Case stories- Utilisation of dredged sludge Pansio / Aurajoki Turku Execution of dredging works



Similar documents
Preliminary pilot for the process stabilisation of dredged contaminated sediments at Pansio harbour in Turku at the end of 2007.

ABSOILS - SUSTAINABLE METHODS AND PROCESSES TO CONVERT ABANDONED LOW-QUALITY SOILS INTO CONSTRUCTION MATERIALS

MASS STABILIZATION of. peat, mud and contaminated sediments. Geoteknikerdag Juni 1st & 2nd 2007 Mikko Leppänen & Jorma Havukainen Ramboll Finland Oy

Göran Holm Director of Research & Development, Swedish Geotechnical Institute (SGI) Project Manager SMOCS

U l t i m a t e e f f i c i e n c y D re D ging

Hazards from the bottom

consulting engineers and scientists

NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012

Boskalis: at home in the Middle East

Screening Crushing Mixing Aerating Loading ALLU SM. Screener Crusher

Storm water strategy of Turku City Citywater Storm water expert meeting Turku

Role of Northern European forestry in the energy production chain, case Fortum. Jari Nylén Purchasing Manager Fortum Power and Heat Oy, HEAT

US&R Heavy Equipment & Rigging Specialist Training Module 3 Unit 3: Demolition Contractor Equip & Helicopter Ops

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

TVO and Nuclear Waste Management at Olkiluoto. Corporate Adviser

SMALL SCALE DREDGING AN INTRODUCTION IT S IN OUR NATURE

CASE: the Island of Nauvo, Finland

Text and photos: Juha Siekkinen, Life+ Return of Rural Wetlands Cover drawing: Jari Kostet Maps and aerial photos: National Land Survey of Finland

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of ( )

The Faust Corporation has always held safety, quality and environmental impact as its first concern in the designing and construction of projects.

Energy story of Turku region, history and future

Sediment and Dredged Material Management - Relevance and Objectives 18 September 2003

Environmentally Friendly Systems to Renovate Secondary Roads. Life- Environment Project: Kukkia Circlet. LIFE02 ENV/FIN/000329

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

NELI-Programme. Kymenlaakso Logistics Development Programme Raija Salo, March 2009

NEW NUCLEAR POWER PLANT UNIT IN FINLAND ACCEPTED BY THE FINNISH PARLIAMENT

Using resources in an efficient way Case Metsä Group

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software

Introduction to the project web-based tools

A"Local"Authority"Biomass"Supply"Chain;" experiences"in"north"lanarkshire"and" Stockport" November"2013"

Design And Construction Of The South San Diego Bay Western Salt Pond Restoration Project Headwaters To Ocean Conference

CHP and DHC in Helsinki

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008

SEA Europe input on future EU-US Transatlantic Trade and Investment Partnership

Rauhalahti Biomass CHP Plant

Methods for Land Reclamation using Soft Soil and Waste

Preliminary validation of the APROS 3-D core model of the new Loviisa NPP training simulator

Waterfront Helsinki Sitra Helsinki

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar

CO 2 emissions, energy efficiency and renewables are in the focus. A carbon neutral future as a goal

Remediation Weekly Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action

LANDFILL MINING POTENTIAL OF CLOSED MSW LANDFILLS IN FINLAND. Tommi Kaartinen VTT, Kai Sormunen Ramboll Finland Oy & Jukka Rintala TUT

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS

Dredging in the Port of Antwerp: Ing. Agnes Heylen Environment Manager Antwerp Port Authority

The Interaction between Soil and Waste Legislation in Ten European Union Countries

District Heating & Cooling in Helsinki

Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic Modeling Summary Report

Colonial Pipeline Company

Precision Hydrographic Services. Company Profile. Company Profile. We do it once, we do it right.

SERVICES 2015 ISO 18001

Land contamination Information requirements for planning applications Version 0.05

MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES

State of the environment in Helsinki 2012

./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$ %3te9. Sol9ara 1 Pro;ect. !"l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=?

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

Reference Materials for Environmental Performance Testing Dr Steve Wood Head of Regulatory and Legislative Services. ISPRA 25 June 2009

Introduction to Waste Treatment Technologies. Contents. Household waste

Plant Maintenance Services and Application of ICT

Remediation Weekly Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action

NORTH LONDON HEAT AND POWER PROJECT DESIGN OF PLANT, NUMBER OF PLANT LINES

Building. 406 Electrical Installations. Competition Coordinators. Image: Skills Finland / Jaakko Manninen. Marko Kangas. 406 Electrical Installations

Switch from gas to biomass in district heating Case Jelgava, Latvia. Kristian Rehnström, 25 February 2015

S4i Stainless. for Industry. A Complete Service Concept Providing Added Value to the Customer. cutting edge solutions. cutting edge solutions

INDUSTRIAL FABRICS Dewatering Systems

Tax relief on buildings. The Grant Thornton capital allowances service

Söderströmtunnel: immersion in downtown Stockholm, Sweden

Wyckoff/Eagle Harbor Site Bainbridge Island, Washington

TOUR DE TABLE CANADA

Application Form - Contracting Firm

Underground Storage Tanks

Development of the BIM based process for Dredging Works

Defining Waste Recovery: Permanent Deposit of Waste on Land.

AvestaPolarit - Operating with three divisions

OWPST & Titan 200 & UK Offshore

PT. ANDIKA BUANA LINES BATAM - BROCHURE

Framework Agreement on the Improvement of Energy Efficiency in Industries

Biogas and landfill gas utilization in Helsinki region waste management. Aino Kainulainen Project Manager Helsinki Region Environmental Services HSY

Summary technical description of the SUNSTORE 4 plant in Marstal

Applied Industrial Energy and Environmental Management. Wiley - IEEE

Country Report, SWEDEN

Profile. Marine ingenuity In just two words, we show what we do, how we do it, and what makes us different. Dredging and Marine Contractors

The U. S. Ambassador s Special Self-Help Program

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362

Software Applications, ICT Services and Infrastructure in Large Scale Enterprises in Poland 2015

ASSESSMENT AND MANAGEMENT OF CONTAMINATED SITES IN FLOOD DISASTER IN SERBIA 2014

COMPARISON OF ELECTRICITY GENERATION COSTS

The new waste burning investment in the Helsinki Metropolitan Area

Energy Efficiency and Renewable Energy Sources in Sweden

PUBLIC NOTICE. PIWS 3000 Medical Waste Treatment System OAC Approval

Hydraulic Marine Machinery

STOCKHOLM CITY PLANNING ADMINISTRATION. Hammarby Sjöstad. Malin Olsson, Head of Section, Stockholm City Planning Adm.

Global and Chinese Rail Mounted Gantry Crane Industry

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY

Welcome to NOAH and Langøya!

THE REGIONAL BALANCE OF WOOD FUEL DEMAND AND SUPPLY IN FINLAND

Seminar on Emissions Trade Policy and Practice in Finland and Hungary

Environmental Remediation Examples and Remediation Strategic Planning

Transcription:

Case stories- Utilisation of dredged sludge Pansio / Aurajoki Turku Execution of dredging works Tapio Leinonen 9.10.2008 1

Presentation content Life-project basic information Targets for the Life project Main tasks Project organisation of parties Dredging works Dredging techniques Other dredging methods 2

LIFE06 ENV/FIN/000195 PROJECT NAME Controlled Treatment of TBT- Contaminated Dredged Sediments for the Beneficial Use in Infrastructure Applications. Case: Aurajoki Turku, Finland STABLE 3

Basic information First application in November 2004 Project awarded in spring 2006 Time schedule 1.4.2006 31.3.2009 Application process was complicated and time consuming Good arguments needed and they are judged in EU level Budget 3,7 M, EU contribution 0,98 M 4

Main targets for the project The target of the project is to develop new environmentally friendly and cost effective stabilisation method for contaminated soil Method is called process stabilisation This kind of method is not known in EU Stabilized dredging masses will be utilized in Pansio harbour as harbour field structures Project target areas are Pansio and river Aurajoki 5

Direct target group for the project Turku harbour has the same tbtproblem as many other harbours They want to solve tbt-problem in sophisticated way European organisations dealing with the sediments, european view is very important in EU finaced projects 6

Main advantages Less environmental risks due to the fact that no unprocessed sediment into basin More homogenous material due to better mixture Less bibder needed Lower costs? 7

Main tasks of Life project Determination of binder recipes Devolopment of process stabilisation method, testing, management and control Life-Cycle assessment Dissemination Management and reporting 8

PROJECT ORGANISATION Project organisation STEERING GROUP TERRAMARE OY (Beneficiary) -Mr Jarmo Yletyinen (Co-ordinator) -Mr Tapio Leinonen (Project manager -Mr Seppo Ajanko (Works manager) HYVINKÄÄN TIELUISKA OY (Partner) BIOMAA OY (1.1.2008) - Mr Valto Tikkanen - Niko Tikkanen - Ville Niutanen COUNCIL OF SOUTH-EAST FINLAND (Partner) - Mr Eero Löytönen T A S K G R O U PS T E C H N I C A L FORTUM POWER AND HEAT OYJ (Partner) - Mr Antto Kulla G R O U PS PORT OF TURKU (Co-finacier) - Mr Matti J. Niemi RAMBOLL FINLAND OY (External asisstant) - Dr Pentti Lahtinen (- Dr Ville Niutanen) ENVIRONMENTAL CENTRE OF SOUTH- EAST FINLAND (Specialist member) - Mrs Marja-Terttu Parsama 9

Life project parties 1/5 FORTUM POWER AND HEAT OY Leading energy company in Scandinavia and Baltic sea area Main products electricity, heat and steam Side products 400 000 tons of fly ash of which 50% for the beneficial use Search market for fly ash 10

Life project parties 2/5 BIOMAA OY Biomaa Oy was founded in 1994 operations in contaminated land remediation and wood fuel crushing, mass stabilisation Main developer of process stabilisation 11

Life project parties 3/5 COUNCIL OF SOUTH-WEST FINLAND One of regional councils in Finland Experience about many EU projects Responsible of publicity and dissemination of the project (Webpages, videos etc.) Expert and assessor 12

Life project parties 4/5 TURKU HARBOUR Important western harbour Fighting with the tbt-problems Wants to be development orientated organisation Co financer of the project 13

Life project parties 5/5 TERRAMARE Leading dredging and harbour construction contractor in Nordic Countries Developed environmental dredging technology since 2002 More that 10 environmental dredging projects during last years Tbt-contractor in Vuosaari 14

Dredging, main plant First pilot on Pansio military harbour in 12.2007 Backhoe dredger Marika + environmental grab Barges Adam ja David Second phase Grab dredger Kahmari + environmental grab Barges Ada5 and Ada6 15

Quantities First pilot on Pansio military harbour in 12.2007 Dredging of Tbt-contaminated material uring environmental grab quantity 2 000 m3 Second phase in 10-12.2008 in river Aurajoki Dredging of Tbt-contaminated material using environmental grab quantity app. 80 000 m3 16

Environmental grab Controlled Sediment Removal: Crane Monitoring System (CMS) / CPM and Horizontal Profiling Grab (HPG) 17

Controlled by RTK-GPS, centimeter-level precision in X, Y, Z planes, real-time feedback for operator, data logging HPG is placed into the sediment (unlike cable rig buckets), and closes on true horizontal plane. Excavate in patterns of overlapping rectangles, no squeezing out of sediments. Proven minimal turbidity, spillage Environmental grab Key Features of CMS and HPG Debris 9.10.2008 handling Tapio Leinonen 18

Environmental grab 19

Environmental grab CMS + HGP Equipment proven over ten years of service Mounted on hydraulic excavator for greater precision Assures removal of contaminated sediment while minimizing overdredging Minimal mixing of water compared to pumping process 20

Accurancy in dredging Accuracy = Substantial Cost Savings 10 cm of unnecessary overdredge over 100 hectares equates to 100,000 m3 Reduction of Disposal Volume = Significant Cost Savings 21

Other dredging methods Backhoe bucket with closing mechanism Disk Cutter Cutter suction dredger 22

Questions Any questions? 23