CITY RIVER CITY RIVER. URBAN RIVER RESTORATION approaches and perspectives Giancarlo Gusmaroli environmental engineer FORGOTTEN RIVERS 11/12/2012



Similar documents
RESTORATION OF URBAN WATERWAYS AS A GREEN INFRA

Delivering multiple benefits through effective river restoration UK & EU

Restoration Planning and Development of a Restoration Bank

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

WATER RESOURCES ENGINEERING DESIGN LANDSCAPE ECOLOGY AND RIVER RESTORATION.

Financing urban renewal, conservation of cultural heritage and tourism development

Bruce Orr and Zooey Diggory S T I L L W A T E R S C I E N C E S. Tom Dudley U C S A N T A B A R B A R A

Flood Risk Management

Flood Risk Management

RELATIONSHIP OF NATURE AND LIVING

Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014

SAN DIEGO CREEK NORTH. Prepared for: City ofnewport Beach 3300 Newport Blvd. Newport Beach, CA 92663

Water and Planning: The Fluid Challenge. How can we secure our future water resources?

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

ERP: Willamette-Ecosystem Services Project

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

What are the physical characteristics of York? Why problems do you think there could be in York use map evidence.

Oxbow Restoration for Fish Habitat and Water Quality

Melbourne, Australia. Melbourne: The city as a catchment approach. The importance of holistic urban water management

THE 4 MAJOR RIVERS RESTORATION PROJECT

Mobility management, a solution for urban congestion regarding EU best practices

Mapping and Modelling the Impact of Land Use Planning and Management Practices on Urban and Peri-Urban Landscapes in the Greater Dublin Area

WET10 - THE CITY WATER DEBATE When Will London Flood? Introduction. Dr Paul Leinster, CBE

INFRASTRUCTURE: Examples from Brazil

The development of a flood damage assessment tool for urban areas

River restoration and Natural Water Retention Measures. but questions and obstacles remain regarding their implementation

International practice for the design of levees. Dr Philip Smith 15th May 2014

River floodplains in Germany in times of climate change

The Sigmaplan: policy-integration and stakeholder management

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

REPUBLIC OF TURKEY MINISTRY OF FORESTRY AND WATER AFFAIRS

Strategic framework for setting priorities for restoring degraded ecosystems in Germany

Emerging gtrends and Innovation in Payments

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Priority Area Coordinator

CORFU Workshop Barcelona, 19 May The CORFU Project. Slobodan Djordjević

1.7.0 Floodplain Modification Criteria

Inventory of the Wildcat Creek Restoration Collection, No online items

Rivers by Design. Rethinking development and river restoration

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

Creating Green Jobs within the Environment and Culture sector.

Regional and territorial modelling for urban planning. A tool to foster cohesion in Europe

International Approaches to Achieving Ecological Objectives of Urban River Basin Enhancement

MATCHOFFICE EUROPEAN SERVICED OFFICES REPORT 2015

State of Green Infrastructure in the Gauteng City-Region

Development in land consolidation in The Netherlands. Experiences. Kees van der Vaart DLG Service for Land and Water Management

Designed and produced by geo-graphicsdesign.com DP 300 3/02

The River Ribble is one of the longest rivers in the North West of England

Working towards a Core Strategy for Wiltshire Topic paper 11: Green infrastructure

Greening the Streets of South London

The Sustainable Sites Initiative: Future Business Opportunities? 2009 Sustainable Sites Initiative

Flood Risk & Surface Water Management. Page 1 of 20

Thank you to all of our 2015 sponsors: Media Partner

Dr. Lidija Globevnik Luka Snoj, Neven Verdnik, Peter Muck. Meta Povž

FOUR RIVERS RESTORATION PROJECT

The North State: Implementing the California Water Action Plan February 24, 2014

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop

Three Risks, One Solution

Origins and causes of river basin sediment degradation and available remediation and mitigation options. Feedback from the Riskbase workshop

Urban Rehabilitation: an instrument for sustainable cities

Flood Risk Management Plans

Guidelines to Green Roofing

COLORADO S LANDSCAPE ARCHITECTS

New approaches of river restoration: matching the EU blueprint to safeguard Europe s waters

PINKHAM WAY ISSUE 01 STRATEGIC RISK ASSESSMENT 27th March 2015

Brussels, 4 September European Cooperation in the field of Scientific and Technical Research - COST - Secretariat COST 279/01

Puhinui Stream Restoration- Concept Plan

Melbourne Principles for Sustainable Cities

Bolton s Flood Risk Management Strategy

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK...

German Approach to Integrated Urban Development within the EU

Muddy River Restoration Project Maintenance and Management Oversight Committee 68 Harvard Street Brookline, Massachusetts

Practical decisions facing urban planners

Development of Decision Support Matrices for Climate Change Adaptation Planning. Jay S. Gregg Malene Kauffmann Kirsten Halsnæs

Next generation insurance - insights into the behaviour and beliefs of the European consumer

Dar es Salaam Masterplan Ministry of Lands, Housing and Human Settlements Development

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan.

+44 (0) ARE CLICKS CRUSHING BRICKS? Ecommerce and the digital influence on bricks-and-mortar retail

The catchment planning system

Settlements Must Be Integrated with Nature

Restoration of urban rivers as a challenge towards sustainability.

WHAT IS WORLD FISH MIGRATION DAY (WFMD)?

Strategy for 2012 to An active player from rural areas to the metropolis

H 5478 S T A T E O F R H O D E I S L A N D

INDONESIA - LAW ON WATER RESOURCES,

METROPOLITAN GOVERNANCE AND STRATEGIC PLANNING ALLIANCES AND AGREEMENTS

River restoration Case Studies

Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute

Modelling floods and damage assessment using GIS

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Prof. Alessandro Balducci, Prorettore Vicario

Water Resources Collections and Archives University of California

PLANNING APPLICATION: 12/00056/APP

Ecosystem services in grasslands: evidence, trade-offs and restoration. James Bullock NERC Centre for Ecology and Hydrology

How To Get A Flood Immunity

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

The New Master Plan aims to reverse the trend of declining population of Lisbon, creating conditions to attract more people.

Transcription:

11/12/2012 URBAN RIVER RESTORATION approaches and perspectives Giancarlo Gusmaroli environmental engineer RIVER SANCTUARY BORDER VECTOR RESOURCE vs CITY worship defend transport exploit TOWN GENERATION ITALIAN CENTRE FOR RIVER RESTORATION CITY vs RIVER FORGOTTEN RIVERS? RIVER CONTINUUM CONCEPT (Vannote, 1980) 1

11/12/2012 NOT ALWAYS WATERFRONT DESIGN 2

WATERFRONT DESIGN address formal part of architectonic composition research urbanistic resolution of deteriorated edges foster enhancement of yet unexpressed zones RIVER RESTORATION today yesterday tomorrow (vision) RIVER RESTORATION address river health research resolution for altered watercourses foster enhancement of ecological status AMENITY vs ECOSYSTEM rehabilitation approach? 3

ENVIRONMENTAL ENHANCEMENT RESTORATION RIGENERATION (river quality) (urban quality) URBAN DEVELOPMENT WATERFRONT RIVERSIDE (city river) (river city) FLOOD RISK RESISTENCE RESILIENCE (fail safe) (safe fail) close to nature approach REFERENCE ECOLOGICAL STATUS 1 TOMORROW TODAY 0 recovery every time it is possible intervent only when it is necessary REFERENCE ECOLOGICAL STATUS 1 TOMORROW EXAMPLES large scale experiences TODAY 0 From Findlay (2006) 4

MUNICH (Germany) 1 of 4 MUNICH (Germany) 1 of 4 MAIN SCOPE URBAN RECREATION ENHANCEMENT OTHER FINALITIES MORE ENVIRONMENTAL INTEGRITY LESS FLOOD RISK THROUGH - less longitudinal and lateral discontinuity - more room for river dynamics - habitat recovery MUNICH (Germany) sleeping defenes below new low dikes 1 of 4 MUNICH (Germany) 1 of 4 removed or lowered banks before after 5

MUNICH (Germany) 1 of 4 NIJMEGEN (Netherland) 2 of 4 Isar-Plan investment: 28 M NIJMEGEN (Olanda) 45 % Munich Municipality 55 % Baviera Region (EU funding) planning starts on: 1995 works start on: 2000 works final delivery: 2008 NIJMEGEN (Netherland) 2 of 4 NIJMEGEN (Netherland) 1 of 4 MAIN SCOPE FLOOD RISK REDUCTION OTHER FINALITIES MORE ENVIRONMENTAL INTEGRITY ENSURE NAVIGATION THROUGH - more room for water flows 6

NIJMEGEN (Netherland) 2 of 4 NIJMEGEN (Netherland) 2 of 4 SEOUL (KOREA) 3 of 4 NIJMEGEN (Netherland) 1 of 4 MAIN SCOPE URBAN REGENERATION OTHER FINALITIES ENHANCE RECREATIONAL VALUE IMPROVE URBAN DRAINAGE THROUGH - deculverting - mimic nature (river garden) Cheonggye-cheon River 7

11/12/2012 SEOUL (KOREA) 3 of 4 SEOUL (KOREA) Cheonggye-cheon River LONDON (UK) 4 of 4 3 of 4 Cheonggye-cheon River LONDON (UK) 4 of 4 Brent River, BEFORE (1999) 8

LONDON (UK) 4 of 4 LONDON (UK) 4 of 4 MAIN SCOPE URBAN REGENERATION OTHER FINALITIES ENHANCE RECREATIONAL VALUE REDUCE FLOOD RISK THROUGH - space for the river - more nature costs (step 1): 1.5 MLNs of tot lenght (step 1 +2): about 2 km LONDON (UK) 4 of 4 LONDON (UK) 4 of 4 NEW OXBOW (2003) RESIDENTIAL BUILDING VALUE + 34 % DURING (2003) AFTER (2005) 9

a few room avaliable 1 of 4 EXAMPLES small scale experiences RIVER SKERNE (UK) more room avaliable 2 of 4 BREDA (Germany) more room avaliable 3 of 4 10

AA EN MAAS (Netherland) more room avaliable 4 of 4 AA EN MAAS (Netherland) more room avaliable 4 of 4 human settlement STATE NORMAL existing channel STATE Trit 1 year STATE Trit 10 year DESIGN BEHAVIOUR SIMULATIONS DESIGN STATE LANDSCAPE NATURE RECREATION TO (NOT) CONCLUDE 1. How much dynamism in urban river reaches? source : Prof. M. Kondolf 11

SAME SPOT-July 1997, after February 1996 flood (3 months after works) Uvar Creek (California) source : Prof. M. Kondolf WHAT DESIGN? 12

11/12/2012 UVAS CREEK, 1879 UVAS CREEK, 1879 UVAS CREEK, 1939 13

SOMETIMES LET MEANDERS TO ADVERTISMENTS TO (NOT) CONCLUDE 2. How to face with socio-economical complexity? RIVER AGREEMENT RIVER AGREEMENT PARTECIPATIVE APPROACH France, since 1981 14

RIVER AGREEMENT RIVER AGREEMENT state of art in Italy (2012) TOTALI sottoscritti avviati annunciati 6 15 45 66 0 10 20 30 40 50 60 70 80 RIVER AGREEMENT RIVER AGREEMENT CONSTRAINS TO BEGIN? lack of social thinking? N.I.M.BY lack of deliberative democracy? N.I.M.A. lack of changement attitude? N.I.M.O. 15

RIVER AGREEMENT before than DECISIONS SHARING they foster DECISION MAKING APPROACHES SHARING FLOOD RISK FURTHER INSIGHTS (some useful links) www.ruimtevoorderivier.nl www.floodresiliencity.eu www.floodprobe.eu www.floodresilience.eu www.floodresiliencegroup.org ENVIRONMENTAL RESTORATION www.therrc.co.uk www.onema.fr www.ecrr.org www.urbem.net RIVER-TOWN DEVELOPMENT www.river-cities.net www.citiesonwater.com www.greenstructureplanning.eu www.green-link.eu www.ursula.ac.uk www.reuris.gig.eu www.life-liesingbach.at www.smurf-project.info www.quercus-project.eu THANK YOU www.cirf.org 16