Equipment and Instrument Tagging Requirements



Similar documents
Design Deliverables Checklist

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

Migrating Guelph Wastewater s Data Monitoring Program to a Web-Based Reporting System:

City of Dallas 1.5 MGD WWTP

The Use of Magnesium Hydroxide Slurry as a Safe and Cost Effective Solution for H 2

The City of Boulder 75 th Street Wastewater Treatment Facility

Environmental Science 101 Waste. Fall Lecture Outline: Terms You Should Know: Learning Objectives: Reading Assignment: Chlorinated.

ANAEROBIC/ANOXIC TANKS

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015

Cambridge Wastewater Treatment Facility

Description of the Water Conserv II Facility

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.

Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and

Sewerage Management System for Reduction of River Pollution

Outline. Background. NFPA 820 Applicability to Wastewater Treatment Facilities. Hazardous Area Classifications. Treatment Plant Area Classifications

Wastewater Treatment System Rehabilitation Project

PLC 1 SEPTIC SYSTEM SCADA SYSTEM OPERATION MANUAL. Revision 1.0 June 05, 2006

WASTEWATER TREATMENT OBJECTIVES

EXISTING WASTEWATER TREATMENT FACILITIES

Facility Classification Standards

How To Reallocate Money From A Project To A Project

CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM

Winnipeg Sewage Treatment Program Integrated Management System

St. John s Harbour Clean-Up Phase 2. Project Description

William E. Dunn Water Reclamation Facility. Facility Overview & Information

Process Analysis and Control P&ID Handout Page 1 P&ID SYMBOLS. ISA Symbols and Loop Diagrams

Technical Feasibility of a Wet Weather Flow Treatment Facility

City of Charlottetown Wastewater Treatment Expansion & Upgrading

DOCKET NO. D CP-2 DELAWARE RIVER BASIN COMMISSION

Altoona Water Authority. Infrastructure Overview

Advanced_O&M_Task_List_Example_Tool_06_02_16: O&M Example

EXISTING WASTEWATER TREATMENT FACILITIES

DRAFT Public Outreach Document for What s an SSMP?

Water Purification Treatment System

26th Ward Wastewater Treatment Plant Wet Weather Operating Plan

Emergency Response Plan

CHAPTER 1 - EXECUTIVE SUMMARY

Type of Sewer Systems. Solomon Seyoum

CHAPTER Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities

Town of New Castle Utility Department Introduction

Sanitary Sewer Overflow Enforcement : A National Perspective

12:10 Lysotherm : 5 jaar ervaring met innovatieve slibhydrolyse. Bert Geraats (Eliquo)

SIMBA - Simulation of biological wastewater systems

HUBER Vacuum Rotation Membrane VRM Bioreactor

Septic Tank Use & Maintenance Tips

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES

Saudi Aramco Project Development

Testimony. Shaun LaLonde Agency Hearing Staff Eduardo Hernandez Applicant Witness

Introduction To General Wastewater Study Guide

Asset management it s a simple concept. Know your system s

Phosphorus Removal. Wastewater Treatment

Membrane Bioreactor Performance Compared to Conventional Wastewater Treatment

Provided below is a description of the processes generating wastewater in a poultry plant and a typical pretreatment and full treatment system.

Module 16: The Activated Sludge Process - Part II Instructor Guide Answer Key

RE: Award of Request for Proposal PW-ES Engineering Services for Upgrades to the Dunnville Wastewater Treatment Plant

Orange County Sanitation District

Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

CERTIFICATION TO OPERATE WATER AND WASTEWATER TREATMENT SYSTEMS APPLICATION INSTRUCTIONS

PERMITTEE/FACILITY NAME: City of Detroit Water and Sewerage Department / Detroit Wastewater Treatment Plant

City of Mebane Wastewater Collection and Treatment Facility

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

Small Wastewater Treatment Systems

ACTIFLO Process For Wet Weather and Wastewater Treatment

aquateam Aquateam - Norwegian Water Technology Centre A/S Report no: Project no: O Project manager: Dr. Bjørn Rusten.

lforrnation Requir C -INF lucture & OPER eraf - Drawing No Drawing No

Case Study: Treatment of alluvial sand, treatment of washing water and sludge.

POTW PHOSPHORUS REMOVAL PROCESSES

SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND

Glossary of Wastewater Terms

IEPA Log No.: C CoE appl. #: CEMVR-OD-P Public Notice Beginning Date: June 10, 2015 Public Notice Ending Date: July 10, 2015

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT

Kansas City s Overflow Control Program

Level 2 Energy Audit. NRSBU Bell Island Wastewater Treatment Plant. Engineering Advisor Nelson Regional Sewerage Business Unit (NRSBU)

HYDROVEX. CSO, SSO and Stormwater Management Specialist Products and Services for North America

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems

The Importance of Master Planning Ibrahim S. Nassar, P.E. Facilities Planning Department Saudi Aramco

Managing & Assisting with State & Federal Enforcement Directives Related to Sanitary Sewer Overflows (SSOs)

IP Sensing Water & Wastewater AMR/SCADA System

The Sewage Plant. The Original! Fully biological. Small sewage. wastewater treatment for. new construction. & retrofitting

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

Executive Summary. Purpose and Need for Project. Background Work

WWTP RETROFIT. Smith & Loveless Inc. Also in this issue: Do You Have Emergency Backup? Aging Clarifiers Retrofit to Like New

1.782 Environmental Engineering Masters of Engineering Project

Dairy Industry. The Quality Company Worldwide

INSTRUCTIONS/INFORMATION HOW TO PROPERLY FILL OUT THE INDIVIDUAL MECHANICAL TREATMENT PLANT WARRANTY INSPECTION / SERVICE REPORT

Experts Review of Aerobic Treatment Unit Operation and Maintenance. Bruce Lesikar Texas AgriLife Extension Service

4.2 Option 1 Expand Existing Lagoon System

1.85 WATER AND WASTEWATER TREATMENT ENGINEERING FINAL EXAM DECEMBER 20, 2005

CITY OF MODESTO SUTTER TREATMENT FACILITY FEASIBILITY STUDY. FINAL April /02/2015


Industrial IT Ó Melody Composer

Wastewater Nutrient Removal

Biological wastewater treatment plants of BIOGEST

WASTE WATER Solutions

TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS

Partner for automation Water technology

Grit Removal Identification and Removal Methods


Transcription:

Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Equipment and Instrument Tagging Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared by: Ed Prestemon Reviewed by: P.Y. Keskar Approved by: Jennifer Baldwin Revision 1 August 2009

Contents Section Page 1.1 Introduction... 1 1.2 Instrument Tagging... 1 1.2.1 Facility Codes... 1 1.2.2 ISA Designation... 2 1.2.3 Unit Processes Number... 2 1.2.4 Loop Numbers, Unit Numbers, and Clarifying Abbreviations... 2 1.3 Equipment Naming and Tagging... 3 1.4 Design Presentation... 3 1.4.1 Instruments... 3 1.4.2 Equipment... 4 Exhibits 1 Typical ISA Instrument Bubble...4 2 Typical Equipment Tag Number Call-out...4 MKE/092400036 III REV. 1 / AUGUST 2009

1.1 Introduction This document provides requirements for equipment and instrument tagging for projects associated with the City of Baton Rouge/Parish of East Baton Rouge (C-P) Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program. The term Engineer is defined as an engineering design firm under contract with the C-P and producing engineering design work on the Program. These requirements are provided to encourage consistency in the design approach used by various Engineers. The primary goal of the equipment and tagging requirements is to establish a methodology that results in consistent equipment names and unique tag numbers for all equipment, instruments, and associated control signals. This will allow all plant and pump station control systems, the system-wide SCADA system, and maintenance management systems to be fully integrated using unique tag numbers for all system components. While the purpose of these requirements is to assure uniformity, it is not intended to stifle Engineer s creativity, design innovation, and ingenuity. Engineers shall review these requirements and adopt them for design of the facilities for which they are responsible. Engineers are ultimately responsible for their design, and this responsibility is in no way diluted or absolved by these requirements. It may be necessary for the Engineer to deviate from these requirements. In such cases, the Engineer shall immediately bring this matter to the attention of the Program Manager (PM) by completing and submitting the form included in the Program Requirements for Engineers. The PM reserves the right to allow or disallow the deviation from the requirements. If the deviation will impact design contract terms, then a Supplemental Agreement will be negotiated between the Engineer, the PM, and the C-P. 1.2 Instrument Tagging All instruments will be labeled with a unique alpha-numeric tag number. Instrument tag numbers will generally consist of the following components: Facility Code ISA designation of process and function Unit Process Number Loop Number Unit Number Clarifying Abbreviation 1.2.1 Facility Codes Facility Codes will be as follows: XXX N S Pump Station Facility Number North WWTP South WWTP MKE/092400036 1 REV. 1 / AUGUST 2009

EQUIPMENT AND INSTRUMENT TAGGING REQUIREMENTS 1.2.2 ISA Designation Instrument Society of America (ISA) designations of process and function must follow Table 1 in ISA Standard 5.1, Instrumentation Symbols and Identification. Some typical examples include: AIT FE LSH LT PI Analytical instrument with indicator and transmitter Flow element Level switch high Level transmitter Pressure indicator (gauge) 1.2.3 Unit Processes Number Unit processes may be modified based on specific project requirements but must use the following applicable unit process numbers: 05 Raw sewage pumping 07 Equalization pumping and storage 10 Preliminary treatment 20 Primary treatment 30 Trickling filters 35 Solids contact basins 40 Final Settling tanks 50 Disinfection 55 Effluent pumping 60 Gravity thickeners and thickened sludge pumping 65 Thickened sludge mixing tanks 70 Anaerobic digestion 80 Sludge dewatering 90 Miscellaneous support facilities All collection system pump stations will use the unit process number for raw sewage pumping, 05. Additional unit process numbers can be created where useful to more clearly differentiate among process equipment and instruments. For example, under preliminary treatment, 10 could be used for screening and 15 for grit removal. 1.2.4 Loop Numbers, Unit Numbers, and Clarifying Abbreviations Loop numbers are generally assigned sequentially within a unit process and define a group of instruments, equipment, and so forth with a specific function. The unit number is a unique identifying number for parallel equipment and instrumentation. It is primarily used to avoid duplication of instrument numbers and is not always needed. In accordance with ISA standards, clarifying abbreviations are needed in some cases to fully define the instrument. For example, analytical instruments, such as those designated by AE, AI, or AIT, require a modifier to indicate what variable is being analyzed. REV. 1 / AUGUST 2009 2 MKE/092400036

EQUIPMENT AND INSTRUMENT TAGGING REQUIREMENTS 1.3 Equipment Naming and Tagging All major equipment, gates, and valves will also receive a unique tagging number that will consist of the following components: Facility Code Equipment designation Unit Process Number Loop Number Unit Number The facility codes, unit process numbers, loop numbers, and unit numbers will be as defined in Section 2 for instruments. Equipment designations will include the following: ARV Air release valve AVRV Air and vacuum release valve G Gate M Mechanical equipment P Pump T Tank PCV Pressure control valve PRV Pressure regulating valve PSV Pressure relief valve V Manual valve Additional equipment designations may be established subject to approval by the PM. Valves with automatic actuators will be given an ISA designation similar to instruments. For Open/Close valves, the letters will be FV. For modulating control valves, the letters will be FCV. In addition to tag numbers, major equipment will also be given names that can be used, primarily by operations staff, to refer to the equipment. For example, if there are four raw sewage pumps, they would typically be given the names, Raw Sewage Pump 1 through Raw Sewage Pump 4, with the numbers the same as the loop numbers. 1.4 Design Presentation Instrument and equipment tag numbers and names must be used consistently throughout the design drawings and specifications. 1.4.1 Instruments Instruments and their tag numbers will be shown on the drawings using the graphical standards included in ISA Standard 15.1. A typical instrument bubble is shown in Exhibit 1. MKE/092400036 3 REV. 1 / AUGUST 2009

EQUIPMENT AND INSTRUMENT TAGGING REQUIREMENTS The bubble in Exhibit 1 includes the following tag number components: AIT ISA designation of process and function 10 Unit Process Number 5 Loop Number 1 Unit Number DO Clarifying Abbreviation EXHIBIT 1 Typical ISA Instrument Bubble AIT 10-5-1 DO The clarifying abbreviation DO in this case stands for dissolved oxygen. All clarifying abbreviations must be defined in the instrumentation and control (I&C) legend drawings. Actuated valves will also be designated using the bubble in Exhibit 1 using FV as the ISA designation for Open/Close valves and FCV for modulating control valves. Note that the facility code is not included as part of the instrument bubbles on the drawings, however, it is acceptable to include the facility code. On projects with many instruments, not including the facility codes will simplify drawing preparation. However, if facility codes are not included, a note should be included in the I&C legend or drawings that clearly identifies the applicable facility codes. When referring to instruments in the specifications, the tag number AIT_10_05_01_DO shall be used for the instrument included in Exhibit 1. Note that the tag number again does not include the facility code but a general note must be included to note the applicable code. If a project contains multiple facilities, such as several pump stations, it would be preferable to list the facility codes as part of the tag numbers in the specifications to avoid confusion. Note that these tag numbers will also be used to identify control signals and I/O points in the plant and pump station control and SCADA systems. In these applications, the facility codes must be included. 1.4.2 Equipment Equipment, valves and other items that do not receive instrument tag numbers will also receive unique tag numbers. Tag numbers will be called out on the drawings using the format shown in Exhibit 2. The call-out in Exhibit 2 includes the following tag number components: P Equipment designation (Pump) 05 Unit Process Number 2 Loop Number 1 Unit Number EXHIBIT P-05-2-1 2 Typical Equipment Tag Number Call-out Again, note that the facility code is not included. Use of the facility code for equipment should be as discussed for instruments. REV. 1 / AUGUST 2009 4 MKE/092400036

EQUIPMENT AND INSTRUMENT TAGGING REQUIREMENTS In many cases, equipment numbers will not require separate unit numbers. In the above example, if there are four raw sewage pumps in unit process 05, which is raw sewage pumping, they could be designated P-05-1 through P-05-4. However, if there are other pumps included in unit process 05, unit numbers would be needed to differentiate between the groups of pumps. When referring to equipment in the specifications, the tag number P-05-2-1 shall be used, as listed in Exhibit 2. If the equipment tag number is listed in a database for software programming or other applications, the tag number should be similar to the format for instruments. Assuming that the tag number in Exhibit 2 is located in the South WWTP, the tag number shall be written as S_P_05_02_01. MKE/092400036 5 REV. 1 / AUGUST 2009