1 Land contamination Information requirements for planning applications Version 0.05 May 2015
2 Table of contents Introduction Outlines the intent of this guidance and defines key terms Required information Outlines the information that is required at relevant stages of application depending upon the scale of development Planning decision Potential outcomes of the planning application process Flow chart Overview of the process Appendix A Sensitive Development Questionnaire Guide to considering contaminated land in the planning process 2
3 Guide to considering contaminated land in the planning process 1 Introduction 1.1 The National Planning Policy Framework (NPPF) published by the Department for Communities and Local Government in March 2012 replaces thousands of pages of national planning policy (including Planning Policy Statement 23: Planning and Pollution Control (PPS23)) and has a primary focus of helping to achieve sustainable development. Section 11 of the NPPF provides guidance on conserving and enhancing the natural environment, and makes a number of statements, in connection with land contamination, the key paragraphs being as follows: Paragraph 120. To prevent unacceptable risks from pollution and land instability, planning policies and decisions should ensure that new development is appropriate for its location. The effects (including cumulative effects) of pollution on health, the natural environment or general amenity, and the potential sensitivity of the area or proposed development to adverse effects from pollution, should be taken into account. Where a site is affected by contamination or land stability issues, responsibility for securing a safe development rests with the developer and/or landowner. Paragraph 121. Planning policies and decisions should also ensure that: the site is suitable for its new use taking account of ground conditions and land instability, including from natural hazards or former activities such as mining, pollution arising from previous uses and any proposals for mitigation including land remediation or impacts on the natural environment arising from that remediation; after remediation, as a minimum, land should not be capable of being determined as contaminated land under Part IIA of the Environmental Protection Act 1990; and adequate site investigation information, prepared by a competent person, is presented. Notwithstanding the above, the NPPF places an emphasis on encouraging the effective use of land by re-using land that has been previously developed (brownfield land), provided that it is not of high environmental value. Planning Policy Guidance is now available online for Land contamination issues. Guide to considering contaminated land in the planning process 3
4 Planning policy guidance states that contamination is more likely to arise in former industrial areas but cannot be ruled out in other locations including in the countryside (e.g. by inappropriate spreading of materials such as sludges, or as a result of contamination being moved from its original source). In addition, some areas may be affected by the natural or background occurrence of potentially hazardous substances, such as radon, methane or elevated concentrations of metallic elements. Planning policy guidance states that a specific investigation can establish whether there is contamination at a particular site, but the possibility should always be considered particularly when the development proposed involves a sensitive use such as housing with gardens, schools or nurseries. All planning applications use the national 1App planning application form. Section 15 (Existing Use) of the 1App form incorporates the principles of the NPPF (as outlined above) and asks a number of questions about the former and existing use of the site. When preparing a planning application the following questions must therefore be addressed and answered accurately with a yes or no on the application form: 1.2 Land which is known to be contaminated This includes sites where relevant information (e.g. previous investigation reports or local knowledge associated with past land use) indicates land contamination, such that the site is not likely to be considered suitable for use in its current state. 1.3 Land where contamination is suspected for all or part of the site This includes land with a previous potentially contaminative use, but where there is no current formal evidence of land contamination. Land with any previous commercial/industrial use, including areas where historical metalliferous mining activity may have taken place, fall into this category. Similarly, land with suspected made ground should also be considered within this category. Further information on potential contaminative activities can be found by reviewing relevant information (e.g. Department of Environment Industry Profiles (DoE, 1995)). Public Protection & Business Support have supplied a historical land use database for use as a development management constraints layer. However, previously developed land with any commercial or industrial former use, irrespective of its specific definition, is likely to require some assessment and will fall under this category. Guide to considering contaminated land in the planning process 4
5 1.4 A proposed use that would be particularly vulnerable to contamination This includes any residential building, school, nursery, allotments and playing fields/recreation areas or similar uses. A proposed change of use from a commercial use to any of the vulnerable groups above is considered to fall within this group. Minor extensions, conservatories, outbuildings and garages are not considered vulnerable provided there is no known or suspected land contamination on the site. It should be noted that contamination is not restricted to land with previous industrial use; it is possible that it may also have occurred on green field sites e.g. spills, intensive pesticide use, waste burial, etc. 2.0 Required Information 2.1 If the answer to any of the above questions is Yes, an appropriate contamination assessment must be submitted with the planning application. Please see Figure 1 for a more detailed explanation including the level of information that will be required which depends upon the nature of the proposed development and whether contamination is suspected on the site. This advice note details the information considered proportionate to meet the requirements of the NPPF. Please note that land in the vicinity of the site may also have to be considered given the potential for contaminants to migrate laterally off site, including gas migration. The precise information requirements are outlined in Table Submitting the correct information with the application will enable it to be processed in timely manner and therefore avoid any delays which may otherwise occur. In certain circumstances it may also avoid the need to impose relevant planning conditions where permission is subsequently granted. The first stage of assessing a site for contamination is to establish its former use(s), its surroundings, and to undertake a walkover survey to collect information about the physical state of the site. If there is known or suspected contamination at the site Environmental Protection Officers from the Public Health and Protection team of Cornwall Council should be consulted at an early stage. If contamination is suspected at this stage it is likely that the applicant will require the services of suitably qualified consultant to undertake further investigatory work. Guide to considering contaminated land in the planning process 5
6 Table 1 Minimum requirements for contamination assessments No suspected or known contamination Minor vulnerable developments* Major vulnerable developments* All other nonvulnerable developments no suspected / previous industrial history, a true Greenfield site Contamination suspected A Brownfield site with previous industrial use or infilled ground Contamination known Existing reports indicate that the site has land contamination issues. *See Table 2 for description of types of development Guide to considering contaminated land in the planning process 6
7 Table 2 Types of vulnerable development Minor vulnerable developments Residential development 1 to 9 dwellings Residential development under 0.5 hectares Mixed use developments including a sensitive end use (see para 1.1) under 0.5 hectares Large extensions to sensitive end use premises (requiring full application) Holiday Premises under 0.5 hectares. Barn Conversions (treated as residential) Change of use applications (proposed change from an industrial/commercial use to a residential or other vulnerable use) Major vulnerable developments Residential development of 10 or more dwellings Residential development over 0.5 hectares in size. Holiday Premises over 0.5 hectares Schools Play areas Hospitals Allotments Mixed use developments including a sensitive end use (see para 1.1) over 0.5 hectares 2.5 Requirement 1 (from Table 1) As a minimum the developer must provide a Phase 1 desk study with the planning application. This should include a desk based study (which looks at all the available historical and environmental information), a site walkover, and the generation of a risk-based conceptual model of the site identifying the potential sources, pathways and receptors at the site ( preliminary risk assessment ). The requirements for a Phase 1 desk study can be found in the document Guidance for the Safe Development of Housing on Land Affected by Contamination, NHBC/EA/CIEH, R&D Publication 66: If the desk study indicates as part of a preliminary risk assessment that potential pollutant linkages are likely on the site then further intrusive investigations will be required in line with CLR 11 Model Procedures for the Management of Contaminated Land. Planning Practice Guidance on Land affected by contamination (released March 2014) states that unless this initial assessment clearly demonstrates that the risk from contamination can be satisfactorily reduced to an acceptable level, further site investigations and risk assessment will be needed before the application can be determined. Guide to considering contaminated land in the planning process 7
8 2.6 Requirement 2 (from Table 1) As a minimum, the applicant must include a completed copy of the Sensitive Development Questionnaire (Appendix A) with the planning application. Please note that the Sensitive Development Questionnaire must be completed by the applicant who must also sign to acknowledge that the information provided is correct. Photographs must be included where relevant. In areas of Cornwall, where metalliferous mining activity is known to have historically taken place, it is strongly recommended that a mining survey is undertaken on this site. If any significant potential contamination sources are identified from this information a formal phased investigation, starting with a formal Phase 1, will be required at the application stage. 2.7 Requirement 3 (From Table 1) A contamination assessment is not required to be submitted with the planning application. 3.0 Planning Decision When the application is decided, it will either be granted without conditions, granted with conditions, or refused. If the application is granted with conditions relating to land contamination then further information will be required (usually before commencement of development). In some cases, further information will be required prior to the decision date if it is deemed that there are significant risks to the development from contamination. These situations will be looked at on a case by case basis and an officer from Public Protection and Support will be able to advise accordingly. Guide to considering contaminated land in the planning process 8
9 Guide to considering contaminated land in the planning process 9
10 Sensitive Development Questionnaire (for Minor Vulnerable Developments) The following questions must be answered by the applicant or another person who has visited the site and has the appropriate knowledge to be able to provide accurate answers. The signature of the applicant is required to acknowledge the accuracy of the answers and acceptance of ultimate liability for these. Site Address: Q1. Is this development on previously developed land*? (*NB. This includes land used for industrial/commercial purposes or infilled ground, but does not included land where the current or former use is residential) If, Please submit a Phase 1 desk study with your planning application. Q2. Please give a brief description of the site and its buildings: Q3. Please describe the type of land usage surrounding the site North: East: West: South: Q4. Are there any fuel storage facilities on site (including underground and/or above ground petrol, diesel or heating oil tanks)? If then please describe and include photo Guide to considering contaminated land in the planning process 10
11 Q5. Are there any areas of the site where waste disposal has occurred in the past (this will include empty drums or spare machinery parts), or areas where bonfires or incineration has taken place? If then please describe and include photo Q6. Are there any infilled pits or ponds on the site? If then please describe and include photo Q7. Are there any electrical sub stations on the site or fuel lines crossing the property? If then please describe and include photo Q8. Are there any former sheep dip facilities on the site? If then please describe and include photo Q9. Is there any staining, smells or other similar evidence of spillages or contamination on the site? If then please describe and include photo Guide to considering contaminated land in the planning process 11
12 Q10.Are you aware of any circumstances that may have led to land contamination affecting on your site? If then please describe Q11. Please give a brief description of the drainage at the property, please mention if you have any soakaways or interceptors at the site. Q12. Any further relevant information? I/we confirm that, to the best of my/our knowledge, any facts stated in this document are true and accurate and accept any liability in relation to this information Print name Signed Date Guide to considering contaminated land in the planning process 12
Planning Advice for Developers
Recommended Guidance The Advice Note on Breckland Council s Contaminated Land web page at http://www.breckland.gov.uk.contaminatedland BS 10175:2001 - Investigation of Contaminated Land - Code of Practice
More informationSite Cleanup in Connecticut
Site Cleanup in Connecticut Taking the Mystery Out of Dealing with Contaminated Property in Connecticut: Information for Property Owners, Buyers, Sellers, Attorneys, Bankers, Insurance Representatives
More informationEnvironmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
More informationNational Planning Policy for Waste
National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this
More informationAPPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
More informationSOIL-MAT ENGINEERS & CONSULTANTS LTD.
SOIL-MAT ENGINEERS & CONSULTANTS LTD. 130 LANCING DRIVE, HAMILTON, ONTARIO L8W 3A1 PHONE (905) 318-7440 FAX (905) 318-7455 E-MAIL: info@soil-mat.on.ca PROJECT NO.: SM 145464-E JANUARY 16, 2014 1371975
More informationDevelopment proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
More informationProposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION
EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially
More informationEnvironmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
More informationDefence College of Technical Training. Former RAF Lyneham Geo-Environmental Report 32655 Appendix D: Preliminary Qualitative Risk Assessment
Item No. Area/ Building Pathway to 1 Identified areas of / (redevelopment Ingestion Inhalation Severe Likely High SKM Enviros desk study highlights several known areas of significant historical. Areas
More informationUNDERGROUND OIL STORAGE TANKS
L E S P E R A N C E M E N D E S L A W Y E R S UNDERGROUND OIL STORAGE TANKS A Property Owner s Guide Robert J Lesperance and Naomi R Rozenberg If your home, townhouse or condominium was built before 1970,
More informationAdvice can also be sought from specific specialist officers in the Council.
Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information
More informationCould your house sale or purchase be affected by Contaminated Land?
Could your house sale or purchase be affected by Contaminated Land? What is Contaminated Land? The legal definition of Contaminated Land, as provided by Part IIA of the Environmental Protection Act 1990,
More informationDistrict of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS
CHAPTER 55 UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS Section 5500 Compliance with Other District Laws 5501 Applicability of UST Regulations 5502 Partial Applicability of UST Regulations to Particular
More informationPresented by: Craig Puerta, PE, MBA December 12, 2012
Presented by: Craig Puerta, PE, MBA December 12, 2012 Established in 2010 under charter from New York State to transfer lower priority sites from State s program. First municipally-run brownfield cleanup
More informationPLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
More informationCentral Area Community Improvement Plan
Central Area Community Improvement Plan Brownfields Tax Assistance Program (TAP) Application Package Program Guide Application Process Chart Application FORM General Administration Provisions Brownfields
More informationApplication for Planning Permission. Town and Country Planning Act 1990
Application for Planning Permission. Town and Country Planning Act 1990 Publication of applications on planning authority websites. Please note that the information provided on this application form and
More informationLIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
More informationCamberford Law plc PROPOSAL FORM. Innovative Insurance Solutions Since 1958
A UNIQUE AND COMPREHENSIVE INSURANCE SCHEME FOR UNOCCUPIED PROPERTY PROPOSAL FORM Camberford Law plc Innovative Insurance Solutions Since 1958 Insurance Brokers Underwriting Agents Authorised and Regulated
More informationV. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials
E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of
More informationapproval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
More informationNatural Resources Conservation Authority Guidelines for Secondary Containment of Hazardous Liquids stored Above-ground
Natural Resources Conservation Authority Guidelines for Secondary Containment of Hazardous Liquids stored Above-ground December 2011 Table of Contents Definition of Terms... 2 Requirements for Secondary
More informationProfessional Indemnity Insurance Proposal Form for Members of the INSTITUTE OF ENVIRONMENTAL MANAGEMENT AND ASSESSMENT ENVIRONMENTAL CONSULTANTS
Professional Indemnity Insurance Proposal Form for Members of the INSTITUTE OF ENVIRONMENTAL MANAGEMENT AND ASSESSMENT ENVIRONMENTAL CONSULTANTS Please complete this form and return to: Tim FitzJohn S-Tech
More informationMBJ Environmental Programmes
MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,
More informationAssessment of Site Deliverability in the Market Towns
East Cambridgeshire District Council of Site Deliverability in the Market Towns August 2014 Annex 1 to the Site Results Technical Background Paper (February 2013) 0 Contents: 1. Introduction 1.1 Role of
More informationIntroduction to Waste Treatment Technologies. Contents. Household waste
Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting
More informationParagraph 9 Exemption The reclamation or improvement of land
The reclamation or improvement of land 1 INTRODUCTION This document provides guidance, definitions, operational policy and strategy with regard registering a paragraph 9 exemption under Schedule 1 of the
More information2. determining that land is not contaminated land and is suitable for any use, and hence can be removed from the CLR or EMR, as relevant.
1. Purpose The Environmental Protection Act 1994 (EP Act) enables listing of land on the environmental management register (EMR) if either a notifiable activity has been or is being conducted, or the land
More informationBirmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description
Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed
More informationINDUSTRIAL PUBLIC LIABILITY INSURANCE
REGD. OFFICE: BHARTI AXA GENERAL INSURANCE COMPANY LIMITED First Floor, The Ferns Icon, Survey No. 28, Next to Akme Ballet, Doddanekundi, Off Outer Ring Road, Bangalore- 560037, Toll-Free Helpline: 1800-103-2292
More informationFLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House
More informationProposal Form - Combined Public and Product Liability Insurance
Toll Free Number 1800-209-5846 (1800-209-LTIN) Website www.ltinsurance.com Proposal Form - Combined Public and Product Liability Insurance SMS LTI to 5607058 (56070LT) GUIDELINES TO FILL THE FORM 1. Please
More informationKey things to Know About Environment as a. Cross Cutting Issue In Early Recovery
Key things to Know About Environment as a Cross Cutting Issue In Early Recovery This brief note provides an overview of key things to know about environment for early recovery actors, including Early Recovery
More informationAGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.
APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height
More informationNovember 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE
November 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE PRE-APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE PRE-APPLICATION The Council welcomes and encourages
More informationGuidelines for On-site Wastewater Management
n-218973 v6 Disclaimer The Gisborne District Council accepts no liability for the performance of the on-site wastewater management systems referred to in this document irrespective of whether consents
More informationANNEX 2 Emergency / Pollution Incident Response Plan
ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...
More informationProposal Form - Commercial General Liability Insurance
Toll Free Number 1800-209-5846 (1800-209-LTIN) Website www.ltinsurance.com Proposal Form - Commercial General Liability Insurance SMS LTI to 5607058 (56070LT) GUIDELINES TO FILL THE FORM (Information given
More informationK A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax
More informationTHE ROYAL BOROUGH OF KENSINGTON AND CHELSEA REMEDIATION STRATEGY
THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA REMEDIATION STRATEGY November 2004 CONTENTS CHAPTER TITLE PAGE One Introduction 1 Two Task One Establishing the appropriate person(s) 3 Three Task Two Identifying
More informationFINAL PLAN OF REMEDIAL ACTION
FINAL PLAN OF REMEDIAL ACTION 1000 FRENCH STREET SITE Wilmington, Delaware DE 1115 June 1999 Department of Natural Resources and Environmental Control Division of Air and Waste Management Site Investigation
More informationCommercial General Liability Insurance Proposal Form. Public Liability Exposures
Commercial General Liability Insurance Proposal Form General Data 1. Name of Proposer in full: 2. Address: 3. Description of Business: 4. How long established? Public Liability Exposures 1. Description
More informationAssessment. Ian Uglow Technical Director, SLR Consulting iuglow@slrconsulting.com. 7 th October 2010
Peat Stability Risk and Hazard Assessment Ian Uglow Technical Director, SLR Consulting iuglow@slrconsulting.com 7 th October 2010 What goes into a Peat Stability Risk Assessment? You will need: An understanding
More informationRisk-Based Decision Making for Site Cleanup
July 2013 Risk-Based Decision Making for Site Cleanup The Oklahoma Department of Environmental Quality (DEQ) has adopted a risk based decision making process to provide a framework for determining cleanup
More informationPROFESSIONAL OPERATOR PRACTICES A SITE SURVEY OF TIMBER TREATMENT BUSINESSES IN THE UK UTILISING BRUSH, DIPPING AND SPRAYING APPLICATION METHODS
PROFESSIONAL OPERATOR PRACTICES A SITE SURVEY OF TIMBER TREATMENT BUSINESSES IN THE UK UTILISING BRUSH, DIPPING AND SPRAYING APPLICATION METHODS 1.1 BACKGROUND TO THIS SUMMARY REPORT Biocides and Pesticides
More informationEquestrian Property & Property Owners Liability Insurance Proposal Form FOR COMMERCIAL ESTABLISHMENTS & PRIVATE YARDS
Equestrian Property & Property Owners Liability Insurance Proposal Form FOR COMMERCIAL ESTABLISHMENTS & PRIVATE YARDS IMPORTANT NOTICE: You are under a duty to disclose to the Insurers all facts likely
More informationPROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks)
PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks) LIABILITY OF THE COMPANY DOES NOT COMMENCE UNTIL THE PROPOSAL HAS BEEN ACCEPTED AND THE PREMIUM PAID THE TERRITORIAL
More informationR enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179
R enfrewshire Local Plan Safe Environment Page Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 16 Flooding and Sustainable Urban Drainage OVERVIEW Flooding
More informationENVIRONMENTAL REVIEW SCREENING QUESTIONS
ENVIRONMENTAL REVIEW SCREENING QUESTIONS All applications to WHEDA are required to meet the Department of Housing and Urban Development s environmental compliance standards listed in 24 CFR Part 58. Your
More informationSpill Prevention, Control and Countermeasure (SPCC) Rule
Spill Prevention, Control and Countermeasure (SPCC) Rule Code of Federal Regulations Title 40 CFR Part 112 Training Guide for Oil and Fuel handlers on Farms 1 Purpose of SPCC Rule To prevent oil discharges
More informationEnvironmental Health & Safety
Environmental Health & Safety Title: Oil Spill Notification, Reporting, and Response Effective Date: 04/01/2008 Document #: PBS-007-001.JPB Revision Date: Rev. 0 I. Purpose of the Policy: To ensure Oil
More informationRESOURCE RECYCLING SOLUTIONS LTD
RESOURCE RECYCLING SOLUTIONS LTD Iron House Farm, Lancaster Road, Out Rawcliffe, Preston, Lancashire, PR3 6BP Accident Management Plan Issue 01 Walker Resource Management Ltd - www.walkerom.com QC Document
More informationEngineers Professional Liability Proposal Form
Proposer Details Name of insured Firm(s) (including predecessors) Principal Address line one Principal Address line two City and postcode Telephone number Website Date Firm Established Please provide details
More informationGuide to the Remediation Report & Fee Submission Form
Guide to the Remediation Report & Fee Submission Form May 1, 2012 TABLE OF CONTENTS 1 DEFINITIONS... 1 2 INTRODUCTION... 3 3 BACKGROUND... 3 3.1 EXISTING POLICY/GUIDELINES FRAMEWORK... 3 Domestic Fuel
More informationUrban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency
Urban Environmental Management in Singapore Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Introduction City state comprising a main island and some islets Land
More informationRisk Assessment Based Environmental Management Systems for Petroleum Retail Stores
Risk Assessment Based Environmental Management Systems for Petroleum Retail Stores NATO/CCMS Pilot Study Prevention and Remediation In Selected Industrial Sectors: Small Sites in Urban Areas Prof. Cem
More informationRESIDENTIAL PROPERTY DISCLOSURE FORM
STATE OF OHIO DEPARTMENT OF COMMERCE 2013 RESIDENTIAL PROPERTY DISCLOSURE FORM Purpose of Disclosure Form: This is a statement of certain conditions and information concerning the property actually known
More informationSTATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT
STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT The South Carolina Code of Laws (Title 27, Chapter 50, Article 1) requires that an owner of residential real property (single
More informationQ 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.
Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some
More informationNarellan Field Service Centre. Pollution Incident Response Management Plan. Prepared by Endeavour Energy Safety and Environmental Services.
Narellan Field Service Centre Pollution Incident Response Management Plan Prepared by Endeavour Energy Safety and Environmental Services Version 3 Version Date 1 30 August 2012 2 30 September 2013 3 9
More informationEPA PRIMP Pollution Incident Response Management Plan
EPA PRIMP Pollution Incident Response Management Plan QA Department: QA Documents\EPA\Pollution Incident Response Management Plan Page 1 AMENDMENT REGISTER Version Number Page Numbers Subject Date QA Department:
More information6 Chemicals from human settlements
6 Chemicals from human settlements 6.1 Introduction The world is becoming increasingly urban, particularly in developing countries. The transition of people from rural areas to cities represents a major,
More informationGuidance on dereliction, demolition and remediation costs. March 2015
Guidance on dereliction, demolition and remediation costs March 2015 Contents 1. The Homes and Communities Agency 01 2. The purpose of the guide 02 3. Contamination policy, regulation & procedural context
More informationknk5 wmoep5 vtmpq NUNAVUT WATER BOARD NUNAVUT IMALIRIYIN
P.O. BOX 119 GJOA HAVEN, NU X0E 1J0 TEL: (867) 360-6338 FAX: (867) 360-6369 KATIMAYINGI knk5 wmoep5 vtmpq NUNAVUT WATER BOARD NUNAVUT IMALIRIYIN Application for: (check one) WATER LICENCE APPLICATION FORM
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER SUPPLY MANAGEMENT. Principles for Ground Water Pollution Prevention and Remediation
DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER SUPPLY MANAGEMENT DOCUMENT NUMBER: 383-0800-001 EFFECTIVE DATE: December 1, 1996 TITLE: AUTHORITY: POLICY: Principles for Ground Water Pollution Prevention
More informationArchitects and Engineers Professional Liability Proposal Form
AIG Insurance Hong Kong Limited Architects and Engineers Professional Liability Proposal Form I. Applicant Details Name of Insured: Address(es): Web Site Address: Establishment Date: II. Business Activities
More informationDOCUMENTATION OF ENVIRONMENTAL INDICATOR DETERMINATION RCRA Corrective Action Environmental Indicator (EI) RCRIS code (CA750)
DOCUMENTATION OF ENVIRONMENTAL INDICATOR DETERMINATION RCRA Corrective Action Migration of Contaminated Groundwater Under Control Facility Name: Former Allentown Paint Manufacturing Company, Inc. Facility
More informationA Guide to Understanding SBA Environmental Due Diligence for Commercial Properties
A Guide to Understanding SBA Environmental Due Diligence for Commercial Properties Partner Engineering and Science has prepared this guide to provide you with information that explains; Why SBA requires
More informationAPPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O
APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND
More informationOn Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing
On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation
More informationENVIRONMENTAL ASPECTS REGISTER (ISO 14001)
ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) 1. Scope The scope of this Environmental Aspects Register covers the following operational areas: Aberdeen Region (A); Cumbernauld Region (C); Warrington Region
More informationA Guide to the Fees for Planning Applications in England
A Guide to the Fees for Planning Applications in England These fees apply from 31 July 2014 onwards. This document is based upon The Town and Country Planning (Fees for Applications, Deemed Applications,
More informationCONTRACTOR ENVIRONMENTAL LIABILITY 101. Violation of environmental laws may result in fine or imprisonment or both.
CONTRACTOR ENVIRONMENTAL LIABILITY 101 Violation of environmental laws may result in fine or imprisonment or both. To avoid potential liability, contractors must be aware of the requirements of the various
More informationUpdated Guidance for Farmers on Requirements for the Storage and Spreading of Poultry Litter to 31 December 2014
Updated Guidance for Farmers on Requirements for the Storage and Spreading of Poultry Litter to 31 December 2014 This publication can be made available in alternative formats. To request it in an alternative
More informationOCCUPATIONAL SAFETY AND HEALTH MANAGEMENT AND CONTAMINATED SITES WORK 2 0 0 5
GUIDANCE NOTE OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT AND CONTAMINATED SITES WORK 2 0 0 5 Guidance for employers, employees, site owners, consultants, self-employed people and contractors C O M M I S
More informationFarm Safety News. Police Suspect Arson. FARMERS spoke of their devastation after two huge fires within ten miles of each other in 24 hours.
Farm Safety News Growing cost of farm fires across the UK Police Suspect Arson FARMERS spoke of their devastation after two huge fires within ten miles of each other in 24 hours. Police and firefighters
More informationPROCEDURE FOR DETERMINING STATUS OF POTENTIALLY CONTAMINATED SITES, AND ASBESTOS CONTAMINATION STATUS
PROCEDURE FOR DETERMINING STATUS OF POTENTIALLY CONTAMINATED SITES, AND ASBESTOS CONTAMINATION STATUS 1. None of the Cost associated with the determination of the status of potentially contaminated sites
More informationNumber of incidents. Non-permitted activities
Pollution incidents 214 evidence summary July 215 1. Introduction Following an increase in the number of serious pollution incidents in 213, the total number of serious pollution incidents decreased by
More informationDraft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL
More informationApplication for a Waste Management Licence
Application for a Waste Management Licence Waste management (For office use only) stamp Received by Initials Please read the guidance notes and the form carefully before you complete it. How to apply To
More informationUNDERGROUND STORAGE TANK SYSTEM CLOSURE REPORT FORM
APPENDIX D COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF ENVIRONMENTAL CLEANUP AND BROWNFIELDS UNDERGROUND STORAGE TANK SYSTEM CLOSURE REPORT FORM - Facility I.D. Facility
More informationPRE-APPLICATION ADVICE FOR LOCAL DEVELOPMENTS COMHAIRLE RO-IARRTAIS DO LEASACHAIDHEAN IONADAIL
PRE-APPLICATION ADVICE FOR LOCAL DEVELOPMENTS COMHAIRLE RO-IARRTAIS DO LEASACHAIDHEAN IONADAIL Our Pre-Application Advice for Local Developments service relates to proposals which are generally of a small
More informationThere are access points readily available into the site.
Site Name Reference Number Settlement Land at Broughton Atterbury U4 Size (Ha) 4. Broughton Planning history/context This section provides a brief overview of any significant planning history on the site
More informationGuide to Tank Insurance
Guide to Tank Insurance OCTOBER 2011 Prepared by: ASTSWMO State Funds Task Force Association of State and Territorial Solid Waste Management Officials 444 North Capitol Street, N.W., Suite 315 Washington,
More information2015 No. 595 TOWN AND COUNTRY PLANNING, ENGLAND. The Town and Country Planning (Development Management Procedure) (England) Order 2015
S T A T U T O R Y I N S T R U M E N T S 2015 No. 595 TOWN AND COUNTRY PLANNING, ENGLAND The Town and Country Planning (Development Management Procedure) (England) Order 2015 Made - - - - 18th March 2015
More informationAnnex 6 Recommendation on Safety Requirements for Contaminated Sites in Flood Risk Areas
Support for the Extension of Accident Risk Spots Inventory and Preventive Measures / Final Report Annex 6 Recommendation on Safety Requirements for Contaminated Sites in Flood Risk Areas Final Draft International
More informationENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE
ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE 1. Introduction This guideline follows the Implementation Rules for Company Environmental
More informationOrchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET. New Detached Double Garage Block with Integrated Garden Store and Loft Storage Area.
Application No: 13/2596N Location: Proposal: Applicant: Expiry Date: Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET New Detached Double Garage Block with Integrated Garden Store and Loft Storage
More informationFire & Explosion Risks in Service Stations
Fire & Explosion Risks in Service Stations Petrol Vapour Petrol gives off highly flammable vapour even at very low temperatures. Because of the flammability of petrol vapours, service stations carry a
More informationProperty Condition Disclosure Statement
NYS Department of State Division of Licensing Services P.O. Box 22001 Albany, NY 12201-2001 (518) 474-4429 www.dos.state.ny.us Name of Seller or Sellers: Property Address: General Instructions: The Property
More informationPrecedent 15. Property Insurance Contract Insurer s and Agent s Breach of Contract and Negligence
Contracts CONTRACTS Precedent 15. Property Insurance Contract Insurer s and Agent s Breach of Contract and Negligence Statement of Claim 1. The plaintiff claims: (a) damages for breach of contract and
More informationChapter 2 Spatial Portrait
15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the
More informationENVIRONMENTAL QUESTIONNAIRE - REAL ESTATE SECURED LOANS
ENVIRONMENTAL QUESTIONNAIRE - REAL ESTATE SECURED LOANS Borrower: Property Known As: Property Address: City State NC Zip Code INSTRUCTIONS: For all loans, complete pages 1-3, answering all questions. If
More informationEMPLOYER S, PUBLIC & PRODUCTS LIABILITY PROPOSAL FORM CONTRACTING TRADES
V2 0 EMPLOYER S, PUBLIC & PRODUCTS LIABILITY PROPOSAL FORM CONTRACTING TRADES Please complete all details in BLOCK LETTERS. Where applicable indicate YES or NO Insurance will not be in force until proposal
More informationENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
More informationA.M. FREDERICKS UNDERWRITING MANAGEMENT LTD. Limited Pollution Liability Insurance Questionnaire (Forming part of the Liability Survey of Hazards)
A.M. FREDERICKS UNDERWRITING MANAGEMENT LTD. Limited Pollution Liability Insurance Questionnaire (Forming part of the Liability Survey of Hazards) 1. Name of Applicant Date Agent/Broker Proposed Policy
More informationChubb Group of Insurance Companies 15 Mountain View Road, Warren, NJ 07059
Chubb Group of Insurance Companies 15 Mountain View Road, Warren, NJ 07059 COUNTRY CLUB POLLUTION LIABILITY APPLICATION FOR DESIGNATED SITES. NOTE: PLEASE COMPLETE AN APPLICATION FOR EACH SITE TO BE INSURED
More informationSafety Manual Title: Spill Prevention & Response Review Date: 6/1/2014
Operation s Purpose The purpose of this plan is to document spill prevention and response requirements. Each Elkhorn Construction, Inc. jobsite will develop a spill prevention and response plan based on
More informationRevenue and Financing Policy
Current Revenue Policy Revenue and Financing Policy Group Activity Environmental Activity - Air Ambient Air Quality Monitor and report on strategy development and implementation. benefits from clean air.
More information