Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs

Project Procurement Management

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)

PROJECT PROCUREMENT MANAGEMENT

PROJECT RISK MANAGEMENT

Project Management Institute (PMBOK 2000) PMP Preparation Worksheet

The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004)

Project Procurement Management

Managing IT Projects. Chapter 2 The PMI Framework

Develop Project Charter. Develop Project Management Plan

The 10 Knowledge Areas & ITTOs

Project Risk Management

PMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION

PROJECT PROCUREMENT MANAGEMENT

Project Procurement Management

PROJECT RISK MANAGEMENT

INSE 6230 Total Quality Project Management

More on Software Project Management Project and Organizations, Project Portfolio Management, Procurement Management

Introducing Project Procurement Management

Negative Risk. Risk Can Be Positive. The Importance of Project Risk Management

Making project management indispensable for business results. Project Management 101

PMP Project Management Professional Study Guide, Third Edition

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Project Management Standards: A Review of Certifications/Certificates

Quick Reference Guide Interactive PDF Project Management Processes for a Project

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

A COMPARISON OF PRINCE2 AGAINST PMBOK

Input, Output and Tools of all Processes

Interpreting the Management Process in IEEE/EIA with the Help of PMBOK

Introduction to the ITS Project Management Methodology

Certification Preparation Course LATVIKON (R.E.P.)Centre

Risk Management approach for Cultural Heritage Projects Based on Project Management Body of Knowledge

PMI Risk Management Professional (PMI-RMP ) - Practice Standard and Certification Overview

Project Management Professional (PMP) Boot Camp

PROJECT RISK MANAGEMENT

Project Integration Management

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

Supplier Management Exercises

Certificate In Project Management (CIPM)

PROJECT MANAGEMENT PLAN CHECKLIST

Time Management. Herb Pollard III

PMP Examination Tasks Puzzle game

PMP/CAPM Prep course. Anwers to all questions with rationale

PMI Risk Management Professional (PMI-RMP) Exam Content Outline

Project Procurement Management

Project Management Professional (PMP)


Module 10 Procurement Management PMP Exam Questions

Project Management Office (PMO)

PMBOK GLOSSARY. Activity Duration Estimating. Estimating the number of work periods which will be needed to complete individual activities.

FUNBIO PROJECT RISK MANAGEMENT GUIDELINES

PMP 2013 Exam Prep. Course Overview

<name of project> Software Project Management Plan

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

21. Earned Value deals with: a. EV Scope b. PV Time c. AC Cost 22. Portfolios are organized around business goals. 23. Take stern action against

Project Management Concepts, Methods, and Techniques

PROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP

Project Risk Management. Presented by Stephen Smith

Comparing the Differences and Complementary features of PRINCE2 and the PMI PMBOK Guide

Step by Step Project Planning

The 9 Things in the PMBOK

Construction Management Standards of Practice

Certification Exam Objectives: PK0-003

Project Managing to Support Change. Cathryn Stam, PMP Tina Salaris, RN, PMP

PMI Certified: PMP - Project Management 5 Days

PMP Exam Tips on Procurement Management, Fourth edition. Procurements section contracted

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500

State of Michigan (SOM) August Department of Technology, Management & Budget

Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010

Principles of Project Management

PROCESS GROUP: PLANNING PROCESS GROUP: INITIATION. Oracle Projects. PMBOK Oracle Mapping. Scope Planning. Develop Project Charter

Risk Management Primer

Project Management Plan for

Risk Workshop Overview. MOX Safety Fuels the Future

The contact workshop is a mix of instructor lead and self paced learning, designed as per the PMBOK Fifth edition of Project Management Institute.

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE

A Report on. December 17, 2013 COMPARISON OF PROGRAMS OBJECTIVES AND TAGET POPULATIONS:

Cost Management. How Much Will This Project Cost?

February 26, 2009 Illinois State University Procurement Management

Crosswalk Between Current and New PMP Task Classifications

Project Management Professional (Certified by PMI)

Project Management Process. Prepared by Jay Knape

Project Management Professional (PMP) Examination Content Outline

PMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION

Procurement Management S# What? Formula Additional Notes CPPC CPFF CPAF CPIF T&M FPEPA FPAF FPIF FFP

Government Contracting 101 PART 2. Text File. Welcome to SBA s training program, Government Contracting 101, Part 2.

pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

Technology Outsourcing. Effective Practices for Selecting a Service Provider

PBL: Project Management. Competency: Project Definition

Course Syllabus. Project Management Certificate

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.

Project Management Certificate (IT Professionals)

Project Management Guidebook

Program Title: Advanced Project Management Knowledge, Skills & Software Program ID: # Program Cost: $4,690 Duration: 52.

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date:

Transcription:

CPM -100: Principles of Project Management Lesson E: Risk and Procurement Management Presented by Sam Lane samlane@aol.com Ph: 703-883-7149 Presented at the IPM 2002 Fall Conference Prepared by the Washington, D.C. Chapter of PMI

Five Process Groups Initiating Controlling Executing Closing 2

Initiating Processes Scope 5.1 Initiation CORE PROCESSES (none) FACILITATING PROCESSES PMBOK P32 3

Processes CORE PROCESSES Scope 5.2 Scope Scope 5.3 Scope Definition 6.1 Activity Definition FACILITATING PROCESSES Quality Time Time 6.2 Cost 7.1 Resource Human Res. Activity Sequencing Time 6.3 Activity Duration Estimating Cost 7.2 Cost Estimating Human Res. Time 6.4 Schedule Development Risk 11.1 Risk Mgmt. Procurement Cost 7.3 Cost Budgeting Integration 4.1 Project Plan Development Procurement 8.1 Quality 9.1 Org l 9.2 Staff Acquisition 12.1 Procurement 12.2 Solicitation Communication Risk Risk Risk Risk 10.1 Comm 11.2 Risk Identification 11.3 Qualitative Risk Analysis 11.4 Quantitative Risk Analysis 11.5 Risk Response PMBOK P33 4

Executing Processes CORE PROCESSES Integration 4.2 Project Plan Execution FACILITATING PROCESSES Quality 8.2 Quality Assurance Human Resource 9.3 Team Development Communications 10.2 Info. Distribution Procurement 12.3 Solicitation Procurement 12.4 Source Selection Procurement 12.5 Contract Admin. PMBOK P35 5

Controlling Processes CORE PROCESSES Communications 10.3 Performance Reporting Integration 4.3 Integrated Change Control FACILITATING PROCESSES Scope 5.4 Scope Verification Scope 5.5 Scope Change Control Time 6.5 Schedule Control Cost 7.4 Cost Control Quality 8.3 Quality Control Risk 11.6 Risk Monitoring & Control PMBOK P36 6

Closing Processes CORE PROCESSES Procurement 12.6 Contract Close-Out Communications 10.4 Administrative Closure PMBOK P37 7

Processes 5.2 Scope 6.1 Activity Definition 6.2 Activity Sequencing 6.3 Duration Estim. 6.4 Schedule Devel. CORE PROCESSES 7.3 Cost Budgeting 11.1 - Risk Management 5.3 Scope Definition 7.1 Resource 7.2 Cost Estim. 11.1 Risk Mgmt 4.1 Proj Plan Devel. 1. Risk Management Plan FACILITATING PROCESSES 8.1 Quality 9.1 Org l 9.2 Staff Acquis n 12.1 Procure 12.2 Solicit. 10.1 Comm 11.2 Risk Ident. 11.3 Qualit. Risk Analysis 11.4 Quantit. Risk Analysis 11.5 Risk Response PMBOK P127 8

Risk Management Risk = an uncertain condition or event that, if it occurs, has a positive or negative effect on a project objective. Every risk has a cause and a potential consequence. Risks are both known and unknown. Risk management is continuous throughout the project. 9

RISK FACTORS All project risks are characterized by the following Three risk factors Risk event: what could go wrong Risk probability: how likely the event is to occur Risk severity: the amount at stake Risk exposure of a given risk event can be determined by: Expected monetary value = risk probability x amount at stake 10

11.1 - Risk Management Inputs 1. Project Charter 2. Organization s Risk Management Policies 3. Defined Roles & Responsibilities 4. Stakeholder Risk Tolerances 5. Template for the Organization's Risk Management Plan 6. WBS Tools & Techniques 1. Meetings Outputs 1. Risk Management Plan PMBOK P129 11

Include in Risk Management Plan Methodology Roles& responsibilities Budgeting Timing Scoring& interpretation Thresholds Reporting formats Tracking 12

Processes 5.2 Scope 6.1 Activity Definition 6.2 Activity Sequencing 6.3 Duration Estim. 6.4 Schedule Devel. CORE PROCESSES 7.3 Cost Budgeting 11.2 - Risk Identification 5.3 Scope Definition 7.1 Resource 7.2 Cost Estim. 11.1 Risk Mgmt 4.1 Proj Plan Devel. 1. Risks 2. Triggers FACILITATING PROCESSES 8.1 Quality 9.1 Org l 9.2 Staff Acquis n 12.1 Procure 12.2 Solicit. 3. Inputs to Other Processes 10.1 Comm 11.2 Risk Ident. 11.3 Qualit. Risk Analysis 11.4 Quantit. Risk Analysis 11.5 Risk Response PMBOK P114 13

11.2 - Risk Identification Inputs 1.Risk Management Plan 2. Project Outputs 3. Risk Categories 4. Historical Information Tools & Techniques 1. Documentation Reviews 2. Information gathering techniques 3. Checklists 4. Assumptions analysis 5. Diagramming techniques 1. Sources of Risk 2. Potential Risk Events 3. Risk Symptoms 4. Inputs to Other Processes PMBOK P131 Outputs 14

Risk Identification - Tools & Techniques Information Gathering Techniques Brainstorming Delphi technique Interviewing SWOT analysis 15

Processes 5.2 Scope 6.1 Activity Definition 6.2 Activity Sequencing 6.3 Duration Estim. 6.4 Schedule Devel. CORE PROCESSES 7.3 Cost Budgeting 11.3 - Qualitative Risk Analysis 5.3 Scope Definition FACILITATING PROCESSES 8.1 Quality 7.1 Resource 9.1 Org l 7.2 Cost Estim. 9.2 Staff Acquis n 11.1 Risk Mgmt 12.1 Procure 4.1 Proj Plan Devel. 12.2 Solicit. 1. Overall project risk ranking 2. List of prioritized risks 3. List of risks for additional analysis and management 10.1 Comm 11.2 Risk Ident. 11.3 Qualit. Risk Analysis 11.4 Quantit. Risk Analysis 11.5 Risk Response 4. Trends in qualitative risk analysis results PMBOK P133 16

Qualitative Risk Analysis Encourages free expression Allows opinions to be expressed Uses skills of common sense Good for capturing knowledge of non-experts Good when there is a great deal of uncertainty 17

Qualitative Risk Analysis - Outputs Overall risk ranking for the project List of prioritized risks List of risks for additional analysis and management Trends in qualitative risk analysis results 18

11.3 - Qualitative Risk Analysis Inputs 1. Risk Management Plan 2. Identified risks 3. Project status 4. Project type 5. Data precision 6. Scales of probability and impact 7. Assumptions Tools & Techniques 1. Risk probability and impact 2. Probability/ impact risk rating matrix 3. Project assumptions testing 4. Data precision ranking Outputs 1. Overall project risk ranking 2. List of prioritized risks 3. List of risks for additional analysis and management 4. Trends in qualitative risk analysis results 19

Qualitative Risk Analysis - Tools & Techniques Risk probability and impact Probability/impact risk rating matrix Project assumptions testing Data precision ranking 20

Probability/impact Risk Rating Matrix - Ordinal R I s k P r o b a b I l I t y Ordinal scales are subjective, rank- ordered values (critical, high, moderate, low) (red- blue-yellow yellow-green) Risk Impact 21 21

Probability/impact Risk Rating Matrix - Cardinal R I S K P R O B A B I L I T Y.25.50.75.90 Cardinal scales are objective, assign numeric values, can be linear or non- linear.90.75.50.25 RISK IMPACT 22 22

Processes 5.2 Scope 6.1 Activity Definition 6.2 Activity Sequencing 6.3 Duration Estim. 6.4 Schedule Devel. CORE PROCESSES 7.3 Cost Budgeting 11.4 - Quantitative Risk Analysis 5.3 Scope Definition 7.1 Resource FACILITATING PROCESSES 8.1 Quality 10.1 Comm 9.1 Org l 11.2 Risk Ident. 7.2 Cost Estim. 9.2 Staff Acquis n 11.3 Qualit. Risk Analysis 11.1 Risk Mgmt 12.1 Procure 11.4 Quantit. Risk Analysis 4.1 Proj Plan Devel. 12.2 Solicit. 11.5 Risk Response 1. Prioritized list of quantified risks 2. Probabilistic analysis of the project 3. Probability of achieving the cost and time objectives 4. Trends in quantitative risk analysis results PMBOK P137 23

11.4 - Quantitative Risk Analysis Inputs 1. Risk Management Plan 2. Identified risks 3. List of prioritized risks 4. List of risks for additional analysis and management 5. Historical information 6. Exert judgment 7. Other planning outputs Tools & Techniques 1. Interviewing 2. Sensitivity analysis 3. Decision tree analysis 4. Simulation Outputs 1. Prioritized list of quantified risks 2. Probabilistic analysis of the project 3. Probability of achieving the cost and time objectives 4. Trends in quantitative risk analysis results 24

Interviewing and Sensitivity Analysis Interviewing Used to gather numerical data on uncertainty ranges WBS elements, activities, etc. Obtain information on probability distribution critical values, for example: Low, most likely, and high for triangle distribution Mean and standard deviation for normal distribution Sensitivity Analysis Examines which uncertainties have the greatest impact on the project 25

DECISION TREE ANALYSIS Probability 0.6 SUCCESS= 0.30 X Outcome $200,000 Expected Monetary Value = $60,000 PROJECT A 0.5 0.4 FAILURE = 0.20 X $50,000 = $10,000 START 0.5 PROJECT B 0.7 SUCCESS= 0.35 X $100,000 = $35,000 0.3 FAILURE = 0.15 X $70,000 = $10,500 1.00 26

SIMPLE PROBABILITY SIMPLE PROBABILITY EQUATION: Pr (Event #1) x Pr (Event #2) = Pr (Both Events) P(t) = P(A) * P(B) OR 0.70 X 0.80 = 0.56 OR 56% NOTE: THIS APPLIES TO INDEPENDENT EVENTS ONLY 27

Simulation - Monte Carlo P r o b a b i l i t y Base Cost (0% Confidence) Add Up Cost Expected Cost (50% Confidence) 90% Confidence Cost (90%Confidence) Note: There is still a 10% chance that the cost of the project will exceed this amount Range of Project Cost Cost $ 28

Processes 5.2 Scope 5.3 Scope Definition FACILITATING PROCESSES 8.1 Quality 10.1 Comm 6.1 Activity Definition 7.1 Resource 9.1 Org l 11.2 Risk Ident. 6.2 Activity Sequencing 6.3 Duration Estim. 7.2 Cost Estim. 9.2 Staff Acquis n 11.3 Qualit. Risk Analysis 6.4 Schedule Devel. 11.1 Risk Mgmt 12.1 Procure 11.4 Quantit. Risk Analysis CORE PROCESSES 7.3 Cost Budgeting 4.1 Proj Plan Devel. 12.2 Solicit. 11.5 Risk Response 11.5 - Risk Response 1. Risk Response Plan 2. Residual Risks 3. Secondary Risks 4. Contractual Agreements 5. Contingency Reserve Amounts Needed 6. Inputs to Other Processes 7. Inputs to a Revised Project Plan PMBOK P140 29

11.5 - Risk Response Inputs 1. * Next slide Tools & Techniques 1. Avoidance 2. Transference 3. Mitigation 4. Acceptance PMBOK P140 Outputs 1. Risk Response Plan 2. Residual Risks 3. Secondary Risks 4. Contractual Agreements 5. Contingency Reserve Amounts Needed 6. Inputs to Other Processes 7. Inputs to a Revised Project Plan 30

11.5 - Risk Response Inputs 1. Risk Management Plan 2. List of prioritized risks 3. Risk ranking of the project 4. Prioritized list of quantified risks 5. Probabilistic analysis of the project 6. Probability of achieving cost and time objectives 7. List of potential responses 8. Risk thresholds 9. Risk owners 10. Common risk causes 11. Trends in qualitative and quantitative risk analysis results 31

11.5 - Risk Response Tools & Techniques Avoidance-eliminating a specific risk, usually by changing the project plan Transference-shift the ownership and consequences to a third party Mitigation - reducing the probability of occurrence, reducing the consequences, or both Acceptance - accepting the risk. Contingency Plan, Contingency Allowance Fallback Plan PMBOK P142 32

Risk Response - Outputs (1) Risk Response Plan Risks, cause, impact Risk owners, other responsibilities Quantitative and qualitative analysis results Risk response strategy selected: Avoidance Transference Mitigation Acceptance Response action plan(s) Budget & schedule Residual risks 33

Risk Response - Outputs (2) Residual Risks Secondary Risks Contractual Agreements Contingency Reserve Amounts Needed Inputs to Other Processes Inputs to a Revised Project Plan 34

Controlling Processes 10.3 Performance Reporting FACILITATING PROCESSES 5.4 5.5 Scope Scope Verif. Change Control 7.4 Cost Control 8.3 Quality Control 4.3 Integrated Change Control 6.5 Sched. Control 11.6 Risk Monitor & Control 11.6 - Risk Monitoring & Control 1. Workaround Plans 2. Corrective Action 3. Project Change Requests 4. Updates to the Risk Response Plan 5. Risk Database 6. Updates to Risk Identification Checklists PMBOK P144 35

11.6 - Risk Monitoring & Control Inputs 1. Risk Management Plan 2. Risk Response Plan 3. Project Communication 4. Additional Risk Identification and Analysis 5. Scope Changes Tools & Techniques 1. Project Risk Response Audits 2. Periodic Project Risk Reviews 3. Earned Value Analysis 4. Technical Performance Measurement 5. Additional Risk Outputs 1. Workaround Plans 2. Corrective Action 3. Project Change Requests 4. Updates to the Risk Response Plan 5. Risk Database 6. Updates to Risk Identification Checklists PMBOK P144 36

Project Procurement Procurement Goals Acquire the right things, in the right quantities, at the right price, at the right time, at the right quality, and on the right terms. Implement make or buy decisions. Provide alternatives to resource constraints. Administer the sub-contracts to fulfill expectations. A key risk management tool Risk transfer/deflection Assumes the contractor s best efforts at all times. 37

Definitions Contract: Mutually binding agreement obligating Seller to provide specified products and buyer to pay. Contract Administration: Managing the relationship with Seller. Contract Closeout: Completion, settlement, and resolution of all outstanding items. 38

Definitions Baseline: The Original Plan plus or minus Approved Changes. Change Control Board (CCB): A formally chartered group of stakeholders responsible for deciding on changes to the Project Baseline. 39

Definitions Deliverable: ANY measurable, tangible, verifiable outcome, result, or item that MUST BE produced to complete a contract. (Includes but not limited to: Products, services and documentation required and accepted by Buyer. Explicit or implied warranty.) 40

Definitions Fixed price or lump sum contract: A fixed price for a well defined product. May include incentives. Cost reimbursable contract: payment for actual (allowable) costs and defined fee. May also include incentives. Unit price contract: a.k.a. Time & Materials contracts. Paid a preset amount per unit of goods or service. 41

Definitions FFP: Firm fixed price (highest risk to the contractor) FPIF: Fixed price, incentive fee. CPFF: Cost plus fixed fee. (Highest risk to the buyer) CPIF: Cost plus incentive fee. (Includes award fee and performance-based fee contracts) 42

Definitions Level Of Effort (Time and Materials) Support-type activity that does not readily lend itself to measurement of discrete accomplishment. Characteristics: Uniform Rate of Activity over specific period of time. Independent Estimates: Buyer s independent estimate of costs that are used to assess reasonableness of contractor proposals. 43

Definitions RFP: Request for proposal. Request for price and a proposed method of meeting requirements. Often used when both price and technical evaluation determines winners. RFQ/IFB: Request for Quote/Invitation for Bid. Usually for materials or services where contract award is price driven. 44

Definitions Warranty Implied Warranty (UCC provisions) The mere act of sale implies (1) general fitness for use & (2) fitness for special uses that the user intends if the seller knows of these special conditions. Express Warranty Beyond the mere act of the sale, the seller makes specific representation (oral, ads, literature, specs, markings, time, etc.) 45

Definitions Guarantees Implied Guarantee (UCC provisions) Involves the merchantability of fitness of use of the final good or service. Express Guarantee Involves an actual promise regarding the level of performance for a contracted good or service. 46

Processes 5.2 Scope 6.1 Activity Definition 6.2 Activity Sequencing 6.3 Duration Estim. 6.4 Schedule Devel. CORE PROCESSES 7.3 Cost Budgeting 12.1 - Procurement 5.3 Scope Definition 7.1 Resource FACILITATING PROCESSES 8.1 Quality 9.1 Org l 7.2 Cost Estim. 9.2 Staff Acquis n 11.1 Risk Mgmt 12.1 Procure 4.1 Proj Plan Devel. 12.2 Solicit. 1. Procurement Management Plan 2. Statement(s) of Work 10.1 Comm 11.2 Risk Ident. 11.3 Qualit. Risk Analysis 11.4 Quantit. Risk Analysis 11.5 Risk Response PMBOK P149 47

12.1 - Procurement Inputs 1. Scope Statement 2. Product Description 3. Procurement Resources 4. Market Conditions 5. Other Outputs 6. Constraints 7. Assumptions Tools & Techniques 1. Make-or-Buy Analysis 2. Expert Judgment 3. Contract Type Selection Outputs 1. Procurement Management Plan 2. Statement(s) of Work PMBOK P149 48

Procurement Procurement Mgt. Plan How Procurement Processes will be managed Type of Contract Roles and Responsibilities Standard Documentation Statement of Work A Narrative Description of Products or Services to be supplied under the contract In some contexts, may refer to a Type of Contract (a Task Order contract) Defines WHAT not How or Who 49

Types of Contracts Three Basic Types: Fixed Price or Lump Sum (FFP, FPIF) Cost Reimbursable (CPFF, CPIF, CPAF,CPPC) Unit Price (Time and Materials) Other Contracting Documents Memorandum of Understanding Purchase Orders Letter Contract 50

Contract Elements The following are the elements of a legally-binding contract: Offer Acceptance Consideration Legality of purpose 51

Tools and Techniques 1. Make or Buy Analysis Make Cost Integration of Operations Idle and Existing Capacity Direct Control Design Secrecy Stabilize Work Force Buy Cost Supplier Skill Set Small Volume Requirement Limited Capacity Augment Labor Force Maintenance of Multiple Sources Indirect Control 52

Tools and Techniques 3. Contract Type Selection Three Basic Types: Fixed Price or Lump Sum (FP, FPIF) Cost Reimbursable (CPFF, CPIF) Unit Price (Cost/Price Schedule) Other Names for Contracts Memorandum of Understanding Purchase Orders 53

Processes 5.2 Scope 6.1 Activity Definition 6.2 Activity Sequencing 6.3 Duration Estim. 6.4 Schedule Devel. CORE PROCESSES 7.3 Cost Budgeting 12.2 - Solicitation 5.3 Scope Definition 7.1 Resource 7.2 Cost Estim. 11.1 Risk Mgmt 4.1 Proj Plan Devel. 1. Procurement Documents 2. Evaluation Criteria FACILITATING PROCESSES 8.1 Quality 9.1 Org l 9.2 Staff Acquis n 12.1 Procure 12.2 Solicit. 3. Statement of Work Updates 10.1 Comm 11.2 Risk Ident. 11.3 Qualit. Risk Analysis 11.4 Quantit. Risk Analysis 11.5 Risk Response PMBOK P152 54

12.2 - Solicitation Inputs 1. Procurement Management Plan 2. Statement(s) of Work 3. Other Outputs Tools & Techniques 1. Standard Forms 2. Expert Judgment Outputs 1. Procurement Documents 2. Evaluation Criteria 3. Statement of Work Updates 55

Executing Processes 4.2 Project Plan Execution 12.3 - Solicitation 1. Proposals FACILITATING PROCESSES 8.2 Quality Assur. 9.3 Team Devel. 10.2 Info. Distrib. 12.3 Solicit n 12.4 Source Select n 12.5 Contract Admin. PMBOK P153 56

12.3 - Solicitation Inputs Tools & Techniques Outputs 1. Procurement Documents 2. Qualified Seller Lists 1. Bidders Conferences 2. Advertising 1. Proposals PMBOK P153 57

Solicitations Request for Quotation (RFQ) Request for Proposal (RFP) Request for Information (RFI) Request for Clarification (RFC) Invitation for Bid (IFB) Invitation for Quote (IFQ) 58

Executing Processes 4.2 Project Plan Execution 12.4 - Source Selection 1. Contract FACILITATING PROCESSES 8.2 Quality Assur. 9.3 Team Devel. 10.2 Info. Distrib. 12.3 Solicit n 12.4 Source Select n 12.5 Contract Admin. PMBOK P155 59

12.4 - Source Selection Inputs 1. Proposals 2. Evaluation Criteria 3. Organizational Policies Tools & Techniques 1. Contract Negotiation 2. Weighting System 3. Screening System 4. Independent Estimates Outputs 1. Contract PMBOK P155 60

Contracts Must include these factors: Competent Parties. Good faith. An Offer. An Acceptance. Agreement (meeting of minds) Consideration (bargain for exchange) 61

Should-cost Estimates Buyer s INDEPENDENT ESTIMATE of cost of product or service Developed to determine reasonableness of sellers proposed costs May be an indication of an inadequate, or misunderstood, SOW PMBOK P156 62

Executing Processes 4.2 Project Plan Execution FACILITATING PROCESSES 8.2 Quality Assur. 9.3 Team Devel. 10.2 Info. Distrib. 12.5 - Contract Administration 1. Correspondence 2. Contract Changes 3. Payment Requests 12.3 Solicit n 12.4 Source Select n 12.5 Contract Admin. PMBOK P156 63

12.5 - Contract Administration Inputs 1. Contract 2. Work Results 3. Change Requests 4. Seller Invoices Tools & Techniques 1. Contract Change Control System 2. Performance Reporting 3. Payment System Outputs 1. Correspondence 2. Contract Changes 3. Payment Requests PMBOK P156 64

CONTRACT TYPE vs. RISK SCOPE OF WORK INFORMATION VERY LITTLE PARTIAL COMPLETE UNCERTAINTY HIGH MODERATE LOW DEGREE OF RISK HIGH MEDIUM LOW SUGGESTED RISK ALLOCATION 100% 0% AGENCY (BUYER) SELLER (CONTRACTOR) 0% 100% CONTRACT TYPES CPPC CPFF CPIF FPIF FFP 65

Closing Processes 12.6 Contract Close-Out 10.4 Administrative Closure 12.6 - Contract Close-Out 1. Contract File 2. Formal Acceptance and Closure PMBOK P158 66

12.6 - Contract Close-Out Inputs 1. Contract Documentation Tools & Techniques 1. Procurement Audits Outputs 1. Contract File 2. Formal Acceptance and Closure PMBOK P159 67