CHECKLIST FOR CARRYING OUT EXCAVATION AND PILING WORKS IN CHANGI/SELETAR AIRPORT



Similar documents
Working together. to prevent cable damage. a partnership for reliable and quality power

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

How To Safely Dig For Natural Gas

Permits to Dig / Permits to Excavate / Permits to work near underground services

Guidelines for Excavations

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Trenching and Excavation Safety

Procedure for Working in or around Excavations

COMMUNICATIONS ALLIANCE LTD NATIONAL BROADBAND NETWORK FIBRE READY DISTRIBUTION NETWORKS

Excavation & Trenching Procedure

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

For business. Wiring your business for broadband. What happens when copper is required?

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

APPLICATION FOR RENEWAL OF LICENCE TO USE OR OPERATE AN ELECTRICAL INSTALLATION (Please read Explanatory Notes before completing the Forms)

Utilities and existing services

REPAIRS TO DAMAGED SEWERS

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

CONTRACTOR SAFETY MANAGEMENT PROGRAM

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Building over or close to a public sewer

Advisory Note. Plumbing Regulation PLUMBING AND DRAINAGE SERVICES INSTALLED IN PROXIMITY OF OTHER SERVICES AND UNDERGROUND OBSTRUCTIONS

WORK AT HEIGHT. STFC Safety Code No 9. Rev. 1.4, Issued April, 2015

The Delivery Hub health, safety and environment Raising the bar 9 Underground service avoidance

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

Geotechnical Building Works (GBW) Submission Requirements

Gas Meter Clearances and Service Installation Requirements

Urban Vehicle Crossing Application To be completed and fees paid for prior to approval

SITE CONTRACTOR PROCEDURES

Occupational Health and Safety Liability for Contractors

Air Traffic Service Training Providers Entry Control Procedures Manual 3. Sample Documents

ROAD OPENING LICENCE APPLICATION FORM PLEASE READ ALL PARTS AND SECTIONS OF THIS FORM IN ADVANCE OF COMPLETING THE APPLICATION

Underground Commercial Electric Service

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

ITS specification Jointing chambers and pull pits (ITS-02-02)

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT

Pre-Qualification Questionnaire Checklist

SECTION SUPPORT OF EXCAVATION

SECTION IX SLIP LINING PIPELINES

Event Space Rental at the Marina Barrage

SECTION SELECTIVE DEMOLITION

SECTION EARTH MOVING

DEPARTMENT OF LABOUR. No. R February 2014 OCCUPATIONAL HEALTH AND SAFETY ACT, 1993 CONSTRUCTION REGULATIONS, 2014

WHS Contractor Management Procedure

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Volume 1 NJUG GUIDELINES ON THE POSITIONING AND COLOUR CODING OF UNDERGROUND UTILITIES APPARATUS

GUIDE FOR UNDERTAKING WORK NEAR UNDERGROUND ASSETS

Public Landscape Aids And Protection Of Assets

WORKING IN CONFINED SPACES GUIDELINES

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

Code of Practice For Avoiding Danger From Underground Services

guidance notes Form C

1.0 Examples on common security provisions/common welfare provisions

STANDARD OPERATING INSTRUCTION. Worksite Safety Traffic Management Procedure

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW

I.S :2013 Fire Detection & Alarm Systems

C. Section TESTING LABORATORY SERVICE.

Technical Services Department WORK PERMIT PROCEDURE. For LONDON LUTON AIRPORT OPERATIONS LTD

Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines

Asbestos in Grounds Management Plan, Matraville Soldiers Settlement Public School, Matraville, NSW

Occupational health and safety specification for construction works contracts

WHS Contractor Management Procedure

Microtrenching and Street Works: An advice note for Local Authorities and Communications Providers.

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure

SEBENICO ATSI COMPANY OVERVIEW

MAJOR PLANNING CONSIDERATIONS CHECKLIST

Guide for Safety with. Underground Services

Prequalification of Roading Contractors

3. QUALITY ASSURANCE REQUIREMENTS

Permit No. Permit Fee: $ Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: Address:

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS

Work in Substations - General

Guidelines on Prior Approval (PA) Application to recruit Foreign Workers (Construction)

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

hs2 Ground A non-technical guide

GUIDE TO TRENCH EXCAVATIONS (SHORING SUPPORT AND DRAINAGE MEASURES)

Ontario Electrical Safety Code - Info Sheet

Buried Cable Installation

WHS CONTRACTOR MANAGEMENT PROCEDURE

SHALLOW UTILITIES JOINT PROVISIONING GUIDELINES SCOPE

EUROPEAN INDUSTRIAL GASES ASSOCIATION

Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

SECTION 1 GENERAL REQUIREMENTS

GHG Accounting in a Construction Project: The Case of Montréal's Turcot Project. Sylvie Tanguay Research Officer, Ministère des Transports du Québec

Town of Concord Drain Layer s Requirements/Info

ICTCBL2065B Splice and terminate optical fibre cable for carriers and service providers

WORK IN CONFINED SPACES

Confined Space Management Procedure

PART 4: SITE INFORMATION

Policy for the Management of Asbestos in Buildings

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

ASSET CREATION DEVELOPER PROCESS INSTRUCTIONS TO DESIGNERS - MAJOR WORKS -

DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA

Transcription:

Attachment A9 CHECKLIST FOR CARRYING OUT EXCAVATION AND PILING WORKS IN CHANGI/SELETAR AIRPORT Objective: To locate and trace all underground services, both charted and uncharted, before commencement of ground works to ensure that all activities can proceed safely without damage or downtime to operating services. Steps: 1. Before commencement of any works on site, the Work Party shall provide advance notification indicating the period and exact site boundary of intended excavation/piling works to the following parties: CAG Engineering & Development Group, covering: High Tension cables Low Tension cables Airfield lighting cables Control cables Water pipelines Drainage subsoil pipes Turf maintenance Public and airside safety requirements FOD control CAG Airport Operations Division, covering Horticulture requirements Estate Management requirements Other relevant agencies, including CAAS Aeronautical Telecommunication & Engineering, covering: Communications Navigation Surveillance Services SingTel StarHub CAFHI CityGas PUB - Sewage pipes Tenants concerned, where necessary AOS/81

2. The Work Party shall request for and obtain as-built services drawings from the parties above to serve as references in order to produce an excavation/piling work plan and to work out a services protection and/or diversion scheme. 3. The Work Party shall carry out services detection on site through engaging the services of a licensed cable detection worker (LCDW). The particulars of the licensed cable detector shall be submitted to the CAG project officer and consultants in charge for endorsement. The CAG project officer and consultants shall make necessary arrangements to ensure that all related electrical services are turned on to facilitate cable detection work. 4. Where advised by the LCDW or requested for by the services owners concerned, the Work Party shall provide trial pits that are manually dug under the close supervision of the LCDW to expose, identify and confirm the services detected. Trial holes shall be required to positively identify all communications cables, fibre optic cables, gas and water pipe location, as well as all other services within or in the proximity of the intended excavation/piling area that cannot be accurately located or easily detected. Detailed information shall be obtained from the appropriate party as to the possibility of such services being located within the proposed construction area. The Work Party shall take all necessary precautions to ensure that these undetectable services are located and protected during the earthworks. Examples of undetectable services are certain telecommunication/data cables, un-energized cables, CAFHI fuel pipes, fibre optic cables, co-axial cables and radar cables. 5 All trial holes must be carried out with caution and dug by manual means. Excavator or other machinery shall not be used for digging trial holes. The method statement for trial holes and trenches shall be submitted to CAG project officer one week in advance for approval before they are dug (Form A). 6. The LCDW will compile a comprehensive services layout report on information gained from existing services drawings provided by the relevant authorities and the trial holes dug on site. The LCDW report will recommend suitable measures to be taken to protect all services on site, based on sound industrial practice and recommendations by the services owners. The LCDW report showing exact locations of services found shall be submitted to relevant services owners for verification. AOS/82

7 The Work Party shall implement appropriate measures as required by the project consultant to protect the services found. 8 The LCDW report shall also highlight all discrepancies between the services layout indicated on plans versus their actual location found on site. CAG project officer shall coordinate a meeting to sort out such discrepancies with all relevant services owners concerned. 9. The Work Party shall make distinctive markings on site using the following color schemes: Green tape shall be used to demarcate the boundary within which services detection has been by the LCDW. No excavation/piling shall be allowed at all time outside the area demarcated by the green tape, i.e. where services detection has not been carried out. Red tape shall be used to demarcate the areas where services have been detected and identified, including any safety buffer required in its vicinity. Sign-posting indicating the type of services found and barricades on the ground surface shall be prominently displayed by the Work Party to prevent any works from spilling into these protected areas and jeopardizing the services within. All workers on site shall be briefed on the above markings and warned against carrying out any excavation/piling works bounded within the red tape. 10. The Work Party shall install safety barriers to protect workers from falling into cable trenches or trial holes that are left exposed. 11. The Work Party shall be required to establish a continuous monitoring plan to ensure that no worker or equipment that could cause damage intrudes into the areas where services are found. 12. Upon completing items 1 to11, the Work Party shall submit an updated excavation/piling work plan showing markings done on site, proposed work methods and services protection and/or diversion scheme to the CAG project officer, consultants and relevant service owners for approval at least 2 weeks before the planned commencement of actual excavation/piling work. AOS/83

13. No excavation/piling works shall commence unless the CAG project officer is satisfied that all the above measures listed in items 1 to 12 above have been met and that other necessary precautions have been taken on site. A Permit to Excavate (Form B) would then be issued to the Work Party. 14. Only Registered Excavator Operators (REO) or Probational Registered Excavator Operators (PREO) will be allowed to operate excavator machines within the work area. 15. Prior to commencement of works, the Work Party s safety manager shall conduct a briefing to all foremen and workers to highlight to them the services layout and to ensure that no works are to be carried out within the services area bounded by red tape unless under the direct supervision of the LCDW and with the explicit approval of the Work Party s project manager, consultants and CAG project officer. 16. In areas where it has been established that services are or may be present, no excavation is to be carried out by excavator. Trial holes are to be hand dug until services are successfully located or desired excavation depth is achieved. 17. Other than having the LCDW to provide standing supervision on site, a competent full-time excavation/piling supervisor shall also be deployed to monitor the site operations during the entire earthworks and to provide close guidance to the excavator operator. 18. The Work Party shall provide protective steel plates or conduits over exposed services positions so as to prevent damage due to movements of heavy vehicles or human traffic over them. 19. If the proposed works were to overcross comms cable ducts, the Work Party shall submit method of support and protection of these ducts to CAG, CAAS Air Traffic Services Division and NCS Communications Engineering Pte Ltd, Line Plant Operations Division for approval. They shall also be informed prior to the dismantling of supports and the backfilling of comms cable ducts. 20.Where the works would be carried out over the Approach Control Radar (ACR) cables, NCS Communications Engineering Pte Ltd shall be engaged for on-site standby to respond quickly to any problems. AOS/84

21.Excavation by machine shall stop once cable slabs are exposed. Only manual excavation is allowed after the cable slabs are removed. Protection slabs over HT cables shall not be tampered with and shall be remained intact unless authorised by CAG and the Work Party s PE to remove them. 22.If unknown services are unaccounted in the process of excavation, Work Party shall stop all works immediately at the affected area and inform the CAG project officer to help to identify these services found. 23.Where necessary, the Work Party shall plan for further cable detection checks to scan the work area for other undetected/ undetectable services. Given the technical limitations of the equipment currently available, investigative detection must be carried out at each stage of the construction process. Stage by stage detection of the underground services must be considered and incorporated within the construction schedule for deep excavation works. This procedure must be implemented until services are successfully located or the effective depth of the excavation is reached. In simple terms, detection is to be carried out during the excavation, at intervals in accordance with the limitations of the detection (typically every 2 to 3 metres), until services are precisely located or the desired construction depth is achieved. AOS/85

File Ref: Date: To: See Distribution List Dear Sir/Mdm REQUEST FOR INFORMATION ON UNDERGROUND SERVICES FOR EXCAVATION/PILING WORKS is planning to carry out excavation/piling works for the following project: PARTICULARS OF PROJECT Project Title Contractor Consultant CAG Officer-in-Charge Contact No. Location of Works (Please see site layout plan attached) Description of Excavation/Piling Work Site Period of Excavation/Piling Works Remarks (if any) We hereby request for information of any underground services under your purview that could be affected by the above-mentioned works. We will carry out cable detection and trial holes and where necessary, contact your staff to verify the services identified on site. We will seek your approval before commencing the proposed excavation/piling works. Your reply with the required information within 2 weeks from the date of this submission would be appreciated. Name & Designation: Signature: Contact No: AOS/86

Distribution List CAFHI Attn: David Phoon (david.phoon@cafhi.com.sg) Contact No: 91995175 / 65464311 (Fax: 6542 2655) [Fuel Hydrant Pipeline & Emergency Cable] CAAS (Aeronautical Telecommunication & Engineering) Attn: Mohd Zaki Ariffin / Chan Kok Sunn / Md Nizam Kamasini [Communications, Navigation & Surveillance Services] CAG(Master Planning) Chee Kay Hyang / Samuel Oh [Airport Development] Ben Tan / Sim Hai Seng [Control Cables] Chan Kim Hove / Tan Hwee Loo [HT Cables] Loh Tick Boon / Anuar Ali [External Airside & Landside LT Cables] Clarence Low / Wong Sou Chun / Jamal Juki [Potable/Fire Hydrant/Industrial Water Pipelines & Drainage Subsoil Pipes] Andy Chin / Low Huay Huay [Airfield Lighting Cables] Tan Eng Kim / Soh Ying Shan [CCTV Services] Note: The contractor(s) shall purchase the services plans for sewer, gas, communication cables for SingTel and Starhub as per these agencies requirements and seek separate approval from these agencies to commence excavation/piling works. AOS/87

FORM A APPLICATION FOR PERMIT TO CARRY OUT TRIAL HOLE AND TRENCHING WORKS CONSULTANTS: WORK PARTY: PROJECT TITLE: LOCATION OF WORKS: (To attached plans) REMARKS: I/We hereby apply for a permit to commence trial hole/trenching works as stipulated in the above location and undertake to comply with the requirements as specified in the checklist and guidelines attached. APPLICANT: NAME OF PROJECT DIRECTOR/MANAGER: SIGNATURE: DATE: APPROVED NOT APPROVED Supported by Consultant: Approval by CAG (Engineering & Development Group): PROJECT MANAGER: PROJECT OFFICER: SIGNATURE AND DATE: SIGNATURE AND DATE: FORM B AOS/88

APPLICATION FOR PERMIT TO CARRY OUT EXCAVATION/PILING WORKS CONSULTANTS: WORK PARTY: PROJECT TITLE: LOCATION OF WORKS: (To attached plans and protection/diversion scheme) REMARKS: I/We hereby apply for a permit to commence *excavation/piling works as stipulated in the above location and undertake to comply with the requirements as specified in the checklist and guidelines attached. APPLICANT: NAME OF PROJECT DIRECTOR/MANAGER: * Delete where inapplicable SIGNATURE: DATE: APPROVED NOT APPROVED Supported by Consultant: Approval by CAG (Engineering & Development Group): PROJECT MANAGER: PROJECT OFFICER: SIGNATURE AND DATE: SIGNATURE AND DATE: AOS/89