1 CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3 LUP Type 1 LUP Type 2 LUP Type 3 Submitted by (Print Name and Sign): Water Pollution Control Manager Name and Company Name: Phone Number: Emergency (24/7) Phone Number: General Information Inspector s Name: Date of Inspection: Weather Condition: Clear Partly Cloudy Cloudy Precipitation Condition: Misty Light Rain Rain Heavy Rain Hail Snow None Wind Condition: None Less than 5 MPH Greater than 5 MPH Construction Phase: Grading and Land Development / Streets and Utilities / Vertical Construction Plant Establishment / Final Landscaping Inactive Site Project Status: Compliance Site Information: Acres Total Project Area Acres Total Project Disturbed Soil Area (DSA) Acres Current Phase Disturbed Soil Area (DSA) Acres Current Phase Inactive Disturbed Soil (DSA) Percent of Work Completed Non-Compliance Major Deficiencies or Discharge(s) noted Prompt Action is Required Substantial Compliance Minor Deficiencies Noted Contractor was notified of deficiencies Stormwater Site Inspection Requirements Perform the following visual inspections of the project site: Activity Yes No N/A Notes 1 SWPPP Documentation Review: 1a 1b 1c 1d Does the SWPPP contain all the required information? Are the SWPPP Site Maps on the wall (where applicable) and kept current reflecting the status of the project and the location of all BMPs? Does the SWPPP need to be amended? Are all of the reports on file?
2 CE 2020 (Rev. 12/11) Page 2 of 5 Field Inspection Notes 2 2a 2b 3 3a 3b 4 4a 4b 5 5a 5b 6 6a 6b 7 8 8a 8b Are there any exposed areas that require temporary or permanent stabilization including seeding or mulching? If yes, identify locations Is existing vegetation being used as a BMP? If yes, identify locations Is there any evidence that sediment is leaving the site? Is there any evidence that the sediment is damaging adjacent property? If yes, identify the locations Are all perimeter and internal sediment-trapping measures in place and operating correctly? Silt Fences Gravel Bags Check Dams Other If no, identify the locations Are inlets and outlets or major discharge points properly maintained? If no, identify the locations Are desilting basins called for on the plan; installed in the proper location; and functioning in accordance with minimum standards? Are cut and fill slopes adequately stabilized? If no, identify the locations
3 CE 2020 (Rev. 12/11) Page 3 of 5 9 9a 9b Are all onsite drainage channels and outlets adequately stabilized, maintained, and free of debris? If no, identify the locations Is there a stabilized construction entrance for the site? Is maintenance required for the stabilized entrance? Is there any evidence of mud, or dirt track-out on public roads; at intersections with public roads? Is there a fueling area onsite? If so, is it delineated on the Site Map? 13 Is there secondary containment for the fueling area? Are the fuel tanks placed on grade? Is the fueling area placed on a low-point where concentrated flow can potentially deliver storm water? Is there a heavy vehicle staging area? 14 Is it shown on the Site Map? Are drip pans or other measures in place? Is there a concrete wash out area? 15 Is it being used? Is it shown on the Site Map? 16 Are portable toilets protected from potential spills and placed properly? Are trash receptacles/bins provided and being used? Is work area reasonably free of trash and debris? Are sidewalks/streets maintained or swept from construction debris/dirt? 19 Do stockpiles have covers and or perimeter protection?
4 CE 2020 (Rev. 12/11) Page 4 of 5 20 Wind Erosion Control: 20a 20b 20c 20d Is there a water truck onsite? Is there visible dust? If yes, identify locations 21 Dewatering Operations: 21a 21b 21c 21d Is there a Dewatering Permit? Is Dewatering currently active? Does Dewatering conform with RWQCB Permit? Is Dewatering discharge within discharge specified limitations? 22 Temporary Stream Crossing: 22a 22b 22c Is the Temporary Stream Crossing constructed as shown on the plan? Does Temporary Stream Crossing conform to 404 Permit and 1601 Permit requirements? Is maintenance or repair required for Temporary Stream Crossing? 23 Project Specific BMP: 23a 23b Is it properly located and installed? Is maintenance or repair needed? Non-Visible Pollutants Inspection Notes* Are all potential non-visible pollutants in watertight containers? 24 Are there any visible signs of leaks or spills? Any associated odors? * Failure to confirm the safe status of non-visible pollutants may trigger sampling of storm water discharge. General Comments 25 25a Are there water pollution control concerns on the project site not addressed by the comments/required actions shown above for BMPs based on the field review of the job site? If yes, provide details below, comments and required actions for each location.
5 CE 2020 (Rev. 12/11) Page 5 of 5 Other s 26 Any additional local agency requirements? Agency Name: Stormwater Inspection Report Certification I certify under penalty of law that this Stormwater Inspection Report was performed in accordance with the General permit. The information contained in this inspection report was gathered from a field site inspection. I am aware that Section 309 (c)(4) of the Clean Water Act provides for significant penalties, including fines and imprisonment for knowingly submitting false material statement, representation or certification. Stormwater Inspector Name: Date Report Completed: Stormwater Inspector Signature: I certify under penalty of law that this Stormwater Site Inspection Report Summary was prepared by me or under my direction or supervision. The information contained in the summary was gathered and evaluated by qualified personnel prior to submittal. Based on my review of the information and inquiry of those who gathered and evaluated the information, the information submitted is, to the best of my knowledge and belief, true accurate, and complete. I am aware that Section 309 (c)(4) of the Clean Water Act (CWA) provides for significant penalties, including fines and imprisonment for knowingly submitting false material statement, representation or certification. Water Pollution Control Manager Name: Water Pollution Control Manager Signature: Accepted by Resident Engineer (Name): Stormwater Inspection Report Acceptance Resident Engineer (Signature): (Attach any site photographs as appropriate) General Information If the inspection form does not contain enough lines to report all locations on a jobsite, attach additional copies of the form page so that all locations are inspected and reported. Obtain forecasted precipitation information from the National Weather Service Forecast Office Website, Weather information should be the best estimate of beginning of the storm event, duration of the event, and time elapsed since the last storm. Rainfall amounts should be recorded from the project site rain gauge; using form CE 2027, Rain Gauge Monitoring Log. Storm Visual Inspections For non-visible pollutant inspections, report all locations shown in the SWPPP. Required Actions All required actions reported on this form must also be reported on form CE-2022, Stormwater Site Inspection Report Corrective Actions Summary. Locations identified where BMPs are failing or have other shortcomings require implementation of repairs or design changes within 72 hours of identification, and complete BMP repairs or other changes as soon as possible.
Appendix I: BMP Inspection Form CASQA SWPPP Template 91 January2011 BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
C. Storm Water Pollution Prevention Plan (SWPPP) Yes No Response / Comment. D. Good Site Management Housekeeping Yes No Response / Comment
CE 2063 (Rev. 12/11) Page 1 of 8 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: CONTRACTOR NAME AND ADDRESS: Submitted by (Print Name and Sign): ORACLE NUMBER: WDID NUMBER: PROJECT SITE RISK LEVEL: Risk
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
STATEMENT OF ACKNOWLEDGMENT
General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, issued 8/21/13, effective 10/1/13 Stormwater Monitoring Report SITE INFORMATION Permittee: BNE Energy
TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report
TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report Complete this form every seven days and after every rain event of 0.5" or greater and retain in your SWP3. General Information Name of Project:
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY
STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY Project Name Permittee NOI # Start Time Inspector s Name(s) Green Card Certification # Inspector s Contact Information
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
SECTION A: LOCAL STORM WATER POLLUTION PREVENTION PLAN
INSTRUCTIONS FOR PREPARING THE LOCAL STORM WATER POLLUTION PREVENTION PLAN City of Hawthorne For sites between 1 and 5 acres As of March 10, 2003, EPA Phase II rules will supercede this document. The Local
Construction Site Inspection. Inspecting to Keep You in Compliance
Construction Site Inspection Inspecting to Keep You in Compliance Inspection/Monitoring/Reporting Know if your plan is working Document corrective actions Ketchikan A Contractor that destroys their site
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
CONSTRUCTION PERMIT SUBMITTAL CHECKLIST
LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel
Temporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
Beseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
Preventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
City of Beaumont, Texas Grading Permit Information
General Information City of Beaumont, Texas Grading Permit Information The permit application shall be signed by the property owner (or lessee) or his authorized representative and by the contractor (if
MONTANA Water Quality & Storm Water Management Training Programs For Construction Activities
MONTANA Water Quality & Storm Water Management Training Programs For Construction Activities Program Delivery: Altitude Training Associates (ATA) Course # Title Length *Prerequisite BMP 101 Introduction
SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:
Stormwater Pollution Prevention Plan "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
Vehicle Tracking Pad
Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
SE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
Storm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
Annual Standards and Specifications. Erosion and Sediment Control
Annual Standards and Specifications for Erosion and Sediment Control January 2012 Version: September 15, 2009 INTRODUCTION Virginia Commonwealth University (VCU), Annual Standards and Specifications for
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Block and Gravel Inlet Protection (BIP)
Block and Gravel Inlet Protection (BIP) Practice Description Block and gravel inlet protection is a sediment control barrier formed around a storm drain inlet by the use of standard concrete block and
Storm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1
SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 An application for approval of a soil erosion and sediment control plan in accordance with these regulations shall be
Waste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
Definition of Tower from the Bradley County Zoning Resolution
Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio
STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION GUIDANCE. Revised 4/2011. Contact information
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT Water Quality Control Division Stormwater Program STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
Concrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
State of Florida. Department of Environmental Protection. Generic Permit. For. Stormwater Discharge from Large and Small Construction Activities
State of Florida Department of Environmental Protection Generic Permit For Stormwater Discharge from Large and Small Construction Activities February 2009 This permit is issued under the provisions of
Good? Bad? Why? http://uncultured.com/2007/09/20/notre-dame-and-watering-sidewalks/ Training Module 4
Good? Bad? Why? http://uncultured.com/2007/09/20/notre-dame-and-watering-sidewalks/ Solution Sprinklers should be directed at lawn areas Spraying water on pavement increases runoff Look for more water-efficient
SeCTion 656 - TemPoRARy Soil erosion and WaTer pollution ConTrol sewpcp requirements
Appendix C SECTION 656 - TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL 656.1 Responsibility of the Contractor-Prepare and Follow Plan. The Contractor shall provide continuous and effective temporary
CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION
CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION CONTENTS 2.0 INTRODUCTION 2-1 2.1 MIMINUM REQUIREMENT #2 SWPP 2-1 ELEMENT 1: MARK CLEARING LIMITS 2-1 ELEMENT 2: ESTABLISH CONSTRUCTION ACCESS 2-2
STORM DRAIN PIPE MAINTENANCE. a. Develop standard operating procedures for maintaining storm drain pipes.
STORM DRAIN PIPE MAINTENANCE a. Develop standard operating procedures for maintaining storm drain pipes. 2. PROCESS Storm drain pipes are to be maintained per the Storm Water System Maintenance Plan schedule.
BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ
BEST MANAGEMENT PRACTICES (BMPs)... What are They? CLEAN STREETS MEAN CLEAN STREAMS Inexpensive to implement and easy to use, BMPs help you to do your share to protect the environment. The term Best Management
City of Beverly Hills Construction Stormwater Requirement Checklist
City of Beverly Hills Construction Stormwater Requirement Checklist Construction activities are required to retain sediments, non-stormwater runoff and all constructionrelated materials, wastes, spills,
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.
CHAPTER 10 POLLUTION PREVENTION PLAN
CHAPTER 10 10.1 INTRODUCTION Virginia Stormwater Management Program (VSMP) land-disturbing activities covered under the General Construction Permit (GCP) are required to develop a Stormwater Pollution
Outdoor Storage of Raw Materials SC-33
Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.
Construction Site Monitoring Program Guidance Manual
Construction Site Monitoring Program Guidance Manual August CTSW-RT-11-255.20.1 California Department of Transportation Division of Environmental Analysis Storm Water Program MS 27 1120 N Street, Sacramento,
Vehicle Tracking Control (VTC)
Vehicle Tracking Control (VTC) SM-4 Description Vehicle tracking controls provide stabilized construction site access where vehicles exit the site onto paved public roads. An effective vehicle tracking
City of San Diego Urban Runoff Management Program. Appendix XI. Minimum BMPs for Mobile Businesses
City of San Diego Urban Runoff Management Program This Page Left Intentionally Blank. Minimum Best Management Practices (BMPs) for Mobile Businesses No. BMP Title Description and Examples Justification
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
Spill Prevention, Control & Cleanup SC-11
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Spills and leaks, if not properly controlled, can adversely impact the storm drain system and receiving waters. Due to
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
Architectural Processing and Inspections for Home Mortgage Insurance
Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect
D R A F T. Best Management Practices Plan (Surface Water, Sediment & Erosion Control) West Carleton Environmental Centre. May 2014
Best Management Practices Plan (Surface Water, Sediment & Erosion Control) West Carleton Environmental Centre D R A F T Prepared for: Waste Management of Canada Corporation 2301 Carp Road Ottawa, Ontario
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
CONTACTS: Mitchell Shire Council 57346200. M.S.C. Building Department 57346230. M.S.C. Health Department 57346238
CONTACTS: Mitchell Shire Council 57346200 M.S.C. Building Department 57346230 M.S.C. Health Department 57346238 M.S.C. Enforcement & Compliance Unit 57346274 Building Control Commission 92856458 USEFUL
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:
EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,
Storm Drain System Operation and Maintenance
Santa Clara Valley Urban Runoff Pollution Prevention Program PUBLIC AGENCY ACTIVITIES Performance Standard and Supporting Documents for Storm Drain System Operation and Maintenance December 19, 1996 March
Critical Regulations SUMMARY OF. Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.
SUMMARY OF Critical Regulations Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.26 Spill Prevention, Control, and Countermeasures Rule (SPCC) 40
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Chris Newman US EPA Region 5 Chicago, IL Compost-Based BMPs Compost-based
WORKERS COMPENSATION REQUIREMENTS UNDER WORKERS COMPENSATION LAW 57
January 1, 2011 WORKERS COMPENSATION REQUIREMENTS UNDER WORKERS COMPENSATION LAW 57 To comply with coverage provisions of the Workers Compensation Law ( WCL ), businesses must: A) be legally exempt from
E&SC Training & Certification
E&SC Training & Certification 5 Chapter E&SC training involves educating, training and certifying individuals involved with managing stormwater, erosion and sediment on NCDOT construction projects. The
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts Submitted to: Town of Sudbury December 2011 Table of Contents 1.0 Introduction... 1 1.1 Responsibility...
Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment
WATER AND SEWER UTILITY OPERATION AND MAINTENANCE Although sewage systems the operation and maintenance of public utilities are not considered themselves are not a chronic sources of stormwater pollution,
Appendix C3: Response Plan for Investigations of Illegal Discharges, 2016
Appendix C3: Response Plan for Investigations of Illegal Discharges, 2016 Response Plan for Investigations For the City and County of Honolulu Municipal Separate Storm Sewer System National Pollutant Discharge
Spill Prevention, Control and Countermeasure (SPCC) Rule
Spill Prevention, Control and Countermeasure (SPCC) Rule Code of Federal Regulations Title 40 CFR Part 112 Training Guide for Oil and Fuel handlers on Farms 1 Purpose of SPCC Rule To prevent oil discharges
III. Relying on another Governmental Entity
I. Permittee Information Permittee Name Cowlitz County Contact Name Patrick Harbison Permittee Coverage Number WAR4-524 Phone Number 36-577-33 Mailing Address 16 13th Ave. S City State Zip + 4 Kelso WA
Erosion Control and Stormwater Quality Field Guide
Perimeter Perimeter Control Control Erosion Control and Stormwater Quality Field Guide [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.
Post Construction Stormwater Management Inspection & Maintenance PROGRAM MANUAL
Post Construction Stormwater Management Inspection & Maintenance PROGRAM MANUAL Thomas Nelson Community College 99 Thomas Nelson Drive Hampton, VA 23666 4601 Opportunity Way Williamsburg, VA 23188 TABLE
Developing Your Stormwater Pollution Prevention Plan A Guide for Construction Sites
Developing Your Stormwater Pollution Prevention Plan A Guide for Construction Sites Who? Construction site operators (generally, the person who has operational control over construction plans and/or the
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
Spill Control Prevention Plan (SCPP)
Spill Control Prevention Plan (SCPP) FACILITY INFORMATION PLEASE PRINT Facility Name: Mailing Address: Physical address if different: Owner Name: Owner Address: Primary Contact Name: Work Phone Number:
Grease Trap Maintenance, Procedures and Cleaning Logs
SAWS Grease Reduction Program Grease Trap Maintenance, Procedures and Cleaning Logs Don t Feed the Grease Monster Best Management Practices for Commercial Food and Restaurant Facilities Train kitchen staff
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
NPDES Industrial Stormwater Inspection Worksheet
NPDES Industrial Stormwater Inspection Worksheet General Information Inspection Type 1200-Z DEQ Inspector Name Mark Riedel, Bob Schwarz DEQ Permit No. 106959 Entry Time 10:00 AM Inspection Date 1/8/15
Module 6: Pollution Prevention Plans and SWPPP Overview
Module 6: Pollution Prevention Plans and SWPPP Overview Module 6 Objectives After completing this module, you should be able to: Explain the minimum requirements of a SWPPP Recognize and identify basic
SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN
SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN XXXX FARM (CITY OR COUNTY), MICHIGAN CONTACT (NAME), OWNER CERTIFICATION: I hereby certify that I have examined the facility, and being familiar with the
STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES
STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES Prepared by City of Houston Harris County Harris County Flood Control District 2006 Edition NOTICE TO USERS The Storm Water Management Handbook
Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers unde
Concrete Batch Plant Investigations 1 Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers under 5 ft 3 are
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans
APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may
APPLICATION PROCESS FOR LAND DISTURBING PERMIT
PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
TABLE OF CONTENTS. Page 2 of 37 Ohio EPA Permit No.: OHC000004
Page 2 of 37 TABLE OF CONTENTS PART I. COVERAGE UNDER THIS PERMIT A. Permit Area B. Eligibility C. Requiring an individual permit or an alternative general permit D. Permit requirements when portions of
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
State of California Department of Transportation Construction Site Best Management Practice (BMP) Field Manual and Troubleshooting Guide
State of California Department of Transportation Construction Site Best Management Practice (BMP) Field Manual and Troubleshooting Guide CTSW-RT-02-007 January 2003 Construction Site BMP Field Manual and
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished