All-in-one Container Data Center solution HUAWEI TECHNOLOGIES CO., LTD.



Similar documents
Huawei IDS1000 Container Data Center Solution

High-density modular data center making cloud easier. Frank Zheng Huawei

Huawei Data Center Facility Integration Solution

HUAWEI TECHNOLOGIES CO., LTD. Huawei IDS2000-S Small Modular Data Center Solution

Huawei IDS2000 Modular Data Center Solution

Huawei Cloud and Virtualization introduction HUAWEI TECHNOLOGIES CO., LTD.

IPSIP M series-m Modular Data Center

IBM Portable Modular Data Center Overview for Critical Facilities Round Table

THE WORLD S MOST EFFICIENT DATA CENTER

Data Center Consolidation Trends & Solutions. Bob Miller Vice President, Global Solutions Sales Emerson Network Power / Liebert

Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime

SMART SHELTER CONTAINER

Building a data center. C R Srinivasan Tata Communications

AIRAH Presentation April 30 th 2014

Cooling Small Server Rooms Can Be. - Jim Magallanes Computer Room Uptime: Uptime Racks:

opdc Cut your data center OPEX upto 70%

Energy Efficiency and Availability Management in Consolidated Data Centers

IBM Twin Data Center Complex Ehningen Peter John IBM BS 2011 IBM Corporation

Automation's Modular Containerized Datacenter Solutions

Data Centre Solutions... energy efficient by design. APC by Schneider Electric Elite Data Centre Partner. APC s leading Elite Data Centre Solutions

Questions to be responded to by the firm submitting the application. Why do you think this project should receive an award? How does it demonstrate:

POD S in Data Centres. The Frame Group Pty Ltd

DataCenter 2020: first results for energy-optimization at existing data centers

Enabling an agile Data Centre in a (Fr)agile market

Re Engineering to a "Green" Data Center, with Measurable ROI

HUAWEI Tecal E6000 Blade Server

Dealing with Thermal Issues in Data Center Universal Aisle Containment

THE OPTIMAL SOLUTION FOR SMALL AND MEDIUM DATA CENTER

Introduction to Hitachi Group Environment- conscious Data Center Programme for inspiring change

Colt Colocation Services Colt Technology Services Group Limited. All rights reserved.

Huawei Business Continuity and Disaster Recovery Solution

Huawei Smart Education Solution

SmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity

Huawei Cloud Data Center Solution

Future-Proof the Banking and Finance Data Center

Modular Data Centre. Flexible, scalable high performance modular data centre solutions. Data Centre Solutions...energy efficient by design

Data Center Equipment Power Trends

Scalable. Affordable. Flexible. Fast.

Every business owns precious data and every business should recognise the risk of losing their data. Natural Disaster

Data Center Infrastructure Management (DCIM)

Reference Guide: SmartDesign Approach: Common Data Center Challenges:

Benefits of. Air Flow Management. Data Center

World s Greenest High Performance Data Center

How To Power And Cool A Data Center

Types of Prefabricated Modular Data Centers

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group

How green is your data center?

Selecting Rack-Mount Power Distribution Units For High-Efficiency Data Centers

Containers and Modules: Is This the Future of the Data Center?

CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS

IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS

Data Center Checklist

Data Sheet FUJITSU Storage ETERNUS CD10000

LG Air conditioning Company Multi V Water Ⅱ. Air Conditioning Academy

Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION

Overview of Green Energy Strategies and Techniques for Modern Data Centers

How to build your Data Center Digitice roadshow Vaasa

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

BELLE VUE MANCHESTER DATA CENTRE

Data Center Facility Basics

Managing Data Centre Heat Issues

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

Enterprise Data Centres

ICT and the Green Data Centre

Energy Efficient Data Centre at Imperial College. M. Okan Kibaroglu IT Production Services Manager Imperial College London.

RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast.

Sovereign. The made to measure data centre

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009

Colocation, Cloud and Managed Services

NGSS Data Consolidator (DC)

Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

Leveraging Radware s ADC-VX to Reduce Data Center TCO An ROI Paper on Radware s Industry-First ADC Hypervisor

Data Sheet FUJITSU Server PRIMERGY CX420 S1 Out-of-the-box Dual Node Cluster Server

CloudEngine Series Data Center Switches. Cloud Fabric Data Center Network Solution

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

Data Center Precision Cooling: The Need For A Higher Level Of Service Expertise. A White Paper from the Experts in Business-Critical Continuity

LG Electronics AE Company, Commercial Air Conditioning

Application Guide Guardian Over the NET Server Room Solution

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

Subject: County of Los Angeles Data Center Space Requirement

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

David Lawler Vice President Server, Access & Virtualization Group

Who do the biggest names in servers, search, healthcare, cloud & financial services trust to provide power management solutions?

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers

Data Center Solutions - The Containerized Evolution

Transcription:

All-in-one Container Data Center solution

Contents All-in-one : Integrated one-stop data center solution All-in-one configuration and subsystems introduction Application scenarios and successful stories Page 2

Challenges of the tradition of building data centers Expansion is limited Difficult to find a suitable place High OPEX Energy inefficiency Difficult to meet the mobile scene and flexible expansion needs With the rapid development of cloud computing and mobile Internet business, the traditional data center faces many Challenges High CAPEX Large-scale data center construction costs of tens of million Long construction period Over one or two years commonly Page 3

Container data center has been widely used Google: Own use HP: 40 POD SUN : Black box SGI :Ice Cube Huawei :Container data center Microsoft : Own use Huawei launched the IDS container data center family of solutions IBM:PMDC Cisco : UCS 2005 2006 2007 2008 2009 2010 2011 Some enterprises have already used the container data center:...... Page 4

Containers adapt to the current trend of the data center The data center construction standards go unified TIA-942 The Uptime Institute Gartner Infrastructure Maturity Model China GB ASHRAE Needs of data center building change: Infrastructure design needs to be changed in order to support high density computing ; Using a variety of automated operations, management tools ; Based on the new design to improve the efficient use of infrastructure such as power and cooling. Supply-demand balance planning of DC resources HAVC Cooling power other Traditional DC-supply Modular design of DC - supply Container DC - supply current requirement Future DC resource requirement 0 1 2 3 4 5 6 7 8 9 10 future supply future requirement current supply The modular concept become an important trend in the current data center construction. The scalability of the data center has also become an important indicator of the success of data center construction. Page 5

Huawei All-in-one : Complete basic functions Centralized cooling / power distribution Aseismatic Management Waterproof/ lightning proof Remote maintenance Fire fighting Page 6

Highly integrated one-stop data center solution All-in-one Fast deployment Wide adaptability Flexible expansion High reliability Low TCO Page 7

Fast deployment Wide adaptability Flexible expansion Fast deployment, put into operation in advance High reliability Low TCO 10-week manufacturing,1-week installation: Solution simplification, factory prefabricated, shorten the construction period, do not need room of building Improve ROI: Compared with the traditional DC, can be put in operation ahead of 1 ~ 2 years. 1 st week Production cycle 10 th week Easy on site: only need place, power and network network power Data center Page 8

Fast deployment Wide adaptability Flexible expansion High reliability One stop solution meets backup or mobility requirement One-stop solution:providing the whole infrastructure such as IT racks, cooling system, power supply etc, adopting integrated management system. Environmental adaptability :adapting high & low temperature district and drought area, passed salty moisture and ocean shipping test. Anti-earthquake& anti-vibration: powerful anti- crash and shock absorption system, passed NEBS testing. Supporting working in the transporting way, satisfying military standard of anti-shock, passed 480km testing on 3rd class road. Satisfying dynamic deployment and moveable scenario such as military, disaster saving, oil, reconnoitering, fieldwork. Low TCO Backup system for disaster recovery Moveable scenario High temperature scenario Low temperature scenario Page 9

Flexible expansion Fast deployment Wide adaptability Flexible expansion High reliability Low TCO cluster and stack deployment Ready to meet any customer migration transport requirements Page 10

Application Scenarioes Fast deployment Wide adaptability Flexible expansion High reliability Low TCO 1. A complete system 2.Can be deployment quickly 3. Disaster relief and Opera Outdoor scenario Awning scenario 1. Super-scale stacked cluster deployment. 2. Flexible equipment room pre-installation schemes 3. Modular design, including the UPS, D.G., and cooling equipment. Warehouse scenario 1. Reuse or construct new traditional IDC equipment rooms 2. Deploy in modules and flexibly expand servers 3. Determine the deployment scenario Page 11

Fast deployment Wide adaptability Flexible expansion Internally and externally stable and reliable High reliability Low TCO Internal :Tire 3 design concept Key components (power supply and cooling) are N + X backup Batteries provide 10 minutes backup The key components powered by the UPS Three levels lightning protection design External:High reliability container design Windproof Seismic Anti-theft Waterproof Can fight against hurricanes in work condition 8 degree Side door, the compartment door to the installation of security door locks, air conditioning outdoor unit and vents has a good anti-theft design The locks, vents and outlets are all complete waterproof sealed Page 12

Fast deployment Wide adaptability Flexible expansion High reliability Low TCO, reducing constructing cost and operating cost Low TCO Low CAPEX: Outdoor applications, the external civil works is simple, just need main Reduce 50% powers and network. The whole systems are in one box, simple installation and low cost. Low OPEX: Green energy, hot and cold aisles are separated, hot and cold air are not mixed. Efficient modular UPS, upgrade the UPS conversion efficiency. Reduce 25% NetEco management system, unified management and maintenance. Enables remote management, reduce labor costs. Page 13

Contents All-in-one : Integrated one-stop data center solution All-in-one configuration and subsystems introduction 40ft container 20ft container Management system Application scenarios and successful stories Page 14

All-in-one (40ft): Integrated solution A container integration of all systems, such as cooling, electricity, equipment, etc.; Cabinet number: 8 IT cabinets +1 UPS cabinet+1 PDF Cooling method: air-cooled precision air-conditioning, 4 +1 backup; Power systems: UPS N +1 backup; 10 minutes backup. Power density: 7.5KW / cabinet (rated); Applicable to the environment: -33-45 Page 15

All-in-one (40ft):Compact layout Four functional areas: air conditioning outdoor unit area, equipment area, battery area, entrance hall. Hot and cold aisles are separated. Page 16

All-in-one (40ft): Complete cooling and power supply system LCU Outdoor unit This system supports the Africa and Latin America market requirements. Other voltage standard (such as dual FireWire 110V, 480V, etc.) can be used transformers to solve. Support 2-way power input; UPS N +1 backup, 40 batteries; backup time is 10 minutes. Input 380VAC 50Hz/480VAC 60Hz Cooling capacity 12.5kW Refrigerant R22 Cooling method Air-cooled precious cooling Backup 4+1 Protection degree LCU:IP20;Outdoor:IP55 Page 17

All-in-one (40ft):Scenes design comprehensive Scene for high temperature (T3 conditions), high-density scene (rated power density 10KW / rack): MAX cabinets: 8-10 racks(without UPS) Average power:11-15kw/rack( rated) Cooling system:air-cooled chilled water, Double outdoor units,1+1 backup(80kw/unit) Five LCUs,4+1 backup (20KW / unit ) Environment:-45-55,enclosed water cycle, can be set in arid area Power system:modular UPS,5+1 redundancy,battery backup is 10min Page 18

All-in-one (40ft):Scenes design comprehensive If operator does not need the ups system, 40 ft All-in-one can also provide ten-cabinets solution. MAX cabinets: 10 racks Average power:7.5kw/rack( rated) Cooling system air-cooled precision airconditioning, 4 +1 backup; Page 19

Contents All-in-one : Integrated one-stop data center solution All-in-one configuration and subsystems introduction 40ft container 20ft container Management system Application scenarios and successful stories Page 20

All-in-one (20ft): Integrated solution A container integration of all systems, such as cooling, electricity, equipment, etc.; Cabinet number: 4 IT cabinets +1 UPS cabinet Cooling method: air-cooled precision air-conditioning, 2 +1 backup; UPS systems: UPS 2 +1 backup; 5 minutes backup. Power density: 7.5KW / cabinet (rated); Applicable to the environment: -33-55 ; adapt T3 conditions. Page 21

All-in-one (20ft): Compact layout FM200 AC AC AC Three functional areas: air conditioning outdoor unit area, equipment area, entrance hall. Hot and cold aisles are separated. Page 22

All-in-one (20ft): Complete cooling and power supply system Item Input Rated input voltage Input voltage range Maximum input current Typical power consumption parameter Dual power supply Three-phase 380VAC 342V~440VAC 63A 20KW Three precision air conditioning, power 12.5KW, 2 +1 backup, come with heating humidification function; All refrigeration components are set in one container, easy to deploy and move. Page 23

Contents All-in-one : Integrated one-stop data center solution All-in-one configuration and subsystems introduction 40ft container 20ft container Management System Application scenarios and successful stories Page 24

All-in-one management system: NetEco NetEco Switch Modular 1 Switch Modular n Switch FE CCU CCU CCU FE CCU RS485 RS485 RS485 RS485 PDF A/C UPS ATS Cameral Smoke Temp. Water-immersion Access PDF A/C UPS ATS Cameral Smoke Temp. Water-immersion Access NetEco can provide centralized monitoring and integrated management to power, environment and security system. Adopting flexible structure and modular design, NetEco can manage not only single IDC infrastructure, but also several IDC infrastructure in different area. Page 25

NetEco management function panoramagram NetEco Solution Page 26

Warning Management Real time equipment monitoring Smart inform method of warning acousto-optic Email Display screen SMS Upper mgt system Process of work order mgt Warning database Assign work order Finish confirm maintain Result feedback Warning receiving Relativity analysis Warning storage Warning display Accumulate and share of operation experience Guide operation efficiently Page 27

Report management Template Plenty of reports template and reports style inside the system Customized Support user-defined reports, instrumental operation etc. Traceable Support user-defined periodic report by email Support checking by excel, PDF and word format. Reports & Chart Prolific presentation such as histogram, pie chart, curve chart Page 28

Interact management, auto & efficient Interact configuration access video and lighting interaction Network warning and video interaction Fire extinguish warning and video interaction Support modification and edition Interact demonstration Lighting system Video system Access mgt system 联 动 配 置 NetEco Access mgt system will interact with lighting and video system, turn on the light automatically, change the direction of cameral to the warning area, take photo and record when it detects normal punching card or illegal invasion. Page 29

Contents All-in-one : Integrated one-stop data center solution All-in-one configuration and subsystems introduction Application scenarios and successful stories Page 30

40ft All-in-one typical application: small data center 40ft All-in-One Container Data Center Scenarios Research institute Digital library University Large hospital Group headquarter Medium financial institute Carton center Data Center Features Under 100KW ICT power consumption 200-400 server scale(on the basis of 1U server) One container 8-10 IT cabinets Page 31

20ft All-in-one typical application: mini data center Scenarios Digital library Hospital 20ft container data center Petroleum Exploration projects Film production unit Disaster relief Data Center Features Under 30KW ICT power consumption Page 32

Case 1: Huawei Support Megapolis Service Deployment Customer requirements and challenges No. 1 retailer in Russia, occupies 73% market share Huawei solutions As local temperature is relatively low and wind power resource is abundant, Huawei offers chilled-air solution. Considering that Christmas is coming soon, 2 sets of system is deployed and put into operation primarily to meet the Xmas demand. Another 2 sets will be added later on, phase by phase. Benefits for customer Sales support is advanced for Xmas, sales increase 14.7% Phase-1 system deployment completed in 5 months, put into use before Xmas, shorten over 50% construction period. Phase-2 completed easily in 2 month, reducing 43% cost. Biggest retailer in Russia - Megapolis The ordering and logistic system is not able to burden pressure from the large scale business in coming Christmas. Megapolis decide to adopt cloud computing to build a new ordering and logistic system for the coming Xmas festival. Traditional data center requires huge investment and very long period to build the infrastructure. Page 33

Case 2: Venezuela ANTV data center Customer requirements and challenges Constructs dependable RDTS(remote disaster tolerant system) quickly, take old storage system in consideration Traditional DC construction required huge investment, can not meet budget in a short time Local power supply system is not stable Huawei solution Provides professional data center services and disaster tolerant plan, including consulting and design services. Offers a solution of chilled-air type container, combined with highly dependable flywheel UPS power supply container. Provides a integrated solution of data migration, backup and remote disaster tolerant Benefits for customer Biggest CT in Venezuela-ANTV Completes system construction in 6 months, 5 months less than traditional construction method. Builds complete backup and disaster tolerant system, promote operation competitiveness. Reduces 40% energy OPEX as calculated by 5 years. Increases 80% storage resources utilization rate. Page 34

Case 3: China Mobile Northern Base-fast deployment Customer requirements and challenges Require fast deployment: complete in 2 months. High standard: meets international advance design standard, green & energy-saving Portable: able to move after construction Huawei solutions Provides chilled-air container type integrated solution Provides professional consulting & customized service for data center. Provides customized production for internal equipment also. Benefits for customer Biggest carrier in China Fast deployed integrated data center, ensure the project going on smoothly. Flexible to shift, Sufficiently utilize the investments. Increase over 30% density of IT rack than traditional way. In response to nation environment protecting appeals, decreases OPEX and advances enterprise image. Page 35

Case 4: Mackenzie University DC-flexible deployment Customer requirements and challenges Biggest private university in Brazil investments of traditional data center construction is too high Existing building is difficult to rebuild, not able to meet the requirement of data center. Network multimedia teaching class and network lab is required. Huawei solutions Provides an integrated solution of IDC container. Provides a independent chilled-air container, lower demands for ground and environment. Highest NAS in industry, offers doc storage solution Benefits for customer Expand the data center easily without changing existing equipment room structure. Comparing traditional way of construction, save 47% cost. Sufficiently utilize space (Deploy on existing parking zone.) Page 36

Case 5: Brazil oil company DC-Portable Biggest oil company in Brazil Customer requirements and challenges Traditional IDC can not meet portable demands in field prospecting. Traditional IDC constructing takes high costs and long period, not able to meet business requirement Huawei solutions Provides integrated All-In-One IDC solution Integrated power system, cooling system and IT equipments into one container. Offers a customizing power system design. Benefits for customer Flexible mobility, meets special demands of field prospecting Reduce huge infrastructure investments, capable to shift flexibly with project. Response fast to increasing business demand of customer itself. Page 37

Thank you. www.huawei.com Copyright 2012 Huawei Technologies Co., Ltd. All Rights Reserved. The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.