs.

5 Dynamc optmzaton of the LNG value chan 5 The decson varables, or control nputs, n the complete model are: The gas condensate flow rate from each wells (9 control nputs). The amount of energy produced n the gas turbne (1 control nput). The gas and condensate output flow rates from the slug catcher (2 control nputs). Export flow rates of LNG, LPG and condensate, respectvely, to approprate shps (3 control nputs). The mass flow whch s tracked by the model s composed of 8 dfferent components. These components are CO 2, N 2, methane, ethane, propane, butane, condensate (C 5+ ) and water. Some components have been neglected; our hypothess beng that t does not reduce the qualty of our results. The complete model ncludes mass component flow rates n and out of each module, and energy consumpton, f applcable, n each component. Some modules lke the LNG and LPG coolng compressors consume a sgnfcant amount of electrcal energy. Detaled nformaton can be found n (Dahl 2007). 3.3 Implementaton The model s mplemented usng MatLAB. Each component has the same nputoutput structure gven by W W,, W, E unt ( t, U, W ) out 1,, out 2, outn, n, out1, E are the component-based output mass flow rate, and consumed electrc and n, U, Wn, refer to the number of output streams, W, heat energy durng a tme perod. decson varables and the component-based nput mass flow rate, respectvely. t defnes the smulaton tme perod. 4. The optmzaton problem The optmzaton problem s formulated so as to mnmze some cost functon on a predefned future tme horzon, typcally 1-2 weeks. The tme axs s dscretzed, typcally wth a step sze of 3-6 hours. The decson varables may vary on the predcton horzon, thereby ncreasng the dmenson of the decson space consderably. To elaborate, lettng 15 decson varables, as defned n secton 3.2, vary every 6 hours on a one week predcton horzon provdes us wth a 420 decson varables. The mathematcal optmzaton problem conssts of three parts; an objectve functon, the model and constrants. The objectve functon provdes a quanttatve measure of the cost ncurred by reducng producton, compared to full capacty, as t wll be assumed that there s no market constrant. The model of the producton chan descrbed earler connects the whole system, n partcular t couples the decson varables and the varables that defne the cost functon. Fnally, the mathematcal optmzaton problem ncludes a number of constrants, manly capacty constrants n the ndvdual components along the producton chan. Due to page constrants we refer to Dahl (2007) for a comprehensve mathematcal descrpton.

6 6 Foss and Halvorsen The optmzaton problem we are left wth s a nonlnear program whch s solved usng a SQP-lke algorthm, see e.g. Nocedal and Wrght (2006). An alternatve approach s to use a mxed nteger optmzaton formulaton combned wth pecewse lnear models as by Tomasgard et.al and Mdthun Common for both approaches s that models for the whole value chan are used, and that the formulaton of models have to be somewhat adjusted to ft the optmzaton formulaton. 5. Test scenaro and results To evaluate a model-based optmzaton scheme the followng test scenaro was defned. It s assumed that LNG shps arrve at the export quay every 120 hours. Shps for LPG and condensate products arrve less frequently. The dea s to evaluate the ncurred cost of one delayed LNG shp as a functon of the delay tme. Ths can be llustrated by Fg.3 where the frst LNG shp s scheduled for arrval at tme equals 48 hours and a delay s hence related to ths tme nstant. It s assumed that later LNG shps arrve on schedule. The predcton horzon was chosen to be 256 hours and the decson varables mght change every 6 hours. Fgure 3. Normal shp arrvals The producton strategy computed by the optmzer s compared wth a smple strategy where producton s reduced such that the LNG storage s full when the LNG shp arrves and hence s ready to receve LNG. Results are shown n Fg.4 where the horzontal tme axs corresponds to the tme axs n Fg.3. These results show that no extra cost for short delays up untl tme equals 88 hours. The reason for ths s that the LNG shps are scheduled to arrve when the storage

7 Dynamc optmzaton of the LNG value chan 7 tanks are about 74% full meanng that there s stll spare capacty. For later arrvals, however, producton must be reduced and sales ncome s lost. The optmzed producton strategy provdes a lower loss than the smple producton strategy. The reason s that producton s not only reduced, t s also redstrbuted between wells. The nne wells produce n pars of three wells from three dfferent reservors. Hence, the composton of the well streams dffer. In partcular, some wells produce more heavy components than others. Usng ths knowledge, whch s embedded n the optmzer, the optmzer redstrbutes producton such that LPG and condensate producton s reduced less than LNG producton as shown n Fg.5. Ths makes sense snce there s no delay for the LPG and condensate shps n the presented scenaro. 6. Dscusson of results Ths study shows that an approach usng smple models connected accordng to the topology of the actual producton system makes sense. An alternatve approach would have been to use the hgh fdelty smulator of the Snøhvt system. Ths has not been studed heren. Ths would, however, probably gve smlar results to the ones shown above. The results clearly show the mportance of ncludng the whole producton chan from wells to export nstead of the usual approach where the upstream part (the system from wells to the slug catcher) and the downstream part (from the slug catcher to export) are optmzed ndvdually. In the latter case the optmzer could not have antcpated the optmzed producton strategy as shown n Fg.4 and 5 snce ths requres a model of the dependences along the whole producton chan. Fgure 4. Cost ncurred by a delayed LNG shp arrval.

8 8 Foss and Halvorsen Fgure 5. Producton change due to delayed LNG shp arrval One reason for stressng the use of smple models s the possble use of the optmzer n a model predctve control (MPC) strategy (see e.g. Qn and Badgewell, 1996). Ths mples re-optmzng the producton strategy usng a movng predcton horzon and gves a substantal ncrease n computatonal load. MPC ntroduces feedback control whch may be mportant to account for uncertantes. An obvous uncertanty s the fact that the exact shp arrval tme s not known. The arrval tme may for nstance be defned as a stochastc varable where canddate dstrbutons mght be the ch-squared or the F-dstrbuton. In ths case t mght be necessary to formulate a stochastc optmzaton problem solvng t as a multstage stochastc program (see e.g. Frauendorfer and Haarbrucker, 2002). Ths agan ncreases computatonal load makng t even more mportant to stck wth a smple model. The predcton horzon s qute long compared to the dynamcs of the producton chan model. Hence, the dynamc ppelne and slug-catcher models were replaced by statc models. Ths reduced run tme to ¼ of ts orgnal value wthout changng results sgnfcantly mplyng that ths s a reasonable smplfcaton.

9 Dynamc optmzaton of the LNG value chan 9 7. Concluson The smple model of the whole producton chan combned wth model-based optmzaton offers an nterestng and feasble alternatve to optmze producton n the event of delayed shp arrval. Furthermore, the mportance of brdgng the gap between the upstream and the downstream doman by usng a model of the whole value chan s shown. References T. Backx, O. Bosgra, W. Marquardt: Integraton of model predctve control and optmzaton of processes, IFAC Symposum Advanced Control of Chemcal Processes, ADCHEM 2000, Psa, Italy, K. Dahl, Optmzaton of the LNG-value chan, Master thess, Norwegan Unversty of Scence and Technology, K. Frauendorfer, G. Haarbrucker: Stochastc and global optmzaton, Sprnger Verlag, K.T. Mdthun, Optmzaton models for lberalzed natural gas markets, PhD Thess, Norwegan Unversty of Scence and Technology, NTNU, 2007:205. J. Mula, R. Poler, J. P. García-Sabater, F. C. Laro: "Models for producton plannng under uncertanty: A revew", Internatonal Journal of Producton Economcs, J. Nocedal, S. J. Wrght: Numercal Optmzaton, Sprnger Verlag, B. Nygreen, M Chrstansen, K. Haugen, T. Bjørkvoll & Krstansen, Modelng Norwegan petroleum producton and transportaton, Annals of Operatons Research 82, , S. J. Qn, T. A. Badgewell: An overvew of ndustral model predctve control technology, CPC-V, Tahoe Cty, USA, A. Tomasgard, F. Rømo, M. Fodstad, & K. Mdthun, Optmzaton models for the natural gas value chan, n G. Hasle, K.-A. Le & E. Quak, eds, Geometrc Modellng, Numercal Smulaton, and Optmzaton: Appled Mathematcs at SINTEF, Sprnger, 2007.

On the Optimal Control of a Cascade of Hydro-Electric Power Stations

On the Optimal Control of a Cascade of Hydro-Electric Power Stations On the Optmal Control of a Cascade of Hydro-Electrc Power Statons M.C.M. Guedes a, A.F. Rbero a, G.V. Smrnov b and S. Vlela c a Department of Mathematcs, School of Scences, Unversty of Porto, Portugal;

More information

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic Lagrange Multplers as Quanttatve Indcators n Economcs Ivan Mezník Insttute of Informatcs, Faculty of Busness and Management, Brno Unversty of TechnologCzech Republc Abstract The quanttatve role of Lagrange

More information

Project Networks With Mixed-Time Constraints

Project Networks With Mixed-Time Constraints Project Networs Wth Mxed-Tme Constrants L Caccetta and B Wattananon Western Australan Centre of Excellence n Industral Optmsaton (WACEIO) Curtn Unversty of Technology GPO Box U1987 Perth Western Australa

More information

IMPACT ANALYSIS OF A CELLULAR PHONE

IMPACT ANALYSIS OF A CELLULAR PHONE 4 th ASA & μeta Internatonal Conference IMPACT AALYSIS OF A CELLULAR PHOE We Lu, 2 Hongy L Bejng FEAonlne Engneerng Co.,Ltd. Bejng, Chna ABSTRACT Drop test smulaton plays an mportant role n nvestgatng

More information

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ).

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ). REVIEW OF RISK MANAGEMENT CONCEPTS LOSS DISTRIBUTIONS AND INSURANCE Loss and nsurance: When someone s subject to the rsk of ncurrng a fnancal loss, the loss s generally modeled usng a random varable or

More information

An MILP model for planning of batch plants operating in a campaign-mode

An MILP model for planning of batch plants operating in a campaign-mode An MILP model for plannng of batch plants operatng n a campagn-mode Yanna Fumero Insttuto de Desarrollo y Dseño CONICET UTN yfumero@santafe-concet.gov.ar Gabrela Corsano Insttuto de Desarrollo y Dseño

More information

Activity Scheduling for Cost-Time Investment Optimization in Project Management

Activity Scheduling for Cost-Time Investment Optimization in Project Management PROJECT MANAGEMENT 4 th Internatonal Conference on Industral Engneerng and Industral Management XIV Congreso de Ingenería de Organzacón Donosta- San Sebastán, September 8 th -10 th 010 Actvty Schedulng

More information

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School Robust Desgn of Publc Storage Warehouses Yemng (Yale) Gong EMLYON Busness School Rene de Koster Rotterdam school of management, Erasmus Unversty Abstract We apply robust optmzaton and revenue management

More information

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña Proceedngs of the 2008 Wnter Smulaton Conference S. J. Mason, R. R. Hll, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION

More information

Support Vector Machines

Support Vector Machines Support Vector Machnes Max Wellng Department of Computer Scence Unversty of Toronto 10 Kng s College Road Toronto, M5S 3G5 Canada wellng@cs.toronto.edu Abstract Ths s a note to explan support vector machnes.

More information

AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE

AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE Yu-L Huang Industral Engneerng Department New Mexco State Unversty Las Cruces, New Mexco 88003, U.S.A. Abstract Patent

More information

An Alternative Way to Measure Private Equity Performance

An Alternative Way to Measure Private Equity Performance An Alternatve Way to Measure Prvate Equty Performance Peter Todd Parlux Investment Technology LLC Summary Internal Rate of Return (IRR) s probably the most common way to measure the performance of prvate

More information

How To Understand The Results Of The German Meris Cloud And Water Vapour Product

How To Understand The Results Of The German Meris Cloud And Water Vapour Product Ttel: Project: Doc. No.: MERIS level 3 cloud and water vapour products MAPP MAPP-ATBD-ClWVL3 Issue: 1 Revson: 0 Date: 9.12.1998 Functon Name Organsaton Sgnature Date Author: Bennartz FUB Preusker FUB Schüller

More information

Credit Limit Optimization (CLO) for Credit Cards

Credit Limit Optimization (CLO) for Credit Cards Credt Lmt Optmzaton (CLO) for Credt Cards Vay S. Desa CSCC IX, Ednburgh September 8, 2005 Copyrght 2003, SAS Insttute Inc. All rghts reserved. SAS Propretary Agenda Background Tradtonal approaches to credt

More information

Simulation and optimization of supply chains: alternative or complementary approaches?

Simulation and optimization of supply chains: alternative or complementary approaches? Smulaton and optmzaton of supply chans: alternatve or complementary approaches? Chrstan Almeder Margaretha Preusser Rchard F. Hartl Orgnally publshed n: OR Spectrum (2009) 31:95 119 DOI 10.1007/s00291-007-0118-z

More information

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts Power-of-wo Polces for Sngle- Warehouse Mult-Retaler Inventory Systems wth Order Frequency Dscounts José A. Ventura Pennsylvana State Unversty (USA) Yale. Herer echnon Israel Insttute of echnology (Israel)

More information

Recurrence. 1 Definitions and main statements

Recurrence. 1 Definitions and main statements Recurrence 1 Defntons and man statements Let X n, n = 0, 1, 2,... be a MC wth the state space S = (1, 2,...), transton probabltes p j = P {X n+1 = j X n = }, and the transton matrx P = (p j ),j S def.

More information

Joint Scheduling of Processing and Shuffle Phases in MapReduce Systems

Joint Scheduling of Processing and Shuffle Phases in MapReduce Systems Jont Schedulng of Processng and Shuffle Phases n MapReduce Systems Fangfe Chen, Mural Kodalam, T. V. Lakshman Department of Computer Scence and Engneerng, The Penn State Unversty Bell Laboratores, Alcatel-Lucent

More information

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy 4.02 Quz Solutons Fall 2004 Multple-Choce Questons (30/00 ponts) Please, crcle the correct answer for each of the followng 0 multple-choce questons. For each queston, only one of the answers s correct.

More information

Fault tolerance in cloud technologies presented as a service

Fault tolerance in cloud technologies presented as a service Internatonal Scentfc Conference Computer Scence 2015 Pavel Dzhunev, PhD student Fault tolerance n cloud technologes presented as a servce INTRODUCTION Improvements n technques for vrtualzaton and performance

More information

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis The Development of Web Log Mnng Based on Improve-K-Means Clusterng Analyss TngZhong Wang * College of Informaton Technology, Luoyang Normal Unversty, Luoyang, 471022, Chna wangtngzhong2@sna.cn Abstract.

More information

A multi-start local search heuristic for ship scheduling a computational study

A multi-start local search heuristic for ship scheduling a computational study Computers & Operatons Research 34 (2007) 900 917 www.elsever.com/locate/cor A mult-start local search heurstc for shp schedulng a computatonal study Ger BrZnmo a,b,, Marelle Chrstansen b, Kjetl Fagerholt

More information

Traffic State Estimation in the Traffic Management Center of Berlin

Traffic State Estimation in the Traffic Management Center of Berlin Traffc State Estmaton n the Traffc Management Center of Berln Authors: Peter Vortsch, PTV AG, Stumpfstrasse, D-763 Karlsruhe, Germany phone ++49/72/965/35, emal peter.vortsch@ptv.de Peter Möhl, PTV AG,

More information

The OC Curve of Attribute Acceptance Plans

The OC Curve of Attribute Acceptance Plans The OC Curve of Attrbute Acceptance Plans The Operatng Characterstc (OC) curve descrbes the probablty of acceptng a lot as a functon of the lot s qualty. Fgure 1 shows a typcal OC Curve. 10 8 6 4 1 3 4

More information

A Lyapunov Optimization Approach to Repeated Stochastic Games

A Lyapunov Optimization Approach to Repeated Stochastic Games PROC. ALLERTON CONFERENCE ON COMMUNICATION, CONTROL, AND COMPUTING, OCT. 2013 1 A Lyapunov Optmzaton Approach to Repeated Stochastc Games Mchael J. Neely Unversty of Southern Calforna http://www-bcf.usc.edu/

More information

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm Avalable onlne www.ocpr.com Journal of Chemcal and Pharmaceutcal Research, 2014, 6(7):1884-1889 Research Artcle ISSN : 0975-7384 CODEN(USA) : JCPRC5 A hybrd global optmzaton algorthm based on parallel

More information

Software project management with GAs

Software project management with GAs Informaton Scences 177 (27) 238 241 www.elsever.com/locate/ns Software project management wth GAs Enrque Alba *, J. Francsco Chcano Unversty of Málaga, Grupo GISUM, Departamento de Lenguajes y Cencas de

More information

Testing and Debugging Resource Allocation for Fault Detection and Removal Process

Testing and Debugging Resource Allocation for Fault Detection and Removal Process Internatonal Journal of New Computer Archtectures and ther Applcatons (IJNCAA) 4(4): 93-00 The Socety of Dgtal Informaton and Wreless Communcatons, 04 (ISSN: 0-9085) Testng and Debuggng Resource Allocaton

More information

Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT

Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT Chapter 4 ECOOMIC DISATCH AD UIT COMMITMET ITRODUCTIO A power system has several power plants. Each power plant has several generatng unts. At any pont of tme, the total load n the system s met by the

More information

Course outline. Financial Time Series Analysis. Overview. Data analysis. Predictive signal. Trading strategy

Course outline. Financial Time Series Analysis. Overview. Data analysis. Predictive signal. Trading strategy Fnancal Tme Seres Analyss Patrck McSharry patrck@mcsharry.net www.mcsharry.net Trnty Term 2014 Mathematcal Insttute Unversty of Oxford Course outlne 1. Data analyss, probablty, correlatons, vsualsaton

More information

HowHow to Find the Best Online Stock Broker

HowHow to Find the Best Online Stock Broker A GENERAL APPROACH FOR SECURITY MONITORING AND PREVENTIVE CONTROL OF NETWORKS WITH LARGE WIND POWER PRODUCTION Helena Vasconcelos INESC Porto hvasconcelos@nescportopt J N Fdalgo INESC Porto and FEUP jfdalgo@nescportopt

More information

Dynamic Pricing for Smart Grid with Reinforcement Learning

Dynamic Pricing for Smart Grid with Reinforcement Learning Dynamc Prcng for Smart Grd wth Renforcement Learnng Byung-Gook Km, Yu Zhang, Mhaela van der Schaar, and Jang-Won Lee Samsung Electroncs, Suwon, Korea Department of Electrcal Engneerng, UCLA, Los Angeles,

More information

Multi-Period Resource Allocation for Estimating Project Costs in Competitive Bidding

Multi-Period Resource Allocation for Estimating Project Costs in Competitive Bidding Department of Industral Engneerng and Management Techncall Report No. 2014-6 Mult-Perod Resource Allocaton for Estmatng Project Costs n Compettve dng Yuch Takano, Nobuak Ish, and Masaak Murak September,

More information

Efficient Project Portfolio as a tool for Enterprise Risk Management

Efficient Project Portfolio as a tool for Enterprise Risk Management Effcent Proect Portfolo as a tool for Enterprse Rsk Management Valentn O. Nkonov Ural State Techncal Unversty Growth Traectory Consultng Company January 5, 27 Effcent Proect Portfolo as a tool for Enterprse

More information

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 畫 類 別 : 個 別 型 計 畫 半 導 體 產 業 大 型 廠 房 之 設 施 規 劃 計 畫 編 號 :NSC 96-2628-E-009-026-MY3 執 行 期 間 : 2007 年 8 月 1 日 至 2010 年 7 月 31 日 計 畫 主 持 人 : 巫 木 誠 共 同

More information

Preventive Maintenance and Replacement Scheduling: Models and Algorithms

Preventive Maintenance and Replacement Scheduling: Models and Algorithms Preventve Mantenance and Replacement Schedulng: Models and Algorthms By Kamran S. Moghaddam B.S. Unversty of Tehran 200 M.S. Tehran Polytechnc 2003 A Dssertaton Proposal Submtted to the Faculty of the

More information

Ants Can Schedule Software Projects

Ants Can Schedule Software Projects Ants Can Schedule Software Proects Broderck Crawford 1,2, Rcardo Soto 1,3, Frankln Johnson 4, and Erc Monfroy 5 1 Pontfca Unversdad Católca de Valparaíso, Chle FrstName.Name@ucv.cl 2 Unversdad Fns Terrae,

More information

A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression

A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression Novel Methodology of Workng Captal Management for Large Publc Constructons by Usng Fuzzy S-curve Regresson Cheng-Wu Chen, Morrs H. L. Wang and Tng-Ya Hseh Department of Cvl Engneerng, Natonal Central Unversty,

More information

Forecasting the Demand of Emergency Supplies: Based on the CBR Theory and BP Neural Network

Forecasting the Demand of Emergency Supplies: Based on the CBR Theory and BP Neural Network 700 Proceedngs of the 8th Internatonal Conference on Innovaton & Management Forecastng the Demand of Emergency Supples: Based on the CBR Theory and BP Neural Network Fu Deqang, Lu Yun, L Changbng School

More information

A method for a robust optimization of joint product and supply chain design

A method for a robust optimization of joint product and supply chain design DOI 10.1007/s10845-014-0908-5 A method for a robust optmzaton of jont product and supply chan desgn Bertrand Baud-Lavgne Samuel Bassetto Bruno Agard Receved: 10 September 2013 / Accepted: 21 March 2014

More information

J. Parallel Distrib. Comput.

J. Parallel Distrib. Comput. J. Parallel Dstrb. Comput. 71 (2011) 62 76 Contents lsts avalable at ScenceDrect J. Parallel Dstrb. Comput. journal homepage: www.elsever.com/locate/jpdc Optmzng server placement n dstrbuted systems n

More information

2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet

2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet 2008/8 An ntegrated model for warehouse and nventory plannng Géraldne Strack and Yves Pochet CORE Voe du Roman Pays 34 B-1348 Louvan-la-Neuve, Belgum. Tel (32 10) 47 43 04 Fax (32 10) 47 43 01 E-mal: corestat-lbrary@uclouvan.be

More information

How To Solve An Onlne Control Polcy On A Vrtualzed Data Center

How To Solve An Onlne Control Polcy On A Vrtualzed Data Center Dynamc Resource Allocaton and Power Management n Vrtualzed Data Centers Rahul Urgaonkar, Ulas C. Kozat, Ken Igarash, Mchael J. Neely urgaonka@usc.edu, {kozat, garash}@docomolabs-usa.com, mjneely@usc.edu

More information

Financial Mathemetics

Financial Mathemetics Fnancal Mathemetcs 15 Mathematcs Grade 12 Teacher Gude Fnancal Maths Seres Overvew In ths seres we am to show how Mathematcs can be used to support personal fnancal decsons. In ths seres we jon Tebogo,

More information

Omega 39 (2011) 313 322. Contents lists available at ScienceDirect. Omega. journal homepage: www.elsevier.com/locate/omega

Omega 39 (2011) 313 322. Contents lists available at ScienceDirect. Omega. journal homepage: www.elsevier.com/locate/omega Omega 39 (2011) 313 322 Contents lsts avalable at ScenceDrect Omega journal homepage: www.elsever.com/locate/omega Supply chan confguraton for dffuson of new products: An ntegrated optmzaton approach Mehd

More information

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College Feature selecton for ntruson detecton Slobodan Petrovć NISlab, Gjøvk Unversty College Contents The feature selecton problem Intruson detecton Traffc features relevant for IDS The CFS measure The mrmr measure

More information

Allocating Time and Resources in Project Management Under Uncertainty

Allocating Time and Resources in Project Management Under Uncertainty Proceedngs of the 36th Hawa Internatonal Conference on System Scences - 23 Allocatng Tme and Resources n Project Management Under Uncertanty Mark A. Turnqust School of Cvl and Envronmental Eng. Cornell

More information

A DATA MINING APPLICATION IN A STUDENT DATABASE

A DATA MINING APPLICATION IN A STUDENT DATABASE JOURNAL OF AERONAUTICS AND SPACE TECHNOLOGIES JULY 005 VOLUME NUMBER (53-57) A DATA MINING APPLICATION IN A STUDENT DATABASE Şenol Zafer ERDOĞAN Maltepe Ünversty Faculty of Engneerng Büyükbakkalköy-Istanbul

More information

A system for real-time calculation and monitoring of energy performance and carbon emissions of RET systems and buildings

A system for real-time calculation and monitoring of energy performance and carbon emissions of RET systems and buildings A system for real-tme calculaton and montorng of energy performance and carbon emssons of RET systems and buldngs Dr PAAIOTIS PHILIMIS Dr ALESSADRO GIUSTI Dr STEPHE GARVI CE Technology Center Democratas

More information

Risk Model of Long-Term Production Scheduling in Open Pit Gold Mining

Risk Model of Long-Term Production Scheduling in Open Pit Gold Mining Rsk Model of Long-Term Producton Schedulng n Open Pt Gold Mnng R Halatchev 1 and P Lever 2 ABSTRACT Open pt gold mnng s an mportant sector of the Australan mnng ndustry. It uses large amounts of nvestments,

More information

RELIABILITY, RISK AND AVAILABILITY ANLYSIS OF A CONTAINER GANTRY CRANE ABSTRACT

RELIABILITY, RISK AND AVAILABILITY ANLYSIS OF A CONTAINER GANTRY CRANE ABSTRACT Kolowrock Krzysztof Joanna oszynska MODELLING ENVIRONMENT AND INFRATRUCTURE INFLUENCE ON RELIABILITY AND OPERATION RT&A # () (Vol.) March RELIABILITY RIK AND AVAILABILITY ANLYI OF A CONTAINER GANTRY CRANE

More information

VoIP Playout Buffer Adjustment using Adaptive Estimation of Network Delays

VoIP Playout Buffer Adjustment using Adaptive Estimation of Network Delays VoIP Playout Buffer Adjustment usng Adaptve Estmaton of Network Delays Mroslaw Narbutt and Lam Murphy* Department of Computer Scence Unversty College Dubln, Belfeld, Dubln, IRELAND Abstract The poor qualty

More information

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING Matthew J. Lberatore, Department of Management and Operatons, Vllanova Unversty, Vllanova, PA 19085, 610-519-4390,

More information

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008 Rsk-based Fatgue Estmate of Deep Water Rsers -- Course Project for EM388F: Fracture Mechancs, Sprng 2008 Chen Sh Department of Cvl, Archtectural, and Envronmental Engneerng The Unversty of Texas at Austn

More information

The Stochastic Guaranteed Service Model with Recourse for Multi-Echelon Warehouse Management

The Stochastic Guaranteed Service Model with Recourse for Multi-Echelon Warehouse Management The Stochastc Guaranteed Servce Model wth Recourse for Mult-Echelon Warehouse Management Jörg Rambau, Konrad Schade 1 Lehrstuhl für Wrtschaftsmathematk Unverstät Bayreuth Bayreuth, Germany Abstract The

More information

Frequency Selective IQ Phase and IQ Amplitude Imbalance Adjustments for OFDM Direct Conversion Transmitters

Frequency Selective IQ Phase and IQ Amplitude Imbalance Adjustments for OFDM Direct Conversion Transmitters Frequency Selectve IQ Phase and IQ Ampltude Imbalance Adjustments for OFDM Drect Converson ransmtters Edmund Coersmeer, Ernst Zelnsk Noka, Meesmannstrasse 103, 44807 Bochum, Germany edmund.coersmeer@noka.com,

More information

Waste to Energy System in Shanghai City

Waste to Energy System in Shanghai City Waste to Energy System n Shangha Cty Group of Envronmental Systems, Department of Envronmental Studes M2 46876 Ya-Y Zhang 1. Introducton In the past ffteen years, the economcs of Chna has mantaned contnuously

More information

Research Article A Time Scheduling Model of Logistics Service Supply Chain with Mass Customized Logistics Service

Research Article A Time Scheduling Model of Logistics Service Supply Chain with Mass Customized Logistics Service Hndaw Publshng Corporaton Dscrete Dynamcs n Nature and Socety Volume 01, Artcle ID 48978, 18 pages do:10.1155/01/48978 Research Artcle A Tme Schedulng Model of Logstcs Servce Supply Chan wth Mass Customzed

More information

Research Article Enhanced Two-Step Method via Relaxed Order of α-satisfactory Degrees for Fuzzy Multiobjective Optimization

Research Article Enhanced Two-Step Method via Relaxed Order of α-satisfactory Degrees for Fuzzy Multiobjective Optimization Hndaw Publshng Corporaton Mathematcal Problems n Engneerng Artcle ID 867836 pages http://dxdoorg/055/204/867836 Research Artcle Enhanced Two-Step Method va Relaxed Order of α-satsfactory Degrees for Fuzzy

More information

What is Candidate Sampling

What is Candidate Sampling What s Canddate Samplng Say we have a multclass or mult label problem where each tranng example ( x, T ) conssts of a context x a small (mult)set of target classes T out of a large unverse L of possble

More information

Fast degree elevation and knot insertion for B-spline curves

Fast degree elevation and knot insertion for B-spline curves Computer Aded Geometrc Desgn 22 (2005) 183 197 www.elsever.com/locate/cagd Fast degree elevaton and knot nserton for B-splne curves Q-Xng Huang a,sh-mnhu a,, Ralph R. Martn b a Department of Computer Scence

More information

Dynamic Scheduling of Emergency Department Resources

Dynamic Scheduling of Emergency Department Resources Dynamc Schedulng of Emergency Department Resources Junchao Xao Laboratory for Internet Software Technologes, Insttute of Software, Chnese Academy of Scences P.O.Box 8718, No. 4 South Fourth Street, Zhong

More information

DEFINING %COMPLETE IN MICROSOFT PROJECT

DEFINING %COMPLETE IN MICROSOFT PROJECT CelersSystems DEFINING %COMPLETE IN MICROSOFT PROJECT PREPARED BY James E Aksel, PMP, PMI-SP, MVP For Addtonal Informaton about Earned Value Management Systems and reportng, please contact: CelersSystems,

More information

Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm

Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm Songklanakarn J. Sc. Technol. 37 (2), 221-230, Mar.-Apr. 2015 http://www.sst.psu.ac.th Orgnal Artcle Optmzed ready mxed concrete truck schedulng for uncertan factors usng bee algorthm Nuntana Mayteekreangkra

More information

An Integrated Approach for Maintenance and Delivery Scheduling in Military Supply Chains

An Integrated Approach for Maintenance and Delivery Scheduling in Military Supply Chains An Integrated Approach for Mantenance and Delvery Schedulng n Mltary Supply Chans Dmtry Tsadkovch 1*, Eugene Levner 2, Hanan Tell 2 and Frank Werner 3 2 1 Bar Ilan Unversty, Department of Management, Ramat

More information

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur Module LOSSLESS IMAGE COMPRESSION SYSTEMS Lesson 3 Lossless Compresson: Huffman Codng Instructonal Objectves At the end of ths lesson, the students should be able to:. Defne and measure source entropy..

More information

EVERY year, seasonal hurricanes threaten coastal areas.

EVERY year, seasonal hurricanes threaten coastal areas. 1 Strategc Stockplng of Power System Supples for Dsaster Recovery Carleton Coffrn, Pascal Van Hentenryck, and Russell Bent Abstract Ths paper studes the Power System Stochastc Storage Problem (PSSSP),

More information

Dynamic Constrained Economic/Emission Dispatch Scheduling Using Neural Network

Dynamic Constrained Economic/Emission Dispatch Scheduling Using Neural Network Dynamc Constraned Economc/Emsson Dspatch Schedulng Usng Neural Network Fard BENHAMIDA 1, Rachd BELHACHEM 1 1 Department of Electrcal Engneerng, IRECOM Laboratory, Unversty of Djllal Labes, 220 00, Sd Bel

More information

Efficient QoS Aggregation in Service Value Networks

Efficient QoS Aggregation in Service Value Networks 22 45th Hawa Internatonal Conference on System Scences Effcent QoS Aggregaton n Servce Value etworks Steffen Haak Research Center for Informaton Technology (FZI) haak@fz.de Benjamn Blau SAP AG benjamn.blau@sap.com

More information

2. SYSTEM MODEL. the SLA (unlike the only other related mechanism [15] we can compare it is never able to meet the SLA).

2. SYSTEM MODEL. the SLA (unlike the only other related mechanism [15] we can compare it is never able to meet the SLA). Managng Server Energy and Operatonal Costs n Hostng Centers Yyu Chen Dept. of IE Penn State Unversty Unversty Park, PA 16802 yzc107@psu.edu Anand Svasubramanam Dept. of CSE Penn State Unversty Unversty

More information

Examensarbete. Rotating Workforce Scheduling. Caroline Granfeldt

Examensarbete. Rotating Workforce Scheduling. Caroline Granfeldt Examensarbete Rotatng Workforce Schedulng Carolne Granfeldt LTH - MAT - EX - - 2015 / 08 - - SE Rotatng Workforce Schedulng Optmerngslära, Lnköpngs Unverstet Carolne Granfeldt LTH - MAT - EX - - 2015

More information

PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 12

PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 12 14 The Ch-squared dstrbuton PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 1 If a normal varable X, havng mean µ and varance σ, s standardsed, the new varable Z has a mean 0 and varance 1. When ths standardsed

More information

Optimal Bidding Strategies for Generation Companies in a Day-Ahead Electricity Market with Risk Management Taken into Account

Optimal Bidding Strategies for Generation Companies in a Day-Ahead Electricity Market with Risk Management Taken into Account Amercan J. of Engneerng and Appled Scences (): 8-6, 009 ISSN 94-700 009 Scence Publcatons Optmal Bddng Strateges for Generaton Companes n a Day-Ahead Electrcty Market wth Rsk Management Taken nto Account

More information

Forecasting the Direction and Strength of Stock Market Movement

Forecasting the Direction and Strength of Stock Market Movement Forecastng the Drecton and Strength of Stock Market Movement Jngwe Chen Mng Chen Nan Ye cjngwe@stanford.edu mchen5@stanford.edu nanye@stanford.edu Abstract - Stock market s one of the most complcated systems

More information

Lecture 2: Single Layer Perceptrons Kevin Swingler

Lecture 2: Single Layer Perceptrons Kevin Swingler Lecture 2: Sngle Layer Perceptrons Kevn Sngler kms@cs.str.ac.uk Recap: McCulloch-Ptts Neuron Ths vastly smplfed model of real neurons s also knon as a Threshold Logc Unt: W 2 A Y 3 n W n. A set of synapses

More information

Optimal resource capacity management for stochastic networks

Optimal resource capacity management for stochastic networks Submtted for publcaton. Optmal resource capacty management for stochastc networks A.B. Deker H. Mlton Stewart School of ISyE, Georga Insttute of Technology, Atlanta, GA 30332, ton.deker@sye.gatech.edu

More information

Minimal Coding Network With Combinatorial Structure For Instantaneous Recovery From Edge Failures

Minimal Coding Network With Combinatorial Structure For Instantaneous Recovery From Edge Failures Mnmal Codng Network Wth Combnatoral Structure For Instantaneous Recovery From Edge Falures Ashly Joseph 1, Mr.M.Sadsh Sendl 2, Dr.S.Karthk 3 1 Fnal Year ME CSE Student Department of Computer Scence Engneerng

More information

Stochastic Inventory Management for Tactical Process Planning under Uncertainties: MINLP Models and Algorithms

Stochastic Inventory Management for Tactical Process Planning under Uncertainties: MINLP Models and Algorithms Stochastc Inventory Management for Tactcal Process Plannng under Uncertantes: MINLP Models and Algorthms Fengq You, Ignaco E. Grossmann Department of Chemcal Engneerng, Carnege Mellon Unversty Pttsburgh,

More information

Topics in Offshore Oil Production Optimization using Real-Time Data

Topics in Offshore Oil Production Optimization using Real-Time Data Hans Petter Beker Topcs n Offshore Ol Producton Optmzaton usng Real-Tme Data Thess for the degree of doktor ngenør Trondhem, June 2007 Norwegan Unversty of Scence and Technology Faculty of Informaton Technology,

More information

NONLINEAR OPTIMIZATION FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY

NONLINEAR OPTIMIZATION FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY NONLINEAR OPTIMIZATION FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY A Dssertaton Presented to the Faculty of the Graduate School of Cornell Unversty In Partal Fulfllment of the Requrements

More information

A Simple Approach to Clustering in Excel

A Simple Approach to Clustering in Excel A Smple Approach to Clusterng n Excel Aravnd H Center for Computatonal Engneerng and Networng Amrta Vshwa Vdyapeetham, Combatore, Inda C Rajgopal Center for Computatonal Engneerng and Networng Amrta Vshwa

More information

A Genetic Programming Based Stock Price Predictor together with Mean-Variance Based Sell/Buy Actions

A Genetic Programming Based Stock Price Predictor together with Mean-Variance Based Sell/Buy Actions Proceedngs of the World Congress on Engneerng 28 Vol II WCE 28, July 2-4, 28, London, U.K. A Genetc Programmng Based Stock Prce Predctor together wth Mean-Varance Based Sell/Buy Actons Ramn Rajaboun and

More information

"Research Note" APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES *

Research Note APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES * Iranan Journal of Scence & Technology, Transacton B, Engneerng, ol. 30, No. B6, 789-794 rnted n The Islamc Republc of Iran, 006 Shraz Unversty "Research Note" ALICATION OF CHARGE SIMULATION METHOD TO ELECTRIC

More information

SIMULATION OPTIMIZATION: APPLICATIONS IN RISK MANAGEMENT

SIMULATION OPTIMIZATION: APPLICATIONS IN RISK MANAGEMENT Internatonal Journal of Informaton Technology & Decson Makng Vol. 7, No. 4 (2008) 571 587 c World Scentfc Publshng Company SIMULATION OPTIMIZATION: APPLICATIONS IN RISK MANAGEMENT MARCO BETTER and FRED

More information

Maintenance Scheduling by using the Bi-Criterion Algorithm of Preferential Anti-Pheromone

Maintenance Scheduling by using the Bi-Criterion Algorithm of Preferential Anti-Pheromone Leonardo ournal of Scences ISSN 583-0233 Issue 2, anuary-une 2008 p. 43-64 Mantenance Schedulng by usng the B-Crteron Algorthm of Preferental Ant-Pheromone Trantafyllos MYTAKIDIS and Arstds VLACHOS Department

More information

Multiple-Period Attribution: Residuals and Compounding

Multiple-Period Attribution: Residuals and Compounding Multple-Perod Attrbuton: Resduals and Compoundng Our revewer gave these authors full marks for dealng wth an ssue that performance measurers and vendors often regard as propretary nformaton. In 1994, Dens

More information

Dynamic Fleet Management for Cybercars

Dynamic Fleet Management for Cybercars Proceedngs of the IEEE ITSC 2006 2006 IEEE Intellgent Transportaton Systems Conference Toronto, Canada, September 17-20, 2006 TC7.5 Dynamc Fleet Management for Cybercars Fenghu. Wang, Mng. Yang, Ruqng.

More information

Business Process Improvement using Multi-objective Optimisation K. Vergidis 1, A. Tiwari 1 and B. Majeed 2

Business Process Improvement using Multi-objective Optimisation K. Vergidis 1, A. Tiwari 1 and B. Majeed 2 Busness Process Improvement usng Mult-objectve Optmsaton K. Vergds 1, A. Twar 1 and B. Majeed 2 1 Manufacturng Department, School of Industral and Manufacturng Scence, Cranfeld Unversty, Cranfeld, MK43

More information

Calculation of Sampling Weights

Calculation of Sampling Weights Perre Foy Statstcs Canada 4 Calculaton of Samplng Weghts 4.1 OVERVIEW The basc sample desgn used n TIMSS Populatons 1 and 2 was a two-stage stratfed cluster desgn. 1 The frst stage conssted of a sample

More information

An Evaluation of the Extended Logistic, Simple Logistic, and Gompertz Models for Forecasting Short Lifecycle Products and Services

An Evaluation of the Extended Logistic, Simple Logistic, and Gompertz Models for Forecasting Short Lifecycle Products and Services An Evaluaton of the Extended Logstc, Smple Logstc, and Gompertz Models for Forecastng Short Lfecycle Products and Servces Charles V. Trappey a,1, Hsn-yng Wu b a Professor (Management Scence), Natonal Chao

More information

Optimal Joint Replenishment, Delivery and Inventory Management Policies for Perishable Products

Optimal Joint Replenishment, Delivery and Inventory Management Policies for Perishable Products Optmal Jont Replenshment, Delvery and Inventory Management Polces for Pershable Products Leandro C. Coelho Glbert Laporte May 2013 CIRRELT-2013-32 Bureaux de Montréal : Bureaux de Québec : Unversté de

More information

Optimization under uncertainty. Antonio J. Conejo The Ohio State University 2014

Optimization under uncertainty. Antonio J. Conejo The Ohio State University 2014 Optmzaton under uncertant Antono J. Conejo The Oho State Unverst 2014 Contents Stochastc programmng (SP) Robust optmzaton (RO) Power sstem applcatons A. J. Conejo The Oho State Unverst 2 Stochastc Programmng

More information

Trade Adjustment and Productivity in Large Crises. Online Appendix May 2013. Appendix A: Derivation of Equations for Productivity

Trade Adjustment and Productivity in Large Crises. Online Appendix May 2013. Appendix A: Derivation of Equations for Productivity Trade Adjustment Productvty n Large Crses Gta Gopnath Department of Economcs Harvard Unversty NBER Brent Neman Booth School of Busness Unversty of Chcago NBER Onlne Appendx May 2013 Appendx A: Dervaton

More information

HYDROGEN STORAGE FOR MIXED WIND-NUCLEAR POWER PLANTS IN THE CONTEXT OF A HYDROGEN ECONOMY

HYDROGEN STORAGE FOR MIXED WIND-NUCLEAR POWER PLANTS IN THE CONTEXT OF A HYDROGEN ECONOMY HYDROGEN STORAGE FOR MIXED WIND-NUCLEAR OWER LANTS IN THE CONTEXT OF A HYDROGEN ECONOMY Gregor Taljan*, Mchael Fowler 1, Claudo Cañzares 1, Gregor Verbč 2 *Unversty of Ljubljana, Faculty of Electrcal Engneerng

More information

Formulating & Solving Integer Problems Chapter 11 289

Formulating & Solving Integer Problems Chapter 11 289 Formulatng & Solvng Integer Problems Chapter 11 289 The Optonal Stop TSP If we drop the requrement that every stop must be vsted, we then get the optonal stop TSP. Ths mght correspond to a ob sequencng

More information

On-Line Fault Detection in Wind Turbine Transmission System using Adaptive Filter and Robust Statistical Features

On-Line Fault Detection in Wind Turbine Transmission System using Adaptive Filter and Robust Statistical Features On-Lne Fault Detecton n Wnd Turbne Transmsson System usng Adaptve Flter and Robust Statstcal Features Ruoyu L Remote Dagnostcs Center SKF USA Inc. 3443 N. Sam Houston Pkwy., Houston TX 77086 Emal: ruoyu.l@skf.com

More information

SPECIALIZED DAY TRADING - A NEW VIEW ON AN OLD GAME

SPECIALIZED DAY TRADING - A NEW VIEW ON AN OLD GAME August 7 - August 12, 2006 n Baden-Baden, Germany SPECIALIZED DAY TRADING - A NEW VIEW ON AN OLD GAME Vladmr Šmovć 1, and Vladmr Šmovć 2, PhD 1 Faculty of Electrcal Engneerng and Computng, Unska 3, 10000

More information

Simulating injection moulding of microfeatured components

Simulating injection moulding of microfeatured components Smulatng njecton mouldng of mcrofeatured components T. Tofteberg 1 * and E. Andreassen 1 1 SINTEF Materals and Chemstry, Oslo, Norway terje.tofteberg@sntef.no; erk.andreassen@sntef.no Numercal smulaton

More information

Can Auto Liability Insurance Purchases Signal Risk Attitude?

Can Auto Liability Insurance Purchases Signal Risk Attitude? Internatonal Journal of Busness and Economcs, 2011, Vol. 10, No. 2, 159-164 Can Auto Lablty Insurance Purchases Sgnal Rsk Atttude? Chu-Shu L Department of Internatonal Busness, Asa Unversty, Tawan Sheng-Chang

More information

ASSESSING THE AVAILABILITY AND ALLOCATION OF PRODUCTION CAPACITY IN A FABRICATION FACILITY THROUGH SIMULATION MODELING: A CASE STUDY

ASSESSING THE AVAILABILITY AND ALLOCATION OF PRODUCTION CAPACITY IN A FABRICATION FACILITY THROUGH SIMULATION MODELING: A CASE STUDY Internatonal Journal of Industral Engneerng, 15(2), 166-175, 2008. ASSESSING THE AVAILABILITY AND ALLOCATION OF PRODUCTION CAPACITY IN A FABRICATION FACILITY THROUGH SIMULATION MODELING: A CASE STUDY J.H.

More information