Remediation Weekly Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action
|
|
|
- Gerald Garrett
- 10 years ago
- Views:
Transcription
1 Remediation Weekly Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action Page 1 Period: June 16 - June 22, 2014 (Week 40) PSC Project Number Completed By: Jeff Adams General Remediation Activities Completed: PSC continued active onsite remediation activities, including backfilling of the Phase 4 excavation. The sketch on Page 2 shows the extent of the excavation and completed backfilling activities. A total of 3, tons of Construction Debris (0 tons this week) and 23, tons of Non-Source Material (0 tons this week) were removed and hauled to Republic Services-Ottowa, Illinois Landfill. A total of 3, tons of clay (3, tons this week) and 23, tons of rock (lime screenings, one-inch minus, and two to three-inch clean rock; 0 tons this week) have been hauled onsite to use as backfill material. In addition, tons of clean one-inch stone (0 tons this week) have been brought in to address the haul roads and parking areas. Approximately 4,000 gallons of water removed from the excavation are currently containerized, while approximately 149,000 gallons (9,000 this week) have been hauled offsite for disposal. Monday - June 16th: Continue backfilling and compaction of the Phase 4 excavation with clay soil from LandComp Landfill, and continue breaking concrete slabs along the canal berm. Performed two lifts today (Lifts 3 & 4); compaction tests were performed by Midwest Testing Services, Inc. (Midwest). Approximately 9,000 gallons (2 truck loads) of impacted water were removed from frac tanks for disposal to PDC in Clinton, IL. Approximately 1,000 gallons of impacted water were pumped from the Phase 5 excavation into frac tanks. QLF hauled out one load (~5,000 gallons) of ammonia-impacted water from the basement for offsite disposal. Ed B. and Mike F. of PSC visit backfill source to inspect & verify its viability. PSC worked with Midwest to get the EDG and Proctor calibrated to the new backfill material. Tuesday - June 17th: Continue backfilling and compaction of the Phase 4 excavation with clay soil from LandComp Landfill, and continue breaking concrete slabs along the canal berm. Performed one lift today (Lift #5); compaction tests were performed by Midwest Testing Services, Inc. (Midwest). QLF hauled out one load (~5,000 gallons) of ammonia-impacted water from the basement for offsite disposal. Two lined roll-off dumpsters were delivered to the Site for disposal of stockpiled ACM pipes. Began adding water to backfill soil upon dumping to increase the moisture content. Wednesday - June 18th: Continue backfilling and compaction of the Phase 4 excavation with clay soil from LandComp Landfill, and continue breaking concrete slabs along the canal berm. Performed two lifts today (Lifts 6 & 7); compaction tests were performed by Midwest Testing Services, Inc. (Midwest). Approximately 1,000 gallons of impacted water were pumped from the Phase 5 excavation into frac tanks. QLF hauled out two loads (~10,000 gallons) of ammonia-impacted water from the basement for offsite disposal. Two roll-off dumpsters were delivered to the Site for disposal of ACM pipes. Thursday - June 19th: Continue backfilling and compaction of the Phase 4 excavation with clay soil from LandComp Landfill, and continue breaking concrete slabs along the canal berm. Performed one lift today (Lift #8); compaction tests were performed by Midwest Testing Services, Inc. (Midwest). QLF hauled out two loads (~10,000 gallons) of ammonia-impacted water from the basement for offsite disposal. Spray Services personnel (2) on Site to oversee the loading of ACM piping into roll-offs for disposal. Ameren personnel (Brian Martin, Warren Mueller, and Bud Chamblin) on Site for visit. Friday - June 20th: Continue backfilling and compaction of the Phase 4 excavation with clay soil from LandComp Landfill, and continue breaking concrete slabs along the canal berm. Performed two lifts today (Lifts 9 & 10); compaction tests were performed by Midwest Testing Services, Inc. (Midwest). QLF hauled out two loads (~10,000 gallons) of ammonia-impacted water from the basement for offsite disposal. Republic Services truck picked up the roll-offs containing the ACM piping for transport and disposal. Saturday - June 21st: No site work performed. Health & Safety Activities: Weather Conditions: H&S Issues/Other: Mostly sunny and warm with periods of rain and thunderstorms and high temperatures in the 80s and 90s. Heat stress, staying fit for duty, and protecting public health & safety. No recordable accidents or incidents occurred. Out of Scope Items: None
2 Remediation Footprint and Excavation Progress Map Ameren LaSalle Former MGP - Soil Removal Action Page 2 Period: June 16 - June 22, 2014 (Week 40) PSC Project Number Completed By: Jeff Adams
3 Air Monitoring Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action Period: June 16 - June 22, 2014 (Week 40) PSC Project Number Completed By: Chris Dawdy Page
4 Air Monitoring Station Locations Ameren LaSalle Former MGP - Soil Removal Action Page 4 Period: June 16 - June 22, 2014 (Week 40) PSC Project Number Completed By: Jeff Adams
5 Project Milestones Summary Report Ameren LaSalle Former MGP - Soil Removal Action Period: June 16 - June 22, 2014 (Week 40) PSC Project Number Completed By: Jeff Adams Page Project Milestones Actual Quantities Weather: Prior Total: This Period: Total To Date: Rainfall (inches) Snowfall (inches) Material Type: Project Estimates Original: Revised: Solid Waste Material: Construction & Demolition Debris-Republic (tons) 3, , MGP Impacted Soil (Non Source)-Republic (tons) 23, , ,000* 0 MGP Impacted Soil (Source)-PDC (tons) TOTAL 27, , Addt. Solid Waste Material: Clean Brick-Canon Pit (loads) Asbestos Containing Material (ACM)-Republic (tons) 1, , Scrap Material (loads) Clean Material: CM-06, 1-Inch Minus (tons) 15, , Lime Screenings (tons) 6, , CS-02, 2 to 3-Inch Clean Stone (tons) 1, , Inch Clean Stone (tons) /2-Inch Rock (tons) Stone Backfill Subtotal 23, , CA-7, 1-Inch Clean Stone (tons) Clean soil backfill (tons) , , Top Soil (cubic yard) TOTAL 23, , , Treated Wastewater: Discharged to PDC (gallons) 140,000 9, , * MGP Impacted Soil volume is data presented in the site investigation report. Trucks Transporting: Monday Tuesday Wednesday Thursday Friday Issues Actually Received Requested
6 Page 6 Placing the first lift of clay backfill (Lift #3) in the Phase 4 excavation; facing south. Calibrating the nuclear density gauge and EDG to the new clay backfill material.
7 Page 7 Compacting backfill Lift #6 in Phase 4; facing southwest. Loading ACM piping into roll-off dumpsters for offsite disposal; facing southwest.
8 Page 8 Republic Services truck picking up roll-off loaded with ACM piping for offsite disposal; facing east. View of backfill progress in Phase 4 at the end of the week; facing southeast.
9 Page 9
10 Page 10
11 Page 11
Remediation Weekly Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action
Remediation Weekly Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action Page 1 Period: August 11 through 17, 2014 (Week 48) PSC Project Number Completed By: Jeff Adams 624-1202-0012
SECTION 202. REMOVAL Of ROADWAYS AND BUILDINGS
SECTION 202 REMOVAL Of ROADWAYS AND BUILDINGS 202.1 Description. This work shall consist of the removal and disposal of all existing improvements from the right of way and within the limits of any construction
WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.
WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:
Routine Maintenance and Inspection
THE CORPORATION OF THE VILLAGE OF WARFIELD POLICY TITLE: Sanitary Sewer Operations POLICY: #5435 PURPOSE: This policy is to provide the Village of Warfield s procedures for maintaining its sanitary sewer
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
Concrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
AMERICAN BOTTOMS REGIONAL WASTWATER TREATMENT FACILITY BID AB 31-15 SLUDGE LOADING, HAULING & DISPOSAL TECHNICAL SPECIFICATIONS
AMERICAN BOTTOMS REGIONAL WASTWATER TREATMENT FACILITY BID AB 31-15 SLUDGE LOADING, HAULING & DISPOSAL TECHNICAL SPECIFICATIONS 1. General Description The contractor shall provide all labor, equipment,
APPENDIX G SETTLEMENT
APPENDIX G SETTLEMENT TABLE OF CONTENTS G.1 IN T R O D U C T IO N... 1 G.2 MATERIAL PLACEMENT AND COMPACTION... 1 G.2.1 Incom pressible M aterials... 1 G.2.2 Compressible Materials... 2 G.2.3 Soil P lacem
CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT
Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160
CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN
CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN Adopted October 5, 2009 Table of Contents Chapter Description Page 1 Facility Descriptions... 3 1.1 Municipal Power Plant, 1001 Park
ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS
Onsite Sewage Treatment & Disposal System Requirements ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS 1. City of Ventura onsite sewage treatment and disposal system (Septic system) permit application
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
SILICON VALLEY CLEAN WATER. May 2015
SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial
Specifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
International University of Monaco 27/04/2012 14:55 - Page 1. Monday 30/04 Tuesday 01/05 Wednesday 02/05 Thursday 03/05 Friday 04/05 Saturday 05/05
International University of Monaco 27/04/12 14:55 - Page 1 Master in International Business and Global Affairs - from 30 avril to 05 mai 12 Monday 30/04 Tuesday 01/05 Wednesday 02/05 Thursday 03/05 Friday
International University of Monaco 21/05/2012 16:01 - Page 1. Monday 30/04 Tuesday 01/05 Wednesday 02/05 Thursday 03/05 Friday 04/05 Saturday 05/05
International University of Monaco 21/05/12 16:01 - Page 1 Master in International Sport Business and Management - from 30 avril to 05 mai 12 Monday 30/04 Tuesday 01/05 Wednesday 02/05 Thursday 03/05 Friday
MATCHDAY 1 7-9 September 2014
MATCHDAY 1 7-9 September 2014 7 September Sunday 18:00 Group D 7 September Sunday 20:45 Group D 7 September Sunday 20:45 Group D 7 September Sunday 18:00 Group F 7 September Sunday 20:45 Group F 7 September
CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014
Operation s Purpose The purpose of this plan is to document spill prevention and response requirements. Each Elkhorn Construction, Inc. jobsite will develop a spill prevention and response plan based on
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Academic Calendar for Faculty
Summer 2013 Term June 3, 2013 (Monday) June 3-4, 2013 (Monday Tuesday) June 5, 2013 (Wednesday) June 5-6, 2013 (Wednesday Thursday) June 6, 2013 (Thursday) July 3, 2013 (Wednesday) July 4, 2013 (Thursday)
GEOTECH ENGINEERING and TESTING
GEOTECH ENGINEERING and TESTING Geotechnical, Environmental, Construction Materials, and Forensic Engineering ACCREDITED GEOTECHNICAL AND CONSTRUCTION CONSIDERATIONS FOR A TYPICAL RESIDENTIAL STRUCTURE
RESIDENTIAL SERVICES. compost recycle landfill
RESIDENTIAL SERVICES LANDFILL compost recycle landfill for service information GREENWASTE OF PALO ALTO 2000 Geng Road Palo Alto, CA 94303 650.493.4894 [email protected] for program information
2016 Dry Cleaning Compliance Calendar
Missouri Department of Natural Resources Division of Environmental Quality 20 Dry Cleaning Compliance Calendar Recycled Paper 12/2015 PUB001310 LEGEND OF TERMS APCP - Air Pollution Control Program EIQ
Collection Systems Technology Fact Sheet Sewers, Conventional Gravity
United States Environmental Protection Agency Collection Systems Technology Fact Sheet Sewers, Conventional Gravity DESCRIPTION Sewers are hydraulic conveyance structures that carry wastewater to a treatment
Beseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
consulting engineers and scientists
consulting engineers and scientists Incorporating Sustainable Principles into Cleanups June 2014 Presented by: Rich Truax, PE GEI Consultants, 650 Personnel Nationwide Rich Truax, P.E. Sr. Program Manager
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in
SANITARY SEWER BACKUP. Causes & Prevention
SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides
Basement Moisture Problems
Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design
Soils and Aggregates Division
Dan Sajedi, Division Chief 443-572-5162 George Hall, Assistant Division Chief Field Operations 443-572-5271 Eric Frempong, Assistant Division Chief Laboratory 443-572-5055 Aggregate Materials, Controlled
Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan
Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the
SPCC Plan - Calculation Guidance
SPCC Plan - Calculation Guidance The following example compares two different design criteria: one based on the volume of the tank and one based on precipitation. Scenario: A 20,000-gallon horizontal tank
City of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment
San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS
San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS Page No. 1.0 BACKGROUND...1 2.0 INTRODUCTION - SEPTAGE RECEIVING STATION...1
SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:
Stormwater Pollution Prevention Plan "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION
Oxford Hills Bus Garage 36 Brown St, Norway, ME Oil Storage Inspection 2/20/14 CONDITIONS OBSERVED Underground Oil Storage: 12,000 gallon underground oil storage tank (split 10,000 gallon diesel/2,000
(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.
Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing
Protect your. home from. basement. have you done everything you can?
Protect your home from basement flooding have you done everything you can? No matter where you live in Winnipeg, your home can be at risk of basement flooding. Heavy rainstorms that fall over short periods
Minnesota Department of Transportation Best Management Practices (BMP) for Concrete Washout May 2009, v5
Best Management Practices (BMP) for Concrete Washout The NPDES permit requires that concrete washout be managed on all construction projects. This document is Mn/DOT s interpretation of MPCA s guidance
Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy [email protected]
Secondary Containment: Regulations & BMPs Beth Powell Vice-President and General Manager New Pig Energy [email protected] Federal Secondary Containment Safeguarding method in addition to the primary
Appendix I: BMP Inspection Form CASQA SWPPP Template 91 January2011 BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III
Annual Storm Water Pollution Prevention Plan and Spill Prevention, Control and Countermeasures Plan Compliance Inspection
Annual Storm Water Pollution Prevention Plan and Spill Prevention, Control and Countermeasures Plan Compliance Inspection September 22, 2014 Prepared By: Facilities Management Environmental Resources University
State of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01
State of Rhode Island Department of Environmental Management Division of Site Remediation Policy Memo 95-01 Guidelines for the Management of Investigation Derived Wastes 1.0 Purpose The purpose of this
GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS
Company Name: Address: The City of Attleboro s Rules and Regulations for the use of Wastewater Facilities require each user to provide protection from accidental discharge of prohibited materials and substances
Helen Mercury Mine EE/CA OPINION OF PROBABLE COST
G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8
Foul Drainage, systems and responsibility. Environmental Protection
Foul Drainage, systems and responsibility Environmental Protection The Building Act 1984 The Building Act 1984 can be used to deal with unsatisfactory provision for drainage and appliances which are harmful
FINAL PLAN OF REMEDIAL ACTION
FINAL PLAN OF REMEDIAL ACTION 1000 FRENCH STREET SITE Wilmington, Delaware DE 1115 June 1999 Department of Natural Resources and Environmental Control Division of Air and Waste Management Site Investigation
First in Service First in Safety
7840 Nagle Avenue Morton Grove, Illinois 60053 847-470-5235 Fax - 847-965-9511 Wind Damage; Frequently Asked Questions: What can I do with branches that fall in my yard? Bring them out to the parkway;
CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form:
CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form: Please complete and submit this form with your building permit application. 80% of all demolition and construction material must be recycled.
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
Designing a Zero-Waste Concrete Mix Testing Lab
Designing a Zero-Waste Concrete Mix Testing Lab James A. Lee 1 Michael J. D Agostino 2 Abstract A zero waste laboratory to mix and test the engineering and performance properties of concrete was designed
Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
International University of Monaco 11/06/2012 09:27 - Page 1. Monday 30/04 Tuesday 01/05 Wednesday 02/05 Thursday 03/05 Friday 04/05 Saturday 05/05
International University of Monaco 11/06/2012 09:27 - Page 1 Master in Finance - Hedge Funds and Private Equity - from 30 avril to 05 mai 2012 Monday 30/04 Tuesday 01/05 Wednesday 02/05 Thursday 03/05
What Causes Foundation Leaking?
A home's foundation has the odds stacked against it from the day it's built. When a home is excavated to make room for the foundation walls, space is left between the outer edge of the foundation wall
SPACE ALLOCATION AND ENCLOSURE DESIGN GUIDELINES FOR TRASH AND RECYCLING
SPACE ALLOCATION AND ENCLOSURE DESIGN GUIDELINES FOR TRASH AND RECYCLING For Residential and New Commercial Construction and Remodel Dated July 1, 2010 If you have any questions regarding the Design Guidelines
Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills
Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills 1. INTRODUCTION: 2011 World of Coal Ash (WOCA) Conference May 9-12,
History of the SPCC Rule
2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally
Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System
Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System An application for the construction or alteration of an individual subsurface sewage disposal system shall
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or
Tampa Bay Seawater Desalination Plant
Tampa Bay Seawater Desalination Plant Project History How The Plant Works Desal Fun Facts 2575 Enterprise Road, Clearwater, FL 33763-1102 Phone: 727.796.2355 / Fax: 727.791.2388 www.tampabaywater.org Tampa
MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.
MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer
STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM
STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM Solid Waste Management Program Waste Management Division 103
INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6
03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf
Section 300 Base Courses
Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA
Draft Construction Work Plan Non-Public Properties Newhall Street Neighborhood Site Hamden, Connecticut
Draft Construction Work Plan Non-Public Properties Newhall Street Neighborhood Site Hamden, Connecticut Revision 0 Prepared for: Olin Corporation Cleveland, Tennessee February 2009 TABLE OF CONTENTS INTRODUCTION...
SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: PREPARED BY:
SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: FLOWER CITY MANAGEMENT & DEVELOPMENT THE MEDICAL ARTS BUILDING (USGBC
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods
Extreme Wet Weather in Brookfield How to Keep Your Basement Dry During Heavy Rains and Floods Relating Stormwater Drainage to Sewer Backups Brookfield has two separate sewer systems Storm sewer system
THE PRICE OF SOLID WASTE MANAGEMENT SERVICES IN VERMONT
THE PRICE OF SOLID WASTE MANAGEMENT SERVICES IN VERMONT 2005 Overview of Survey Results FINAL REPORT July 2005 Prepared for: Vermont Department of Environmental Conservation Solid Waste Program 103 South
STORM DRAIN PIPE MAINTENANCE. a. Develop standard operating procedures for maintaining storm drain pipes.
STORM DRAIN PIPE MAINTENANCE a. Develop standard operating procedures for maintaining storm drain pipes. 2. PROCESS Storm drain pipes are to be maintained per the Storm Water System Maintenance Plan schedule.
HANOVER COUNTY DEPARTMENT OF PUBLIC WORKS SOLID WASTE DISPOSAL SERVICES SOLID WASTE DISPOSAL REGULATIONS
HANOVER COUNTY DEPARTMENT OF PUBLIC WORKS SOLID WASTE DISPOSAL SERVICES SOLID WASTE DISPOSAL REGULATIONS Solid Waste Disposal Facilities Only residential solid waste and specified farm waste may be disposed
Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards
Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL
Sustainable Resource Management Ltd
6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
Renew Indianapolis Demolition Contractor Pool Hardest Hit Funds/Blight Elimination Program
Renew Indianapolis Demolition Contractor Pool Hardest Hit Funds/Blight Elimination Program Renew Indianapolis, a not-for-profit organization working in conjunction with the City of Indianapolis s Department
FACILITY MANAGEMENT PLAN. TAM Organics Compost Facilty HOUGHTON LANE BENNINGTON, VERMONT. December 15, 2012. Facility Owner:
FACILITY MANAGEMENT PLAN TAM Organics Compost Facilty HOUGHTON LANE BENNINGTON, VERMONT December 15, 2012 Facility Owner: TAM, Inc. 639 North Rd. Shaftsbury, VT 05262 p: 802-447-1300 f: 802-445-3044 TABLE
CHAPTER 13 LAND DISPOSAL
CHAPTER 13 LAND DISPOSAL Supplemental Questions: Which of Shakespeare's plays is the source of the opening quote? The Tempest [1611-1612],Act: I, Scene: i, Line: 70. 13-1. Cite four reasons landfills remain
Part 9 SUBDRAIN DESIGN AND LAYOUT
Part 9 SUBDRAIN DESIGN AND LAYOUT Early subdrainage often consisted of placing free-draining material, mostly gravel and rock, in the axis of filled swales, as sketched above. These began to be employed
SUNSHINE CANYON LANDFILL
SUNSHINE CANYON LANDFILL January 15, 2014 Mr. Gerry Villalobos SCL LEA Program Manager 5050 Commerce Drive Baldwin Park, California 91706 Subject: December 2013 Monthly Report (MRMP 46, 96, 119, & 125)
