Simulation and optimization of supply chains: alternative or complementary approaches?

Size: px
Start display at page:

Download "Simulation and optimization of supply chains: alternative or complementary approaches?"

Transcription

1 Smulaton and optmzaton of supply chans: alternatve or complementary approaches? Chrstan Almeder Margaretha Preusser Rchard F. Hartl Orgnally publshed n: OR Spectrum (2009) 31: DOI /s z Abstract Dscrete-event smulaton and (mxed-nteger) lnear programmng are wdely used for supply chan plannng. We present a general framework to support the operatonal decsons for supply chan networks usng a combnaton of an optmzaton model and dscrete-event smulaton. The smulaton model ncludes nonlnear and stochastc elements, whereas the optmzaton model represents a smplfed verson. Based on ntal smulaton runs cost parameters, producton, and transportaton tmes are estmated for the optmzaton model. The soluton of the optmzaton model s translated nto decson rules for the dscrete-event smulaton. Ths procedure s appled teratvely untl the dfference between subsequent solutons s small enough. Ths method s appled successfully to several test examples and s shown to delver compettve results much faster compared to conventonal mxed-nteger models n a stochastc envronment. It provdes the possblty to model and solve more realstc problems (ncorporatng dynamsm and uncertanty) n an acceptable way. The lmtatons of ths approach are gven as well. Keywords Supply chan management Optmzaton Dscrete-event smulaton Hybrd method C. Almeder (B) M. Preusser R. F. Hartl Unversty of Venna, Brünnerstr 72, 1210 Venna, Austra e-mal: chrstan.almeder@unve.ac.at M. Preusser e-mal: margaretha.preusser@unve.ac.at R. F. Hartl e-mal: rchard.hartl@unve.ac.at H.O. Günther, H. Meyr, Supply Chan Plannng c Sprnger-Verlag Berln Hedelberg

2 30 C. Almeder et al. 1 Introducton In recent years ntra-company supply chans have been growng sgnfcantly spannng producton and dstrbuton stes all over the world. At the same tme global competton has ncreased, such that there s a strong demand for new decson support tools on strategc, tactcal and operatonal levels. Bswas and Narahar (2004) classfed the relevant research on such decson support systems nto three categores: (a) (b) (c) Optmzaton models manly for mult-echelon nventory control. In most cases these models are determnstc and used for strategc or tactcal decsons. Analytcal performance models, whch consder a dynamc and stochastc envronment. They are used to nvestgate desgn or prncpal management decsons. Such systems are represented as Markov chans, Petr nets or queung models. Smulaton and nformaton models, whch are used to analyze complex dynamc and stochastc stuatons and to understand ssues of supply chan decson makng. For the frst and the second categores, t s often necessary to make several smplfcatons from the real-world case n order to develop solvable models. Nevertheless the problem sze s usually very lmted. Although there are promsng developments of combnatons of these two categores (cf. Sect. 2), many of them reman on a strategc level and the stochastc property s consdered by a small number of dfferent scenaros. In ths paper we develop a new soluton approach by applyng a LP/MIP formulaton n the context of a dscrete-event smulaton. So we are able to combne the advantages of models from all categores mentoned above by consderng a detaled representaton of a dynamc and stochastc envronment and allow the applcaton of optmzaton methods n ths context. Our nvestgatons are based on a general supply chan network model wth dfferent facltes (supplers, manufacturers, dstrbutors) and dfferent transportaton modes connectng these facltes. We assume that there s a central planner wth perfect nformaton such as for ntra-company supply chans or supply chans wth a domnant member. Ths problem settng s motvated by a case study about a global supply chan network n the paper ndustry (Gronalt et al. 2007). The goal s to reduce costs by smultaneously optmzng the producton/transportaton schedule and reducng nventory levels. We are amng for a robust soluton, n the sense that a stochastc envronment s consdered. Comparng our problem to the tasks n the supply chan matrx (cf. Stadtler 2005), the problem s a combnaton of several operatonal tasks: producton plannng, dstrbuton plannng and transport plannng. In addton to other approaches, we assume a stochastc smulaton model for these tasks and combne t wth classcal optmzaton approaches. Our goal s to acheve an optmal operaton plan for supply chan networks by combnng optmzaton models and smulaton models. We do not use the optmzaton on top of the smulaton, where an optmzaton algorthm uses the smulaton model as a black-box evaluaton functon (cf. Glover et al. 1999). Instead we nclude smulaton and optmzaton n an teratve process n order to gan the advantages of optmzaton (exact soluton) and smulaton (nonlneartes, complex structure, stochastcty). In the prevous research (Almeder and Preusser 2004; Preusser et al. 2005a,b) we

3 Smulaton and optmzaton of supply chans 31 smulate Solutons of smulaton experments aggregate Decson rules n D-E model Optmzaton model derve Lnear soluton optmze Fg. 1 Interacton between smulaton and optmzaton developed a rough dea of ths concept. In the current paper we extended ths concept, such that t s possble to apply t to a wde range of supply chan problems. Furthermore we analyze n detal the advantages and dsadvantages of ths approach and present results for dfferent test cases. The supply chan s represented as a dscrete-event model (D-E model) and a smplfed verson s modeled as an optmzaton model. We start by performng several smulaton runs n order to get average values of the parameters (e.g., unt transportaton costs) whch are then fed nto the optmzaton model. After solvng the optmzaton model the result s transformed nto decson rules that are used n the dscrete-event model. Then we start agan wth further smulaton experments (see Fg. 1), and so on. Our contrbuton s twofold: Development and analyss of a general framework (Fg. 1) and a toolbox for the combnaton of dscrete-event smulaton and optmzaton of supply chans. For stochastc supply chans, an teratve combnaton of smulaton and lnear programmng s emprcally shown to be compettve compared to determnstc MIP-models. The paper s organzed as follows: We start wth a lterature revew n Sect. 2, followed by a descrpton of the general model framework n Sect. 3. In Sect. 4 we explan the lnkage between the smulaton model and ts lnear verson. Fnally, we report on dfferent test results n Sect. 5 and gve conclusons and an outlook for possble future research n Sect Lterature revew 2.1 Supply chans Aspects of the ntegraton of transport and producton plannng wthn supply chans have been nvestgated n several papers (cf. Erengüc et al. 1999). Combned plannng approaches for dfferent decson levels (e.g., tactcal and operatonal decsons) can be found n Meyr (2002) and Schneewess (2003). There are numerous papers dealng wth lnear or mxed-nteger programs for supply chan networks and network flows. Yaged (1971) dscussed n hs paper a statc network model whch ncludes

4 32 C. Almeder et al. nonlneartes. He tres to optmze the product flow by solvng a lnearzed verson of the network and to mprove the flow n the network. Paraschs (1989) dscussed several dfferent possbltes to lnearze such networks and Fleschmann (1993) presented several applcatons of network flow models, whch are solved through lnearzaton. Pankaj and Fsher (1994) showed that based on an MIP model the coordnaton of producton and dstrbuton can reduce the operatng cost substantally. Dogan and Goetschalckx (1999) showed that larger supply chan desgn problems can be solved usng decomposton. A recent case study about a supply chan of the pulp ndustry modeled as a MIP s gven by Gunnarsson et al. (2007). In general the problems solved wth LPs and MIPs usually nclude several smplfcatons n order to keep them solvable. Recent publcatons also ncluded stochastc elements n the optmzaton models. Santoso et al. (2005) consdered a stochastc programmng approach for the supply chan network desgn. They used a sample average approxmaton and Benders decomposton to solve desgn problems for a supply chan whle consderng future operatonal costs. For that purpose they developed a lnear model wth uncertan cost factors and demand. Although they used a fast algorthm, realstc problems wth sample szes of up to 60 scenaros need several hours to be solved. Alonso-Ayuso et al. (2003) consdered a smlar combned desgn and operaton problem. Ther stochastc programmng approach was able to solve medum szed problems wth about 100 bnary decsons wthn 1 h. Leung et al. (2007) presented a robust optmzaton model for a smultaneous producton plannng for several stes n a supply chan under uncertanty. But stll they are restrcted to rather small models and consder only four dfferent scenaros. In the feld of supply chan smulaton Klejnen (2005) gave a short overvew of smulaton tools and technques used for supply chans. He dstngushed between four dfferent approaches: spreadsheet smulaton, system dynamcs, dscrete-event dynamc systems smulaton, and busness games. Clearly, dscrete-event smulaton s the most powerful tool to consder complex stochastc systems. Numerous software packages for dscrete-event smulaton are avalable, both very specalzed ones for a specfc part of the supply chan and general ones wth a hgh functonalty n modelng and vsualzaton of supply chans (cf. Kelton et al. 2002; Kuhn and Rabe 1998). One example s the Supply Net Smulator presented by Stäblen et al. (2007). It allows smulatng the behavor of ndvdual members n a supply chan network. They used an agent-based approach, where each member optmzes ts own operatons n the sense of an advanced plannng system. But there s no nteracton between smulaton and optmzaton. 2.2 Optmzaton and smulaton Most of today s smulators nclude possbltes to do a black-box parameter optmzaton of a smulaton model. Glover et al. (1999) presented the successful development of OptQuest ( OptTek Systems, Inc. 1 ), an optmzaton toolbox contanng dfferent 1

5 Smulaton and optmzaton of supply chans 33 algorthms (manly metaheurstcs) desgned to optmze confguraton decsons n smulaton models. The smulaton model s used only for the evaluaton of the objectve value, no further structural nformaton s used. Swsher et al. (2000) and Fu (2002) stated n ther papers that there s stll a bg gap between optmzaton methods for smulaton-based optmzaton used n commercal software and methods avalable n research lterature. Truong and Azadvar (2003) developed an envronment for solvng supply chan desgn problems, where they combne smulaton wth genetc algorthms and mxednteger programs. Strategc decsons regardng faclty locaton and partner selecton are consdered. The work by Lee and Km (2002), possbly the most related work n ths context, shows a combnaton of smulaton and optmzaton for the case of a productondstrbuton system. They use smulaton to check the capacty assumptons used for a smpler lnear model n a more realstc envronment wth stochastc machne breakdowns and to update these capacty parameters for the optmzaton. After several teratons they end up wth a soluton of the optmzaton model whch s also wthn the constrants of the stochastc smulaton model. Ther method s qute smlar to our approach, but they am for more realstc capacty estmaton for the optmzaton model. In contrast, we try to fnd a robust plan for producton, stockng, and transportaton consderng stochastc and nonlnear operatons and costs by estmatng delays and cost factors based on smulaton experments. 3 The supply chan network model The general descrpton of the supply chan orgnates from a case study about a supply chan n the paper ndustry (cf. Gronalt et al. 2007). Several producton stes are used to manufacture dfferent paper products, whch are delvered ether drectly or va hubs to customers all over the world. The man task n ths case study was to develop a 1-year plan for producton quanttes and transportaton lnks. In ths case study a statc model was developed, whch was used to get rough estmates quckly. Inspred by ths case study we formulate the followng problem settng. The bass for our supply chan model s a predefned network,.e., the locatons of all actors and the connectons between them are gven. Wthn the network we dfferentate between three types of partcpants connected by transportaton lnks: supplers provdng raw materals; customers who demand certan products at a specfc tme; producton/warehouse stes where producton, stockng, and transshpment takes place. The whole supply chan s order-drven, that means products are manufactured or transported only f a subsequent member of the supply chan requests t. So the orgn for all actvtes s the predefned determnstc demand of the customers. All actvtes are based on tme perods, whch mght be days or shorter tme perods. The supplers are used as source for raw materals, whch are sent to producton stes f requested. Producton/warehouse stes can store ncomng products. These products

6 34 C. Almeder et al. can be used to manufacture new products, or they are smply transferred to the output nventory. From there they are sent to subsequent members of the supply chan. The smulaton model s mplemented usng AnyLogc ( XJ Technologes), a Java-based smulaton tool. The model s constructed as a lbrary ncludng several dfferent modules. These modules represent the four types of partcpants n the supply chan network plus a general control module necessary for controllng the smulaton experments as well as the communcaton wth the optmzaton model whch was developed usng Xpress-MP ( Dash Optmzaton). Ths model s a smplfed determnstc verson of the lbrary modules of the smulaton model. In ths secton we wll explan the dfferent modules of our supply chan network. 3.1 Module suppler Smulaton model. Ths module s used to generate certan products, store them, and delver them f demanded. It has one nput port to receve orders for products and one output port to delver products. If ths module receves an order through the nput port, then t sends the requested amount of products va the output port. If the amount exceeds the current nventory level, only the avalable amount s sent. As soon as new products arrve n the nventory they are delvered untl the whole order has been fulflled. The costs arsng n ths module are only nventory costs for storng products pror to delvery. These costs may have any user-defned functonal form. Accordng to the gven parameters n each perod, new products are generated and added to the stock. Optmzaton model. We also developed a smplfed representaton as an optmzaton model. We denote by J S the set of supplers wthn a network, by P the set of products, and by T the number of perods. The representaton of the suppler s behavor n the optmzaton model can be formulated as follows (If p and t are free ndces,.e. not used as a summaton ndex, then the set of equatons s meant to be vald t = 1,...,T, p P.): TC S = T out H p ( out l p (t)) J S, (1) p P t=1 (t) = out l p (t 1) out f p (t) + S p (t) J S, (2) out l p (t) 0 J S. (3) out l p For a complete lst of parameters and varables, see Appendx C. The overall cost of suppler s denoted by TC S, consstng only of the holdng cost out H p ( ) of the output nventory, expressed by the rght-hand sde of (1). Equatons (2) are the nventory balance equatons for the output nventores out l p (t). The stock s dmnshed by the outflow of materals, out f p (t), and ncreased by the gven supply S p (t). Thelast set of constrants (3) guarantees that the nventory level cannot be negatve. The smulaton and the optmzaton model are connected va the holdng costs n (1) whch represent the user-defned cost functon n the smulaton.

7 Smulaton and optmzaton of supply chans Module producton Smulaton model. Ths module s the core of the whole model. It represents a producton ste as well as a transshpment pont. It conssts of an nput and an output storage. Items are ether transformed nto new tems or smply transferred from the nput to the output storage. Ths module has one nput port and one output port for orders, as well as one nput and one output port for products. The nput storage s replenshed by orderng products va the output port for orders from a suppler or another producton module. The orderng polcy may be ether autonomous (e.g., an (s,s)-polcy or any user-defned polcy) or t s determned by the result of the optmzaton model. Products are receved through the product nput port and stored n the nput nventory. The producton of new products or the transfer of products s ntated by an nternal order placed by the output nventory (ether autonomous or based on the soluton of the optmzaton model). The delay for producton and transfer s a user-defned functon. It may contan stochastc elements and depend on other parameters (e.g., the current load). Producton and transfer have lmted capactes and furthermore producton s restrcted to the avalablty of raw materals (other products). If these capactes do not allow producng (or transferrng) a lot as a whole, t s splt nto several batches. Through the nput order port the module receves orders from other producton or customer modules. Products are sent through the output product port accordng to these orders and based on avalablty. Costs arse n ths model for nventory holdng (nput and output), for producton, and for transfer. Optmzaton model. The optmzaton model for the producton node s as follows (we denote by J I the set of producton nodes n the supply chan network): TC I = p P + p P T t=1 W p ( p m (t)) + p P T t=1 m p (t) prod Cap p (t), u p (t) ta Cap p (t), T t=1 ( ) n H p n l p (t) + p P p P p P n l p (t) = n l p (t 1) + n f p (t) Z p ( p u (t)) T t=1 out H p ( out l p (t)) J I, (4) a p m p (t) prod C (t) J I, (5) d p u p (t) ta C (t) J I, (6) α p (p ) m p (t) u p (t) + r p (t) J I, (7) p P out l p (t) = out l p (t 1) out f p (t) + χ p t δ m p (t δ p ) +χ p t σ u p (t σ p ) + s p (t) J I, (8) n l p (t) nvn Cap p (t), q p n l p (t) n L (t) J I, (9) p P

8 36 out l p (t) nvout Cap p (t), p P q p m p (t) 0, u p (t) 0, n l p (t) 0, out C. Almeder et al. out l p (t) out L (t) J I, (10) l p (t) 0 J I. (11) The overall cost of a producton node s represented by TC I. These costs consst of producton costs (the producton amounts are denoted by m p (t)) transfer costs (the transfer amounts are denoted by u p (t)) and the holdng costs of the nput and the output nventory. Constrants (5) and (6) restrct the producton and the transfer for each product ndvdually, as well as for the total producton and transfer. In the latter case the amounts are multpled by the resource requrements. The dstncton between ndvdual capacty constrants for each product and global capacty constrants are necessary to cover general stuatons where dfferent resources as well as common resources are necessary for producton. Equatons (7) are the nventory balance equatons for the nput nventores. The current nventory level s determned by the nventory level of the prevous perod, the nflow from other nodes, the requred raw materals for producton, the transfer amount and some external nflow (from outsde of the system); α p (p ) represents the unts of raw materal p whch s necessary to produce one unt of product p. The nventory balance equatons for the output nventores (8) are smlar, but the producton and transfer delays (δ p,σp )havetobe consdered before a new product arrves n the output nventory. Functon χ t ε s an ndcator functon, used n order to avod the use of producton and transfer amounts for negatve perods. Equatons (9) and (10) are used to restrct the stock of the nput and the output nventory (for each product separately and accumulated usng the space requrements q p ). These two types of restrctons allow modelng a dedcated-storage as well as a random-storage polcy. The smulaton model and the optmzaton model are connected through the cost factors n Eqs. (4) and producton and transfer delays (δ p,σp ), whch are user-defned functons n the smulaton model possbly contanng stochastc and nonlnear elements. Furthermore the producton and transfer amounts (m p (t), u p (t)) ofthe optmzaton model are used to determne producton plans n the smulaton model. For example, f m p (t) >0 for a specfc product and perod, then n the smulaton model the amount gven by m p (t) s ordered n perod t. 3.3 Module customer Smulaton model. Accordng to a gven demand table, the customer places orders at the producton stes. Due to stochastc features wthn the smulaton, t s not possble to tme delveres exactly. Therefore the customer has an nput nventory, whch s used to satsfy the demand. The nventory level can be negatve (shortages), as well as postve (oversupply). In both cases penalty costs occur, whch are hgher for shortages. The module has one output port for sendng requests and one nput port for recevng products. The orders are sent ether accordng to the demand table (ncludng a standard delay tme for transportaton) or accordng to the soluton of the optmzaton model.

9 Smulaton and optmzaton of supply chans 37 Optmzaton model. The optmzaton model for the customers behavor can be wrtten as follows (we denote by J C the set of customer nodes n the supply chan network): TC C = p P T t=1 R p (n b p (t)) J C, (12) n l p (t) n b p (t) = n l p (t 1) n b p (t 1) + n f p (t) D p (t) + r p (t) J C, (13) n l p (t) = 0 J C. (14) In (12) we calculate the cost at the suppler whch conssts only of penalty cost for back orders n b p (t). Equatons (13) are the nventory balance equatons where the customers demands D p (t) are consdered. It s assumed that all customers are justn-tme customers. Therefore, constrants (14) ensure that no oversupply (postve stock level) s possble,.e. t s not allowed to send more products than demanded by the customers. Ths JIT assumpton may be dropped and holdng costs for postve stock may be ncluded. In the smulaton model the JIT assumpton s weakened, because stochastc transportaton tmes may cause an unwanted early delvery. These early delveres are penalzed. The dfferences between the smulaton model and ts representaton as an optmzaton model are the penalty cost factors n (12) and the JIT assumpton expressed n (14). 3.4 Module transport Smulaton model. Ths module s used to transport products between dfferent modules. It receves products through ts sngle nput port and sends t (accordng to some tme delay) through the output port to the next module (Producton or Customer). It has a lmted capacty and organzes the transports accordng to a FIFO rule. It s also possble to splt shpments f the avalable capacty does not allow sngle shpment. The tme delay may be stochastc and may depend on other parameters. User-defned costs arse for transportaton and may nclude transportaton tme, amounts, and fxed charge parts. Optmzaton model. The representaton of the transport modules as an optmzaton model can be formulated as follows. Each transport module s dentfed by the ndces of the nodes, whch t connects. Furthermore, we need an addtonal ndex v V denotng the dfferent transport modes (f v s not used as a summaton ndex, the equatons are vald for all v V ): TC T j = T t=1 v V p P ( ) v C p v j x p j (t) J S J I, j J I J C, (15)

10 38 C. Almeder et al. v x p j (t) v Cap p j (t), v g p vx p j (t) v C j (t) J S J I, j J I J C, p P (16) n f p j (t) = out f p (t) = J s J I v τ j <t v V j J I J C v V v x p j (t v τ j ) j J I J C, (17) v x p j (t) J S J I, (18) v x p j (t) 0 J S J I, j J I J C. (19) The total transportaton cost for transports from member to member j of the supply chan network s denoted by TCj T and v x p j (t) gves the transportaton amount for each perod, each product, and each transportaton mode. Constrants (16) lmt the transportaton to a product-specfc and an overall capacty lmt. Equatons (17) and (18) represent the nflow of products to member j and the outflow of products from member. The connecton between the smulaton and the optmzaton model s establshed by the transportaton cost functons n (15) and the transportaton delays v τ j n (17) on the one hand, and through the transportaton amounts v x p j (t) on the other hand. These transportaton amounts are used to defne orderng schemes for the Producton and Customer modules n the smulaton model. That means f v x p j (t) >0, then member j of the supply chan sends a request for v x p j (t) unts of product p to member of the supply chan at tme t. 3.5 Supply chan optmzaton model The optmzaton model of the whole supply chan network s defned by mnmzng the total cost mn TC S + TC I + TC C + J S J I J C J S J I j J I J C TC T j (20) subject to the constrants (1) (19). If we assume that all cost functons are lnear,.e. that the objectve (20) s a lnear functon, we can wrte t as follows: mn j J p P + J I + t=1,..t v V p P t=1,..t J S J I p P t=1,..t v c p j vx p j (t) + J I z p u p (t) + J I p P t=1,..t p P t=1,..t out h p out l p (t) + w p n h p n l p (t) J C p P t=1,..t m p (t) ρ p n b p (t). (21)

11 Smulaton and optmzaton of supply chans 39 suppler producton customer transport_1 transport_2 param (LP) out p h param (LP) v v c, t p j DV (Sm) v x p (t) j j param (LP) p w,, p n h p d m p,, p z out p h s p DV (Sm) p (t), u (t), param (LP) v v c, t p j j DV (Sm) v p xj (t) param (LP) n p r Fg. 2 An example of the module confguraton for a smple supply chan consstng of one suppler, one producton ste, and one customer (dashed lnes ndcate nformaton flow and sold lnes ndcate materal flow). For the case of a lnear program the nformaton below the modules represents the parameters whch are calculated durng the smulaton runs and transferred to the LP, param (LP), and the decson varables of the LP used as decson rules n the smulaton model, DV (Sm.) Hence, we get a lnear programmng model whch we wll use n connecton wth the smulaton model as depcted n Fgure 1. A detaled descrpton of the lnear model can be found n Preusser et al. (2005a,b). Ths model s a pure lnear program whch can be solved easly wth any standard LP-solver wthn very short tme. If necessary, t s possble to extend the model formulaton to consder more features, e.g., fxed-cost transportaton, bnary decsons, step functons, etc. These extensons lead to a mxed-nteger formulaton, thus ncreasng computatonal tme (cf. Appendx A). 3.6 Supply chan smulaton model Implementng a smulaton model n AnyLogc means to arrange the accordng modules and connect them. In Fg. 2 an llustratve example shows, how these modules can be connected n order to mantan nformaton flow (drect connectons between Suppler, Producton, and Customer) and materal flow (va Transport modules). Furthermore the cost and delay functons for each module must be specfed. 4 Connectng the optmzaton wth the smulaton In order to couple the optmzaton model and the smulaton model, we frst have to defne the requred data and the way they should be exchanged. We decded to use an MS Access database to store all necessary nformaton whch s: General network structure: Ths ncludes the number of actors n the supply chan and the accordng lnks between them. General parameters used n the smulaton and optmzaton models: These sets of parameters nclude all capacty lmtatons, resource parameters, bll-of-materals, predefned supply at the supplers, and predefned demand at the customers.

12 40 C. Almeder et al. aggregated results (transportaton delays, producton delays, ) smulaton model general parameters MS Access database general parameters optmzaton model (AnyLogc) (ODBC) (Xpress) decson rules (orderng plans, producton schedules, ) Fg. 3 Ths scheme shows the data exchange between the smulaton and the optmzaton model va the MS Access database n the mddle Results of the optmzaton model (= parameters for the smulaton): The results of the optmzaton used as decson rules n the smulaton are producton and transfer quanttes, as well as transportaton amounts (m p (t), u p (t), v x p j (t)). Results of the smulaton model (= parameters for the optmzaton model): The man results of the smulaton experments used n the optmzaton model are the cost parameters and the delays for producton, transfer and transport. The smulaton model s desgned as the master process, whch controls the data communcaton and the LP/MIP-solver. The smulaton model and the optmzaton model retreve and store values from and to the database usng the Open Database Connectvty (ODBC) nterface (see Fg. 3). To ntate the optmzaton process n our system, a few smulaton runs are performed usng the data from the database. Mssng decson rules whch, n later teratons, are generated usng the results of the optmzaton model, are substtuted by autonomous decson rules (lke an (s,s)-polcy for the replenshment). These frst smulaton runs are only necessary to generate ntal parameter values for the optmzaton model, but ther results wll be gnored n further teratons n order to avod basng effects caused by the autonomous decson rules. The results of the ntal runs (delays, per unt costs, etc.) are aggregated and accordng means and varances are stored n the database (see Sect. 4.1). Afterwards Xpress-MP s executed. It loads the general data and the smulaton results from the database, computes the soluton of the optmzaton model and stores the results (orderng and delvery plans, producton and transfer schedules, etc.) n the database. Then we start agan wth fve smulaton experments usng now the newly computed decson rules (see Sect. 4.2), based on the soluton of the optmzaton model. Further on we wll denote ths algorthm by SmOpt (or SmLP, f a pure LP model s used for the optmzaton part, and SmMIP, f a mxed-nteger formulaton s used). In Table 1 a pseudo code of ths SmOpt algorthm s gven. 4.1 Aggregatng smulaton results Snce the smulaton model may contan stochastc and nonlnear elements, t s necessary to perform several smulaton runs and combne the results. For the cost parameters, necessary for a lnear optmzaton model, we calculate average per unt cost. That means, e.g., for the producton costs we accumulate the total cost for the

13 Smulaton and optmzaton of supply chans 41 Table 1 Pseudo code for the combned smulaton optmzaton approach SmOpt SmOpt: Load necessary smulaton parameters from the database Perform a few smulaton runs usng autonomous decson rules Aggregate results and store them n the database whle stoppng crtera are not met Load aggregated parameters nto LP/MIP-Solver Solve the optmzaton model Wrte new decson rules to the database Load new decson rules nto smulaton model Perform smulaton runs usng these decson rules Aggregate results and store them n the database end-whle whole plannng horzon for a certan product and dvde these costs by the number of products produced. Other parameters, called crtcal parameters, have a drect nfluence on the materal flow (e.g., transportaton delay). The use of average values for those parameters would most probably lead to bad results. In about half of the cases the delay would be longer than assumed and would cause addtonal delays n subsequent operatons. Therefore, t seems reasonable to use, e.g., a 90%-quantle (based on a normal dstrbuton wth estmated mean and varance calculated from the dfferent smulaton runs) for such delay parameters. Ths results n an overestmaton of the delays for the optmzaton model, because the tme s determned such that 90% of the observed delays wll be shorter, but t ensures that a smooth materal flow through the network s possble. For the crtcal parameters t s useful to combne results from the prevous teratons wth current ones, n order to enlarge the sample sze and to get better estmates of the mean and the varance. 4.2 Decson rules based on the soluton of the optmzaton model There are several possble ways to use the soluton of the LP-model wthn the smulaton model. One method, whch we apply here, s to use the transportaton, producton and transfer results ( v x p j (t), m p (t), u p (t)) as a gven orderng plan. Accordng to the transportaton values v x p j (t) module j sends a request to module at tme t for the gven amount v x p j (t) of products of type p usng the transportaton mode v. Smlarly, producton and transfer results can be used. In some cases, due to the stochastc features of the smulaton model, t may happen that some of the modules are outof-stock for a specfc product. Snce unfulflled orders are backlogged, these requests are fulflled as soon as the products are avalable. More complex procedures would be, e.g., to use results of the senstvty analyss (dual varables, reduced costs) to determne the crtcal parameters, to observe these parameters durng the smulaton runs, and to adapt decson rules (use a dfferent

14 42 C. Almeder et al smulaton optmzaton total cost Sm 1-Opt 2-Sm 2-Opt 3-Sm 3-Opt 4-Sm 4-Opt teraton Fg. 4 Objectve values of the optmzaton model and the smulaton model for each teraton for a determnstc model consderng fxed costs for producton, transfer and transport 5-Sm 5-Opt 6-Sm 6-Opt soluton of the optmzaton model) f the observed parameters reach a certan threshold. For our examples we use the frst approach for translatng the soluton of the optmzaton model nto decson rules for the smulaton model (cf. Sect. 3). In ths paper we wsh to nvestgate the drect nteractons between the soluton of the optmzaton model and the smulaton results. The analyss of more complex decson rules goes beyond the scope of ths paper and mght by a subject for further research. 5 Tests and results We wsh to nvestgate the followng research questons wth emprcal tests usng a set of test nstances: Does ths method converge n practce for realstc test cases? If we can observe convergence, s the result optmal or at least a good approxmaton? Is ths method advantageous compared wth tradtonal plannng methods? Although t s not possble to prove general convergence for all our test nstances, we observe fast convergence of the objectve values of the smulaton and optmzaton model. Fgure 4 shows a typcal stuaton usng the results of the determnstc test nstance D1-L descrbed n Sect We start wth the smulaton model usng an autonomous rule for replenshng the nventores. Snce we start wth all nventores empty, t takes a long tme, untl the orders are fulflled. Ths causes hgh costs and an overestmaton of transportaton and producton delays. Therefore, the frst soluton of the lnear model leads also to a hgh objectve value manly consstng of penalty costs for late (or even no) delveres. Consequently, the smulaton model leads to a smlar objectve functon n teraton 2, because t uses the delvery plans of the soluton of the lnear model. Due to the fact that the soluton of the lnear model causes a somehow synchronzed materal flow,

15 Smulaton and optmzaton of supply chans 43 the measured delays are much lower now. Therefore, the cost of the soluton of the lnear model n the second teraton decreases. After three teratons the smulaton and the lnear model have converged to the same soluton. 5.1 Determnstc problems wth fxed costs In order to verfy the qualty of the solutons, we create a set of 12 examples. For these test nstances we consder a smple supply chan consstng of three actors (a suppler, a producer and a customer) and a tme horzon of 30 perods. For transportaton of products two transport modules are used, whch connect the suppler and the producer as well as the producer and the customer. Two types of products are demanded by the customer: product 1 whch s provded by the suppler and sent va the producer to the customer and product 2 whch s manufactured by the producer usng product 1 as a raw materal. The cost structure s as follows: 2 The transportaton costs consst of fxed costs per delvery, whch are subject to a step functon. A transport costs 100, 200 or 300 monetary unts, dependng on the amount delvered. The costs of producton and transfer are separated nto varable costs and fxed costs. The varable producton costs are set to 30 and the fxed part s 50 monetary unts. Transferrng products costs 15 per product unt plus a fxed part of 10. Delayed delveres are penalzed by 100 monetary unts per product unt and perod. Concernng the demand at the customer we dstngush between nstances wth hgh demand and others wth low demand. The dfference les n the frequency of orders sent off by the customer. In hgh demand cases the occurrng orders n each perod are around the maxmum possble quanttes whch could be delvered consderng the capactes of the suppler and the producer. In low demand models the ordered amounts cover approxmately 70% of the possble delveres n each perod. Instances D1-L to D5-L (see Table 2) represent fve dfferent realzatons for low demand models. Accordngly, D6-H to D10-H correspond to fve dfferent realzatons of hgh demand models. The last two nstances, D1a-L and D6a-H, are modfcatons of nstances D1-L and D6-H, respectvely. The former ones consder exactly the same orderng amounts as D1-L and D6-H but the fxed costs for producton and transfer at the ntermedate node are ncreased to 1000 and 500, respectvely. For examples of ths sze t s possble to formulate an exact mxed-nteger model and determne the optmal soluton. The correspondng MIP formulaton conssts of 1,342 constrants, 1,080 contnuous and 300 bnary decson varables. For the smulaton approach the nonlnear parts are only consdered n the smulaton model tself, the connected lnear (non-nteger) model does not nclude any of them. See Table 2 for the resultng total costs of the smulaton and the optmal soluton (MIP). The gap between our SmLP approach the optmal solutons ganed by solvng the exact MIP formulaton vares between 0.44 and 3.46% and averages n 1.87%. As we would expect, for the two test nstances wth hgh fxed cost the gap ncreases. 2 All datasets are avalable at

16 44 Table 2 Comparson of total costs between our smulaton-based optmzaton approach SmLP and the exact MIP-model for determnstc test cases classfed by the occurrence of customer demand (H hgh demand, L low demand) MIP solutons marked wth (*) are best solutons found after one hour calculaton tme C. Almeder et al. Instance SmLP Exact MIP Dfference (%) D1-L D2-L D3-L D4-L D5-L D6-H D7-H D8-H D9-H D10-H D1a-L D6a-H * 3.26 Average For test nstances wth low demand the varaton of the gap seems hgher than for the test nstances wth hgh demand. But on average there seems no sgnfcant dfference between the results of those two groups of nstances. Based on the above results we may conclude that the error caused by neglectng fxed cost s low as long as the fxed costs are low compared wth other costs. If the fxed costs ncrease (relatve to the other costs), the nonlnear propertes should be consdered n the optmzaton model used for the SmOpt approach,.e. a SmMIP should be used nstead of the SmLP (see also the followng subsecton). 5.2 Test nstances wth stochastc transport delays In order to measure the qualty of our solutons n a stochastc envronment we prepare a set of test examples ncludng stochastc transportaton tmes. We compare our Sm- LP approach usng a smplfed lnear model wthout bnary varables wth an exact MIP-model. Ths MIP-model does not cover stochastc features and we have to provde estmated values of the transportaton tmes. Wthn the smulaton we consder unformly dstrbuted transportaton delays between 1 and 9 for transportatons from the suppler to the producer and between 1 and 5 for transportatons from the producer to the customer. For estmatng the delay parameters we perform runs usng 90%-, 70%-, and 50%-quantles. The correspondng transportaton delays for the MIP-model are set accordng to the used quantle. For the small test cases there would probably be no notceable dfference between the results of a 99%- and a 90%- quantle. Therefore, we test a hgh quantle (90%, rsk averse), the average value (50%), and some ntermedate value (70%). The maxmum runtme s set to 30 mnutes for the MIPmodel,.e. we report the best soluton found after ths tme lmt, whle the smulaton approach converges after a few seconds. For the smulaton approach we agan process 8 teratons, each consstng of 5 smulaton runs and one LP computaton. Fnally the soluton of the MIP-model and the soluton of the SmLP are evaluated by performng

17 Smulaton and optmzaton of supply chans 45 Table 3 Dfference of the mean total costs of 20 runs between the SmLP and SmMIP method and the soluton found by a determnstc MIP model classfed by the occurrence of customer demand (H hgh demand, L low demand) Instance MIP SmLP SmMIP Cost Quant. (%) Cost Quant. (%) Dff. (%) Cost Quant. (%) Dff. (%) S1-L S2-L S3-L S4-L S5-L S6-H S7-H S8-H S9-H S10-H S1a-L S6a-H Av.-L Av.-H Average The total costs are reported n the columns Cost. The quantle whch lead to the best results s reported n the column Quant. The dfference wth respect to the soluton of the determnstc MIP s denoted n column Dff. 20 ndependent smulaton runs. Furthermore, we replace the smplfed lnear model wth the MIP model (SmMIP approach) and perform the same tests. The results for all three methods are dsplayed n Table 3, where negatve percentage values mply that the smulaton acheves a better result than the exact MIP-model. The results of the SmLP approach, where we combne the pure LP model wth the smulaton model, are on average slghtly worse compared wth the determnstc MIP approach. For the low demand cases alone we can observe a small mprovement. Consderng the varaton of the results these dfferences are not sgnfcant. Furthermore, we test a second approach, the SmMIP approach, where all nonlnear features of the model are also consdered n the optmzaton part whch s represented by a MIP model. So the dfference between the SmMIP and the exact approach s only, that n the frst case the parameters are estmated based on smulaton experments and n the latter case the parameters are determned usng the known dstrbuton functons. Here we see that the soluton qualty can be rased for 9 out of 12 test nstances and on average the result s slghtly better than the determnstc MIP approach. Even f for some nstances the 70%-quantle yelds the best results, the 90%- quantle leads to only slghtly hgher costs. Usng the 50%-quantle,.e. the expected value, always caused much hgher costs. Addtonally we analyze the varaton of the 20 fnal smulaton runs for each method. There s no sgnfcant dfference of the varaton for all methods. The coeffcent of varaton for the total costs s always around 0.07.

18 46 C. Almeder et al. For larger test nstances t would not be possble to solve the MIP or to apply the Sm- MIP method. In a prelmnary study (cf. Mtrovc 2006) we focused on that ssue and tred to fnd the approxmate lmts of solvng MIP formulatons of supply chan problems by the means of three state-of-the-art LP/MIP-solvers. The tests were conducted on a PC (Intel P4 2.4 GHz, 1 GB RAM) usng Wndows We used a set of dfferent szed supply chan network problems consderng fxed costs n transportaton, producton and transfer. The best performng solver succeeded n solvng problems wth 20 supply chan actors, 8 products, 5 perods and 2 transportaton modes, consderng 3,360 bnary varables before and 250 bnary varables after presolvng. The next n sze, whch ncluded 10 products nstead of 8, could not be solved wthn a tme lmt of one hour. Thus, there s a trade-off between a good approxmaton resultng from MIP-models or fast computatonal tmes. Defntely, mportant decsons nvolvng hgh fxed costs should be consdered wthn the optmzaton model of our SmOpt method. 5.3 Quantle tests on larger nstances In addton to the small nstances used n the prevous subsectons we generate a set of 12 nstances representng larger supply chan networks. Usng these test nstances we analyze the nfluence of the quantle on the results f the uncertanty s concentrated n a specfc part of the supply chan. The sze and structure of these test cases s shown n Fg. 5. Ths fcttous supply chan network conssts of 10 actors: 3 supplers, 4 producton nodes, and 3 customers. The ntermedate nodes are separated nto two layers and all of them are authorzed to produce and also transfer products. All actors are connected sup 1 cust 1 prod 1 prod 3 sup 2 cust 2 prod 2 prod 4 sup 3 cust 3 Fg. 5 Exemplary supply chan network. For smplcty the transport modules have been omtted

19 Smulaton and optmzaton of supply chans 47 Table 4 Total costs of SmLP for test example wth ten supply chan actors and stochastc transportaton delays at the begnnng of the supply chan The results for the 90%-quantle are taken as basc values. For the remanng quantles the dfference to the correspondng basc value s gven. The S ndcates that there s more stochastcty close to the suppler Instances Quantle 90% 70% 50% L1-L-S % 11.20% L2-L-S % 6.00% L3-L-S % 10.85% L4-L-S % 11.51% L5-L-S % 9.80% L6-H-S % 10.10% L7-H-S % 4.51% L8-H-S % 10.92% L9-H-S % 8.65% L10-H-S % 10.12% L1a-L-S % 4.04% L6a-H-S % 4.52% Total Avg % 8.52% by one transportaton mode. The customers request 4 dfferent products. Products 1 and 2 are on the one hand fnal products, whch have to be delvered to the customers and on the other hand raw materals used to produce products 3 and 4. Frst we consder the case wth the stochastcty concentrated at the begnnng of the supply chan. Hence, for the connecton between the supplers and the frst layer of producton stes we assume stochastc transportaton tmes, whch are unformly dstrbuted between 1 and 5. The transportaton tmes between the two layers of producton nodes are unformly dstrbuted between 1 and 3. For the remanng lnks we assume determnstc transportaton tmes of 1. The costs functons for producton and transport consst of fxed costs and varable costs. If all bnary decsons would be consdered n a MIP-model, ths would lead to more than 3,800 bnary varables, whch s beyond the sze of problems we could solve wth the best MIP/LP-solvers wthn several hours. In comparson, our SmLP algorthm takes about 12 mn for one test nstance to converge to a soluton. We evaluate three dfferent values for the quantle used for the estmaton of the delay parameters: 90, 70, and 50%. See Table 4 for the results. In ths case t seems that the 90%-quantle s most robust choce, although the 70%- quantle delvers only slghtly worse results on average and n some cases even better ones, whereas the 50%-quantle leads to the worst results for all nstances. Due to the fact that there s less stochastc near to the customer, t s possble to reduce the safety factors for the delays to some extent wthout ncreasng the costs too much, because lost tme at the begnnng of the supply chan can be made up at the end. We also conduct experments where the transportaton delays at the end of the supply chan are stochastc,.e. the connecton between producton nodes and customers are unformly dstrbuted between 1 and 5. Transportaton tmes between the two layers of producton nodes are agan unformly dstrbuted between 1 and 3. Remanng transportaton tmes are set to 1. The correspondng results are summarzed n Table 5.

20 48 Table 5 Total costs of SmLP for test example wth ten supply chan actors and stochastcty concentrated near the end of the supply chan The results for the 90%-quantle are taken as basc values. For the remanng quantles the percentage dfference to the correspondng basc value s gven. The C ndcates that there s more stochastc at the customer C. Almeder et al. Instance Quantle 90% 70% 50% L1-L-C % 43.96% L2-L-C % 45.02% L3-L-C % 48.81% L4-L-C % 50.60% L5-L-C % 51.41% L6-H-C % 52.09% L7-H-C % 59.29% L8-H-C % 41.68% L9-H-C % 52.44% L10-H-C % 43.16% L1a-L-C % 32.56% L6a-H-C % 32.95% Total Avg % 46.16% For these nstances the best choce would be to use the hghest safety factor (90%), because f there are delays at the end of the supply chan, there s no chance to catch up. For the test nstances L1a-H-C and L6a-H-C wth hgh fxed cost, we also apply a SmMIP method where we nclude only the hgh fxed-charge producton costs. The low fxed-charge transportaton costs are stll neglected. For all quantles the Sm- MIP method delvers slghtly lower costs (L1a-L-C: 4.48%/ 10.86%/ 1.19% for 90%/70%/50%-quantles; L6a-H-C: 3.47%/ 2.96%/ 0.37% for 90%/70%/50%- quantles) but the calculaton tmes are more than fve tmes longer. If we assume stochastc transportaton tmes for the whole supply chan (all transportaton delays are unformly dstrbuted between 1 and 5), the results are smlar to those n Table 5,.e. the 90%-quantle s always the best choce. 6 Conclusons In ths paper we have presented a new approach that combnes the advantages of complex smulaton models and abstract optmzaton models. We have shown that our method s able to generate compettve solutons quckly, even compared wth tradtonal plannng approaches that are much more tme consumng. Our nvestgatons can be summarzed as follows: In many cases the SmLP method seems to be a good trade-off between soluton qualty and computatonal tme. If the nonlnear elements n the model are domnatng t s better to apply the SmMIP approach and consder these nonlneartes n the optmzaton model as along as the computatonal tme for solvng the optmzaton model s acceptable.

21 Smulaton and optmzaton of supply chans 49 Furthermore, we nvestgated the mpact of safety tmes for delays on the soluton qualty. If we use the 90%-quantle, we can generate robust plans, but for specfc stuatons we mght get better results wth less safety tme. Only for the case f stochastc s near the customer, then the 90%-quantle s clearly the best. Nevertheless, the choce of the quantle depends on the structure of the supply chan and has to be fne-tuned n each case. Usng the 50%-quantle,.e. the expected values for the delays, always leads to pure results. If the uncertanty s concentrated far away from the customer, the cost ncrease by usng the expectaton value s about 10% whereas the ncrease s almost 50% f the uncertanty occurs close to the customer. Further research for dfferent aspects of ths method s stll possble and necessary. The aggregaton step and the generaton of new decson rules s an open feld. One possblty s to nterpret the soluton of the optmzaton model only as a target strategy and use adaptve decson rules to approxmate ths target strategy n an uncertan envronment. The use of senstvty results of the optmzaton model mght lead to mproved decson rules. Further nvestgatons are possble for the boundares between the smulaton and the optmzaton model. The queston, whch aspects should be ncluded n the optmzaton model, s not completely answered yet. If more complex models are used, other fast soluton methods (e.g., heurstcs, metaheurstcs, etc.) should be taken nto consderaton. We conclude by answerng the queston posed n the ttle of ths paper: smulaton and optmzaton are complementary approaches and t s worthwhle combnng them. Acknowledgment We wsh to thank Martn Grunow and two anonymous referees for ther valuable comments on ths manuscrpt. Appendx A: MIP formulaton for fxed-charge transportaton cost The objectve (20) of the optmzaton model can be transformed nto a mxed-nteger program consderng ( for example ) fxed transportaton costs. In case, the transportaton cost functons v C p v j x p j (t) can be wrtten as follows: ( ) { v v C p v j x p j (t) c p = j f v x p j (t) >0 0 otherwse, p, t,v. (22) In order to capture ths stuaton, t s necessary to ntroduce bnary decson varables v Ɣ p j (t) whch ndcate f there s postve transportaton. So by addng the followng constrants: v x p j (t) G vɣ p j (t), p, t,v (23) t s possble to formulate the transportaton costs as the lnear functons

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ).

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ). REVIEW OF RISK MANAGEMENT CONCEPTS LOSS DISTRIBUTIONS AND INSURANCE Loss and nsurance: When someone s subject to the rsk of ncurrng a fnancal loss, the loss s generally modeled usng a random varable or

More information

On the Optimal Control of a Cascade of Hydro-Electric Power Stations

On the Optimal Control of a Cascade of Hydro-Electric Power Stations On the Optmal Control of a Cascade of Hydro-Electrc Power Statons M.C.M. Guedes a, A.F. Rbero a, G.V. Smrnov b and S. Vlela c a Department of Mathematcs, School of Scences, Unversty of Porto, Portugal;

More information

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts Power-of-wo Polces for Sngle- Warehouse Mult-Retaler Inventory Systems wth Order Frequency Dscounts José A. Ventura Pennsylvana State Unversty (USA) Yale. Herer echnon Israel Insttute of echnology (Israel)

More information

2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet

2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet 2008/8 An ntegrated model for warehouse and nventory plannng Géraldne Strack and Yves Pochet CORE Voe du Roman Pays 34 B-1348 Louvan-la-Neuve, Belgum. Tel (32 10) 47 43 04 Fax (32 10) 47 43 01 E-mal: corestat-lbrary@uclouvan.be

More information

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis The Development of Web Log Mnng Based on Improve-K-Means Clusterng Analyss TngZhong Wang * College of Informaton Technology, Luoyang Normal Unversty, Luoyang, 471022, Chna wangtngzhong2@sna.cn Abstract.

More information

Credit Limit Optimization (CLO) for Credit Cards

Credit Limit Optimization (CLO) for Credit Cards Credt Lmt Optmzaton (CLO) for Credt Cards Vay S. Desa CSCC IX, Ednburgh September 8, 2005 Copyrght 2003, SAS Insttute Inc. All rghts reserved. SAS Propretary Agenda Background Tradtonal approaches to credt

More information

Project Networks With Mixed-Time Constraints

Project Networks With Mixed-Time Constraints Project Networs Wth Mxed-Tme Constrants L Caccetta and B Wattananon Western Australan Centre of Excellence n Industral Optmsaton (WACEIO) Curtn Unversty of Technology GPO Box U1987 Perth Western Australa

More information

An Alternative Way to Measure Private Equity Performance

An Alternative Way to Measure Private Equity Performance An Alternatve Way to Measure Prvate Equty Performance Peter Todd Parlux Investment Technology LLC Summary Internal Rate of Return (IRR) s probably the most common way to measure the performance of prvate

More information

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School Robust Desgn of Publc Storage Warehouses Yemng (Yale) Gong EMLYON Busness School Rene de Koster Rotterdam school of management, Erasmus Unversty Abstract We apply robust optmzaton and revenue management

More information

What is Candidate Sampling

What is Candidate Sampling What s Canddate Samplng Say we have a multclass or mult label problem where each tranng example ( x, T ) conssts of a context x a small (mult)set of target classes T out of a large unverse L of possble

More information

CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK. Sample Stability Protocol

CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK. Sample Stability Protocol CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK Sample Stablty Protocol Background The Cholesterol Reference Method Laboratory Network (CRMLN) developed certfcaton protocols for total cholesterol, HDL

More information

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur Module LOSSLESS IMAGE COMPRESSION SYSTEMS Lesson 3 Lossless Compresson: Huffman Codng Instructonal Objectves At the end of ths lesson, the students should be able to:. Defne and measure source entropy..

More information

Outsourcing inventory management decisions in healthcare: Models and application

Outsourcing inventory management decisions in healthcare: Models and application European Journal of Operatonal Research 154 (24) 271 29 O.R. Applcatons Outsourcng nventory management decsons n healthcare: Models and applcaton www.elsever.com/locate/dsw Lawrence Ncholson a, Asoo J.

More information

The Stochastic Guaranteed Service Model with Recourse for Multi-Echelon Warehouse Management

The Stochastic Guaranteed Service Model with Recourse for Multi-Echelon Warehouse Management The Stochastc Guaranteed Servce Model wth Recourse for Mult-Echelon Warehouse Management Jörg Rambau, Konrad Schade 1 Lehrstuhl für Wrtschaftsmathematk Unverstät Bayreuth Bayreuth, Germany Abstract The

More information

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic Lagrange Multplers as Quanttatve Indcators n Economcs Ivan Mezník Insttute of Informatcs, Faculty of Busness and Management, Brno Unversty of TechnologCzech Republc Abstract The quanttatve role of Lagrange

More information

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña Proceedngs of the 2008 Wnter Smulaton Conference S. J. Mason, R. R. Hll, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION

More information

An Interest-Oriented Network Evolution Mechanism for Online Communities

An Interest-Oriented Network Evolution Mechanism for Online Communities An Interest-Orented Network Evoluton Mechansm for Onlne Communtes Cahong Sun and Xaopng Yang School of Informaton, Renmn Unversty of Chna, Bejng 100872, P.R. Chna {chsun,yang}@ruc.edu.cn Abstract. Onlne

More information

Forecasting the Direction and Strength of Stock Market Movement

Forecasting the Direction and Strength of Stock Market Movement Forecastng the Drecton and Strength of Stock Market Movement Jngwe Chen Mng Chen Nan Ye cjngwe@stanford.edu mchen5@stanford.edu nanye@stanford.edu Abstract - Stock market s one of the most complcated systems

More information

DEFINING %COMPLETE IN MICROSOFT PROJECT

DEFINING %COMPLETE IN MICROSOFT PROJECT CelersSystems DEFINING %COMPLETE IN MICROSOFT PROJECT PREPARED BY James E Aksel, PMP, PMI-SP, MVP For Addtonal Informaton about Earned Value Management Systems and reportng, please contact: CelersSystems,

More information

SUPPLIER FINANCING AND STOCK MANAGEMENT. A JOINT VIEW.

SUPPLIER FINANCING AND STOCK MANAGEMENT. A JOINT VIEW. SUPPLIER FINANCING AND STOCK MANAGEMENT. A JOINT VIEW. Lucía Isabel García Cebrán Departamento de Economía y Dreccón de Empresas Unversdad de Zaragoza Gran Vía, 2 50.005 Zaragoza (Span) Phone: 976-76-10-00

More information

Traffic State Estimation in the Traffic Management Center of Berlin

Traffic State Estimation in the Traffic Management Center of Berlin Traffc State Estmaton n the Traffc Management Center of Berln Authors: Peter Vortsch, PTV AG, Stumpfstrasse, D-763 Karlsruhe, Germany phone ++49/72/965/35, emal peter.vortsch@ptv.de Peter Möhl, PTV AG,

More information

Many e-tailers providing attended home delivery, especially e-grocers, offer narrow delivery time slots to

Many e-tailers providing attended home delivery, especially e-grocers, offer narrow delivery time slots to Vol. 45, No. 3, August 2011, pp. 435 449 ssn 0041-1655 essn 1526-5447 11 4503 0435 do 10.1287/trsc.1100.0346 2011 INFORMS Tme Slot Management n Attended Home Delvery Nels Agatz Department of Decson and

More information

Frequency Selective IQ Phase and IQ Amplitude Imbalance Adjustments for OFDM Direct Conversion Transmitters

Frequency Selective IQ Phase and IQ Amplitude Imbalance Adjustments for OFDM Direct Conversion Transmitters Frequency Selectve IQ Phase and IQ Ampltude Imbalance Adjustments for OFDM Drect Converson ransmtters Edmund Coersmeer, Ernst Zelnsk Noka, Meesmannstrasse 103, 44807 Bochum, Germany edmund.coersmeer@noka.com,

More information

1. Fundamentals of probability theory 2. Emergence of communication traffic 3. Stochastic & Markovian Processes (SP & MP)

1. Fundamentals of probability theory 2. Emergence of communication traffic 3. Stochastic & Markovian Processes (SP & MP) 6.3 / -- Communcaton Networks II (Görg) SS20 -- www.comnets.un-bremen.de Communcaton Networks II Contents. Fundamentals of probablty theory 2. Emergence of communcaton traffc 3. Stochastc & Markovan Processes

More information

Omega 39 (2011) 313 322. Contents lists available at ScienceDirect. Omega. journal homepage: www.elsevier.com/locate/omega

Omega 39 (2011) 313 322. Contents lists available at ScienceDirect. Omega. journal homepage: www.elsevier.com/locate/omega Omega 39 (2011) 313 322 Contents lsts avalable at ScenceDrect Omega journal homepage: www.elsever.com/locate/omega Supply chan confguraton for dffuson of new products: An ntegrated optmzaton approach Mehd

More information

THE DISTRIBUTION OF LOAN PORTFOLIO VALUE * Oldrich Alfons Vasicek

THE DISTRIBUTION OF LOAN PORTFOLIO VALUE * Oldrich Alfons Vasicek HE DISRIBUION OF LOAN PORFOLIO VALUE * Oldrch Alfons Vascek he amount of captal necessary to support a portfolo of debt securtes depends on the probablty dstrbuton of the portfolo loss. Consder a portfolo

More information

Can Auto Liability Insurance Purchases Signal Risk Attitude?

Can Auto Liability Insurance Purchases Signal Risk Attitude? Internatonal Journal of Busness and Economcs, 2011, Vol. 10, No. 2, 159-164 Can Auto Lablty Insurance Purchases Sgnal Rsk Atttude? Chu-Shu L Department of Internatonal Busness, Asa Unversty, Tawan Sheng-Chang

More information

Stochastic Inventory Management for Tactical Process Planning under Uncertainties: MINLP Models and Algorithms

Stochastic Inventory Management for Tactical Process Planning under Uncertainties: MINLP Models and Algorithms Stochastc Inventory Management for Tactcal Process Plannng under Uncertantes: MINLP Models and Algorthms Fengq You, Ignaco E. Grossmann Department of Chemcal Engneerng, Carnege Mellon Unversty Pttsburgh,

More information

Preventive Maintenance and Replacement Scheduling: Models and Algorithms

Preventive Maintenance and Replacement Scheduling: Models and Algorithms Preventve Mantenance and Replacement Schedulng: Models and Algorthms By Kamran S. Moghaddam B.S. Unversty of Tehran 200 M.S. Tehran Polytechnc 2003 A Dssertaton Proposal Submtted to the Faculty of the

More information

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING Matthew J. Lberatore, Department of Management and Operatons, Vllanova Unversty, Vllanova, PA 19085, 610-519-4390,

More information

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy 4.02 Quz Solutons Fall 2004 Multple-Choce Questons (30/00 ponts) Please, crcle the correct answer for each of the followng 0 multple-choce questons. For each queston, only one of the answers s correct.

More information

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm Avalable onlne www.ocpr.com Journal of Chemcal and Pharmaceutcal Research, 2014, 6(7):1884-1889 Research Artcle ISSN : 0975-7384 CODEN(USA) : JCPRC5 A hybrd global optmzaton algorthm based on parallel

More information

Fault tolerance in cloud technologies presented as a service

Fault tolerance in cloud technologies presented as a service Internatonal Scentfc Conference Computer Scence 2015 Pavel Dzhunev, PhD student Fault tolerance n cloud technologes presented as a servce INTRODUCTION Improvements n technques for vrtualzaton and performance

More information

IMPACT ANALYSIS OF A CELLULAR PHONE

IMPACT ANALYSIS OF A CELLULAR PHONE 4 th ASA & μeta Internatonal Conference IMPACT AALYSIS OF A CELLULAR PHOE We Lu, 2 Hongy L Bejng FEAonlne Engneerng Co.,Ltd. Bejng, Chna ABSTRACT Drop test smulaton plays an mportant role n nvestgatng

More information

An MILP model for planning of batch plants operating in a campaign-mode

An MILP model for planning of batch plants operating in a campaign-mode An MILP model for plannng of batch plants operatng n a campagn-mode Yanna Fumero Insttuto de Desarrollo y Dseño CONICET UTN yfumero@santafe-concet.gov.ar Gabrela Corsano Insttuto de Desarrollo y Dseño

More information

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 畫 類 別 : 個 別 型 計 畫 半 導 體 產 業 大 型 廠 房 之 設 施 規 劃 計 畫 編 號 :NSC 96-2628-E-009-026-MY3 執 行 期 間 : 2007 年 8 月 1 日 至 2010 年 7 月 31 日 計 畫 主 持 人 : 巫 木 誠 共 同

More information

A Secure Password-Authenticated Key Agreement Using Smart Cards

A Secure Password-Authenticated Key Agreement Using Smart Cards A Secure Password-Authentcated Key Agreement Usng Smart Cards Ka Chan 1, Wen-Chung Kuo 2 and Jn-Chou Cheng 3 1 Department of Computer and Informaton Scence, R.O.C. Mltary Academy, Kaohsung 83059, Tawan,

More information

Statistical Methods to Develop Rating Models

Statistical Methods to Develop Rating Models Statstcal Methods to Develop Ratng Models [Evelyn Hayden and Danel Porath, Österrechsche Natonalbank and Unversty of Appled Scences at Manz] Source: The Basel II Rsk Parameters Estmaton, Valdaton, and

More information

How To Understand The Results Of The German Meris Cloud And Water Vapour Product

How To Understand The Results Of The German Meris Cloud And Water Vapour Product Ttel: Project: Doc. No.: MERIS level 3 cloud and water vapour products MAPP MAPP-ATBD-ClWVL3 Issue: 1 Revson: 0 Date: 9.12.1998 Functon Name Organsaton Sgnature Date Author: Bennartz FUB Preusker FUB Schüller

More information

"Research Note" APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES *

Research Note APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES * Iranan Journal of Scence & Technology, Transacton B, Engneerng, ol. 30, No. B6, 789-794 rnted n The Islamc Republc of Iran, 006 Shraz Unversty "Research Note" ALICATION OF CHARGE SIMULATION METHOD TO ELECTRIC

More information

Trade Adjustment and Productivity in Large Crises. Online Appendix May 2013. Appendix A: Derivation of Equations for Productivity

Trade Adjustment and Productivity in Large Crises. Online Appendix May 2013. Appendix A: Derivation of Equations for Productivity Trade Adjustment Productvty n Large Crses Gta Gopnath Department of Economcs Harvard Unversty NBER Brent Neman Booth School of Busness Unversty of Chcago NBER Onlne Appendx May 2013 Appendx A: Dervaton

More information

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008 Rsk-based Fatgue Estmate of Deep Water Rsers -- Course Project for EM388F: Fracture Mechancs, Sprng 2008 Chen Sh Department of Cvl, Archtectural, and Envronmental Engneerng The Unversty of Texas at Austn

More information

VRT012 User s guide V0.1. Address: Žirmūnų g. 27, Vilnius LT-09105, Phone: (370-5) 2127472, Fax: (370-5) 276 1380, Email: info@teltonika.

VRT012 User s guide V0.1. Address: Žirmūnų g. 27, Vilnius LT-09105, Phone: (370-5) 2127472, Fax: (370-5) 276 1380, Email: info@teltonika. VRT012 User s gude V0.1 Thank you for purchasng our product. We hope ths user-frendly devce wll be helpful n realsng your deas and brngng comfort to your lfe. Please take few mnutes to read ths manual

More information

1.1 The University may award Higher Doctorate degrees as specified from time-to-time in UPR AS11 1.

1.1 The University may award Higher Doctorate degrees as specified from time-to-time in UPR AS11 1. HIGHER DOCTORATE DEGREES SUMMARY OF PRINCIPAL CHANGES General changes None Secton 3.2 Refer to text (Amendments to verson 03.0, UPR AS02 are shown n talcs.) 1 INTRODUCTION 1.1 The Unversty may award Hgher

More information

J. Parallel Distrib. Comput.

J. Parallel Distrib. Comput. J. Parallel Dstrb. Comput. 71 (2011) 62 76 Contents lsts avalable at ScenceDrect J. Parallel Dstrb. Comput. journal homepage: www.elsever.com/locate/jpdc Optmzng server placement n dstrbuted systems n

More information

Marginal Revenue-Based Capacity Management Models and Benchmark 1

Marginal Revenue-Based Capacity Management Models and Benchmark 1 Margnal Revenue-Based Capacty Management Models and Benchmark 1 Qwen Wang 2 Guanghua School of Management, Pekng Unversty Sherry Xaoyun Sun 3 Ctgroup ABSTRACT To effcently meet customer requrements, a

More information

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College Feature selecton for ntruson detecton Slobodan Petrovć NISlab, Gjøvk Unversty College Contents The feature selecton problem Intruson detecton Traffc features relevant for IDS The CFS measure The mrmr measure

More information

SIMULATION OPTIMIZATION: APPLICATIONS IN RISK MANAGEMENT

SIMULATION OPTIMIZATION: APPLICATIONS IN RISK MANAGEMENT Internatonal Journal of Informaton Technology & Decson Makng Vol. 7, No. 4 (2008) 571 587 c World Scentfc Publshng Company SIMULATION OPTIMIZATION: APPLICATIONS IN RISK MANAGEMENT MARCO BETTER and FRED

More information

Enabling P2P One-view Multi-party Video Conferencing

Enabling P2P One-view Multi-party Video Conferencing Enablng P2P One-vew Mult-party Vdeo Conferencng Yongxang Zhao, Yong Lu, Changja Chen, and JanYn Zhang Abstract Mult-Party Vdeo Conferencng (MPVC) facltates realtme group nteracton between users. Whle P2P

More information

Optimal Joint Replenishment, Delivery and Inventory Management Policies for Perishable Products

Optimal Joint Replenishment, Delivery and Inventory Management Policies for Perishable Products Optmal Jont Replenshment, Delvery and Inventory Management Polces for Pershable Products Leandro C. Coelho Glbert Laporte May 2013 CIRRELT-2013-32 Bureaux de Montréal : Bureaux de Québec : Unversté de

More information

Multiple-Period Attribution: Residuals and Compounding

Multiple-Period Attribution: Residuals and Compounding Multple-Perod Attrbuton: Resduals and Compoundng Our revewer gave these authors full marks for dealng wth an ssue that performance measurers and vendors often regard as propretary nformaton. In 1994, Dens

More information

Calculating the high frequency transmission line parameters of power cables

Calculating the high frequency transmission line parameters of power cables < ' Calculatng the hgh frequency transmsson lne parameters of power cables Authors: Dr. John Dcknson, Laboratory Servces Manager, N 0 RW E B Communcatons Mr. Peter J. Ncholson, Project Assgnment Manager,

More information

Complex Service Provisioning in Collaborative Cloud Markets

Complex Service Provisioning in Collaborative Cloud Markets Melane Sebenhaar, Ulrch Lampe, Tm Lehrg, Sebastan Zöller, Stefan Schulte, Ralf Stenmetz: Complex Servce Provsonng n Collaboratve Cloud Markets. In: W. Abramowcz et al. (Eds.): Proceedngs of the 4th European

More information

In some supply chains, materials are ordered periodically according to local information. This paper investigates

In some supply chains, materials are ordered periodically according to local information. This paper investigates MANUFACTURING & SRVIC OPRATIONS MANAGMNT Vol. 12, No. 3, Summer 2010, pp. 430 448 ssn 1523-4614 essn 1526-5498 10 1203 0430 nforms do 10.1287/msom.1090.0277 2010 INFORMS Improvng Supply Chan Performance:

More information

The Greedy Method. Introduction. 0/1 Knapsack Problem

The Greedy Method. Introduction. 0/1 Knapsack Problem The Greedy Method Introducton We have completed data structures. We now are gong to look at algorthm desgn methods. Often we are lookng at optmzaton problems whose performance s exponental. For an optmzaton

More information

Examensarbete. Rotating Workforce Scheduling. Caroline Granfeldt

Examensarbete. Rotating Workforce Scheduling. Caroline Granfeldt Examensarbete Rotatng Workforce Schedulng Carolne Granfeldt LTH - MAT - EX - - 2015 / 08 - - SE Rotatng Workforce Schedulng Optmerngslära, Lnköpngs Unverstet Carolne Granfeldt LTH - MAT - EX - - 2015

More information

Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network *

Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network * JOURNAL OF INFORMATION SCIENCE AND ENGINEERING 24, 819-840 (2008) Data Broadcast on a Mult-System Heterogeneous Overlayed Wreless Network * Department of Computer Scence Natonal Chao Tung Unversty Hsnchu,

More information

NONLINEAR OPTIMIZATION FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY

NONLINEAR OPTIMIZATION FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY NONLINEAR OPTIMIZATION FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY A Dssertaton Presented to the Faculty of the Graduate School of Cornell Unversty In Partal Fulfllment of the Requrements

More information

Realistic Image Synthesis

Realistic Image Synthesis Realstc Image Synthess - Combned Samplng and Path Tracng - Phlpp Slusallek Karol Myszkowsk Vncent Pegoraro Overvew: Today Combned Samplng (Multple Importance Samplng) Renderng and Measurng Equaton Random

More information

The OC Curve of Attribute Acceptance Plans

The OC Curve of Attribute Acceptance Plans The OC Curve of Attrbute Acceptance Plans The Operatng Characterstc (OC) curve descrbes the probablty of acceptng a lot as a functon of the lot s qualty. Fgure 1 shows a typcal OC Curve. 10 8 6 4 1 3 4

More information

Linear Circuits Analysis. Superposition, Thevenin /Norton Equivalent circuits

Linear Circuits Analysis. Superposition, Thevenin /Norton Equivalent circuits Lnear Crcuts Analyss. Superposton, Theenn /Norton Equalent crcuts So far we hae explored tmendependent (resste) elements that are also lnear. A tmendependent elements s one for whch we can plot an / cure.

More information

An Evaluation of the Extended Logistic, Simple Logistic, and Gompertz Models for Forecasting Short Lifecycle Products and Services

An Evaluation of the Extended Logistic, Simple Logistic, and Gompertz Models for Forecasting Short Lifecycle Products and Services An Evaluaton of the Extended Logstc, Smple Logstc, and Gompertz Models for Forecastng Short Lfecycle Products and Servces Charles V. Trappey a,1, Hsn-yng Wu b a Professor (Management Scence), Natonal Chao

More information

Retailers must constantly strive for excellence in operations; extremely narrow profit margins

Retailers must constantly strive for excellence in operations; extremely narrow profit margins Managng a Retaler s Shelf Space, Inventory, and Transportaton Gerard Cachon 300 SH/DH, The Wharton School, Unversty of Pennsylvana, Phladelpha, Pennsylvana 90 cachon@wharton.upenn.edu http://opm.wharton.upenn.edu/cachon/

More information

European Journal of Operational Research

European Journal of Operational Research European Journal of Operatonal Research 221 (2012) 317 327 Contents lsts avalable at ScVerse ScenceDrect European Journal of Operatonal Research journal homepage: www.elsever.com/locate/ejor Producton,

More information

Optimal Bidding Strategies for Generation Companies in a Day-Ahead Electricity Market with Risk Management Taken into Account

Optimal Bidding Strategies for Generation Companies in a Day-Ahead Electricity Market with Risk Management Taken into Account Amercan J. of Engneerng and Appled Scences (): 8-6, 009 ISSN 94-700 009 Scence Publcatons Optmal Bddng Strateges for Generaton Companes n a Day-Ahead Electrcty Market wth Rsk Management Taken nto Account

More information

Recurrence. 1 Definitions and main statements

Recurrence. 1 Definitions and main statements Recurrence 1 Defntons and man statements Let X n, n = 0, 1, 2,... be a MC wth the state space S = (1, 2,...), transton probabltes p j = P {X n+1 = j X n = }, and the transton matrx P = (p j ),j S def.

More information

Managing Cycle Inventories. Matching Supply and Demand

Managing Cycle Inventories. Matching Supply and Demand Managng Cycle Inventores Matchng Supply and Demand 1 Outlne Why to hold cycle nventores? Economes of scale to reduce fxed costs per unt. Jont fxed costs for multple products Long term quantty dscounts

More information

Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT

Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT Chapter 4 ECOOMIC DISATCH AD UIT COMMITMET ITRODUCTIO A power system has several power plants. Each power plant has several generatng unts. At any pont of tme, the total load n the system s met by the

More information

Dynamic optimization of the LNG value chain

Dynamic optimization of the LNG value chain Proceedngs of the 1 st Annual Gas Processng Symposum H. Alfadala, G.V. Rex Reklats and M.M. El-Halwag (Edtors) 2009 Elsever B.V. All rghts reserved. 1 Dynamc optmzaton of the LNG value chan Bjarne A. Foss

More information

Joint Scheduling of Processing and Shuffle Phases in MapReduce Systems

Joint Scheduling of Processing and Shuffle Phases in MapReduce Systems Jont Schedulng of Processng and Shuffle Phases n MapReduce Systems Fangfe Chen, Mural Kodalam, T. V. Lakshman Department of Computer Scence and Engneerng, The Penn State Unversty Bell Laboratores, Alcatel-Lucent

More information

A multi-start local search heuristic for ship scheduling a computational study

A multi-start local search heuristic for ship scheduling a computational study Computers & Operatons Research 34 (2007) 900 917 www.elsever.com/locate/cor A mult-start local search heurstc for shp schedulng a computatonal study Ger BrZnmo a,b,, Marelle Chrstansen b, Kjetl Fagerholt

More information

APPLICATION OF COMPUTER PROGRAMMING IN OPTIMIZATION OF TECHNOLOGICAL OBJECTIVES OF COLD ROLLING

APPLICATION OF COMPUTER PROGRAMMING IN OPTIMIZATION OF TECHNOLOGICAL OBJECTIVES OF COLD ROLLING Journal Journal of Chemcal of Chemcal Technology and and Metallurgy, 50, 6, 50, 2015, 6, 2015 638-643 APPLICATION OF COMPUTER PROGRAMMING IN OPTIMIZATION OF TECHNOLOGICAL OBJECTIVES OF COLD ROLLING Abdrakhman

More information

Medium and long term. Equilibrium models approach

Medium and long term. Equilibrium models approach Medum and long term electrcty prces forecastng Equlbrum models approach J. Vllar, A. Campos, C. íaz, Insttuto de Investgacón Tecnológca, Escuela Técnca Superor de Ingenería-ICAI Unversdad ontfca Comllas

More information

A Performance Analysis of View Maintenance Techniques for Data Warehouses

A Performance Analysis of View Maintenance Techniques for Data Warehouses A Performance Analyss of Vew Mantenance Technques for Data Warehouses Xng Wang Dell Computer Corporaton Round Roc, Texas Le Gruenwald The nversty of Olahoma School of Computer Scence orman, OK 739 Guangtao

More information

Staff Paper. Farm Savings Accounts: Examining Income Variability, Eligibility, and Benefits. Brent Gloy, Eddy LaDue, and Charles Cuykendall

Staff Paper. Farm Savings Accounts: Examining Income Variability, Eligibility, and Benefits. Brent Gloy, Eddy LaDue, and Charles Cuykendall SP 2005-02 August 2005 Staff Paper Department of Appled Economcs and Management Cornell Unversty, Ithaca, New York 14853-7801 USA Farm Savngs Accounts: Examnng Income Varablty, Elgblty, and Benefts Brent

More information

How To Calculate The Accountng Perod Of Nequalty

How To Calculate The Accountng Perod Of Nequalty Inequalty and The Accountng Perod Quentn Wodon and Shlomo Ytzha World Ban and Hebrew Unversty September Abstract Income nequalty typcally declnes wth the length of tme taen nto account for measurement.

More information

Support Vector Machines

Support Vector Machines Support Vector Machnes Max Wellng Department of Computer Scence Unversty of Toronto 10 Kng s College Road Toronto, M5S 3G5 Canada wellng@cs.toronto.edu Abstract Ths s a note to explan support vector machnes.

More information

SIMULATION OF INVENTORY CONTROL SYSTEM FOR SUPPLY CHAIN PRODUCER WHOLESALER CLIENT IN EXTENDSIM ENVIRONMENT

SIMULATION OF INVENTORY CONTROL SYSTEM FOR SUPPLY CHAIN PRODUCER WHOLESALER CLIENT IN EXTENDSIM ENVIRONMENT SIMULATION OF INVENTOY CONTOL SYSTEM FO SUPPLY CHAIN PODUCE WHOLESALE CLIENT IN EXTENDSIM ENVIONMENT Eugene Kopytov and Avars Muravjovs Transport and Telecommuncaton Insttute, Lomonosov Street, ga, LV-09,

More information

CS 2750 Machine Learning. Lecture 3. Density estimation. CS 2750 Machine Learning. Announcements

CS 2750 Machine Learning. Lecture 3. Density estimation. CS 2750 Machine Learning. Announcements Lecture 3 Densty estmaton Mlos Hauskrecht mlos@cs.ptt.edu 5329 Sennott Square Next lecture: Matlab tutoral Announcements Rules for attendng the class: Regstered for credt Regstered for audt (only f there

More information

Open Access A Load Balancing Strategy with Bandwidth Constraint in Cloud Computing. Jing Deng 1,*, Ping Guo 2, Qi Li 3, Haizhu Chen 1

Open Access A Load Balancing Strategy with Bandwidth Constraint in Cloud Computing. Jing Deng 1,*, Ping Guo 2, Qi Li 3, Haizhu Chen 1 Send Orders for Reprnts to reprnts@benthamscence.ae The Open Cybernetcs & Systemcs Journal, 2014, 8, 115-121 115 Open Access A Load Balancng Strategy wth Bandwdth Constrant n Cloud Computng Jng Deng 1,*,

More information

APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT

APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT Toshhko Oda (1), Kochro Iwaoka (2) (1), (2) Infrastructure Systems Busness Unt, Panasonc System Networks Co., Ltd. Saedo-cho

More information

ASSESSING THE AVAILABILITY AND ALLOCATION OF PRODUCTION CAPACITY IN A FABRICATION FACILITY THROUGH SIMULATION MODELING: A CASE STUDY

ASSESSING THE AVAILABILITY AND ALLOCATION OF PRODUCTION CAPACITY IN A FABRICATION FACILITY THROUGH SIMULATION MODELING: A CASE STUDY Internatonal Journal of Industral Engneerng, 15(2), 166-175, 2008. ASSESSING THE AVAILABILITY AND ALLOCATION OF PRODUCTION CAPACITY IN A FABRICATION FACILITY THROUGH SIMULATION MODELING: A CASE STUDY J.H.

More information

Traffic-light a stress test for life insurance provisions

Traffic-light a stress test for life insurance provisions MEMORANDUM Date 006-09-7 Authors Bengt von Bahr, Göran Ronge Traffc-lght a stress test for lfe nsurance provsons Fnansnspetonen P.O. Box 6750 SE-113 85 Stocholm [Sveavägen 167] Tel +46 8 787 80 00 Fax

More information

How Sets of Coherent Probabilities May Serve as Models for Degrees of Incoherence

How Sets of Coherent Probabilities May Serve as Models for Degrees of Incoherence 1 st Internatonal Symposum on Imprecse Probabltes and Ther Applcatons, Ghent, Belgum, 29 June 2 July 1999 How Sets of Coherent Probabltes May Serve as Models for Degrees of Incoherence Mar J. Schervsh

More information

SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS

SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS Magdalena Rogalska 1, Wocech Bożeko 2,Zdzsław Heduck 3, 1 Lubln Unversty of Technology, 2- Lubln, Nadbystrzycka 4., Poland. E-mal:rogalska@akropols.pol.lubln.pl

More information

Vision Mouse. Saurabh Sarkar a* University of Cincinnati, Cincinnati, USA ABSTRACT 1. INTRODUCTION

Vision Mouse. Saurabh Sarkar a* University of Cincinnati, Cincinnati, USA ABSTRACT 1. INTRODUCTION Vson Mouse Saurabh Sarkar a* a Unversty of Cncnnat, Cncnnat, USA ABSTRACT The report dscusses a vson based approach towards trackng of eyes and fngers. The report descrbes the process of locatng the possble

More information

A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression

A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression Novel Methodology of Workng Captal Management for Large Publc Constructons by Usng Fuzzy S-curve Regresson Cheng-Wu Chen, Morrs H. L. Wang and Tng-Ya Hseh Department of Cvl Engneerng, Natonal Central Unversty,

More information

Inter-Ing 2007. INTERDISCIPLINARITY IN ENGINEERING SCIENTIFIC INTERNATIONAL CONFERENCE, TG. MUREŞ ROMÂNIA, 15-16 November 2007.

Inter-Ing 2007. INTERDISCIPLINARITY IN ENGINEERING SCIENTIFIC INTERNATIONAL CONFERENCE, TG. MUREŞ ROMÂNIA, 15-16 November 2007. Inter-Ing 2007 INTERDISCIPLINARITY IN ENGINEERING SCIENTIFIC INTERNATIONAL CONFERENCE, TG. MUREŞ ROMÂNIA, 15-16 November 2007. UNCERTAINTY REGION SIMULATION FOR A SERIAL ROBOT STRUCTURE MARIUS SEBASTIAN

More information

Dynamic Fleet Management for Cybercars

Dynamic Fleet Management for Cybercars Proceedngs of the IEEE ITSC 2006 2006 IEEE Intellgent Transportaton Systems Conference Toronto, Canada, September 17-20, 2006 TC7.5 Dynamc Fleet Management for Cybercars Fenghu. Wang, Mng. Yang, Ruqng.

More information

Optimization of network mesh topologies and link capacities for congestion relief

Optimization of network mesh topologies and link capacities for congestion relief Optmzaton of networ mesh topologes and ln capactes for congeston relef D. de Vllers * J.M. Hattngh School of Computer-, Statstcal- and Mathematcal Scences Potchefstroom Unversty for CHE * E-mal: rwddv@pu.ac.za

More information

Luby s Alg. for Maximal Independent Sets using Pairwise Independence

Luby s Alg. for Maximal Independent Sets using Pairwise Independence Lecture Notes for Randomzed Algorthms Luby s Alg. for Maxmal Independent Sets usng Parwse Independence Last Updated by Erc Vgoda on February, 006 8. Maxmal Independent Sets For a graph G = (V, E), an ndependent

More information

An Introduction to 3G Monte-Carlo simulations within ProMan

An Introduction to 3G Monte-Carlo simulations within ProMan An Introducton to 3G Monte-Carlo smulatons wthn ProMan responsble edtor: Hermann Buddendck AWE Communcatons GmbH Otto-Llenthal-Str. 36 D-71034 Böblngen Phone: +49 70 31 71 49 7-16 Fax: +49 70 31 71 49

More information

A method for a robust optimization of joint product and supply chain design

A method for a robust optimization of joint product and supply chain design DOI 10.1007/s10845-014-0908-5 A method for a robust optmzaton of jont product and supply chan desgn Bertrand Baud-Lavgne Samuel Bassetto Bruno Agard Receved: 10 September 2013 / Accepted: 21 March 2014

More information

Number of Levels Cumulative Annual operating Income per year construction costs costs ($) ($) ($) 1 600,000 35,000 100,000 2 2,200,000 60,000 350,000

Number of Levels Cumulative Annual operating Income per year construction costs costs ($) ($) ($) 1 600,000 35,000 100,000 2 2,200,000 60,000 350,000 Problem Set 5 Solutons 1 MIT s consderng buldng a new car park near Kendall Square. o unversty funds are avalable (overhead rates are under pressure and the new faclty would have to pay for tself from

More information

Allocating Time and Resources in Project Management Under Uncertainty

Allocating Time and Resources in Project Management Under Uncertainty Proceedngs of the 36th Hawa Internatonal Conference on System Scences - 23 Allocatng Tme and Resources n Project Management Under Uncertanty Mark A. Turnqust School of Cvl and Envronmental Eng. Cornell

More information

VoIP Playout Buffer Adjustment using Adaptive Estimation of Network Delays

VoIP Playout Buffer Adjustment using Adaptive Estimation of Network Delays VoIP Playout Buffer Adjustment usng Adaptve Estmaton of Network Delays Mroslaw Narbutt and Lam Murphy* Department of Computer Scence Unversty College Dubln, Belfeld, Dubln, IRELAND Abstract The poor qualty

More information

HowHow to Find the Best Online Stock Broker

HowHow to Find the Best Online Stock Broker A GENERAL APPROACH FOR SECURITY MONITORING AND PREVENTIVE CONTROL OF NETWORKS WITH LARGE WIND POWER PRODUCTION Helena Vasconcelos INESC Porto hvasconcelos@nescportopt J N Fdalgo INESC Porto and FEUP jfdalgo@nescportopt

More information

Abteilung für Stadt- und Regionalentwicklung Department of Urban and Regional Development

Abteilung für Stadt- und Regionalentwicklung Department of Urban and Regional Development Abtelung für Stadt- und Regonalentwcklung Department of Urban and Regonal Development Gunther Maer, Alexander Kaufmann The Development of Computer Networks Frst Results from a Mcroeconomc Model SRE-Dscusson

More information

Forecasting the Demand of Emergency Supplies: Based on the CBR Theory and BP Neural Network

Forecasting the Demand of Emergency Supplies: Based on the CBR Theory and BP Neural Network 700 Proceedngs of the 8th Internatonal Conference on Innovaton & Management Forecastng the Demand of Emergency Supples: Based on the CBR Theory and BP Neural Network Fu Deqang, Lu Yun, L Changbng School

More information

Causal, Explanatory Forecasting. Analysis. Regression Analysis. Simple Linear Regression. Which is Independent? Forecasting

Causal, Explanatory Forecasting. Analysis. Regression Analysis. Simple Linear Regression. Which is Independent? Forecasting Causal, Explanatory Forecastng Assumes cause-and-effect relatonshp between system nputs and ts output Forecastng wth Regresson Analyss Rchard S. Barr Inputs System Cause + Effect Relatonshp The job of

More information