APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY

Size: px
Start display at page:

Download "APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY"

Transcription

1 PORTLAND HARBOR RI/FS APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY DRAFT Prepared for The Prepared by Anchor QEA, LLC

2 TABLE OF CONTENTS TABLE OF CONTENTS... I LIST OF FIGURES... II LIST OF TABLES... III LIST OF ACRONYMS... IV EXECUTIVE SUMMARY DREDGE VOLUME DETERMINATION General Methods Detailed Methods Neatline Volume Allowable Overdredge Volume Additional Volume for Engineering Factors Residuals Neatline Volume Ratio Reductions to Dredge Volume Results REFERENCES... 8 i

3 LIST OF FIGURES Figure 1a-e Figure 2a-e Figure 3 Figure 4 Figure 5 Alternative B-F Depth of Impact Sub-Thiessen IDs and Slope Buffer Zones Alternatives B-F Dredge Volume Determination Method Slope Buffer Zone Reductions Structure Dredging Access Issues ii

4 LIST OF TABLES Table 1 Table 2 Table 3 Table 4 Table 5 Summary of Technology Implementability Screening Results by Sub-SMA Based on Site Uses and Physical Conditions Sub-Thiessen Dredge Volume Calculations EPA Method Sub-Thiessen Dredge Volume Calculations LWG Method Removal Volume Summarized by SMA EPA Method Removal Volume Summarized by SMA LWG Method iii

5 LIST OF ACRONYMS CAD CDF cy DOI DUI EF EMNR EPA ft 2 FS LWG SL SMA SU Confined Aquatic Disposal Confined Disposal Facility cubic yards Depth of Impact Depth of Unknown Impact Engineering Factor Enhanced Monitored Natural Recovery U.S. Environmental Protection Agency square feet Feasibility Study SubSMA type for confined dredging Sediment Management Area SubSMA type for upland dredging iv

6 EXECUTIVE SUMMARY This appendix: Provides greater detail concerning the methods for estimating removal volume discussed in Section 5.10 of the draft FS text Describes how the removal volumes are estimated based on the two methods considered the U.S. Environmental Protection Agency (EPA) method and the (LWG) method and the differences between the two methods. Provides detailed estimations and summations of removal volume on a subsma, SMA, and total alternative basis for each alternative for both the LWG and EPA methods. A summary of removal volumes by SMA for both the LWG and the EPA methods are shown in Tables 4 and 5 respectively. In general, removal volume estimates based on the LWG method are significantly greater than the removal volumes estimates based on the EPA method. 1

7 1.0 DREDGE VOLUME DETERMINATION Section 5.10 of the draft FS describes development of the sub-thiessen surface area and Depth of Impact (DOI), and then describes how simplified removal volumes are calculated. The purpose of this appendix is to describe in greater detail how the dredge volumes were calculated and modified to account for structural considerations and slope offsets (slope buffer zone). The accuracy of the methodology used for volume estimation in this draft FS is highly dependent upon the concept of environmental dredging presented in Section 6 and includes one production pass followed by the placement of a thin layer of suitable cover material. If further dredging to remove residuals is required (i.e., continued dredging passes until a sediment chemical criteria is met), the volume estimates presented in this evaluation may be significantly lower than the actual quantities dredged during construction. 1.1 GENERAL METHODS Where removal was considered to be an implementable technology by Table 1, sub- Thiessens were flagged for removal for in situ focused or removal focused alternatives. Dredge volumes were not calculated for previously remediated areas, areas where removal was not considered an implementable technology, or for enhanced monitored natural recovery (EMNR) areas in sediment management area (SMA) 17S. Where sub- Thiessens intersected with confined aquatic disposal (CAD)/confined disposal facility (CDF) areas, the sub-thiessen volume was flagged for exclusion from the final dredge volume tabulation if the CAD or CDF was active. A range of dredge volumes was calculated for each sub-thiessen flagged for removal under each alternative. Low and high dredge volume estimates were determined on a sub-thiessen basis using reasonable high and low assumptions, which are discussed in Section 1.2. The basic dredge volume calculation is equal to the sub-thiessen area multiplied by the DOI. In general, this calculation uses the sub-thiessen area, the sub-thiessen DOI, and the subsma type, which informs the type of dredging rate that would be used in the cost estimates. For example SU indicates upland dredging while SL indicates a limited in-water dredging rate to account for structural limitations. Each designation has a different dredging rate. 1.2 DETAILED METHODS The core Thiessen polygon surface was intersected with subsmas and divided into sub- Thiessens. In this way, a subsurface core could contribute DOI information to multiple sub-thiessens and multiple subsmas. Figure 1 shows the Thiessen polygons and DOI. Figure 2 shows the sub-thiessen identifications, and slope buffer zones (discussed in Section ) for each alternative. 2

8 Volumes were calculated on a sub-thiessen basis and then summed to provide overall volumes by SMA. Volumes were calculated using two separate methods, which are referred to as the LWG method and the EPA method. The LWG proposed the LWG method, but EPA (EPA 2011; see Appendix O) a different method. The EPA method is the basis of cost estimates presented in Appendix K. The total volume for each sub-thiessen is the sum of the neatline volume (as defined by the DOI), plus the additional volume for residuals management, constructability considerations like overdredge allowances, and increases for uncertainties associated with design. For the LWG method, this additional volume includes specific adjustments for overdredge allowances, residuals volume, and adjustments for engineering factors as described in Section The EPA method does not necessarily differentiate each of the factors used in the LWG method. Instead, EPA's method uses the neatline volume ratio (discussed in Section 1.2.5) to account for the additional volume. The total volume for a particular sub-thiessen is described subsequently for both the EPA method and the LWG method and is shown in Figure 3. Total dredge volumes for the LWG method (V LWG ) and the EPA method (V EPA ) were calculated as follows: where: V LWG = Volume in cubic yards (cy) as calculated using the LWG method (1) (2) V EPA NV = Volume in cy as calculated using the EPA method = Neatline volume in cy NR = Neatline ratio (1.5 to 2.0) RV AO = Residuals volume in cy = Allowable overdredge volume in cy EF = Engineering factors (30% to 50%) Neatline Volume The portion of the removal volume directly associated with the DOI is defined above as the neatline volume. Because the DOI and the dredge areas are equivalent for the LWG and the EPA methods, the neatline volumes for both methods are equivalent. The neatline volume is typically calculated using the DOI multiplied by the area of the sub- Thiessen. In some cases the neatline volume is modified for the slope buffer zone as discussed in Section The neatline volume is calculated as follows: 3

9 (3) where: NV = Neatline Volume in cubic yards (cy) A s-t = Sub-Thiessen Area of unrestricted Dredging in square feet (ft 2 ) DOI = Depth of Impact in ft A SBZ = Sub-Thiessen slope buffer zone area in ft 2 A s-t = Sub-Thiessen area of unrestricted dredging in ft Depth of Impact The DOI is based on the raw depth of impact for a particular sample location. An additional 1 to 3 feet is added to the DOI if the bottom-most sample of a core has elevated concentration levels. This is known as the Depth of Unknown Impact (DUI) and it is added to the core to determine the final DOI. If the bottom sample of a core does not have elevated concentration levels, the DUI is zero. The DOI is calculated as follows: where: (4) DOI = Depth of Impact in ft DOI raw = Depth of Impact in ft prior to adjustments for cores with elevated bottom samples DUI = Depth of Unknown Impact in ft, which ranges from 1 to 3 feet, or is zero Slope Buffer Zone Area Reductions to neatline volumes associated with the slope buffer zone area apply to both the LWG method and the EPA method. The Slope Buffer Zone area is defined as the area where the depth of the dredge cut transitions from zero feet to the full DOI. Because the slope buffer zone area is dependent on the slope of the mudline and the DOI, slope buffer zone areas are equivalent for the EPA and the LWG methods. This transition in the dredge cut is needed to allow for potential slope stability issues that would be created by very steep cuts, and allows for a more realistic and constructible dredge prism. As a conservative draft feasibility study (FS)-level assumption, a 2H:1V dredge prism cut is considered in the volumes only for sub-thiessens adjacent to the shoreline where removal occurs. Figure 4 illustrates the slope buffer zone area. The slope buffer zones in each SMA are shown in Figure 2. Slope buffer zone areas for each sub-thiessen are shown in Table 2. 4

10 The area of unrestricted dredging,, is defined as the area where all removal operations (i.e., residuals dredging, residuals capping, and removal of the full DOI) are expected to occur. In the slope buffer zone area, A SBZ, only partial removal of the DOI is expected. To account for the impacted sediments left in situ, an engineered cap will be constructed in the slope buffer zone area. The area of unrestricted dredging is calculated as: where: (5) A s-t A raw A SBZ = Sub-Thiessen area of unrestricted dredging = Raw sub-thiessen area, without reductions for the slope Buffer Zone = Slope buffer zone area in sub-thiessen Allowable Overdredge Volume The allowable overdredge estimate only applies to the LWG method. For the EPA method, this additional volume is assumed to be accounted for in the neatline ratio discussed in Section The allowable overdredge, D, is an estimate of the range of additional dredge depth, which will be expected as a result of the contractor s equipment type, varying operator experience, and Site conditions. Allowing overdredge is necessary to account for variance between volumes developed in the estimating process and likely actual volumes. For calculation of the LWG method the allowable overdredge depth was assumed to vary from 0.5 feet to 2.0 feet for low and high volume estimates. The allowable overdredge volume for the LWG method is calculated as: where: (6) D = Additional depth for overdredge allowances of 0.5 to 2 ft A s-t = Sub-Thiessen area of unrestricted dredging in ft 2 AO = Additional volume in cy to account for the overdredge Additional Volume for Engineering Factors Similarly, the estimate of additional volume for engineering factors only applies to the LWG method. For the EPA method, this additional volume is assumed to be accounted for in the neatline ratio discussed in Section For the LWG method, an Engineering Factor (EF) was multiplied by the neatline and overdredge volumes to account for adjustments to the estimated dredge volume expected following final design and 5

11 construction. As part of remedial design, additional cores will be advanced in the active remediation areas. These additional cores will change the actual extent of required dredging. In addition, as part of remedial design, the engineer will develop dredge prisms that are efficient for the construction equipment anticipated to be used. This will entail removing extra materials so that the contractor has longer, flatter dredge cuts to improve efficiency. The optimization of the dredge prism from the GIS-based planned dredge cuts will increase the dredge volumes. Finally, additional dredge material associated with the transition slopes between deep and shallow cuts and around the dredge perimeter will need to be considered. The EF is established to capture the increased dredge volume for all of the factors mentioned. Based on past experience, the range of values of EF was set at 0.3 to Residuals Volume estimates for residuals are explicitly calculated for the LWG method. For the EPA method, the residuals volume is presumed accounted for with the neatline ratio, as discussed in Section For the LWG method, the residuals volume is calculated separately from the removal volume associated with the DOI. For the EPA method, the residuals volume is included in the neatline ratio. In order to complete cost estimates, volume estimates for residuals volume need to be calculated and broken out from the total volume. For both methods, the residuals volume is calculated assuming a 6-inch dredge cut plus a 6-inch overdredge allowance to account for factors similar to those discussed in Section of the draft FS. For the LWG method, the residuals volume is calculated as: where: (7) RV RD = Residuals Volume in cy = Residuals Dredge Depth in ft, equal to 1 ft A s-t = Sub-Thiessen Area of Unrestricted Dredging in ft Neatline Volume Ratio EPA directed LWG to account for the combined factors described in Section to of this appendix by using a neatline volume ratio; as such, the neatline volume ratio only applies to the EPA method. The neatline volume ratio is a factor applied to the neatline volume as shown in Equation 2. As directed by the EPA, the neatline volume ratio ranges from 1.5 to 2.0 for the low volume and high volume estimates, respectively Reductions to Dredge Volume Removal volumes were reduced for structural considerations as discussed in the draft FS Section 5.4, and for the slope buffer zone areas discussed in this appendix. Dredging 6

12 immediately adjacent to structures can potentially impact the structure in the following ways: Removing sediment adjacent to a structure s piling can cause loss of lateral and vertical support, which in turn can weaken the structure. Many waterfront structures have battered piling to resist lateral loads against a structure. Dredging adjacent to structures can potentially damage battered piling. Dredge buckets can strike structures and piling if they are too close to the structure. Offsets prevent unwanted contact. As part of final design many of these elements will be investigated in detail, potentially eliminating the need for offsets. Section 6 of the draft FS describes the evaluation of dredging in, around, and under structures in more detail. Figure 5 summarizes the extent of dredging around structures and shows situations where dredging is limited or restricted. In summary, extensive dredging under robust fixed structures was generally screened out as a feasible technology for the draft FS. 1.3 RESULTS Sub-Thiessen level volume calculations for the EPA method are provided in Table 2. Sub-Thiessen volumes for the LWG method volumes are provided in Table 3. Table 4 summarizes removal volume by SMA for each alternative using the EPA method. Table 5 summarizes removal volume for each alternative by SMA for the LWG method. In general, removal volume estimates based on the LWG method are greater than the removal volume estimates based on the EPA method. The cost estimates presented in Appendix K were generated based on the EPA method. 7

13 2.0 REFERENCES EPA Letter dated July, 15, 2011, from EPA to LWG regarding EPA Comments on Portland Harbor FS Key Elements Check-in (June 21 & 22, 2011). Region 10, Oregon Operations Office. Portland, OR. 8

Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic Modeling Summary Report

Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic Modeling Summary Report Port of New York and New Jersey Feasibility Analysis for a Dredged Material Public Processing Facility Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic

More information

N Q.3 Choose a level of accuracy appropriate to limitations on measurement when reporting quantities.

N Q.3 Choose a level of accuracy appropriate to limitations on measurement when reporting quantities. Performance Assessment Task Swimming Pool Grade 9 The task challenges a student to demonstrate understanding of the concept of quantities. A student must understand the attributes of trapezoids, how to

More information

M EMORANDUM. Protection Agency

M EMORANDUM. Protection Agency 6650 SW Redwood Lane, Suite 333 Portland, Oregon 97224 Phone 503.670.1108 Fax 503.670.1128 www.anchorqea.com M EMORANDUM To: Sean Sheldrake, U.S. Environmental Date: June 20, 2014 Protection Agency From:

More information

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented

More information

Estimating Trench Excavation

Estimating Trench Excavation Estimating Excavation By Steven J. Peterson, PE, MBA Introduction excavation is often performed by hydraulic backhoe excavators. This is because hydraulic excavators are not only good at excavating below

More information

The Buffalo River Restoration Project Frequently Asked Questions

The Buffalo River Restoration Project Frequently Asked Questions The Buffalo River Restoration Project Frequently Asked Questions The Buffalo River Restoration Partnership is a public-private collaborative effort to clean up sediment in the Buffalo River. Although discharges

More information

Introduction to Lockheed West Seattle. Working Together. Site Background. Lockheed West Seattle Superfund Site

Introduction to Lockheed West Seattle. Working Together. Site Background. Lockheed West Seattle Superfund Site Lockheed West Seattle Superfund Site Introduction to Lockheed West Seattle From the later years of World War II through 1987, Lockheed Corporation, a predecessor to Lockheed Martin Corporation, performed

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

Cost Estimating Concepts

Cost Estimating Concepts Cost Estimating Concepts Goal to provide an overview of cost estimating (CE) concepts in order to review CEs prepared by others or to create alternative CEs Why? financial assurance provision based upon

More information

CHAPTER 4 EARTHWORK. Section I. PLANNING OF EARTHWORK OPERATIONS

CHAPTER 4 EARTHWORK. Section I. PLANNING OF EARTHWORK OPERATIONS CHAPTER 4 EARTHWORK Section I. PLANNING OF EARTHWORK OPERATIONS IMPORTANCE In road, railroad, and airfield construction, the movement of large volumes of earth (earthwork) is one of the most important

More information

STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM

STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM Solid Waste Management Program Waste Management Division 103

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

Appendix D. Estimation of Work Site and Transportation Accident Risks

Appendix D. Estimation of Work Site and Transportation Accident Risks Appendix D Estimation of Work Site and Transportation Accident Risks Appendix D Estimation of Work Site and Transportation Accident Risks Prepared for: General Electric Company Pittsfield, Massachusetts

More information

APPENDIX A ALTERNATIVES COST ANALYSIS

APPENDIX A ALTERNATIVES COST ANALYSIS APPENDIX A ALTERNATIVES COST ANALYSIS 1.0 INTRODUCTION This appendix provides the cost detail for the remedial alternatives. The limits of the alternatives are based on the sediment PRG of 13.7 mg/kg TPAHs.

More information

Financial Analysis for the Ambleside Centre Zoning Districts

Financial Analysis for the Ambleside Centre Zoning Districts Financial Analysis for the Ambleside Centre Zoning Districts July 2013 Prepared for: The District of West Vancouver By: Coriolis Consulting Corp. Table of Contents 1.0 Introduction... 1 1.1 Purpose...

More information

VOLUME of Rectangular Prisms Volume is the measure of occupied by a solid region.

VOLUME of Rectangular Prisms Volume is the measure of occupied by a solid region. Math 6 NOTES 7.5 Name VOLUME of Rectangular Prisms Volume is the measure of occupied by a solid region. **The formula for the volume of a rectangular prism is:** l = length w = width h = height Study Tip:

More information

Area of Parallelograms (pages 546 549)

Area of Parallelograms (pages 546 549) A Area of Parallelograms (pages 546 549) A parallelogram is a quadrilateral with two pairs of parallel sides. The base is any one of the sides and the height is the shortest distance (the length of a perpendicular

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

Chapter 12: Three Methods for Computing the Volume of a Lake

Chapter 12: Three Methods for Computing the Volume of a Lake January 000 Manual of Fisheries Survey Methods II: with periodic updates Chapter : Three Methods for Computing the Volume of a Lake Clarence M. Taube Suggested citation: Taube, Clarence M. 000. Instructions

More information

Appendix 4-C. Open Channel Theory

Appendix 4-C. Open Channel Theory 4-C-1 Appendix 4-C Open Channel Theory 4-C-2 Appendix 4.C - Table of Contents 4.C.1 Open Channel Flow Theory 4-C-3 4.C.2 Concepts 4-C-3 4.C.2.1 Specific Energy 4-C-3 4.C.2.2 Velocity Distribution Coefficient

More information

Wyckoff/Eagle Harbor Site Bainbridge Island, Washington

Wyckoff/Eagle Harbor Site Bainbridge Island, Washington Alaska Region 10 Idaho 1200 Sixth Avenue Oregon Seattle WA 98101 Washington Superfund Fact Sheet Wyckoff/Eagle Harbor Site Bainbridge Island, Washington April 1998 Many significant developments have taken

More information

Measurement with Ratios

Measurement with Ratios Grade 6 Mathematics, Quarter 2, Unit 2.1 Measurement with Ratios Overview Number of instructional days: 15 (1 day = 45 minutes) Content to be learned Use ratio reasoning to solve real-world and mathematical

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

7.2 Quadratic Equations

7.2 Quadratic Equations 476 CHAPTER 7 Graphs, Equations, and Inequalities 7. Quadratic Equations Now Work the Are You Prepared? problems on page 48. OBJECTIVES 1 Solve Quadratic Equations by Factoring (p. 476) Solve Quadratic

More information

Dimensioning and Estimating Brick Masonry

Dimensioning and Estimating Brick Masonry TECHNICAL NOTES on Brick Construction 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 10 February 2009 Dimensioning and Estimating Brick Masonry Abstract: This Technical

More information

Welcome to Math 7 Accelerated Courses (Preparation for Algebra in 8 th grade)

Welcome to Math 7 Accelerated Courses (Preparation for Algebra in 8 th grade) Welcome to Math 7 Accelerated Courses (Preparation for Algebra in 8 th grade) Teacher: School Phone: Email: Kim Schnakenberg 402-443- 3101 kschnakenberg@esu2.org Course Descriptions: Both Concept and Application

More information

Sediment Management Standards Cleanup Action Decision: Duwamish/Diagonal CSO/SD

Sediment Management Standards Cleanup Action Decision: Duwamish/Diagonal CSO/SD FINAL Sediment Management Standards Cleanup Action Decision: Duwamish/Diagonal CSO/SD July 25, 2002 Prepared by Washington State Department of Ecology Northwest Regional Office, Toxics Cleanup Program

More information

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT 2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

1) (-3) + (-6) = 2) (2) + (-5) = 3) (-7) + (-1) = 4) (-3) - (-6) = 5) (+2) - (+5) = 6) (-7) - (-4) = 7) (5)(-4) = 8) (-3)(-6) = 9) (-1)(2) =

1) (-3) + (-6) = 2) (2) + (-5) = 3) (-7) + (-1) = 4) (-3) - (-6) = 5) (+2) - (+5) = 6) (-7) - (-4) = 7) (5)(-4) = 8) (-3)(-6) = 9) (-1)(2) = Extra Practice for Lesson Add or subtract. ) (-3) + (-6) = 2) (2) + (-5) = 3) (-7) + (-) = 4) (-3) - (-6) = 5) (+2) - (+5) = 6) (-7) - (-4) = Multiply. 7) (5)(-4) = 8) (-3)(-6) = 9) (-)(2) = Division is

More information

Tennessee. Energy and Cost Savings. for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC

Tennessee. Energy and Cost Savings. for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC BUILDING TECHNOLOGIES PROGRAM Tennessee Energy and Cost Savings for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC 1 2009 AND 2012 IECC AS COMPARED TO THE 2006 IECC Tennessee

More information

Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM

Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM Guidance for Flood Risk Analysis and Mapping Changes Since Last FIRM May 2014 This guidance document supports effective and efficient implementation of flood risk analysis and mapping standards codified

More information

consulting engineers and scientists

consulting engineers and scientists consulting engineers and scientists Incorporating Sustainable Principles into Cleanups June 2014 Presented by: Rich Truax, PE GEI Consultants, 650 Personnel Nationwide Rich Truax, P.E. Sr. Program Manager

More information

JOINT PERMIT APPLICATION PACKAGE

JOINT PERMIT APPLICATION PACKAGE JOINT PERMIT APPLICATION PACKAGE Delaware City Refining Company LLC Shoreline Stabilization & Restoration Project Date: Prepared For: Delaware City Refining Company LLC 4550 Wrangle Hill Road Delaware

More information

Show that when a circle is inscribed inside a square the diameter of the circle is the same length as the side of the square.

Show that when a circle is inscribed inside a square the diameter of the circle is the same length as the side of the square. Week & Day Week 6 Day 1 Concept/Skill Perimeter of a square when given the radius of an inscribed circle Standard 7.MG:2.1 Use formulas routinely for finding the perimeter and area of basic twodimensional

More information

2Digital tablets or computer scanners can

2Digital tablets or computer scanners can Appendix A Measuring Lake Surface Area Lake surface area can be measured with a bathymetric map using any of the following techniques: 1One of the most accurate methods is to use a planimeter to trace

More information

8.0 Construction Cost Estimates

8.0 Construction Cost Estimates 8.0 Construction Cost Estimates 8.1 Introduction This chapter summarizes the results of the Task 14, Cost Estimating work for the five overall restoration alternatives under evaluation by Reclamation.

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

Colorado Energy and Cost Savings

Colorado Energy and Cost Savings BUILDING TECHNOLOGIES PROGRAM Colorado Energy and Cost Savings for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC 1 2009 AND 2012 IECC AS COMPARED TO THE 2006 IECC Colorado

More information

Elev. A = 200.05, Elev. B = 325.25, horizontal distance = 1625 feet a. 7.7 b..077 c. 12.98 d. 1.28

Elev. A = 200.05, Elev. B = 325.25, horizontal distance = 1625 feet a. 7.7 b..077 c. 12.98 d. 1.28 1. If the percent grade is 7.25 % and the horizontal length of grade is 1625 feet, what is the change in elevation? a. 117.81 feet b. 1178.13 feet c. 11.78 feet d. 1.17 feet 2. In surveying, the distance

More information

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters. Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,

More information

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Mississippi. Energy and Cost Savings. for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC

Mississippi. Energy and Cost Savings. for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC BUILDING TECHNOLOGIES PROGRAM Mississippi Energy and Cost Savings for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC 1 2009 AND 2012 IECC AS COMPARED TO THE 2006 IECC

More information

APPENDIX G SETTLEMENT

APPENDIX G SETTLEMENT APPENDIX G SETTLEMENT TABLE OF CONTENTS G.1 IN T R O D U C T IO N... 1 G.2 MATERIAL PLACEMENT AND COMPACTION... 1 G.2.1 Incom pressible M aterials... 1 G.2.2 Compressible Materials... 2 G.2.3 Soil P lacem

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

Area & Volume. 1. Surface Area to Volume Ratio

Area & Volume. 1. Surface Area to Volume Ratio 1 1. Surface Area to Volume Ratio Area & Volume For most cells, passage of all materials gases, food molecules, water, waste products, etc. in and out of the cell must occur through the plasma membrane.

More information

Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations

Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations Hazardous Materials and Waste Management Division (303) 692-3300 First Edition

More information

Site Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point

Site Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point Site Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point Prepared for Maryland Port Administration 2310 Broening Highway Baltimore, MD 21224 (410) 631-1022 Maryland

More information

FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001

FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001 FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001 I. INTRODUCTION Section 121(c) of the Comprehensive Environmental Response, Compensation and Liability Act

More information

called and explain why it cannot be factored with algebra tiles? and explain why it cannot be factored with algebra tiles?

called and explain why it cannot be factored with algebra tiles? and explain why it cannot be factored with algebra tiles? Factoring Reporting Category Topic Expressions and Operations Factoring polynomials Primary SOL A.2c The student will perform operations on polynomials, including factoring completely first- and second-degree

More information

A Primer on Forecasting Business Performance

A Primer on Forecasting Business Performance A Primer on Forecasting Business Performance There are two common approaches to forecasting: qualitative and quantitative. Qualitative forecasting methods are important when historical data is not available.

More information

SECTION 15 FLOODPLAIN MANAGEMENT

SECTION 15 FLOODPLAIN MANAGEMENT SECTION 15 15.1 Purpose Certain areas of the City of Gardiner, Maine, are subject to periodic flooding, causing serious damages to properties within these areas. Relief is available in the form of flood

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

Openings in Foundation Walls for Buildings Located in Special Flood Hazard Areas

Openings in Foundation Walls for Buildings Located in Special Flood Hazard Areas Openings in Foundation Walls for Buildings Located in Special Flood Hazard Areas in accordance with the National Flood Insurance Program FEDERAL EMERGENCY MANAGEMENT AGENCY FEDERAL INSURANCE ADMINISTRATION

More information

Slope Density. Appendix F F-1 STATEMENT OF PURPOSE DISCUSSION OF SLOPE

Slope Density. Appendix F F-1 STATEMENT OF PURPOSE DISCUSSION OF SLOPE Appendix F Slope Density F-1 STATEMENT OF PURPOSE This document has been prepared with the intent of acquainting the general reader with the slope-density approach to determining the intensity of residential

More information

Idaho Energy and Cost Savings

Idaho Energy and Cost Savings BUILDING TECHNOLOGIES PROGRAM Idaho Energy and Cost Savings for New Single and Multifamily Homes: 2012 IECC as Compared to the 2009 IECC 1 2012 IECC AS COMPARED TO THE 2009 IECC Idaho Energy and Cost Savings

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

Illinois State Standards Alignments Grades Three through Eleven

Illinois State Standards Alignments Grades Three through Eleven Illinois State Standards Alignments Grades Three through Eleven Trademark of Renaissance Learning, Inc., and its subsidiaries, registered, common law, or pending registration in the United States and other

More information

Quick Reference ebook

Quick Reference ebook This file is distributed FREE OF CHARGE by the publisher Quick Reference Handbooks and the author. Quick Reference ebook Click on Contents or Index in the left panel to locate a topic. The math facts listed

More information

Model Virginia Map Accuracy Standards Guideline

Model Virginia Map Accuracy Standards Guideline Commonwealth of Virginia Model Virginia Map Accuracy Standards Guideline Virginia Information Technologies Agency (VITA) Publication Version Control Publication Version Control: It is the user's responsibility

More information

OKANOGAN COUNTY OFFICE OF PLANNING AND DEVELOPMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION

OKANOGAN COUNTY OFFICE OF PLANNING AND DEVELOPMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION OKANOGAN COUNTY OFFICE OF PLANNING AND DEVELOPMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION Okanogan County Code, OCC 15.08, Floodplain Management The State of Washington has authorized county governments

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

Appendix B: Monitoring Tool Matrices

Appendix B: Monitoring Tool Matrices Appendix B: Monitoring Tool Matrices Content: This appendix provides a detailed description of the ISRAP matrix organization and an explanation of each field of the monitoring tool matrices (www.israp.org).

More information

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies

More information

Energy and Cost Savings

Energy and Cost Savings BUILDING TECHNOLOGIES PROGRAM Rhode Island Energy and Cost Savings for New Single- and Multifamily Homes: 2012 IECC as Compared to the 2009 IECC 1 2012 IECC AS COMPARED TO THE 2009 IECC Rhode Island Energy

More information

Indiana Energy and Cost Savings

Indiana Energy and Cost Savings BUILDING TECHNOLOGIES PROGRAM Indiana Energy and Cost Savings for New Single and Multifamily Homes: 2012 IECC as Compared to the 2009 IECC 1 2012 IECC AS COMPARED TO THE 2009 IECC Indiana Energy and Cost

More information

Georgia Energy and Cost Savings

Georgia Energy and Cost Savings BUILDING TECHNOLOGIES PROGRAM Georgia Energy and Cost Savings for New Single and Multifamily Homes: 2012 IECC as Compared to the 2009 Georgia Energy Code 1 2012 IECC AS COMPARED TO THE 2009 GEORGIA ENERGY

More information

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS PLANTER BOXES 1. Determine the impervious area contributing flow to the planter box (see Chapter 4.2). 2. Assumption: Typical soil infiltration

More information

Town of Chatham Department of Community Development

Town of Chatham Department of Community Development Town of Chatham Department of Community Development TOWN ANNEX 261 GEORGE RYDER ROAD 02633 CHATHAM, MA TELEPHONE (508) 945-5168 FAX (508) 945-5163 FEMA FLOOD MAP UPDATE & PROPOSED ZONING BYLAW AMENDMENT

More information

SPCC Plan - Calculation Guidance

SPCC Plan - Calculation Guidance SPCC Plan - Calculation Guidance The following example compares two different design criteria: one based on the volume of the tank and one based on precipitation. Scenario: A 20,000-gallon horizontal tank

More information

Scope and Sequence KA KB 1A 1B 2A 2B 3A 3B 4A 4B 5A 5B 6A 6B

Scope and Sequence KA KB 1A 1B 2A 2B 3A 3B 4A 4B 5A 5B 6A 6B Scope and Sequence Earlybird Kindergarten, Standards Edition Primary Mathematics, Standards Edition Copyright 2008 [SingaporeMath.com Inc.] The check mark indicates where the topic is first introduced

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

10 7, 8. 2. 6x + 30x + 36 SOLUTION: 8-9 Perfect Squares. The first term is not a perfect square. So, 6x + 30x + 36 is not a perfect square trinomial.

10 7, 8. 2. 6x + 30x + 36 SOLUTION: 8-9 Perfect Squares. The first term is not a perfect square. So, 6x + 30x + 36 is not a perfect square trinomial. Squares Determine whether each trinomial is a perfect square trinomial. Write yes or no. If so, factor it. 1.5x + 60x + 36 SOLUTION: The first term is a perfect square. 5x = (5x) The last term is a perfect

More information

ARTICLE 12 FLOOD DAMAGE PREVENTION

ARTICLE 12 FLOOD DAMAGE PREVENTION ARTICLE 12 FLOOD DAMAGE PREVENTION SECTION 12.1 AUTHORIZATION 12.1.1 General The Legislature of the State of North Carolina has in Part 6, Article 21 of Chapter 143; Parts 3 and 4 of Article 18 of Chapter

More information

4.3.5 - Breakaway Walls

4.3.5 - Breakaway Walls 4.3.5 - Breakaway Walls Elevation of a structure on a properly designed foundation reduces the potential for water damage from flooding. When the space below the lowest elevated floor is maintained free

More information

Geometry and Measurement

Geometry and Measurement The student will be able to: Geometry and Measurement 1. Demonstrate an understanding of the principles of geometry and measurement and operations using measurements Use the US system of measurement for

More information

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update July 16, 2015 Policy Committee FEMA Map Update Costal Analysis and mapping study by FEMA in 2009 Changes

More information

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars Report on Wind Resistance of Signs supported by Glass Fiber Reinforced Concrete (GFRC) Pillars Prepared for US Sign and Fabrication Corporation January, 2006 SUMMARY This study found the attachment of

More information

MATHCOUNTS TOOLBOX Facts, Formulas and Tricks

MATHCOUNTS TOOLBOX Facts, Formulas and Tricks MATHCOUNTS TOOLBOX Facts, Formulas and Tricks MATHCOUNTS Coaching Kit 40 I. PRIME NUMBERS from 1 through 100 (1 is not prime!) 2 3 5 7 11 13 17 19 23 29 31 37 41 43 47 53 59 61 67 71 73 79 83 89 97 II.

More information

Determining the Area and Volume of Your Pond

Determining the Area and Volume of Your Pond Determining the Area and Volume of Your Pond Michael A. Davis, Ph.D. UF/IFAS Baker County Extension Service Tim Wilson, M.S. UF/IFAS Bradford County Extension Service Basil Bactawar, M.S. UF/IFAS Union

More information

Site Development Information Worksheet for single family residential development

Site Development Information Worksheet for single family residential development Site Development Information Worksheet for single family residential development Project description: Address: Owner Name: Phone No. Date Signature & phone number of Individual who Completed this Worksheet

More information

GLOSSARY OF TERMINOLOGY

GLOSSARY OF TERMINOLOGY GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.

More information

Site Description and History

Site Description and History 3130 Southwest 17 th Street Pembroke Park, Florida County: Broward District: Southeast Site Lead: EPA Placed on National Priorities List: July 22, 1987 HWC # 023 Site Description and History The Petroleum

More information

VAV Laboratory Room Airflow The Lowdown on Turndown

VAV Laboratory Room Airflow The Lowdown on Turndown Technology Report March, 2003 VAV Laboratory The Lowdown on Turndown Turndown comparison of these two turndown ratios. Note the small actual airflow difference between them. control ranges are normally

More information

Algebra 1 2008. Academic Content Standards Grade Eight and Grade Nine Ohio. Grade Eight. Number, Number Sense and Operations Standard

Algebra 1 2008. Academic Content Standards Grade Eight and Grade Nine Ohio. Grade Eight. Number, Number Sense and Operations Standard Academic Content Standards Grade Eight and Grade Nine Ohio Algebra 1 2008 Grade Eight STANDARDS Number, Number Sense and Operations Standard Number and Number Systems 1. Use scientific notation to express

More information

6.4 Factoring Polynomials

6.4 Factoring Polynomials Name Class Date 6.4 Factoring Polynomials Essential Question: What are some ways to factor a polynomial, and how is factoring useful? Resource Locker Explore Analyzing a Visual Model for Polynomial Factorization

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

APPLICATIONS AND MODELING WITH QUADRATIC EQUATIONS

APPLICATIONS AND MODELING WITH QUADRATIC EQUATIONS APPLICATIONS AND MODELING WITH QUADRATIC EQUATIONS Now that we are starting to feel comfortable with the factoring process, the question becomes what do we use factoring to do? There are a variety of classic

More information

What is GIS? Geographic Information Systems. Introduction to ArcGIS. GIS Maps Contain Layers. What Can You Do With GIS? Layers Can Contain Features

What is GIS? Geographic Information Systems. Introduction to ArcGIS. GIS Maps Contain Layers. What Can You Do With GIS? Layers Can Contain Features What is GIS? Geographic Information Systems Introduction to ArcGIS A database system in which the organizing principle is explicitly SPATIAL For CPSC 178 Visualization: Data, Pixels, and Ideas. What Can

More information

Higher Education Math Placement

Higher Education Math Placement Higher Education Math Placement Placement Assessment Problem Types 1. Whole Numbers, Fractions, and Decimals 1.1 Operations with Whole Numbers Addition with carry Subtraction with borrowing Multiplication

More information

Sample Problems. Practice Problems

Sample Problems. Practice Problems Lecture Notes Quadratic Word Problems page 1 Sample Problems 1. The sum of two numbers is 31, their di erence is 41. Find these numbers.. The product of two numbers is 640. Their di erence is 1. Find these

More information

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington

More information

WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS

WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS GAP.14.1.2.2 A Publication of Global Asset Protection Services LLC WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS INTRODUCTION A hydrant or other large-volume flow test is necessary for proper water

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan State of Louisiana Coastal Protection and Restoration Authority of Louisiana 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan for East Marsh Island Marsh Creation State Project Number TV-21

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information