Infrastructure Planning and Management. Phases of an Infrastructure Project
|
|
|
- Alvin Arnold
- 10 years ago
- Views:
Transcription
1 Infrastructure Planning and Management Phases of an Infrastructure Project
2 Agenda Talking about the various phases in an infrastructure project
3 Introduction to the Infrastructure Process Infrastructure Planning can be conceived as a multistage process. The infrastructure Planning Process must take into account the local context Local needs should be satisfied The project should comply with the existing institutional and legal frameworks The project should align with political objectives and ideology The project should be technically and economically feasible The various stages are listed on the next slide
4 Operation Construction Contracting and Procuring Services Detailed Studies and Project Structuring Preliminary Feasibility Time
5 Description of Stages The preliminary feasibility stage of the project establishes the need for the project. Existing information as well as field visits are conducted to substantiate the need for a project. This phase also determines the kinds of detailed studies that need to be undertaken The Detailed Studies and Project Structuring stage is often the most time-consuming. Technical Studies (e.g. geotechnical studies, land surveys) need to be undertaken to help design the infrastructure. Economic and Market studies (e.g. Willingness to Pay studies) must also be undertaken.
6 Description of Stages Other studies that are undertaken are Environmental Compatibility and Environmental Impact Assessment Socio Economic Cost Benefit Analysis Financial Analysis At the conclusion of this stage, a Detailed Project Report (DPR) is also prepared with detailed technical specifications Financial Engineering and Structuring must also be done during this stage Lenders, Terms of Loan (Tenors and Rates of Interest), mix of debt and equity, and user charges can all be modeled to determine the financial viability of the project For Private participation in infrastructure, the private sector may be tasked with many of these studies
7 Description of Stages Once the DPR is prepared, the project can be contracted out. Expressions of Interest are sought Requests for Proposals are sought Pre-bid conferences are held to clarify terms of the project Proposals are evaluated and a successful bidder is selected The successful bidder then proceeds with the construction of the project. Material, manpower and productivity risks must be managed in this phase. Once the project has been built and commissioned, operations can commence and the infrastructure service can be availed by the citizens
8 Description of Stages An Operations and Maintenance Contract can be given to a separate party. Maintenance Parameters can be fixed well in advance Technical Maintenance and quality issues, Revenue generation issues and Administrative risks must be considered in this phase In the case of Private Provision of Infrastructure, a winning bidder is selected based on their ability to build and operate the infrastructure Each of these stages varies in duration as described in the figure on the next slide. The greater the time spent on project preparation and structuring, the more likely it is that the project can be implemented smoothly and in a cost-effective manner. Hasty project preparation often leads to rework of documents, leads to false or missing information, and leads to project delays.
9 Project Lifecycle
10 The nature of the Project Process Infrastructure project development is seldom a linear or a deterministic process. At all stages, the developing agency must work in partnership with several stakeholders. For successful projects, this partnership is vital The figure on the next slide indicates some of the fuzzy aspects of infrastructure planning. These will be revisited in more detail in a later class.
11 Stages in the Planning Process
12 Steps in the Planning Phase 1. Upon identifying a need and performing economic analysis, the sponsoring agency might feel the need to build a coalition and seek external expertise to successfully complete a project. A process of coalition building might then be put into place 2. Government and Political buy-in must be secured at all levels, and the project can be modified in order to ensure this 3. Emerging Fears from residents of the local communities, including environmental and social groups can then be confronted and alleviated both by transparent consultations and further modifications to the project 4. Project Financing can be obtained and the project can proceed to completion
13 Thank You
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and
Keys to a Successful Outsourcing Transition
Keys to a Successful Outsourcing Transition finance.arvato.com Getting it Right the First Time: Keys to a Successful Outsourcing Transition A large part of success in outsourcing depends on a seamless
Availability Payment Mechanisms For Transit Projects ADVISORY
Availability Payment Mechanisms For Transit Projects ADVISORY Agenda Availability Payments Overview Structure Financial Implications Case Study Additional Considerations KPMG Infrastructure 2 What is an
School Construction Projects
The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect
Meet challenges head on
Meet challenges head on Deal Advisory / Global We can help you master Financial Restructuring. Enhancing value through financial restructuring. / 1 Your vision. Our proven capabilities. Despite its challenges,
Delivering e-procurement Local e-gov National e-procurement Project Overarching Guide to e-procurement for LEAs
1. Introduction Background The National e-procurement Project (NePP) and Centre for Procurement Performance (CPP) are working to support and enable schools to meet their e- Government targets and to gain
Auditor General Procurement Processes Review - Bid Bonds/Performance Bonds
STAFF REPORT June 22, 2005 To: From: Subject: Administration Committee Deputy City Manager and Chief Financial Officer Auditor General Procurement Processes Review - Bid Bonds/Performance Bonds Purpose:
https://www.ofgem.gov.uk/publications-and-updates/ofto-build-providing-additional-flexibility-through-extendedframework
All interested parties Direct Dial: 020 7901 1849 Email: [email protected] Date: 17 November 2015 Dear Colleague EPC Contract Principles for OFTO Build Tenders This letter provides guidance
Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.
Project Management Institute Construction Extension to A Guide to the Project Management Body of Knowledge PMBOK Guide 2000 Edition Provisional Construction Extension to A Guide to the Project Management
15 Guiding Principles
Health, Safety, Environment and Corporate Social Responsibility 15 Guiding Principles 2013 Message from President and CEO 0 New Gold has a complementary portfolio of assets in different countries and cultures
Audit summary. 1.1 Introduction
1 Audit summary 1.1 Introduction 1.1.1 Background In November 2007 the Government announced that it had selected a private partner to construct a new Royal Children s Hospital (RCH), on a site immediately
ADMINISTRATIVE REGULATION AR: 6.03 DATE APPROVED September 10, 2002 ORIGINATING DEPARTMENT:
ADMINISTRATIVE REGULATION AR: 6.03 DATE APPROVED September 10, 2002 SUBJECT: ORIGINATING DEPARTMENT: Debt Management Policy Office of Management & Budget Page 1 of 8 I. PURPOSE: The County recognizes the
Part B1: Business case developing the business case
Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project
Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14
Procedures for Tenders and Contracts October 2014 Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Huon Valley Council Procedures for Tenders and Contracts October 2014
Capital Expenditure Guidelines
Division of Local Government Department of Premier and Cabinet Capital Expenditure Guidelines December 2010 These are Director General s Guidelines issued pursuant to section 23A of the Local Government
Chapter 1.7 Project Management. 1. Project financing is one of the step of project management- State True or False
Chapter 1.7 Project Management Part I: Objective type questions and answers 1. Project financing is one of the step of project management- State True or False 2. Proposed new technologies, process modifications,
Using Less Energy: Nova Scotia s Electricity Efficiency and Conservation Plan
Using Less Energy: Nova Scotia s Electricity Efficiency and Conservation Plan April 2014 Contents Summary...1 Introduction...2 Objectives of the Plan...3 Plan of Action...5 The Benefits of Energy Efficiency...
Check. They re Chartered. Chartered Project Managers
Check. They re Chartered. Chartered Project Managers The Society of Chartered Surveyors Ireland is the leading organisation of its kind in Ireland for professionals working in the property, land and construction
Page 69. Sutton Living Business Plan and Loan Agreement. Mary Morrissey, Strategic Director of Environment, Housing and Regeneration
Page 69 Agenda Item 5b Report to: Opportunity Sutton Limited Sub- Committee Date: 4 August 2015 Report title: Report from: Ward/Areas affected: Chair of Committee/Lead Member: Author(s)/Contact Number(s):
REPUBLIC OF KENYA COUNTY GOVERNMENT OF LAIKIPIA MEDIUM TERM DEBT MANAGEMENT STRATEGY 2013/14-2017/18
REPUBLIC OF KENYA COUNTY GOVERNMENT OF LAIKIPIA MEDIUM TERM DEBT MANAGEMENT STRATEGY 2013/14-2017/18 COUNTY EXECUTIVE MEMBER, FINANCE, PLANNING AND COUNTY DEVELOPMENT LAIKIPIA COUNTY February 2014 i EXECUTIVE
Guide on Developing a HRM Plan
Guide on Developing a HRM Plan Civil Service Branch June 1996 Table of Contents Introduction What is a HRM Plan? Critical Success Factors for Developing the HRM Plan A Shift in Mindset The HRM Plan in
Consolidated I&T Data Centre - P3 Canada Fund
STAFF REPORT ACTION REQUIRED Consolidated I&T Data Centre - P3 Canada Fund Date: January 16, 2012 To: From: Wards: Reference Number: Government Management Committee Deputy City Manager & Chief Financial
3.05. Infrastructure Ontario Alternative Financing and Procurement. Chapter 3 Section. Background. Alternative Financing and Procurement
Chapter 3 Section 3.05 Infrastructure Ontario Alternative Financing and Procurement Background Alternative Financing and Procurement Alternative Financing and Procurement (AFP) is the name given to the
RULES AND REGULATIONS FOR FINANCING PROJECTS AND COMMERCIAL ACTIVITIES
Page 1 of 8 Section 1. Purpose These Rules and Regulations are adopted by the Board of Governors pursuant to Article 13.3. of the Agreement Establishing the Black Sea Trade and Development Bank (Establishing
PPP Basics and Principles of a PPP Framework
Note 1 May 2012 PPP Basics and Principles of a PPP Framework This note is the first in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership
2.1 Initiation Phase Overview
2.1 Initiation Phase Overview The is the conceptualization of the project. This section describes the basic processes that must be performed to get a project started. Accordingly, the purpose of the is
QUEENSLAND CENTRE FOR PROFESSIONAL DEVELOPMENT (QCPD) TENDERING SERVICE: TENDER BID DECISION, PREPARATION AND SUBMISSION PROCEDURES
PROCEDURES QUEENSLAND CENTRE FOR PROFESSIONAL DEVELOPMENT (QCPD) TENDERING SERVICE: TENDER BID DECISION, PREPARATION AND SUBMISSION PROCEDURES PURPOSE These procedures provide guidance on the process of
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
Scheduling work in Kanban
Scheduling work in Kanban 1 Background The need for scheduling arose, in our context, from several separate stakeholders wanting to know when we, software development, will be working on features that
Anatomy of an IT Outsourcing Deal. Bruce Laco Deloitte John Pickett IT World Canada Barry Sookman McCarthy Tetrault
Anatomy of an IT Outsourcing Deal Bruce Laco Deloitte John Pickett IT World Canada Barry Sookman McCarthy Tetrault 3656867 Agenda Key Considerations for IT Outsourcing Decision Anatomy of an Outsourcing
Risk Management in the Development of a Penta-P Project
Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don
Best Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education
EMAIL [email protected] WEB www.fosterinfrastructure.com Best Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education
How to successfully manage your mega-project
How to successfully manage your mega-project Part I Early planning and organizing for success kpmg.com 2 Building, Construction & Real Estate How to successfully manage your mega-project A three-part series
Saskatoon North Partnership for Growth (P4G) Draft Communications and Engagement Strategy
Saskatoon North Partnership for Growth (P4G) Draft Communications and Engagement Strategy Introduction This Communications and Engagement Strategy (Strategy) sets the communications and engagement framework
THE RELATIONSHIP BETWEEN THE CLIENT, CLIENTS PROJECT TEAM AND THE EPCM PROJECT TEAM. Mr C. A. F. Sweet The South Institute of Mining and Metallurgy
THE RELATIONSHIP BETWEEN THE CLIENT, CLIENTS PROJECT TEAM AND THE EPCM PROJECT TEAM Mr C. A. F. Sweet The South Institute of Mining and Metallurgy The inter-relationship between these parties and the effect
ACCOUNTING OFFICERS CHIEF FINANCIAL OFFICERS HEADS OF PROCUREMENT GUIDELINE FOR BID COMMITTEE MEMBERS
ACCOUNTING OFFICERS CHIEF FINANCIAL OFFICERS HEADS OF PROCUREMENT GUIDELINE FOR BID COMMITTEE MEMBERS Supply Chain Management Office Practice Note Number SCM-03 of 2005 1 Context The Public Finance Management
(24 August 2001 to date) LOCAL GOVERNMENT: MUNICIPAL SYSTEMS ACT 32 OF 2000
(24 August 2001 to date) LOCAL GOVERNMENT: MUNICIPAL SYSTEMS ACT 32 OF 2000 (Gazette No. 21776, Notice No. 1187, dated 20 November 2000. Commencement date: 1 March 2001 unless otherwise indicated) [Proc.
Developing a Public-Private Partnership Framework: Policies and PPP Units
Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework
THE APPLICATION OF A VALUE ASSURANCE SYSTEM TO OIL & GAS DEVELOPMENT PROJECTS (Guido Mattu, Franca Marini)
PAGE 1 THE APPLICATION OF A VALUE ASSURANCE SYSTEM TO OIL & GAS DEVELOPMENT PROJECTS (Guido Mattu, Franca Marini) Ing. Guido Mattu More than 25 years experience in Engineering and Project Management activities
OUT-OF-COURT RESTRUCTURING GUIDELINES FOR MAURITIUS
These Guidelines have been issued by the Insolvency Service and endorsed by the Bank of Mauritius. OUT-OF-COURT RESTRUCTURING GUIDELINES FOR MAURITIUS 1. INTRODUCTION It is a generally accepted global
1. TERMS OF REFERENCE 1 2. INTRODUCTION 2 3. ACTION ITEMS 7 4. SUPPORTING COMMENTS ON THE ACTION ITEMS 11 5. LAWYERS AND LEGAL ADVICE 19
Table of contents Page 1. TERMS OF REFERENCE 1 2. INTRODUCTION 2 3. ACTION ITEMS 7 4. SUPPORTING COMMENTS ON THE ACTION ITEMS 11 5. LAWYERS AND LEGAL ADVICE 19 6. MODIFICATION TO THE COMCARE WEBSITE 24
CHAPTER 11 THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION GENERAL REVENUE ACCOUNT. Information Technology Services Department
CHAPTER 11 THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION GENERAL REVENUE ACCOUNT GOVERNMENT DEPARTMENT Information Technology Services Department Management of information technology outsourcing
Badger BC. Investments Ltd. Business Plan 2014 2017. A wholly owned subsidiary of Broxbourne Borough Council
Badger BC Investments Ltd Business Plan 2014 2017 A wholly owned subsidiary of Broxbourne Borough Council Contents Summary 3 Governance and management structure 4 Rights, obligations and decision making
P3 Business Case Development Guide
P3 Business Case Development Guide Improving the delivery of public infrastructure through public-private partnerships PPP Canada 100 Queen Street, Suite 630 Ottawa, Ontario K1P 1J9 Canada Tel: 613.947.9480
Goldman Sachs Environmental Policy Framework
Goldman Sachs Environmental Policy Framework Goldman Sachs believes that a healthy environment is necessary for the well-being of society, our people and our business, and is the foundation for a sustainable
State Records Guideline No 25. Managing Information Risk
State Records Guideline No 25 Managing Information Risk Table of Contents 1 Introduction... 4 1.1 Purpose... 4 1.2 Authority... 4 2 Risk Management and Information... 5 2.1 Overview... 5 2.2 Risk management...
Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL. XXXXX PPP Unit
Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL XXXXX PPP Unit Chief Executive Officer Job Description: The CEO is tasked with the establishment of a PPP Unit for the Government
INQUIRIES AND ANSWERS RFP/2014/609- FLEET MANAGEMENT TRAINING
INQUIRIES AND ANSWERS RFP/2014/609- FLEET MANAGEMENT TRAINING # Questions Answers 1 2 3 4 As per the TOR, a bidder can bid only for option 1 (elearning). Will this affect the evaluation process and chances
Setting up and operationalisation of Enterprise PMOs
Setting up and operationalisation of Enterprise PMOs A. Why an EPMO? Entities in private and non-profit/ governmental sectors need to constantly address change due to external and internal forces. These
IVA PROTOCOL Straightforward consumer individual voluntary arrangement
IVA PROTOCOL Straightforward consumer individual voluntary arrangement Purpose of the protocol 1.1 The purpose of the protocol is to facilitate the efficient handling of straightforward consumer individual
Annual Meeting of Senior PPP Officials 2010
Paris _ 12th of April 2010 PPP Risk Pricing PPPs Vs Traditional Procurement PPPs Strengths PPPs around the World Best PPPs Practices PPP Risk Pricing DESIGN DIFFERENT PPP DELIVERY MODELS BOT BUILD FINANCE
Project Governance a board responsibility. Corporate Governance Network
Project Governance a board responsibility Corporate Governance Network November 2015 1 Contents Page Introduction 3 Board responsibilities 3 What is project governance? 4 The boards duties in respect of
4 Keys to Driving Results from Project Governance
THOUGHT LEADERSHIP WHITE PAPER In partnership with Agile or Waterfall? 4 Keys to Driving Results from Project Governance You can t swing a project manager these days without hitting the debate of Agile
Project, Program & Portfolio Management Help Leading Firms Deliver Value
in collaboration with Project, Program & Portfolio Help Leading Firms Deliver Value Managing Effectively & Efficiently Through an Enterprise PMO Program & Portfolio : Aligning IT Capabilities with Business
Unit B5 Secure financial resources for your organisation s plans
Unit B5 Secure financial resources for your organisation s plans This Unit has been imported from the Management Standards Unit Summary Overview This unit is about managing your organisation s finance
Change Management. Objectives. 8 Steps of Change. Change Management: How To Achieve A Culture Of Safety. TeamSTEPPS 06.1 Change Management
: How To Achieve A Culture Of Safety Objectives Identify and discuss the Eight Steps of Describe the actions required to set the stage for organizational change Identify ways to empower team members to
From Concept to Contract:
AltaTerra Working Paper 13 October 2008 From Concept to Contract: Hewlett-Packard s San Diego Solar Power Project by Jon Guice and Don Bray Executive Summary Hewlett-Packard, the world s largest information
Course Guide Project Management Package
Duration: Time: Payment: Venue: 19 weeks 7.30am to 10.30am MasterCard, VISA, Cheque, EFT, and/or cash 293 Princes Hwy, St Peters NSW 2044 Days/Dates: Fee: Enquiries: Wednesday mornings - commencing on
Infrastructure and Project Financing Asia Pacific Scenario. Ajay Sagar
Infrastructure and Project Financing Asia Pacific Scenario by Ajay Sagar This article was originally published in the June 2006 Global Infrastructure Report of Project Finance International Magazine The
SCOPE MANAGEMENT PLAN <PROJECT NAME>
SCOPE MANAGEMENT PLAN TEMPLATE This Project Scope Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
REQUEST FOR PROPOSAL SPECTATOR FACILITY FEASIBILITY STUDY ADDENDUM NO. 1
Financial Management Services Purchasing Division Request for Proposal Spectator Facility Feasibility Study REQUEST FOR PROPOSAL FOR A SPECTATOR FACILITY FEASIBILITY STUDY ADDENDUM NO. 1 This addendum
Department of Health PFU & PPP Forum. Benchmarking and market testing in NHS PFI projects. Code of Best Practice
Department of Health PFU & PPP Forum Benchmarking and market testing in NHS PFI projects Code of Best Practice This Code of Best Practice provides guidance and advice on good practice to NHS Trusts, Project
Infrastructure Ontario Borrowing Today for the City of Tomorrow Session #1 Steve Rohacek, Vice President, Municipal Business Development & Lending
Click to edit Master title style Infrastructure Ontario Borrowing Today for the City of Tomorrow Session #1 Steve Rohacek, Vice President, Municipal Business Development & Lending www.infrastructureontario.ca
PUBLIC PRIVATE PARTNERSHIP (PPP) IN HARYANA
PUBLIC PRIVATE PARTNERSHIP (PPP) IN HARYANA 1. INTRODUCTION 1.1 Government of Haryana (GoH) recognizes that a partnership approach under Public Private Partnership (PPP) should be one of the tools to deliver
Problem Loan Workout and Debit Restructuring for SME s in Egypt
Problem Loan Workout and Debit Restructuring for SME s in Egypt Course Hours: 24 Course Code: 12167 Objectives The principal objectives of this programme are to provide delegates with a developed understanding
Workshop Privacy Impact Assessments The NOREA-PIA: design and experience
PI.lab: Privacy in 2014 Workshop Privacy Impact Assessments The NOREA-PIA: design and experience Wolter Karssenberg RE Member of the Knowledge Group Privacy Audits NOREA (NOREA is the professional association
Agreements, bonds and guarantees
Agreements, bonds and guarantees SPV Formation The Special Project Vehicle (SPV) may take a variety of forms, including a corporation, limited liability company, general partnership, limited partnership,
CONTACT(S) Koichiro Kuramochi [email protected] +44 (0)20 7246 6496
IASB Agenda ref 12C STAFF PAPER March 2014 IASB Meeting IFRS IC Nov 2013 and Jan 2014 Project Paper topic Narrow-scope amendments to IFRS 10 Consolidated Financial Statements Investment Entities Amendments
Mortgage Lending Analytics
Mortgage Lending Analytics Operational Practices December 2, 2014 Leslie Deich Today s Agenda The basics of mortgage lending from both the borrower and lender s perspective Overview of the operational
Montana Growth Through Agriculture. Program Guidelines. Updated June 2016
Montana Growth Through Agriculture Program Guidelines Updated June 2016 For deadline postings, go to the Growth Through Agriculture webpage at www.gta.mt.gov Refer Any Questions to: Montana Growth Through
1. What is a biodiversity offset?
How can BBOP help companies? This document is intended for developers who are considering undertaking a biodiversity offset and may welcome help from the Business and Biodiversity Offsets Programme (BBOP).
Reputational risk: A risk management framework
Reputational risk: A risk management framework Kasper Nielsen Executive Partner, Reputation Institute John Ludlow Deputy Chair, Airmic Tom Hoad Enterprise Risk Underwriter, Tokio Marine Kiln Wednesday
ALL NATIONS TRUST COMPANY SAMPLE BUSINESS PLAN
ALL NATIONS TRUST COMPANY SAMPLE BUSINESS PLAN WHAT MAKES A GOOD BUSINESS PLAN? A business plan is a written document, which outlines: the business and owner s background the proposed resources to be used
CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1
CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 PART 3G Contracts Standing Orders 2015/16 Definitions Aggregation is the combining together of the total contract value from separate contracts
Scheme and Guidelines for India Infrastructure Project Development Fund
Scheme and Guidelines for India Infrastructure Project Development Fund Department of Economic Affairs Ministry of Finance Government of India Contents Preamble. iii Acronyms and definitions vii 1. The
Migration Planning guidance information documents change ManageMent Best Practices October 7, 2011
Migration Planning guidance information documents change ManageMent Best Practices October 7, 2011 Table Of Contents 1. Purpose... 1 2. Change Management Approach... 1 2.1 Change Management Objectives...
The Municipal Infrastructure Grant Programme
The Municipal Infrastructure Grant Programme An Introductory Guide Prepared by Department of Provincial and Local Government March 2004 TABLE OF CONTENTS 1. Introduction... 1 1.2 About this document...
The Role of Mortgage Insurance under the New Global Regulatory Frameworks
The Role of Mortgage Insurance under the New Global Regulatory Frameworks By Anna Whittingham Regulatory Analyst, Genworth Financial Mortgage Insurance Europe Summary and Overview The introduction of fundamental
Module 10 Procurement Management PMP Exam Questions
Module 10 Procurement Management PMP Exam Questions PMP, PMBOK and the Registered Education Provider logo are registered marks of the Project Management Institute, Inc Question 1 A company needs some work
Guide for the Development of Results-based Management and Accountability Frameworks
Guide for the Development of Results-based Management and Accountability Frameworks August, 2001 Treasury Board Secretariat TABLE OF CONTENTS Section 1. Introduction to the Results-based Management and
Page 1 of 9 MICROLOAN RULES AND REGULATIONS
Page 1 of 9 MICROLOAN RULES AND REGULATIONS Micro Loans will be made available to small businesses located in or locating in, the City of Darlington. The Darlington Downtown Revitalization Association
Please send your responses via email, to: [email protected]. Respondent details. Mark Redhead. Head of Policy
REFORM OF THE PRIVATE FINANCE INITIATIVE RESPONSE Please send your responses via email, to: [email protected] The deadline for responses is Friday 10 February 2012. Respondent details Your
Draft Model Social Infrastructure PPP Bill
Draft Model Social Infrastructure PPP Bill RELATING TO PUBLIC-PRIVATE AGREEMENTS FOR PUBLIC BUILDINGS BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF [add state name]: SECTION. The Legislature makes the
March 2016 K.17 Financing Feasibility Report - Final
March 2016 K.17 Financing Feasibility Report - Final Commercial -Project Management IMPORTANT NOTICE The information provided further to UK CCS Commercialisation Programme (the Competition) set out herein