CB Svendsen A/S PS 0.0.0/ rev... Description Installation guide for. The is designed for copying of signals from electricity-, heat- or water meters to s. This way, it is possible to connect a data logger and a at the same time. The can copy up to pulse based meters, and make timeshare for M-BUS based meter. The signals are copied through an optocoupler (pulses) and a relay (M-BUS). This ensures galvanic separation between the and the data logger. All pulse inputs towards the meters are specified with the S0 standard, and all pulse outputs towards the FA-0//0/ and the are specified with the S0 standard as well. The is CE approved cf. EN00- and EN00-. Temperature range for the is -0 C to C.. Physical placement of the CTS box The CTS box should be places close to the FA device. Maximum recommended cable length between and the FA device is meter.. Wall mounting of the The is made for wall mounting with self-tapping screws. Mounting holes are located inside the.. Connecting the CB-Svendsen A/S, Kirke Værløse vej, DK-00 Værløse, Tlf. +
CB Svendsen A/S PS 0.0.0/ rev.. Connecting a meter(s) (The left vertical connector in the ): The connector marked METER is used for connecting meters. It is only necessary to connect the number of meters that are in use. If the meter has a polarity independent pulse output (relay), there is no incorrect way to connect the pulse output of the meter. Connecting a (The right vertical connector in the ): The connector marked CTS is used for connecting a or other data acquisition equipment. It is only necessary to connect the number of outputs which are in use. Note: The can only receive signals from the if a FA (or other data logger, which can power the ) has been connected correctly! Connecting a FA type 0//0/ (The horizontal connector in the ): This connector is used for connecting a FA device. Not all terminals require a connection. Every pulse output from the meter is powered from the corresponding pulse input in the FA. A copying of pulses from a single pulse giving meter requires: wires from the FA, wires to the pulse output in the meter and wires for the copy signal for the. If the Timeshare function in the is used for a M-BUS port in a meter, terminal (P+) and terminal (G) on the horizontal connector must be connected to each other, as the function is powered through these terminals. The following pages contain some examples for typical mounting applications. x pulse setup: P+ P- P+ P- P+ P- P+ P- P+ P- P+ P- 9 0 FA-0//0/ P+ P- M+M- M+ M- 9 0 CB-Svendsen A/S, Kirke Værløse vej, DK-00 Værløse, Tlf. +
CB Svendsen A/S PS 0.0.0/ rev.. x pulse mounting: P+ P- P+ P- P+ P- P+ P- P+ P- P+ P- 9 0 FA-0//0/ P+ P- M+M- M+ M- 9 0 x M-Bus: P+ P- P+ P- P+ P- P+ P- P+ P- P+ P- 9 0 FA-0//0/ P+ P- M+M- M+ M- 9 0 CB-Svendsen A/S, Kirke Værløse vej, DK-00 Værløse, Tlf. +
CB Svendsen A/S PS 0.0.0/ rev.. x M-Bus with M-Bus converter for Siemens WR/: P+ P- P+ P- P+ P- P+ P- P+ P- P+ P- 9 0 FA-0//0/ MBUS conv. P+ P- M+M- M+ M- 9 0 x pulse, x M-Bus: P+ P- P+ P- P+ P- P+ P- P+ P- P+ P- 9 0 FA-0//0/ P+ P- M+M- M+ M- 9 0 CB-Svendsen A/S, Kirke Værløse vej, DK-00 Værløse, Tlf. +
CB Svendsen A/S PS 0.0.0/ rev.. Use of for sharing of M or M on FA-0//0/: The can be used on M or M on FA-0//0/. P+ P- P+ P- P+ P- P+ P- P+ P- P+ P- 9 0 FA-0//0/ P+ P- M+M- M+ M- 9 0 Note: T on the MUST connect to M+ (or M+). Do NOT connect to M- or M-! R on the MUST connect to M- (or M-). Do NOT connect to M+ or M+! Please note that: The has one Timeshare function, which means that an additional box is required, if both M and M are to be shared. If the multiport are to be shared as well, boxes are required. The FA-0 and FA- can connect an M-BUS meter on M and an M-BUS meter on M (along with an additional meter on the multi port). The FA-0 and FA- can connect up to M-BUS meters on M and additional meters on M (along with one additional meter on the multi port). The wiring to the is the same for FA-0//0/. The CAN NOT be used for FA-0//0/, IF an M-BUS meter requires a constant voltage on the M-BUS port. The detects when the FA device starts to power up the meters by putting a voltage on the port. The detects this, and activates a relay that reroutes the meters to the FA device. If a constant voltage is used, the meters will be permanently routed to the FA device. CB-Svendsen A/S, Kirke Værløse vej, DK-00 Værløse, Tlf. +
CB Svendsen A/S PS 0.0.0/ rev.. Sealing and powering the The is powered remotely by the FA device, and does not need any other external powering. Sealing the box (with thread or plastic) is possible via the sets of holes in two opposite corners on the.. Verifying the installation Pulse verification: After installation a test is performed, to see if the FA and receives pulses. FA- 0//0/ will flash momentarily with a red LED at every received pulse. Read the manual for the regarding test of pulses for the. M-BUS verification: When the M-BUS interface in the FA device is inactive, the M-BUS is connected directly to the through a relay. Please verify that communication can be performed between meter and (consult the manual for the CTS-system regarding this). M-BUS communication between the meter and the FA device is verified by performing a press-and-hold on the button on the FA device for more than.s, thus starting a manual reading. When the communication commence, the red LED on the will flash. This indicates that the M-BUS has been rerouted through the relay to the FA. Verify that the M- BUS reading is OK (i.e. by watching the LEDs on the FA, consult the installation guide for the FA if in doubt) and that the red LED on the turns off approximately seconds after the last activity on the M-BUS. Remember that the correct driver for the M-BUS based meter MUST be present/chosen in the FA-0//0/ before a correct result can be expected. CB-Svendsen A/S, Kirke Værløse vej, DK-00 Værløse, Tlf. +