IT Asset Management. ProPath. Office of Information and Technology
|
|
|
- Sylvia Hines
- 10 years ago
- Views:
Transcription
1 IT Asset Management ProPath Office of Information and Technology
2 Table of Contents IT Asset Management Process Maps... 1 Process: IT Asset Management IT Asset Management and Goals Goals IT Asset Management RACI Information IT Asset Management Process Process Activity Name: ITAM-1 Acquire IT Assets Process Activity Name: ITAM-1-DEC01 National Buy? Process Activity Name: ITAM-1-DEC02 Regional Buy? Process Activity Name: ITAM 1.1 National Buys Process Activity Name: ITAM-1.1-DEC01 Special Funding? Process Activity Name: ITAM-1.1-DEC02 Input Required? Process Activity Name: ITAM-1.1-DEC03 Life Cycle? Process Activity Name: ITAM Analyze Inventory by Functionality and Compatibility Process Activity Name: ITAM Validate Refresh Data Process Activity Name: ITAM Analyze Data at National Level Process Activity Name: ITAM Submit ITARS Request Process Activity Name: ITAM Make Budget Decision Process Activity Name: ITAM DEC01 Continue? Process Activity Name: ITAM Define Specifications for Equipment Process Activity Name: ITAM Define ITAM/Logistic Requirements within PWS Process Activity Name: ITAM Execute Procurement Process Activity Name: ITAM Communicate Asset Management Purchase to the Field Process Activity Name: ITAM-1.2 Regional Buys (Activations) Process Activity Name: ITAM-1.2-DEC01 Special Funding Process Activity Name: ITAM Identify New Activation Projects Process Activity Name: ITAM Determine Activation Scope Process Activity Name: ITAM Open Activation Request Process Activity Name: ITAM Notify Regional Activation Team Process Activity Name: ITAM Submit ITARS Request Process Activity Name: ITAM Review Specifications for Equipment Process Activity Name: ITAM Submit Request to Purchase Process Activity Name: ITAM Refine Order i
3 Process Activity Name: ITAM Define Procurement / Delivery Requirements Process Activity Name: ITAM Refine Network Design Process Activity Name: ITAM Refine Wireless Network Process Activity Name: ITAM Refine Telephone System Process Activity Name: ITAM Refine Server Order Process Activity Name: ITAM Refine PC Order Process Activity Name: ITAM Refine Printer & Scanner Order Process Activity Name: ITAM Refine Laptop Order Process Activity Name: ITAM Refine Content Delivery Engine Process Activity Name: ITAM Refine Telecommunication Requirements Process Activity Name: ITAM Communicate Asset Management Purchase to the Field Process Activity Name: ITAM-1.3 Local Procurement Purchases Process Activity Name: ITAM Gather Business Line Requirements Process Activity Name: ITAM DEC01 Special Funding? Process Activity Name: ITAM DEC02 Activation? Process Activity Name: ITAM Execute Special Funding Process Activity Name: ITAM Prioritize Projects Process Activity Name: ITAM Determine Procurement Plan Process Activity Name: ITAM DEC01 Facility Buy? Process Activity Name: ITAM Identify Funded Facility Requirements Process Activity Name: ITAM Identify Funded SLM Requirements Process Activity Name: ITAM Submit ITARS Request Process Activity Name: ITAM DEC01 ITARS Approved? Process Activity Name: ITAM Create and Submit IFCAP Process Activity Name: ITAM Approve ICAP Process Activity Name: ITAM DEC01 Approve? Process Activity Name: ITAM Submit IFCAP 2237 to Purchasing Process Activity Name: ITAM Execute Break - Fix Process Activity Name: ITAM Develop Activation Projects Process Activity Name: ITAM Identify Local Projects Process Activity Name: ITAM Solicit Local VA Leadership Input Process Activity Name: ITAM Provide Feedback Process Activity Name: ITAM Determine Activation Meets Requirements Definition Process Activity Name: ITAM DEC01 Activations? ii
4 Process Activity Name: ITAM-2 Deploy and Manage IT Assets Process Activity Name: ITAM-2.1 Receive Notification of Incoming Shipment Process Activity Name: ITAM Notify Logistics of Pending Shipments. 90 Process Activity Name: ITAM Resolve Split Delivery Dates Process Activity Name: ITAM-2.2 Manage Receipt of Assets in Logistics Process Activity Name: ITAM-2.2-DEC01 Hold in Logistics Process Activity Name: ITAM Verify Invoice and Equipment Process Activity Name: ITAM Identify Components Process Activity Name: ITAM Identify and Record Serial Numbers Process Activity Name: ITAM Produce NX Catalog Validation Report.. 96 Process Activity Name: ITAM Count Assets to Match Receiving Documents Process Activity Name: ITAM Notify GIP of Consumables Process Activity Name: ITAM Prepare Barcode Label Process Activity Name: ITAM Validate Barcode Label Process Activity Name: ITAM Crosscheck Barcode Label to Equipment Process Activity Name: ITAM-2.3 Manage Assets in Storage Process Activity Name: ITAM Receive Equipment from Logistics Process Activity Name: ITAM Obtain Secure Storage Space Process Activity Name: ITAM Limit Access to Storerooms Process Activity Name: ITAM Scan Equipment Into Storage Process Activity Name: ITAM Perform Periodic Inventory Scans Process Activity Name: ITAM Prepare Deployment Plan Process Activity Name: ITAM-2.4 Prepare Assets for Deployment Process Activity Name: ITAM Scan for Deployment to Staging Area. 108 Process Activity Name: ITAM Validate Updated Location Process Activity Name: ITAM-2.5 Manage Deployed Assets Process Activity Name: ITAM Remove Assets from Storage Process Activity Name: ITAM Update Location Records Process Activity Name: ITAM DEC01 Mobile / Loaned Equipment? Process Activity Name: ITAM Obtain End-User Signature Process Activity Name: ITAM Deploy Asset Process Activity Name: ITAM-3 Monitor IT Assets Process Activity Name: ITAM-3.1 Verify Inventory Data Records Process Activity Name: ITAM-3.2 Monitor Inventory Process Process Activity Name: ITAM Prepare Inventory Schedule Process Activity Name: ITAM Conduct Annual Inventory Scans iii
5 Process Activity Name: ITAM-3.3 Track Movement of Non-Expendable Assets Process Activity Name: ITAM-3.4 Receive Notification of Annual Inventory Process Activity Name: ITAM-3.5 Perform Annual Inventory Reconciliation Process Activity Name: ITAM Produce Exception Listing Process Activity Name: ITAM Reconcile Exception Listing Process Activity Name: ITAM Perform Annual Inventory Process Activity Name: ITAM DEC01 Missing Equipment? Process Activity Name: ITAM Generate Report of Survey Form Process Activity Name: ITAM Submit EIL Process Activity Name: ITAM Perform 5% Verification Process Activity Name: ITAM-3.6 Monitor Perpetual Inventory Process Process Activity Name: ITAM-4 Dispose IT Assets Process Activity Name: ITAM-4.1 Prepare Equipment for Turn-In Process Activity Name: ITAM-4.1-DEC01 Electronic Media Process Activity Name: ITAM-4.2 Sanitize Equipment Process Activity Name: ITAM-4.3 Submit Electronic Turn-In Request Process Activity Name: ITAM-4.4 Validate Turn-In Date Process Activity Name: ITAM-4.5 Coordinate Transfer to Logistics Process Activity Name: ITAM-4-6 Remove Equipment from EIL iv
6 IT Asset Management Process Maps Information Technology Asset Management Facility Chief Information Officer ITAM-1 Acquire IT Assets home overview goals raci help IT Asset Manager ITAM-3 Monitor IT Assets ITAM-4 Dispose IT Assets Logistics Staff ITAM-2 Deploy and Manage IT Assets The links in this process map are inactive. Please scroll to view activity data. 1
7 Information Technology Asset Management: ITAM-1 Acquire IT Assets home proc ess goals raci ITAM 1.1 National Buys Facility Chief Information Officer Yes National Buy? No Regional Buy? No Yes ITAM-1.2 Regional Buys (Activations) ITAM-1.3 Local Procurement Purchases The links in this process map are inactive. Please scroll to view activity data. 2
8 Information Technology Asset Management: ITAM-1.1 National Buys home proc ess overview back raci help Project Manager ITAM Analyze Data at National Level ITAM Submit ITARS Request ITAM Make Budget Decision No Continue? Yes ITAM Communicate Asset Management Purchase to the Field Integrated Product Team ITAM Define Specifications for Equipment ITAM Define ITAM/Logistic Requirements within PWS To: ACQL Acquisition Life Cycle From: ACQL Acquisition Life Cycle ITAM Execute Procurement Regional Director ITAM Validate Refresh Data Facility Chief Information Officer Special Funding? Yes No No Input Required? Yes No Life Cycle? Yes ITAM Analyze Inventory by Functionality and Compatibility To: ITAM Execute Special Funding The links in this process map are inactive. Please scroll to view activity data. 3
9 Information Technology Asset Management: ITAM-1.2 Regional Buys (Activations) Regional Acquisition Team ITAM Submit Request to Purchase To: ACQL Acquisition Life Cycle From: ACQL Acquisition Life Cycle ITAM Refine Order home proc ess back goals ITAM Communicate Asset Management Purchase to the Field raci Integrated Product Team ITAM Review Specifications for Equipment Facility Chief Information Officer No Special Funding? Yes ITAM Identify New Activation Projects ITAM Determine Activation Scope To: ITAM Execute Special Funding ITAM Submit ITARS Request ITAM Notify Regional Acquisition Team ITAM Open Activation Request To: ITAM-2 Deploy and Manage IT Assets The links in this process map are inactive. Please scroll to view activity data. 4
10 Information Technology Asset Management: ITAM Refine Order home proc ess back goals raci ITAM Refine Network Design ITAM Refine Server Order ITAM Refine Laptop Order Regional Acquisition Team ITAM Define Procurement / Delivery Requirements ITAM Refine Wireless Network ITAM Refine Telephone System ITAM Refine PC Order ITAM Refine Printer & Scanner Order ITAM Refine Content Delivery Engine ITAM Refine Telecommunication Requirements The links in this process map are inactive. Please scroll to view activity data. 5
11 Information Technology Asset Management: ITAM-1.3 Local Procurement Purchases home proc ess back goals raci ITAM Execute Special Funding Facility Chief Information Officer ITAM Gather Business Line Requirements Yes Special Funding? No Activation? Yes No ITAM Execute Break - Fix ITAM Develop Activation Projects The links in this process map are inactive. Please scroll to view activity data. 6
12 Information Technology Asset Management: ITAM Execute Special Funding Regional Director ITAM Determine Procurement Plan Facility Buy? Yes ITAM Identify Funded Facility Requirements No ITAM Identify Funded SLM Requirements home proc ess back overview raci help Approving Official ITAM Approve ICAP 2237 Approve? No Yes Regional Acquisition Team ITAM Create and Submit IFCAP 2237 Yes ITARS Approved? ITAM Submit IFCAP 2237 to Purchasing No Facility Chief Information Officer ITAM Prioritize Projects ITAM Submit ITARS Request From: ITARS Information Technology Acquisition Request System To: ITARS Information Technology Acquisition Request System To: PUR Purchase From: PUR Purchase The links in this process map are inactive. Please scroll to view activity data. 7
13 Information Technology Asset Management: ITAM Develop Activation Projects Facility Chief Information Officer ITAM Identify Local Projects ITAM Solicit Local VA Leadership Input home proc ess back goals raci IT Asset Manager ITAM Determine Activation Meets Requirements Definition Yes Activations? No To: ITAM 1.2 Regional Buys (Activations) To: ITAM Execute Special Funding Local VA Leadership ITAM Provide Feedback The links in this process map are inactive. Please scroll to view activity data. 8
14 Information Technology Asset Management: ITAM-2 Deploy and Manage IT Assets Facility Chief Information Officer ITAM-2.1 Receive Notification of Incoming Shipments home proc ess goals raci IT Asset Manager ITAM-2.3 Manage Assets in Storage ITAM-2.4 Prepare Assets for Deployment IT Staff ITAM-2.5 Manage Deployed Assets Logistics Staff ITAM-2.2 Manage Receipt of Assets in Logistics No Hold in Logistics? Yes The links in this process map are inactive. Please scroll to view activity data. 9
15 Information Technology Asset Management: ITAM-2.1 Receive Notification of Incoming Shipments home proc ess back goals raci Facility Chief Information Officer ITAM Notify Logistics of Pending Shipments IT Asset Manager ITAM Resolve Split Delivery Dates The links in this process map are inactive. Please scroll to view activity data. 10
16 Information Technology Asset Management: ITAM-2.2 Manage Receipt of Assets in Logistics home proc ess back goals raci IT Asset Manager ITAM Notify GIP of Consumables ITAM Crosscheck Barcode Label to Equipment Logistics Staff ITAM Identify Components ITAM Verify Invoice and Equipment ITAM Identify and Record Serial Numbers ITAM Produce NX Catalog Validation Report ITAM Count Assets to Match Receiving Documents ITAM Prepare Barcode Label ITAM Validate Barcode Label The links in this process map are inactive. Please scroll to view activity data. 11
17 Information Technology Asset Management: ITAM-2.3 Manage Assets in Storage Facility Chief Information Officer ITAM Obtain Secure Storage Space home proc ess back goals ITAM Prepare Deployment Plan raci IT Asset Manager ITAM Limit Access to Storerooms ITAM Perform Periodic Inventory Scans IT Staff ITAM Receive Equipment from Logistics ITAM Scan Equipment Into Storage The links in this process map are inactive. Please scroll to view activity data. 12
18 Information Technology Asset Management: ITAM-2.4 Prepare Assets for Deployment home proc ess back goals raci IT Asset Manager ITAM Scan for Deployment to Staging Area ITAM Validate Updated Location The links in this process map are inactive. Please scroll to view activity data. 13
19 Information Technology Asset Management: ITAM-2.5 Manage Deployed Assets home proc ess back overview raci help IT Staff ITAM Obtain End-User Signature ITAM Deploy Asset Yes ITAM Update Location Records Mobile/ Loaned Equipment? No Logistics Staff ITAM Remove Assets from Storage The links in this process map are inactive. Please scroll to view activity data. 14
20 Information Technology Asset Management: ITAM-3 Monitor IT Assets Facility Chief Information Officer ITAM-3.4 Receive Notification of Annual Inventory home proc ess goals raci IT Asset Manager ITAM-3.2 Monitor Inventory Process ITAM-3.6 Monitor Perpetual Inventory Process Logistics Staff ITAM-3.1 Verify Inventory Data Records ITAM-3.5 Perform Annual Inventory Reconciliation IT Staff ITAM-3.3 Track Movement of Non- Expendable Assets The links in this process map are inactive. Please scroll to view activity data. 15
21 Information Technology Asset Management: ITAM-3.2 Monitor Inventory Process home proc ess back goals raci IT Asset Manager ITAM Prepare Inventory Schedule ITAM Conduct Annual Inventory Scans The links in this process map are inactive. Please scroll to view activity data. 16
22 Information Technology Asset Management: ITAM-3.5 Perform Annual Inventory Reconciliation Facility Chief Information Officer home proc ess back overview raci ITAM Submit Equipment Inventory List help IT Asset Manager ITAM Reconcile Exception Listing ITAM Perform Annual Inventory Missing Equipment? No Yes ITAM Generate Report of Survey Form Logistics Staff ITAM Produce Exception Listing ITAM Reconcile Equipment Inventory Listing ITAM Perform 5% Verification The links in this process map are inactive. Please scroll to view activity data. 17
23 Information Technology Asset Management: ITAM-4 Dispose IT Assets home proc ess overview raci help IT Staff ITAM-4.2 Sanitize Equipment IT Asset Manager ITAM-4.1 Prepare Equipment for Turn-In Yes Electronic Media? No ITAM-4.3 Submit Electronic Turn-In Request ITAM-4.4 Validate Turn-In Date ITAM-4.5 Coordinate Transfer to Logistics Logistics Staff ITAM-4.6 Remove Equipment from EIL The links in this process map are inactive. Please scroll to view activity data. 18
24 Process: IT Asset Management Overview: The process map for IT Asset Management cycles through the following process and review activities: ITAM-1 Acquire IT Assets ITAM-1-DEC01 National Buy? ITAM-1-DEC02 Regional Buy? ITAM 1.1 National Buys ITAM-1.1-DEC01 Special Funding? ITAM-1.1-DEC02 Input Required? ITAM-1.1-DEC03 Life Cycle? ITAM Analyze Inventory by Functionality and Compatibility ITAM Validate Refresh Data ITAM Analyze Data at National Level ITAM Submit ITARS Request ITAM Make Budget Decision ITAM DEC01 Continue? ITAM Define Specifications for Equipment ITAM Define ITAM/Logistic Requirements within PWS ITAM Execute Procurement ITAM Communicate Asset Management Purchase to the Field ITAM-1.2 Regional Buys (Activations) ITAM-1.2-DEC01 Special Funding ITAM Identify New Activation Projects ITAM Determine Activation Scope ITAM Open Activation Request ITAM Notify Regional Activation Team ITAM Submit ITARS Request ITAM Review Specifications for Equipment ITAM Submit Request to Purchase ITAM Refine Order ITAM Define Procurement / Delivery Requirements ITAM Refine Network Design ITAM Refine Wireless Network ITAM Refine Telephone System ITAM Refine Server Order ITAM Refine PC Order ITAM Refine Printer & Scanner Order ITAM Refine Laptop Order ITAM Refine Content Delivery Engine ITAM Refine Telecommunication Requirements ITAM Communicate Asset Management Purchase to the Field ITAM-1.3 Local Procurement Purchases ITAM Gather Business Line Requirements ITAM DEC01 Special Funding? ITAM DEC02 Activation? 19
25 ITAM Execute Special Funding ITAM Prioritize Projects ITAM Determine Procurement Plan ITAM DEC01 Facility Buy? ITAM Identify Funded Facility Requirements ITAM Identify Funded SLM Requirements ITAM Submit ITARS Request ITAM DEC01 ITARS Approved? ITAM Create and Submit IFCAP 2237 ITAM Approve ICAP 2237 ITAM DEC01 Approve? ITAM Submit IFCAP 2237 to Purchasing ITAM Execute Break - Fix ITAM Develop Activation Projects ITAM Identify Local Projects ITAM Solicit Local VA Leadership Input ITAM Provide Feedback ITAM Determine Activation Meets Requirements Definition ITAM DEC01 Activations? ITAM-2 Deploy and Manage IT Assets ITAM-2.1 Receive Notification of Incoming Shipment ITAM Notify Logistics of Pending Shipments ITAM Resolve Split Delivery Dates ITAM-2.2 Manage Receipt of Assets in Logistics ITAM-2.2-DEC01 Hold in Logistics ITAM Verify Invoice and Equipment ITAM Identify Components ITAM Identify and Record Serial Numbers ITAM Produce NX Catalog Validation Report ITAM Count Assets to Match Receiving Documents ITAM Notify GIP of Consumables ITAM Prepare Barcode Label ITAM Validate Barcode Label ITAM Crosscheck Barcode Label to Equipment ITAM-2.3 Manage Assets in Storage ITAM Receive Equipment from Logistics ITAM Obtain Secure Storage Space ITAM Limit Access to Storerooms ITAM Scan Equipment Into Storage ITAM Perform Periodic Inventory Scans ITAM Prepare Deployment Plan ITAM-2.4 Prepare Assets for Deployment ITAM Scan for Deployment to Staging Area ITAM Validate Updated Location ITAM-2.5 Manage Deployed Assets ITAM Remove Assets from Storage 20
26 ITAM Update Location Records ITAM DEC01 Mobile / Loaned Equipment? ITAM Obtain End-User Signature ITAM Deploy Asset ITAM-3 Monitor IT Assets ITAM-3.1 Verify Inventory Data Records ITAM-3.2 Monitor Inventory Process ITAM Prepare Inventory Schedule ITAM Conduct Annual Inventory Scans ITAM-3.3 Track Movement of Non-Expendable Assets ITAM-3.4 Receive Notification of Annual Inventory ITAM-3.5 Perform Annual Inventory Reconciliation ITAM Produce Exception Listing ITAM Reconcile Exception Listing ITAM Perform Annual Inventory ITAM DEC01 Missing Equipment? ITAM Generate Report of Survey Form ITAM Submit EIL ITAM Perform 5% Verification ITAM-3.6 Monitor Perpetual Inventory Process ITAM-4 Dispose IT Assets ITAM-4.1 Prepare Equipment for Turn-In ITAM-4.1-DEC01 Electronic Media ITAM-4.2 Sanitize Equipment ITAM-4.3 Submit Electronic Turn-In Request ITAM-4.4 Validate Turn-In Date ITAM-4.5 Coordinate Transfer to Logistics ITAM-4-6 Remove Equipment from EIL 21
27 IT Asset Management and Goals This process defines the best in class methodology for deploying and tracking Information Technology equipment that maximizes the value of VA assets while improving inventory accuracy and reducing cost. Goals The goal of the Information Technology Asset Management (ITAM) process is to define the best in class methodology for acquiring, deploying and tracking equipment that maximizes the value of VA assets while improving inventory accuracy and reducing cost. Specifically the process: - Provides a clear and concise standard process from acquisition to disposal - Conforms to applicable Federal and VA policies and directives - Utilizes industry best practices adapted to the VA environment - Captures and integrates needed technical and financial information - Drives the organization to adopt the same standard process at every VA location - Utilizes applicable metrics to drive continuous improvement 22
28 IT Asset Management RACI Information The following describes the RACI information for this process: ITAM Analyze Inventory by Functionality and Compatibility : Facility Chief Information Officer Accountable Role: Technology Management ITAM Validate Refresh Data : Regional Director Accountable Role: Technology Management ITAM Analyze Data at National Level : Project Manager Accountable Role: VISN Chief Information Officer ITAM Submit ITARS Request : Project Manager Accountable Role: VISN Chief Information Officer ITAM Make Budget Decision : Project Manager Accountable Role: VISN Chief Information Officer ITAM Define Specifications for Equipment : Integrated Product Team Accountable Role: Technology Management 23
29 ITAM Define ITAM/Logistic Requirements within PWS : Integrated Product Team Accountable Role: Facility Chief Information Officer Consulted Role: Logistics Staff ITAM Execute Procurement : Integrated Product Team Accountable Role: Technology Management ITAM Communicate Asset Management Purchase to the Field : Project Manager Accountable Role: VISN Chief Information Officer ITAM Identify New Activation Projects : Facility Chief Information Officer Accountable Role: Regional Director ITAM Determine Activation Scope : Facility Chief Information Officer Accountable Role: Regional Director ITAM Open Activation Request : Facility Chief Information Officer Accountable Role: Regional Director ITAM Notify Regional Activation Team : Facility Chief Information Officer Accountable Role: Regional Director 24
30 Informed Role: Integrated Product Team ITAM Submit ITARS Request : Facility Chief Information Officer Accountable Role: Regional Director ITAM Review Specifications for Equipment : Integrated Product Team Accountable Role: Facility Chief Information Officer Informed Role: Regional Acquisition Team ITAM Submit Request to Purchase : Regional Acquisition Team Accountable Role: Regional Director ITAM Define Procurement / Delivery Requirements : Regional Acquisition Team Accountable Role: Regional Director Informed Role: Facility Chief Information Officer ITAM Refine Network Design : Regional Acquisition Team Accountable Role: Regional Director Informed Role: Facility Chief Information Officer ITAM Refine Wireless Network : Regional Acquisition Team Accountable Role: Regional Director 25
31 Informed Role: Facility Chief Information Officer ITAM Refine Telephone System : Regional Acquisition Team Accountable Role: Regional Director Informed Role: Facility Chief Information Officer ITAM Refine Server Order : Regional Acquisition Team Accountable Role: Regional Director Informed Role: Facility Chief Information Officer ITAM Refine PC Order : Regional Acquisition Team Accountable Role: Regional Director Informed Role: Facility Chief Information Officer ITAM Refine Printer & Scanner Order : Regional Acquisition Team Accountable Role: Regional Director Informed Role: Facility Chief Information Officer ITAM Refine Laptop Order : Regional Acquisition Team Accountable Role: Regional Director Informed Role: Facility Chief Information Officer ITAM Refine Content Delivery Engine 26
32 : Regional Acquisition Team Accountable Role: Regional Director Informed Role: Facility Chief Information Officer ITAM Refine Telecommunication Requirements : Regional Acquisition Team Accountable Role: Regional Director Informed Role: Facility Chief Information Officer ITAM Communicate Asset Management Purchase to the Field : Regional Acquisition Team Accountable Role: VISN Chief Information Officer ITAM Gather Business Line Requirements : Facility Chief Information Officer Accountable Role: VISN Chief Information Officer ITAM Prioritize Projects : Facility Chief Information Officer Accountable Role: Regional Director ITAM Determine Procurement Plan : Regional Director Accountable Role: VISN Chief Information Officer ITAM Identify Funded Facility Requirements : Regional Director Accountable Role: VISN Chief Information Officer 27
33 ITAM Identify Funded SLM Requirements : Regional Director Accountable Role: VISN Chief Information Officer ITAM Submit ITARS Request : Facility Chief Information Officer Accountable Role: Regional Director ITAM Create and Submit IFCAP 2237 : Regional Acquisition Team Accountable Role: Regional Director Consulted Role: Facility Chief Information Officer ITAM Approve ICAP 2237 : Approving Official Accountable Role: Regional Director Informed Role: Facility Chief Information Officer ITAM Submit IFCAP 2237 to Purchasing : Regional Acquisition Team Accountable Role: Regional Director Informed Role: Approving Official ITAM Execute Break - Fix : Facility Chief Information Officer Accountable Role: VISN Chief Information Officer Consulted Role: Technology Management 28
34 ITAM Identify Local Projects : Facility Chief Information Officer Accountable Role: VISN Chief Information Officer ITAM Solicit Local VA Leadership Input : Facility Chief Information Officer Accountable Role: VISN Chief Information Officer ITAM Provide Feedback : Local VA Leadership Accountable Role: Facility Chief Information Officer ITAM Determine Activation Meets Requirements Definition : Facility Chief Information Officer Accountable Role: Deputy Assistant Secretary/Deputy Chief Information Officer ITAM Notify Logistics of Pending Shipments : Facility Chief Information Officer Accountable Role: IT Asset Manager Informed Role: IT Staff, Logistics Officer, Logistics Staff ITAM Resolve Split Delivery Dates : IT Asset Manager Accountable Role: Facility Chief Information Officer Informed Role: Logistics Officer, Logistics Staff, IT Staff ITAM Verify Invoice and Equipment 29
35 : Logistics Staff Accountable Role: IT Asset Manager Consulted Role: IT Staff Informed Role: Facility Chief Information Officer, Logistics Officer ITAM Identify Components : Logistics Staff Accountable Role: IT Asset Manager Consulted Role: IT Staff Informed Role: Facility Chief Information Officer, Logistics Staff ITAM Identify and Record Serial Numbers : Logistics Staff Accountable Role: IT Asset Manager Consulted Role: IT Staff Informed Role: Logistics Officer, Facility Chief Information Officer ITAM Produce NX Catalog Validation Report : Logistics Staff Accountable Role: IT Asset Manager Consulted Role: IT Staff Informed Role: Logistics Officer, Facility Chief Information Officer ITAM Count Assets to Match Receiving Documents : Logistics Staff Accountable Role: IT Asset Manager Consulted Role: IT Staff Informed Role: Logistics Officer, Facility Chief Information Officer 30
36 ITAM Notify GIP of Consumables : IT Asset Manager Accountable Role: Facility Chief Information Officer Consulted Role: IT Staff Informed Role: Logistics Officer, Logistics Staff ITAM Prepare Barcode Label : Logistics Staff Accountable Role: IT Asset Manager Informed Role: IT Staff, Logistics Officer, Facility Chief Information Officer ITAM Validate Barcode Label : Logistics Staff Accountable Role: IT Asset Manager Informed Role: IT Staff, Logistics Officer, Facility Chief Information Officer ITAM Crosscheck Barcode Label to Equipment : IT Asset Manager Accountable Role: Facility Chief Information Officer Informed Role: Logistics Staff, IT Staff, Logistics Officer ITAM Receive Equipment from Logistics : IT Staff Accountable Role: IT Asset Manager Informed Role: Logistics Officer, Logistics Staff, Facility Chief Information Officer ITAM Obtain Secure Storage Space : Facility Chief Information Officer 31
37 Accountable Role: IT Asset Manager Consulted Role: IT Staff Informed Role: Law Enforcement, Logistics Officer, Logistics Staff, Information Security Officer ITAM Limit Access to Storerooms : IT Asset Manager Accountable Role: Facility Chief Information Officer Informed Role: Law Enforcement, IT Staff, Information Security Officer ITAM Scan Equipment Into Storage : IT Staff Accountable Role: IT Asset Manager ITAM Perform Periodic Inventory Scans : IT Asset Manager Accountable Role: Facility Chief Information Officer Informed Role: IT Staff ITAM Prepare Deployment Plan : Facility Chief Information Officer Accountable Role: IT Asset Manager Informed Role: IT Staff, Logistics Officer ITAM Scan for Deployment to Staging Area : IT Asset Manager Accountable Role: Facility Chief Information Officer Informed Role: IT Staff 32
38 ITAM Validate Updated Location : IT Asset Manager Accountable Role: Facility Chief Information Officer Consulted Role: IT Staff ITAM Remove Assets from Storage : Logistics Staff Accountable Role: IT Asset Manager Informed Role: IT Staff, Logistics Officer, Facility Chief Information Officer ITAM Update Location Records : IT Staff Accountable Role: IT Asset Manager Informed Role: Logistics Officer, Logistics Staff, Facility Chief Information Officer ITAM Obtain End-User Signature : IT Staff Accountable Role: Facility Chief Information Officer Informed Role: IT Asset Manager ITAM Deploy Asset : IT Staff Accountable Role: IT Asset Manager Informed Role: Facility Chief Information Officer ITAM-3.1 Verify Inventory Data Records : Logistics Staff Accountable Role: Facility Chief Information Officer 33
39 Informed Role: IT Staff, IT Asset Manager, Logistics Officer ITAM Prepare Inventory Schedule : IT Asset Manager Accountable Role: Facility Chief Information Officer Consulted Role: Logistics Staff Informed Role: IT Staff, Logistics Officer ITAM Conduct Annual Inventory Scans : IT Asset Manager Accountable Role: Facility Chief Information Officer Consulted Role: Logistics Staff Informed Role: IT Staff, Logistics Officer ITAM-3.3 Track Movement of Non-Expendable Assets : IT Staff Accountable Role: IT Asset Manager Consulted Role: Logistics Staff Informed Role: Logistics Officer, Facility Chief Information Officer ITAM-3.4 Receive Notification of Annual Inventory : IT Custodial Officer Accountable Role: VISN Chief Information Officer ITAM Produce Exception Listing : Logistics Staff Accountable Role: Facility Chief Information Officer Consulted Role: IT Staff Informed Role: IT Asset Manager, Logistics Officer 34
40 ITAM Reconcile Exception Listing : IT Asset Manager Accountable Role: Facility Chief Information Officer Informed Role: Logistics Officer, Logistics Staff, IT Staff ITAM Perform Annual Inventory : IT Asset Manager Accountable Role: Facility Chief Information Officer Informed Role: IT Staff ITAM Generate Report of Survey Form : IT Asset Manager Accountable Role: Facility Chief Information Officer Consulted Role: Logistics Staff Informed Role: Law Enforcement, IT Staff, Logistics Officer, Information Security Officer ITAM Submit EIL : Facility Chief Information Officer Accountable Role: IT Asset Manager Informed Role: Law Enforcement, Logistics Officer, Logistics Staff, IT Staff, Information Security Officer ITAM Perform 5% Verification : Logistics Staff Accountable Role: Logistics Officer Consulted Role: Facility Chief Information Officer Informed Role: IT Staff, IT Asset Manager 35
41 ITAM-3.6 Monitor Perpetual Inventory Process : IT Asset Manager Accountable Role: Facility Chief Information Officer Informed Role: Logistics Staff, IT Staff, Information Security Officer ITAM-4.1 Prepare Equipment for Turn-In : IT Asset Manager Accountable Role: Facility Chief Information Officer Informed Role: Logistics Staff, IT Staff, Information Security Officer ITAM-4.2 Sanitize Equipment : IT Staff Accountable Role: Facility Chief Information Officer Consulted Role: Information Security Officer, 508 Reviewer Informed Role: Logistics Officer, Logistics Staff, IT Asset Manager ITAM-4.3 Submit Electronic Turn-In Request : IT Asset Manager Accountable Role: Facility Chief Information Officer Consulted Role: 508 Reviewer Informed Role: Logistics Officer, Logistics Staff, IT Staff ITAM-4.4 Validate Turn-In Date : IT Asset Manager Accountable Role: Logistics Staff Informed Role: IT Staff, Logistics Officer, Facility Chief Information Officer ITAM-4.5 Coordinate Transfer to Logistics 36
42 : IT Asset Manager Accountable Role: Facility Chief Information Officer Informed Role: Logistics Officer, Logistics Staff, IT Staff ITAM-4-6 Remove Equipment from EIL : Logistics Staff Accountable Role: IT Asset Manager Informed Role: IT Staff, Logistics Officer, Information Security Officer, Facility Chief Information Officer 37
43 IT Asset Management Process Process Activity Name: ITAM-1 Acquire IT Assets None ITAM-2 Deploy and Manage IT Assets The sub-process ITAM-1 Acquire IT Assets cycles through the following dependent activities: - ITAM-1.1 National Buys - ITAM-1.2 Regional Buys (Activations) - ITAM-1.3 Local Procurement Purchases Process Activity Name: ITAM-1-DEC01 National Buy? None If yes, ITAM 1.1 National Buys Or If no, ITAM-1-DEC02 Regional Buy? There is a decision dependency that determines the next activity to complete. If this is a National Buy the next activity to complete is ITAM-1.1 National Buy. If this is not a National Buy proceed to the next decision dependency to determine the next step to complete. Facility Chief Information Officer Process Activity Name: ITAM-1-DEC02 Regional Buy? ITAM-1-DEC01 National Buy? If Yes, ITAM-1.2 Regional Buys (Activations) Or 38
44 If No, ITAM-1.3 Local Procurement Purchases There is a decision dependency that determines the next activity to complete. If this is a Regional Buy the next activity to complete is ITAM-1.2 Regional Buys (Activations) If this is not a Regional Buy the next activity to complete is ITAM-1.3 Local Procurement Purchases. Facility Chief Information Officer Process Activity Name: ITAM 1.1 National Buys ITAM-1-DEC01 National Buy? ITAM-2 Deploy and Manage IT Assets The sub-process ITAM-1.1 National Buys cycles through the following dependent activities: - ITAM Analyze Inventory by Functionality and Compatibility - ITAM Validate Refresh Data - ITAM Analyze Data at National Level - ITAM Submit ITARS Request - ITAM Make Budget Decision - ITAM Define Specifications for Equipment - ITAM Define ITAM/Logistic Requirements within PWS - ITAM Execute Procurement - ITAM Communicate Asset Management Purchase to the Field Process Activity Name: ITAM-1.1-DEC01 Special Funding? ITAM-1-DEC01 National Buy? If yes, ITAM Execute Special Funding Or If no, ITAM-1.1-DEC02 Input Required? 39
45 There is a decision dependency that determines the next activity to complete. If this is a Special Funding purchase the next activity to complete is ITAM Execute Special Funding. If this is not a Special Funding purchase proceed to the next decision dependency to determine the next activity to complete. Facility Chief Information Officer Process Activity Name: ITAM-1.1-DEC02 Input Required? ITAM-1.1-DEC01 Special Funding? If yes, ITAM-1.1-DEC03 Life Cycle Or If no, ITAM Analyze Data at National Level There is a decisions dependency that determines the next activity to complete. If additional input is required proceed to the next decision dependency to determine the next activity to complete. If additional input is not required the next activity to complete is ITAM Analyze Data at National Level. Facility Chief Information Officer Process Activity Name: ITAM-1.1-DEC03 Life Cycle? ITAM-1.1-DEC02 Input Required? If yes, ITAM Analyze Inventory by Functionality and Compatibility Or If no, ITAM Analyze Data at National Level There is a decision dependency that determines the next activity to complete. 40
46 If this is a life cycle purchase the next activity to complete is ITAM Analyze Inventory by Functionality and Compatibility If this is not a life cycle purchase the next activity to complete is ITAM Analyze Data at National Level Facility Chief Information Officer Process Activity Name: ITAM Analyze Inventory by Functionality and Compatibility DEC-1.1-DEC03 Life Cycle? ITAM Validate Refresh Data The Facility Chief Information Officer analyzes inventory by commodity type to determine assets suitable for refresh based on functionality and use status, (Operating System (OS) Compatibility, Ram, and Disk Space). Automated Engineering Management System/Medical Equipment Report System Data Facility Strategic Plan OIT Strategic Plan VA Strategic Plan Visibility Tools i.e. (System Center Configuration Manager (SCCM) and Tivoli Endpoint Manager (TEM)) Spreadsheet containing assets meeting refresh criteria Facility Chief Information Officer Automated Engineering Management System/Medical Equipment Report System Extract Report VA Capital Assessment Process VA IT Inventory Compliance (IIC) Portal VA IT Inventory Control Knowledge Center 41
47 Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) Refresh buys are designed to replace equipment that is non-functional, that is not fully optimized, or incompatible with the VA baseline configurations. Process Activity Name: ITAM Validate Refresh Data ITAM Analyze Inventory by Functionality and Compatibility ITAM Analyze Data at National Level The Regional Director validates the refresh data provided by the Facility Chief Information Officer. Facility Strategic Plan Spreadsheet containing assets meeting refresh criteria VA Strategic Plan Visibility Tools (i.e. System Center Configuration Manager (SCCM) and Tivoli Endpoint Manager (TEM)) Validated Spreadsheet containing assets meeting refresh criteria Regional Director VA Capital Assessment Process VA IT Inventory Control Knowledge Center Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) 42
48 None Listed Process Activity Name: ITAM Analyze Data at National Level ITAM-1.1-DEC02 Input Required? Or ITAM-1.1-DEC03 Life Cycle? Or ITAM Validate Refresh Data ITAM Submit ITARS Request The Project Manager, or designated Business Owner, analyzes the Data for National Purchases for both Life Cycle and all other purchases being recommended and produces the Capital Asset Planning Survey. Automated Engineering Management System/Medical Equipment Report System Data by CSN Current Capital Asset Planning Survey Facility Strategic Plan System Center Configuration Manager SCCM Data (Microsoft Asset Management Tool) VA Strategic Plan Capital Asset Planning Survey Project Manager VA Capital Assessment Process Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) 43
49 Replacement equipment should not be based only on age, but also on functionality and compatibility with approved tools and software. Process Activity Name: ITAM Submit ITARS Request ITAM Analyze Data at National Level ITAM Make Budget Decision The Project Manager, or designated Business Owner, submits the Information Technology Acquisition Request System (ITARS). Budget Integrated Product Team Budget Data ITARS Request Project Manager Information Technology Acquisition Request System (ITARS) One-VA Technical Reference Model Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The Technology Management group is not the only office who submits ITARS requests. The One-VA Technical Reference Model is used for key equipment specifications for the ITARS Request. Process Activity Name: ITAM Make Budget Decision ITAM Submit ITARS Request 44
50 ITAM DEC01 Continue? The Project Manager, or designated Business Owner, makes a budget decision to continue or to end at this point if the decision is made that the budget does not support the acquisition. If the decision is to continue the Project Manager forms an Integrated Product Team of Subject Matter Experts to work on the process of defining equipment Requirements. Analyzed Capital Asset Planning Survey Budget Integrated Product Team Budget Data Updated Budget Project Manager VA Capital Assessment Process Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) None Listed Process Activity Name: ITAM DEC01 Continue? ITAM Make Budget Decision If yes, the following activities are completed concurrently: - ITAM Define Specifications for Equipment - ITAM Define ITAM/Logistic Requirements within PWS Or If no, the process ends. 45
51 There is a dependency that determines the next activity to complete. If the Project Manager makes the Budget Decision to continue the next activities are completed concurrently: - ITAM Define Specifications for Equipment - ITAM Define ITAM/Logistic Requirements within PWS If the Project Manager makes the Budget Decision to not continue the process ends. Project Manager Process Activity Name: ITAM Define Specifications for Equipment This activity is completed concurrently with the following activity: - ITAM Define ITAM/Logistic Requirements within PWS ITAM DEC01 Continue? The following activities are completed concurrently: - Information Technology Acquisition Request System - Contract Services Support - Purchase The Integrated Product Team uses the One VA Technical Reference Model and Subject Matter Experts to define equipment specifications. The specifications are reviewed by Enterprise System Engineering and are also used in the development of the Statement of Work submitted to the Technical Acquisitions Center. The Project Manager's ensure that certain requirements are included with the Performance Work Statement (PWS) to ensure contractors comply with guidelines for delivery and receipt of equipment. Analyzed Capital Asset Planning Survey Integrated Product Team Budget Data Performance Work Statement Spreadsheet containing assets meeting refresh criteria 46
52 Updated Budget Equipment Specifications Update Performance Work Statement Integrated Product Team Information Technology Acquisition Request System (ITARS) Information Technology Receiving Support System (ITRSS) Portal One-VA Technical Reference Model Federal Acquisition Regulation (FAR) Systems Engineering and Design Review (SEDR) Process VA Acquisition Regulation (VAAR) Technical Analysis Review/Technical Analysis Summary has been changed to Systems Engineering and Design Review. In addition, certain requirements need to be included such as, requiring vendor to include the Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Purchase Order (PO) and Project on all Packing Slips, no partial deliveries, and a requirement to make positive contact with the warehouse prior to shipment to ensure available space at the warehouse. The contractor maintains an electronic list of all delivered equipment by serial number, noting delivery location, Purchase Order number and individual that signs for the equipment. Delivery location will include the Region number, VISN number, station number, street address, city and state. The electronic list will be provided in a file with one serial number per line in a standard format such as excel, or quote and comma delimited format. Contractor will provide the list via electronic mail after receipt of the equipment by the site. The list will be sent to the site POC and additional VA staff identified at the time the order is placed. Process Activity Name: ITAM Define ITAM/Logistic Requirements within PWS This activity is completed concurrently with the following activity: ITAM Define Specifications for Equipment 47
53 ITAM DEC01 Continue? The following activities are completed concurrently: - Information Technology Acquisition Request System - Contract Services Support - Purchase The Integrated Product Team ensures that certain requirements are included with the Project Work Statement (PWS) to ensure contractors comply with guidelines for delivery and receipt of equipment. In addition to an understandable, itemized summary of the equipment being procured, every centralized IT procurement contract needs to contain a standard, mandatory deliverable: a detailed list of non-expendable equipment provided by the contract (in an Excel spreadsheet). Ideally, providing a spreadsheet in advance of each batch of equipment being delivered and a summary spreadsheet at the conclusion of the contract including any equipment warranty swaps encountered during roll-out. At a minimum: purchase order number, Contract Line Item Number (CLIN), station number, serial number, manufacturer, model number, total cost of each item, delivery date, and warranty end date. With this detailed list of information, invoices and property records can be validated very easily after each batch is shipped. At the conclusion of the project, we can ensure that all non-expendable property has been entered correctly. It is essential that the Integrated Project Team for centralized procurements (i.e., lifecycle replacement procurements) publish and update a Master Delivery Schedule that summarizes the number of items of equipment that will be delivered to each Facility. This will also help with the receiving process and invoice certification. Analyzed Capital Asset Planning Survey Integrated Product Team Budget Data Performance Work Statement Updated Budget Equipment Specifications Reviewed Performance Work Statement Integrated Product Team 48
54 Information Technology Acquisition Request System (ITARS) Information Technology Receiving Support System (ITRSS) Portal One-VA Technical Reference Model Federal Acquisition Regulation (FAR) Systems Engineering and Design Review (SEDR) Process VA Acquisition Regulation (VAAR) The contractor maintains an electronic list of all delivered equipment by serial number, noting delivery location, Purchase Order number and individual that signs for the equipment. Delivery location will include the Region number, VISN number, station number, street address, city and state. The electronic list will be provided in a file with one serial number per line in a standard format such as excel, or quote and comma delimited format. Contractor will provide the list via electronic mail after receipt of the equipment by the site. The list will be sent to the site POC and additional VA staff identified at the time the order is placed. Contractors shall coordinate deliveries with Site POCs before shipment of all shipments to ensure sites have adequate storage space prior to shipping, Contractor (prime) shall notify the Delivery Date Coordinator and the respective Site POCs, by phone followed by , of all incoming deliveries including line-by-line details for review of requirements. VA Project Manager, Implementation Manager, and COR shall be copied on all communication to sites. Contractor cannot make any changes to the delivery quantities or schedule at the request of Site POC other than the ability of the site to ask that their shipments be broken up into no more than three partial deliveries. All shipments, either single or multiple container deliveries, will bear the VA Purchase Order number on external shipping labels and associated manifests or packing lists. In the case of multiple container deliveries, a statement readable near the VA PO number will indicate total number of containers for the complete shipment (ex. Package 1 of 2 ), clearly readable on manifests and external shipping labels. Process Activity Name: ITAM Execute Procurement The following activities are completed concurrently. - Information Technology Acquisition Request System - Contract Services Support - Purchase ITAM Communicate Asset Management Purchase to the 49
55 Field The Integrated Product Team, or designated Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Requestor, after reviewing the Technical Acquisition Center Proposal from the Statement of Work, executes the procurement and sends status information to the Project Manager Equipment Specifications Notification of ITARS approval (Verbal or Written) Statement of Work Technical Acquisition Center Proposal IFCAP Request, Turn-in and Request for Property or Services Integrated Funds Control, Accounting, and Procurement Records Reviewed Statement of Work Reviewed Technical Acquisition Center Proposal Integrated Product Team Information Technology Acquisition Request System (ITARS) Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) Systems Engineering and Design Review (SEDR) Process VA Acquisition Regulation (VAAR) None Listed Process Activity Name: ITAM Communicate Asset Management Purchase to the Field ITAM Execute Procurement ITAM-2 Deploy and Manage IT Assets 50
56 The Project Manager, or designee, communicates to both OIT and Logistics the asset management component to any equipment buy. Award Document including Warranty Information Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Purchase Order IT Procurement Bulletin Project Manager Information Technology Acquisition Request System (ITARS) Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) IFCAP Requirements Analysts User's Guide VA Acquisition Regulation (VAAR) The IT Procurement Bulletin Containing Asset Management Component of the IT Buy needs to contain at a minimum the following information: A description of the project, IFCAP Purchase Order listing unit prices for each Contract Line Item Number, Category Stock Number, Common Model Number, Equipment Category, delivery schedule including quantities and shipping time frames. Process Activity Name: ITAM-1.2 Regional Buys (Activations) ITAM-1-DEC02 Regional Buy? ITAM-2 Deploy and Manage IT Assets The sub-process ITAM-1.2 Regional Buys (Activations) cycles through the following dependent activities. - ITAM Identify New Activation Projects 51
57 - ITAM Determine Activation Scope - ITAM Open Activation Request - ITAM Notify Regional Activation Team - ITAM Submit ITARS Request - ITAM Review Specifications for Equipment - ITAM Submit Request to Purchase - ITAM Refine Order - ITAM Communicate Asset Management Purchase to the Field Process Activity Name: ITAM-1.2-DEC01 Special Funding ITAM-1-DEC02 Regional Buy? If yes, ITAM Execute Special Funding. If no, ITAM Determine Activation Scope. There is a decision dependency that determines the next activity to complete. If this is Special Funding purchase, the next activity to complete is ITAM Execute Special Funding. If this is not a Special Funding purchase, proceed to the next decision diamond to determine the next activity to complete. Facility Chief Information Officer Process Activity Name: ITAM Identify New Activation Projects ITAM-1.2-DEC01 Special Funding? ITAM Determine Activation Scope The Facility Chief Information Officer works with the Regional Service Line Subject Matter Experts, or their designee, along with local VA leadership to identify New Activation Projects. All IT buys must adhere to the requirements listed in the One-VA Technical Reference Model (TRM). The following areas are addressed when determining activation projects: 52
58 Determine Network Design Determine Wireless Network Determine Telephone Systems Determine Server Needs Determine PC Needs Determine Laptop Needs Determine Printer & Scanner Needs Determine Content Delivery Engine Determine Telecommunications Requirements Activation Requests Approved Activation Number for Major and Minor Construction Projects Memos Meeting Minutes Approved Activation Tracking List Updated Memos Facility Chief Information Officer One-VA Technical Reference Model Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) Activation Requests serve as a vehicle for OI&T to obtain approval and begin procurement stages which includes endpoint devices and infrastructure to support new staff. OI&T Activation Requests are defined as the method in which administrations work with OI&T field managers to provide IT support to the opening of new clinics, remodeling non-clinical to clinical space (i.e.: new exam rooms), expanded services and Full-Time Equivalent Employee (FTEE) growth. An approved VHA activation number is required for major and minor construction projects. Examples of what is not an activation include: 53
59 - Remodeling with no increase in FTEE or usable square footage - Replacement of equipment - Innovation projects - Moving from one location to another - Creating a pool of spare equipment Process Activity Name: ITAM Determine Activation Scope ITAM Identify New Activation Projects ITAM Open Activation Request The Facility Chief Information Officer (FCIO) works with the Regional Service Line Subject Matter Experts along with the IT Asset Manager, Network Chief Information Officer (NCIO), and Local VA Leadership determine scope of IT Support needed, for the activation projects, based on the number of Full Time Equivalent Employees (FTEE's) and completes an Equipment List needed to support the FTEE's. Approved Activation Tracking List Floor Plans Statement of Work New Entry in Approved Activation Tracking List Facility Chief Information Officer One-VA Technical Reference Model Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) None Listed 54
60 Process Activity Name: ITAM Open Activation Request ITAM Determine Activation Scope ITAM Notify Regional Acquisition Team The Facility Chief Information Officer (FCIO) opens the Activation Request and secures a project number for the Activations. (Note: an outcome of opening the Activation Request is to form the Activation Team to work the activations.) Approved Activation Tracking List Data Call Statement of Work Activation Team Activation Web Form Collection of Activations by Quarter Project Number Facility Chief Information Officer One-VA Technical Reference Model Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) Every Region has their own Request Portal. There is no centralized Request Portal. The FCIO is a member of the Activation Team(s) that are created for each activation project. Process Activity Name: ITAM Notify Regional Activation Team ITAM Open Activation Request 55
61 ITAM Submit ITARS Request The Facility Chief Information Officer notifies the Veterans Integrated Service Network CIO, the Regional Director or designee, and the Regional Activation Team of any activation request via the Activation Web Form and Project Number. An Integrated Product Team is developed to conduct an analysis of the major acquisitions. Activation Web Form Collection of Activations by Quarter Data Call Project Number Notification of Activation Web Form Notification of Project Number Facility Chief Information Officer One-VA Technical Reference Model Request Portal Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) Every Region has their own Request Portal. There is no centralized Request Portal. Process Activity Name: ITAM Submit ITARS Request ITAM Notify Regional Acquisition Team ITAM Review Specifications for Equipment 56
62 The Facility Chief Information Officer submits the Information Technology Acquisition Request System (ITARS) request to the Integrated Product Team for review. Budget Collection of Activations by Quarter Data Call ITARS Request Facility Chief Information Officer Information Technology Acquisition Request System (ITARS) One-VA Technical Reference Model Request Portal Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The FCIO uses the Collection of Activations by Quarter and other Request Portal information from the region for data needed for the ITARS Request. The One-VA Technical Reference Model is a key source of data for equipment specifications. Every Region has their own Request Portal. There is no centralized Request Portal. Process Activity Name: ITAM Review Specifications for Equipment ITAM Submit ITARS Request ITAM Submit Request to Purchase 57
63 The Integrated Product Team reviews the Specifications for Equipment contained in the Information Technology Acquisition Request System (ITARS) request to ensure all information required by the Technical Acquisition Center is included. Analyzed Capital Asset Planning Survey ITARS Request Integrated Product Team Budget Data Updated Budget Reviewed ITARS Request Integrated Product Team Information Technology Acquisition Request System (ITARS) Information Technology Receiving Support System (ITRSS) Portal One-VA Technical Reference Model Federal Acquisition Regulation (FAR) Systems Engineering and Design Review (SEDR) Process VA Acquisition Regulation (VAAR) Certain requirements need to be included such as, requiring vendor to include the Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Purchase Order (PO) and Project on all Packing Slips, no partial deliveries, and a requirement to make positive contact with the warehouse prior to shipment to ensure available space at the warehouse. Process Activity Name: ITAM Submit Request to Purchase ITAM Review Specifications for Equipment The following activities are completed concurrently: - Information Technology Acquisition Request System 58
64 - Contract Services Support - Purchase The Regional Acquisition Team reviews, approves, and submits a request to place the order to the acquisition group. The Region Activations Team is responsible for refining orders, with input from the Facility Chief Information Officer, as changes occur to the workforce in the region. Collection of Activations by Quarter Data Call Information Technology Acquisition Request System Request IFCAP Request, Turn-in and Request for Property or Services Updated Activated Projects Regional Acquisition Team Information Technology Acquisition Request System (ITARS) One-VA Technical Reference Model Request Portal Federal Acquisition Regulation (FAR) IFCAP Requirements Analysts User's Guide VA Acquisition Regulation (VAAR) Every Region has their own Request Portal. There is no centralized Request Portal. The IFCAP Request, Turn-in and Request for Property or Services artifact is located in the IFCAP Portal in. Process Activity Name: ITAM Refine Order The following activities are completed concurrently: 59
65 - Information Technology Acquisition Request System - Contract Services Support - Purchase ITAM Communicate Asset Management Purchase to the Field The sub-process ITAM Refine Order cycles through the following dependent activities: - ITAM Define Procurement / Delivery Requirements - ITAM Refine Network Design - ITAM Refine Wireless Network - ITAM Refine Telephone System - ITAM Refine Server Order - ITAM Refine PC Order - ITAM Refine Printer & Scanner Order - ITAM Refine Laptop Order - ITAM Refine Content Delivery Engine - ITAM Refine Telecommunication Requirements Process Activity Name: ITAM Define Procurement / Delivery Requirements Note: The following activities are completed concurrently: - Information Technology Acquisition Request System - Contract Services Support - Purchase Note: The following activities are completed concurrently: - ITAM Refine Network Design - ITAM Refine Wireless Network - ITAM Refine Telephone System - ITAM Refine Server Order - ITAM Refine PC Order - ITAM Refine Printer & Scanner Order - ITAM Refine Laptop Order 60
66 - ITAM Refine Content Delivery Engine - ITAM Refine Telecommunication Requirements The Regional Acquisition Team, or designee, works with Subject Matter Experts to define procurement / delivery requirements. Certain requirements need to be included such as, requiring vendor to include the Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Purchase Order (PO) and Project on all Packing Slips, no partial deliveries, and a requirement to make positive contact with the warehouse prior to shipment to ensure available space at the warehouse. Floor Plans Full Time Equivalent Employee Info IFCAP Request, Turn-in and Request for Property or Services Statement of Work Procurement and Delivery Details Regional Acquisition Team Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) IFCAP Requirements Analysts User's Guide VA Acquisition Regulation (VAAR) The Procurement and Deliver Details are communicated to Logistics and used to create Delivery Notifications for incoming shipments. Process Activity Name: ITAM Refine Network Design Note: The following activities are completed concurrently: - ITAM Refine Wireless Network - ITAM Refine Telephone System - ITAM Refine Server Order - ITAM Refine PC Order 61
67 - ITAM Refine Printer & Scanner Order - ITAM Refine Laptop Order - ITAM Refine Content Delivery Engine - ITAM Refine Telecommunication Requirements ITAM Define Procurement / Delivery Requirements ITAM Communicate Asset Management Purchase to the Field The Regional Acquisition Team works with the Regional LAN Teams, Regional Acquisition Teams, National Content Delivery Teams and Regional Telecommunications Business Office to refine the order for the Data Network to include: wireless network, telephone systems, servers, personal computers, laptops, printers and scanners, content delivery engine, and telecommunications requirements to include lead time information. Floor Plans Full Time Equivalent Employee Info IFCAP Request, Turn-in and Request for Property or Services Statement of Work Refined Network Design Regional Acquisition Team Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The Facility Chief Information Officer refines orders based on changes to the workforce in the region. Note: The Refined Network Design includes updated network equipment lists. Process Activity Name: ITAM Refine Wireless Network Note: The following activities are completed concurrently: 62
68 - ITAM Refine Network Design - ITAM Refine Telephone System - ITAM Refine Server Order - ITAM Refine PC Order - ITAM Refine Printer & Scanner Order - ITAM Refine Laptop Order - ITAM Refine Content Delivery Engine - ITAM Refine Telecommunication Requirements ITAM Define Procurement / Delivery Requirements ITAM Communicate Asset Management Purchase to the Field The Regional Acquisition Team works with the Regional LAN Team to refine the order for the wireless network equipment based on employee changes and other technology changes in the region. Floor Plans Full Time Equivalent Employee Info Regional LAN Template Statement of Work Refined Wireless Network Equipment Order (if applicable) Regional Acquisition Team Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) 63
69 The Facilities Chief Information Officer refines orders based on changes to the workforce in the region. Process Activity Name: ITAM Refine Telephone System Note: The following activities are completed concurrently: - ITAM Refine Network Design - ITAM Refine Wireless Network - ITAM Refine Server Order - ITAM Refine PC Order - ITAM Refine Printer & Scanner Order - ITAM Refine Laptop Order - ITAM Refine Content Delivery Engine - ITAM Refine Telecommunication Requirements ITAM Define Procurement / Delivery Requirements ITAM Communicate Asset Management Purchase to the Field The Regional Acquisition Team works with the Regional LAN Team to refine the order for the telephone system equipment based on employee changes and other technology changes in the region. Floor Plans Full Time Equivalent Employee Info Regional VoIP Planning Form Statement of Work Refined Telephone System Equipment Order (if applicable) Regional Acquisition Team Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) 64
70 Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The Facilities Chief Information Officer refines orders based on changes to the workforce in the region. Process Activity Name: ITAM Refine Server Order Note: The following activities are completed concurrently: - ITAM Refine Network Design - ITAM Refine Wireless Network - ITAM Refine Telephone System - ITAM Refine PC Order - ITAM Refine Printer & Scanner Order - ITAM Refine Laptop Order - ITAM Refine Content Delivery Engine - ITAM Refine Telecommunication Requirements ITAM Define Procurement / Delivery Requirements ITAM Communicate Asset Management Purchase to the Field The Regional Acquisition Team works with the Regional LAN Team to refine the order for the server equipment based on employee changes and other technology changes in the region. Floor Plans Full Time Equivalent Employee Info Statement of Work Refined Server Equipment List Order Regional Acquisition Team 65
71 Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The Facilities Chief Information Officer refines orders based on changes to the workforce in the region. Process Activity Name: ITAM Refine PC Order Note: The following activities are completed concurrently: - ITAM Refine Network Design - ITAM Refine Wireless Network - ITAM Refine Telephone System - ITAM Refine Server Order - ITAM Refine Printer & Scanner Order - ITAM Refine Laptop Order - ITAM Refine Content Delivery Engine - ITAM Refine Telecommunication Requirements ITAM Define Procurement / Delivery Requirements ITAM Communicate Asset Management Purchase to the Field The Regional Acquisition Team works with the Regional LAN Team and the VA Points of Contacts to refine the order for the Personnel Computer (PC) equipment based on employee changes and other technology changes in the region. Floor Plans Statement of Work Refined Personnel Computer Equipment Order 66
72 Regional Acquisition Team Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The Facilities Chief Information Officer refines orders based on changes to the workforce in the region. Process Activity Name: ITAM Refine Printer & Scanner Order Note: The following activities are completed concurrently: - ITAM Refine Network Design - ITAM Refine Wireless Network - ITAM Refine Telephone System - ITAM Refine Server Order - ITAM Refine PC Order - ITAM Refine Laptop Order - ITAM Refine Content Delivery Engine - ITAM Refine Telecommunication Requirements ITAM Define Procurement / Delivery Requirements ITAM Communicate Asset Management Purchase to the Field The Regional Acquisition Team works with the Regional Acquisition Team to refine the order for the printer and scanner equipment based on employee changes and other technology changes in the region. Floor Plans Statement of Work 67
73 Refined Printer and Scanner Equipment Order Regional Acquisition Team Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The Facilities Chief Information Officer refines orders based on changes to the workforce in the region. Process Activity Name: ITAM Refine Laptop Order Note: The following activities are completed concurrently: - ITAM Refine Network Design - ITAM Refine Wireless Network - ITAM Refine Telephone System - ITAM Refine Server Order - ITAM Refine PC Order - ITAM Refine Printer & Scanner Order - ITAM Refine Content Delivery Engine - ITAM Refine Telecommunication Requirements ITAM Define Procurement / Delivery Requirements ITAM Communicate Asset Management Purchase to the Field The Regional Acquisition Team works with the Regional Acquisition Team to refine the order for the laptop equipment based on employee changes and other technology changes in the region. 68
74 Floor Plans Statement of Work Refined Laptop Equipment Needs Order Regional Acquisition Team Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The Facilities Chief Information Officer refines orders based on changes to the workforce in the region. Process Activity Name: ITAM Refine Content Delivery Engine Note: The following activities are completed concurrently: - ITAM Refine Network Design - ITAM Refine Wireless Network - ITAM Refine Telephone System - ITAM Refine Server Order - ITAM Refine PC Order - ITAM Refine Printer & Scanner Order - ITAM Refine Laptop Order - ITAM Refine Telecommunication Requirements ITAM Define Procurement / Delivery Requirements ITAM Communicate Asset Management Purchase to the Field 69
75 The Regional Acquisition Team works with the Regional Acquisition Team and sends an request to the Content Delivery Network (CDN) approximately six months before the activation. The Content Delivery Network Team works with the FCIO and Acquisitions Group on configuring and shipping the device to meet the needs of the location. Floor Plans Statement of Work to National CDN Team Regional Acquisition Team Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The Facilities Chief Information Officer refines orders based on changes to the workforce in the region. Process Activity Name: ITAM Refine Telecommunication Requirements Note: The following activities are completed concurrently: - ITAM Refine Network Design - ITAM Refine Wireless Network - ITAM Refine Telephone System - ITAM Refine Server Order - ITAM Refine PC Order - ITAM Refine Printer & Scanner Order - ITAM Refine Laptop Order - ITAM Refine Content Delivery Engine 70
76 ITAM Define Procurement / Delivery Requirements ITAM Communicate Asset Management Purchase to the Field The Regional Acquisition Team works with the Regional Telecommunications Business Office (TBO) and Regional Integrated Product Team to refine the order for the Telecommunications Regional TBO Circuit Request based on employee changes and other technology changes in the region. Floor Plans Statement of Work Refined Regional TBO Circuit Request Order Regional Acquisition Team Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The Facilities Chief Information Officer refines orders based on changes to the workforce in the region. Process Activity Name: ITAM Communicate Asset Management Purchase to the Field ITAM Refine Order ITAM-2 Deploy and Manage IT Assets 71
77 The Regional Acquisition Team, or designee, communicates to both OIT and Logistics the asset management component to any equipment buy by completing the IT Procurement Bulletin and sending to the field. Award Document including Warranty Information Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Purchase Order IT Procurement Bulletin Regional Acquisition Team Information Technology Acquisition Request System (ITARS) VA Receiving Tracking System Portal Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) IFCAP Requirements Analysts User's Guide VA Acquisition Regulation (VAAR) The IT Procurement Bulletin Containing Asset Management Component of the IT Buy contain, at a minimum, the following information: description of the project, IFCAP Purchase Order listing unit prices for each Contract Line Item Number, Category Stock Number, Common Model Number, Equipment Category, delivery schedule including quantities and shipping time frames. Process Activity Name: ITAM-1.3 Local Procurement Purchases ITAM-1-DEC02 Regional Buy? ITAM-2 Deploy and Manage IT Assets 72
78 The sub-process ITAM-1.3 Local Procurement Purchases cycles through the following dependent activities: - ITAM Gather Business Line Requirements - ITAM Execute Special Funding - ITAM Execute Break - Fix - ITAM Develop Activation Projects Process Activity Name: ITAM Gather Business Line Requirements ITAM-1-DEC02 Regional Buy? ITAM DEC01 Special Funding? The Facility Chief Information Officer gathers business line requirements from customer interactions and local facility meetings using the Facility Strategic Plan, Equipment Requests, Move Requests, and Service Requests from the Local VA Leadership and IT Asset Manager. The outcome is a data call for local procurement needs for the facility. Equipment Requests Facility Strategic Plan Local Tracking List Move Requests Service Requests Spend Plan Submission to Region - Data Call Updated Local Tracking List Facility Chief Information Officer None Listed 73
79 Federal Acquisition Regulation (FAR) IFCAP Requirements Analysts User's Guide VA Acquisition Regulation (VAAR) None Listed Process Activity Name: ITAM DEC01 Special Funding? ITAM Gather Business Line Requirements If yes, ITAM Execute Special Funding Or If no, ITAM DEC02 Activation? There is a decision dependency that determines the next activity to complete. If this is Special Funding purchase the next activity to complete is ITAM Execute Special Funding. If this is not a Special Funding purchase proceed to the next decision diamond to determine the next activity to complete. Facility Chief Information Officer Process Activity Name: ITAM DEC02 Activation? ITAM DEC01 Special Funding? If yes, ITAM Develop Activation Projects Or If no, ITAM Execute Break - Fix There is a decision dependency that determines the next activity to complete. If this is an activation purchase the next activity to complete is ITAM Develop Activation Projects. 74
80 If this is not an activation purchase the next activity to complete is ITAM Execute Break - Fix. Facility Chief Information Officer Process Activity Name: ITAM Execute Special Funding ITAM-1.3-DEC01 Special Funding? ITAM-2 Deploy and Manage IT Assets The sub-process ITAM Execute Special Funding cycles through the following dependent activities. - ITAM Prioritize Projects - ITAM Determine Procurement Plan - ITAM Identify Funded Facility Requirements - ITAM Identify Funded SLM Requirements - ITAM Submit ITARS Request - ITAM Create and Submit IFCAP Form ITAM Approve IFCAP ITAM Submit VA Form 2237 to Purchasing Process Activity Name: ITAM Prioritize Projects ITAM DEC01 Special Funding? ITAM Determine Procurement Plan If discretionary money is available, the Facility Chief Information Officer works with the Facility Director to prioritize and validate established needs. Business Line Needs Strategic Plans 75
81 Prioritized Project Requirements Prioritized Projects Facility Chief Information Officer None Listed Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) None Listed Process Activity Name: ITAM Determine Procurement Plan ITAM Prioritize Projects ITAM DEC01 Facility Buy? The Regional Director (RD) works with the Network and Facility Chief Information Officer (FCIO) to determine the procurement spending plan based on facility requirements or service line management requirements. If this is a facility funded requirement, the Regional Directors works with the FCIO to break out the facility procurement dollars. If this is not a facility buy, the RD works with the FCIO to break out the Service Line Requirements. Prioritized Project Requirements Prioritized Projects Procurement Plan 76
82 Regional Director None Listed Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) None Listed Process Activity Name: ITAM DEC01 Facility Buy? ITAM Determine Procurement Plan If yes, ITAM Identify Funded Facility Requirements Or If no, ITAM Identify Funded SLM Requirements There is a decision dependency that determines the next activity to complete. If this is a Facility Buy the next activity to complete is ITAM Identify Funded Facility Requirements. If this is not a Facility Buy the next activity to complete is ITAM Identify Funded SLM Requirements. Regional Director Process Activity Name: ITAM Identify Funded Facility Requirements ITAM DEC01 Facility Buy? ITAM Submit ITARS Request 77
83 The Regional Director works with the Network and Facility Chief Information Officer to break out the funded VA Facility Requirements from the Procurement Plan. Procurement Plan VA Facility Requirements Regional Director None Listed Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) None Listed Process Activity Name: ITAM Identify Funded SLM Requirements ITAM DEC01 Facility Buy? ITAM Submit ITARS Request The Regional Director works with the Network and Facility Chief Information Officer to break out the funded Service Line Manager Requirements from the Procurement Plan. Re-prioritized Project Requirements Re-prioritized Projects 78
84 Service Line Manager Requirements Regional Director None Listed Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) None Listed Process Activity Name: ITAM Submit ITARS Request ITAM Identify Funded Facility Requirements Or ITAM Identify Funded SLM Requirements Information Technology Acquisition Request System The Facility Chief Information Officer (FCIO) submits the Information Technology Acquisition Request System (ITARS) request. Budget Service Line Manager Requirements VA Facility Requirements ITARS Request 79
85 Facility Chief Information Officer Information Technology Acquisition Request System (ITARS) One-VA Technical Reference Model Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The FCIO uses the One-VA Technical Reference Model for key equipment specifications for the ITARS Request. Process Activity Name: ITAM DEC01 ITARS Approved? There is a flow from Information Technology Acquisition Request System into ITAM If yes, ITAM Create Or If no, ITAM-2 Deploy and Manage IT Assets There is a decisions diamond that determines the next activity to complete; - If the ITARS is approved the next activity to complete is ITAM Create and Submit IFCAP If the ITARS is not approved the activity ends. Regional Acquisition Team Process Activity Name: ITAM Create and Submit IFCAP 2237 ITAM DEC01 ITARS Approved? Or ITAM DEC01 Approve? 80
86 ITAM Approve ICAP 2237 The Regional Acquisition Team, after reviewing the Technical Acquisition Center Proposal from the Statement of Work, electronically prepares the purchase order using the Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) site to generate the Request, Turn-in and Request for Property or Services When preparing the IFCAP 2237 ensure the proper Budget Object Code (BOC) is assigned in the Budget Tracking Tool per the Contract Line Item Number (CLIN). Statement of Work and/or Performance Work Statement Technical Acquisition Center Proposal IFCAP Request, Turn-in and Request for Property or Services Regional Acquisition Team Budget Tracking Tool (BTT) Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The IFCAP 2237 must be in enough detail for logistics to determine if the acquisition includes equipment, services, or software. The 2237 becomes the IFCAP Purchase order and is used by Logistics to properly receive and catalog equipment within the VA system of records. The IFCAP Request, Turn-in and Request for Property or Services artifact is located in the IFCAP Portal in. Process Activity Name: ITAM Approve ICAP 2237 ITAM Create and Submit IFCAP
87 ITAM DEC01 Approve? The Approving Official reviews the IFCAP Request, Turn-in and Request for Property or Services and if approved returns the approved 2237 to the Regional Acquisition Team for submission to Purchasing. If not approved the 2237 is return to the Regional Acquisition Team for revisions. IFCAP Request, Turn-in and Request for Property or Services Approved IFCAP Request, Turn-in and Request for Property or Services Approving Official Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) The IFCAP Request, Turn-in and Request for Property or Services artifact is location in the IFCAP Portal in. Process Activity Name: ITAM DEC01 Approve? ITAM Approve ICAP 2237 If yes, ITAM Submit IFCAP 2237 to Purchasing Or If no, ITAM Create and Submit IFCAP 2237 There is a decision dependency that determines the next activity to complete. - If the Approving Official approves the IFCAP 2237 the next activity to complete is ITAM Submit IFCAP 2237 to Purchasing 82
88 - If the Approving Official does not approve the IFCAP 2237 the next activity to complete is ITAM Create and Submit IFCAP 2237 Approving Official Process Activity Name: ITAM Submit IFCAP 2237 to Purchasing ITAM DEC01 Approve? PUR-1 Receive Approved Funding Requirement The Regional Acquisition Team submits the approved Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) 2237 Request, Turn-in and Request for Property or Services to Purchasing. IFCAP Request, Turn-in and Request for Property or Services Approved IFCAP Request, Turn-in and Request for Property or Services Regional Acquisition Team Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) None Listed Process Activity Name: ITAM Execute Break - Fix ITAM DEC02 Activations? 83
89 ITAM-2 Deploy and Manage IT Assets The Facility Chief Information Officer executes a break - fix local procurement for any items that has been damaged and requires repairs following local procurement guidelines. Automated Engineering Management System/Medical Equipment Report System Records Local Procurement Facility Chief Information Officer Automated Engineering Management System/Medical Equipment Report System Extract Report VA IT Inventory Compliance (IIC) Portal VA Acquisition Regulation (VAAR) When completed in a future ProPath release, this sub-process, Execute Break - Fix, is to consist of additional activities with associated artifacts, tools, and standards. This process varies across the pillars based on local procurement Break - Fix processes. Process Activity Name: ITAM Develop Activation Projects ITAM DEC02 Activation? ITAM-2 Deploy and Manage IT Assets The sub-process ITAM Develop Activation Projects cycles through the following dependent activities. - ITAM Identify Local Projects - ITAM Solicit Local VA Leadership Input 84
90 - ITAM Provide Feedback - ITAM Determine Activation Meets Requirements Definition Process Activity Name: ITAM Identify Local Projects ITAM DEC02 Activation? ITAM Solicit Local VA Leadership Input The Facility Chief Information Officer works with the IT Asset Manager and Local VA Leadership to identify local projects for activations that meet budget requirements. Facility Strategic Plan IT Tactical Plan Local Tracking List Budget Requirements List Updated IT Tactical Plan Facility Chief Information Officer None Listed Federal Acquisition Regulation (FAR) IFCAP Requirements Analysts User's Guide VA Acquisition Regulation (VAAR) None Listed Process Activity Name: ITAM Solicit Local VA Leadership Input ITAM Identify Local Projects 85
91 ITAM Provide Feedback The Facility Chief Information Officer (FCIO) solicits input from the IT Asset Manager and VA Local Leadership including the Fiscal Officer or Local Facilities Management on specific IT requirements. The FCIO is actively participating in Local Strategic Planning Process. Budget Requirements List Local Tracking List Submission to Region - Data Call Workforce Planning Projections (Hoteling and Telework Projections) Verbal and Formal Input Facility Chief Information Officer None Listed Federal Acquisition Regulation (FAR) IFCAP Requirements Analysts User's Guide VA Acquisition Regulation (VAAR) None Listed Process Activity Name: ITAM Provide Feedback ITAM Solicit Local VA Leadership Input ITAM Determine Activation Meets Requirements Definition The Local VA Leadership provides feedback to the Facility Chief Information Officer concerning specific IT needs. 86
92 Budget Requirements List Local Tracking List Verbal and Formal Input ( or other formal communication means) Feedback on IT Needs Local VA Leadership None Listed Federal Acquisition Regulation (FAR) IFCAP Requirements Analysts User's Guide VA Acquisition Regulation (VAAR) There are various methods for how the VA Leadership provides feedback on specific IT needs. Process Activity Name: ITAM Determine Activation Meets Requirements Definition ITAM Provide Feedback ITAM =DEC01 Activations? The Facility Chief Information Officer works with both the IT Asset Management Division (or designee) and the VA Local Leadership to determine the procurement meets the current definition of an activation. Activation Requests serve as a vehicle for OI&T to obtain approval and begin procurement stages which includes endpoint devices and infrastructure to support new staff. OI&T Activation Requests are defined as the method in which administrations work with OI&T field managers to 87
93 provide IT support to the opening of new clinics, remodeling non-clinical to clinical space (i.e.: new exam rooms), expanded services and Full-Time Equivalent Employee (FTEE) growth. An approved VHA activation number is required for major and minor construction projects. Approved VHA activation number for major and minor construction projects. Cost Estimate Verbal and Formal Input New Record of Activation For Quarterly Activation Data Call Facility Chief Information Officer Systems Engineering and Design Review Information Technology Acquisition Request System (ITARS) Federal Acquisition Regulation (FAR) VA Acquisition Regulation (VAAR) Examples of what is not an activation include: - Remodeling with no increase in FTEE or usable square footage - Replacement of equipment - Innovation projects - Moving from one location to another - Creating a pool of spare equipment Process Activity Name: ITAM DEC01 Activations? ITAM Determine Activation Meets Requirements Definition If yes, ITAM 1.2 Regional Buys (Activations) Or If no, ITAM Execute Special Funding 88
94 There is a decision dependency that determines the next activity to complete. If the purchase is an Activations acquisition the next activity to complete is ITAM 1.2 Regional Buys (Activations) If the purchase is not an Activations acquisition the next activity to complete is ITAM Execute Special Funding IT Asset Manager Process Activity Name: ITAM-2 Deploy and Manage IT Assets ITAM-1 Acquire IT Assets ITAM-3 Monitor IT Assets The sub-process ITAM-2 Deploy and Manage IT Assets cycles through the following dependent activities. - ITAM-2.1 Receive Notification of Incoming Shipments - ITAM-2.2 Manage Receipt of Assets in Logistics - ITAM-2.3 Manage Assets in Storage - ITAM-2.4 Prepare Assets for Deployment - ITAM-2.5 Manage Deployed Assets Process Activity Name: ITAM-2.1 Receive Notification of Incoming Shipment ITAM-1 Acquire IT Assets ITAM-2.2 Manage Receipt of Assets in Logistics The sub-process ITAM-2.1 Receive Notification of Incoming Shipment cycles through the following dependent activities. - ITAM Notify Logistics of Pending Shipments - ITAM Resolve Split Delivery Dates 89
95 Process Activity Name: ITAM Notify Logistics of Pending Shipments ITAM-1 Acquire IT Assets ITAM Resolve Split Delivery Dates The Facility Chief Information Officer (FCIO) notifies Logistics The Facility Chief Information Officer (FCIO), or designee notifies Logistics Staff of pending incoming shipments. The FCIO provides Logistics with information regarding incoming shipments of equipment. For local procurements this information is extracted from Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) system. For national procurements shipment and tracking information is available on the Information Technology Receiving Support System (ITRSS) portal. In addition, national procurements have a requirement for the vendor to make positive contact with local sites prior to delivery to ensure space availability. Delivery Spreadsheets IT Procurement Bulletin Integrated Funds Distribution, Control Point Activity, Accounting and Procurement Purchase Orders Procurement and Delivery Details Delivery Notification (See rmation) Facility Chief Information Officer Field Operations WIKI Knowledge Repository VA Receiving Tracking System Portal IFCAP Requirements Analysts User's Guide VA Handbook 7002, Logistics Management Procedures Notifying Logistics of pending shipments is a collaborative effort involving Logistics/Property Management and the FCIO or the IT Custodial Officer. 90
96 Communication through the facility locations occurs via s and Excel spreadsheets as well as delivery notifications (automated s) listed in. Process Activity Name: ITAM Resolve Split Delivery Dates ITAM Notify Logistics of Pending Shipments ITAM-2.2 Manage Receipt of Assets in Logistics The IT Asset Manager or designee resolves issues arising from split delivery dates. The IT Asset Manager identifies overlapping dates, staffing shortages, and storage problems and resolves these with the Facility Chief Information Officer. The IT Asset Manager interacts directly with the shipping company to resolve issues or problems with incoming shipments. Delivery Notification Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Purchase Orders Multiple Delivery Appointments/Announcements (Detailed) IT Asset Manager None Listed IFCAP Requirements Analysts User's Guide VA Handbook 7002, Logistics Management Procedures All packing slips must reference the IFCAP Purchase Order. 91
97 The delivery appointments/announcements must contain quantities, dates, schedules, purchase order number, point of contact, and, if needed, special delivery instructions. The delivery appointments/announcements must be affixed on all boxes of an order. Requirements have been built into awards for all National Buys for vendors to contact VA sites before delivery. The IT Asset Manager uses s, calendars, and phone calls to resolve problems associated with split delivery dates. Process Activity Name: ITAM-2.2 Manage Receipt of Assets in Logistics ITAM-2.1 Receive Notification of Incoming Shipments ITAM-2.2-DEC01 Hold in Logistics? The sub-process ITAM-2.2 Manage Receipt of Assets in Logistics cycles through the following dependent activities. - ITAM Verify Invoice and Equipment - ITAM Identify Components - ITAM Identify and Record Serial Numbers - ITAM Produce NX Catalog Validation Report - ITAM Count Assets to Match Receiving Documents - ITAM Notify GIP of Consumables - ITAM Prepare Barcode Label - ITAM Validate Barcode Label - ITAM Crosscheck Barcode Label to Equipment Process Activity Name: ITAM-2.2-DEC01 Hold in Logistics ITAM-2.2 Manage Receipt of Assets in Logistics 92
98 If yes, ITAM-2.4 Prepare Assets for Deployment Or If no, ITAM-2.3 Manage Assets in Storage There is a decision dependency that determines the next activity to complete. If the assets are to be held in logistics the next activity to complete is ITAM-2.4 Prepare Assets for Deployment. If the assets are not to be held in logistics the next activity to complete is ITAM-2.3 Manage Assets in Storage. Logistics Staff Process Activity Name: ITAM Verify Invoice and Equipment ITAM-2.1 Receive Notification of Incoming Shipment ITAM Identify Components The Logistics Staff conducts receiving verification and equipment identification. The Logistics Staff reviews purchase orders and shipping documents to match up with actual assets received. Integrated Funds Distribution, Control Point Activity, Accounting and Procurement Purchase Orders Shipping Documents (Packing Slips) Integrated Funds Distribution, Control Point Activity, Accounting and Procurement System Receiving Report Logistics Staff None Listed 93
99 IFCAP Requirements Analysts User's Guide VA Handbook 7002, Logistics Management Procedures Use electronic means (i.e. barcode scanners and advance importable spreadsheets) when possible to capture asset information such as serial numbers, purchase order numbers, and if applicable, the Nation Project number. Process Activity Name: ITAM Identify Components ITAM Verify Invoice and Equipment ITAM Identify and Record Serial Numbers The Logistics Staff works with the IT Asset Manager to identify and validate the receipt of the asset and related components. This is a manual process of reconciling the components/consumables to the purchase order. The Logistics Staff is responsible for confirming the accuracy of incoming receipts so payment can be approved for the vendors. If the acquisition is a national procurement the Logistics Staff must notify the OIT Inventory Management Officer that the material has been received in order for payment to be made. Integrated Funds Distribution, Control Point Activity, Accounting and Procurement Purchase Orders Shipping Documents (Packing Slips) List of consumables for entry to Generic Inventory Package Validated Integrated Funds Distribution, Control Point Activity, Accounting and Procurement System Receiving Report 94
100 Logistics Staff VA IT Inventory Compliance (IIC) Portal VA Receiving Tracking System Portal Vendor(s) Internet Portal Entry IFCAP Delivery Order Users Guide VA Handbook 7002, Logistics Management Procedures VHA Directive , Standardization of Supplies and Equipment Additional information used for consumables can be found in "Contract Award Documents" and "Vendor Product Manuals" supplied by the IT Asset Manager. Process Activity Name: ITAM Identify and Record Serial Numbers ITAM Identify Components ITAM Produce NX Catalog Validation Report The Logistics Staff identifies and records serial numbers. The Logistics Staff collects the needed information from the equipment to populate the Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS) record for each of the thirty-five required fields. Any questions related to serial numbers and other required fields are addressed with the IT Asset Manager. Automated Engineering Management System/Medical Equipment Report System Record Delivery Order Equipment Inventory List Integrated Funds Distribution, Control Point Activity, Accounting and Procurement System Receiving Report Shipping Documents (Packing Slips) Vendor Equipment Tags/Labels Vendor Spreadsheets 95
101 Receiving Report Updated Automated Engineering Management System/Medical Equipment Report System Record Updated Equipment Inventory List Logistics Staff Automated Engineering Management System/Medical Equipment Report System Extract Report Barcode Printer IFCAP Requirements Analysts User's Guide VA Handbook 7002, Logistics Management Procedures Some locations use Excel spreadsheets to upload batches of serial numbers if the vendor provides this detail. Vendor spreadsheets containing serial numbers provided in national buys are available from National Inventory Management Officer. Required Fields are highlighted on pages 47 and 48 of the VA Handbook 7002, Logistics Management Procedures. Process Activity Name: ITAM Produce NX Catalog Validation Report ITAM Identify and Record Serial Numbers ITAM Count Assets to Match Receiving Documents The Logistics Staff produces a NX Catalog Validation Report showing new assets added to the Equipment Inventory Listing (EIL) from Automated Engineering Management System /Medical Equipment Report System (AEMS/MERS) Report. AEMS/MERS Record Delivery Order Equipment Inventory List Integrated Funds Distribution, Control Point Activity, Accounting and Procurement System 96
102 Receiving Report Shipping Documents (Packing Slips) Vendor Equipment Tags/Labels Vendor Spreadsheets NX Catalog Validation Report Logistics Staff Automated Engineering Management System/Medical Equipment Report System Extract Report Barcode Printer IFCAP Requirements Analysts User's Guide VA Handbook 7002, Logistics Management Procedures Some locations use internal notification systems to show new assets added to the EIL. The NX Catalog Validation Report is to be run in AEMS/MERS and taken to the Facility Chief Information Officer for verification. Process Activity Name: ITAM Count Assets to Match Receiving Documents ITAM Produce NX Catalog Validation Report ITAM Notify GIP of Consumables The Logistics Staff counts assets and matches them to the receiving documents. The Logistics Staff identifies accountable versus expendable items and assigns the correct Category Stock Number (CSN). The Logistics Staff also verifies the assets match receiving documents and records the results in Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS). For national buys the Logistics Staff records the quantities received in the 97
103 Information Technology Receiving Support System (ITRSS) portal. Locations not on ITRSS portal must confirm receipt of national buys to the OIT Inventory Management Officer. Automated Engineering Management System/ Medical Equipment Report System Property Records Information Technology Receiving Support System Portal Records VA Catalog #3 Supply Catalog Vendor Shipping/Receiving Documents Updated Automated Engineering Management System/Medical Equipment Report System Property Records Updated Information Technology Receiving Support System Portal Records Logistics Staff Automated Engineering Management System/Medical Equipment Report System Extract Report VA Receiving Tracking System Portal VA Handbook 7002, Logistics Management Procedures The ITRSS Portal provides the correct CSN and also has links to common Information Technology CSN's. Process Activity Name: ITAM Notify GIP of Consumables ITAM Count Assets to Match Receiving Documents ITAM Prepare Barcode Label The IT Asset Manager, or designee, notifies the Logistics Manager or Item Manager of the Generic Inventory Package (GIP) of consumables that need to be stocked for future end-user requests. 98
104 Vendor Documentation Inventory Request for Generic Inventory Package to Stock IT Asset Manager Vendor web sites IFCAP Requirements Analysts User's Guide None Listed Process Activity Name: ITAM Prepare Barcode Label ITAM Notify GIP of Consumables ITAM Validate Barcode Label The Logistics Staff produces and prints barcode labels for all received non-expendable assets by ensuring all printed fields of Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS) records are completed. Automated Engineering Management System/Medical Equipment Report System Records Barcode Label Companion List to Barcode Labels Logistics Staff 99
105 Automated Engineering Management System/Medical Equipment Report System Extract Report VA Handbook 7002, Logistics Management Procedures The Equipment Category Barcode Label contains the equipment entry number, serial number, station number, and asset description. Process Activity Name: ITAM Validate Barcode Label ITAM Prepare Barcode Label ITAM Crosscheck Barcode Label to Equipment The Logistics Staff validates barcode labels. The Logistics Staff ensures the barcode labels are affixed to the asset or are provided to the IT Asset Manager. The IT Asset Manager or designee verifies the information on the label matches the information on the asset. No equipment is placed "in use" without a proper barcode label affixed. Automated Engineering Management System/Medical Equipment Report System Barcode Labels Companion List to Barcode Labels Replacement Automated Engineering Management System/Medical Equipment Report System Barcode Labels Logistics Staff Automated Engineering Management System/Medical Equipment Report System Extract Report VA Handbook 7002, Logistics Management Procedures 100
106 This step tests and verifies that the barcode label was affixed to the asset properly (i.e. not printed poorly or attached with creases, tears, hard to read location, etc.) and can be read by a scanner. When uploaded back to AEMS/MERS it provides an initial Physical Inventory Date that is used on the Information Technology Inventory Compliance portal calculations. The Companion List is from AEMS/MERS. Process Activity Name: ITAM Crosscheck Barcode Label to Equipment ITAM Validate Barcode Label ITAM-2.2-DEC01 Hold in Logistics? The IT Asset Manager, or designee, crosscheck's barcode labels to equipment. The IT Asset Manager has a third party (an entity other than the Logistics Staff) conduct a manual/physical crosscheck of equipment entry numbers, equipment description, and serial numbers to ensure they match to the barcode labels. Automated Engineering Management System/Medical Equipment Report System Barcode Labels NX Catalog Validation Report Replacement Barcode Labels (if needed) IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report VA Handbook 7002, Logistics Management Procedures Internal Quality Control checks are conducted by the IT Asset Manager to ensure the barcode label being printed can be read by the barcode scanner. 101
107 This activity is a Best Practice to help with General Accounting Office recommendations. Process Activity Name: ITAM-2.3 Manage Assets in Storage ITAM-2.2-DEC01 Hold in Logistics? ITAM-2.4 Prepare Assets for Deployment The sub-process ITAM-2.3 Manage Assets in Storage cycles through the following dependent activities. - ITAM Receive Equipment from Logistics - ITAM Obtain Secure Storage Space - ITAM Limit Access to Storerooms - ITAM Scan Equipment Into Storage - ITAM Perform Periodic Inventory Scans - ITAM Prepare Deployment Plan Process Activity Name: ITAM Receive Equipment from Logistics ITAM-2.2-DEC01 Hold in Logistics? ITAM Obtain Secure Storage Space The Information Technology (IT) Staff receives equipment from Logistics. The IT Staff takes receipt of the equipment from Logistics. A copy of the Integrated Funds Distribution, Control Point Activity, Accounting and Procurement System (IFCAP) Receiving Report is presented for signature by the IT Staff at transfer. Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) System Receiving Report Signed Integrated Funds Distribution, Control Point Activity, Accounting and Procurement System Receiving Report 102
108 IT Staff None Listed IFCAP Requirements Analysts User's Guide VA Handbook 7002, Logistics Management Procedures The VA standard is 95% of all assets must be deployed with 90 days of receipt into storage. Only certain authorized Information Technology personnel can sign for equipment per the VA Handbook 7002, Logistics Management Procedures. Written authorization comes from Facility Chief Information Officer. Copies of the Signed Receiving Report are sent to Logistics and the IT Asset Manager. Process Activity Name: ITAM Obtain Secure Storage Space ITAM Receive Equipment from Logistics ITAM Limit Access to Storerooms The Facility Chief Information Officer (FCIO) obtains secure storage space for equipment. The FCIO working with Information Technology (IT) Staff (Custodial Official) identifies storage space and oversees needed modifications to secure the space such as re-keying access doors. The FCIO makes arrangements with security, law enforcement management and engineering management limiting access to IT Staff. If any staging, informal or temporary storage space is required the FCIO or delegate will abide by the physical security requirements for these spaces as outlined in VA Handbook 0730/4, Appendix B. These requirements include re-keying, access control, and no overall access; refer to VA Directive 0730/4 for additional requirements on security of temporary, informal, and staging area space. Install a suitable partition in the interstitial space which prevents "up and over" access. The FCIO or delegate will notify police and security of the newly created space so that these areas are included in the routine security checks. Floor Plan (Temporary Storage) Lock Inventory 103
109 Physical Security Space List Updated Floor Plan (Temporary Storage) Updated Lock Inventory Updated Physical Security Space List Facility Chief Information Officer None Listed VA Handbook 0730/4, Security and Law Enforcement VA Handbook 7002, Logistics Management Procedures The VA standard is 95% of all assets must be deployed with 90 days of receipt into storage. Space Committees are in place to help identify secure storage locations. In many cases no artifacts are created as suitable storage space already exists. Process Activity Name: ITAM Limit Access to Storerooms ITAM Obtain Secure Storage Space ITAM Scan Equipment Into Storage The IT Asset Manager limits access to storerooms used for storing equipment prior to deployment. The IT Asset Manager provides security during the workday for these locations and works with VA Police to ensure after hours security at these locations. Updated Floor Plan (Temporary Storage) Updated Lock Inventory Updated Physical Security Space List 104
110 Security Logs IT Asset Manager None Listed VA Handbook 0730/4, Security and Law Enforcement VA Handbook 7002, Logistics Management Procedures IT Asset Management Council was established to develop the security measures in VA Handbook 0730/4, Security and Law Enforcement. Process Activity Name: ITAM Scan Equipment Into Storage ITAM Limit Access to Storerooms ITAM Perform Periodic Inventory Scans The Information Technology (IT) Staff scans and moves equipment into storage locations. The IT Staff scans the barcode labels, changes the physical location to the IT storage location, and uploads the information to the Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS). Automated Engineering Management System/Medical Equipment Report System Records Updated Automated Engineering Management System/Medical Equipment Report System Records 105
111 IT Staff Automated Engineering Management System/Medical Equipment Report System Extract Report Barcode Scanner VA Handbook 7002, Logistics Management Procedures AEMS/MERS Equipment Barcode and Location Space Labels are updated with physical inventory date and location fields in the records. Process Activity Name: ITAM Perform Periodic Inventory Scans ITAM Scan Equipment Into Storage ITAM Prepare Deployment Plan The IT Asset Manager, or designee, performs periodic inventory scans of equipment in secured storage locations to maintain inventory accuracy. The IT Asset Manager performs periodic and annual inventory scans of the storeroom locations updating the date and location fields per the General Accountability Office (GAO) audit informal recommendations. Automated Engineering Management System/Medical Equipment Report System Records Updated Automated Engineering Management System/Medical Equipment Report System Records IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report Barcode Scanner 106
112 None Listed Performing periodic inventory scans is considered a Best Practice. Process Activity Name: ITAM Prepare Deployment Plan ITAM Perform Periodic Inventory Scans ITAM-2.4 Prepare Assets for Deployment The Facility Chief Information Officer (FCIO) or designee reviews the Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS) records and prepares a deployment plan based on facility requirements. Facility Requirements Deployment Plan Facility Chief Information Officer Automated Engineering Management System/Medical Equipment Report System Extract Report Field Operations WIKI Knowledge Repository Region 1 Activations, Expansions, Upgrades and Refresh Portal VA IT Inventory Control Knowledge Center None Listed To access other Activation Portals contact the Region's ITAM Division Chiefs or RILO's. The contact information is available using the VA IT Inventory Control Knowledge Center listed in Tools. 107
113 Process Activity Name: ITAM-2.4 Prepare Assets for Deployment ITAM-2.2-DEC01 Hold in Logistics? Or ITAM-2.3 Manage Assets in Storage ITAM-2.5 Manage Deployed Assets The sub-process ITAM-2.4 Prepare Assets for Deployment cycles through the following dependent activities. - ITAM Scan for Deployment to Staging Area - ITAM Validate Updated Location Process Activity Name: ITAM Scan for Deployment to Staging Area ITAM-2.2-DEC01 Hold in Logistics? Or ITAM-2.3 Manage Assets in Storage ITAM Validate Updated Location The IT Asset Manager, or designee, scans all equipment removed from storage and placed into the staging area for deployment, as applicable. Automated Engineering Management System/Medical Equipment Report System Barcode Labels Deployment Plan Location Door Tags Updated Automated Engineering Management System/Medical Equipment Report System Records 108
114 IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report Barcode Scanner VA Directive 6500, Managing Information Security Risk: VA Information Security Program VA Handbook 0730/4, Security and Law Enforcement VA Handbook 7002, Logistics Management Procedures None Listed Process Activity Name: ITAM Validate Updated Location ITAM Scan for Deployment to Staging Area ITAM-2.5 Manage Deployed Assets The IT Asset Manager, or designee, validates the locations of assets deployed to staging areas are updated successfully in Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS). The Asset Manager physically delivers the assets to staging areas. Automated Engineering Management System/Medical Equipment Report System Barcode Labels Updated Automated Engineering Management System/Medical Equipment Report System Records IT Asset Manager 109
115 Automated Engineering Management System/Medical Equipment Report System Extract Report VA Handbook 7002, Logistics Management Procedures This is a Best Practice Quality Check step to ensure accurate AEMS/MERS Physical Inventory Date and Location Field Data. Process Activity Name: ITAM-2.5 Manage Deployed Assets ITAM-2.4 Prepare Assets for Deployment ITAM-3 Monitor IT Assets The sub-process ITAM-2.5 Manage Deployed Assets cycles through the following dependent activities. - ITAM Remove Assets from Storage - ITAM Update Location Records - ITAM Obtain End-User Signature - ITAM Deploy Asset Process Activity Name: ITAM Remove Assets from Storage ITAM-2.4 Prepare Assets for Deployment ITAM Update Location Records The Logistics Staff moves all items, in collaboration with Information Technology Staff, from secured storage into staging areas for deployment. Automated Engineering Management System/Medical Equipment Report System Records Staged Information Technology Equipment 110
116 Logistics Staff Automated Engineering Management System/Medical Equipment Report System Extract Report Barcode Scanner VA Handbook 7002, Logistics Management Procedures Logistics is not required to maintain a running inventory at this stage. Process Activity Name: ITAM Update Location Records ITAM Remove Assets from Storage ITAM DEC01 Mobile / Loaned Equipment? Information Technology (IT) Staff tracks and updates locations when assets are moved from secure storage. The IT Staff uploads new Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS) location records. Assets not physically located within a VA supported facility (i.e. laptops, telecommuter equipment, etc.) need to reflect the offsite location using the IT REMOTE LOCATION, LOCATION, and COMMENTS field in AEMS/MERS. Automated Engineering Management System/Medical Equipment Report System Records Updated Automated Engineering Management System/Medical Equipment Report System Records IT Staff 111
117 Automated Engineering Management System/Medical Equipment Report System Extract Report Barcode Scanner VA Handbook 7002, Logistics Management Procedures Changing AEMS/MERS location by the IT Staff is part of the new IT options in AEMS/MERS. The IT Staff uses the AEMS/MERS IT Owner Menu to update the Inventory Edit fields. Inventory Edit Options allows OIT to edit the record for existing piece of equipment. Only equipment that has a CMR/EIL with IT TRACKING set to YES is to be updated. This option is locked with the EN IT INVENTORY Security Key. Process Activity Name: ITAM DEC01 Mobile / Loaned Equipment? ITAM Update Location Records If yes, ITAM Obtain End-User Signature. Or If no, ITAM Deploy Asset Note: There is a decision dependency that determines the next activity to complete: If the equipment is mobile / loaned equipment the next activity to complete is ITAM Obtain End-User Signature. If the equipment is not mobile / loaned equipment the next activity to complete is ITAM Deploy Asset IT Staff Process Activity Name: ITAM Obtain End-User Signature ITAM DEC01 Mobile / Loaned Equipment? ITAM Deploy Asset 112
118 The Information Technology (IT) Staff obtains end-user signature electronically or physically for mobile / loaned equipment. There are two methods for collection signatures, one is with the VistA account and the second is printing a hard copy of the receipt from Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS) for signature by the end-user. Automated Engineering Management System/Medical Equipment Report System Records Updated Automated Engineering Management System/Medical Equipment Report System Records VA Form 0887, VA Property Loan Form IT Staff Automated Engineering Management System/Medical Equipment Report System Extract Report IT Equipment Module The form generated from AEMS/MERS may be used in lieu of VA Form 0887, VA Property Loan Form. IT Staff uses AEMS/MERS menu to assign responsibilities. Changing AEMS/MERS location by the IT Staff is part of the new IT options in AEMS/MERS. The IT Staff uses the AEMS/MERS IT Owner Menu to update the Inventory Edit fields. Best practice is to create a "Mobile Use" location and assign all portable assets that are used in a telework or issued to an individual to this mobile use location. Process Activity Name: ITAM Deploy Asset ITAM DEC01 Mobile / Loaned Equipment? Or 113
119 ITAM Obtain End-User Signature ITAM-3 Monitor IT Assets The Information Technology (IT) Staff deploys the asset. All movement of IT Equipment is scanned into Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS). Assets issued to individuals such as laptops, BlackBerrys, cell phones, and other portable assets are to be moved to an IT tracked equipment inventory listing and assigned at the user level. Automated Engineering Management System/Medical Equipment Report System Records Updated Automated Engineering Management System/Medical Equipment Report System Records Updated Equipment Inventory Listing (See more information) IT Staff Automated Engineering Management System/Medical Equipment Report System Extract Report IT Equipment Module The automated hand receipt generated from the Equipment Inventory Listing is used in lieu of VA Form 0887, Property Pass. Process Activity Name: ITAM-3 Monitor IT Assets ITAM-2 Deploy and Manage IT Assets ITAM-4 Dispose IT Assets 114
120 The sub-process ITAM-3 Monitor IT Assets cycles through the following dependent activities. - ITAM-3.1 Verify Inventory Data Records - ITAM-3.2 Monitor Inventory Process - ITAM-3.3 Track Movement of Non-Expendable Asset - ITAM-3.4 Receive Notification of Annual Inventory - ITAM-3.5 Perform Annual Inventory Reconciliation - ITAM-3.6 Monitor Perpetual Inventory Process Process Activity Name: ITAM-3.1 Verify Inventory Data Records ITAM-2.5 Manage Deployed Assets ITAM-3.2 Monitor Inventory Process The Logistics Staff verifies all required fields within Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS) records are complete. This process is completed jointly with IT Asset Manager and IT Staff. Automated Engineering Management System/Medical Equipment Report System Records VA IT Inventory Compliance Portal Records Updated Automated Engineering Management System/Medical Equipment Report System Records Updated VA IT Inventory Compliance Portal Records Logistics Staff Automated Engineering Management System/Medical Equipment Report System Extract Report VA IT Inventory Compliance (IIC) Portal IT Performance Dashboard 115
121 None Listed The VA IT Inventory Compliance (IIC) Portal shows details of assets by location for reporting to Management. The IT Performance Dashboard contains key information for each region. Process Activity Name: ITAM-3.2 Monitor Inventory Process ITAM-3.1 Verify Inventory Data Records ITAM-3.3 Track Movement of Non-Expendable Assets The sub-process ITAM-3.2 Monitor Inventory Process cycles through the following dependent activities. - ITAM Prepare Inventory Schedule - ITAM Conduct Annual Inventory Scan Process Activity Name: ITAM Prepare Inventory Schedule ITAM-2.5 Manage Deployed Assets ITAM Conduct Annual Inventory Scans The IT Asset Manager, or designee, prepares a monthly inventory schedule per the perpetual inventory process. Automated Engineering Management System/Medical Equipment Report System Records Floor Plans Inventory Schedule IT Asset Manager 116
122 Automated Engineering Management System/Medical Equipment Report System Extract Report VA Handbook 7002, Logistics Management Procedures The IT Asset Manager prepares a schedule for going floor by floor and building by building to count all inventory over the course of a year. Process Activity Name: ITAM Conduct Annual Inventory Scans ITAM Prepare Inventory Schedule ITAM-3.3 Track Movement of Non-Expendable Assets The IT Asset Manager, or designee, conducts an annual inventory scan. The IT Asset Manager ensures IT staff systematically scans all equipment in each building at least once per year per VA Standard 7002, Logistics Management Procedures. Automated Engineering Management System/Medical Equipment Report System Records Inventory Schedule Updated Automated Engineering Management System/Medical Equipment Report System Records IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report VA IT Inventory Compliance (IIC) Portal VA Handbook 7002, Logistics Management Procedures The IT Inventory Compliance Portal is a dashboard display of current status and historical performance. 117
123 Process Activity Name: ITAM-3.3 Track Movement of Non-Expendable Assets ITAM-3.2 Monitor Inventory Process ITAM-3.4 Receive Notification of Annual Inventory Information Technology (IT) Staff tracks the movement of non-expendable assets by scanning equipment and uploading the updated location information and physical inventory date into Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS). The AEMS/MERS Exception Report is an artifact used to identify equipment that has not been inventoried in the last twelve months. Automated Engineering Management System/Medical Equipment Report System Records VA IT Inventory Compliance Portal - Exception Report Updated Automated Engineering Management System/Medical Equipment Report System Records Updated VA IT Inventory Compliance Portal - Exception Report IT Staff Automated Engineering Management System/Medical Equipment Report System Extract Report VA IT Inventory Compliance (IIC) Portal IT Performance Dashboard VA Handbook 7002, Logistics Management Procedures The IT Inventory Compliance Portal is a dashboard display of current status and historical performance. The IT Performance Dashboard contains key information for each region. 118
124 Process Activity Name: ITAM-3.4 Receive Notification of Annual Inventory ITAM-3.3 Track Movement of Non-Expendable Assets ITAM-3.5 Perform Annual Inventory Reconciliation The IT Custodial Officer or designee receives notification from Logistics to conduct the annual inventory based on the last inventory anniversary date. A reminder notification is provided ninety days prior to the Official Notification Memo for the annual inventory. The IT Custodial Officer obtains a working copy of the Exception Report. Twenty working days prior to the anniversary month of the EIL or the annual reconciliation date, Logistics will prepare an exception report capturing any items on the EIL that have not been inventoried in the previous 365 days. Items inventoried within the preceding 365 days to the 1st day of the current anniversary month will be excluded from the current exception report. Equipment Inventory Listing Inventory by Exception Report Official Notification Memo (Annual Inventory) Update Equipment Inventory Listing IT Custodial Officer Automated Engineering Management System/Medical Equipment Report System Extract Report VA IT Inventory Compliance (IIC) Portal VA Handbook 7002, Logistics Management Procedures The preferred method of running an exception list is from the local vista system, however, the IT Inventory Compliance Portal, which is updated on a weekly basis, may be used by the custodial officer to identify those assets that have not been inventoried in the past 365 days. 119
125 Process Activity Name: ITAM-3.5 Perform Annual Inventory Reconciliation ITAM-3.4 Receive Notification of Annual Inventory ITAM-3.6 Monitor Perpetual Inventory Process The sub-process ITAM-3.5 Perform Annual Inventory Reconciliation cycles through the following dependent activities. - ITAM Produce Exception Listing - ITAM Reconcile Exception Listing - ITAM Perform Annual Inventory - ITAM Generate Report of Survey Form - ITAM Submit EIL - ITAM Perform 5% Verification Process Activity Name: ITAM Produce Exception Listing ITAM-3.4 Receive Notification of Annual Inventory ITAM Reconcile Exception Listing The Logistics Staff produces the inventory exception lists for Equipment Inventory Listings. The Accountable Officer and the Facility Chief Information Officer agree on a date range for the creation of the exception listing. Twenty working days prior to the anniversary month of the EIL or the annual reconciliation date, Logistics will prepare an exception report capturing any items on the EIL that have not been inventoried in the previous 365 days. Items inventoried within the preceding 365 days to the 1st day of the current anniversary month will be excluded from the current exception report. Automated Engineering Management System/Medical Equipment Report System Records Class 1 Exception Listing 120
126 Updated Class 1 Exception Listing Logistics Staff Automated Engineering Management System/Medical Equipment Report System Extract Report VA IT Inventory Compliance (IIC) Portal VA Handbook 7002, Logistics Management Procedures The preferred method of running an exception list is from the local vista system, however, the IT Inventory Compliance Portal, which is updated on a weekly basis, may be used by the custodial officer to identify those assets that have not been inventoried in the past 365 days. Process Activity Name: ITAM Reconcile Exception Listing ITAM Produce Exception Listing ITAM Perform Annual Inventory The IT Asset Manager, or designee, reconciles/locates all equipment included in the Class 1 Exception Listing and creates a Reconciled Exception Listing Report. Any assets appearing on the Reconciled Exception Listing Report with the last physical inventory date of greater than one year that cannot be located is added to VA Form 1217, Report of Survey. Automated Engineering Management System/Medical Equipment Report System Records Updated Class 1 Exception Listing Reconciled Class 1 Exception Listing Report VA Form 1217, Report of Survey IT Asset Manager 121
127 Automated Engineering Management System/Medical Equipment Report System Extract Report VA IT Inventory Compliance (IIC) Portal VA Handbook 7002, Logistics Management Procedures As locations become more proficient with the perpetual inventory process fewer items are anticipated to appear on the Exception Listing report. All annual inventory reconciliation must be completed within ten working days for less than 100 items on the Equipment Inventory Listing (EIL) and within twenty working days for 100 or more items appearing on the EIL per the VA Handbook 7002, Logistics Management Procedures. Process Activity Name: ITAM Perform Annual Inventory ITAM Reconcile Exception Listing ITAM DEC01 Missing Equipment? The IT Asset Manager, or designee, performs the annual inventory as required in VA Handbook 7002, Logistics Management Procedures. The IT Asset Manager locates all equipment with scan dates greater than one year. Automated Engineering Management System/Medical Equipment Report System Records Reconciled Class 1 Exception Listing Report Updated Automated Engineering Management System/Medical Equipment Report System Records IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report VA IT Inventory Compliance (IIC) Portal 122
128 Barcode Scanner None Listed As locations become more proficient with the perpetual inventory process fewer items are anticipated to appear on the Exception Listing report. All annual Consolidated Memorandum of Receipt reconciliation must occur within ten working days for less than 100 items on the Equipment Inventory Listing (EIL) and within twenty working days for 100 or more items appearing on the EIL per the VA Handbook 7002, Logistics Management Procedures. Process Activity Name: ITAM DEC01 Missing Equipment? ITAM Perform Annual Inventory If yes, ITAM Generate Report of Survey Form Or If no, ITAM Submit EIL Note: There is a decision dependency that determines the next activity to complete: If there is missing equipment the next activity to complete is ITAM Generate Report of Survey Form. If there is no missing equipment the next activity to complete is ITAM Submit EIL. IT Asset Manager Process Activity Name: ITAM Generate Report of Survey Form ITAM DEC01 Missing Equipment? ITAM Submit EIL The IT Asset Manager, or designee, generates VA Form 1217, Report of Survey form for all equipment not found during reconciliation and sends the form to the Facility Chief Information 123
129 Officer. The IT Asset Manager conducts a preliminary investigation and alerts the Information Security Officer and VA Police of any assets not found prior to generating the Report of Survey form. Findings from the preliminary investigation are submitted on VA Form 1217, Report of Survey. Any assets appearing on the Exception Listing Report with the last physical inventory date greater than one year that cannot be located are added to VA Form 1217, Report of Survey. Automated Engineering Management System/Medical Equipment Report System Records Reconciled Class 1 Exception Listing Report VA Form 1217, Report of Survey IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report VA Handbook 7002, Logistics Management Procedures None Listed Process Activity Name: ITAM Submit EIL ITAM DEC01 Missing Equipment? Or ITAM Generate Report of Survey Form ITAM Perform 5% Verification The Facility Chief Information Officer (FCIO) submits a signed the Equipment Inventory List (EIL) upon completion of the inventory. If applicable, the FCIO submits a signed Report of Survey. 124
130 Equipment Inventory List VA Form 1217, Report of Survey Certified Equipment Inventory List Updated VA Form 1217, Report of Survey (Signed) Facility Chief Information Officer None Listed VA Handbook 7002, Logistics Management Procedures The FCIO signature certifies the EIL Process Activity Name: ITAM Perform 5% Verification ITAM Submit EIL ITAM-3.6 Monitor Perpetual Inventory Process The Logistics Staff coordinates and leads the 5% independent verification and validation inventory process. This a double check to the Equipment Inventory Listing reconciliation. The VA Handbook 7002, Logistics Management Procedures requires three parties be involved to include, Logistics Staff, IT Staff, and one disinterested party. Automated Engineering Management System/Medical Equipment Report System Extract/Listing Certified Equipment Inventory List 125
131 Updated Automated Engineering Management System/Medical Equipment Report System Records Logistics Staff Automated Engineering Management System/Medical Equipment Report System Extract Report VA Handbook 7002, Logistics Management Procedures Some locations have the 5% option listed as a menu item on the AEMS/MERS system. The 5% independent verification is to be done within ten working days of the completion of the EIL inventory. If the inventory reconciliation rate falls below 95%, then another physical inventory must be completed within six months. Process Activity Name: ITAM-3.6 Monitor Perpetual Inventory Process ITAM-3.5 Perform Annual Inventory Reconciliation ITAM-4 Dispose IT Assets The IT Asset Manager, or designee, monitors the status of the perpetual inventory process and monitors the compliance status of the assets per the VA Logistics Policy and the General Accountability Office recommendations. There is a local requirement for the IT Staff to maintain control of equipment in possession of IT for deployment and turn-in. Automated Engineering Management System/Medical Equipment Report System Records Compliance Portal Charts, Reports and Extracts Input to Regional Director, FCIO and IT Staff Performance Plans via Annual Reviews Updated Automated Engineering Management System/Medical Equipment Report System Records 126
132 IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report VA IT Inventory Compliance (IIC) Portal VA Handbook 7002, Logistics Management Procedures When completed in a future ProPath release, this sub-process, Monitor Perpetual Inventory Process, is to consist of additional activities with associated artifacts, tools, and standards.. Process Activity Name: ITAM-4 Dispose IT Assets ITAM-3 Monitor IT Assets None The sub-process ITAM-4 Dispose IT Assets cycles through the following dependent activities. - ITAM-4.1 Prepare Equipment for Turn-In - ITAM-4.2 Sanitize Equipment - ITAM-4.3 Submit Electronic Turn-In Request - ITAM-4.4 Validate Turn-In Date - ITAM-4.5 Coordinate Transfer to Logistics - ITAM-4.6 Remove Equipment from EIL Process Activity Name: ITAM-4.1 Prepare Equipment for Turn-In ITAM-3 Monitor IT Assets ITAM-4.1-DEC01 Electronic Media? 127
133 The IT Asset Manager, or designee, prepares equipment for turn-in. The IT Asset Manager scans equipment slated for removal from service and placed into a secured staging area. Equipment is received from sources such as: Individuals being off-boarded, Supervisors/Contracting Officer Representative (COR)/IT Asset Manager, or other entities. Automated Engineering Management System/Medical Equipment Report System Records Equipment Barcode and Location Space Labels Physical Inventory Date and Location Updated Automated Engineering Management System/Medical Equipment Report System Records Updated Physical Inventory Date and Location IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report Barcode Scanner VA Handbook 7002, Logistics Management Procedures None Listed Process Activity Name: ITAM-4.1-DEC01 Electronic Media ITAM-4.1 Prepare Equipment for Turn-In If yes, ITAM-4.2 Sanitize Equipment Or If no, ITAM-4.3 Submit Electronic Turn-In Request 128
134 Note: There is a decision dependency that determines the next activity to complete: If the asset has an electronic media device the next activity to complete is ITAM-4.2 Sanitize Equipment. If the asset does not have an electronic media device the next activity to complete is ITAM-4.3 Submit Electronic Turn-In Request IT Asset Manager Process Activity Name: ITAM-4.2 Sanitize Equipment ITAM-4.1-DEC01 Electronic Media? ITAM-4.3 Submit Electronic Turn-In Request The Information Technology (IT) Staff sanitizes equipment with onboard electronic media devices, such as computers, BlackBerrys, PDA's, cell phones, and other devices referenced in VA Handbook , Electronic Media Sanitization prior to turn-in or transfer. The VA Handbook documents the sanitization procedures to follow for assets being disposed of as well as assets being transferred to other VA locations. The IT Staff documents the sanitization utilizing VA Form 0751, Sanitization Certificate, and if required, places the electronic media devices in a secure area. If the turned-in equipment is to be transferred, the IT Asset Manager ensures VA Form 134, Combination Requisition and Shipping Ticket, accompanies the asset. This process requires signatures from the Information Security Officer, the Facility Chief Information Officer, and IT staff person who performed the sanitization. Automated Engineering Management System/Medical Equipment Report System Records Equipment Barcode Label Equipment / Turn-In Request package in VistA Sanitized Equipment VA Form 0751, Information Technology Sanitization Certificate VA Form 134, Combination Requisition and Shipping Ticket 129
135 IT Staff Automated Engineering Management System/Medical Equipment Report System Extract Report Barcode Scanner MP-6 Electronic Media Sanitization SOP VA Handbook , Electronic Media Sanitization VA Handbook 7002, Logistics Management Procedures VA Handbook 0730/4, Security and Law Enforcement VA Handbook 7348, Utilization and Disposal of Personal Property All equipment items containing any form of media, including electronic storage, spent thermal printer ribbons, or any printed output, which, if released to the general public, could cause a breach in security or confidentiality for the Veteran or employee, are to be sanitized prior to turning in for disposal action. This sanitization process is to be documented on VA Form 0751, IT Equipment Sanitization Certificate accompanied by a turn in document, and furnished to Logistics Service by IT personnel once the process is complete. If an asset uses any form of electronic media and is not being transferred, the hard drives or removable storage media must be labeled/marked (using indelible ink) with the Equipment Entry (EE) number of the equipment it was removed from taking care not to label/write over the serial number. If there are multiple drives, they should be labeled/marked 1/3, 2/3, 3/3, as appropriate to the associated quantity. All removed media is turned over to the Information Security Officer for secured storage and timely disposal. Electronic media devices awaiting sanitization are secured in a controlled environment per VA Handbooks 6500 and and VHA Handbook 0730/1, Security and Law Enforcement. The VA Form 0751, Sanitization Certificate, (documented with the AEMS/MERS/ Equipment Barcode Label with Asset ID Number) accompanies all assets with electronic media devices to final disposal. (Must accompany the turn in documentation). Process Activity Name: ITAM-4.3 Submit Electronic Turn-In Request ITAM-4.1-DEC01 Electronic Media? Or ITAM-4.2 Sanitize Equipment 130
136 ITAM-4.4 Validate Turn-In Date The IT Asset Manager, or designee, submits electronic turn-in requests. The IT Asset Manager uses Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS) menu option [PRCN TURN ENTER] to submit items for turn-in. If the turnedin asset is to be transferred to another VA facility, the IT Asset Manager uses VA Form 134, Combination Requisition and Shipping Ticket, ensuring the all applicable asset data available from the VA IT Inventory Compliance (IIC) Portal is included on the form. Automated Engineering Management System/Medical Equipment Report Equipment System Status Automated Engineering Management System/Medical Equipment Report System Equipment Barcode Labels VA Form 0751, Sanitization Certificate VA Form 134, Combination Requisition and Shipping Ticket Electronic Turn-In Request Report Updated Automated Engineering Management System/Medical Equipment Report System Status ("Turn-In Date") IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report Barcode Scanner VA Handbook 7002, Logistics Management Procedures VA Form 0751, Sanitization Certificate or if applicable, VA Form 134, Combination Requisition and Shipping Ticket, travels with the asset throughout the turn-in process. Process Activity Name: ITAM-4.4 Validate Turn-In Date ITAM-4.3 Submit Electronic Turn-In Request 131
137 ITAM-4.5 Coordinate Transfer to Logistics The IT Asset Manager, or designee, validates that the Automated Engineering Management System/Medical Equipment Report System (AEMS/MERS) record(s) for items on the electronic turn-in have an entry in the "Turn-In Date" field corresponding to the date the electronic turn-in was approved. Automated Engineering Management System/Medical Equipment Report System Equipment Barcode Labels Electronic Turn-In Request Report VA Form 0751, Sanitization Certificate VA Form 134, Combination Requisition and Shipping Ticket Updated Automated Engineering Management System/Medical Equipment Report System Status IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report VA Handbook 7002, Logistics Management Procedures The IT Asset Manager validating the status has been updated in AEMS/MERS serves as a Quality Control Check.VA Form 0751, Sanitization Certificate or if applicable, VA Form 134, Combination Requisition and Shipping Ticket travels with the asset throughout the turn-in process. Process Activity Name: ITAM-4.5 Coordinate Transfer to Logistics ITAM-4.4 Validate Turn-In Date ITAM-4.6 Remove Equipment from EIL The IT Asset Manager, or designee, coordinates and controls the turn-in of all equipment staged for disposition with the Logistics Staff. 132
138 Electronic Turn-In Request Report VA Form 0751, Sanitization Certificate VA Form 134, Combination Requisition and Shipping Ticket Updated Electronic Turn-In Request Report IT Asset Manager Automated Engineering Management System/Medical Equipment Report System Extract Report VA Handbook 7002, Logistics Management Procedures The IT Asset Manager coordinates the transfer of assets to Logistics Staff via s, outlook calendar events, and phone calls.va form 0751, Sanitization Certificate or if applicable, VA Form 134, Combination Requisition and Shipping Ticket, travels with the asset throughout the turn-in process. Process Activity Name: ITAM-4-6 Remove Equipment from EIL ITAM-4.5 Coordinate Transfer to Logistics None The Logistics Staff removes equipment from the Information Technology operations Equipment Inventory List (EIL). Logistics Staff moves the asset record from 78 series EIL to a Logistics EIL which transfers accountability to Logistics while disposition is pending. Equipment Inventory Listing Updated Electronic Turn-In Request Report VA Form 0751, Sanitization Certificate 133
139 VA Form 134, Combination Requisition and Shipping Ticket Updated Equipment Inventory Listing Logistics Staff Automated Engineering Management System/Medical Equipment Report System Extract Report VA Handbook 7002, Logistics Management Procedures This activity is a quality check performed to verify that disposed equipment no longer appears on the EIL.VA Form 0751, Sanitization Certificate and if applicable, VA Form 134, Combination Requisition and Shipping Ticket, travels with the asset throughout the turn-in process. END OF PROCESS 134
Asset management guidelines
Asset management guidelines 1 IT asset management (ITAM) overview Objective Provide a single, integrated view of agency assets in order to allow agencies to identify the asset location and assess the potential
Project Initiation. ProPath. Office of Information and Technology
Project Initiation ProPath Office of Information and Technology Table of Contents Project Initiation Process Maps... 1 Process: Project Initiation... 10 Project Initiation and Goals... 12... 12 Goals...
Project Monitoring and Control
Project Monitoring and Control ProPath Office of Information and Technology Table of Contents Project Monitoring and Control Process Maps... 1 Process: Project Monitoring and Control... 10 Project Monitoring
4.0 Receiving Process
4.0 Receiving Process Delivery of requested products or services marks a transition in the Purchase-to-Pay process from a purchasing activity to a payables activity. All purchases must be received to release
Software Asset Management on System z
Software Asset Management on System z Mike Zelle Tivoli WW IT Asset Management Marketing SAM in SHARE Project Manager [email protected] Agenda Why Software Asset Management (SAM) The Discipline of Software
Product Build. ProPath. Office of Information and Technology
Product Build ProPath Office of Information and Technology Table of Contents Product Build Process Maps... 1 Process: Product Build... 3 Product Build and Goals... 4... 4 Goals... 4 Product Build RACI
Chapter 10 Receiving, Inspection, Acceptance Testing and Acceptance or Rejection
Chapter 10 Receiving, Inspection, Acceptance Testing and Acceptance or Rejection Table of Contents Receiving, Inspection, Acceptance Testing and Acceptance or Rejection...1 Chapter 10...3 Receiving, Inspection,
Track Em Version 3.1
Track Em Version 3.1 Getting Started Guide Table of Contents Introduction 3 Running Track Em over a Network 4 Testing Portable Scanner Communications 4 General Startup Steps 5 Assets (items with unique
Software Licenses Managing the Asset and Related Risks
AUDITOR GENERAL S REPORT ACTION REQUIRED Software Licenses Managing the Asset and Related Risks Date: February 4, 2015 To: From: Wards: Audit Committee Auditor General All Reference Number: SUMMARY The
O.R.C. 5120.01; 5120.22
STATE OF OHIO SUBJECT: PAGE 1 OF 7 Inventory, Donation, Transfer & Disposal of DRC IT Hardware & NUMBER: 05-OIT-21 Software RULE/CODE REFERENCE: O.R.C. 5120.01; 5120.22 SUPERSEDES: 05-OIT-21 dated 09/13/11
Welcome to the topic on purchasing items.
Welcome to the topic on purchasing items. In this topic, we will perform the basic steps for purchasing items. As we go through the process, we will explain the consequences of each process step on inventory
Attachment Y SaaS ITSM Demonstration and Scenarios
Attachment Y SaaS ITSM Demonstration and Scenarios Demonstration and Oral Presentation Agenda In accordance with Section 1.16 of the RFP, each Presenter will be provided a 3 hour time period to discuss
Office of Small and Disadvantage Business Utilization (OSDBU) Logistics Support Contract
Office of Small and Disadvantage Business Utilization (OSDBU) Logistics Support Contract 1. Introduction. The Department of Veteran Affairs (VA) Office of Small and Disadvantaged Business Utilization (OSDBU)
FIXED ASSET CAPITALIZATION POLICY
FIXED ASSET CAPITALIZATION POLICY I. Who is responsible II. IV. Fixed Assets A. Definition B. Acquiring Fixed Assets C. Receiving Fixed Assets D. Adjustmens of Fixed Assets E. Temp Loans F. Repairs Inventory
Washington Headquarters Services ADMINISTRATIVE INSTRUCTION
Washington Headquarters Services ADMINISTRATIVE INSTRUCTION NUMBER 94 October 19, 2007 Incorporating Change 1, February 19, 2008 DFD SUBJECT: Personal Property Management and Accountability References:
BMC Remedyforce Asset Management. Frequently Asked Questions
BMC Remedyforce Frequently Asked Questions Table of Contents BMC Remedyforce 2 Overview 2 Frequently Asked Questions 2 Definitions 2 1. What is Configuration Management? 2 2. What is IT? 2 3. What is a
integrate 2 Business Process Redesign: Business Process Recommendations Asset Management May 31, 2013
integrate 2 Business Redesign: Business Recommendations Asset Management May 31, 2013 Business Recommendations: Introduction Business Recommendations SUB-PROCESS RECOMMENDATION CONTENTS Recommendations
14 FAH-1 H-110 DELEGATED RESPONSIBILITIES
14 FAH-1 H-100 DELEGATED RESPONSIBILITIES 14 FAH-1 H-110 DEPARTMENT-WIDE MANAGEMENT CONTROLS (Office of Origin: A/LM) 14 FAH-1 H-111 AGENCY PROPERTY MANAGEMENT OFFICER (Uniform State/USAID) a. The Director,
Audit of IT Asset Management Report
Audit of IT Asset Management Report Recommended by the Departmental Audit Committee for approval by the President on Approved by the President on September 4, 2012 e-doc : 3854899 1 Table of Contents EXECUTIVE
MSD Supply Chain Programme Strategy Workshop
MSD Supply Chain Programme Strategy Workshop Day 2 APPENDIX Accenture Development Partnerships Benchmarking MSD s Current Operating Supply Chain Capability 1.0 Planning 2.0 Procurement 3.0 Delivery 4.0
InventoryControl. The Complete Inventory Tracking Solution for Small Businesses
InventoryControl The Complete Inventory Tracking Solution for Small Businesses Get in control of your inventory with Wasp Inventory Control the complete inventory tracking solution for small businesses.
Latitude Warehouse Management System. WMS forretail & Wholesale Distributors.
Latitude Warehouse Management System WMS forretail & Wholesale Distributors. _Gain Inventory Control 1 Benefits of a Warehouse Management System (WMS) vary depending on the current situation, the key advantages
Stock Control Solutions for Small Business
Stock Control Solutions for Small Business Get in control of your stock with Wasp Inventory Control the complete stock management solution for small business. Wasp Inventory Control offers small businesses
Release Management. ProPath. Office of Information and Technology
Release Management ProPath Office of Information and Technology Table of Contents Release Management Process Maps... 1 Process: Release Management... 7 Release Management and Goals... 9... 9 Goals... 9
Appendix D to DIR Contract No. DIR-SDD-2102. SYNNEX Corporation STATEMENT OF WORK / SUPPLEMENTAL AGREEMENT for <DIR CUSTOMER> END USER SERVICES
Appendix D to DIR Contract No. DIR-SDD-2102 SYNNEX Corporation STATEMENT OF WORK / SUPPLEMENTAL AGREEMENT for END USER SERVICES TABLE OF CONTENTS 1. Introduction... 3 2. Term of SOW...
ITSM Process Description
ITSM Process Description Office of Information Technology Incident Management 1 Table of Contents Table of Contents 1. Introduction 2. Incident Management Goals, Objectives, CSFs and KPIs 3. Incident Management
MAXIMO 7 TRAINING GUIDE PURCHASING & RECEIVING FLORIDA INTERNATIONAL UNIVERSITY. P 202.262.2500 3451 NE 1 st Ave M1008 Miami, FL 33137
MAXIMO 7 TRAINING GUIDE PURCHASING & RECEIVING FLORIDA INTERNATIONAL UNIVERSITY P 202.262.2500 3451 NE 1 st Ave M1008 Miami, FL 33137 Table of Contents I CHAPTER 1 THE PURCHASING MODULES...5 1.1 Objectives...
Hardware Inventory Management Greater Boston District
Hardware Inventory Management Greater Boston District Audit Report Report Number IT-AR-15-004 March 25, 2015 Highlights Management does not have an accurate inventory of hardware assets connected to the
LANDesk Data Analytics
LANDesk White Paper LANDesk Data Analytics An innovative, comprehensive approach to managing software and hardware assets Visit www.landesk.com for more information. To the maximum extent permitted under
RIVERSIDE SCHOOL DISTRICT NO. 2 FIXED ASSETS PROCEDURES MANUAL
RIVERSIDE SCHOOL DISTRICT NO. 2 FIXED ASSETS PROCEDURES MANUAL FIXED ASSETS ACQUISITION PROCESS The fixed assets acquisition process is responsible for the proper recording and distributing of any fixed
InventoryControl. The Complete Inventory Tracking Solution for Small Businesses
InventoryControl The Complete Inventory Tracking Solution for Small Businesses Get in control of your inventory with Wasp Inventory Control the complete inventory tracking solution for small businesses.
FIXED ASSETS PROCEDURES
SECTION XI - INVENTORY / FIXED ASSETS FIXED ASSETS PROCEDURES WHO IS RESPONSIBLE? A. Building principals and department managers are accountable for assets/equipment within their immediate area of responsibility.
Lot: a group of product that is unique to time, date and location of manufacture.
Supplier ar Code Labeling Requirements E-43002 1 Scope and Purpose This document establishes requirements for package labeling and date or lot code segregation for suppliers providing material to enchmark
The World of IT Financial Management
The World of IT Financial June 20-24 St. Louis, MO IT Asset Best Practices Seminar Dilbert on Cloud Decision-Making 3 What experience do we have in the room? Name Company / Agency How many years experience
Independent Test and Evaluation
Independent Test and Evaluation ProPath Office of Information and Technology Table of Contents Independent Test and Evaluation Process Maps... 1 Process: Independent Test and Evaluation... 3 Independent
REQUEST FOR PROPOSAL #08-02 FIXED ASSET INVENTORY TRACKING SYSTEM AND RELATED SERVICES
REQUEST FOR PROPOSAL #08-02 FIXED ASSET INVENTORY TRACKING SYSTEM AND RELATED SERVICES Proposals due by 2:00 P.M. on Thursday, April 3, 2008 delivered to: Yonkers Public Schools Purchasing Department One
Norming Asset Management. To make asset management easy and automatic with Sage Accpac ERP
Norming Asset Management To make asset management easy and automatic with Sage Accpac ERP Modules Asset Accounting Asset Maintenance Asset Leasing Asset Tracking Highlights Integrates with Sage Accpac
Attachment Y SaaS ITSM Demonstration and Scenarios. 1. Demonstration and Oral Presentation Agenda
Attachment Y SaaS ITSM Demonstration and Scenarios 1. Demonstration and Oral Presentation Agenda In accordance with Section 1.16 1.5 of the TORFP, each Offeror will be provided a 3 hour 6 hour time period
ULSTER COUNTY COMPTROLLER S OFFICE Elliott Auerbach, Comptroller
ULSTER COUNTY COMPTROLLER S OFFICE Elliott Auerbach, Comptroller July 28, 2015 Review of Internal Controls over IT Equipment The mission of the Ulster County Comptroller s Office is to serve as an independent
Next Generation ITAM in the Cloud: Business Intelligence and Analytics as a Service
Next Generation ITAM in the Cloud: Business Intelligence and Analytics as a Service Frank Venezia, Siwel Consulting, Inc. Steffani Lomax, Siwel Consulting, Inc. White Paper - May 2012 SM Next Generation
Administrative Policies and Procedures Manual 801 PURCHASING GOODS AND SERVICES
VER: 1.0 CSA Review Date: 12/2008 Revised: 12/2008 Administrative Policies and Procedures Manual 801 PURCHASING GOODS AND SERVICES POLICY Purchases shall be made by: a purchase order issued by the Administrative
ASSET MANAGEMENT TABLE OF CONTENTS
ASSET MANAGEMENT TABLE OF CONTENTS Strategic Value... 2 Department Objectives... 2 Programs... 2 Acquisitions... 2 Inventory... 2 Surplus Property... 2 Internet Sales... 3 PC Shop... 3 Construction Accounting...
EXHIBIT MATERIALS MANAGEMENT REQUIREMENTS FOR CONTRACTED STORAGE PROVIDERS
EXHIBIT MATERIALS MANAGEMENT REQUIREMENTS FOR CONTRACTED STORAGE PROVIDERS TABLE OF CONTENTS 1. General 1.1. Purpose 1.2. Scope 1.3. Target groups and responsibility 1.3.1. Target groups 1.3.2. Roles and
Inventory Management and Tracking System. Frequently Asked Questions
Inventory Management and Tracking System Frequently Asked Questions System Information 1. What is IMATS? 2. What is IMATS Connect? 3. How was IMATS developed? 4. My state already has an inventory management
Sole Source Procurement
Sole Source Procurement A Sole Source Procurement is a purchase made over $5000 without competition when competition is normally required. A Sole Source purchase is justified when there is only one good
Review of the Veterans Health Administration s Use of Reverse Auction Acquisitions
Department of Veterans Affairs Office of Inspector General Review of the Veterans Health Administration s Use of Reverse Auction Acquisitions Report No. 13-01408-294 Washington, DC 20420 September 26,
B Resource Guide: Implementing Financial Controls
What s in this Guide: I. Definition: What are Financial Controls? II. Why Do You Need Financial Controls? III. Best Practices: Financial Controls to Consider I. Definition: What are Financial Controls?
Stated below are the SCIRE activity level control objectives for purchasing and accounts payable.
SCIRE PURCHASING AND ACCOUNTS PAYABLE AND SUMMARY The goals of the purchasing function at SCIRE are to achieve open, competitive and costeffective buying, while adhering to external funding sources for
Department of Veterans Affairs VA HANDBOOK 4090 GOVERNMENT FLEET CARD PROCEDURES
Department of Veterans Affairs VA HANDBOOK 4090 Washington, DC 20420 Transmittal Sheet January 12, 2010 GOVERNMENT FLEET CARD PROCEDURES 1. REASON FOR ISSUE: This handbook prescribes procedures for use
Vendor Access Management
Vendor Access Management ProPath Office of Information and Technology Table of Contents Vendor Access Management Process Map... 1 Process: Vendor Access Management... 2 Vendor Access Management Description
Best Practices in. Asset Management. Joe Cayen Cayen Systems October 28, 2014 Nonprofit Leadership Conference, UW-Parkside
Best Practices in Asset Management Joe Cayen Cayen Systems October 28, 2014 Nonprofit Leadership Conference, UW-Parkside It s 10 pm, do you know where your kids are? It s audit time: do you know where
What is Almyta? Who is using Almyta? Does it fit my business?
What is Almyta? Almyta Control System (or just "Almyta") is Windows-based networkable business management software for PCs. It helps businesses to track and manage their inventory, purchasing, manufacturing,
Inventory Management System
UH Material Management Inventory Management System UH Warehouse Staff Documentation MarketPlace Procurement Coordinator One time set-up: You will need to should change your default tabs that display. These
Reporting Enhancements
Microsoft Dynamics GP 10.0 Pack List Reporting Enhancements Office Excel Report The Office Excel Report Builder: Create new Office Excel reports with data connections to Microsoft Dynamics GP. Create Builder
Inform Upgrade Version 20.0.77.77. New Features Improved Google Calendar Synchronization
**The latest Inform upgrade includes features and fixes from all previous upgrades. Please review the upgrade notes for any additional versions that fall between your current version and this upgrade.**
Sophisticated Yet Simple
Sophisticated Yet Simple A SALESFORCE ADD-ON FOR ORDER FULFILLMENT AND INVENTORY MANAGEMENT You started with, it changed the way you conduct business, in fact, you now have more customers, more employees,
GAO. Inventory System Checklist Systems Reviewed Under the Federal Financial Management Improvement Act of 1996. Financial Management Series
GAO United States General Accounting Office Financial Management Series May 1998 Inventory System Checklist Systems Reviewed Under the Federal Financial Management Improvement Act of 1996 GAO/AIMD-98-21.2.4
IBM Tivoli Asset Management for IT
Cost-effectively manage the entire life cycle of your IT assets IBM Highlights Help control the costs of IT assets with a single product installation that tracks and manages hardware, software and related
Microsoft Dynamics GP 2013. Packaging of Functionality & Product Capabilities in Microsoft Dynamics GP 2013
Microsoft Dynamics GP 2013 Packaging of Functionality & Product Capabilities in Microsoft Dynamics GP 2013 Date: November, 2012 Contents Become a Dynamic Business with Microsoft Dynamics GP 3 How to Buy
Solution Guide for Dynamics GP
Solution Guide for Dynamics GP Warehouse & Inventory Management Gain accurate control of your inventory Fixed Asset Tracking Track asset details with a scan Field Sales & Delivery Streamline your sales
Request for Bids For Point of Sale System for School Cafeteria
Request for Bids For Point of Sale System for School Cafeteria The Rochester School District is seeking proposals for Point of Sales System for School Cafeteria. Bids will be accepted until 12:00 noon
EMAS EXECUTIVE MANAGEMENT ACCOUNTING SYSTEM Financial and Distribution application solutions PRODUCT OVERVIEW
EXECUTIVE MANAGEMENT ACCOUNTING SYSTEM Financial and Distribution application solutions INDEX GENERAL INFORMATION Common Features Page 3 Technical Information Page 3 Product Objectives.. Page 3 MODULE
HP Service Manager. Software Version: 9.40 For the supported Windows and Linux operating systems. Processes and Best Practices Guide (Codeless Mode)
HP Service Manager Software Version: 9.40 For the supported Windows and Linux operating systems Processes and Best Practices Guide (Codeless Mode) Document Release Date: December, 2014 Software Release
Report of Audit OFFICE OF INSPECTOR GENERAL. Information Technology Infrastructure Project Management A-07-02. Tammy Rapp Auditor-in-Charge
OFFICE OF INSPECTOR GENERAL Report of Audit Information Technology Infrastructure Project Management A-07-02 Tammy Rapp Auditor-in-Charge FARM CREDIT ADMINISTRATION Memorandum Office of Inspector General
Asellertool Amazon Shipment Tutorial
Asellertool Amazon Shipment Tutorial Chapter 1: Setup...1 Chapter 2: Work Flow...3 Chapter 3: Other Features...5 The Asellertool Amazon Shipment Software allows Amazon sellers to download orders, print
DOING BUSINESS WITH CHARLOTTE-MECKLENBURG SCHOOLS A GUIDE FOR VENDORS. March 2007
DOING BUSINESS WITH CHARLOTTE-MECKLENBURG SCHOOLS A GUIDE FOR VENDORS March 2007 CONTACT INFORMATION: This Vendor Guide is intended to be an informational only publication to assist the business community
Hickman Mills C-1 School District. Inventory Control Procedures
1. Purpose To ensure the maintenance and implementation of adequate controls to account for the procurement, location, custody, and security of equipment purchased with District and Grant funds. To present
GLOSSARY the terms below are to be interpreted as follows wherever they appear in the classification specification:
STATE OF OHIO (DAS) CLASSIFICATION SPECIFICATION CLASSIFICATION SERIES Sourcing MAJOR AGENCIES All Agencies SERIES NUMBER 6451 EFFECTIVE DRAFT SERIES PURPOSE The purpose of the sourcing occupation is to
Monthly Activity Report*
Information Security Monthly Activity Report* March 2015 VA uses a defense-in-depth approach to information security to protect the data we hold on Veterans. While the defense-in-depth approach protects
Configuration Management
Configuration Management ProPath Office of Information and Technology Table of Contents Configuration Management Process Map... 1 Process: Configuration Management... 2 Configuration Management Description
OzLINK Advanced Fulfillment Guide for NetSuite
ELOPMENT OzLINK Advanced Fulfillment Guide for NetSuite Learn more about OzLINK s solutions for NetSuite at: 1 Table of Contents 1. Warehouse Challenges for Growing Businesses 2 2. Opportunities for Warehouse
Know how much inventory is on hand. Inventory is money. Old and obsolete inventory can paralyze your business
WHITE PAPER Introduction Many small and medium-sized businesses are looking for smarter ways to operate in order to survive in this changing economy. After gaining control of your finances (generally with
Service Level Agreement Between: Computing and Informational Technology And The Finance and Business Operations Division
Service Level Agreement Between: Computing and Informational Technology And The Finance and Business Operations Division 1/9 1. Executive Summary This Service Level Agreement ( SLA ) is between Computing
Clarity Infrastructure Management helps network operators to plan and document the change to their networks
Clarity Infrastructure Management helps network operators to plan and document the change to their networks clarity.com 2 Clarity Simplifying Operations Cost effective and timely network rollouts or upgrades
Critical Issues in IT Asset Management
Western Region Fall Education Seminar Salt Lake City, Utah 2015 Critical Issues in IT Asset Management Norman Pugh-Newby Deloitte November 4, 2015 Agenda ITAM Why It Matters? Definition & Objectives IT
THOMAS G. DAY SENIOR VICE PRESIDENT, INTELLIGENT MAIL AND ADDRESS QUALITY PRITHA N. MEHRA VICE PRESIDENT, BUSINESS MAIL ENTRY AND PAYMENT TECHNOLOGIES
March 31, 2009 THOMAS G. DAY SENIOR VICE PRESIDENT, INTELLIGENT MAIL AND ADDRESS QUALITY PRITHA N. MEHRA VICE PRESIDENT, BUSINESS MAIL ENTRY AND PAYMENT TECHNOLOGIES GEORGE W. WRIGHT VICE PRESIDENT, INFORMATION
Maximo ITSM Product Suite. Francois Marais
Maximo ITSM Product Suite Francois Marais What do we mean by Maximo Service & IT Asset Management (ITSM)? MAXIMO and TIVOLI Traditional Maximo Service desk (ITSM) NOW! Tivoli Service Request Manager TSRM
ORACLE SERVICES PROCUREMENT
ORACLE SERVICES PROCUREMENT KEY FEATURES Create contracts for services with complex payment terms Incorporate progress payment schedule into services contracts Track and report progress based on schedule
MET/TEAM Test Equipment Asset Management Software
MET/TEAM Test Equipment Asset Management Software NEW, easy-to-use, browser-based calibration asset management software Modular, browser-based calibration asset management solution MET/TEAM software is
SUBJECT: WAREHOUSE FACILITIES ORDERING, RECEIVING, SECURING, STORING, AND DISPENSING MATERIALS.
MIAMI-DADE AVIATION DEPARTMENT STANDARD OPERATING PROCEDURES PROCUREMENT AND COMMODITIES DIVISION SOP No. 03-01 Effective: July 25, 2003 SUBJECT: WAREHOUSE FACILITIES ORDERING, RECEIVING, SECURING, STORING,
PSU Hyland OnBase Document Imaging and Workflow Services Level Memorandum of Understanding
PSU Hyland OnBase Document Imaging and Workflow Services Level Memorandum of Understanding Table of Contents -I. Summary -II. Service Description-Scope of OnBase Document Imaging and Workflow Service Integration
REPORT 2015/112 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2015/112 Audit of information and communication technology hosting services provided by third parties to the Office of the United Nations High Commissioner for Refugees Overall
WARRANTY MANAGEMENT REDESIGN
TECHNICAL SERVICE DEPARTMENT Jan/2014 SUMMARY The Technical Service Department has established a set of business principles to support a variety of Departments within the District that includes Maintenance,
IDEAS Property Clerk Enterprise Property Management Accounting Software. IDEAS Software 1-866-346-6700 www.ideascomputer.com
IDEAS Property Clerk Enterprise Property Management Accounting Software IDEAS Software 1-866-346-6700 www.ideascomputer.com Table of Contents IDEAS Property Clerk Enterprise Product Overview...1 Key Benefits
A Provance White Paper
The Benefits of Combined IT Service Management and IT Asset Management A Provance White Paper Contents Introduction... 3 IT Service Management... 3 IT Asset Management... 4 People... 4 Processes... 5 Shared
