Project Scheduling and Control Procedures



Similar documents
Engineering Documents in Expedition

Pressure Testing Procedures for Pipelines

FEMC Document Control

Pressure Testing Procedures for Building Services Piping

Facilities Maintenance Work Order Procedures

Water System Disinfection

PROJECT CONTROL PROCEDURE (PROJECT STANDARDS AND SPECIFICATIONS)

HAPE Treatment Guidelines

Project Control System Manual. Jefferson Science Associates, LLC. 600 Progress Status. Project Control System Manual Revision

Table 2-1: Elements of the Project Management Plan

ACE PROJECT M&E CONSULTANCY

Best Practices for Print Service Management. Best Practices in Open Print Management

Project Management Guidelines

IT1T Integrated Recruitment Systems 2015

Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201

Project Management Fact Sheet:

Scheduling Process Maturity Level Self Assessment Questionnaire

TECHNIQUES FOR MANAGING COMPLEX PROJECTS WITH PLANNING AND SCHEDULING SOFTWARE PAUL E HARRIS EASTWOOD HARRIS

Template K Implementation Requirements Instructions for RFP Response RFP #

Chapter 5. Planning the Audit Engagement

Section 100 Contractor Quality Control Program

Schedule analytics tool

Construction Management Standards of Practice

10 Best Practices in Printer Fleet Management

INTERIM SITE MONITORING PROCEDURE

1. Interpretation of this Schedule

Commonwealth of Massachusetts CommonWay Schedule Management Guidelines. Common Values - Common Goals Common Way. Schedule Management.

Terms of Reference. Egypt Post - Several position: Architects, Interior Design, Structure Design, Site Engineer and Electromechanical Design.

Infrastructure Planning and Management. Phases of an Infrastructure Project

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices

PROJECT MANAGEMENT PLAN <PROJECT NAME>

The Program Managers Guide to the Integrated Baseline Review Process

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014

Consultancy Services Proposal

CATHOLIC UNIVERSITY OF HEALTH AND ALLIED SCIENCES - GUIDELINES FOR JOINT PHD PROGRAMMES

EMS Example Example EMS Audit Procedure

Project Management Competency Standards

JOB ANALYSIS AND DESCRIPTION

CCE-TRK-SPN-010 Specification for Movement Monitoring of Railway Track

700 Analysis and Reporting

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

IT Asset Management. ProPath. Office of Information and Technology

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

Release: 1. BSBPMG510A Manage projects

DATA PROTECTION POLICY

Project Management Tools

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES. Level III Content Outline

SCHEDULE AND BUDGETING

DOCUMENT HISTORY LOG. Description

CRITICAL PATH METHOD (CPM) SCHEDULES

Contract / Construction Management. November 2006

Salmabad, Kingdom of Bahrain. COLLEGE OF ADMINISTRATIVE AND FINANCIAL SCIENCES (CAFS) Bachelor of Science in Business Informatics (BSBI)

2.0 OBJECTIVES OF THE CONSULTANCY SERVICE

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Information Technology Engineers Examination. Network Specialist Examination. (Level 4) Syllabus. Details of Knowledge and Skills Required for

Digital Archiving Survey

OFFICE OF PERSONNEL MANAGEMENT ATLANTA OVERSIGHT DIVISION ATLANTA, GEORGIA

Pre Bid Notice. Rajeev Keskar G.M. (R.O.) MPPMCL, Bhopal Notice: GM/RO/314 Date 03/09/2015

CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT***

How To Manage Assets

ITRM Guideline CPM Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE

A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE

Classification Appeal Decision Under Section 5112 of Title 5, United States Code

POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections

Fundamentals of Measurements

THE CITY OF NORTH LAS VEGAS REQUEST FOR INFORMATION FOR ASSET TRACKING & INVENTORY MANAGEMENT RFI# RELEASE DATE: JUNE 30, 2009

MASSEY UNIVERSITY COLLEGE RESEARCH CENTRE AGREEMENT

Commercialization of Transport and Logistics Storage Logistics Supply Logistics Administrative Management of International Trade

Project Manager (Renewable Energy) Terms of Reference

Timor- Leste. United Nations Development Programme. Vacancy Announcement

(UNOFFICIAL TRANSLATION)

Interim Terms of Reference for Consultancy Services

Oracle Primavera P6 Enterprise Project Portfolio management Overview Programme Reference # 201A

Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 21: Procurement and Supply Management Plan PGGP-EH-SPENV

Supporting Effective Evaluations: A Guide to Developing Performance Measurement Strategies

SA Tool Kit release life cycle

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

D R A F T. Resource Ordering and Status System (ROSS) Software Configuration Management Guidelines

Operations. Group Standard. Business Operations process forms the core of all our business activities

EXHIBIT 2-2-C PROGRESS SCHEDULES

EQR PROTOCOL 1: ASSESSMENT OF COMPLIANCE WITH MEDICAID MANAGED CARE REGULATIONS

Project Management Manual Update Transportation Department City of Edmonton

Sound Transit Internal Audit Report - No

Transcription:

Project Scheduling and Control Procedures Document Number Revision 0 Approved By Ric Morris (Acting Director) DHQ, Stations August 30, 2001 Active Divisions/Departments FEMC Raytheon Polar Services Company HARD COPY NOT CONTROLLED-CONTROLLED COPY AVAILABLE ONLINE

Table of Contents Table of Contents... i Purpose... 1 Scope/Applicability...1 Responsibilities... 1 Director, FEMC... 1 Manager, Planning and Controls... 2 Manager, FEMC... 2 Construction Coordinator... 2 Manager, Engineering... 3 Project Engineer... 3 Scheduler... 4 FEMC Assistant Manager, Materials... 4 Procedures... 4 Master Schedule... 4 Engineering and Procurement Schedule (EP)... 5 Construction Schedule... 5 Distribution/Use... 5 References... 5 Records... 5 i

Purpose To create, maintain, and publish an integrated system of schedules that coordinate engineering, procurement, shipping, and construction activities or tasks. Scope/Applicability This procedure applies to all projects assigned and undertaken by the Facilities Engineering, Maintenance and Construction Division (FEMC), Raytheon Polar Services Company (RPSC). Responsibilities Director, FEMC Assures that this procedure is implemented for all engineering and construction projects. Reviews and approves all schedules prior to release to the NSF or other organizations. Reviews and approves all resource and cost loading in schedules prior to use. Reviews all schedules and approves options to minimize the impact of schedule deviations on planned cost and performance. Interfaces with the National Science Foundation (NSF) on all scheduling matters. Page 1 of 5 pages

Manager, Planning and Controls Supervises the establishment of standard procedures for creating and maintaining schedules. Supervises the creation of schedules. Reviews all schedules for accuracy and consistency. Develops and supervises the implementation and execution of the cost and performance reporting systems. Reviews the reporting systems for accuracy and reasonableness. Manager, FEMC Reviews construction schedules for completeness and accuracy. Establishes manpower allocations and activity duration for all construction schedules. Approves projected deviations from Engineered Standards. Establishes the format and frequency of construction schedules. Approves selected options to reduce the impact of deviations from the schedule. Provides actual performance data to the Project Control Office through schedule updates. Construction Coordinator Assists the scheduler with the creation of construction schedules. Performs a detailed review of the schedule for construction logic and reasonableness. Reviews manpower allocations and activity duration for all construction activities. Supervises project execution to ensure adherence to the schedule to the extent possible. Reports deviations from or additions to the schedule to the Manager, FEMC, and the Project Scheduler. Page 2 of 5 pages

Utilizes construction schedules to determine deviations from planned cost or performance and evaluates options to minimize impacts. Provides actual performance data to the Project Controls Office. Manager, Engineering Coordinates the gathering of project information prior to schedule preparation, including the Engineering Project Definitions (EPD), design drawings, and resources. Reviews Engineering and Procurement (EP) schedules for accuracy and reasonableness. Assigns resource allocations and activity duration for engineering and design schedules. Establishes the format and frequency of engineering and design schedules. Coordinates and reports deviations from the schedule to the Project Controls Office. Reports actual cost and performance data to the Project Control Office. Project Engineer Provides engineering requirements to the Engineering Manager and Scheduler. Assists the Construction Coordinator/Supervisor and the Scheduler by identifying relevant engineering standards and evaluating the need for planned deviations from those standards. Reviews the construction schedule for integration of logic. Provides accurate schedule updates to the Master and Engineering, Construction, and Procurement schedules for engineering and design activities. Utilizes the published schedules to detect deviations from planned performance of engineering design that affect procurement and construction activities, and to recommend options to reduce impacts. Assists the scheduler to interpret the plans and specifications. Page 3 of 5 pages

Scheduler Creates cost and resource schedules with input from the Estimator, Engineering Manager, and Construction Management. Maintains compatible baseline and as-built schedules to provide comparative data between planned and actual costs and between schedules and productivity performance. Provides projected resource requirements from the scheduling system to the Manager, FEMC, and the Engineering Manager. Provides schedules as required by the Manager, FEMC, and the Engineering Manager, to ensure early warning of deviations from planned performance. FEMC Assistant Manager, Materials Assists the scheduler by identifying needed procurement and logistics activities and estimating the activity duration. Provides continuous tracking of procurement and logistics activities for schedules and immediately notifies the scheduler of deviations from planned cost or performance. Procedures This procedure will be used to produce 3 types of schedules: Master Schedule, Engineering, Procurement (EP) Schedules and Construction Schedules. Master Schedule The Master Schedules are used for total project planning of SPSE and SPSM and to summarize detailed engineering, procurement, and construction. The Master Schedule is resource and cost loaded based upon the package summary of the detailed Final estimate. It outlines the start, execution, and completion of a project. Milestone activities are shown as well as engineering, design, procurement, logistics, and construction activities. The Master Schedule summarizes the EP and Construction Schedules to facilitate management review. Updates and reporting to the client occurs as required by the client. Page 4 of 5 pages

Engineering and Procurement Schedule (EP) An EP Schedule is prepared immediately upon authorized inclusion of a project in the Annual Program Plan. This schedule defines the activities necessary for timely commencement of the detail engineering and design functions. This schedule details in weeks the production of engineering reports, design drawings, material procurements, and construction efforts. The ECP is updated and statused weekly. Construction Schedule The Construction Schedule is developed from the detailed estimate. The estimate work packages are incorporated into construction activities based upon logical criteria not necessarily comparable with Engineered Standards. It is resource and cost loaded using mandays, and can be summarized using hammock and milestone activities. The Construction Schedule is updated and statused weekly and functions as a basis for the Program Plan development. Distribution/Use The schedules are intended as planning and control schedules for use internally by RPSC. The schedules will not normally be distributed outside RPSC. The Director of FEMC, the Manager of Engineering, or the Manager of SPSM may provide copies of schedules to the National Science Foundation as required. References Engineering Project Definitions (EPD) (EN-D-200) Records This procedure generates no records. Page 5 of 5 pages