Robson Forensic Engineers, Architects, Scientists & Fire Investigators



Similar documents
Chapter 22. Lump Sum Project Guidelines

SECTION STORM DRAINAGE TABLE OF CONTENTS

CHAPTER 8 CIVIL DESIGN

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

Scope of Work Construction Inspection and Materials Testing Services

Short-term. Action items that fall into this category need to take place over the next one to two years.

EXHIBIT A Accessible Truck Routes Map

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

Engineering Major Service Actual Budget Projected Request Executive Adopted

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

Township of Enniskillen. Asset Management Plan

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Infrastructure assets are distinguished from other capital assets because they normally:

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

How To Install An Overhead Sewer

EDUCATION AND PROFESSIONAL DEVELOPMENT PROFESSIONAL EXPERIENCE

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Section 000 Organization of an Engineering District (Construction)

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

July 2010 Met Council contributes $1 million to small business loan fund More Downtown Downtown Minneapolis St. Paul

OGS TO AWARD NEW CONSTRUCTION CONTRACTS

FHWA Emergency Relief (FHWA-ER) Training

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

SECTION STORM DRAIN SYSTEM

Drainage Analysis for the McKownville Area

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

3 Tappan Zee Bridge Rehabilitation Options

CHAPTER 5. Storm Sewer

Warren County MS4 Stormwater Management Program Plan

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

Bridges & Culverts Condition by Quantity

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Robson Forensic Engineers, Architects, Scientists & Fire Investigators

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

C O N S U L T A N T S RESUME

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

Brownfields. Technical Report # 7

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, TIP Public Review Meeting

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

Guidelines for. Permeable Pavement

C-2 Construction, Inc. - NAICS Codes

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

2015 OPERATIONAL PROGRAMS SCHEDULE

City of Valdosta Land Development Regulations. Table of Contents

FOR IMMEDIATE RELEASE September 17, 2013 Contact:

Welcome to our New Focus Office. Now delivering engineering solutions to the Lethbridge Area

DRAFT Public Outreach Document for What s an SSMP?

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/ Federal Project: BR-0252(001)D

Special Specification 7021 Water Main and Sewer Line Replacements

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING

How To Build A Road In A Townhouse

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Q. Please provide resumes for Gary L. Murray, Sean LaCour, Glenn Samms, Trina L. Troke, Trina Cormier.

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Close-Out Documents... 9

Town of Huntsville Municipal Asset Management Plan

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

CIVIL ENGINEERING ASSOCIATE, 7246

Alternatives Presentation Meeting Middlebury WCRS(23)

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

ERIE COUNTY COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM (FY 1985 to FY 2013)

Kansas City s Overflow Control Program

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)

LS 2540 SEWER LATERALS AND INSPECTION TEES

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer

Storm Drain System Operation and Maintenance

225 statewide business consultants, 15 transportation consultants and 8 former CDOT engineers available to help you immediately!

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU

Municipal Road Fund To account for County grant money used for various street projects approved through the county s municipal road fund.

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION

Exhibit A Scope of Work


2011 HYDRAULICS MANUAL

FREQUENTLY ASKED QUESTIONS: CIVIL ENGINEERING AND CIVIL ENGINEERING TECHNOLOGY

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT

Summary of Potential Storm Drain Projects and Programs

GENERAL EXPERIENCE OF FIRM

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY

Transcription:

PROFESSIONAL EXPERIENCE 2013 to Robson Forensic, Inc. present Associate Provide technical investigations, analysis, reports, and testimony toward the resolution of commercial and personal injury litigation involving design and construction of roads, municipal facilities, and aquatic facilities, heavy construction and failure analysis. 2013 Boswell Engineering, Albany, NY /Construction Inspector Senior Transportation Construction Inspector (NICET III) on NYSDOT Projects. Responsibilities included: Oversight of work zone traffic control and site safety measures; Assuring compliance of contractor s procedures and work with contract documents, plans and specifications; Estimating quantities; Documenting field conditions; Tracking work completed; Documenting daily work using Site Manager; Field testing of concrete per NYSDOT and American Concrete Institute (ACI) procedures and specifications. D261910 Rehabilitation of I-787 Bridges and Ramps at Clinton Ave Interchange; D262026 Accelerated Bridge Program; Rehabilitation of Rte. 2 over Hudson River; D262135 Replacement of Rte. 29 over Black Creek; D262350 I-87/Adirondack Northway Stop Texting Signs Initiative 2009 to Greenman-Pedersen, Inc., Albany, NY 2013 for consulting engineering company. Responsibilities included: Design work for transportation, utility, electrical and landscape engineering projects in New York State and Vermont; Designing geometric horizontal and vertical alignment of asphalt concrete and portland cement concrete highways, collector roads, roundabouts, urban streets, intersections, sidewalks and multi-purpose recreation trails; Designing signage and pavement markings in conformance with the federal Manual of Uniform Traffic Control Devices (MUTCD) and New York State supplement; Designing work zone traffic control measures, detours and temporary utility relocations; Drafting plans using AutoCADD and Microstation; Writing contract documents & bid proposals; Developing special specifications; Ensuring conformance with Federal, State and local codes and regulations; Estimating quantities and costs; Coordinating project planning and construction activities with utility companies, railroads, municipalities and interested parties; Preparing engineering calculations; Writing engineering reports; Researching 07/02/15 1 www.robsonforensic.com

new construction/repair techniques and materials; Reviewing contractor submittals, material certifications and certified payroll reports; Performing field surveys; Providing construction support; Performing construction inspections for NYSDOT, municipal and private projects including oversight of work zone traffic control measures, full-depth roadway reconstruction, asphalt concrete mill & fill and overlay, storm drain and sanitary sewer construction, utility work, portland cement sidewalk construction, sign and pavement marking installation, landscaping tracking and documenting work completed. Coordination of utility facility locations (including underground piping/conduit and utility poles) with utility companies, municipalities and other interested parties. Design/ing projects included: Draft Engineering Study of Eroded Slope, University at Albany Foundation Bioscience Development Corporation, East Greenbush, NY; Transportation Improvements (Pedestrian Facilities), New Rochelle, NY; Siena College Pedestrian Connection to NYS Route 9, Loudenville, NY; Replacement of Plank Road Bridge over Mill Brook, Moriah, NY; Rehabilitation of the Albany County Vietnam Veterans Memorial (Landscape Design), Lafayette Park, Albany, NY; Greenspace Zoning Evaluation Report, University at Albany Foundation Bioscience Development Corporation (East Campus), East Greenbush, NY; Foundation Repairs (Historic Brick Building Restoration) Sunnycroft Building, Willard Drug Treatment Center, Romulus, NY; Port Henry Beach Campground Restoration (Electrical System Design), Port Henry, NY; Traffic Improvements to NYS Route 4 at New Fed-Ex Distribution Center, East Greenbush, NY; D213654 NYSTA Buffalo Division, Pavement Rehabilitation MP 378 MP 394, Batavia, NY; Helderberg Hudson Rail Trail, Albany County, NY; County Road 156 (Fuller Road) Corridor Improvements, Albany, NY; Zim Smith Multi-Purpose Trail, Saratoga County, NY. Inspection projects included: Walkway Over The Hudson Main Span Structural Steel Modifications, Highland, NY; University at Albany Signage at the Fuller Road/Tricentennial Drive Roundabout, Albany, NY; Traffic Improvements to NYS Route 4 at New Fed-Ex Distribution Center, East Greenbush, NY; County Road 156 (Fuller Road) Corridor Improvements, Albany, NY; Ellsworth Commons Commercial/Residential Project Construction along frontage with NYS Route 9, Malta, NY; 07/02/15 2 www.robsonforensic.com

D030659 NYSDOT Region 1 Construction Inspection Term Agreement including: D261452 I-87 Paving and Joint Repairs, Warren County, NY; D261195 Bridge Painting Rexford Bridge, Schenectady, NY; CR 108 (Dunning St/Plains Rd) Resurfacing, Malta, NY; Shaftsbury Sidewalk Enhancement, Shaftsbury, VT. 2003 to Aquatic Development Group, Cohoes, NY 2008 Project Designer Member of design studio working on community pools, natatoriums, indoor and outdoor water parks. Responsibilities included: Development of waterpark designs from concept drawings to construction documents using AutoCADD; Designing disinfection systems, filtration systems, circulation systems, process piping and water heating systems for pools, water slides, water features, wet-decks and hydro-spas; Performing hydraulic analysis of proposed water circulation systems; Ensuring conformance with health and safety codes; Responsible for applications to State Health Departments for facility licensing; Coordinating designs with water slide and other specialty manufacturers; Specifying pumps, equipment, pool appurtenances and materials; Detailing mechanical, electrical and structural drawings; Estimating quantities & costs; Providing construction support. Great Escape Indoor Waterpark, Queensbury, NY; Rudy A. Ciccotti Family Recreation Center, Albany, NY; Silver Mountain Indoor Waterpark, Kellogg, Idaho; Greek Peak Indoor Waterpark, Cortland, NY; Kalahari Indoor Waterpark (Phases 1 & 2), Sandusky, Ohio; Kalahari Adventure River, Wisconsin Dells, Wisconsin; Columbus Zoo Outdoor Waterpark, Columbus, Ohio Hacienda Water Park, Doradro Beach, Puerto Rico; Tornado (Water Slide) Landing Pools at Six Flags New England and The Great Escape, Agawam, Massachusetts and Queensbury, NY. 2000 to Cianbro Corporation, Pittsfield, ME 2002 Project Engineer Project Engineer for regional heavy construction general contractor. Responsibilities included: Direct contact and coordination with owners; Negotiating prices; Coordinating work with subcontractors, consulting engineers, fabricators, and suppliers; Writing Subcontracts and Purchase Orders; Processing payments to suppliers and subcontractors; Writing repair and welding procedures; Specifying materials; Reviewing shop drawings; Responsible for project-specific permitting 07/02/15 3 www.robsonforensic.com

issues; Tracking project budgets and schedules; Estimating work; Drafting plans and shop drawings using AutoCADD; Detailing structural steel; Writing reports; Participating in dispute resolution proceedings; Performing field surveys; Documenting existing and new site conditions; Tracking and documenting work performed; Tracking compliance with Davis-Bacon regulations, Buy American provisions, Labor rules and project E.E.O. goals. Coordination of utility facility locations (including underground piping/conduit and utility poles) with utility companies, municipalities and other interested parties. Replacement of Route 9 over Hudson River, Glens Falls, NY (NYSDOT); Rehabilitation of Moveable Dam 8 at Lock E-12 Erie Canal, Tribes Hill, NY (NYS Canal Corporation and Thruway Authority); Deck Replacement of Kingston-Rhinecliff Bridge, Kingston, NY (NYS Bridge Authority). 1999 to Laberge Group, Ltd., Colonie, NY 2000 Responsibilities included: Working as an Assistant Design Engineer on Wastewater Treatment and NYSDOT/Municipal Transportation Projects for consulting engineering firm. Reconstruction of NYS Route 2/Congress Street, Troy, NY; Reconstruction of 3 rd Street and 3 rd Avenue, Rensselaer, NY; Postenkill Gorge Pedestrian Trail, Troy, NY; I-90 Exit 8 Extension Study, North Greenbush, NY; Sanitary and Storm Sewer Additions, East Greenbush, NY; Parking Impact Analysis, Colonie, NY; NYCDEC Town of Shandanken Wastewater Treatment Study 1998 Wilbur Smith Associates, Latham, NY /Assistant Team Leader Responsibilities included: Assistant Team Leader for NYSDOT Region 1 Bridge Inspections; Transportation Construction Inspector on NYS Thruway Authority asphalt concrete paving projects. 1997 to Schultz Construction, Round Lake, NY 1998 Project Engineer Construction Field Engineer for heavy construction firm. Responsibilities included: Supervising and tracking emergency field repairs; Writing welding and repair procedures; Documenting field conditions; Coordinating field 07/02/15 4 www.robsonforensic.com

changes and revisions with owners, fabricators and subcontractors; Tracking and documenting work completed; Documenting force account/disputed work; Preparing demolition/erection drawings; Reviewing bid requirements and project plans; Soliciting and reviewing quotes; Estimating quantities; Assisting with bid & budget preparation; Ordering materials; Reviewing shop drawings and subcontractor s submittals; Serving as liaison to subcontractors; Responsible for submitting required paperwork to owner; Assisting with project mobilization; Producing and submitting project status, E.E.O goal and Davis-Bacon wage reports. Rehabilitation of Lock C-4 Champlain Canal, Stillwater, NY (NYS Canal Corporation and Thruway Authority); Canal Terminal Wall Erie Canal, Amsterdam, NY (NYS Canal Corporation and Thruway Authority). 1994 to Clough, Harbour & Associates, Albany, NY 1997 Engineering Technician (Summer Coordinated NYSDOT & ConnDOT projects (underwater bridge inspection, & Fall) fathometer surveys, scour evaluations) for consulting engineer firm. PROFESSIONAL CREDENTIALS Professional Engineer: NCEES, Connecticut, Illinois, Indiana, Maine, Massachusetts, Michigan, New York, Vermont Certified Concrete Field Technician, American Concrete Institute (ACI) EDUCATION Bachelors of Science, ing, Union College, Schenectady, NY, May 1997 Associate of Science, Math Science/Engineering Science, Hudson Valley Community College, Troy, NY, May 1995 Bachelor of Arts, Vassar College, Poughkeepsie, NY June 1986 Continuing Education: OSHA 10 Hour Course Construction Safety and Health ACI Concrete Field Technician Level 1 07/02/15 5 www.robsonforensic.com

PROFESSIONAL MEMBERSHIPS Capitol District Damage Prevention Council (Dig Safely NY) Board of Education Enlarged City School District of Troy, NY Executive Board New York State Association of Small City School Districts SANITARY AND STORM SEWER EXPERIENCE Forensic investigations of municipal sanitary sewer overflow events, urban storm sewer back-ups and rural water body siltation due to erosion from storm drainage. Design and installation of a temporary sanitary sewer line suspended over the Hudson River in Glens Falls, NY. Design of a combined sewer separation project in Rensselaer, NY. Field location and condition surveys of sanitary sewer systems in the Cities of Troy and Rensselaer, NY. Design of the reconstruction of, and addition to, an urban storm sewer system in the towns of Guilderland and Colonie, NY. Designed storm sewer systems using the Rational Method. Field Engineer for the construction of a roadway drainage/storm sewer project in Brunswick, NY. Field location and condition surveys of storm sewer systems in Voorheesville, Guilderland and Colonie, NY. Construction Inspector for the construction of municipal and private development storm sewer systems. Design, production and quality control of precast underground utility structures including: Sanitary and Storm Manholes Pump Stations Septic Tanks (Residential and Commercial) Distribution Boxes Box Culverts Custom Vaults Catch Basins Concrete Coating/Waterproofing Products and Structure Appurtances (Boots, Steel & PVC Sleeves, Linkseal, Hatches, Manhole Covers, Frames and Grates) Designed process piping systems including pressure, suction and gravity flow. 07/02/15 6 www.robsonforensic.com