L2571-AZE: Water Supply and Sanitation Investment Program Nakhchivan City Water Supply and Sewerage Subproject (Tranche 1)

Similar documents
Preventing Storm Water Pollution: What We Can Do

Environmental Site Inspection Checklist

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

Activity Yes No N/A Notes

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

City of Green Bay Department of Public Works Engineering Department

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

ALL YOU NEED TO KNOW...

MLD: Domestic Maritime Transport Project

Florida Department of Environmental Protection

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

ENVIRONMENTAL SITE MANAGEMENT & REHABILITATION AWARENESS COURSE management level

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

Planning, Health and Environment Division

Environmental Management Plan

APPENDIX 4. Risk Tables

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

SEPTIC TANK SYSTEMS. Single purpose septic tank receives toilet wastes (blackwater) or sullage (greywater) only.

Proposed Terms of Reference for EIA studies

SECTION 810 SEWER LINE CLEANING

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

Looking after your Septic Tank System

Spill Prevention, Control and Countermeasure (SPCC) Rule

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review

DESCRIPTION OF WORK:

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

16. Storm water drainage

BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ

2006 Standard Application Processing Time. 10 months. 14 months

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Temporary Batch Plants

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

SECTION SELECTIVE DEMOLITION

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

City of Shelbyville Site Inspection Checklist

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

GMS: Rehabilitation of Railway in Cambodia

SECTION SITE PREPARATION

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Type of Sewer Systems. Solomon Seyoum

MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8

Concrete Waste Management

Homeowner s Guide to Maintaining a Sewage Treatment System

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

TITLE 6. Health and Sanitation CHAPTER 1. Health and Sanitation

Septic System. Responsibility! Is Your. You should know that:

Ingredion ANZ Pty Ltd

Construction Site Draina e

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2

BASEMENT FLOODING. Prevention Guide for. Homeowners

Help protect our special places by maintaining your septic tank

Trenching and Excavation Safety

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Environmental Construction Operations Plan (ECO Plan) Framework

History of the SPCC Rule

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.

INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8

MBJ Environmental Programmes

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

Storm Water Management Requirements for Construction Projects Less than One Acre

Environmental guidelines for preparation of an Environment Management Plan

Storm Drain Inlet Protection

G. Common Defects in Buildings - Leakage

Q 4/17/13: Thank you for your quick response to our dated April 10, In looking over your comments, we have a few clarifying remarks.

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

SPILL PREVENTION PLAN

UNIVERSITY OF WISCONSIN MADISON

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

Outlet stabilization structure

ENVIRONMENTAL MANAGEMENT PLAN :-

CONSTRUCTION PERMIT REQUIREMENTS

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

3. QUALITY ASSURANCE REQUIREMENTS

ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report

Properly maintaining your septic system will help reduce the. It s Your Septic System. Homeowner s Guide. Here s How to Take Care of It

DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

CERTIFYING DRAINLAYER

Waste Handling & Disposal

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

SOUTH COOGEE TRANSPORT MANAGEMENT PLAN

CHAPTER 17. Sewers and Sewage

Environmental Monitoring Report

ANNEX 2 Emergency / Pollution Incident Response Plan

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS

Environmental Impact Assessment

TRAFFIC MANAGEMENT PLAN

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

Routine Maintenance and Inspection

Transcription:

Environmental Monitoring Report Semestral Report January 2012 L2571-AZE: Water Supply and Sanitation Investment Program Nakhchivan City Water Supply and Sewerage Subproject (Tranche 1) Prepared by SAWMC, Government of the Republic of Azerbaijan for the Asian Development Bank.

Bi Annual Environmental Monitoring Report Period: July 1st December 31th 2011 Project Number: 42408-MFF January 2012 Republic of Azerbaijan: Water Supply and Sanitation Investment Program Nakhchivan City Water Supply and Sewerage Subproject (Tranche 1) Prepared by SAWMC, Government of Republic of Azerbaijan for the Asian Development Bank.

2 ACRONYMS ADB : Asian Development Bank AR : Autonomous Republic ECO : Environmental Control Official EIA : Environmental Impact Assessment EMP : Environmental Management Plan EMU : Environmental Management Unit IEE : Initial Environmental Examination Km : Kilometer m 3 : Cubic meter Mg/L : milligrams per liter Mld : Million liter per day MENR : Ministry of Ecology and Natural Resources M&E : Monitoring and Evaluation NAR : Nakhchivan Autonomous Republic PIU : Project Implementation Unit PMF : Project Management Facility PMO : Project Management Office Project : Nakhchivan City Water Supply and Sewage Infrastructure SAWMC : State Amelioration and Water Management Committee SEE : The State Ecological Expertise SNIP : Construction Norms and Regulations of Azerbaijan WSS : Water Supply and Sewage WTP : Water Treatment Plant WWTP : Wastewater Treatment Plant WHO : World Health Organization This bi annual environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

3 CONTENTS I. INTRODUCTION...4 A. Construction activities and Project Progress during previous 6 months... 5 B. Environmental Management Team... 5 C. Project Organization... 5 II. ENVIRONMENTAL MONITORING...6 A. Noise... 6 B. Water Quality... 6 C. Air Quality... 7 D. Flora and Fauna... 7 E. Waste Disposal... 7 F. Summary Monitoring Report... 7 III. ENVIRONMENTAL MANAGEMENT...8 A. Site Inspections... 8 B. Reporting... 8 C. Non-compliance Notices... 8 D. Corrective Action Plans... 8 E. Consultation and Complaints... 8 ANNEX A: MONITORING DATA...9 ANNEX B: PICTURES... 12

4 I. INTRODUCTION The Azerbaijan Water Supply and Sanitation Investment Program is being cofinanced by the Government of Azerbaijan and the Asian Development Bank through a multitranche financing facility (MFF) involving several tranches. The Tranche 1 Nakhcivan subproject of the Investment Program included partial construction of WSS network of the City and construction of a new WTP. According to the Loan Agreement L-2571 AZE betwen the Govenment of Azerbaijan and ADB, construction works for intercity sewerage and water networks and also water treatment plant in the town of Nakhichivan are executed. Two packages were planned within this subproject: Contract-1 (L-42408-ICB-2.02): Construction of 21.5 km of water network with fire fighting hydrants and house connections, 18.3 km of sewage network with manholes and house connections, and a 10,000 m 3 concrete water reservoir. Contract-2 (L-42408-ICB-2.03): Construction of Nakhcivan City water treatment plant with 40,000m 3 /day capacity The construction works under Contract-1, which had started in May 2010, was succesfully completed in September 2011. The construction works under Contract-2 have started in December 2011, and is expected to last for eighteen (18) months. This Report (Bi-Annual Environmental Monitoring Report) is prepared considering the time period from July 2011 to December 2011. The Project s Environmental Impact Monitoring and Mitigation is carried out in accordance with the Environmental Management Plans prepared by the PIU / Consultant. The construction activities affecting the environment are as follows: (1) Trenching (2) Removal of soil (3) Pipe installation (4) Backfilling and compaction (5) Asphalt/concrete roadway patching/paving (6) Slope protection and other miscellaneous works. The following items are monitored during the implementation of the project. (1) Noise (2) Water Quality (3) Air Quality

5 (4) Flora - Fauna (5) Waste disposal The subproject construction sites under Contract -1 were located in existing roads right of way. Also the area to be the site for construction of the water treatment plant (Contract-2) is owned by Nakhchivan Sukanalizasiya OSC. There are no protected areas, wetlands, mangroves, or estuaries. There is no land acquisition and relocation of people. Trees, vegetation (mostly shrubs and grasses), and animals in the subproject sites are those commonly found in built-up areas. The geological structure of the area is stable and no potential land subsidence is foreseen. A. Construction activities and Project Progress during previous 6 months The activities which were carried out by the Contractors in the past 6 months (July 1 to December 31, 2011) comprised mainly of 11.2 km of water lines and 2.7 km of sewage lines with associated valves, fittings, hydrants, manholes etc. In addition, excavation works of water treatment plant building has also started in December. Other works which were carried out are incidental items comprised of installation of manholes, fire hydrants, valves and valve boxes. The whole of the Works under Contract 1 were completed in September 2011. B. Environmental Management Team An environmental management team exists under the PIU of SAWMC. The team consists of Mr. Ibrahim Mammadov as Manager and Mr. Humbat Bakhshiyev as Environmental Control Official (ECO). The consultant has also a construction specialist and field inspectors on site for help SAWMC on supervision and monitoring of the Environmental Management Plan. The following works were performed by the environmental management team explain the contents of the Environmental Management Plan (EMP) to the contractor, the site staff, the supervisors and any other relevant personnel. be on site on daily to supervise environmental actions associated with construction activities. monitor and implement the EMP as the most important function. ensure that the contractor understands what is to be done to rectify and address any problems that have arisen from the monitoring. C. Project Organization Project organization for the two awarded contracts listed above is given in the table below.

6 Contract Employer Contractor Engineer Contract-1 (L-42408-ICB-2.02) Contract-2 (L-42408-ICB-2.03) SAWMC Gemiqaya İnşaat MMC Gemiqaya İnşaat & Denizsu Joint Ven. Yolsu Engineering Services Ltd. II. ENVIRONMENTAL MONITORING During the last six months no environmental issues or complaints from the local residents were received. On the contrary, ongoing random public consultations showed that all construction work is being done with very well taken environmental safety precautions. The Contractor kept records of contractors safety; environmental considerations of construction sites; air quality, noise and waste management; and public complaints in accordance with Contractors obligations under the Contract. Within this report period, no public complaints or adverse environmental impacts related to the works has been noted or observed. A. Noise The Contractor has employed practical means to minimize noise resulting from construction work. Noise was minimized through proper maintenance of equipment and vehicles. All construction tasks were carried out during unrestricted hours (09.00 to 18.00) Monday to Saturday, excluding general holidays All heavy vehicles and mechanical equipments used for the purpose of the Works were fitted with exhaust silencers, which are being maintained in good and efficient working order. No diesel heavy construction equipment are kept running idle for more than five minutes. Machines in intermittent use were being shut down in the intervening period between works or throttled down to a minimum. The Contractor had organized his operations at the start of the project with regard to the positioning of plant and movement of vehicles to minimize noise adjacent to properties. This organization continued until the end of the project. Special consideration have been provided to protect workers from harmful and long exposures to noise originating from construction machinery such as the wearing of earmuffs for operators. Handling of construction materials were done during daytime. B. Water Quality No construction work took place around natural bodies of water like rivers, streams, etc.

7 All works have been undertaken in a manner that will minimize the silting of any body of water and no debris, slash, wood chips, organic debris, soil, petroleum, diesel fuel, oil, grease, ashes, or other substances deleterious to environment was allowed to enter any water bodies. Solid Construction material and spoil stockpiles were covered to reduce material loss and run-off and stockpiles were not located nearer than 200m to any water bodies. Natural drainage patterns have been maintained or controlled throughout the entire construction operation to minimize silt release into streams or other water bodies. C. Air Quality In cases where dust may occur; the surfaces were sprayed with water using water trucks equipped with sprinklers or any other appropriate means. This procedure was executed to effectively control the excessive spreading of dusts particularly during dry and windy days. 30 km/h speed limit was set for movement of heavy construction vehicles on roads in the City. All excavation works, and loading/unloading operations were stopped when wind speed exceeded 12 km/s. Dust emission created by concrete and asphalt plants were collected by their dust collection system or cloth filters to control the excessive dust. All construction activities were executed in such a way that will minimize if not totally eliminate the spreading of dust or any inconvenience and nuisance to nearby communities. D. Flora and Fauna The Contractor did not encounter any Flora or Fauna along the pipeline alignment, there is no Flora during the execution of the Works. E. Waste Disposal All solid wastes were properly packaged, and disposed at the designated waste disposal site of the City. The site was designated by MENR, and was located 8 km north-west of the City. Waste containers were placed in every construction site and worker camps. These containers were daily collected and disposed lawfully. F. Summary Monitoring Report The table below provides a summary of safeguard issues included in Contractors Monthly Reports for (i) July to September 2011, prior to completion of the Works for Contract 1; and (ii) December 2011 for Contract 2.

8 Month (2011) July August September October November December Noise Checked Checked Checked N/A N/A Checked Water Quality N/A N/A Air Quality N/A N/A Flora Fauna Protected Protected Protected N/A N/A Protected Waste Disposal Controlled Controlled Controlled N/A N/A Controlled Public Complaints None None None N/A N/A None Healthy & Safety Issu. None None None N/A N/A None III. ENVIRONMENTAL MANAGEMENT A. Site Inspections PIU Environmental Control Official performed daily site visits to project sites. In addition, the consultants field inspectors were on site daily to observe safeuard measures. Plus, the PIU environmental manager performed at least weekly visits to the construction sites. B. Reporting The Contractor submitted monthly statements to the PIU describing their environmental monitoring activities. Refer to summary table above and Annex A. C. Non-compliance Notices No non-compliance notices have been issued on Contract 1. Contract 2 works have just started and no notice was issued to Gemiqaya İnşaat & Denizsu Joint Venture, either. D. Corrective Action Plans No corrective actions were raised during the report period of July December 2011. E. Consultation and Complaints No complaints were received during the report period.

ANNEX A: MONITORING DATA 9

10 No Location Issue Recommended measures Use of Safety tools Availability of safety (goggles, tools at the gloves, construction site. dress, helmet, shoes, etc.) Implementation/ Compliances Safety tools were provided by Contractor to workers Comment Temporary Sign and Signals for construction works Important signals like line marker post, information boards, warning signs and identification signs etc. should be made available along the alignment. Warning signs and information boards were installed during construction 1 Construction Sites Dust Regular watering for dust prevention due to vehicle and machinery movement. Limit vehicles speeds to prevent dust Lower machinery and vehicle noise Regular watering of exposed construction areas provided. Vehicle speeds limited to a maximum of 30 km/h. Use silencer units on heavy vehicles and equipment Noise Pollution Minimize general construction noise Noise generating construction activities kept to a minimum and within working hours only. Water Pollution Provide sediment traps for erosion control Traps and barriers installed where needed as shown by ECO Solid Waste Provide adequate number of refuse bins with lids at the construction sites Discard all construction waste at Bins provided at every construction site. Regular waste collection and disposal to MENR designated landfill

11 a registered landfill site site was provided. Water Quality Arrangement for Elevated service tank. Availability of taps in bathroom, toilet, kitchen, and lunch space Overhead reservoir installed Taps installed in all toilets, kitchen and dining areas 2 Construction camp Sanitation Drainage at the camp Solid waste Provision of water closet and flushing system in toilet and bathroom Effluent transportation Arrangement into Septic tank for Treatment and disposal through soak pits. Provision of storm water drainage to nearby drain outside the camp area. Avoid stagnation of water inside the camp. Placement of waste collection bins, and Immediate modernization of waste disposal bins with cover and proper handling at the camp. All toilets are provided with water Sewage discharged into packet Storm water drainage installed and directly discharged to nearby water ditch No stagnation of water inside the camp Each room provided with waste bin and are collected and properly disposed 3 Material stocking area Fire fighting equipments should be placed at the camp and office, Dust polluting the material stocking area Immediate placement of firefighting equipments so that it can visible and in case of any emergency, it can be utilized. Soil stabilization of the dirt access road with gravel to prevent dust generation Fire extinguishers installed in conspicuous areas Access road to material stocking area was stabilized, dust generation eliminated

ANNEX B: PICTURES 12

13 A view of Material Stocking Area with proper storm water management measures Workers with helmets and appropriate suits in a trench

14 Project information board and signs Safety signs

15 Safety signs Rerouting with a flag person

16 Asphalt patching works on a closed street Team Meeting on Environmental Issues at SAWMC office

Discussions on Environmental Issues with Contractor personnel 17