2.0 OBJECTIVES OF THE CONSULTANCY SERVICE

Size: px
Start display at page:

Download "2.0 OBJECTIVES OF THE CONSULTANCY SERVICE"

Transcription

1 TERMS OF REFERENCE FOR AN INDEPENDENT DATA BASE MANAGEMENT AND IT CONSULTANT TO PROVIDE PREPARATION AND IMPLEMENTATION SUPPORT FOR THE NEITI INDUSTRY AUDIT DATA MANAGEMENT SYSTEM (NIADMS) 1.0 BACKGROUND The Federal Government of Nigeria (FGN) embraced the Extractive Industries Transparency Initiative (EITI) in 2004 as a major component of the on-going anti-corruption reform in Nigeria while ensuring that revenues from the extractive sector contribute towards sustainable development. At inception of EITI in Nigeria in 2004, its implementation was focused primarily on the oil and gas sector. However, implementation has been extended to solid minerals sector as well as fiscal allocation and statutory disbursement. More details on the EITI as well as the NEITI can be founding the NEITI Handbook and at and respectively. As part of its major functions to meet the objectives, NEITI conducts regular Audits to establish what companies have paid to the government, what government has received during the period under review; if government has received what it is expected to receive and if companies have paid what they are expected to pay. Under its four (4) years strategic plan, NEITI intends to improve the efficiency and timeliness of its audit. NEITI intends to engage a consultant(s) to develop a business process, address NEITI audit data collection constraint, process flow chart, and an Operational Manual for the NEITI audits. Thereafter, NEITI intends to engage a firm to migrate the data collection and analysis aspect of the NEITI audit procedures contained in the OM from manual to electronic implementation. Against the background of engaging the IT design firm, NEITI intends to engage the services of an individual IT consultant to prepare and develop a conceptual framework to support NEITI on the electronic implementation of the data collection and analysis aspect of the NEITI audit procedures. 2.0 OBJECTIVES OF THE CONSULTANCY SERVICE The main objective of this assignment is to secure IT technical development and implementation support and assistance on all activities on the critical path for design, development, procurement and deployment of the NEITI Audit Database Management system (NIADMS). For this purpose, NEITI is seeking to engage the services of an individual consultant for a minimum period of a year to conceptualize the NIADMS framework as well as provide project preparation and implementation support. The following are the specific scope of the assignment Page 1 of 7

2 I) Phase 1 Project Conceptualisation and Preparation (Strategic Review and Needs Assessment and Procurement Support for the Design and Deployment of the NEITI Industry Audit Database Management System (NIADMS) a) The consultant(s) will confer with the selected business process consultants in order to have an early insight into the business process review as well as provide perspectives to their work. b) Familiarization with the Operational Manual and process flow chart system regarding design paradigm, functional and operational scope of the NIADMS. c) Assessment of the data gathering process of the NEITI audit reporting cycle with the aim to identify process lapses and proposed actions to tackle such identified lapses; d) Assess the business requirements of the covered entities, identify the factors that will determine efficiency and effectiveness of the data collection and analysis aspect of the NEITI audits, and of the yardsticks by which the NDMS will be measured by the covered entities, including treatment (security and confidentiality) of business and proprietary data ; e) Review the Government Integrated Financial Management System (GIFMIS), which the Federal Ministry of Finance is currently implementing; and identify the opportunities for integration and automatic interfaces with NEITI s NIADMS for the purpose of easing and automating NEITI s access to information on revenue flows into the Federation account by government agencies; f) Assessment of NEITI s ICT infrastructure and proposal of the architecture for automation of the data management system, the quality management and security standards to be followed, the methodology and tools to be used in construction of the NIADMS and the status of data communications between NEITI and the covered entities; g) Development of the draft Strategic Review and Assessment Report, which should contain the draft NIADMS conceptual framework study document, proposed procurement strategy as well as recommended methodology or specification of detailed NIADMS system requirements and budget; h) Provide support along the procurement chain from placement of advert to negotiation with selected firm, by assisting the PIU and the evaluation committees in the review and development of procurement documents REOI, ToR, Cost Estimates, Bid Documents, Selection Criteria and Draft Contract. i) Provide support to the Evaluation committee in the assessment of bids, providing clarifications to bidders and negotiations with the preferred bidders. The consultant would conclude this phase of the work program by the following: Prepare a strategic review and due diligence issues report with a summary of the findings and critical issues for resolution. Page 2 of 7

3 Review and assist in the completion of Procurement Documents (Specifications, ToR, Cost Estimates, Bid Documents, Evaluation Criteria) and Negotiations with selected bidders) in accordance with the World bank procurement guidelines. Present the report to NEITI management and Board. II) Phase 2 - Project Implementation Support Contract Monitoring, Supervision & Quality Control for design and deployment of the NIADMS. a) To provide support to NEITI to facilitate compliance with contractual terms and conditions including assessment of the consultant s deliverables to ensure value for money and efficiency; b) Advise NEITI on the consultants recommendations on claims and disputes, variation orders and extensions of time. c) Provide support to NEITI to ensure that the consultants deliverables comply with relevant international ICT standards; The consultant would conclude this phase of the work program by the following: Prepare a report with a summary of the main activities undertaken and the issues for NEITI management attention QUALIFICATIONS The Consultant shall have a broad background in IT systems (including database development), management, planning, procurement and implementation. Essential qualifications include: a) Advanced degrees in Information Systems, IT Technology, Statistics, Computer Engineering, or other relevant discipline. Other trainings in the area of assignment will be an asset; b) The Consultant should have over 10 years experience in the development, procurement and implementation of IT systems, which should include professional experience in database management, data base design and maintenance, information management or monitoring data; c) Experience in the preparation, review and management decision process related to the scope and architecture of complex database and information management systems is necessary; d) An experience working with large organizations or programs in the development of software and database management systems is required; e) Experience of defining and monitoring performance indicators is an asset; f) Experience of "monitoring and evaluation" (focused on results) of projects is an asset; g) Experience with World Bank procurement guidelines would be an added advantage; h) Demonstrated ability to work independently and with initiative Page 3 of 7

4 i) Excellent verbal, written and presentation communication skills in English, including high-level report-writing skills; j) Significant developing country experience is necessary, and direct Nigeria experience would be an advantage 5.0 PROJECT ADMINISTRATIVE ARRANGEMENTS The consultant shall be solely responsible for review, analysis and interpretation of data, reports etc. as it pertains to this assignment and for the findings, conclusions and recommendations in the report. During the course of the assignment, the Consultant reports directly to the project lead at NEITI. The Consultant will confirm acceptance of the administrative matters detailed below. 5.1 Assistance from NEITI NEITI will provide, or facilitate the provision of all available data, documents and other relevant technical, financial, communication, regulatory and administrative information relating to the automation of the operational manual and process flow chart as the case maybe for the completion of the assignment. In addition, NEITI will provide to the Consultant, without cost, office space in the secretariat as the case maybe and counterpart staff as mutually agreed between the NEITI and the Consultant as the need arises. The NEITI s ICT unit will be carried along for relevant information and to make sure there is no room for integration hitches. 5.2 Conduct of the Consultant a. The Consultant cannot bid nor be part of the company, Firm, Consortium to undertake the design and development of the NEITI audit data management system automation. b. The consultant will work at par with the company, Firm, Consortium to undertake the design of the business process re-engineering and operational manual as well as company, Firm, Consortium engaged in the design and development of the NEITI audit data management system automation. c. The Consultant will, at all times, be expected to carry out the assignment with the highest degree of professionalism and integrity. The Consultant will be expected to conduct his duties in an open and transparent manner. d. The Consultant will not, under any circumstance, take any actions or be seen to be taking any actions, which may hinder or prevent the NEITI from executing this assignment. e. The Consultant will study all NEITI guidelines and policies with respect to the Nigerian EITI program, and will be expected to ensure that the assignment is concluded with the strictest adherence to all such policies and regulations. f. The Consultant will not, under any circumstances, take any material decision pertinent to this assignment without the express permission and written consent of an authorized representative of the NEITI. g. The Consultant will not, under any circumstances, discuss, divulge or use any information regarding this assignment or any other transaction conducted as part of the FGN s EITI Program, without the express written permission of an authorized representative of NEITI Page 4 of 7

5 6.0 TIME INPUT AND DURATION The assignment will require a total of 69 man-days spread over the period span of the consultancy from the date of engagement 7.0 DELIVERABLES The consultant on engagement should provide the PIS within 1 week. The following deliverables, which should be submitted in triplicate copies and in CD-ROM format are the expected deliverables from the consultant: Phase I a. The Consultant will submit 10 copies (Electronic and hard copies) of the Draft Strategic Review and Needs Assessment Report, which should contain the NIADMS conceptual framework study document, proposed procurement strategy, budget, as well as recommended methodology or specification of detailed NIADMS system requirements and budget within 4 weeks of the commencement of the assignment; b. The consultant shall present 10 copies (Electronic and hard copies) of the draft to stakeholders (NEITI & Covered entities) within 6 weeks of the commencement of the assignment. The Consultant will be involved in organizing the workshop. c. The Consultant will incorporate the comments from the stakeholder workshop and submit 10 copies (Electronic and hard copies) of the Final Strategic Review and Needs Assessment Report within 8 weeks of the commencement of the assignment. d. The Consultant shall guide the evaluation committees during the evaluation of the received EOIs and on their final decision and submit 10 copies (Electronic and hard copies) of an independent report within 2days of the evaluation committee completing the evaluation; e. The Consultant shall review the comments submitted by bidders and in providing responses, participate in the pre-bid conference and 6 copies (Electronic and hard copies) of e a pre-bid conference report within 2 days of completing the pre-bid conference; f. The consultant shall guide the evaluation committees during the evaluation of the received technical proposal and on their final decision and submit 10 copies (Electronic and hard copies) of an evaluation report within 3days of the evaluation committee completing the evaluation; g. The Consultant shall assist in drafting the negotiation report after having prepared and submitted 5copies(Electronic and hard copies) of the negotiation brief, participated in the negotiations, provide technical comments on the draft contract and prepare Negotiation brief, participate in the negotiations with preferred bidder and in finalizing the contract. Phase II The Consultant shall review the deliverables submitted by the selected NIADMS firm during the NIADMS design phase and submit detailed reports indicating compliance Page 5 of 7

6 with contractual terms, expected quality international ICT standards based on agreed reporting timelines. The Consultant shall take 3 days to review each deliverable and submit a report to NEITI; 8.0 PAYMENT SCHEDULE FOR THE CONSULTANT Below is the schedule of payment for the Consultant. Phases S/N Reports Timeline Payment Terms Phase I Effective date of contract/ Commencement of services 1 Draft Strategic Review and Needs Assessment Report 2 Presentation of the draft Strategic Review and Needs Assessment Report to stakeholders (NEITI & Covered entities) 3 Strategic Review and Needs Assessment Report. 4 Submission of the Procurement Documents (REOI, ToR, CE,RFP and Evaluation Criteria) and the technical evaluation report 4 Negotiation report after having prepared and submitted the negotiation brief and participated in the negotiations -Provide technical comments on the draft contract and prepare Negotiation brief -Participate in the negotiations Start date - Upon contract signature is Month (M) M + 4 Weeks M + 6 Weeks M + 8 Weeks 30% of the contract amount to be paid 30% of the contract amount to be paid 10% of contract sum Page 6 of 7

7 with preferred bidder and finalise the contract Draft Operational Manual Phase II 5 Provision of detailed comments on the NIADMS firm s first report Provision of detailed comments on the NIADMS firm s second report Provision of detailed comments on the NIADMS firm s final report 10% of the contract amount 10% of the contract amount 10% of the contract amount Page 7 of 7

ASSAM POWER GENERATION CORPORATION LIMITED

ASSAM POWER GENERATION CORPORATION LIMITED ASSAM POWER GENERATION CORPORATION LIMITED Notice Inviting Expression of Interest for Consultancy in connection of Assam Power Sector Investment Program financed by ADB NIT No. NIT/PMU/05 of 2014-15 Director

More information

TERMS OF REFERENCE (ToR)

TERMS OF REFERENCE (ToR) TERMS OF REFERENCE (ToR) Consultancy services for Monitoring the Implementation of Computerized Integrated Financial Management Information System (IFMIS) of BREB & PBSs for Institutional Strengthening

More information

TENDER NUMBER: ITT/SACU/015/2015/O Information and Communication Technology (ICT) Audit IT Effectiveness Review

TENDER NUMBER: ITT/SACU/015/2015/O Information and Communication Technology (ICT) Audit IT Effectiveness Review TENDER NUMBER: ITT/SACU/015/2015/O Information and Communication Technology (ICT) Audit IT Effectiveness Review CLOSING DATE & TIME FRIDAY, 23 JANUARY 2015 17H00 (Namibian Time) POSTAL & PHYSICAL ADDRESS

More information

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES)

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES) REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES) Consultancy services for Systems Integration and IT project management Client: Central Bank of Yemen Country: Republic of Yemen Project: Financial

More information

Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL. XXXXX PPP Unit

Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL. XXXXX PPP Unit Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL XXXXX PPP Unit Chief Executive Officer Job Description: The CEO is tasked with the establishment of a PPP Unit for the Government

More information

SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES

SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES Table of Contents 1st. INTRODUCTION... 3 2nd. ELECTRICITY SECTOR BACKGROUND. 4 3rd. SCOPE OF WORK. 6 PHASE :

More information

Consolidated I&T Data Centre - P3 Canada Fund

Consolidated I&T Data Centre - P3 Canada Fund STAFF REPORT ACTION REQUIRED Consolidated I&T Data Centre - P3 Canada Fund Date: January 16, 2012 To: From: Wards: Reference Number: Government Management Committee Deputy City Manager & Chief Financial

More information

ACE PROJECT M&E CONSULTANCY

ACE PROJECT M&E CONSULTANCY ASSOCIATION OF AFRICAN UNIVERSITIES ASSOCIATION DES UNIVERSITÉS AFRICAINES ACE PROJECT M&E CONSULTANCY BACKGROUND The Association of African Universities has received financing from the World Bank toward

More information

Terms of Reference. Preparing Safety and Technical Management Programme for Electricity Licensees

Terms of Reference. Preparing Safety and Technical Management Programme for Electricity Licensees Terms of Reference Preparing Safety and Technical Management Programme for Electricity Licensees Introduction Public Utilities Commission of Sri Lanka (PUCSL) has started regulating the electricity industry

More information

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and

More information

R E Q U E S T F O R P R O P O S A L S H U M A N R E S O U R C E S S T R A T E G I C A N D I M P L E M E N T A T I O N S U P P P O R T RFP/JHB/ 037

R E Q U E S T F O R P R O P O S A L S H U M A N R E S O U R C E S S T R A T E G I C A N D I M P L E M E N T A T I O N S U P P P O R T RFP/JHB/ 037 P.O. Box 3209, Houghton, 2041 Block A, Riviera Office Park, 6-10 Riviera Road, Riviera R E Q U E S T F O R P R O P O S A L S H U M A N R E S O U R C E S S T R A T E G I C A N D I M P L E M E N T A T I

More information

Duration: One year with the option of an additional year based on performance.

Duration: One year with the option of an additional year based on performance. Position: Adviser to the Internal Audit Unit Objectives: A person to support the newly established Internal audit unit to transform it from its infancy stage to a unit that is a trusted adviser, and more

More information

1.0 BACKGROUND 2.0 OBJECTIVE OF ASSIGNMENT

1.0 BACKGROUND 2.0 OBJECTIVE OF ASSIGNMENT TERMS OF REFERENCE FOR IFMIS PROJECT MANAGER AT THE PUBLIC FINANCIAL MANAGEMENT IMPROVEMENT AND CONSOLIDATION PROJECT, MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT 1.0 BACKGROUND 1.1 The Public Financial

More information

Details for Engagement of Management Consulting Firm for OSRFS

Details for Engagement of Management Consulting Firm for OSRFS Details for Engagement of Management Consulting Firm for OSRFS 1. Background. In order to continue with the pace of reform and to implement the next phase of Public Enterprises (PE) Reform, Odisha State

More information

CONTRACT MANAGEMENT FRAMEWORK

CONTRACT MANAGEMENT FRAMEWORK CONTRACT MANAGEMENT FRAMEWORK August 2010 Page 1 of 20 Table of contents 1 Introduction to the CMF... 3 1.1 Purpose and scope of the CMF... 3 1.2 Importance of contract management... 4 1.3 Managing contracts...

More information

Extractive Industries Transparency Initiative. Validation guide

Extractive Industries Transparency Initiative. Validation guide Extractive Industries Transparency Initiative Validation guide Extractive Industries Transparency Initiative Validation guide Report of the EITI International Advisory Group Annex A: Validation guide Contents

More information

PHASE II. I. Background. free flow of. the AEC. a) b) BRICS countries. Outputs. Page 1 of 6

PHASE II. I. Background. free flow of. the AEC. a) b) BRICS countries. Outputs. Page 1 of 6 ASEAN AUSTRALIA DEVELOPMENT COOPERATION PROGRAM (AADCP) PHASE II CONSULTING OPPORTUNITY FOR SCOPING STUDY OF OUTSOURCING IN ASEAN The ASEAN Secretariat invites applications for the above-referenced project

More information

POSITION INFORMATION DOCUMENT

POSITION INFORMATION DOCUMENT POSITION INFORMATION DOCUMENT Position Title: Senior Manager, ICT Contracts Classification Code: ASO8 Division: ICT Services Directorate: ICT Contracts & Performance Management Type of Appointment: Branch:

More information

Vendor Relations and Changing Software

Vendor Relations and Changing Software Vendor Relations and Changing Software Presenters Lindsey Stillman, State of Georgia Department of Community Affairs Fran Ledger, Canavan Associates Learning Objectives To become familiar with important

More information

UoD IT Job Description

UoD IT Job Description UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management

More information

How To Write An Nps Rfda

How To Write An Nps Rfda Pension Fund Regulatory and Development Authority Selection of Project Management Consultants- 2015 Response to Queries- Pre-bid meeting by 11:00 hrs on 14 th September, 2015 Sr. No. RFP Document Reference

More information

Request of Expressions of Interest For Project Management Consulting (PMC) Firm

Request of Expressions of Interest For Project Management Consulting (PMC) Firm Election Commission Secretariat Preparation of Electoral Roll with Photographs and Facilitating the Issuance of National Identity Card Project Islamic Foundation Building Agargaon, Dhaka. No. PERP&FINIDC/Ops/040/479

More information

Contracting for Services

Contracting for Services Contracting for Services A National State Auditors Association Best Practices Document Published by the National State Auditors Association Copyright 2003 by the National State Auditors Association. All

More information

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT - INTRODUCTION 1.1. General. Kuwait Ports Authority (KPA) through the Ministry Of Finance (MOF) wishes

More information

ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU

ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU PURPOSE: To lead and facilitate effective organisation-wide contracts development,

More information

Request for Proposal HQC2012-11-16. Evaluation of Saskatchewan s Lean Health Care Transformation: Phase 1

Request for Proposal HQC2012-11-16. Evaluation of Saskatchewan s Lean Health Care Transformation: Phase 1 Request for Proposal HQC2012-11-16 Evaluation of Saskatchewan s Lean Health Care Transformation: Phase 1 Issued: November 16, 2012 Table of Contents 1 Statement of Purpose... 3 2 About HQC... 4 3 Proposal

More information

City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT

City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT Date original issued: September 28, 2015 Qualifications Statements due: The City of Vallejo will consider Proposals submitted in response

More information

DEBT MANAGEMENT OFFICE NIGERIA

DEBT MANAGEMENT OFFICE NIGERIA DEBT MANAGEMENT OFFICE NIGERIA APPOINTMENT OF A GOVERNMENT STOCKBROKER: REQUEST FOR PROPOSAL The Debt Management Office (DMO) on behalf of the Federal Government of Nigeria (FGN) is seeking to engage the

More information

Highlands and Islands Broadband Pathfinder Project - Background

Highlands and Islands Broadband Pathfinder Project - Background ITEM: 22(a) PAGE: 1 REPORT TO: The Moray Council on 5 July, 2006 SUBJECT: BY: Highlands and Islands Broadband Pathfinder Project - Background Chief Executive 1. Reason for Report 1.1 The Pathfinder Broadband

More information

REQUEST FOR EXPRESSIONS OF INTEREST

REQUEST FOR EXPRESSIONS OF INTEREST REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK Immeuble du Centre de commerce International d Abidjan - CCIA Avenue Jean-Paul II, 01 BP 1387, Abidjan 01, COTE D IVOIRE 1. Subject: The African

More information

Regulatory Reform - Case Studies on Improving the Business Environment for Small and Medium Enterprises (SMEs)

Regulatory Reform - Case Studies on Improving the Business Environment for Small and Medium Enterprises (SMEs) Policy Support Unit Request for Proposals A Policy Research Project Regulatory Reform - Case Studies on Improving the Business Environment for Small and Medium Enterprises (SMEs) An Activity of the Policy

More information

CEYLON PETROLEUM CORPORATION. Terms of Reference. Management Consultancy for Ceylon Petroleum Corporation. BID No: B/07/2015

CEYLON PETROLEUM CORPORATION. Terms of Reference. Management Consultancy for Ceylon Petroleum Corporation. BID No: B/07/2015 CEYLON PETROLEUM CORPORATION Terms of Reference Management Consultancy for Ceylon Petroleum Corporation BID No: B/07/2015 Closing of the Bid : 1400 hrs. on 29.04.2015 Page 1 of 10 CALL FOR EXPRESSION OF

More information

APSO CODES OF PROFESSIONAL PRACTICE INDEX

APSO CODES OF PROFESSIONAL PRACTICE INDEX APSO CODES OF PROFESSIONAL PRACTICE APSO has an important role to play in continuously improving standards and providing guidance to stakeholders on developments and trends in the staffing industry. The

More information

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 PART 3G Contracts Standing Orders 2015/16 Definitions Aggregation is the combining together of the total contract value from separate contracts

More information

Procurement Capability Standards

Procurement Capability Standards IPAA PROFESSIONAL CAPABILITIES PROJECT Procurement Capability Standards Definition Professional Role Procurement is the process of acquiring goods and/or services. It can include: identifying a procurement

More information

KERALA STATE INDUSTRIAL DEVELOPMENT CORPORATION LTD

KERALA STATE INDUSTRIAL DEVELOPMENT CORPORATION LTD KERALA STATE INDUSTRIAL DEVELOPMENT CORPORATION LTD NOTICE INVITING BIDS FROM QUALIFYING CONSULTANTS FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) ON THE LIFE SCIENCES PARK, THIRUVANANTHAPURAM Introduction:

More information

Contract Management Guideline

Contract Management Guideline www.spb.sa.gov.au Contract Management Guideline Version 3.2 Date Issued January 2014 Review Date January 2014 Principal Contact State Procurement Board Telephone 8226 5001 Contents Overview... 3 Contract

More information

Certificate IV in Property Services (Real Estate) CPP40307. Unit Descriptions & Evidence Required to Demonstrate Competency

Certificate IV in Property Services (Real Estate) CPP40307. Unit Descriptions & Evidence Required to Demonstrate Competency Certificate IV in Property Services (Real Estate) CPP40307 Unit Descriptions & Evidence Required to Demonstrate Competency Agenda Course Description... 3 Pathways Information... 3 Entry Requirements...

More information

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES FIRMS SELECTION)

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES FIRMS SELECTION) NATIONAL AGENCY FOR FISCAL ADMINISTRATION, ROMANIA REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES FIRMS SELECTION) Country: ROMANIA Name of the Project: Revenue Administration Modernization Project

More information

Video Production Services for the Ontario College of Trades (the College)

Video Production Services for the Ontario College of Trades (the College) Video Production Services for the Ontario College of Trades (the College) Request for Proposal (RFP) No. OCOT/CM/2014-03 Date Issued: 14 April 2014 1 TABLE OF CONTENTS A. INTRODUCTION...4 1. Objective...

More information

Draft Fiscal Transparency Principles. IV. Resource Revenue Management

Draft Fiscal Transparency Principles. IV. Resource Revenue Management Draft of December 18, 2014 Draft Fiscal Transparency Principles IV. Resource Revenue Management Natural resource revenues should be collected, managed, and disbursed in an open, transparent, and sustainable

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.

More information

Project Implementation: Procurement & Contract Management. April 2012

Project Implementation: Procurement & Contract Management. April 2012 & Contract Management April 2012 & Contract Management We would like to acknowledge the contribution of the Programme Management Department in the preparation of this presentation that will introduce some

More information

1.0 Manager, Human Resources. Job Purpose

1.0 Manager, Human Resources. Job Purpose 1.0 Manager, Human Resources Job Purpose Manage the human resources division and implement human resources policies and procedures to ensure the Corporation is resourced with professional, competent and

More information

CALL FOR PROPOSALS FOR INSTITUTIONAL CAPACITY DEVELOPMENT 1. BACKGROUND Organizational Context: The National Federal Parliament (NFP) was inaugurated in August 2012, with the selection (by traditional

More information

Standardised Job Descriptions for Infrastructure Development and Technical Services Units of Provincial Health Departments as funded through the

Standardised Job Descriptions for Infrastructure Development and Technical Services Units of Provincial Health Departments as funded through the Standardised Job Descriptions for Infrastructure Development and Technical Services Units of Provincial Health Departments as funded through the Division of Revenue Act March 2015 1 JOB DESCRIPTION JOB

More information

Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 21: Procurement and Supply Management Plan PGGP-EH-SPENV-000018-025

Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 21: Procurement and Supply Management Plan PGGP-EH-SPENV-000018-025 Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 21: Procurement and Supply Management Plan PGGP-EH-SPENV-000018-025 LNG Project Page i of ii CONTENTS

More information

Provision of Internet Services at NNPC Corporate Headquarters, Abuja

Provision of Internet Services at NNPC Corporate Headquarters, Abuja Provision of Internet Services at NNPC Corporate Headquarters, Abuja Bid Document JULY 2015 Telecoms Department 1. Invitation to Bidders The invitation is to bid for the Provision of Internet Services

More information

Mineral Exploration Corporation Limited (A Govt. of India Enterprise) A Miniratna PSE. Engagement of ERP Consultant on Contract Basis

Mineral Exploration Corporation Limited (A Govt. of India Enterprise) A Miniratna PSE. Engagement of ERP Consultant on Contract Basis Mineral Exploration Corporation Limited (A Govt. of India Enterprise) A Miniratna PSE Dr.Babasaheb Ambedkar Bhavan, Seminry Hills, NAGPUR 440006 Engagement of ERP Consultant on Contract Basis Mineral Exploration

More information

BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service

BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which

More information

United Nations Children s Fund (UNICEF) Supply Division, Copenhagen, Denmark

United Nations Children s Fund (UNICEF) Supply Division, Copenhagen, Denmark United Nations Children s Fund (UNICEF) Supply Division, Copenhagen, Denmark Request for proposals for individual consultancy for the Development of a Business Plan for the Implementation of Electronic

More information

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011 BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under

More information

STRATEGIC ASSET MANAGER POSITION & PERSON DESCRIPTION February 2015

STRATEGIC ASSET MANAGER POSITION & PERSON DESCRIPTION February 2015 GENERAL Position & Person Descriptions form an important part of an integrated planning process to ensure that individual performance, and the required outputs and outcomes, align with the strategic and

More information

CONTRACT MANAGEMENT POLICY

CONTRACT MANAGEMENT POLICY CONTRACT MANAGEMENT POLICY Section Finance Approval Date 25/08/2014 Approved by Directorate Next Review Aug 2016 Responsibility Chief Operating Officer Key Evaluation Question 6 PURPOSE The purpose of

More information

UNSOLICITED PROPOSALS

UNSOLICITED PROPOSALS UNSOLICITED PROPOSALS GUIDE FOR SUBMISSION AND ASSESSMENT January 2012 CONTENTS 1 PREMIER S STATEMENT 3 2 INTRODUCTION 3 3 GUIDING PRINCIPLES 5 3.1 OPTIMISE OUTCOMES 5 3.2 ASSESSMENT CRITERIA 5 3.3 PROBITY

More information

Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm)

Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm) Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm) a. Background: 1. The GoB in accordance with its Public Financial Management (PFM) Strategy & Vision and Medium

More information

Annex -1- Terms of Reference (TOR)

Annex -1- Terms of Reference (TOR) Annex -1- Terms of Reference (TOR) Project Name: Lebanon s First Biennial Update Report Reference Number: 00086912 Subject: Consultant in climate change and education Short-term consultancy for the preparation

More information

TERMS OF REFERENCE. Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities

TERMS OF REFERENCE. Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities TERMS OF REFERENCE Reference: Post Title: DMU/NXCWG0927 Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities Project Location: Nassau, The Bahamas

More information

Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows

Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows JOB DESCRIPTION Position: Location of position: Reporting to: Special functional relationships: Term of Appointment: Programme Manager/Procurement Specialist Suva Capital Works Manager Capital Works Programme

More information

The Victorian Public Sector values dictate the way we interact with each other, with our the market and guide the way that we make decisions.

The Victorian Public Sector values dictate the way we interact with each other, with our the market and guide the way that we make decisions. POSITION DESCRIPTION Position Title: Procurement Officer New Position Department: Finance Compliance & Procurement Date: 22/10/2015 Reports to (position): Procurement Manager Grade: 5 Positions that report

More information

Current Employment Opportunities Full Time Staff. Current Vacancies: I. Senior Project Manager / Project Manager... 2

Current Employment Opportunities Full Time Staff. Current Vacancies: I. Senior Project Manager / Project Manager... 2 Current Vacancies: I. Senior Project Manager / Project Manager... 2 I. Senior Project Manager / Project Manager Introduction Maxwell Stamp PLC (MSP) is recognised as one of the world s leading development

More information

Proposed Principles to be addressed in APES GN 20 Outsourced Accounting Services

Proposed Principles to be addressed in APES GN 20 Outsourced Accounting Services Proposed Principles to be addressed in APES GN 20 Outsourced Accounting Services Roles and Responsibilities The proposed Guidance Note 20 Outsourced Accounting Services (GN 20) will set out the various

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi 110 001 Tel : 23753920/ Fax : 23753923

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi 110 001 Tel : 23753920/ Fax : 23753923 CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi 110 001 Tel : 23753920/ Fax : 23753923 Ref.No.: 2/7(8)/2008-RIMS/Policy/CERC Dated: 29 th

More information

1. Evolution of infrastructure procurement in NSW. 2. Market consultation and outcomes. 3. Response and implementation. 4. Project Deed Evolution

1. Evolution of infrastructure procurement in NSW. 2. Market consultation and outcomes. 3. Response and implementation. 4. Project Deed Evolution Reducing Bid Costs for Outcome-Based Procurements in NSW Infrastructure and Structured Finance Unit: Partnering to Create Partnerships December 2015 1. Evolution of infrastructure procurement in NSW 2.

More information

To establish a single channel for public procurement contracts.

To establish a single channel for public procurement contracts. EXPRESSION OF INTEREST (EOI) FOR RECRUITEMENT OF E-PROCUREMENT APPLICATION MANAGER CONSULTANT (X3) 1.0 Background The Government of Rwanda (GoR) wishes to capitalize on employing the use of the most advanced

More information

Customer Responsiveness Strategy

Customer Responsiveness Strategy Customer Responsiveness Strategy Dated 23 June 2006. Telstra Corporation Limited (ABN 33 051 775 556) ( Telstra ) Disclaimer This Customer Responsiveness Strategy is being published in furtherance of Telstra

More information

Programme Specification

Programme Specification Programme Specification Title: Construction Project Management Final Award: Master of Science (MSc) With Exit Awards at: Postgraduate Certificate (PG Cert) Postgraduate Diploma (PG Dip) Master of Science

More information

Template K Implementation Requirements Instructions for RFP Response RFP #

Template K Implementation Requirements Instructions for RFP Response RFP # Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship

More information

REQUEST FOR PROPOSALS (PROCUREMENT OF SERVICES) For Simple Assignments SERVICES FOR. The Design and Development of the Zimbabwe Diaspora Website

REQUEST FOR PROPOSALS (PROCUREMENT OF SERVICES) For Simple Assignments SERVICES FOR. The Design and Development of the Zimbabwe Diaspora Website FPU.SR- 19.5 REQUEST FOR PROPOSALS (PROCUREMENT OF SERVICES) For Simple Assignments SERVICES FOR The Design and Development of the Zimbabwe Diaspora Website Prepared by Number 4 Duthie Road, Alexandra

More information

CITY OF MEDICINE HAT PROFESSIONAL PRACTICE MANAGEMENT PLAN

CITY OF MEDICINE HAT PROFESSIONAL PRACTICE MANAGEMENT PLAN CITY OF MEDICINE HAT PROFESSIONAL PRACTICE MANAGEMENT PLAN Table of Contents 1. INTRODUCTION... 2 1.1. Foreword... 2 1.2. Objectives of Professional Practice Management Plan... 2 1.3. Statement on Ethics...

More information

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608 aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608 NCSA 01 Competency Based Assessment in Architecture THE

More information

https://www.ofgem.gov.uk/publications-and-updates/ofto-build-providing-additional-flexibility-through-extendedframework

https://www.ofgem.gov.uk/publications-and-updates/ofto-build-providing-additional-flexibility-through-extendedframework All interested parties Direct Dial: 020 7901 1849 Email: transmissioncompetition@ofgem.gov.uk Date: 17 November 2015 Dear Colleague EPC Contract Principles for OFTO Build Tenders This letter provides guidance

More information

Contract and Vendor Management Guide

Contract and Vendor Management Guide Contents 1. Guidelines for managing contracts and vendors... 2 1.1. Purpose and scope... 2 1.2. Introduction... 2 2. Contract and Vendor Management 2.1. Levels of management/segmentation... 3 2.2. Supplier

More information

CENTRAL BANK OF SOMALIA

CENTRAL BANK OF SOMALIA BANKIGA DHEXE EE SOOMAALIYA البنك المركزي المحافظ الصومالي CENTRAL BANK OF SOMALIA The Central Bank of Somalia (CBS), with the help of World Bank Group s Capacity Injection project, is pleased to launch

More information

CONTRACT FOR CONSULTING SERVICES SMALL ASSIGNMENTS LUMP-SUM PAYMENTS (INTER-AMERICAN DEVELOPMENT BANK/ANY FUND ADMINISTERED BY THE BANK FINANCED)

CONTRACT FOR CONSULTING SERVICES SMALL ASSIGNMENTS LUMP-SUM PAYMENTS (INTER-AMERICAN DEVELOPMENT BANK/ANY FUND ADMINISTERED BY THE BANK FINANCED) 1 CONTRACT FOR CONSULTING SERVICES SMALL ASSIGNMENTS LUMP-SUM PAYMENTS (INTER-AMERICAN DEVELOPMENT BANK/ANY FUND ADMINISTERED BY THE BANK FINANCED) CONTRACT THIS CONTRACT ( Contract ) is entered into this

More information

REQUEST FOR PROPOSAL Stakeholder Workshop Series Google Analytics and Trip Advisor

REQUEST FOR PROPOSAL Stakeholder Workshop Series Google Analytics and Trip Advisor REQUEST FOR PROPOSAL Stakeholder Workshop Series Google Analytics and Trip Advisor Contents Introduction... 1 The RFP Process... 1 Project Timetable... 1 Proposal Submission Guidelines... 2 Restrictions

More information

1.1 An initial request to enter into a contractual arrangement may be initiated by either Massey University or another party (Other Party).

1.1 An initial request to enter into a contractual arrangement may be initiated by either Massey University or another party (Other Party). CONTRACT MANAGEMENT PROCEDURE Section Risk Management Contact Risk Manager Last Review February 2013 Next Review February 2016 Approval Not required Procedures Contract Initiation Request Mandatory Guidance

More information

(Project Name: Capital Market Development, Debt Management and Pension Reform Technical Assistance Project [Project ID: P113834]

(Project Name: Capital Market Development, Debt Management and Pension Reform Technical Assistance Project [Project ID: P113834] Terms of Reference (Project Name: Capital Market Development, Debt Management and Pension Reform Technical Assistance Project [Project ID: P113834] Assignment Description: Regulatory Impact Assessment

More information

APES GN 30 Outsourced Services

APES GN 30 Outsourced Services APES GN 30 Outsourced Services Prepared and issued by Accounting Professional & Ethical Standards Board Limited ISSUED: March 2013 Copyright 2013 Accounting Professional & Ethical Standards Board Limited

More information

OVERSTRAND MUNICIPALITY

OVERSTRAND MUNICIPALITY C 3 / 001 OVERSTRAND MUNICIPALITY CONTRACT MANAGEMENT POLICY Approved by Council 28 May 2015 Implementation date: 1 July 2015 TABLE OF CONTENTS C 3 / 002 1. PRE-AMBLE 2 2. DEFINITIONS 3 3. ABBREVIATIONS

More information

LETTER OF INVITATION. to participate in. Revenue Management System (RMS) Discovery Workshop. Organized by

LETTER OF INVITATION. to participate in. Revenue Management System (RMS) Discovery Workshop. Organized by LETTER OF INVITATION to participate in Revenue Management System (RMS) Discovery Workshop Organized by THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION OF ROMANIA The new Strategy of National Agency for Fiscal

More information

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS 1. GENERAL PROVISIONS. 1.2 DEFINITIONS Where the words

More information

LINCOLNSHIRE COUNTY COUNCIL. JEM Number: 3209

LINCOLNSHIRE COUNTY COUNCIL. JEM Number: 3209 LINCOLNSHIRE COUNTY COUNCIL JOB DESCRIPTION DIRECTORATE: Resources Division/Section/Branch: Business Improvement Service/Sub-Division: Programme and Project Office JOB TITLE: Programme Manager JEM Number:

More information

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 financed by the Asian Development Bank under Loan 2755-KGZ (SF) TERMS OF REFERENCE

More information

REQUEST FOR PROPOSAL (RFP) FOR SELECTION OF HEALTH CARE CONSULTANCY SERVICES FOR BIHAR MEDICAL SERVICES & INFRASTRUCTURE CORPORATION LTD.

REQUEST FOR PROPOSAL (RFP) FOR SELECTION OF HEALTH CARE CONSULTANCY SERVICES FOR BIHAR MEDICAL SERVICES & INFRASTRUCTURE CORPORATION LTD. REQUEST FOR PROPOSAL (RFP) FOR SELECTION OF HEALTH CARE CONSULTANCY SERVICES FOR BIHAR MEDICAL SERVICES & INFRASTRUCTURE CORPORATION LTD. November 2013 BIHAR MEDICAL SERVICES & INFRASTRUCTURE CORPORATION

More information

Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14

Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Procedures for Tenders and Contracts October 2014 Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Huon Valley Council Procedures for Tenders and Contracts October 2014

More information

CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.????

CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.???? CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.???? 1 1. PRE-AMBLE All transactions undertaken by the Cape Winelands District Municipality involves a contract whether explicitly

More information

POSTGRADUATE CERTIFICATE IN PROFESSIONAL PRACTICE IN ARCHITECTURE

POSTGRADUATE CERTIFICATE IN PROFESSIONAL PRACTICE IN ARCHITECTURE University of Cambridge: Programme Specifications Every effort has been made to ensure the accuracy of the information in this programme specification. Programme specifications are produced and then reviewed

More information

Request for Expressions of Interest (EoI)

Request for Expressions of Interest (EoI) Kingdom of Lesotho LESOTHO INSTITUTE OF ACCOUNTANTS - OPERATIONALISATION OF LESOTHO PROFESSIONAL ACCOUNTANCY PROGRAMME European Development Fund Poverty Reduction Budget Support Phase II (FED022-701) Support

More information

2.2 All purchases for supplies, services (including construction) and equipment.

2.2 All purchases for supplies, services (including construction) and equipment. St. Mary s General Hospital Kitchener, Ontario ========================================================================== Supply Chain Guidelines ==========================================================================

More information

HISTORICAL RECORD / HISTORIQUE. NSPO REGULATION No. 4200 / RÈGLEMENT N 4200 DE LA NPSO NSPO PROCUREMENT REGULATIONS RÈGLEMENT DES ACHATS DE LA NSPO

HISTORICAL RECORD / HISTORIQUE. NSPO REGULATION No. 4200 / RÈGLEMENT N 4200 DE LA NPSO NSPO PROCUREMENT REGULATIONS RÈGLEMENT DES ACHATS DE LA NSPO HISTORICAL RECORD / HISTORIQUE NSPO / RÈGLEMENT N 4200 DE LA NPSO NSPO PROCUREMENT REGULATIONS RÈGLEMENT DES ACHATS DE LA NSPO Regulations approved by the NSPO Agency Supervisory Board on 26 June 2013

More information

Construction Management/ General Contractor Alternative Contracting Process

Construction Management/ General Contractor Alternative Contracting Process Clean Water State Revolving Fund Loan Program Construction Management/ General Contractor Alternative July 2011 Last Updated: 08/03/2011 By: Larry McAllister DEQ 11-WQ-027 Prepared by: Clean Water State

More information

Request for Proposal Business & Financial Services Department

Request for Proposal Business & Financial Services Department Request for Proposal Business & Financial Services Department CONTRACT 5118 P Enterprise Project Management Solution Design and Implementation 1. Introduction 1.1 The City of Richmond (the City ) proposes

More information

GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY

GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY GE Oil & Gas Quality at GE Oil & Gas GE imagination at work QUALITY 2 - Quality at GE Oil & Gas TABLE OF CONTENTS GE Oil & Gas and Quality Visions Our Customer Commitments The Quality Organization and

More information

Terms of Reference PUBLIC PERCEPTION SURVEY. Office of Disaster Preparedness and Emergency Management

Terms of Reference PUBLIC PERCEPTION SURVEY. Office of Disaster Preparedness and Emergency Management Terms of Reference PUBLIC PERCEPTION SURVEY Office of Disaster Preparedness and Emergency Management Background The ODPEM is the National Disaster Office responsible for disaster management in Jamaica

More information

REQUEST FOR PROPOSAL INFORMATION SECURITY PROGRAM PROVIDER

REQUEST FOR PROPOSAL INFORMATION SECURITY PROGRAM PROVIDER REQUEST FOR PROPOSAL INFORMATION SECURITY PROGRAM PROVIDER OCTOBER 18, 2013 1 Table of Contents I. EXECUTIVE OVERVIEW... 3 II. BACKGROUND... 3 A. Goals & Objective of Request... 3 B. Project Scope... 4

More information

Papua New Guinea: Supporting Public Financial Management, Phase 2

Papua New Guinea: Supporting Public Financial Management, Phase 2 Technical Assistance Report Project Number: 44379 012 Capacity Development Technical Assistance (CDTA) November 2012 Papua New Guinea: Supporting Public Financial Management, Phase 2 The views expressed

More information

Government of India Ministry of Communications &IT Department of Telecommunication

Government of India Ministry of Communications &IT Department of Telecommunication Government of India Ministry of Communications &IT Department of Telecommunication To, (As per by email) Subject: Invitation of Expression of Interest (EOI) for Implementation of ISO 9001:20008 project

More information

Request for Proposal Permitting Software

Request for Proposal Permitting Software Request for Proposal Permitting Software Date Issued: October 7, 2015 Proposals Due no later than: 2:00pm EST on November 10, 2015 Page 1 of 10 Revised 10/5/2015 TABLE OF CONTENTS Section I Introduction

More information

CRD Wastewater Treatment Project: Observations and Recommendations on Project Governance

CRD Wastewater Treatment Project: Observations and Recommendations on Project Governance Appendix A - Governance May 3, 2016 CRD Wastewater Treatment Project: Observations and Recommendations on Project Governance Background In early April 2016, the Minister of Communities, Sport and Cultural

More information